1 Spring Test 16 due 06/14/2013 Multiple Choice Identify the choice that best completes the statement or answers the question. Figure Refer to the information shown in Figure Motor 1 is rated at 30 hp and Motor 2 is rated at 7 1 / 2 hp. The smallest conductors permitted between the gutter and the switch for Motor 2 are AWG. a. 6 b. 3 c. 1/0 d. 8 e Refer to the information shown in Figure Motor 1 is rated at 30 hp and Motor 2 is rated at 7 1 / 2 hp. The smallest conductors permitted between the gutter and the switch for Motor 1 are AWG. a. 6 b. 3 c. 1/0 d. 8 e The minimum feeder load for a 40 foot long show window is VA. a b c. 10,000 d. none of these Figure Refer to the motor nameplate shown in Figure The largest 1-pole circuit breaker that can be installed in a 120/208-volt, 3Ø, 4-wire panelboard for this motor is a A. a. 125 b. 100 c. 200 d. 70 e Refer to the motor nameplate shown in Figure The largest 2-pole circuit breaker that can be installed in a 120/240-volt, 3Ø, 4-wire panelboard for this motor is a A. a. 40 b. 100 c. 50 d. 70 e For a cable or raceway that is installed through bored holes in wood members, the holes shall be bored so that the edge of the hole is not less than 1 1 / 4 " from the nearest edge of the wood member. Where this distance cannot be maintained, the cable or raceway shall be protected from penetration by nails and screws by a steel plate or bushing, at least -inch thick, and of appropriate length and width installed to cover the area of the wiring. a. 1 / 16 b. 1 / 8 c. 3 / 16 d. 7. Mandatory inspections include; a. service, feeders c. data, fire alarm b. receptacles, switches d. None of these 1 / 4

2 8. When using the optional calculation for sizing service conductors, a dwelling unit, which contains a 20 kva electric furnace, would have a computed heating load of. a. 25kVA c. 13kVA b. 20kVA d. 8kVA 9. Your body has a resistance of about 50,000 ohms between your hands. You complete a 208-volt circuit by holding one "hot" in your left hand and the other "hot" in your right hand. The current flowing in your body is about ma. a. 9.6 b. 4.2 c..24 d. 4.8 e. 2.4 Figure Refer to the motor nameplate shown in Figure The smallest branch circuit conductors that can be installed between the 2-pole circuit breaker in the 120/240-volt, 3Ø, 4-wire panelboard and the motor are AWG. a. 12 b. 14 c. 16 d. 10 e Refer to the motor nameplate shown in Figure The smallest branch circuit conductors that can be installed between the 1-pole circuit breaker in the 120/240-volt, 3Ø, 4-wire panelboard and the motor are AWG. a. 12 b. 14 c. 16 d. 10 e Aluminum fittings and enclosures shall be permitted to be used with conduit. a. steel rigid metal c. polyvinyl chloride b. aluminum rigid metal d. any of these 13. The classification of a location where easily ignitible fibers/flyings are stored or handled other than in the process of manufacture is. a. Class I, Division 1 c. Class II, Division 1 e. Class III, Division 1 b. Class I, Division 2 d. Class III, Division Conductive materials enclosing electrical conductors are grounded to. I. prevent surges of voltage II. prevent surges of lightning III. facilitate overcurrent device operation in case of ground faults a. I only b. II only c. III only d. all of these 15. Flexible cords and cables shall NOT be. a. used as elevator cables b. run through holes in walls c. used as data processing cables d. used to prevent transmission of vibration 16. According to the NEC, flat conductor cable is permitted to be used for. I. general-purpose circuit conductors II. appliance circuit conductors a. I only b. II only c. either I or II d. neither I nor II

3 17. An inspector has visited a jobsite and found that were deficiencies in the electrical installation done by an electrical contractor who took out the permit. The inspector writes a correction notice and leaves it on the job. Nobody visits the job for 4 days. The general contractor finds the note, but the electrical contractor does not get notified by the general contractor for two and a half weeks. What is the maximum time to correct the deficiencies and recall for an inspection? Is the electrical contractor (EC) or general contractor (GC) responsible? a. 5 days, EC d. 20 days, GC b. 7 days, GC e. 20 days, EC c. 7 days, EC 18. Not more than one conductor shall be connected to the grounding electrode by a single clamp or fitting unless the clamp or fitting is. a. cast bronze or brass d. all of these b. listed for multiple conductors e. none of these c " in thickness 19. Electrical installations in hollow spaces, vertical shafts, and ventilation or air-handling ducts shall be so made that the possible spread of fire or products of combustion will not be. a. substantially increased c. exposed b. allowed d. underrated 20. Motor Nameplate Information: 115/230-V 1Ø 1 hp Supply: 1-pole breaker in a 120/240-V, 1-ph, 3-W panel Minimum size circuit conductors are AWG. a. 8 b. 12 c. 6 d. 10 e What is the maximum distance (in feet) between supports for a straight run of 2" IMC made up with threaded couplings? a. 16 b. 10 c. 6 d. 3 e Which of the following wiring methods is permitted through an air conditioning duct? a. electrical metallic tubing b. PVC c. no wiring method is permitted in an A/C duct d. Romex 23. Type AC cable shall be secured by staples, cable ties, straps, hangers, or similar fittings at intervals not exceeding feet. a. 3 b. 10 c. 6 d. 2 e. 4 1 / Overcurrent protective devices shall be so selected and coordinated as to permit the circuit protective devices used to clear a fault without the occurrence of extensive damage to the electrical components of the circuit. This fault shall be assumed to be. I. between any circuit conductor and the equipment grounding conductor(s) or enclosing metal raceway II. between two or more of the circuit conductors a. neither I nor II b. II only c. both I and II d. I only 25. A 175-Amp breaker protects a feeder that originates in a 120/208-volt, 3-ph, 4-wire service panel in a residence. Which of the following conductors is the smallest size permitted for the feeder? a. 2/0 b. 1 c. 1/0 d. 2 e Equipment designed to open circuits under shall have an interrupting rating not less than the nominal circuit voltage and the current that is available at the line side of the equipment.

