SeeBridge Demonstrator
|
|
- Rolf Russell
- 5 years ago
- Views:
Transcription
1 Automated Compilation of Semantically Rich BIM Models of Bridges Highway bridge Point Cloud Data 3D geometry BIM model BIM model with defects Non contact survey 3D Reconstruction Semantic Enrichment Damage Mapping About
2 Existing RC Concrete Highway Bridges Cambridge Bridges Photo Album Haifa Bridge Photo Album Atlanta Bridges Photo Album Press Esc to return to main demonstrator Press Esc to return to main demonstrator Press Esc to return to main demonstrator Next Stage Point Cloud Data
3 Point Cloud Data Cambridge bridges a) Little Wilbraham Road crossing A14 and b) A14 & A1303 Haifa Route 79 Atlanta Ackworth A point cloud data (PCD) file of the bridge is obtained from stationary laser scanning, mobile laser scanning or from photogrammetry. The point cloud data have no information associated with the points they purely represent the surface geometry that was detected. Previous stage - Photos Next stage 3D Geometry
4 3D Geometry Cambridge bridges a) Little Wilbraham Road crossing A14 and b) A14 & A1303 Haifa Route 79 Atlanta Acworth To obtain the 3D solid geometry objects from the point cloud data (PCD), specialized algorithms are run to cluster points to identify surfaces, to associate surfaces to identify objects, and to rebuild solid objects. Objects may be incomplete due to occlusions in the scans, and they still carry none of the detailed information expected in a BIM model. Previous stage - Point Cloud Data Next stage BIM Model
5 BIM Model Cambridge bridge on A11 & A1301 Haifa Route 79 A Building Information Model carries more than geometry it s objects are classified, numbered and aggregated in various ways; it has non-physical objects (like axis grids) that align its objects, and it has logical objects that may have been missing from the 3D geometry files. All of these are added by the semantic enrichment step. Previous stage - 3D Geometry Next stage Defect Mapping
6 Defect Mapping Cambridge bridge on Little Wilbraham Road & A14 Finally, the bridge model is supplemented with information about the bridge s defects. The defects can be queried and browsed, viewed as if you were at the bridge and close to its surfaces. Previous stage - BIM Model
7 About SeeBridge SeeBridge is an acronym for Semantic Enrichment Engine for Bridges. It expresses the idea that some of the ways in which engineers see a bridge model, with the ability to infer implicit information from the explicit shapes visible in the digital model, can be captured in the form of rules that can be processed using forward chaining inference engines. Similarly, historical knowledge of the specific local context in which a bridge was constructed can be leveraged to add supplementary information using the same rule processing format. The SeeBridge project has received funding from the European Union s Seventh Framework Programme for research, technological development and demonstration under grant agreement no SeeBridge is co-funded by Funding Partners of The ERA-NET Plus Infravation and the European Commission. The Funding Partners of the Infravation 2014 call are: MINISTERIE VAN INFRASTRUCTUUR EN MILIEU, RIJKSWATERSTAAT BUNDESMINISTERIUM FÜR VERKEHR, BAU UND STADTENTWICKLUNG, DANISH ROAD DIRECTORATE, STATENS VEGVESEN VEGDIREKTORATET, TRAFIKVERKET-TRV, VEGAGERÐIN, MINISTERE DE L ECOLOGIE, DU DEVELOPPEMENT DURABLE ET DE L ENERGIE, CENTRO PARA EL DESARROLLO TECNOLOGICO INDUSTRIAL, ANAS S.p.A,. NETIVEI, ISRAEL NATIONAL TRANSPORT INFRASTRUCTURE COMPANY LTD, FEDERAL HIGHWAY ADMINISTRATION USDOT Next
8 About SeeBridge Partners Subcontractors Technion AEC 3 Germany Georgia Tech Kedmor Engineers Ltd. Georgia Department of Transportation Supporters Pointivo, Inc. Technische Universität München London Underground University of Cambridge Trimble Navigation, Ltd. Netivei Israel Bundes Ministerium fur Verkehr and Digitale Infrastruktur BMVI Previous
Motivation. Large number of bridges and road structures. In the US, > 600,000 bridges. Large number of aging structures
Motivation Bridge Capacity Population Density I- 55 Thomas St I- 40 Walnut Grove Rd I- 240 US Hwy 70 S Germantown Rd Large number of bridges and road structures In the US, > 600,000 bridges E Shelby Dr
More informationDeliverable 6.1. Project Scientific Report
