Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

Size: px
Start display at page:

Download "Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound"

Transcription

1 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 19 Block Foxhall Road NW S/B Study Area and Location District PSA Ward ANC Phase Description D Proposed 19 Block Foxhall Road Northwest Southbound Site 178 KEY: Existing Camera Proposed Camera Bus Stop Metro Station Hiker/Biker Trail School Other Pedestrian Generator George Washington University: Mt. Vernon Campus This proposed speed camera will be located in Ward 3 at the 19 block of Foxhall Road Northwest in the southbound direction. Foxhall Road runs from Nebraska Avenue Northwest in the north to Canal Street Northwest in the south. The posted speed limit is 25 MPH. W3-454 District Department of Transportation 55 M Street SE, Suite 4 Washington, DC 23

2 19 Block Foxhall Road NW S/B Field Assessment Summary Foxhall Road is assumed to run in a North-South direction, and is classified as a minor arterial. Foxhall Road has one travel lane in each direction. This site has the following characteristics: This site is located in a residential area with houses and driveways on the eastern side of the road and in the surrounding area. There is a median grass island and sidewalks on both sides with curb, gutter, and drainage inlets. The existing pavement is in good condition. Two schools are in the area: The George Washington University Mt. Vernon Campus and The Field School. Recreational facilities for the University are also in the area. Facing Southbound Direction W3-455 District Department of Transportation 55 M Street, SE, Suite 4 Washington, DC 23

3 19 Block Foxhall Road NW S/B Facing North Speed Data Analysis Northbound Southbound Posted Speed Limit (MPH) Mean Speed (MPH) th Percentile Speed (MPH) MPH Pace Speed Sample Size 6,532 6,39 ADT 12,841 The mean speed is 2 MPH higher than the posted speed limit in both directions and the 85 th percentile speed is 1 MPH higher than the posted speed limit in the northbound direction and 12 MPH higher in the southbound direction. Due to the residential nature, this location may benefit from additional speed enforcement. Crash Data Analysis Between January 1, 21 and December 31, 212, there were a total of 1 crashes at this location. A breakdown of number of crashes by collision type can be found in the chart below. The most common types of crash were Rear End (3 crashes). There were two crashes each of types Left Turn, Head On, and Unspecified. W3-456 District Department of Transportation 55 M Street, SE, Suite 4 Washington, DC 23

4 19 Block Foxhall Road NW S/B Severity Weather Surface condition Light Condition Total 1 Fatal Clear 8 8 Dry 8 8 Day 5 5 Injury 2 2 Rain Wet Night 3 3 Taxi 1 1 Snow Snow/Ice Bus 3.5 Number of Crashes by Collision Type Rear End Number of Crashes Left Turn Head On Unspecified 1.5 Side Swipe Collision Type Safety Nexus This site presents the following safety considerations which may establish a nexus between the speed camera and traffic safety: 1. Speed Data The 85th percentile speed is much higher than the posted speed limit at this location. 2. Crash Data The crash data analysis shows a low number of crashes at this location. 3. Field Assessment The following site characteristics suggest a need for a safer travel environment: a. This site is located in a residential area with houses and driveways on the eastern side of the road and in the surrounding area. b. This site is located adjacent to a college campus, George Washington University Mt. Vernon campus, and is in the area of one other school, The Field School. W3-457 District Department of Transportation 55 M Street, SE, Suite 4 Washington, DC 23

5 19 Block Foxhall Road NW S/B Although the crash data analysis showed a low number of crashes at this location, due to the speed data analysis, the specific site characteristics, the proximity of schools to the site, and other pedestrian generators, there is a nexus between traffic safety and the speed camera at this location. W3-458 District Department of Transportation 55 M Street, SE, Suite 4 Washington, DC 23

6 19 block of Foxhall RD NW Speed SAMMAT ENGINEERING SERVICES, LLC 1515 RISING RIDGE ROAD MOUNT AIRY, MD SB Start Time Total 11/6/13 * * * * * * * * * * * * * * * 1: * * * * * * * * * * * * * * * 2: * * * * * * * * * * * * * * * 3: * * * * * * * * * * * * * * * 4: * * * * * * * * * * * * * * * 5: * * * * * * * * * * * * * * * 6: : : : : : PM : : : : : : : : : : : Total W3-459

7 19 block of Foxhall RD NW Speed SAMMAT ENGINEERING SERVICES, LLC 1515 RISING RIDGE ROAD MOUNT AIRY, MD SB Start Time Total 11/7/ : : : : : : 7: * * * * * * * * * * * * * * * 8: * * * * * * * * * * * * * * * 9: * * * * * * * * * * * * * * * 1: * * * * * * * * * * * * * * * 11: * * * * * * * * * * * * * * * 12 PM * * * * * * * * * * * * * * * 13: * * * * * * * * * * * * * * * 14: * * * * * * * * * * * * * * * 15: * * * * * * * * * * * * * * * 16: * * * * * * * * * * * * * * * 17: * * * * * * * * * * * * * * * 18: * * * * * * * * * * * * * * * 19: * * * * * * * * * * * * * * * 2: * * * * * * * * * * * * * * * 21: * * * * * * * * * * * * * * * 22: * * * * * * * * * * * * * * * 23: * * * * * * * * * * * * * * * Total Grand Total th Percentile : 5th Percentile : 85th Percentile : 95th Percentile : 9 MPH 29 MPH 37 MPH 4 MPH Stats Mean Speed(Average) : 27 MPH 1 MPH Pace Speed : MPH Number in Pace : 298 Percent in Pace : 46.1% Number of Vehicles > 25 MPH : 4161 Percent of Vehicles > 25 MPH : 66.% W3-46