4 a. short-circuit b. overload c. ground-fault d. all of these e. none of these 27. A 1 hp, 115/230-V, 1Ø motor circuit is fed from a single-pole breaker in a 120/240-V, 1-ph, 3-W panel. The maximum permitted rating of an ITCB is A. a. 25 b. 50 c. 40 d. 30 e Motor Nameplate Information: /460-V 3Ø 3 hp Supply: 3-pole breaker in a 120/208-V, 3-ph, 4-W panel Minimum size circuit conductors are AWG. a. 10 b. 6 c. 8 d. 14 e. 12 Figure Wire connected to the motor must have the correct ampacity according to the 75 column. However, inside the conduit between the panel and the wireway ampacity corrections are made, as usual, in the 90 column. The specifications require that separate equipment grounding conductors be installed in each raceway. The engineer who wrote the specs means that a metal raceway can t be used as the only EGC. But remember that only one EGC must be installed in each conduit. Refer to the drawing shown below to answer questions that refer to this figure. 29. Refer to Figure The largest permitted breaker that can be installed in the panel for Motor 1 is A. a. 70 b. 60 c. 40 d. 35 e Which of the following are harmonic-producing loads? I. incandescent lamps II. welders III. UPS systems a. I only c. I & II only e. I & III only b. II & III only d. III only f. I, II & III 31. Armored cable installed in thermal insulation shall have conductors rated at. The ampacity of cable installed in these applications shall be that of 60 degree C conductors. a. 60 degrees C b. 194 degrees F c. 75 degrees C d. 90 degrees F Figure

5 Feeder to serve these three motors. Use Exc. 1 to (C)(1) to determine individual motor OCPDs. 32. Refer to the information shown in Figure Without regard to the future motors, the smallest conductors permitted between Panel LC and the gutter are AWG or kcmil. a. 250 b. 300 c. 4/0 d. 350 e What minimum size conductors are required to feed a watt, 240-volt electric furnace operated at 240 volts? Size the conductors per 424.3(B). The branch-circuit OCPD is a circuit breaker that is rated for 75 C. a. 6 b. 4 c. 8 d. 10 e Which of the following provides clearance requirements from walls for proper ventilation of transformer enclosures? a. The NEC d. All of these b. Job specifications e. None of these c. Manufacturer's nameplate 35. Where one or more complete paragraphs from the previous edition of the NEC have been deleted in the current edition, the deletion is identified by between the remaining paragraphs. a. a vertical ( ) line in the margin d. brackets ([ ]) around the deleted text b. a bullet ( ) e. crossed-out text c. underlined text f. none of these 36. Expansion fittings and telescoping sections of metal raceways shall be made electrically continuous by or other means. a. a main bonding jumper d. equipment bonding jumpers b. concrete encasement e. isolation c. a grounding electrode conductor 37. A 150-Amp breaker protects a feeder that originates in a 120/208-volt, 3-ph, 4-wire service panel in a school. Which of the following THHN/THWN copper conductors is the smallest size permitted for the feeder? a. 3/0 b. 1 c. 2/0 d. 2 e. 1/0 38. The allowable fill for an 1 1 / 4 -inch Schedule 40 PVC with more than 2 conductors is sq. in. a..794 b..333 c..495 d Which of these potential hazards are addressed by the requirements in the NEC? a. protection against overcurrent d. all of these b. protection against overvoltage e. none of these c. protection against fault currents 40. What is the cross sectional area of a 1 1 / 2 " rigid metal conduit? a b..829 c d Flexible Metal Conduit used to connect equipment where flexibility is required after installation: a. must utilize stranded conductors. d. provides adequate grounding if listed fittings are used.

6 b. requires the installation of an equipment grounding conductor. c. cannot be longer than 1.4 meters, (41/2 ft.). e. shall only be used in trade sizes larger than 11/4 inches 42. RMC shall be securely fastened within feet of each outlet box, junction box, device box, cabinet, conduit body, or other conduit termination. a. 5 b. 20 c. 3 d. 10 e Short sections of metal enclosures used to protect from physical damage shall not be required to be connected to the equipment grounding conductor. a. service conductors c. cable assemblies b. feeders d. none of these 44. The FLA shown on a motor nameplate is used to size. a. OL protection c. conductors b. SC&GF protection d. all of these 45. One of the requirements for plan review of complex structures is. a. service of 400 amps or more c. any multifamily structure b. Service of 400 amps or more and 10,000 d. none of these A of fualt current or 150V to ground 46. A 2-pole breaker in a 120/208-V, 3-ph, 4-W panel supplies power to a circuit. This circuit is connected to a 2 hp, 208-V, 1Ø motor. A safety switch is to be installed adjacent to the motor. DETD fuses with a maximum permitted rating of A can be installed in the switch. a. 35 b. 20 c. 30 d. 40 e An insulated conductor that is intended for use as a grounded conductor, where contained within a flexible cord, shall be identified by or by other means permitted. I. a white or gray outer finish II. one or more white stripes on other than green insulation III. a green outer finish IV. a green outer finish with one or more yellow stripes a. I only b. I or II only c. III only d. III or IV only 48. One receptacle is to be installed on a dedicated (individual) branch circuit. A receptacle rated at amps could be used where the circuit is connected to a 50-A circuit breaker. I. 40 II. 50 a. either I or II b. I only c. II only d. neither I nor II Figure Refer to the nameplate and information shown in Figure The smallest BC conductors permitted are AWG.

7 a. 12 b. 8 c. 10 d. 6 e What is the minimum size THHN/THWN wire permitted to serve a load that will draw 47 amps? The load will operate for about 5 hours at a time. The branch-circuit OCPD is a circuit breaker that is rated for 75 C. a. 10 AWG b. 8 AWG c. 6 AWG d. 4 AWG e. none of these 51. The smallest wire that can be installed to serve a load that has a nameplate rating of 142 amps is AWG. The OCPD has terminations rated at 75 C. a. 4/0 b. 2/0 c. 1/0 d. 3/0 e. none of these 52. If an apartment complex has a lighting load of kva, what is the demand factor of this lighting load in kva? Each apartment contains an electric range. (The optional method is not to be used.) a. 602 kva b kva c kva d kva