ERA-NET Plus on Infrastructure Innovation SeeBridge Semantic Enrichment Engine for Bridges Start date: 01/10/2015 Duration: 21 months Deliverable 6.1 Project Scientific Report Main Editor(s) Technion Rafael
More informationTechnical Report Model Exchange between Revit and Allplan using IFC: a Case Study for a Bridge Model
Technische Universität München Department of Civil, Geo and Environmental Engineering Chair of Computational Modeling and Simulation Technical Report Model Exchange between Revit and Allplan using IFC:
More informationInnovation. lidarnews.com. volume 3 issue 5. Points clouds and terrain models support rail project. Structured light scanning for human head modeling
volume 3 issue 5 LIDAR lidarnews.com SCALABILITY Points clouds and terrain models support rail project EXPRESSION Structured light scanning for human head modeling FLUCTUATION Scanning moving objects using
More informationPoint Clouds to IFC/BrIM Objective:
Point Clouds to IFC/BrIM Objective: Develop and demonstrate a point cloud data processing solution, which takes a point cloud of a bridge obtained from laser scanning as input, and generates a solid model
More informationDURAARK. Ex Libris conference April th, 2013 Berlin. Long-term Preservation of 3D Architectural Data
DURAARK Long-term Preservation of 3D Architectural Data Ex Libris conference April 29-30 th, 2013 Berlin Dr Helmi Ben Hmida (Leibniz University Hanover, DE) 1 / 33 30 / 04 / 13 Dr Helmi Ben Hmida (Leibniz
More informationM. JOUBERT JA JOUBERT ARCHITECTURE R. THOMAS NORTH BY NORTHWEST W. KLEIN SIEMENS C. VAN ZWEEP - UNIRESEARCH COORDINATOR ANS VAN DOORMAAL (TNO)
DELIVERABLE REPORT DELIVERABLE N 0 : D2.7 DISSEMINATION LEVEL: PUBLIC Title: DEMONSTRATOR OF THE ELASSTIC DESIGN DATE: 22 APRIL 2016 VERSION: FINAL AUTHOR(S): M. JOUBERT JA JOUBERT ARCHITECTURE REVIEWED
More informationBIM in infrastructure case study: Swedish road projects vägplan
BIM in infrastructure case study: Swedish road projects vägplan Mateusz Nettmann Moving Poland s construction industry into the future with BIM (BIM Event BPCC) January, 11, 2018 AGENDA Introduction: AECOM
More informationProject Description: Automated Compilation of Semantically Rich BIM Models of Bridges Information Delivery Manual
BIM Guideline Detailed Exchange Requirements Project SeeBridge for the Project Phase Inspection & Data Collection Date: 23.03.2017 Creator: Burcu Esen Barutcu Project : Automated Compilation of Semantically
More informationBuilding Information Modeling (BIM) and Measuring Techniques
Building Information Modeling (BIM) and Measuring Techniques Christian CLEMEN, Robert EHRICH and Christopher VAN ZYL, Germany C. Clemen, R. Ehrich,C. van Zyl Building Information Model (BIM) and Measuring
More informationDesign Intent of Geometric Models
School of Computer Science Cardiff University Design Intent of Geometric Models Frank C. Langbein GR/M78267 GR/S69085/01 NUF-NAL 00638/G Massey University 22nd September 2004; Version 1.0 Design Intent
More informationActive Recognition and Manipulation of Simple Parts Exploiting 3D Information
experiment ActReMa Active Recognition and Manipulation of Simple Parts Exploiting 3D Information Experiment Partners: Rheinische Friedrich-Wilhelms-Universität Bonn Metronom Automation GmbH Experiment
More informationLocation-Based Web Services for Car Infotainment
Location-Based Web Services for Car Infotainment Susanne Boll University of Oldenburg & OFFIS Institute for Information Technology 01.07.2009 1st tubs.city Symposium, Braunschweig 52 16 30"N 10 31 43"E
More informationDuraArK Durable Architectural Knowledge
Motivation Data on the Web Some eyecatching opener illustrating growth and or diversity of web data Durable Architectural Knowledge Stefan Dietze (Leibniz University Hanover, DE): Coordinator Reinhard
More information2011 Bentley Systems, Incorporated. Bentley Descartes V8i Advancing Information Modeling For Intelligent Infrastructure
Bentley Descartes V8i Advancing Information Modeling For Intelligent Infrastructure Agenda Why would you need Bentley Descartes? What is Bentley Descartes? Advanced Point Cloud Workflows Advanced Terrain
More informationLIDAR BASED BRIDGE EVALUATION PH.D DEFENSE - WANQIU LIU. Advisor: Dr. Shen-en Chen
LIDAR BASED BRIDGE EVALUATION PH.D DEFENSE - WANQIU LIU Advisor: Dr. Shen-en Chen Acknowledgement Dr. Edd Hauser Dr. Gary Teng Dr. Srinivas Pulugurtha Dr. Jing Zhou USDOT-RiTA Project No. DTOS59-07-H-0005
