Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

Size: px
Start display at page:

Download "Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE"

Transcription

1 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Study Area and Location District PSA Ward ANC Phase Description 6 64/68 7 7C/7E Planned East Capitol Street Westbound at Southern Avenue Northeast Recreation Center Site 114 KEY: Planned Camera Proposed Camera Bus Stop Metro Station Hiker/Biker Trail School Other Pedestrian Generator This planned speed camera will be located in Ward 7 at the intersection of East Capitol Street and Southern Avenue Northeast in the westbound direction. East Capitol Street runs between Southern Avenue Southeast to the east and C Street Northeast to the west. The posted speed limit is 3 MPH. W7-328 District Department of Transportation 55 M Street, SE, Suite 4 Washington, DC 23

2 East Capitol Street at Southern Avenue NE Field Assessment Summary East Capitol Street is assumed to run in an east-west direction, and is classified as a principal arterial. East Capitol Street has two through lanes, a through and right lane, and a left turn lane eastbound, as well as two through lanes, a through and left lane, and a right turn lane westbound. Southern Avenue Northeast has one through and right lane and one through and left lane in each direction. This site has the following characteristics: This is a residential area with apartments and houses. There is roadwork in the northwest corner. The Capitol Heights Metro Station is in the southeast corner of the intersection. There is sidewalk on both sides of all four legs of the intersection. There are islands in the northeast corner, the southwest corner, and the middle of the west leg. There are concrete medians on all four legs. There is a break in the median on the south leg at the entrance to the metro station. The intersection has a traffic signal with pedestrian signals and crosswalks on all four legs. There is a slope downgrade northbound on the south leg. There are bus stops westbound on the west leg and east bound on the east leg. There is a bus bay for the bus stop on the east leg. Looking Eastbound W7-329 District Department of Transportation 55 M Street, SE, Suite 4 Washington, DC 23

3 East Capitol Street at Southern Avenue NE Looking Westbound Speed Data Analysis Posted Speed Limit (MPH) 3 Mean Speed (MPH) 3 85th Percentile Speed (MPH) 39 1 MPH Pace Speed (MPH) ADT 8,399 The mean speed is equal to the posted speed limit and the 85 th percentile speed is 9 MPH higher than the posted speed limit. Crash Data Analysis From the Accident Summary Report provided for the dates between January 1, 21 and December 31, 212, there were a total of 52 crashes at this location. A breakdown of number of crashes by collision type can be found in the chart on the next page. The most common types of crashes at this location were Right Angle (15 crashes), Left Turn (11 crashes), Rear End (7 crashes) and Fixed Object (7 crashes). Furthermore, this site experienced high frequency (24 crashes) of injury-related crashes. W7-33 District Department of Transportation 55 M Street, SE, Suite 4 Washington, DC 23

4 East Capitol Street at Southern Avenue NE Severity Weather Surface condition Light Condition Total 52 Fatal Clear % Dry % Day % Injury % Rain % Wet % Night % Bus 3 5.8% Snow 2 3.8% Snow/Ice 1 1.9% Truck 2 3.8% 16 Number of Crashes by Collision Type Right Angle Number of Crashes Left Turn Right Turn Rear End Side Swipe Head On Parked Fixed Object Ran Off Road Pedestrian Unspecified Collision Type The Southern Avenue Corridor is listed as one of the Top 1 high frequency crash corridors from 29 to 211, according to the Traffic Safety Statistics Report for the District of Columbia (29-211). 1 Safety Nexus This site presents the following safety considerations which may establish a nexus between traffic safety and the speed camera: 1. Speed Data The 85 th percentile speed is much higher than the posted speed limit at this location. 2. Crash Data There was an elevated number of speed-related crashes at this location, including right angle collisions, as well as a high frequency (24 crashes) of injury-related crashes. The Southern Avenue Corridor is listed as one of the Top 1 high frequency crash corridors from 29 to Field Assessment The following site characteristics suggest a need for a safer travel environment: 1 DDOT, Traffic Safety Statistics Report for the District of Columbia (29-211), page 8. W7-331 District Department of Transportation 55 M Street, SE, Suite 4 Washington, DC 23

5 East Capitol Street at Southern Avenue NE a. This is a residential area with apartments and houses and roadwork in the northwest corner. b. There are several bus stops and one Metrorail station in the area which generate pedestrian activity. Due to the speed data analysis, the elevated number of speed-related crashes and injury-related crashes, the site characteristics, and pedestrian generators, there is a nexus between traffic safety and the speed camera at this location. W7-332 District Department of Transportation 55 M Street, SE, Suite 4 Washington, DC 23

6 East Capitol St WB at Southern Ave NE Speed SAMMAT ENGINEERING SERVICES, LLC 1515 RISING RIDGE ROAD MOUNT AIRY, MD WB Start Time Total 11/2/13 * * * * * * * * * * * * * * * 1: * * * * * * * * * * * * * * * 2: * * * * * * * * * * * * * * * 3: : : : : : : : : PM : : : : : : : : : : : Total W7-333