8 Spring Test 16 due 06/14/2013 Answer Section MULTIPLE CHOICE 1. ANS: D Motor #1: T.FLA=88-80/40 Motor #2: T.FLA= /11 25-ft Tap ampacity Fdr Ampacity A 3 = 50 amps 8 AWG versus = A 14 AWG REF: 2011 NEC: T ; NAT: Obj ABank TOP: Sizing Feeder Taps MSC: Symbol EPS: DoubleArrow-RT 2. ANS: D Motor #1: T.FLA=88-80/40 Motor #2: T.FLA= /11 10-ft Tap ampacity Fdr OCP A 10 = 15 amps 14 AWG versus = 50 A 8 AWG REF: 2011 NEC: T ; OBJ: Obj Worksheet NAT: Obj ABank TOP: Sizing Feeder Taps MSC: Symbol EPS: DoubleArrow-RT 3. ANS: B VA = NEC: (G)(2) REF: 2011 NEC: (G)(2) OBJ: Obj Worksheet NAT: Obj ABank 4. ANS: C = 200 A standard size Reference: 2011 NEC: (C)(1); T REF: 2011 NEC: (C)(1); T OBJ: Obj Worksheet NAT: Obj ABank TOP: Sizing 1-ph Motor BC OCPDs MSC: Symbol EPS: times;doublearrow-rt 5. ANS: B = 100 A standard size 2011 NEC: (C)(1); T REF: 2011 NEC: (C)(1); T NAT: Obj ABank TOP: Sizing 1-ph Motor BC OCPDs MSC: Symbol EPS: times;doublearrow-rt 6. ANS: A 2011 NEC: 300.4(A)(1) REF: 2011 NEC: 300.4(A)(1) NAT: Obj ABank 7. ANS: A Mandatory Inspections (1) Electrical inspectors shall inspect appropriateness of the size, placement, protection and termination of the following electrical installations, note discrepancies and require correction of code violations: (a) Service entrance conductors;

9 (b) Service equipment; (c) Grounding electrode and grounding electrode conductor; (d) Bonding; (e) Overcurrent protection; (f) Branch circuits; (g) Feeders; (h) Ground-fault circuit interrupter devices (GFCI) and ground-fault protection systems (GFP); and (i) Underground installations. 8. ANS: C 1. Look in the index for Dwellings, Feeder load, calculations for, which refers to Section , the optional calculation for a dwelling unit. 2. Because this is a central electric furnace, Section (B) allows, in item 4, the service load to be calculated at 65 percent of the total central electric space-heating load: 20 kva x 0.65 = 13 kva KEY: electric heat, feeder calculation 9. ANS: B I = E R = (208) (50,000) = amps = 4.16 ma REF: Ohm's Law NAT: Obj ABank 10. ANS: B = 10 A 14 AWG 2011 NEC: T ; T (B)(16) REF: 2011 NEC: T ; T (B)(16) NAT: Obj ABank TOP: Sizing 1-ph Motor BC conductors MSC: Symbol EPS: times;doublearrow-rt 11. ANS: B = 20 A 14 AWG 2011 NEC: T ; T (B)(16) REF: 2011 NEC: T ; T (B)(16) OBJ: Obj Worksheet NAT: Obj ABank TOP: Sizing 1-ph Motor BC conductors MSC: Symbol EPS: times;doublearrow-rt 12. ANS: D 2011 NEC: with 110.3(B) REF: 2011 NEC: with 110.3(B) OBJ: Obj Worksheet NAT: Obj ABank 13. ANS: D 2011 NEC: 500.5(D)(2) REF: 2011 NEC: 500.5(D)(2) OBJ: 201 NEC Worksheet NAT: 201 NEC ABank

10 14. ANS: C 2011 NEC: 250.4(B)(4) REF: 2011 NEC: 250.4(B)(4) OBJ: 423 NEC Worksheet NAT: 423 NEC ABank 15. ANS: B 2011 NEC: REF: 2011 NEC: NAT: Obj ABank 16. ANS: C 2011 NEC: (A) REF: 2011 NEC: (A) OBJ: Obj Worksheet NAT: Obj ABank 17. ANS: E Correction of Defects (1) Defects in electrical installations noted by the electrical inspector shall be corrected and an inspection request made within 20 calendar days of the date of actual notice of deficiency. For the purpose of this rule, actual notice is given when the inspecting jurisdiction does everything required in OAR Calls for Inspection (1) All persons who take out an electrical permit, homeowners as well as electrical contractors, shall request an inspection within three working days of: (a) The completion of any electrical installation intended to be covered or concealed or that is intended to be placed into service before the final electrical inspection; and (b) The completion of all electrical installations for the job site covered by a particular permit. (2) Transactions under a master inspection permit are covered by separate requirements. 18. ANS: B 2011 NEC: REF: 2011 NEC: OBJ: 423 NEC Worksheet NAT: 423 NEC ABank 19. ANS: A 2011 NEC: REF: 2011 NEC: OBJ: Obj Worksheet NAT: Obj ABank 20. ANS: E Table FLA = 16 amps = 20 A 14 AWG at 75º terminations

11 2011 NEC: T ; T (B)(16) REF: 2011 NEC: T ; T (B)(16) NAT: Obj ABank TOP: Sizing 1-ph Motor BC conductors MSC: Symbol EPS: times;doublearrow-rt 21. ANS: A 2011 NEC: (B)(2) with T (B)(2) REF: 2011 NEC: (B)(2) with T (B)(2) OBJ: Obj Worksheet NAT: Obj ABank 22. ANS: A 2011 NEC: (B) REF: 2011 NEC: (B) NAT: Obj ABank 23. ANS: E 2011 NEC: (C) REF: 2011 NEC: (C) OBJ: Obj Worksheet NAT: Obj ABank 24. ANS: C 2011 NEC: REF: 2011 NEC: OBJ: 422 NEC Worksheet NAT: 422 NEC ABank 25. ANS: A T (B)(7) applies to 120/240 1-ph only >> use T (B)(16) REF: 2011 NEC: T (B)(7) N/A NAT: Obj ABank 26. ANS: D 2011 NEC: REF: 2011 NEC: NAT: Obj ABank 27. ANS: C Table FLA = 16 amps = 40-A breaker 2011 NEC: (C)(1); T REF: 2011 NEC: (C)(1); T OBJ: Obj Worksheet NAT: Obj ABank TOP: Sizing 1-ph Motor BC OCPDs MSC: Symbol EPS: times 28. ANS: D Table FLA = 10.6 amps = 13.3 A 14 AWG at 75º terminations 2011 NEC: T ; T (B)(16) REF: 2011 NEC: T ; T (B)(16) NAT: Obj ABank TOP: Sizing 3-ph Motor BC conductors MSC: Symbol EPS: times;doublearrow-rt 29. ANS: A Motor 1 - Table FLA = 28 amps = 70-A breaker 2011 NEC: (C)(1); T REF: 2011 NEC: (C)(1); T OBJ: Obj Worksheet NAT: Obj ABank