More informationREPRESENTATION REQUIREMENTS OF AS-IS BUILDING INFORMATION MODELS GENERATED FROM LASER SCANNED POINT CLOUD DATA
REPRESENTATION REQUIREMENTS OF AS-IS BUILDING INFORMATION MODELS GENERATED FROM LASER SCANNED POINT CLOUD DATA Engin Burak Anil 1 *, Burcu Akinci 1, and Daniel Huber 2 1 Department of Civil and Environmental
More informationROAD SURFACE STRUCTURE MONITORING AND ANALYSIS USING HIGH PRECISION GPS MOBILE MEASUREMENT SYSTEMS (MMS)
ROAD SURFACE STRUCTURE MONITORING AND ANALYSIS USING HIGH PRECISION GPS MOBILE MEASUREMENT SYSTEMS (MMS) Bonifacio R. Prieto PASCO Philippines Corporation, Pasig City, 1605, Philippines Email: bonifacio_prieto@pascoph.com
More informationERA-Net Smart Energy Systems Ein Programm für Regionen wie das Waldviertel
ERA-Net Smart Energy Systems Ein Programm für Regionen wie das Waldviertel Michael Hübner Bundesministerium für Verkehr, Innovation und Technologie Abteilung Energie- und Umwelttechnologien Michael Hübner
More information3D Laser Scanning Approaches and Business Models for implementing BIM in Facility Management
3D Laser Scanning Approaches and Business Models for implementing BIM in Facility Management M.Sc. Zsuzsa Besenyői, HTW Berlin Prof. Dr.-Ing. Markus Krämer, HTW Berlin Dipl.-Ing. (FH) Frank Lindner, G2Plus
More informationDISCERN Libraries User Guide
Distributed Intelligence for Cost-Effective and Reliable Distribution Network Operation DISCERN Libraries User Guide Author: OFFIS Date: 22.04.2016 www.discern.eu The research leading to these results
More informationReality Modeling Webinar
Reality Modeling Webinar Leveraging 3D Reality Meshes for Real-Time Asset Management and Monitoring What is Reality Modeling? Images & video? What is Reality Modeling? Images & video As-built drawings
More informationQuestions and Answers for Customers
Autodesk InfraWorks 360 Questions and Answers for Customers www.sistemacad.com General Information 2 1.1 Are any changes being made to how Autodesk InfraWorks is packaged in 2015? 2 1.2 I have been using
More informationDesign Intent of Geometric Models
School of Computer Science Cardiff University Design Intent of Geometric Models Frank C. Langbein GR/M78267 GR/S69085/01 NUF-NAL 00638/G Auckland University 15th September 2004; Version 1.1 Design Intent
More informationOPTIMIZING 3D SURFACE CHARACTERISTICS DATA COLLECTION BY RE-USING THE DATA FOR PROJECT LEVEL ROAD DESIGN
OPTIMIZING 3D SURFACE CHARACTERISTICS DATA COLLECTION BY RE-USING THE DATA FOR PROJECT LEVEL ROAD DESIGN Benoit Petitclerc, P.E. John Laurent, M. Sc Richard Habel, M. Sc., Pavemetrics Systems Inc., Canada
More informationtechnical notes trimble realworks software
technical notes trimble realworks software A POWERFUL 3D LASER SCANNING OFFICE SOFTWARE SUITE Designed for today s multifaceted scanning professional, Trimble RealWorks is a powerful office software that
More informationRoadBIM Seminar Tallinn. Ongoing Swedish InfraBIM Activities Väino Tarandi, KTH & buildingsmart Sweden
RoadBIM Seminar 11.09.2013 Tallinn Ongoing Swedish InfraBIM Activities Väino Tarandi, KTH & buildingsmart Sweden Agenda The Swedish Transport Administration BIM implementation V-con BIM-examples Stockholm
More informationLiDAR improves railroad maintenance and safety
www.terrasolid.com LiDAR improves railroad maintenance and safety Kjell Tuominen 16.10 2018 Current maintenance and safety problems The maintenance tenders are based on incomplete information The accuracy
More informationINTERLINK A EUROPEAN ROAD OTL. LDAC 5 th Linked Data in Architecture and Construction Workshop November 2017 Dijon, France
INTERLINK A EUROPEAN ROAD OTL LDAC 5 th Linked Data in Architecture and Construction Workshop Dijon, France INTERLINK http://www.cedr.eu/strategic-plan-tasks/research/cedr-call-2015/call- 2015-asset-information-using-bim/interlink/
More informationRealworks Software. A Powerful 3D Laser Scanning Office Software Suite
TECHNICAL NOTES Realworks Software A Powerful 3D Laser Scanning Office Software Suite Trimble RealWorks is a powerful office software that imports rich data from your 3D laser scanning instrument and transforms
More informationASTRONOMY & PARTICLE PHYSICS CLUSTER
ASTRONOMY & PARTICLE PHYSICS CLUSTER Giovanni LAMANNA LAPP, Laboratoire d Annecy de Physique des Particules CNRS London, 30 January 2019 ESCAPE - The European Science Cluster of Astronomy & Particle Physics
More informationTRIMBLE TOTAL STATIONS: TRUSTED TODAY, DESIGNED FOR TOMORROW.