7 East Capitol St WB at Southern Ave NE Speed SAMMAT ENGINEERING SERVICES, LLC 1515 RISING RIDGE ROAD MOUNT AIRY, MD WB Start Time Total 11/21/ : : : : 5: * * * * * * * * * * * * * * * 6: * * * * * * * * * * * * * * * 7: * * * * * * * * * * * * * * * 8: * * * * * * * * * * * * * * * 9: * * * * * * * * * * * * * * * 1: * * * * * * * * * * * * * * * 11: * * * * * * * * * * * * * * * 12 PM * * * * * * * * * * * * * * * 13: * * * * * * * * * * * * * * * 14: * * * * * * * * * * * * * * * 15: * * * * * * * * * * * * * * * 16: * * * * * * * * * * * * * * * 17: * * * * * * * * * * * * * * * 18: * * * * * * * * * * * * * * * 19: * * * * * * * * * * * * * * * 2: * * * * * * * * * * * * * * * 21: * * * * * * * * * * * * * * * 22: * * * * * * * * * * * * * * * 23: * * * * * * * * * * * * * * * Total Grand Total th Percentile : 5th Percentile : 85th Percentile : 95th Percentile : 13 MPH 31 MPH 39 MPH 45 MPH Stats Mean Speed(Average) : 3 MPH 1 MPH Pace Speed : MPH Number in Pace : 3914 Percent in Pace : 46.6% Number of Vehicles > 3 MPH : 4838 Percent of Vehicles > 3 MPH : 57.6% W7-334

8 East Capitol St WB at Southern Ave NE Volume SAMMAT ENGINEERING SERVICES, LLC 1515 RISING RIDGE ROAD MOUNT AIRY, MD Start Wed 2-Nov-13 Thu 21-Nov-13 Fri 22-Nov-13 Daily Average Time A.M. P.M. A.M. P.M. A.M. P.M. A.M. P.M. 12: * * * * :15 * 1 19 * * * :3 * * * * :45 * * * * : * 12 1 * * * :15 * * * * :3 * * * * :45 * * * * : * 78 2 * * * :15 * 1 6 * * * 6 1 2:3 * 81 5 * * * :45 * * * * : * * * * :15 * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * : * * * * Total Combined Total Peak 6:3 1: 12: 6:3 1: Vol P.H.F ADT ADT 8,399 AADT 8,399 W7-335

9 DC Department of Transportation - Traffic Accident Reporting and Analysis System Accident Summary Report (R-8) Corridor: EAST CAPITOL ST,BN From SOUTHERN AVE,BN TO FIFTY EIGHTH ST,BN Time Period Covered: From 1/1/21 To 12/31/212 Prepared By: Rahul Jain Prepared Date: 1/6/213 Total Number of Accident: Total Number of Fatalities: Total Number of Injuries: Total Number of Disabling Injuries: Total Number of NonDisabling Injuries: Total Number of Pedestrians Involved: Total Number of Bicycles Involved: Total Number of Motorcycles Involved: Collision Type #ACC % Collision Type #ACC % Right Angle: % Fixed Object: % Left Turn: % Ran Off Road: 1 1.9% Right Turn: 1 1.9% Ped. Involved: 2 3.8% Rear End: % Backing: Side Swiped: 4 7.7% Non Collision: Head On: 2 3.8% Under/Over Ride: Parked: 1 1.9% Unspecified: 1 1.9% Time of Day #ACC % 7:3 ~ 9:3: 3 5.8% 9:3 ~ 11:3: 3 5.8% 11:3 ~ 13:3: 3 5.8% 13:3 ~ 16:: % 16: ~18:3: % 18:3 ~ 7:3: % Unspecified: Day o fweek #ACC % Sunday: 5 9.6% Monday: 5 9.6% Tuesday: % Wednesday: % Thursday: % Friday: % Saturday: % Weather Condition #ACC % Clear: % Rain: % Snow: 2 3.8% Sleet/Hail: Fog/Mist: 1 1.9% Crosswind/Blowing Sand: Unspecified: 2 3.8% Surface Condition #ACC % Dry: % Wet: % Snow/Ice: 1 1.9% Slush: 1 1.9% Water/Sand: Repairing: Unspecified: Type of Vehicle #VEH % Passenger Car: % Bus: 3 3.2% Truck: 2 2.1% Taxi: 1 1.1% Minivan: Police/Emergency Vehicle: 2 2.1% Motorcycle/Moped: Bicycle: Fixed Object: Unspecified: 3 3.2% Accident Severity Type #ACC % Fatal Collision: Injury Collision: % PDO Collision: % Light Condition #ACC % Daylight: % Dawn/Dusk: 5 9.6% Dark(Lighted): % Dark(Not Lighted): Dark(Unknown Lighting): Unspecified: Contributing Factor #VEH % Driver: Speed: 1 1.1% Driver: Alcohol/Drug: 2 2.1% Driver: Electronic Device: Driver: Others: % Vehicle: 1 1.1% Roadway: Unspecified: % Pedestrian Actions #ACC % In Crosswalk with Signal: In Crosswalk against Signal: In Crosswalk no Signal: In Unmarked Crosswalk: Not in Crosswalk: From Between Parked Cars: Unspecified: Records are not approved as of 1/6/213 7:43:13 PM W7-336