8 19 block of Foxhall RD NW Speed SAMMAT ENGINEERING SERVICES, LLC 1515 RISING RIDGE ROAD MOUNT AIRY, MD NB Start Time Total 11/6/13 * * * * * * * * * * * * * * * 1: * * * * * * * * * * * * * * * 2: * * * * * * * * * * * * * * * 3: * * * * * * * * * * * * * * * 4: * * * * * * * * * * * * * * * 5: * * * * * * * * * * * * * * * 6: : : : : : PM : : : : : : : : : : : Total W3-461

9 19 block of Foxhall RD NW Speed SAMMAT ENGINEERING SERVICES, LLC 1515 RISING RIDGE ROAD MOUNT AIRY, MD NB Start Time Total 11/7/ : : : : : : 7: * * * * * * * * * * * * * * * 8: * * * * * * * * * * * * * * * 9: * * * * * * * * * * * * * * * 1: * * * * * * * * * * * * * * * 11: * * * * * * * * * * * * * * * 12 PM * * * * * * * * * * * * * * * 13: * * * * * * * * * * * * * * * 14: * * * * * * * * * * * * * * * 15: * * * * * * * * * * * * * * * 16: * * * * * * * * * * * * * * * 17: * * * * * * * * * * * * * * * 18: * * * * * * * * * * * * * * * 19: * * * * * * * * * * * * * * * 2: * * * * * * * * * * * * * * * 21: * * * * * * * * * * * * * * * 22: * * * * * * * * * * * * * * * 23: * * * * * * * * * * * * * * * Total Grand Total th Percentile : 5th Percentile : 85th Percentile : 95th Percentile : 12 MPH 29 MPH 35 MPH 38 MPH Stats Mean Speed(Average) : 27 MPH 1 MPH Pace Speed : MPH Number in Pace : 383 Percent in Pace : 58.2% Number of Vehicles > 25 MPH : 4812 Percent of Vehicles > 25 MPH : 73.7% W3-462

10 19 block of Foxhall RD NW Volume SAMMAT ENGINEERING SERVICES, LLC 1515 RISING RIDGE ROAD MOUNT AIRY, MD Start 6-Nov-13 SB NB Combined 7-Nov- SB NB Combined Time Wed A.M. P.M. A.M. P.M. A.M. P.M. Thu A.M. P.M. A.M. P.M. A.M. P.M. 12: * 83 * 79 * * 11 * 24 * 12:15 * 84 * 8 * * 15 * 32 * 12:3 * 74 * 87 * * 2 * 9 * 12:45 * 59 * 78 * * 4 * 7 * 1: * 93 * 85 * * 7 * 14 * 1:15 * 74 * 88 * * 2 * 7 * 1:3 * 78 * 99 * * 7 * 13 * 1:45 * 82 * 78 * 16 4 * 4 * 8 * 2: * 88 * 91 * * 7 * 1 * 2:15 * 1 * 115 * * 2 * 6 * 2:3 * 96 * 122 * * 2 * 8 * 2:45 * 84 * 132 * * 3 * 6 * 3: * 12 * 112 * * 4 * 7 * 3:15 * 11 * 99 * 29 2 * 8 * 1 * 3:3 * 13 * 15 * 28 1 * 2 * 3 * 3:45 * 12 * 113 * * 5 * 7 * 4: * 113 * 18 * * 5 * 9 * 4:15 * 115 * 83 * * 3 * 5 * 4:3 * 112 * 98 * 21 6 * 9 * 15 * 4:45 * 119 * 127 * * 16 * 24 * 5: * 15 * 128 * * 26 * 31 * 5:15 * 128 * 124 * * 17 * 3 * 5:3 * 16 * 115 * * 26 * 4 * 5:45 * 113 * 122 * * 48 * 7 * 6: * * * * * * 6: * * * * * * 6: * * * * * * 6: * * * * * * 7: * * * * * * 7: * * * * * * 7: * * * * * * 7: * * * * * * 8: * * * * * * 8: * * * * * * 8: * * * * * * 8: * * * * * * 9: * * * * * * 9: * * * * * * 9: * * * * * * 9: * * * * * * 1: * * * * * * 1: * * * * * * 1: * * * * * * 1: * * * * * * 11: * * * * * * 11: * * * * * * 11: * * * * * * 11: * * * * * * Total Day Total % Total 18.9% 3.5% 18.4% 32.2% 4.5% 59.5% Peak 7:45 4:3 6:45 4:45 7:45 4:45 5: 5: 5: Vol P.H.F ADT ADT 12,841 AADT 12,841 W3-463