GEOSPatial SOLUTIONS Trimble S-SERIES TOTAL Stations TRIMBLE TOTAL STATIONS: TRUSTED TODAY, DESIGNED FOR TOMORROW. For more than a decade, on countless jobs all over the world, Trimble Robotic s have delivered
More informationDESENT: Smart decision support system for urban energy and transportation
DESENT: Smart decision support system for urban energy and transportation Intermediate results of the project DESENT Thomas Nacht Real Corp 2018, 04.04 06.04.2018, Vienna/Austria Agenda Introducing the
More informationRealWorks Software. A Powerful 3D Laser Scanning Office Software Suite
TECHNICAL NOTES RealWorks Software A Powerful 3D Laser Scanning Office Software Suite Trimble RealWorks is a powerful office software that imports rich data from your 3D laser scanning instrument and transforms
More informationERROR SOURCES IN PROCCESSING LIDAR BASED BRIDGE INSPECTION
The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XLII-/W7, 07 ISPRS Geospatial Week 07, 8 September 07, Wuhan, China ERROR SOURCES IN PROCCESSING LIDAR
More informationAUTOMATIC GENERATION OF DIGITAL BUILDING MODELS FOR COMPLEX STRUCTURES FROM LIDAR DATA
AUTOMATIC GENERATION OF DIGITAL BUILDING MODELS FOR COMPLEX STRUCTURES FROM LIDAR DATA Changjae Kim a, Ayman Habib a, *, Yu-Chuan Chang a a Geomatics Engineering, University of Calgary, Canada - habib@geomatics.ucalgary.ca,
More informationEnergy Efficiency Tuning: READEX. Madhura Kumaraswamy Technische Universität München
Energy Efficiency Tuning: READEX Madhura Kumaraswamy Technische Universität München Project Overview READEX Starting date: 1. September 2015 Duration: 3 years Runtime Exploitation of Application Dynamism
More informationRobust Automatic 3D Point Cloud Registration and Object Detection
FEATURE EXTRACTION FOR BIM Robust Automatic 3D Point Cloud Registration and Object Detection BY DAVID SELVIAH This article presents a ground-breaking approach to generating survey data for a BIM process
More informationHorizon 2020 INFRADEV Design studies. RICHFIELDS Working Packages 2 Deliverable D2.2. Project identity. Date delivered: M6
Horizon 2020 INFRADEV-1-2014 - Design studies RICHFIELDS Working Packages 2 Deliverable D2.2 Project identity Date delivered: M6 Author: Christina Sadler Deliverable lead beneficiaries: EUFIC Project Project
More informationIntegration of Parametric Geometry into IFC-Bridge
Integration of Parametric Geometry into IFC-Bridge Yang Ji 1, Jakob Beetz 2, Nicholas Nisbet 3, Peter Bonsma 4, Casimir Katz 5, André Borrmann 1 1 Computational Modelling and Simulation Group, Technische
More information2011 Bentley Systems, Incorporated. Bentley Descartes V8i (SELECTseries 3) Advancing Information Modeling For Intelligent Infrastructure
Bentley Descartes V8i (SELECTseries 3) Advancing Information Modeling For Intelligent Infrastructure What is Bentley Descartes? Image Processing Raster Geo-Referencing Advanced raster transformation (warping,
More informationIntegrated Projects. Madonna di Pietranico Pompeii insula V1 V I S UA L COMPUTING L A B I ST I - C N R
Integrated Projects Madonna di Pietranico Pompeii insula V1 V I S UA L COMPUTING L A B I ST I - C N R La Madonna di Pietranico Pietranico s Madonna Terracotta statue, destroyed by an earthquake. We used
More informationRELEASE NOTES TRIMBLE REALWORKS SOFTWARE VERSION System requirements New Features and Changes
RELEASE NOTES TRIMBLE REALWORKS SOFTWARE VERSION 9.0.1.313 System requirements New Features and Changes Trimble Navigation Ltd, 10368 Westmoor Drive, Westminster, CO 80021, USA 2014, Trimble Navigation
More informationA New Way to Control Mobile LiDAR Data
A New Way to Control Mobile LiDAR Data Survey control has always been a critically important issue when conducting mobile LiDAR surveys. While the accuracies currently being achieved with the most capable
More informationMichael Hübner. Co-Chair SET-Plan MS Working Group on SET-Plan Action 4- Energy Systems and Networks (SET-Plan Steering Group)