Study Area and Location District PSA Ward ANC Phase Description B Planned Branch Avenue Northbound at Alabama Avenue Southeast

Study Area and Location District PSA Ward ANC Phase Description B Planned Branch Avenue Northbound at Alabama Avenue Southeast Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Branch Avenue at Alabama Avenue SE Study Area and Location District PSA Ward ANC Phase Description 6

More information

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 29 Block Military Road NW E/B Study Area and Location District PSA Ward ANC Phase Description 2 21 3

More information

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Calvert Street NW Study Area and Location District PSA Ward ANC Phase Description

More information

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 35 Block Massachusetts Avenue NW Study Area and Location District PSA Ward ANC Phase Description 2 24

More information

Site 59 W5-147 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 59 W5-147 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block Bladensburg Road NE SW/B Study Area and Location District PSA Ward ANC Phase Description 5

More information

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 17 Block North Portal Drive NW Study Area and Location District PSA Ward ANC Phase Description 4 41

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia I-395 SW after Exit 4 E/B Study Area and Location District PSA Ward ANC Phase Description 1 71 8 8A

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block 4th Street NE Study Area and Location District PSA Ward ANC Phase Description 1 14 6 6C Proposed

More information

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 19 Block Foxhall Road NW S/B Study Area and Location District PSA Ward ANC Phase Description 2 25 3

More information

Site 40. Recreational Center

Site 40. Recreational Center Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Georgia Avenue S/B at Missouri Avenue NW Study Area and Location District PSA Ward ANC Phase Description

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC 295.4 Miles South of Pennsylvania Avenue SE Study Area and Location District PSA Ward ANC Phase Description

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel Study Area and Location District PSA Ward ANC Phase Description

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6100 Block Georgia Avenue NW Study Area and Location District PSA Ward ANC Phase Description 4 402 4

More information

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Military Road NW Study Area and Location District PSA Ward ANC Phase Description

More information

ROADWAY LIGHTING CURFEW

ROADWAY LIGHTING CURFEW STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Rhode Island Department of Transportation ROADWAY LIGHTING CURFEW IMPLEMENTATION PLAN March 25, 21 TABLE OF CONTENTS INTRUDUCTION/OVERVIEW... 1 1.1. ANTICIPATED

More information

Traffic Impact Study for the Girard Winery Project

Traffic Impact Study for the Girard Winery Project October 16, 2014 Ms. Heather McCollister 1512 D Street Napa, CA 94559 Traffic Impact Study for the Girard Winery Project Dear Ms. McCollister; Whitlock & Weinberger Transportation, Inc. (W-Trans) has completed

More information

Bellevue s Traffic Adaptive Signals

Bellevue s Traffic Adaptive Signals What we ll cover Bellevue s Traffic Adaptive Signals SCATS Phase 1 Implementation SCATS Operations Responsiveness New Features Some Initial Results 2011 Program and Beyond Final Thoughts ITE Quad Mtg April

More information

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES SEPA TRANSPORTATION CONCURRENCY - ROAD IMPACT FEES Introduction Revised February 2004 These guidelines describe how to prepare a traffic study, or Traffic

More information

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan Managing DC Work Zones: DDOT s Citywide Transportation Management Plan ARTBA National Work Zone Management Conference September 20, 2016 1 Outline Citywide Transportation Management Plan (TMP) Citywide

More information

Metrobus 30s Line Enhancements

Metrobus 30s Line Enhancements Customer Service, Operations and Safety Committee Action Item III-C February 14, 2008 Metrobus 30s Line Enhancements Washington Metropolitan Area Transportation Authority Board Action/Information Summary

More information

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana March 2011 Prepared for: URS Corporation 2020 E. First Street, Suite #400 Santa Ana, CA 92705 Tel:

More information

Annual FARS/GES System-Wide Training

Annual FARS/GES System-Wide Training Annual FARS/GES System-Wide Training Anaheim, California October 26th-30th 2009 SWT 2009 October 26th-30th 1 Session Summary To Complete this session you will need the following materials: 2010 FARS Coding

More information

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013 Council of State Governments Takoma Langley Transit Center Purple Line Project Briefing October 28, 2013 Takoma Langley Transit Center Purpose and Need Provide a safe, attractive and efficient facility

More information

Proposed FY 06 Project Development Program and FY 05 Project Development Program Update

Proposed FY 06 Project Development Program and FY 05 Project Development Program Update Washington Metropolitan Area Transit Authority Proposed FY 06 Project Development Program and FY 05 Project Development Program Update Presented to the Board of Directors: P D E C Planning & Development

More information

HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION. Presentation to ANC 3E April 13, 2017

HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION. Presentation to ANC 3E April 13, 2017 HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION Presentation to ANC 3E April 13, 2017 1 PURPOSE AND NEED We are committed to providing reliable electric service to our customers. As part of this commitment,

