Network Integration Service
|
|
- Jonah Moody
- 6 years ago
- Views:
Transcription
1 Network Integration Service MPS PAG Meeting November 21, 2013
2 Network Service The Transmission Provider will provide firm transmission service over its Transmission System to the Network Customer for the delivery of capacity and energy from its designated Network Resources to service its Network Loads on a basis that is comparable to any Transmitter s use of the Transmission System to reliably serve its Native Load Customers. Source: NBTO OATT 2
3 Principles of Network Service Network Transmission Service (Network Integration Transmission Service) is used for the transmission of capacity and energy from network generating resources (can be external resources) to network loads. Network transmission service enables network customers to use their generation resources to serve their network loads. Network customers also can use the service to deliver economy energy purchases to their network loads. Source: FERC Pro Forma 3
4 Network Customers All Retail Customers of MPS Houlton Water Company Van Buren Light & Power District Bangor Hydro Electric All Transmission Owners in the ISO-NE Balancing Area 4
5 Why Network Service Now? Network Service has been considered in the past and dismissed. ISA north load (MPS) - 660,000 MWh Historically imports - 26% Retirement of in region generation increases imports significantly Network resources supplying energy - Tinker and Mars Hill Constrained interface locked up by two suppliers Enable firm transactions from NB, PEI, NS, HQ and NE Increase Access to Suppliers 5
6 Advantages Solves emerging constraint Solves market liquidity issues Increase price transparency Lower prices Reduces seams with other markets Allows existing NMMR to relieve capacity obligations Allows existing NMMR to encourage more suppliers Implement Reciprocity with ISO-NE (Forgiveness of Out Charges) 6
7 NB Transmission System HQ MPS PEI ISO-NE NSPI EMEC 7
8 Wholesale Costs in NoMe Market Pricing Of Electric Supply Energy based on ISO-NE Forward LMP Market Capacity based on ISO- NE Forward Capacity Auction Ancillary Services based on NBTO Capacity Based Ancillary Services Balancing Energy based on NB Power marginal costs Transmission based on NB Tariff + ISO-NE Tariff (13 $/MWh) ISA Self Funding Tariff Reliability Charges 8
9 Network Service Costs NMISA North NB Power Network Service $/kw month Schedules 1 & $/kw month 12 NCP 112,100 kw Annual Cost (cdn) 2,800,000 $ $/MWh 4.24 $/kwh Average kwh ISO-NE Network Service $/kw month 12 CP 101,384 kw Annual Cost 9,529,000 $ $/MWh $/kwh Average kwh
10 NBTO Attachment K Transmission Expansion Policy The principles for cost sharing are as follows: If the additional transmission tariff revenues associated with the increased use of the Transmission System is more than or equal to the increase in the Transmission System revenue requirement there will be no costs incurred by the Transmission Customer. If the additional transmission tariff revenues associated with the increased use of the Transmission System are less than the increase in the Transmission System revenue requirement, the Transmission Customer will make a contribution to capital of an amount that will allow the Transmission Provider to continue to collect the full revenue requirement. To the extent that the Transmission Provider identifies system benefits, the requirement of the Transmission Customer to make a contribution to capital is diminished by the net present value of the system benefits. 10
11 Estimated Interface Expansion Costs Project Cost Tinker Upgrade 2,000,000 Perth Transfer 750,000 New 138 kv tie 12,500,000 Total 15,250,000 NB Power Transmission Carrying Cost 15% Annual Revenue Requirement Upgrade (NB) 2,287,500 $/kwyr
12 Estimated Reciprocity Savings MPS Transmission Revenue Credits = $2,100, $/MWh 2014 ISO-NE RNS 94 $/kwyr $/MWh Savings Break Even Purchases 7.58 $/MWh 277,000 MWh Expected Standard Offer Reduction From Network Service & Reciprocity: ISO + NBTO -> = $/MWh 12
13 Challenges NB Interface 74 MW of Existing Reservations (grandfather?) Queue Position (Expansion) In-Region Generation becomes available Multi-jurisdictional ISO-NE Connection Costs Governance Feasibility (Pending Stability Studies) 13
Generation Interconnection Process. NEMSTF Education Session 1 January 19, 2012
Generation Interconnection Process NEMSTF Education Session 1 January 19, 2012 www.pjm.com Follows FERC Pro Forma Process Queues are open for a 3 month period Spreads Workload Out Over Year Generation,
More informationResidual Auction Revenue Rights
Residual Auction Revenue Rights Brian Chmielewski Sr. Analyst, Market Simulation Department Market Implementation Committee November 2, 2016 Overview Auction Revenue Rights (ARRs) prorated in Stage 1B
More informationResidual Auction Revenue Rights
Residual Auction Revenue Rights Brian Chmielewski Sr. Analyst, Market Simulation Department Markets and Reliability Committee November 17, 2016 Overview Auction Revenue Rights (ARRs) prorated in Stage