12 TOP: Sizing 1-ph Motor BC OCPDs MSC: Symbol EPS: times 30. ANS: B REF: Gen Knowledge NAT: Obj ABank 31. ANS: B 2011 NEC: (A) REF: 2011 NEC: (A) NAT: Obj ABank 32. ANS: B Motor #1: T.FLA= /7.6 Motor #2: T.FLA= /65 Motor #3: T.FLA=88-80/40 [ ] = A 300 kcmil is minimum permitted size REF: 2011 NEC: T ; OBJ: Obj Worksheet NAT: Obj ABank TOP: Sizing Feeder Conductors MSC: Symbol EPS: DoubleArrow-RT 33. ANS: B I = [ %] 240 = amps #4 with a 90 amp OCP REF: 2011 NEC: (A)(1) & 424.3(B) NAT: Obj ABank 34. ANS: C 2011 NEC: REF: 2011 NEC: OBJ: Obj Worksheet NAT: Obj ABank 35. ANS: B 2011 NEC: page REF: 2011 NEC: page OBJ: Obj Worksheet NAT: Obj ABank 36. ANS: D 2011 NEC: REF: 2011 NEC: NAT: Obj ABank 37. ANS: E 2011 NEC: T (B)(16) REF: 2011 NEC: T (B)(16) OBJ: Obj Worksheet NAT: Obj ABank 38. ANS: D 2011 NEC: ;Ch 9-Table 4 REF: 2011 NEC: ;Ch 9-Table 4 OBJ: Obj Worksheet NAT: Obj ABank 39. ANS: D 2011 NEC: 90.1(D)_(I-Note) REF: 2011 NEC: 90.1(D)_(I-Note) NAT: Obj ABank 40. ANS: A 2011 NEC: 344;Ch 9-Table 4 REF: 2011 NEC: 344;Ch 9-Table 4 NAT: Obj ABank 41. ANS: B

13 (5)(d) 42. ANS: C 2011 NEC: (A) REF: 2011 NEC: (A) NAT: Obj ABank 43. ANS: C 2011 NEC: Exc 2 REF: 2011 NEC: Exc 2 OBJ: 423 NEC Worksheet NAT: 423 NEC ABank 44. ANS: A 2011 NEC: 430.6(A)(2) REF: 2011 NEC: 430.6(A)(2) OBJ: Obj Worksheet NAT: Obj ABank 45. ANS: B Electrical Plan Review for Complex Structures (1) A jurisdiction providing electrical code plan review services may only require electrical plan review for a complex structure. For the purpose of this rule, "complex structures" have an electrical system designed, constructed or reconstructed with any of the following: (a) Ampacity: (A) A service or feeder beginning at 400 Amps where the available fault current exceeds 10,000 Amps at 150 Volts or less to ground or exceeds 14,000 Amps for all other installations; or (B) Installation of a 150 KVA or larger separately derived system as defined in Article 100 of the National Electrical Code (NEC); or (C) Addition of a new motor load of 100 HP or more; or (D) Fire pump installations as defined in Article 695 of the NEC; or (E) Emergency systems installations as defined in Article 700 of the NEC; or (F) A service or feeder rated at 600 Amps or over. (b) Voltage. More than 600 supply volts nominal. (c) Height. More than three stories. (d) Occupancy. (A) Six or more residential units in one structure; or (B) An "A" (Assembly) occupancy, "E" (Educational) occupancy, or "I-2" or "I-3" (Institutional) occupancy as defined in the adopted Oregon Structural Specialty Code; or (C) Any of the following special occupancies as described in Chapter 5 of the NEC adopted by the board in OAR : (i) Hazardous (Classified) locations as defined in Articles 500 to 516; or

14 (ii) Installations in patient care areas of health care facilities as defined in Article 517; or (iii) Agricultural buildings used for commercial purposes, as defined in Article 547; or (iv) Floating buildings as defined in Article 553; or (v) Marinas and boat yards as defined in Article 555; or (e) Recreational Vehicle Park. A new recreational vehicle park, or any addition or alteration to an existing park. 46. ANS: E Table FLA = 13.2 amps = A fuse 2011 NEC: (C)(1) Exc 1; T REF: 2011 NEC: (C)(1) Exc 1; T NAT: Obj ABank TOP: Sizing 1-ph Motor BC OCPDs MSC: Symbol EPS: times;arrow-up 47. ANS: B 2011 NEC: 200.6(C) REF: 2011 NEC: 200.6(C) OBJ: Obj Worksheet NAT: Obj ABank 48. ANS: C 2011 NEC: (B)(1) REF: 2011 NEC: (B)(1) NAT: Obj ABank 49. ANS: C Table FLA = /27 amps = AWG 2011 NEC: REF: 2011 NEC: NAT: Obj ABank TOP: Sizing 3-ph Motor BC conductors MSC: Symbol EPS: times;doublearrow-rt 50. ANS: C 47 x 1.25 = amps 59 amps minimum ampacity at the 75 breaker this calls for 6 AWG as a minimum wire size on a 60 A breaker REF: 2011 NEC: (A)(1) OBJ: Obj Worksheet NAT: Obj ABank 51. ANS: C 2011 NEC: (A)(1) REF: 2011 NEC: (A)(1) NAT: Obj ABank 52. ANS: D = % = % = % = kva REF: 2011 NEC: T OBJ: Obj Worksheet NAT: Obj ABank

Spring Test 5 due 4/26/2013

Spring Test 5 due 4/26/2013 Spring Test 5 due 4/26/2013 Multiple Choice Identify the choice that best completes the statement or answers the question. 1. Where fixed multioutlet assemblies are employed, each feet or fraction thereof

More information

Spring Test 9 due 05/11/2013

Spring Test 9 due 05/11/2013 Spring Test 9 due 05/11/2013 Multiple Choice Identify the choice that best completes the statement or answers the question. 1. A grounding electrode is. a. a solid conductor b. a circuit conductor that

More information

Fall Test 21 due 12/11/2012

Fall Test 21 due 12/11/2012 Fall Test 21 due 12/11/2012 Multiple Choice Identify the choice that best completes the statement or answers the question. 1. Emergency system transfer equipment, including automatic transfer switches,

More information

Spring Test 17 due 06/14/2013

Spring Test 17 due 06/14/2013 Spring Test 17 due 06/14/2013 Multiple Choice Identify the choice that best completes the statement or answers the question. 1. The NEC defines cable as a cylindrical assembly composed of a conductor centered

More information

Spring Test 13 due 06/14/2013

Spring Test 13 due 06/14/2013 Spring Test 13 due 06/14/2013 Multiple Choice Identify the choice that best completes the statement or answers the question. 1. The power supply to the mobile home shall be a feeder assembly consisting

More information

Entry Level Assessment Blueprint Electrical Occupations

Entry Level Assessment Blueprint Electrical Occupations Entry Level Assessment Blueprint Electrical Occupations Test Code: 3029 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Safety Apply shop safety rules and ergonomics Explain fire