11 DC Department of Transportation - Traffic Accident Reporting and Analysis System Accident Summary Report (R-8) Corridor: FOXHALL RD,NW From FOXHALL CRESCENT,NW TO WHITEHAVEN PKWY,NW Time Period Covered: From 1/1/21 To 12/31/212 Prepared By: Rahul Jain Prepared Date: 9/17/213 Total Number of Accident: Total Number of Fatalities: Total Number of Injuries: Total Number of Disabling Injuries: Total Number of NonDisabling Injuries: Total Number of Pedestrians Involved: Total Number of Bicycles Involved: Total Number of Motorcycles Involved: 1 2 Collision Type #ACC % Collision Type #ACC % Right Angle: Fixed Object: Left Turn: 2 2 Ran Off Road: Right Turn: Ped. Involved: Rear End: 3 3 Backing: Side Swiped: 1 1 Non Collision: Head On: 2 2 Under/Over Ride: Parked: Unspecified: 2 2 Time of Day #ACC % 7:3 ~ 9:3: 1 1 9:3 ~ 11:3: :3 ~ 13:3: 13:3 ~ 16:: : ~18:3: :3 ~ 7:3: 5 5 Unspecified: Day o fweek #ACC % Sunday: Monday: 2 2 Tuesday: 1 1 Wednesday: 1 1 Thursday: 2 2 Friday: 2 2 Saturday: 2 2 Weather Condition #ACC % Clear: 8 8 Rain: Snow: Sleet/Hail: Fog/Mist: Crosswind/Blowing Sand: Unspecified: 2 2 Surface Condition #ACC % Dry: 8 8 Wet: Snow/Ice: Slush: Water/Sand: Repairing: Unspecified: 2 2 Type of Vehicle #VEH % Passenger Car: % Bus: Truck: Taxi: 1 5.3% Minivan: Police/Emergency Vehicle: Motorcycle/Moped: Bicycle: Fixed Object: Unspecified: 2 1.5% Accident Severity Type #ACC % Fatal Collision: Injury Collision: 2 2 PDO Collision: 8 8 Light Condition #ACC % Daylight: 5 5 Dawn/Dusk: Dark(Lighted): 1 1 Dark(Not Lighted): 2 2 Dark(Unknown Lighting): Unspecified: 2 2 Contributing Factor #VEH % Driver: Speed: Driver: Alcohol/Drug: Driver: Electronic Device: Driver: Others: 2 1.5% Vehicle: Roadway: Unspecified: % Pedestrian Actions #ACC % In Crosswalk with Signal: In Crosswalk against Signal: In Crosswalk no Signal: In Unmarked Crosswalk: Not in Crosswalk: From Between Parked Cars: Unspecified: 6 Records are not approved as of 9/17/213 9:13:4 AM W3-464

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 35 Block Massachusetts Avenue NW Study Area and Location District PSA Ward ANC Phase Description 2 24

More information

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 29 Block Military Road NW E/B Study Area and Location District PSA Ward ANC Phase Description 2 21 3

More information

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 17 Block North Portal Drive NW Study Area and Location District PSA Ward ANC Phase Description 4 41

More information

Site 59 W5-147 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 59 W5-147 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block Bladensburg Road NE SW/B Study Area and Location District PSA Ward ANC Phase Description 5

More information

Study Area and Location District PSA Ward ANC Phase Description B Planned Branch Avenue Northbound at Alabama Avenue Southeast

Study Area and Location District PSA Ward ANC Phase Description B Planned Branch Avenue Northbound at Alabama Avenue Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Branch Avenue at Alabama Avenue SE Study Area and Location District PSA Ward ANC Phase Description 6

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block 4th Street NE Study Area and Location District PSA Ward ANC Phase Description 1 14 6 6C Proposed

More information

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Calvert Street NW Study Area and Location District PSA Ward ANC Phase Description

More information

Site 40. Recreational Center

Site 40. Recreational Center Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Georgia Avenue S/B at Missouri Avenue NW Study Area and Location District PSA Ward ANC Phase Description

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6100 Block Georgia Avenue NW Study Area and Location District PSA Ward ANC Phase Description 4 402 4

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia I-395 SW after Exit 4 E/B Study Area and Location District PSA Ward ANC Phase Description 1 71 8 8A

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Study Area and Location District PSA Ward ANC Phase Description

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC 295.4 Miles South of Pennsylvania Avenue SE Study Area and Location District PSA Ward ANC Phase Description

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel Study Area and Location District PSA Ward ANC Phase Description

More information

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Military Road NW Study Area and Location District PSA Ward ANC Phase Description

More information

Traffic Impact Study for the Girard Winery Project

Traffic Impact Study for the Girard Winery Project October 16, 2014 Ms. Heather McCollister 1512 D Street Napa, CA 94559 Traffic Impact Study for the Girard Winery Project Dear Ms. McCollister; Whitlock & Weinberger Transportation, Inc. (W-Trans) has completed

More information

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan Managing DC Work Zones: DDOT s Citywide Transportation Management Plan ARTBA National Work Zone Management Conference September 20, 2016 1 Outline Citywide Transportation Management Plan (TMP) Citywide

More information

Crystal Springs Upland School Transportation Demand Management Plan. March 2016

Crystal Springs Upland School Transportation Demand Management Plan. March 2016 Crystal Springs Upland School Transportation Demand Management Plan March 06 CONTENTS Introduction... Transportation Demand Management (TDM) Program.... Background/Survey of Existing Student Commuting

More information

Hennepin Avenue Downtown

Hennepin Avenue Downtown Hennepin Avenue Downtown Construction Kick-off Meeting Stakeholders, Owners, Managers January 14 & 17, 2019 Agenda Summary Background Principles Scope, Schedule, Budget Construction Utilities Roadway What

More information

HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION. Presentation to ANC 3E April 13, 2017

HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION. Presentation to ANC 3E April 13, 2017 HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION Presentation to ANC 3E April 13, 2017 1 PURPOSE AND NEED We are committed to providing reliable electric service to our customers. As part of this commitment,

More information

Annual FARS/GES System-Wide Training

Annual FARS/GES System-Wide Training Annual FARS/GES System-Wide Training Anaheim, California October 26th-30th 2009 SWT 2009 October 26th-30th 1 Session Summary To Complete this session you will need the following materials: 2010 FARS Coding

More information

ROADWAY LIGHTING CURFEW

ROADWAY LIGHTING CURFEW STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Rhode Island Department of Transportation ROADWAY LIGHTING CURFEW IMPLEMENTATION PLAN March 25, 21 TABLE OF CONTENTS INTRUDUCTION/OVERVIEW... 1 1.1. ANTICIPATED

More information

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES SEPA TRANSPORTATION CONCURRENCY - ROAD IMPACT FEES Introduction Revised February 2004 These guidelines describe how to prepare a traffic study, or Traffic

More information

Traffic Impact Study for the Grove Street Subdivision

Traffic Impact Study for the Grove Street Subdivision Whitlock & Weinberger Transportation, Inc. 490 Mendocino Avenue Suite 201 Santa Rosa, CA 95401 voice (707) 542-9500 fax (707) 542-9590 475 14 th Street Suite 290 Oakland, CA 94612 voice (510) 444-2600

More information

A Plan to Connect Baltimore

A Plan to Connect Baltimore A Plan to Connect Baltimore BaltimoreLink by the Numbers Improved Access to Frequent Transit Lines (frequent = every 15 mins. or better) 131,000 more JOBS (+37%) 205,000 more PEOPLE (+34%) More Service

More information

Metrobus 30s Line Enhancements

Metrobus 30s Line Enhancements Customer Service, Operations and Safety Committee Action Item III-C February 14, 2008 Metrobus 30s Line Enhancements Washington Metropolitan Area Transportation Authority Board Action/Information Summary

More information

Calipatria Solar Farm TIA

Calipatria Solar Farm TIA Calipatria Solar Farm TIA Prepared for: 7SM 8ME, LLC 71SM 8ME, LLC c/o 8minutenergy Renewables LLC Prepared by: Fehr & Peers March 25, 211 IE1-37 TABLE OF CONTENTS Executive Summary... i Project Trip Estimates...

More information

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study James Webb, P.E., Iowa Department of Transportation Liz Finarty, P.E., Iowa Department of Transportation James Armstrong,

More information

Des Moines Area Regional Transit Non Rider Survey

Des Moines Area Regional Transit Non Rider Survey Moines Area Regional Transit Non Rider Survey helping organizations make better decisions since 1982 Findings Report Submitted to the Moines Area Regional Transit Authority by: ETC Institute 725 W. Frontier

More information

Design Considerations for Real-time Arterial Performance Measurement Systems Using Transit Bus Probes

Design Considerations for Real-time Arterial Performance Measurement Systems Using Transit Bus Probes Design Considerations for Real-time Arterial Performance Measurement Systems Using Transit Bus Probes Abraham Emmanuel & David Zavattero Chicago Department of Transportation Project Goals Estimate traffic

More information

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013 Council of State Governments Takoma Langley Transit Center Purple Line Project Briefing October 28, 2013 Takoma Langley Transit Center Purpose and Need Provide a safe, attractive and efficient facility

More information

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana March 2011 Prepared for: URS Corporation 2020 E. First Street, Suite #400 Santa Ana, CA 92705 Tel:

More information

Appendix D Supportive Transportation Materials

Appendix D Supportive Transportation Materials Appendix D Supportive Transportation Materials D.1. Stakeholder Input and Coordination As noted in Section 1.7 of the main Master Plan document, there have been several opportunities for stakeholders to

More information

SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT

SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT Principal Investigator Tom Maze Principal Contributor Ali Kamyab Sponsored by the Engineering

More information

Bellevue s Traffic Adaptive Signals

Bellevue s Traffic Adaptive Signals What we ll cover Bellevue s Traffic Adaptive Signals SCATS Phase 1 Implementation SCATS Operations Responsiveness New Features Some Initial Results 2011 Program and Beyond Final Thoughts ITE Quad Mtg April

More information

Traffic Impact Analysis

Traffic Impact Analysis LA PALMA VILLAGE INITIAL STUDY CITY OF ANAHEIM Appendices Appendix I Traffic Impact Analysis September 2015 LA PALMA VILLAGE INITIAL STUDY CITY OF ANAHEIM Appendices This page intentionally left blank.