More informationMarch 15, 2011 VIA ELECTRONIC FILING
California Independent System Operator Corporation VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20246 Re: California
More informationLarge Generator Interconnection Generator, Transmission, & Distribution Asset Responsibilities
Large Generator Interconnection Generator, Transmission, & Distribution Asset Responsibilities Effective Date: May 12, 2014 Revision History Date May 1, 2013 May 12, 2014 Description Initial document Revision
More informationResidual Auction Revenue Rights Enhancement
Residual Auction Revenue Rights Enhancement Brian Chmielewski Sr. Analyst, Market Simulation Department Markets and Reliability Committee December 22, 2016 Solution Package Overview - Package A Proposed
More informationOPUC Transmission Workshop 2 FERC Pro Forma Transmission
OPUC Transmission Workshop 2 FERC Pro Forma Transmission Eric Christensen, Cairncross & Hempelmann Karen Kruse, PacifiCorp February 28, 2019 Background of FERC Pro Forma Documents (Refresher from morning
More informationNEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018)
NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
More informationISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO
ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call
More informationNETWORK INTEGRATION TRANSMISSION SERVICE. Preamble
Seventh Revised Volume No. 5 (MT) Original Sheet No. 53 III. NETWORK INTEGRATION TRANSMISSION SERVICE Preamble The Transmission Provider will provide Network Integration Transmission Service pursuant to
More informationMidwest ISO Overview - ATC Customer Meeting. February 26, 2009
Midwest ISO Overview - ATC Customer Meeting February 26, 2009 Agenda Overview January 2009 Dashboard Module E RAR Timeline Questions 2 Overview January was characterized by seasonal cold temperatures,
More informationGeneration Interconnection Feasibility Study Report
Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection
More informationI. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff)
I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff) * MISO will add the underlined text provided by the Owners Committee to Section 34.2 of the Tariff with
More informationContingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting
Contingency Reserve Sharing; Ancillary Services Market Presented to the JCM Joint Stakeholder Meeting 1 Agenda Products and Nature of Current Services Contingency Reserve Sharing Group (CRSG) Agreement
More informationIntroduction to the NYISO
Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the
More informationStandard INT Dynamic Transfers
A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately in congestion management procedures.
More informationUpper vs. Lower Case BTMG. Resource Adequacy Subcommittee October 11, 2017
Upper vs. Lower Case BTMG Resource Adequacy Subcommittee October 11, 2017 Purpose & Key Takeaways Purpose: Address issue assigned to RASC by SC: Define lower case btmg and/or criteria such as MW threshold
More informationBusiness Practice. 1.2 Resources must meet certain FERC specified requirements in order to qualify as Designated Network Resources.
Business Practice 1. General 1.1 Primary Network Service is a long-term firm service and should only be used by Network Customers when reserving and scheduling delivery of energy from Designated Network
More informationChris Hickman President, Energy Services
focused on the part of the energy web that can be built out now, for profit, with near-term ROI and a growth path that could eventually produce macro-level network effects. Chris Hickman President, Energy
More informationBC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1
OATT Attachment Q-1 First Revision of Page 1 ATTACHMENT Q-1 Dynamic Scheduling This attachment contains the eligibility requirements and the terms and conditions for the provision of dynamic scheduling
More informationStandard INT Dynamic Transfers
Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately
More informationDraft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission
The following White Paper proposes a draft methodology for determining the incremental amount of transfer capability that would be the basis for the quantity of Merchant Transmission CRRs to be allocated
More informationOrder No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process
Order No. 1000 Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Thinh Nguyen Manager, Interconnection Projects New York Independent System Operator Joint
More informationNorthWestern Energy (NWMT)
NorthWestern Energy (NWMT) Open Access Transmission Tariff and OASIS Business Practices Effective 12/27/2007 These business practices apply to transmission service requests made after 10/4/2006. These
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationWorkshop J. FirstEnergy Pennsylvania - Met-Ed, Penelec, Penn Power, West Penn Power: Electric Rates & Tariffs. 1:45 p.m. to 2:45 p.m.