More information

NEC 2008 Code Changes Top 20 Revisions. By: Rafi Wartan, PE, LEED AP

NEC 2008 Code Changes Top 20 Revisions. By: Rafi Wartan, PE, LEED AP NEC 2008 Code Changes Top 20 Revisions By: Rafi Wartan, PE, LEED AP #1 Article 210.4 MULTIWIRE BRANCH CIRCUITS The rule on simultaneous disconnecting means requirements for multiwire branch circuits was

More information

Electrical Components and Equipment for General Use Self Inspection Checklist

Electrical Components and Equipment for General Use Self Inspection Checklist Name of School: Optional Information Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: Electrical Components and Equipment for General Use Self Inspection Checklist Guidelines:

More information

2014 AFCI code compliant safety. Understanding the 2014 NEC. for AFCI protection

2014 AFCI code compliant safety. Understanding the 2014 NEC. for AFCI protection 2014 AFCI code compliant safety Understanding the 2014 NEC for AFCI protection Understanding the code for code compliant safety An arc fault is an unintended arc created by current flowing through an unplanned

More information

Meter Enclosure and Equipment Standards

Meter Enclosure and Equipment Standards Meter Enclosure and Equipment Standards (a) (b) General Requirements: CITY OF OCALA UTILITY SERVICES METER ENCLOSURE AND EQUIPMENT STANDARDS: (1) To avoid the costs associated with having to replace unacceptable

More information

Installation Notes TII Model 341 Protector

Installation Notes TII Model 341 Protector Installation Notes TII Model 341 Protector (ATT-IS PEC 32918) for MERLIN Communications System In Range Out of Building (IROB) Station Installation By Trained Technician Only WARNING: Failure to follow

More information

Introduction to the Inspection Checklist for Rooftop Solar Photovoltaic (PV) Systems in Goshen, IN

Introduction to the Inspection Checklist for Rooftop Solar Photovoltaic (PV) Systems in Goshen, IN Introduction to the Inspection Checklist for Rooftop Solar Photovoltaic (PV) Systems in Goshen, IN This Inspection Checklist for Rooftop Photovoltaic (PV) Systems is based on the Model Inspection Checklist

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD9, applicable TC -, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of lanes meets DD 9, applicable TC -,

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 5 APPR:LWB:DBP:07-31-13

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Date: Quantities meet DD9, applicable TC -, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of stations meets DD 9, applicable

More information

Application Techniques CENTERLINE 2100 Motor Control Centers

Application Techniques CENTERLINE 2100 Motor Control Centers POWER SYSTEM CONSIDERATIONS FOR PRODUCT SELECTION Application Techniques CENTERLINE 2100 Motor Control Centers Power System Considerations for Product Selection i Power System Considerations for Product

More information

Electrical Integration of PV Systems. Ridha Hamidi, Ph.D.

Electrical Integration of PV Systems. Ridha Hamidi, Ph.D. Electrical Integration of PV Systems Ridha Hamidi, Ph.D. 1 Many articles in the NEC are applicable to the electrical integration of a PV system, particularly Article 690. 2 The NEC defines the various

More information

Emery County Senior Center Green River 06/07

Emery County Senior Center Green River 06/07 SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD9, applicable TC 5-, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of lanes meets DD 9, applicable TC 5-,

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD9, applicable TC -, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of lanes meets DD 9, applicable TC -,

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 6 APPR:MDW:JVG:06-08-18

More information

SECTION PANELBOARDS

SECTION PANELBOARDS SECTION 16450 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for panelboards providing fault interrupting capability and overcurrent protective devices. 1.02 REFERENCE STANDARDS A.

More information

Electrical Plan Review

Electrical Plan Review Electrical Plan Review Overcurrent Protection and Devices, Short-Circuit Calculations, Component Protection, Selective Coordination, and Other Considerations Table of Contents Part I: Overcurrent Protection

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist TES A. Roads-Service, Lanes Common Items Trails and service roads provide adequate access to buildings for maintenance B. Testing Results-provided to the local government construction representative Data

More information

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Labels. 3. Wire markers. 4. Conduit markers. 5. Underground Warning Tape. 6. Lockout

More information

Testing for safe and efficient branch circuits

Testing for safe and efficient branch circuits Testing for safe and efficient branch circuits Written by Chad Reynolds, Product Manager, IDEAL Test and Measurement Division Branch Circuit Testing Branch circuit wiring and testing practices are primarily

More information

HUBBELL SPIKESHIELD Wired-In Branch Panels Surge Protective Device (SPD)

HUBBELL SPIKESHIELD Wired-In Branch Panels Surge Protective Device (SPD) HUBBELL SPIKESHIELD Wired-In Branch Panels Surge Protective Device (SPD) Instruction Bulletin 8222-0513B Retain for future use. SPIKESHIELD Wired-In Branch Panels 8222-0513B 05/2012 Table of Contents Precautions...

More information

Computer Network Design Guide Existing Systems 1 / 6

Computer Network Design Guide Existing Systems 1 / 6 COMPUTER NETWORK DESIGN GUIDELINE FOR EXISTING SYSTEMS DOCUMENT NUMBER: 16765 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 11-27-06 - First Issued NOTES: The attached guideline should

More information

ASCO 920 Remote Control (RC) Switches

ASCO 920 Remote Control (RC) Switches Maximum reliability and excellent value ASCO 920 Remote Control (RC) Switches ASCO 920 Remote Control Switch in Type Enclosure The ASCO 920 is designed as a feeder disconnect switch for load capacities

More information

920 Remote Control (RC) Switches

920 Remote Control (RC) Switches 920 Remote Control (RC) Switches ASCO is the global leader in power switching and controls ASCO 920 PRODUCT SPECIFICATIONS SWITCH ONLY (PANELBOARD MOUNTING) 1,2,3 () DIMENSIONS, IN.(MM) WIDTH HEIGHT DEPTH

More information

SECTION PANELBOARDS. A. NECA (National Electrical Contractors Association) -Standard of Installation

SECTION PANELBOARDS. A. NECA (National Electrical Contractors Association) -Standard of Installation SECTION 26 24 16 PANELBOARDS PART 1 -GENERAL 1.1 SUMMARY A. Section includes distribution and branch circuit panelboards, electronic grade branch circuit panelboards, [and load centers]. 1.2 REFERENCES

More information

R-LB R-LX Series Installation, Operation & Maintenance Manual

R-LB R-LX Series Installation, Operation & Maintenance Manual Installation, Operation & Maintenance Manual WARNINGS Safety First Hazardous Voltage & Shock Hazard Only qualified licensed electricians should install or service SPDs Hazardous voltages exist within SPDs

More information

Equipment Short-Circuit Current Rating and Available Fault Current

Equipment Short-Circuit Current Rating and Available Fault Current Equipment Short-Circuit Current Rating and Available Fault Current Dan Neeser Field Application Engineer Eaton s Bussmann Business Dan.Neeser@CooperIndustries.com Agenda Interrupting Rating & Series Rating

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285.