Michael Hübner Austrian Federal Ministry of Transport, Innovation and Technology Department of Energy and Environmental Technologies (Smart Energy Systems, Smart Grids) Co-Chair SET-Plan MS Working Group
More informationValidation of Exported Field Data in GEOPAK Drainage (Survey to Drainage)
Validation of Exported Field Data in GEOPAK Drainage (Survey to Drainage) 1.1 Overview The Export to GEOPAK Drainage tool can be utilized to leverage data collected by field surveys (i.e., pipes and structures)
More informationKnow What You Want: How to Start a Successful Scan-to-BIM Project MARGARITA LEONOVA
Know What You Want: How to Start a Successful Scan-to-BIM Project MARGARITA LEONOVA Scan-to-BIM Scan the Building Get a Point Cloud Generate Building Information Model Scan-to-BIM Why convert a point cloud
More informationCLEPA Conference: "Warranty in a Digital World"
& CLEPA Conference: "Warranty in a Digital World" Legal aspects of warranty contracts in the automotive industry Dr. Christian Kessel Bird & Bird LLP Frankfurt am Main, 19 September 2018 Agenda 1. Setting
More informationAPPLICATION OF 3D TERRESTRIAL LASER SCANNING IN THE PROCESS OF UPDATE OR CORRECTION OF ERRORS IN THE CADASTRAL MAP
Presented at the FIG Working Week 2017, May 29 - June 2, 2017 in Helsinki, Finland Dr.-Eng. Gintcho Kostov GEO ZEMIA Ltd. 1 1. Introduction 3D Terrestrial laser scanning delivers highly accurate spatial
More informationExplore Laser Scanning in As-Built Survey. Vijay Chowdhary SE: BIM/CIM
Explore Laser Scanning in As-Built Survey Vijay Chowdhary SE: BIM/CIM About FARO The world leader in portable 3-D measurement and imaging technology EMEA Headquarters Korntal-Münchingen, Germany APAC Headquarters
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Directorate B - Investment, Innovative & Sustainable Transport Brussels, MOVE B4 DIRECTIVE 2010/40/EU EUROPEAN ITS COMMITTEE (EIC) BRUSSELS,
More information2/19/2018. Who are we? Who am I? What is Scanning? How does scanning work? How does scanning work? Scanning for Today s Surveyors
2/19/2018 Who are we? Scanning for Today s Surveyors Survey, GIS, and Construction dealer Founded in 1988 Employee Owned Headquartered in Bismarck, ND States covered: ND, SD, MN, MT, WY, CO, UT, ID, WA,
More informationInnovationPartnership Talking Traffic
The Dutch Ministry of Infrastructure and Environment Presentation InnovationPartnership Talking Traffic Smart Mobility! Michael van Scheijndel 10 oktober 2017 Procurement team Program manager Direction
More informationMesserli Informatik GmbH EliteCAD ME V13 R2 update information 1
Messerli Informatik GmbH EliteCAD ME V13 R2 update information 1 EliteCAD ME V13 R2 update information February 2016 This update of EliteCAD ME contains numerous improvements and optimizations which have
More informationAutomatic DTM Extraction from Dense Raw LIDAR Data in Urban Areas
Automatic DTM Extraction from Dense Raw LIDAR Data in Urban Areas Nizar ABO AKEL, Ofer ZILBERSTEIN and Yerach DOYTSHER, Israel Key words: LIDAR, DSM, urban areas, DTM extraction. SUMMARY Although LIDAR
More informationBringing Singapore to life in 3D
Bringing Singapore to life in 3D Dr Victor Khoo, Deputy Director Singapore Land Authority Bringing Singapore to life in 3D ESRI Singapore UC 2016 Dr. Victor Khoo Singapore Land Authority SLA 2016 RESTRICTED
More informationResearch Infrastructures Use and Further Needed Development
Joint : Testing and Research Infrastructure for Future Power Grids Research Infrastructures Use and Further Needed Development Mihai Calin The research leading to these results has received funding from
More information3D Optics (including Photogrammetry)
To: USDOT/RITA research team members From: C. Brooks, D. Evans CC: P. Hannon Date: October 15 th, 2010 Number: 07 Re: Work plans progress to date The following summarizes the work plans associated with
More informationDevelopment of Optimum Assessment Technique for Railway Infrastructure Clearances