More information

ESTIMATING PARAMETERS FOR MODIFIED GREENSHIELD S MODEL AT FREEWAY SECTIONS FROM FIELD OBSERVATIONS

ESTIMATING PARAMETERS FOR MODIFIED GREENSHIELD S MODEL AT FREEWAY SECTIONS FROM FIELD OBSERVATIONS 0 ESTIMATING PARAMETERS FOR MODIFIED GREENSHIELD S MODEL AT FREEWAY SECTIONS FROM FIELD OBSERVATIONS Omor Sharif University of South Carolina Department of Civil and Environmental Engineering 00 Main Street

More information

Prepared for: Rocklin. Prepared by:

Prepared for: Rocklin. Prepared by: APPENDIX L Sierra Gateway Apartments Transportation Impact Analysis Report Prepared for: Rocklin Sierra Apartments II, LLC Prepared by: SIERRA GATEWAY APARTMENTS TRANSPORTATION IMPACT ANALYSIS REPORT PREPARED

More information

Traffic Impact Analysis

Traffic Impact Analysis LA PALMA VILLAGE INITIAL STUDY CITY OF ANAHEIM Appendices Appendix I Traffic Impact Analysis September 2015 LA PALMA VILLAGE INITIAL STUDY CITY OF ANAHEIM Appendices This page intentionally left blank.

More information

A Plan to Connect Baltimore

A Plan to Connect Baltimore A Plan to Connect Baltimore BaltimoreLink by the Numbers Improved Access to Frequent Transit Lines (frequent = every 15 mins. or better) 131,000 more JOBS (+37%) 205,000 more PEOPLE (+34%) More Service

More information

APPENDIX D. Traffic Impact Analysis

APPENDIX D. Traffic Impact Analysis APPENDIX D Traffic Impact Analysis TRAFFIC IMPACT ANALYSIS CALEXICO SOLAR FARM I County of Imperial, California July 8, 2011 LLG Ref. 3-11-2034 Prepared by: Cara Leone Transportation Planner II Under the

More information

Des Moines Area Regional Transit Non Rider Survey

Des Moines Area Regional Transit Non Rider Survey Moines Area Regional Transit Non Rider Survey helping organizations make better decisions since 1982 Findings Report Submitted to the Moines Area Regional Transit Authority by: ETC Institute 725 W. Frontier

More information

Virginia Transit Update

Virginia Transit Update Virginia Transit Update Jennifer Mitchell Agency Director Virginia Transit Association May 24, 2017 1 Key Priorities for Statewide Transit Program Funding Safety and State of Good Repair Expansion 2 Funding

More information

Performance Evaluation of Non-Intrusive Methods for Traffic Data Collection. Kamal Banger, Ministry of Transportation of Ontario

Performance Evaluation of Non-Intrusive Methods for Traffic Data Collection. Kamal Banger, Ministry of Transportation of Ontario Abstract Performance Evaluation of Non-Intrusive Methods for Traffic Data Collection Kamal Banger, Ministry of Transportation of Ontario Nancy Adriano, P.Eng., Ministry of Transportation of Ontario For

More information

Design Considerations for Real-time Arterial Performance Measurement Systems Using Transit Bus Probes

Design Considerations for Real-time Arterial Performance Measurement Systems Using Transit Bus Probes Design Considerations for Real-time Arterial Performance Measurement Systems Using Transit Bus Probes Abraham Emmanuel & David Zavattero Chicago Department of Transportation Project Goals Estimate traffic

More information

SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT

SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT Principal Investigator Tom Maze Principal Contributor Ali Kamyab Sponsored by the Engineering

More information

Appendix D Supportive Transportation Materials

Appendix D Supportive Transportation Materials Appendix D Supportive Transportation Materials D.1. Stakeholder Input and Coordination As noted in Section 1.7 of the main Master Plan document, there have been several opportunities for stakeholders to

More information

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM Date of Meeting: # 9 SUBJECT: ELECTION DISTRICTS: STAFF CONTACTS: Public and Private Infrastructure Improvements Adjacent to the Dulles

More information

Crystal Springs Upland School Transportation Demand Management Plan. March 2016

Crystal Springs Upland School Transportation Demand Management Plan. March 2016 Crystal Springs Upland School Transportation Demand Management Plan March 06 CONTENTS Introduction... Transportation Demand Management (TDM) Program.... Background/Survey of Existing Student Commuting

More information

Traffic Impact Analysis Shotwell Road Residential Clayton, NC

Traffic Impact Analysis Shotwell Road Residential Clayton, NC Shotwell Road Residential Clayton, NC TABLE O CONTENTS 1. INTROUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3. Adjacent Land Uses...2 1.4. Existing Roadways...2

More information

APPENDIX E TRANSPORTATION

APPENDIX E TRANSPORTATION APPENDIX E TRANSPORTATION 2011 PATRON SURVEYS VISSIM MODEL CALIBRATION AND VALIDATION Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax:

More information

DRAFT. Trail Counter Update. Central Iowa Trail Count Program. Trail counters in Central Iowa