More information

An Analysis of TDM Impacts on a Corridor Segment Research Findings

An Analysis of TDM Impacts on a Corridor Segment Research Findings An Analysis of TDM Impacts on a Corridor Segment Research Findings Phil Winters, CUTR TDM Program Director Liren Zhou, Graduate Research Assistant Sachin Rai, ITS Research Associate Nevine Georggi, TDM

More information

APPENDIX E TRANSPORTATION

APPENDIX E TRANSPORTATION APPENDIX E TRANSPORTATION 2011 PATRON SURVEYS VISSIM MODEL CALIBRATION AND VALIDATION Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax:

More information

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY Chapter 15: Safety and Security A. INTRODUCTION This chapter discusses safety and security as they relate to the Proposed Project and summarizes how potential safety and security issues are identified

More information

Rural Expressway Intersection Characteristics that Contribute to Reduced Safety Performance

Rural Expressway Intersection Characteristics that Contribute to Reduced Safety Performance Rural Expressway Intersection Characteristics that Contribute to Reduced Safety Performance Garrett D. Burchett Center for Transportation Research and Education Iowa State University 2901 South Loop Drive,

More information

Appendix D. Transportation Study

Appendix D. Transportation Study Appendix D Transportation Study Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May 29 County of Mendocino Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May

More information

APPENDIX A TDM Development Guideline

APPENDIX A TDM Development Guideline Appendix A: TDM Development Guideline APPENDIX A TDM Development Guideline Appendix A: TDM Development Guideline Page A.1 1 INTRODUCTION AND OVERVIEW 1.1 About This Guideline This guideline contains information

More information

Automated Photo Enforcement Annual Report 2017

Automated Photo Enforcement Annual Report 2017 Automated Photo Enforcement Annual Report 7 Automated Photo Enforcement Program Sustainable Streets Division San Francisco Municipal Transportation Agency January, 9 Automated Photo Enforcement Annual

More information

Westbard Concept Framework Plan Presentation. Workshop Wrap up November 18, November 18 Concept Framework Plan

Westbard Concept Framework Plan Presentation. Workshop Wrap up November 18, November 18 Concept Framework Plan November 18 Concept Framework Plan Westbard Concept Framework Plan Presentation Workshop Wrap up November 18, 2014 November 18 Concept Framework Plan Workshop Re cap Day 1: visioning session: characteristics

More information

TRAFFIC STUDIES MADE SIMPLER: COUNT AND CLASSIFICATION IN THE CLOUD

TRAFFIC STUDIES MADE SIMPLER: COUNT AND CLASSIFICATION IN THE CLOUD TRAFFIC STUDIES MADE SIMPLER: COUNT AND CLASSIFICATION IN THE CLOUD AllTrafficSolutions.com 2 CONTENTS Overview 3 Case Study: Missouri Department of Transportation (MoDOT) 4 Welcome to TraffiCloud TM 6

More information

Evaluation of Roadside Surveys for Freight Transport Data at Border Crossings

Evaluation of Roadside Surveys for Freight Transport Data at Border Crossings Evaluation of Roadside Surveys for Freight Transport Data at Border Crossings Wirach Hirun #1 # Department of Civil and Environmental Engineering, Kasetsart University Chalermprakiat Sakon Nakhon Province

More information

TRANSPORTATION DEPARTMENT Business Plan

TRANSPORTATION DEPARTMENT Business Plan TRANSPORTATION DEPARTMENT 2018 Business Plan Today s Agenda Mission Department Overview Planning Initiatives Commission Priorities and 2018 Budget Requests Five-year Plan Department of Transportation Mission

More information

Final Report. Interstate-680 Bus-on-Shoulder Feasibility Assessment. prepared for

Final Report. Interstate-680 Bus-on-Shoulder Feasibility Assessment. prepared for Final Report Interstate-680 Bus-on-Shoulder Feasibility Assessment prepared for Metropolitan Transportation Commission & Contra Costa Transportation Authority prepared by HDR in association with Fehr &

More information

DRAFT. Trail Counter Update. Central Iowa Trail Count Program. Trail counters in Central Iowa

DRAFT. Trail Counter Update. Central Iowa Trail Count Program. Trail counters in Central Iowa Trail Counter Update Trail counters in Central Iowa Central Iowa Trail Count Program In October 2011, the MPO began the Central Iowa Trail Count Program with 40 infrared trail counters from TRAFx Research

More information

APPENDIX D. Traffic Impact Analysis

APPENDIX D. Traffic Impact Analysis APPENDIX D Traffic Impact Analysis TRAFFIC IMPACT ANALYSIS CALEXICO SOLAR FARM I County of Imperial, California July 8, 2011 LLG Ref. 3-11-2034 Prepared by: Cara Leone Transportation Planner II Under the

More information

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities - Central Corridor Rail-Volution - Weaving Transit into Existing Communities Management Committee, October 31, 2009 June Improving 11, 2008 mobility Easing congestion Strengthening our communities Twin

More information

vision42

vision42 vision42 www.vision42.org vision4 auto-free light rail 2 boulevard for 42nd Street Roxanne Warren, AIA, Chair George Haikalis, ASCE, Co-Chair Institute for Rational Urban Mobility,Inc. www.vision42.org

More information

Project File Number: B. Geographic Location of Proposed Project or Program (check all that apply)

Project File Number: B. Geographic Location of Proposed Project or Program (check all that apply) COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION PROJECT INITIATION FORM Project File Number: Part I: Summary Information A. Proponent Information Municipality/Agency

More information

Using Empirical (real-world) Transportation Data to Extend Travel Demand Model Capabilities

Using Empirical (real-world) Transportation Data to Extend Travel Demand Model Capabilities Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 10-4-2013 Using Empirical (real-world) Transportation Data to Extend Travel Demand Model

More information

Cedar Rapids ITS Deployment Project

Cedar Rapids ITS Deployment Project Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders

More information

Prepared for: Rocklin. Prepared by:

Prepared for: Rocklin. Prepared by: APPENDIX L Sierra Gateway Apartments Transportation Impact Analysis Report Prepared for: Rocklin Sierra Apartments II, LLC Prepared by: SIERRA GATEWAY APARTMENTS TRANSPORTATION IMPACT ANALYSIS REPORT PREPARED

More information

SPEED SURVEY ANALYSIS SYSTEM

SPEED SURVEY ANALYSIS SYSTEM SPEED SURVEY ANALYSIS SYSTEM user s manual CROSSROADS SOFTWARE 210 W. Birch Street, Suite 207 Brea, CA 92821 (714) 990-6433 Fax: (714) 990-5628 www.crossroadssoftware.com Chapter One: Introducing the Speed

More information

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM Date of Meeting: # 9 SUBJECT: ELECTION DISTRICTS: STAFF CONTACTS: Public and Private Infrastructure Improvements Adjacent to the Dulles

More information

ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS

ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1 STUDY

More information

Traffic Impact Analysis Shotwell Road Residential Clayton, NC

Traffic Impact Analysis Shotwell Road Residential Clayton, NC Shotwell Road Residential Clayton, NC TABLE O CONTENTS 1. INTROUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3. Adjacent Land Uses...2 1.4. Existing Roadways...2

More information

ORDINANCE NO. _ CITY OF LEOTI, KANSAS

ORDINANCE NO. _ CITY OF LEOTI, KANSAS ORDINANCE NO. _2018-06 CITY OF LEOTI, KANSAS AN ORDINANCE AMENDING SECTION 28-1 OF THE MUNICIPAL CODE OF THE CITY OF LEOTI REGULATING TRAFFIC WITHIN THE CORPORATE LIMITS OF THE CITY OF LEOTI, KANSAS; INCORPORATING

More information

Coordinated Highways Action Response Team

Coordinated Highways Action Response Team Coordinated Highways Action Response Team PANEL 3: EVENT RESPONSE TOOLS YOU CAN USE AT YOUR AGENCY Richard R. Dye CHART Systems Administrator Maryland State Highway Administration I-95 CORRIDOR COALITION

More information

Travel Time on the Highway 7 Corridor YORK REGION. Robert Bruce President TPA North America Inc.

Travel Time on the Highway 7 Corridor YORK REGION. Robert Bruce President TPA North America Inc. Travel Time on the Highway 7 Corridor YORK REGION Robert Bruce President TPA North America Inc. Presentation Overview Introduction to vivanext project Project Description Bluetooth Traffic Monitoring Overview

More information

A parabolic curve that is applied to make a smooth and safe transition between two grades on a roadway or a highway.

A parabolic curve that is applied to make a smooth and safe transition between two grades on a roadway or a highway. A parabolic curve that is applied to make a smooth and safe transition between two grades on a roadway or a highway. VPC: Vertical Point of Curvature VPI: Vertical Point of Intersection VPT: Vertical Point

More information

Performance Evaluation of Non-Intrusive Methods for Traffic Data Collection. Kamal Banger, Ministry of Transportation of Ontario

Performance Evaluation of Non-Intrusive Methods for Traffic Data Collection. Kamal Banger, Ministry of Transportation of Ontario Abstract Performance Evaluation of Non-Intrusive Methods for Traffic Data Collection Kamal Banger, Ministry of Transportation of Ontario Nancy Adriano, P.Eng., Ministry of Transportation of Ontario For

More information

SAFETY ON THE IH 35 EXPANSION PROJECTS. Andy Petter, P.E. - Waco District

SAFETY ON THE IH 35 EXPANSION PROJECTS. Andy Petter, P.E. - Waco District SAFETY ON THE IH 35 EXPANSION PROJECTS Andy Petter, P.E. - Waco District Presentation IH 35 Expansion through the Waco District Safety Requirements on the Projects IH 35 Safety Summit Meetings Crash Data

More information

HILLTOP SENIOR LIVING CENTER Pollard Station Traffic Impact Analysis

HILLTOP SENIOR LIVING CENTER Pollard Station Traffic Impact Analysis HILLTOP SENIOR LIVING CENTER Pollard Station Traffic Impact Analysis Prepared for Town of Truckee Prepared by TRANSPORTATION CONSULTANTS, INC. Pollard Station TRAFFIC IMPACT ANALYSIS Prepared for the Town

More information

The Maryland Transit Administration. A Plan to Connect Baltimore

The Maryland Transit Administration. A Plan to Connect Baltimore The Maryland Transit Administration A Plan to Connect Baltimore 1 What We ve Heard Over 1,100 stakeholder comments submitted through the Bus Network Improvement Project (BNIP) Six workshops, three pop-up

More information

UDOT Freeway and Traffic Signal Performance Metrics

UDOT Freeway and Traffic Signal Performance Metrics UDOT Freeway and Traffic Signal Performance Metrics September 26, 2016 Grant Farnsworth, PE, PTOE UDOT Traffic Mobility Engineer Kelly Burns Eric Rasband Utah Demographics Speed Report Benefit of Past

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 16-021 WHEREAS, In Fiscal Year 2015, the San Francisco Juvenile Court adjudicated approximately 819 transit violation citations

More information

195 Hegenberger Road Hotel: Traffic Circulation Analysis in Response to Comments on the Final EIR

195 Hegenberger Road Hotel: Traffic Circulation Analysis in Response to Comments on the Final EIR 350 Frank H. Ogawa Plaza Suite 300 Oakland, CA 94612 510.839.5066 phone 510.839.5825 fax www.esassoc.com Technical Memorandum date November 12, 2014 to from subject Colleen Liang, Port Associate Environmental