Development of Optimum Assessment Technique for Railway Infrastructure Clearances F. Moghadasnejad 1 and M. Fathali 2 1- Assistant Professor, moghadas@aut.ac.ir 2- PhD. Student, m_fathali@aut.ac.ir Amirkabir
More informationMarc De Bruyne 3D Design Improvement Leader, DOW Chemical
Marc De Bruyne 3D Design Improvement Leader, DOW Chemical John Foster Director, Profox Companies DOW Chemical Terneuzen in the Netherlands Globally, second largest DOW site after Freeport US. Producing
More informationD8.1 Project website
D8.1 Project website WP8 Lead Partner: FENIX Dissemination Level: PU Deliverable due date: M3 Actual submission date: M3 Deliverable Version: V1 Project Acronym Project Title EnDurCrete New Environmental
More informationAdvanced Data Procurement From A Contractors Perspective
Advanced Data Procurement From a Contractors Perspective Advanced Data Procurement From A Contractors Perspective Brian K. Smith & Travis Rauscher, PE 1 Session Summary Laser scanning and UAV data procurement
More informationEuropean Reference Data Management Service (ERDMS)
European Reference Data Management Service (ERDMS) Usermanual Grant Agreement: TREN/FP7/TR/218362 (Sub)workpackage: SWP 5.2. D.14 and D.15 Author: RWS Version (date): 2011-03-21 European Reference Data
More information(Project Number ) SecSoN Workshop, ACM SIGCOMM 2018 Budapest, 24 August Mike Surridge, University of Southampton IT Innovation Centre
5G-ENSURE (Project Number 671562) Trust Modelling in 5G Networks SecSoN Workshop, ACM SIGCOMM 2018 Budapest, 24 August 2018 Mike Surridge, University of Southampton IT Innovation Centre ms _at_ it-innovation.soton.ac.uk
More informationInteroperability driven integration of biomedical data sources
Interoperability driven integration of biomedical data sources Douglas TEODORO a,1, Rémy CHOQUET c, Daniel SCHOBER d, Giovanni MELS e, Emilie PASCHE a, Patrick RUCH b, and Christian LOVIS a a SIMED, University
More informationPlane Based Free Stationing for Building Models
Christian MANTHE, Germany Key words: plane based building model, plane detection, plane based transformation SUMMARY 3D Building models are used to construct, manage and rebuild buildings. Thus, associated
More informationNATIONWIDE POINT CLOUDS AND 3D GEO- INFORMATION: CREATION AND MAINTENANCE GEORGE VOSSELMAN
NATIONWIDE POINT CLOUDS AND 3D GEO- INFORMATION: CREATION AND MAINTENANCE GEORGE VOSSELMAN OVERVIEW National point clouds Airborne laser scanning in the Netherlands Quality control Developments in lidar
More informationCloud-based Rapid Elastic MAnufacturing
Cloud-based Rapid Elastic MAnufacturing WP9 Impact D9.2.1 Promotion and Promotional Material Deliverable Lead: TANet Contributing Partners: ASC Delivery 03/2015 Dissemination Level: Public Version 1.0
More informationTrimble Realworks Software
TECHNICAL NOTES Trimble Realworks Software A Powerful 3D Laser Scanning Office Software Suite DESIGNED FOR TODAY S MULTIFACETED SCANNING PROFESSIONAL, TRIMBLE REALWORKS IS A POWERFUL OFFICE SOFTWARE THAT
More informationDRIVER Step One towards a Pan-European Digital Repository Infrastructure
DRIVER Step One towards a Pan-European Digital Repository Infrastructure Norbert Lossau Bielefeld University, Germany Scientific coordinator of the Project DRIVER, Funded by the European Commission Consultation
More informationOpenBIM Latest developments at Rijkswaterstaat
OpenBIM Latest developments at Rijkswaterstaat Benno.Koehorst@rws.nl May 27,28 2013 Goals about use of information at RWS - simplify the flow of information from the building contractor to the project
More informationVISO: A Shared, Formal Knowledge Base as a Foundation for Semi-automatic InfoVis Systems
VISO: A Shared, Formal Knowledge Base as a Foundation for Semi-automatic InfoVis Systems Jan Polowinski Martin Voigt Technische Universität DresdenTechnische Universität Dresden 01062 Dresden, Germany
More informationINNOVER-EAST. WP5 Dissemination. Deliverable D5.3 Basic Dissemination Material