DRAFT. Trail Counter Update. Central Iowa Trail Count Program. Trail counters in Central Iowa Trail Counter Update Trail counters in Central Iowa Central Iowa Trail Count Program In October 2011, the MPO began the Central Iowa Trail Count Program with 40 infrared trail counters from TRAFx Research

More information

Automated Photo Enforcement Annual Report 2017

Automated Photo Enforcement Annual Report 2017 Automated Photo Enforcement Annual Report 7 Automated Photo Enforcement Program Sustainable Streets Division San Francisco Municipal Transportation Agency January, 9 Automated Photo Enforcement Annual

More information

1.1. Driving Around Euclid. Goals. Launch 1.1

1.1. Driving Around Euclid. Goals. Launch 1.1 1.1 Driving Around Euclid Goals Review the coordinate system Explore distances on a coordinate grid In this problem, students review the concept of the coordinate grid and are introduced to the idea of

More information

Hennepin Avenue Downtown

Hennepin Avenue Downtown Hennepin Avenue Downtown Construction Kick-off Meeting Stakeholders, Owners, Managers January 14 & 17, 2019 Agenda Summary Background Principles Scope, Schedule, Budget Construction Utilities Roadway What

More information

Other conditional and loop constructs. Fundamentals of Computer Science Keith Vertanen

Other conditional and loop constructs. Fundamentals of Computer Science Keith Vertanen Other conditional and loop constructs Fundamentals of Computer Science Keith Vertanen Overview Current loop constructs: for, while, do-while New loop constructs Get out of loop early: break Skip rest of

More information

Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing

Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing Customer Services, Operations, and Safety Committee Board Information Item III-B September 24, 2009 Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing Washington Metropolitan Area

More information

Benning Road-H Street Limited Line

Benning Road-H Street Limited Line How to use this timetable Use the map to find the stops closest to where you will get on and off the bus. Select the schedule (Weekday, Saturday, Sunday) for when you will travel. Along the top of the

More information

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY Chapter 15: Safety and Security A. INTRODUCTION This chapter discusses safety and security as they relate to the Proposed Project and summarizes how potential safety and security issues are identified

More information

Approval of Navy Yard Chiller Joint Development Agreement

Approval of Navy Yard Chiller Joint Development Agreement Planning, Program Development and Real Estate Committee Item V B July 9, 2015 Approval of Navy Yard Chiller Joint Development Agreement Washington Metropolitan Area Transit Authority Board Action/Information

More information

Calipatria Solar Farm TIA

Calipatria Solar Farm TIA Calipatria Solar Farm TIA Prepared for: 7SM 8ME, LLC 71SM 8ME, LLC c/o 8minutenergy Renewables LLC Prepared by: Fehr & Peers March 25, 211 IE1-37 TABLE OF CONTENTS Executive Summary... i Project Trip Estimates...

More information

SPEED SURVEY ANALYSIS SYSTEM

SPEED SURVEY ANALYSIS SYSTEM SPEED SURVEY ANALYSIS SYSTEM user s manual CROSSROADS SOFTWARE 210 W. Birch Street, Suite 207 Brea, CA 92821 (714) 990-6433 Fax: (714) 990-5628 www.crossroadssoftware.com Chapter One: Introducing the Speed

More information

Traffic Impact Study for the Grove Street Subdivision

Traffic Impact Study for the Grove Street Subdivision Whitlock & Weinberger Transportation, Inc. 490 Mendocino Avenue Suite 201 Santa Rosa, CA 95401 voice (707) 542-9500 fax (707) 542-9590 475 14 th Street Suite 290 Oakland, CA 94612 voice (510) 444-2600

More information

Rural Expressway Intersection Characteristics that Contribute to Reduced Safety Performance

Rural Expressway Intersection Characteristics that Contribute to Reduced Safety Performance Rural Expressway Intersection Characteristics that Contribute to Reduced Safety Performance Garrett D. Burchett Center for Transportation Research and Education Iowa State University 2901 South Loop Drive,

More information

The Maryland Transit Administration. A Plan to Connect Baltimore

The Maryland Transit Administration. A Plan to Connect Baltimore The Maryland Transit Administration A Plan to Connect Baltimore 1 What We ve Heard Over 1,100 stakeholder comments submitted through the Bus Network Improvement Project (BNIP) Six workshops, three pop-up

More information

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study James Webb, P.E., Iowa Department of Transportation Liz Finarty, P.E., Iowa Department of Transportation James Armstrong,

More information

Gaston County GIS. Interactive Mapping Website

Gaston County GIS. Interactive Mapping Website Gaston County GIS Interactive Mapping Website The Gaston County GIS mapping website optimizes the available window viewing area and has interactive tools, collapsible menus and movable windows. This map

More information

Approval to Negotiate and Execute a Term Sheet for the Navy Yard Chiller Site Joint Development

Approval to Negotiate and Execute a Term Sheet for the Navy Yard Chiller Site Joint Development Planning, Program Development and Real Estate Committee Item V- B September 11, 2014 Approval to Negotiate and Execute a Term Sheet for the Navy Yard Chiller Site Joint Development Washington Metropolitan