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285. SECTION 26 04 75 - SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Applicable provisions of the General Conditions, Supplementary General Conditions and Special Conditions shall govern work performed

More information

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM>

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM> SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 September 2011 STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 MATERIAL SPECIFICATIONS FOR WEIGH-IN-MOTION SYSTEM The

More information

Understanding SCCR. THE BEST ELECTRICAL CONTROLS BUSINESS ON THE PLANET! Unmatched Service Superior Product Quality Advantage Pricing

Understanding SCCR. THE BEST ELECTRICAL CONTROLS BUSINESS ON THE PLANET! Unmatched Service Superior Product Quality Advantage Pricing Understanding SCCR What is SCCR? When it comes to industrial machinery, it s critical to ensure that electrical panels are designed and built with the proper SCCR to maintain the system, eliminate downtime

More information

SECTION WIRING DEVICES PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION WIRING DEVICES PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section. SECTION 16140 WIRING DEVICES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes receptacles, connectors,

More information

SureTest Model ST 1D Instructions

SureTest Model ST 1D Instructions #61-152 #61-153 SureTest Model ST 1D Instructions Introduction The SureTest family of circuit analyzers identify problems common to electrical circuits quickly, easily and accurately. They have a patented

More information

Site Preparation CHAPTER

Site Preparation CHAPTER CHAPTER 3 Site Preparation This chapter describes the steps to take and the considerations you should keep in mind prior to installing the modules in an open rack. It also contains information that applies

More information

Page 1 of 149 First Revision No. 50-NFPA 79-2012 [ Global Input ] Delete the parenthetical terms used to describe IEC terms that follow terms used in NFPA 79 such as "protective bonding". Add information

More information

SECTION SWITCHBOARDS

SECTION SWITCHBOARDS SECTION 26 24 13 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Switchboards 2. Commercial Metering Switchboards 3. Non-Utility Power Meters (Microprocessor-Based Metering Equipment) PART 2 - PRODUCTS

More information

Installation and Operation Manual

Installation and Operation Manual Installation and Operation Manual APC 2X Series Hardwire Products PMP2X-A PMF2X-A PMG2X-A PMH2X-A APC hardwired products are designed to provide specification-grade performance at the service entrance,

More information

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide. .2 Loadcenters and Circuit Breakers Overview Product Selection Guide BR Loadcenters Description Service Single-phase, three-wire, 20/240 Vac Short-Circuit Current Rating 0 kaic: All single- and three-phase

More information

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. SECTION 26 43 00 SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. 1.2 DEFINITIONS A. ATS:

More information

More Questions from Inspectors Numerous PV Systems Pose Issues

More Questions from Inspectors Numerous PV Systems Pose Issues Perspectives on PV More Questions from Inspectors Numerous PV Systems Pose Issues by John Wiles 76 IAEI NEWS March. April 2012 www.iaei.org Photovoltaic (PV) systems prices continue to drop and inspectors

More information

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template.

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template. 6. ENGINEERING SYSTEMS REQUIREMENTS G40 SITE ELECTRICAL UTILITIES SYSTEMS REQUIREMENTS SITE ELECTRICAL UTILITIES TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT

More information

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS SECTION 264313 - TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

More information

GENERAL UL th EDITION DESIGN-BUILD SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC.

GENERAL UL th EDITION DESIGN-BUILD SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC. [Refer to Engineering Notes at End of Spec] Section [16XXX] [264XXX] - SURGE PROTECTIVE DEVICES (SPDs) PART 1 - GENERAL 1.1 SCOPE A. This section includes Surge Protective Devices (SPDs) for low-voltage

More information

GENERAL UL th EDITION BID SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC.

GENERAL UL th EDITION BID SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC. [Refer to Engineering Notes at End of Spec] Section [16XXX] [264XXX] - SURGE PROTECTIVE DEVICES (SPDs) PART 1 - GENERAL 1.1 SCOPE A. This section includes Surge Protective Devices (SPDs) for low-voltage

More information

1-Line Load Calculation Software. User s Manual APPROVED. Copyright 2013 Durand & Associates. Page 1

1-Line Load Calculation Software. User s Manual APPROVED. Copyright 2013 Durand & Associates. Page 1 1-Line 2014 Load Calculation Software User s Manual APPROVED Copyright 2013 Durand & Associates Page 1 1-LINE 2014 COPYRIGHT 2013 - DURAND & ASSOCIATES This software and manual are protected by Federal

More information

Blueprint Drawings & Wiring Diagrams. for branch circuits

Blueprint Drawings & Wiring Diagrams. for branch circuits Blueprint Drawings & Wiring Diagrams for branch circuits Blueprint Symbols Wiring Diagram Symbols 2 Table of Contents Single Pole Switching p. 5-11 Three-way Switching p. 12-18 Four-way Switching p.19-25

More information

The purpose of this document is to specify the power requirements for Core Health and Fitness LLC equipment.

The purpose of this document is to specify the power requirements for Core Health and Fitness LLC equipment. Power Requirements Applies to: All Machines The purpose of this document is to specify the power requirements for Core Health and Fitness LLC equipment. Latest Rev. Attention: Obtain the assistance of

More information

Installing the Cisco AS5400XM Universal Gateway

Installing the Cisco AS5400XM Universal Gateway CHAPTER 3 Installing the Cisco AS5400XM Universal Gateway This chapter guides you through the installation of the Cisco AS5400XM universal gateway and includes the following sections: Setting Up the Chassis,

More information

UL 508 A standard-compliant design of industrial control panel

UL 508 A standard-compliant design of industrial control panel UL 508 A standard-compliant design of industrial control panel Axel Jöhnke System Architecture Expert 14-15 SEPTEMBER 2011, MUNICH Agenda www.infoplc.net Origin and Comprehension Organizations Certificates

More information

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1993 Specifications CSJ s 0924-06-221,etc. & 0924-06-223 SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1. Description. This specification describes the minimum acceptable requirements for a weatherproof

More information

DANGER DANGER: is used in this manual to warn of high voltages capable of causing shock, burns, or death.