More information

OR 217,I-5 Experience Portland, OR

OR 217,I-5 Experience Portland, OR OR 217,I-5 Experience Portland, OR By: Abby Caringula Parsons Brinckerhoff July 8th, 2011 Presentation Outline Background VISUM Network Adjustment Model Origin-Destination(O-D) Demand Development ANM Export

More information

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6 Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-04 County: King List of 17-04 Amendment Projects:

More information

ESTIMATING PARAMETERS FOR MODIFIED GREENSHIELD S MODEL AT FREEWAY SECTIONS FROM FIELD OBSERVATIONS

ESTIMATING PARAMETERS FOR MODIFIED GREENSHIELD S MODEL AT FREEWAY SECTIONS FROM FIELD OBSERVATIONS 0 ESTIMATING PARAMETERS FOR MODIFIED GREENSHIELD S MODEL AT FREEWAY SECTIONS FROM FIELD OBSERVATIONS Omor Sharif University of South Carolina Department of Civil and Environmental Engineering 00 Main Street

More information

Managing DC Work Zones via a Citywide Transportation Management Plan. ITE Mid-Colonial District Annual Meeting May 20, 2014

Managing DC Work Zones via a Citywide Transportation Management Plan. ITE Mid-Colonial District Annual Meeting May 20, 2014 Managing DC Work Zones via a Citywide Transportation Management Plan ITE Mid-Colonial District Annual Meeting May 20, 2014 Presentation Outline The Team The Challenge The Approach Project Diagram Work

More information

Northwest Needs Improvements Survey

Northwest Needs Improvements Survey PW5 NW 107th Ave One thousand feet N of NW 122nd St Okeechobee Rd Widen bridge over Miami Canal PW6 NW 82nd Ave NW 8th St NW 12th St Construct new 4-lane road PW7 NW 87 Ave NW 36th St NW 58th St Add 2-lanes

More information

Proposed FY 06 Project Development Program and FY 05 Project Development Program Update

Proposed FY 06 Project Development Program and FY 05 Project Development Program Update Washington Metropolitan Area Transit Authority Proposed FY 06 Project Development Program and FY 05 Project Development Program Update Presented to the Board of Directors: P D E C Planning & Development

More information

ITSMR Research Note. Crashes Involving Cell Phone Use and Distracted Driving KEY FINDINGS ABSTRACT INTRODUCTION. Crash Analyses.

ITSMR Research Note. Crashes Involving Cell Phone Use and Distracted Driving KEY FINDINGS ABSTRACT INTRODUCTION. Crash Analyses. December 2016 KEY FINDINGS Crash Analyses Less than 1% of police-reported fatal and personal injury (F & PI) crashes involved the use of a cell phone over the five years, 2011-2015. 12 persons were killed

More information

Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing

Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing Customer Services, Operations, and Safety Committee Board Information Item III-B September 24, 2009 Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing Washington Metropolitan Area

More information

Emergency Response: How dedicated short range communication will help in the future. Matthew Henchey and Tejswaroop Geetla, University at Buffalo

Emergency Response: How dedicated short range communication will help in the future. Matthew Henchey and Tejswaroop Geetla, University at Buffalo Emergency Response: How dedicated short range communication will help in the future. 1.0 Introduction Matthew Henchey and Tejswaroop Geetla, University at Buffalo Dedicated short range communication (DSRC)

More information

PART 2. SIGNS Chapter 2L. Changeable Message Signs

PART 2. SIGNS Chapter 2L. Changeable Message Signs PART 2. SIGNS Chapter 2L. Changeable Message Signs TABLE OF CONTENTS Chapter 2L. CHANGEABLE MESSAGE SIGNS Page Section 2L. Description of Changeable Message Signs.................................... 2L-

More information

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician. PUBLIC WORKS ORGANIZATIONAL CHART Director of Public Works/City Engineer Secretary Word Processor Transit Services Manager Fleet Services Supervisor Streets and Facilities Supervisor Principal Principal

More information

Distracted Driving- A Review of Relevant Research and Latest Findings

Distracted Driving- A Review of Relevant Research and Latest Findings Distracted Driving- A Review of Relevant Research and Latest Findings National Conference of State Legislatures Louisville, KY July 27, 2010 Stephen Oesch The sad fact is that in the coming weeks in particular,

More information

1.1. Driving Around Euclid. Goals. Launch 1.1

1.1. Driving Around Euclid. Goals. Launch 1.1 1.1 Driving Around Euclid Goals Review the coordinate system Explore distances on a coordinate grid In this problem, students review the concept of the coordinate grid and are introduced to the idea of

More information

MEASURING SEATBELT USAGE THROUGH EXISTING TRAFFIC SURVEILLANCE SYSTEMS: PILOT PROJECT

MEASURING SEATBELT USAGE THROUGH EXISTING TRAFFIC SURVEILLANCE SYSTEMS: PILOT PROJECT MEASURING SEATBELT USAGE THROUGH EXISTING TRAFFIC SURVEILLANCE SYSTEMS: PILOT PROJECT Mark Lofgren Rural Transportation Safety and Security Center Upper Great Plain Transportation Institute North Dakota