More information

Appendix D. Transportation Study

Appendix D. Transportation Study Appendix D Transportation Study Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May 29 County of Mendocino Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May

More information

Managing DC Work Zones via a Citywide Transportation Management Plan. ITE Mid-Colonial District Annual Meeting May 20, 2014

Managing DC Work Zones via a Citywide Transportation Management Plan. ITE Mid-Colonial District Annual Meeting May 20, 2014 Managing DC Work Zones via a Citywide Transportation Management Plan ITE Mid-Colonial District Annual Meeting May 20, 2014 Presentation Outline The Team The Challenge The Approach Project Diagram Work

More information

TRANSPORTATION DEPARTMENT Business Plan

TRANSPORTATION DEPARTMENT Business Plan TRANSPORTATION DEPARTMENT 2018 Business Plan Today s Agenda Mission Department Overview Planning Initiatives Commission Priorities and 2018 Budget Requests Five-year Plan Department of Transportation Mission

More information

HILLTOP SENIOR LIVING CENTER Pollard Station Traffic Impact Analysis

HILLTOP SENIOR LIVING CENTER Pollard Station Traffic Impact Analysis HILLTOP SENIOR LIVING CENTER Pollard Station Traffic Impact Analysis Prepared for Town of Truckee Prepared by TRANSPORTATION CONSULTANTS, INC. Pollard Station TRAFFIC IMPACT ANALYSIS Prepared for the Town

More information

Northern Virginia Transportation Authority

Northern Virginia Transportation Authority IV Northern Virginia Transportation Authority March 23, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation 66 Outside the Beltway Project Scope Multimodal improvements to

More information

UDOT Freeway and Traffic Signal Performance Metrics

UDOT Freeway and Traffic Signal Performance Metrics UDOT Freeway and Traffic Signal Performance Metrics September 26, 2016 Grant Farnsworth, PE, PTOE UDOT Traffic Mobility Engineer Kelly Burns Eric Rasband Utah Demographics Speed Report Benefit of Past

More information

Cedar Rapids ITS Deployment Project

Cedar Rapids ITS Deployment Project Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders

More information

MEASURING SEATBELT USAGE THROUGH EXISTING TRAFFIC SURVEILLANCE SYSTEMS: PILOT PROJECT

MEASURING SEATBELT USAGE THROUGH EXISTING TRAFFIC SURVEILLANCE SYSTEMS: PILOT PROJECT MEASURING SEATBELT USAGE THROUGH EXISTING TRAFFIC SURVEILLANCE SYSTEMS: PILOT PROJECT Mark Lofgren Rural Transportation Safety and Security Center Upper Great Plain Transportation Institute North Dakota

More information

A parabolic curve that is applied to make a smooth and safe transition between two grades on a roadway or a highway.

A parabolic curve that is applied to make a smooth and safe transition between two grades on a roadway or a highway. A parabolic curve that is applied to make a smooth and safe transition between two grades on a roadway or a highway. VPC: Vertical Point of Curvature VPI: Vertical Point of Intersection VPT: Vertical Point

More information

195 Hegenberger Road Hotel: Traffic Circulation Analysis in Response to Comments on the Final EIR

195 Hegenberger Road Hotel: Traffic Circulation Analysis in Response to Comments on the Final EIR 350 Frank H. Ogawa Plaza Suite 300 Oakland, CA 94612 510.839.5066 phone 510.839.5825 fax www.esassoc.com Technical Memorandum date November 12, 2014 to from subject Colleen Liang, Port Associate Environmental

More information

TRAFFIC STUDIES MADE SIMPLER: COUNT AND CLASSIFICATION IN THE CLOUD

TRAFFIC STUDIES MADE SIMPLER: COUNT AND CLASSIFICATION IN THE CLOUD TRAFFIC STUDIES MADE SIMPLER: COUNT AND CLASSIFICATION IN THE CLOUD AllTrafficSolutions.com 2 CONTENTS Overview 3 Case Study: Missouri Department of Transportation (MoDOT) 4 Welcome to TraffiCloud TM 6

More information

Interactive Highway Safety Design Model (IHSDM) Workshop Nevada DOT Las Vegas, NV February 13, 2014

Interactive Highway Safety Design Model (IHSDM) Workshop Nevada DOT Las Vegas, NV February 13, 2014 Interactive Highway Safety Design Model (IHSDM) Workshop Nevada DOT Las Vegas, NV February 13, 2014 Overview Hands-on Exercises: IHSDM Crash Prediction Module (CPM) The Crash Prediction Module estimates

More information

Final Presentation SUITLAND FEDERAL CENTER. SUITLAND FEDERAL CENTER MASTER PLANNING ULI minitap

Final Presentation SUITLAND FEDERAL CENTER. SUITLAND FEDERAL CENTER MASTER PLANNING ULI minitap Final Presentation SUITLAND MASTER PLANNING ULI minitap GENERAL SERVICES ADMINISTRATION NATIONAL CAPITAL REGION OFFICE OF PLANNING & DESIGN QUALITY 7TH & D STREETS SW WASHINGTON, DC 20407 2:30 4:00 PM