Workshop J FirstEnergy Pennsylvania - Met-Ed, Penelec, Penn Power, West Penn Power: Electric Rates & Tariffs 1:45 p.m. to 2:45 p.m. Biographical Information Charles V. Fullem, Director Rates & Regulatory
More informationWIND ENERGY, CONGESTION MANAGEMENT, AND TRANSMISSION RIGHTS ISSUE DESCRIPTION/PROBLEM STATEMENT. August Issue Brief
ND ENERGY, CONGESON MANAGEMEN, AND RANSMSSON RGHS ssue Brief SSUE DESCRPON/PROBLEM SAEMEN ransmission congestion occurs when more power is scheduled or flows across transmission lines than the physical
More informationThe NYISO shall assign a Queue Position based upon the date and time of receipt of the
30.4 Queue Position 30.4.1 General The NYISO shall assign a Queue Position based upon the date and time of receipt of the valid Interconnection Request; provided that, if the sole reason an Interconnection
More informationGO15 Reliable & Sustainable Power Grids
Travis Rouillard Markets & Distributed Resources GE Grid Solutions GO15 Reliable & Sustainable Power Grids April 13, 2016 Corporate Enterprise February 2014 1 2040 GLOBAL POPULATION: 9 billion INCREASED
More informationTable of Contents. Preface. SECTION 1 Introduction 1. SECTION 3 Operating Reserve 65. SECTION 2 Energy Market 17
Table of Contents Table of Contents Preface SECTION 1 Introduction 1 Q3 2012 In Review 1 PJM Market Background 2 Conclusions 3 Role of MMU 6 Reporting 7 Monitoring 7 Market Design 8 Recommendations 8 Highlights
More informationMISO-PJM Cross-Border Planning. February 19, 2014 MISO-PJM JCM
MISO-PJM Cross-Border Planning February 19, 2014 MISO-PJM JCM Planning Issues at the Seam 2 Background JOA Historical and Projected Congestion Study - 2012 to 2014 Future Scenario based 80+ major project
More informationMarket Settlements Auction Revenue Rights & Financial Transmission Rights. March 2011 Henry Chu
Market Settlements Auction Revenue Rights & Financial Transmission Rights March 2011 Henry Chu Market Settlement Training Series Market Settlements Training Modules: Overview O101 (Feb. 2011) ARR/FTR AF201
More informationMidwest ISO Year in Review Accomplishments
Midwest ISO Year in Review 2006 Accomplishments 1 Reliability Accomplishments Spring storms Sustained summer heat July 31 ramping at 6,000 Megawatts (MW) per hour
More informationBoard of Directors Meeting. April 27, 2017
Board of Directors Meeting April 27, 2017 2016 Annual Report April 27, 2017 Project Team 2016 Annual Report Lead Kari Lynch Communications & Marketing Specialist Independent Auditors Subject Matter Experts
More informationInterconnection and Transmission
Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection
More informationWorkshop on PJM ARR and FTR Market 2012/2013
Workshop on PJM ARR and FTR Market 2012/2013 www.pjm.com PJM 2012 1 Training Objectives At the completion of this training, you should be able to Understand the concepts and principles of Auction Revenue
More informationbcuc British Columbia Utilities Commission
January 26, 2018 bcuc British Columbia Utilities Commission Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700
More informationIntroduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure
1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the
More informationPublished: December 15, 2017 Revised: December 15, 2017
Market Participant Guide: SPP 2018 Congestion Hedging Published: December 15, 2017 Revised: December 15, 2017 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion
More informationRocky Mountain Power Docket No Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER
Rocky Mountain Power Docket No. 17-035-36 Witness: Kelcey A. Brown BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Direct Testimony of Kelcey A. Brown August 2017 1 2 3 4
More informationExhibit to Agenda Item #1a
Exhibit to Agenda Item #1a Sandra Kopp Wednesday, Board Finance September & Audit 28, Committee 2011 Meeting and Special SMUD Board of Directors Meeting Budget 2018 Wednesday,, scheduled to begin at 5:00