More information

ITSMR Research Note KEY FINDINGS. Crash Analyses: Ticket Analyses:

ITSMR Research Note KEY FINDINGS. Crash Analyses: Ticket Analyses: December 2018 KEY FINDINGS Crash Analyses: 2013-2017 Less than 1% of police-reported fatal and personal injury (F & PI) crashes involved the use of a cell phone over the five years, 2013-2017. 15 persons

More information

Virginia Transit Update

Virginia Transit Update Virginia Transit Update Jennifer Mitchell Agency Director Virginia Transit Association May 24, 2017 1 Key Priorities for Statewide Transit Program Funding Safety and State of Good Repair Expansion 2 Funding

More information

Advanced Driver Assistance: Modular Image Sensor Concept

Advanced Driver Assistance: Modular Image Sensor Concept Vision Advanced Driver Assistance: Modular Image Sensor Concept Supplying value. Integrated Passive and Active Safety Systems Active Safety Passive Safety Scope Reduction of accident probability Get ready

More information

2018 State and Federal Legislative Program

2018 State and Federal Legislative Program 2018 State and Federal Legislative Program STATE TRANSPORTATION FUNDING The passage of HB 2313 (2013) was the result of bipartisan cooperation throughout the Commonwealth. The regional funding provided

More information

2017 STP PROJECT APPLICATION (OREGON)

2017 STP PROJECT APPLICATION (OREGON) Project Title Section 1. Applicant Information Name of Lead Agency/ Organization Address Phone Number Name & Title of Contact Person Email Address Certified Local Public Agency (Yes/No) Section 2. Project

More information

Travel Demand Modeling and Project Coding Procedures

Travel Demand Modeling and Project Coding Procedures Travel Demand Modeling and Project Coding Procedures Revised July 2008 As described in the Final Transportation Conformity Rule (section 93.122), travel demand models used to generate emission estimates

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number: Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 102948 Resolution: Yes No TITLE Metro Transit Police Department Third Quarter Security Report

More information

Matthew H. Brown Curriculum Vitae. Education

Matthew H. Brown Curriculum Vitae. Education Matthew H. Brown Curriculum Vitae Education Valley City State University o September 2012 to May 2014 o Bachelor of Science in Career and Technical Education North Dakota Highway Patrol Academy, Bismarck,

More information

ITSMR RESEARCH NOTE EFFECTS OF CELL PHONE USE AND OTHER DRIVER DISTRACTIONS ON HIGHWAY SAFETY: 2006 UPDATE. Introduction SUMMARY

ITSMR RESEARCH NOTE EFFECTS OF CELL PHONE USE AND OTHER DRIVER DISTRACTIONS ON HIGHWAY SAFETY: 2006 UPDATE. Introduction SUMMARY September 2006 ITSMR RESEARCH NOTE EFFECTS OF CELL PHONE USE AND OTHER DRIVER DISTRACTIONS ON HIGHWAY SAFETY: 2006 UPDATE Introduction The use of cell phones and other driver distractions continue to be

More information

An Analysis of TDM Impacts on a Corridor Segment

An Analysis of TDM Impacts on a Corridor Segment An Analysis of TDM Impacts on a Corridor Segment Phil Winters, CUTR TDM Program Director Liren Zhou, Graduate Research Assistant Sachin Rai, ITS Research Associate Nevine Georggi, TDM Research Associate

More information

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017 Chattanooga 2045 RTP Chattanooga 2045 RTP addresses both transportation supply and demand Continued

More information

Transit Development Plan/Transportation Demand. Chuck Steigerwald Director of Strategic Planning. Management Plan

Transit Development Plan/Transportation Demand. Chuck Steigerwald Director of Strategic Planning. Management Plan Transit Development Plan/Transportation Demand Chuck Steigerwald Director of Strategic Planning Management Plan OmniRide Strategic Plan Phase III TDP/TDMP Recommended service changes Ten-year plan Final

More information

M50 Demand Management Study

M50 Demand Management Study Study Briefing paper to the Strategic Policy Committees (Transport) of : Dun Laoghaire Rathdown County Council, Dublin City Council Fingal County Council South Dublin Co Council 5 th June 2013 December

More information

TRAFFIC IMPACT ANALYSIS. MIDWAY SOLAR FARM II County of Imperial, California January 11, 2011

TRAFFIC IMPACT ANALYSIS. MIDWAY SOLAR FARM II County of Imperial, California January 11, 2011 TRAFFIC IMPACT ANALYSIS MIDWAY SOLAR FARM II County of Imperial, California January 11, 2011 LLG Ref. 3-10-2013 Prepared by: Cara Leone Transportation Planner II Under the Supervision of: Chris Mendiara

More information

Rutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual. New Jersey Highway Authority. Garden State Parkway

Rutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual. New Jersey Highway Authority. Garden State Parkway Rutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual Prepared for Garden State Parkway New Jersey Highway Authority April 2007 Developed by: Rutgers University Intelligent

More information

Distracted Driving Accident Claims Involving Mobile Devices Special Considerations and New Frontiers in Legal Liability

Distracted Driving Accident Claims Involving Mobile Devices Special Considerations and New Frontiers in Legal Liability Presenting a live 90-minute webinar with interactive Q&A Distracted Driving Accident Claims Involving Mobile Devices Special Considerations and New Frontiers in Legal Liability WEDNESDAY, AUGUST 1, 2012

More information