DANGER DANGER: is used in this manual to warn of high voltages capable of causing shock, burns, or death. Installation/Operation Manual TABLE OF CONTENTS Page UNPACKING AND INSTALLATION Unpacking and Preliminary Inspection...2, 3 Model Number...9 LOCATION CONSIDERATIONS Environment, Equipment Performance,

More information

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 07/16/08 TSEWG TP-3: SURGE PROTECTOR PERFORMANCE AND EVALUATION CRITERIA

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 07/16/08 TSEWG TP-3: SURGE PROTECTOR PERFORMANCE AND EVALUATION CRITERIA TSEWG TP-3: SURGE PROTECTOR PERFORMANCE AND EVALUATION CRITERIA SURGE PROTECTION DESIGN. Parallel Versus Series Protection. Surge protectors within the scope of this UFC should normally be of the parallel

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 26 24 11 This section specifies the furnishing, installation, and connection of the distribution switchboards. 1.2 RELATED WORK: A. Section 13 05 41, SEISMIC RESTRAINT

More information

Stalking the Elusive and Somewhat Strange PV System

Stalking the Elusive and Somewhat Strange PV System A series of articles on photovoltaic (PV) power systems and the National Electrical Code by John Wiles PERSPECTIVES ON PV Stalking the Elusive and Somewhat Strange PV System Photo 1. Framed PV modules

More information

Great Western Painting Assured Equipment Grounding Conductor Program OR Ground Fault Circuit Interrupter (GFCI)

Great Western Painting Assured Equipment Grounding Conductor Program OR Ground Fault Circuit Interrupter (GFCI) Assured Equipment Grounding Conductor Program OR Ground Fault Circuit Interrupter (GFCI) GROUND FAULT CIRCUIT INTERRUPTERS Wiring design and protection. - 1926.404 Our company uses ground fault circuit

More information

SECTION WIRING DEVICES

SECTION WIRING DEVICES PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 DEFINITIONS... 1 1.4 REFERENCES... 2 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 2 1.7 COORDINATION... 2 PART 2 - PRODUCTS... 2 2.1

More information

1993 SPECIFICATIONS CSJ , ETC. & SPECIAL SPECIFICATION ITEM 6132 ARTERIAL TRAFFIC MANAGEMENT SYSTEM

1993 SPECIFICATIONS CSJ , ETC. & SPECIAL SPECIFICATION ITEM 6132 ARTERIAL TRAFFIC MANAGEMENT SYSTEM 1993 SPECIFICATIONS CSJ 1685-05-068, ETC. & 1685-02-042 1.0 DESCRIPTION SPECIAL SPECIFICATION ITEM 6132 ARTERIAL TRAFFIC MANAGEMENT SYSTEM THIS ITEM DESCRIBES THE OPERATION AND INSTALLATION OF AN ARTERIAL

More information

G5 PDU Installation Guide

G5 PDU Installation Guide G5 PDU Installation Guide 1 Contents Before You Begin... 3 Overview... 3 Important Safety Information... 3 Required Tools... 5 Section 1 Introduction... 6 Classification Overview... 6 Features... 7 Form

More information

FORM FOR PROPOSAL FOR 2014 NATIONAL ELECTRICAL CODE

FORM FOR PROPOSAL FOR 2014 NATIONAL ELECTRICAL CODE FORM FOR PROPOSAL FOR 2014 NATIONAL ELECTRICAL CODE INSTRUCTIONS PLEASE READ CAREFULLY Type or print legibly in black ink. Use a separate copy for each proposal. Limit each proposal to a SINGLE section.

More information

Spacing Requirements for Power Distribution and Terminal Blocks

Spacing Requirements for Power Distribution and Terminal Blocks Spacing Requirements for Power Distribution and Terminal Blocks New requirements in the 2005 NEC for a marked short-circuit current rating on industrial control panels, industrial machinery, and commercial/industrial

More information

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions HP UPS R/T3000 G2 Installation Instructions Overview The HP UPS R/T3000 G2 features a 2U rack-mount with convertible tower design and offers power protection for loads up to a maximum of 3300 VA/3000 W

More information

Explosion-Protected Arc-Fault Protection ExAFCI Arc-Fault Circuit Interrupter

Explosion-Protected Arc-Fault Protection ExAFCI Arc-Fault Circuit Interrupter Installation, Operation & Maintenance Sheet Explosion-Protected Arc-Fault Protection ExAFCI Arc-Fault Circuit Interrupter > Contents 1 Contents 1 Contents...2 2 General Information...2 2.1 Manufacturer...2

More information

SECTION WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 26 27 26 - WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SURFACE CONTROLTrack INSTALLATION INSTRUCTIONS

SURFACE CONTROLTrack INSTALLATION INSTRUCTIONS SURFACE CONTROLTrack INSTALLATION INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS - For use with CONTROLTrack System Only When installing or using this track system, basic safety precautions should always be

More information

E-Series Site Preparation Guide

E-Series Site Preparation Guide E-Series Site Preparation Guide September 2017 215-11797_A0 doccomments@netapp.com Table of Contents 3 Contents Deciding whether to use this guide... 10 Specifications of the model 3040 40U cabinet...

More information

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide. .2 Overview Product Selection Guide BR Loadcenters Description Service Single-phase, three-wire, 20/240 Vac Short-Circuit Current Rating 0 kaic: All single- and three-phase loadcenters 70 225 A, 8 to 42

More information

GE Digital Energy. Power Quality

GE Digital Energy. Power Quality GE Digital Energy Power Quality INSTALLATION, OPERATION AND MAINTENANCE MANUAL GE TRANQUELL Enhanced Thermal Protection (ETP) Series Wall Mounted Medium and High Exposure Surge Protective Devices (SPDs)

More information

AcquiSuite Ally 12 & 48 Advanced Multi-Circuit Meter

AcquiSuite Ally 12 & 48 Advanced Multi-Circuit Meter AcquiSuite Ally 12 & 48 Advanced Multi-Circuit Meter Install Guide Revision C (12/18) DANGER HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Revision C (12/18) Turn off all power supplying equipment

More information

User s Guide. POWERVAR Single Phase Power Conditioners

User s Guide. POWERVAR Single Phase Power Conditioners POWERVAR Single Phase Power Conditioners User s Guide Industrial Conditioners GPI Series B Conditioners GPI Series 1 Conditioners 2-15 kva Single Phase Conditioners GPI Series 1 Conditioners RoHS Compliant

More information

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide. .2 Overview Product Selection Guide BR Loadcenters Description Service Single-phase, three-wire, 20/240 Vac Short-Circuit Current Rating 0 kaic: All single- and three-phase loadcenters 70 225A, 8 to 42