INNOVER-EAST Building a more effective pathway leading from research to innovation through cooperation between the European Union and Eastern Partnership countries in the field of energy efficiency FP7
More informationPROJECT DELIVERABLE REPORT
PROJECT DELIVERABLE REPORT Grant Agreement Number: 283284 Project Acronym: X-Scan Project Title: Laser guided inspection robot for the Non-Destructive Testing of thin steel gauge welds in the shipping
More informationSmart shipping & The Netherlands: national and international cooperation
Smart shipping & The Netherlands: national and international cooperation Leon van der Meij Inge Willemsen Department of Maritime Affairs International workshop autonomous ship cooperation Oslo, October
More informationMethods for Automatically Modeling and Representing As-built Building Information Models
NSF GRANT # CMMI-0856558 NSF PROGRAM NAME: Automating the Creation of As-built Building Information Models Methods for Automatically Modeling and Representing As-built Building Information Models Daniel
More informationImage Processing Via Pixel Permutations
Image Processing Via Pixel Permutations Michael Elad The Computer Science Department The Technion Israel Institute of technology Haifa 32000, Israel Joint work with Idan Ram Israel Cohen The Electrical
More informationOpen Data Transport Authorities
Open Data Transport Authorities Frederika Welle Donker f.m.welledonker@tudelft.nl 1 Knowledge Centre Open Data Research focuses on the governance of open data, its impact, legal and financial conditions
More informationFIBO Operational Ontologies Briefing for the Object Management Group
FIBO Operational Ontologies Briefing for the Object Management Group March 20, 2013, Reston, VA David Newman Strategic Planning Manager, Senior Vice President, Enterprise Architecture Chair, Semantic Technology
More informationThe MultilingualWeb-LT project
Multilingualism & Drupal The MultilingualWeb-LT project Denver, CO. March 20th, 2012 Seite 1 Cocomore essentials Agency for integrated communication and IT services 120 employees Offices in Germany and
More informationPI Revises Draft Report. PA/PI & SAC Confer
JTRP Report Publishing Process Modern publishing practices require a diverse skill set that often is best outsourced to specialized organizations to produce and effectively disseminate high quality, professional
More informationResearch Infrastructures and Horizon 2020
Ana Arana Antelo DG Research & Head of Research Infrastructures ERF Workshop - Hamburg, 31 May 2012 Research Infrastructures and Horizon 2020 The EU Framework Programme for Research and 2014-2020 Research
More informationPolygonal Meshes. Thomas Funkhouser Princeton University COS 526, Fall 2016
Polygonal Meshes Thomas Funkhouser Princeton University COS 526, Fall 2016 Digital Geometry Processing Processing of 3D surfaces Creation, acquisition Storage, transmission Editing, animation, simulation
More information3D modeling of interior spaces: Learning the language of indoor architecture. Kourosh Khoshelham Lucia Díaz-Vilariño
3D modeling of interior spaces: Learning the language of indoor architecture Kourosh Khoshelham Lucia Díaz-Vilariño NEED FOR 3D INDOOR MODELS Crisis management in large public buildings Automated route
More informationGerman Research Strategy in the Area of Civil Security Research
8th Interdisciplinary Workshop on Global Security WISG 2014 German Research Strategy in the Area of Civil Security Research Eckhart Curtius Federal Ministry of Education and Research Division Security
More informationIntegration of Emerging Inspection Devices with Rapid Manufacturing Systems
1 Integration of Emerging Inspection Devices with Rapid Manufacturing Systems Anath Fischer CAD & Life Cycle Engineering Faculty of Mechanical Engineering Technion - Israel Institute of Technology, Haifa,
More informationEUROPEAN COMISSION INFORMATION SOCIETY AND MEDIA DIRECTORATE-GENERAL. Information and Communication Technologies. Collaborative Project