More information

St. Helena Island 5-6 December,

St. Helena Island 5-6 December, 5-6 December, 2011 Beaufort County Multi-Jurisdictional Form-Based Code Workshop and Charrette Report 2011 Opticos Design, Inc. 154 Beaufort County Multi-Jurisdictional Form-Based Code Workshop and Charrette

More information

B.E. Mechanical. Big Country Construction & Building Supplies Ltd. Bumper to Bumper. Cam's Inspections. Cervus Ag Equipment

B.E. Mechanical. Big Country Construction & Building Supplies Ltd. Bumper to Bumper. Cam's Inspections. Cervus Ag Equipment B.E. Mechanical Mailing Address : Box 106 Business Phone : 403-854-8737 Red Seal heavy duty mobile mechanic Big Country Construction & Building Supplies Ltd. Street Address : 403 3rd Avenue East Mailing

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:

Washington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number: Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 102948 Resolution: Yes No TITLE Metro Transit Police Department Third Quarter Security Report

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS RESOLUTION No. 16-021 WHEREAS, In Fiscal Year 2015, the San Francisco Juvenile Court adjudicated approximately 819 transit violation citations

More information

Crash Scene Mapping Solutions for Quick Clearance during Inclement Weather

Crash Scene Mapping Solutions for Quick Clearance during Inclement Weather Crash Scene Mapping Solutions for Quick Clearance during Inclement Weather By Lee DeChant One of nine digital images acquired by the Minnesota State Patrol and mapped using photogrammetry Inclement weather

More information

Using Empirical (real-world) Transportation Data to Extend Travel Demand Model Capabilities

Using Empirical (real-world) Transportation Data to Extend Travel Demand Model Capabilities Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 10-4-2013 Using Empirical (real-world) Transportation Data to Extend Travel Demand Model

More information

Project File Number: B. Geographic Location of Proposed Project or Program (check all that apply)

Project File Number: B. Geographic Location of Proposed Project or Program (check all that apply) COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION PROJECT INITIATION FORM Project File Number: Part I: Summary Information A. Proponent Information Municipality/Agency

More information

Evaluation of Roadside Surveys for Freight Transport Data at Border Crossings

Evaluation of Roadside Surveys for Freight Transport Data at Border Crossings Evaluation of Roadside Surveys for Freight Transport Data at Border Crossings Wirach Hirun #1 # Department of Civil and Environmental Engineering, Kasetsart University Chalermprakiat Sakon Nakhon Province

More information

PROJECT TIMELINE. Next steps. Plan. Start of Service

PROJECT TIMELINE. Next steps. Plan. Start of Service PROJECT TIMELINE 2018 2019 2020 2021 2022 2023 WE ARE HERE Plan Develop Build Develop design options for termini, station locations, and transit operations Conduct environmental research Assess funding

More information

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C TPB R2-2014 July 17, 2013 NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C. 20002 RESOLUTION APPROVING THE 2013 CONSTRAINED LONG RANGE TRANSPORTATION

More information

2018 State and Federal Legislative Program

2018 State and Federal Legislative Program 2018 State and Federal Legislative Program STATE TRANSPORTATION FUNDING The passage of HB 2313 (2013) was the result of bipartisan cooperation throughout the Commonwealth. The regional funding provided

More information

Westbard Concept Framework Plan Presentation. Workshop Wrap up November 18, November 18 Concept Framework Plan

Westbard Concept Framework Plan Presentation. Workshop Wrap up November 18, November 18 Concept Framework Plan November 18 Concept Framework Plan Westbard Concept Framework Plan Presentation Workshop Wrap up November 18, 2014 November 18 Concept Framework Plan Workshop Re cap Day 1: visioning session: characteristics

More information

OR 217,I-5 Experience Portland, OR

OR 217,I-5 Experience Portland, OR OR 217,I-5 Experience Portland, OR By: Abby Caringula Parsons Brinckerhoff July 8th, 2011 Presentation Outline Background VISUM Network Adjustment Model Origin-Destination(O-D) Demand Development ANM Export

More information

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017 Chattanooga 2045 RTP Chattanooga 2045 RTP addresses both transportation supply and demand Continued

More information

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.

Meeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time. TO WHOM IT MAY CONCERN: NOTICE OF RE-SCHEDULED BOARD MEETINGS This is notice that the re-scheduled meetings of the Board of Directors of the New Jersey Transit Corporation, NJ Transit Rail Operations,

More information

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801 GORE BUILDING 238 N. Massachusetts Avenue, Lakeland, FL 33801 CDB LOCATION REDEVELOPMENT PROJECT MUNN PARK HISTORIC DISTRICT INCENTIVES AVAILABLE ADJACENT PARKING INCLUDED BK698301 Phone: (863) 683-3425

More information

Downtown Boise Multimodal Center

Downtown Boise Multimodal Center Treasure Valley High Capacity Transit Study Downtown Boise Multimodal Center Environmental Assessment June 2009 Prepared by the Federal Transit Administration and Valley Regional Transit. U.S. Department

More information

PROPOSED EXPANSION OF THE BOOYSENDAL SOUTH EVEREST MINE

PROPOSED EXPANSION OF THE BOOYSENDAL SOUTH EVEREST MINE BOOYSENDAL PLATINUM (PTY) LTD TRAFFIC IMPACT STUDY (FEB 2017) REV 2 PROPOSED EXPANSION OF THE BOOYSENDAL SOUTH EVEREST MINE PREPARED BY: HAMATINO CONSULTING ENGINEERS 13 HOOGGELEGEN ROAD WHITE RIVER 1240

More information

Road Intersections Near Level Crossings: Intersection Awareness in Illinois. Brian Vercruysse Illinois Commerce Commission

Road Intersections Near Level Crossings: Intersection Awareness in Illinois. Brian Vercruysse Illinois Commerce Commission Road Intersections Near Level Crossings: Intersection Awareness in Illinois Brian Vercruysse Illinois Commerce Commission Illinois Freight & Passenger Rail Systems Metra Commuter Illinois Rail Crossing

More information

TRAFFIC IMPACT ANALYSIS. MIDWAY SOLAR FARM II County of Imperial, California January 11, 2011

TRAFFIC IMPACT ANALYSIS. MIDWAY SOLAR FARM II County of Imperial, California January 11, 2011 TRAFFIC IMPACT ANALYSIS MIDWAY SOLAR FARM II County of Imperial, California January 11, 2011 LLG Ref. 3-10-2013 Prepared by: Cara Leone Transportation Planner II Under the Supervision of: Chris Mendiara

More information

TxDOT TMS PERFORMANCE MEASURES ITS TEXAS Texas Department of Transportation

TxDOT TMS PERFORMANCE MEASURES ITS TEXAS Texas Department of Transportation TxDOT TMS PERFORMANCE MEASURES ITS TEXAS 2017 Texas Department of Transportation Traffic Management Systems November 2017 TRF-TM Update 1 2 Implementation of TMS Performance Metrics TMS Performance Metrics

More information

2017 STP PROJECT APPLICATION (OREGON)

2017 STP PROJECT APPLICATION (OREGON) Project Title Section 1. Applicant Information Name of Lead Agency/ Organization Address Phone Number Name & Title of Contact Person Email Address Certified Local Public Agency (Yes/No) Section 2. Project

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

Transit Development Plan/Transportation Demand. Chuck Steigerwald Director of Strategic Planning. Management Plan

Transit Development Plan/Transportation Demand. Chuck Steigerwald Director of Strategic Planning. Management Plan Transit Development Plan/Transportation Demand Chuck Steigerwald Director of Strategic Planning Management Plan OmniRide Strategic Plan Phase III TDP/TDMP Recommended service changes Ten-year plan Final

More information

Advanced Driver Assistance: Modular Image Sensor Concept

Advanced Driver Assistance: Modular Image Sensor Concept Vision Advanced Driver Assistance: Modular Image Sensor Concept Supplying value. Integrated Passive and Active Safety Systems Active Safety Passive Safety Scope Reduction of accident probability Get ready

More information

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009 North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings December 9 & 10, 2009 1 Welcome & Introductions 2 3 What Are We Doing Here Tonight? Public Hearing for RTD North Metro Corridor

More information

MEMORANDUM. Church of the Redeemer School Focused Transportation Impact Analysis

MEMORANDUM. Church of the Redeemer School Focused Transportation Impact Analysis MEMORANDUM Date: Februrary 2, 2016 To: From: Subject: Father Samer Youssef, Church of the Redeemer Sarah Jampole and Matt Haynes, Fehr & Peers Church of the Redeemer School Focused Transportation Impact

More information

Kansas Division. January 31, 2018

Kansas Division. January 31, 2018 Division January 31, 6111 SW 29 th, Suite 100 Topeka, 66614 (785) 273-2600 (785) 273-2620 (fax) www.fhwa.dot.gov/ksdiv/index.htm Catherine M. Patrick, P.E. State Transportation Engineer Department of Transportation

More information

Purple Line Extension Updates on La Cienega and Rodeo Stations September 13, 2017

Purple Line Extension Updates on La Cienega and Rodeo Stations September 13, 2017 Purple Line Extension Updates on La Cienega and Rodeo Stations September 13, 2017 1 Agenda Section 1 Construction Updates Wilshire/La Cienega Station Piling Update La Cienega Decking Safety Decking Overview

More information

ORDINANCE NO. _ CITY OF LEOTI, KANSAS

ORDINANCE NO. _ CITY OF LEOTI, KANSAS ORDINANCE NO. _2018-06 CITY OF LEOTI, KANSAS AN ORDINANCE AMENDING SECTION 28-1 OF THE MUNICIPAL CODE OF THE CITY OF LEOTI REGULATING TRAFFIC WITHIN THE CORPORATE LIMITS OF THE CITY OF LEOTI, KANSAS; INCORPORATING

More information