More information

Electrical Service Change-Tn Neenah

Electrical Service Change-Tn Neenah Electrical Service Change-Tn Neenah Permit # Owners name Project address Contractors name Contractors address Fax #: Type of occupancy Job description New construction Main panel Single phase Additional

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: Members of the NEC-Code Making Panel 3 FROM: Jean

More information

Model HM-535 Power Supply Installation and Service Instructions

Model HM-535 Power Supply Installation and Service Instructions Model HM-535 Power Supply Installation and Service Instructions 430-535 0104 2004 Heritage MedCall, Inc SENTRY INSTALLATION & SERVICE INSTRUCTIONS POWER SUPPLY UNIT Model HM-535 IMPORTANT SAFETY INSTRUCTIONS

More information

UNDERCARPET CABLING SYSTEM For Power and Communications

UNDERCARPET CABLING SYSTEM For Power and Communications UNDERCARPET CABLING SYSTEM For Power and Communications Linking Everything Together Power, Voice, and Data December 5, 2007 Undercarpet Cabling System Overview What is Undercarpet Cabling? Primary Applications

More information

Office of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO

Office of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO Cabling Standards Office of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO 1. Purpose CABLING STANDARDS This technical note

More information

JOURNEYMAN ELECTRICIAN

JOURNEYMAN ELECTRICIAN 2014 NATIONAL ELECTRICAL JOURNEYMAN ELECTRICIAN EXAM QUESTIONS AND ANSWERS 10 Complete closed book exams with answers 24 Complete open book exams with answers Complete Final Journeyman Exam Over 1850 actual

More information

SECTION WIRING DEVICES

SECTION WIRING DEVICES SECTION 16141 WIRING DEVICES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Zenith Series DPB Distributed Power Busway

Zenith Series DPB Distributed Power Busway Critical Power from GE Zenith Series DPB Distributed Power Busway Key Solutions for Datacenter Overhead Power Distribution Generation 2 GE Series DPB Gen 2 Bus System Flexible. Robust. Efficient. Specifically

More information

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV 16346-1 3a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

USER MANUAL INSTALLATION MANUAL. Isolation transformers. ITR Isolation Transformer 7000 W 230V/32A

USER MANUAL INSTALLATION MANUAL. Isolation transformers. ITR Isolation Transformer 7000 W 230V/32A USER MANUAL INSTALLATION MANUAL Isolation transformers ITR000702000 Isolation Transformer 7000 W 230V/32A Victron Energy B.V. The Netherlands General phone: +31 (0)36 535 97 00 Customer support desk: +31

More information

SPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120

SPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120 DESIGN GUIDELINES PRESTO INSTALLATION & CONNECTIVITY PAGE 1 of 4 ELECTRICAL CONNECTIVITY AND WIRING Communications Conduits Conduits designated for Presto equipment data wiring shall be clearly identified

More information

Installation Manual. APEX Series. Silicon and MOV Panel Protection. APEX Series

Installation Manual. APEX Series. Silicon and MOV Panel Protection. APEX Series Installation Manual APEX Series Silicon and MOV Panel Protection APEX Series APEX Series Installation Guide 2 Table of Contents Mechanical Installation 3 Table One - Application Rating 3 Figure 1 - Mounting

More information

File E Project 05NK Issued: Revised: REPORT CLASSIFIED FOR USE WITH SPECIFIED EQUIPMENT (XUPD)

File E Project 05NK Issued: Revised: REPORT CLASSIFIED FOR USE WITH SPECIFIED EQUIPMENT (XUPD) File E248748 Project 05NK27956 Issued: 2007-11-01 Revised: 2009-12-04 REPORT on SURGE PROTECTIVE DEVICES/PANELBOARD EXTENSION MODULES, CLASSIFIED FOR USE WITH SPECIFIED EQUIPMENT (XUPD) GE ZENITH CONTROLS

More information

White Paper October 2009

White Paper October 2009 ANSI /UL1449 Third Edition Safety Standard (New UL and NEC standards means new performance levels, test procedures and markings to products and manufacturers) White Paper October 2009 The past two years

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: Members of the NEC-Code Making Panel 13 FROM:

More information

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section.

The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified in this Section. SECTION 16420 - ELECTRICAL EQUIPMENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS The General Provisions of the Contract, including General, Supplementary and Special Conditions, apply to the work specified

More information

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide.

1.2. Loadcenters and Circuit Breakers. Contents. Overview. Type BR Loadcenters and Circuit Breakers. Product Selection Guide. .2 Loadcenters and Circuit Breakers Overview Product Selection Guide BR Loadcenters Description Service Single-phase, three-wire, 20/240 Vac Short-Circuit Current Rating 0 kaic: All single- and three-phase

More information

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System Part 1 General 1.01 Summary A. These specifications describe

More information

TECH NOTE #: CPS-1 SUMMARY OF APPLICABLE UL AND IEEE STANDARDS

TECH NOTE #: CPS-1 SUMMARY OF APPLICABLE UL AND IEEE STANDARDS TECH NOTE #: CPS-1 SUMMARY OF APPLICABLE UL AND IEEE STANDARDS FOR SURGE PROTECTION DEVICES This Tech Note provides an overview of the key standards associated with surge suppressors and AC powerline filters.

More information

Basics of Industrial Electricity and Troubleshooting Electrical Control Circuits

Basics of Industrial Electricity and Troubleshooting Electrical Control Circuits Basics of Industrial Electricity and Troubleshooting Electrical Control Circuits Course Details Date: January 28 January 31, 2019 Time: 8:00 A.M. - 4:30 P.M. Capacity: 12 attendees Provider: National Technology

More information

MCFCW-20-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 60,000 BTUH

MCFCW-20-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 60,000 BTUH MCFCW-20-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 60,000 BTUH 1 Chilled and Hot Water Fan Coil High Static 4-Pipe Nominal

More information

HP R/T2200 UPS. Overview. Precautions. Installation Instructions. The HP UPS R/T2200 features power protection for loads up to 2200 VA/1600 W.

HP R/T2200 UPS. Overview. Precautions. Installation Instructions. The HP UPS R/T2200 features power protection for loads up to 2200 VA/1600 W. HP R/T2200 UPS Installation Instructions Overview The HP UPS R/T2200 features power protection for loads up to 2200 VA/1600 W. For more information about any of the topics covered in this document, see

More information

SECTION ELECTRIC METERING

SECTION ELECTRIC METERING SECTION 26 27 13 ELECTRIC METERING SPEC WRITER NOTES: Use this section only for NCA projects Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information