EUROPEAN COMISSION INFORMATION SOCIETY AND MEDIA DIRECTORATE-GENERAL Information and Communication Technologies Collaborative Project Transcription and Translation of Video Lectures Grant Agreement Number
More informationToward generation of a Building Information Model of a deformed structure using laser scanning technology
Toward generation of a Building Information Model of a deformed structure using laser scanning technology R Zeibak-Shini, R Sacks & S Filin Technion Israel Institute of Technology, Israel Earthquakes are
More informationProbabilis)c Temporal Inference on Reconstructed 3D Scenes
Probabilis)c Temporal Inference on Reconstructed 3D Scenes Grant Schindler Frank Dellaert Georgia Ins)tute of Technology The World Changes Over Time How can we reason about )me in structure from mo)on
More informationResearch Infrastructures and Horizon 2020
Research Infrastructures and Horizon 2020 Christos VASILAKOS DG Research & 1 st CoPoRI Workshop on EoE 11-12 June 2012 Hamburg, DE The EU Framework Programme for Research and 2014-2020 Research and Europe
More informationPhotogrammetry and 3D Car Navigation
Photogrammetric Week '07 Dieter Fritsch (Ed.) Wichmann Verlag, Heidelberg, 2007 Strassenburg-Kleciak 309 Photogrammetry and 3D Car Navigation MAREK STRASSENBURG-KLECIAK, Hamburg ABSTRACT The technological
More informationAn Introduction to Cloud Computing with OpenNebula
OpenNebula Cloud Management Platform > Innovative Open Source Technologies and Professional Services to Build your Enterprise-ready Cloud Computing Environment An Introduction to Cloud Computing with OpenNebula
More informationWP6 Personal Mobility Assistant. D6.4: Application Design Studio Prototype
WP6 Personal Mobility Assistant D6.4: Application Design Studio Prototype Deliverable Lead: ASC Contributing Partners: ASC, TALK, TIE Delivery 04/2015 Dissemination Level: Public Version 1.0 This deliverable
More informationAutomated Visualization Support for Linked Research Data
Automated Visualization Support for Linked Research Data Belgin Mutlu 1, Patrick Hoefler 1, Vedran Sabol 1, Gerwald Tschinkel 1, and Michael Granitzer 2 1 Know-Center, Graz, Austria 2 University of Passau,
More informationSHRP 2 Safety Research Symposium July 27, Site-Based Video System Design and Development: Research Plans and Issues
SHRP 2 Safety Research Symposium July 27, 2007 Site-Based Video System Design and Development: Research Plans and Issues S09 Objectives Support SHRP2 program research questions: Establish crash surrogates
More informationInteraction Design and Implementation for Multimodal Mobile Semantic Web Interfaces
HCI International, Beijing, China, 27th July 2007 Interaction Design and Implementation for Multimodal Mobile Semantic Web Interfaces Daniel Sonntag German Research Center for Artificial Intelligence 66123
More informationValidation of Exported Field Data in GEOPAK Drainage (Survey to Drainage)
Validation of Exported Field Data in GEOPAK Drainage (Survey to Drainage) 1.1 Overview The Export to GEOPAK Drainage tool can be utilized to leverage data collected by field surveys (i.e., pipes and structures)
More informationAnalytics Toolkit - Final Deployment
The NOMAD (Novel Materials Discovery) Laboratory a European Centre of Excellence Analytics Toolkit - Final Deployment Deliverable No: 4.3 Expected Delivery Date: 31/10/2017, M24 Actual Delivery Date: 06/12/2017,
More informationPanel Session: Experiences from Installations and Pilots. Communication Technologies for Smart Grid
Panel Session: Experiences from Installations and Pilots Communication Technologies for Smart Grid Smart Grid Communication Technology Internetization of the energy sector timeline energy industry Fusion
More informationTCBL PUBLIC COMMUNICATION TOOLS. Co-funded by Horizon 2020
TCBL PUBLIC COMMUNICATION TOOLS Co-funded by Horizon 2020 TCBL 646133 DELIVERABLE 8.3 31 DECEMBER 2015 Co-funded by Horizon 2020 DELIVERABLE PROJECT ACRONYM: TCBL GRANT AGREEMENT N.: 646133 PROJECT TITLE:
More information