More informationDecorah City Council - January 16, Decorah Power Municipal Electric Utility (MEU) Feasibility Study
Decorah City Council - January 16, 2018 Decorah Power Municipal Electric Utility (MEU) Feasibility Study MEU Feasibility Study Team NewGen Strategies and Solutions Denver, CO Dave Berg Consulting Rosemount,
More informationFeasibility Study on Load Flow and Short Circuit Project
Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November
More informationSystem Impact Study for Power Supply 400 MW Import on the EAL BCHA Path
System Impact Study for Power Supply 400 MW Import on the EAL BCHA Path Report No: NPP2000-21 September 13, 2001 Network Performance Planning Department T&D Engineering Executive Summary BC Hydro Power
More informationVALUE OF ENERGY STORAGE GAS/ELECTRIC PARTNERSHIP CONFERENCE. Daniel Crotzer
VALUE OF ENERGY STORAGE GAS/ELECTRIC PARTNERSHIP CONFERENCE Daniel Crotzer CONFIDENTAL. FRACTAL BUSINESS FLEXGEN ANALYTICS PARTNERS LLC. LLC. ALL RIGHTS ALL RIGHTS RESERVED. RESERVED. 1 Thank You www.fractalba.com
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection
More informationBell Mobility Special Offer for CBAC. Hardware discount code IAT198370
Bell Mobility Special Offer for CBAC Hardware discount code IAT198370 Overview: CBAC new plan and hardware information and offer from Bell Mobility to be reviewed in following pages. For all users billed
More informationCAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012
CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of
More informationIMPLICATIONS AND OPPORTUNITIES OF THE REIT MODERNIZATION ACT
IMPLICATIONS AND OPPORTUNITIES OF THE REIT MODERNIZATION ACT INTRODUCTION Congress created REITs in 1960 to allow people to invest in diversified, professionally managed real estate enterprises, but over
More informationOpen Access Transmission Tariff of Southern Companies
Open Access Transmission Tariff of Southern Companies Procedures for Reserving Transmission Capacity for Future Load Growth, Designating/Undesignating Network Resources, and Arranging for Other Related
More informationData Center UPS Systems Why 1% Efficiency Matters
Data Center UPS Systems Why 1% Efficiency Matters Harry Handlin Director Critical Power Applications, September 18, 2014 Key Questions / Problems Addressed: Why efficiency gains of as little as 1 percent
More informationMemorandum. This memorandum requires Committee action.
California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure
More informationSouthwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual. Version 3.4 Last Updated: February 2015
Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual Version 3.4 Last Updated: February 2015 Copyright 2012-2015 Nexant, Inc. All rights reserved. Nexant, Inc.
More informationEnergy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan
Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision
More informationNokia Conference Call 1Q 2012 Financial Results
Nokia Internal Use Only Nokia Conference Call 1Q 2012 Financial Results April 19 th, 2012 15.00 Helsinki time 8.00 New York time Stephen Elop President & CEO Timo Ihamuotila CFO Matt Shimao Head of Investor
More informationMAGYAR TELEKOM GROUP Q RESULTS PRESENTATION MAY 8, 2018
MAGYAR TELEKOM GROUP Q1 218 RESULTS PRESENTATION MAY 8, 218 Q1 218 GROUP SEGMENTAL REVENUE AND EBITDA Group segmental revenues* Group segmental EBITDA* 152 15 148 146 144 3. 3.8 3.6 +6.5% -1.6.4 -.1. 149.6
More informationA Regulatory Perspective on Distributed Generation
A Regulatory Perspective on Distributed Generation Southwest Electrical Metering Association Spring Meeting Galveston June 10, 2015 Darryl Nelson Rates and Regulatory Agenda Why Rules are Needed Texas
More informationCereal Hudson. Tariffs. Anthony S. Campagiorni, Esq. Vice President, Regulatory & Governmental Affairs. Requested Revenue Increases
1 Anthony S. Campagiorni, Esq. Vice President, Regulatory & Governmental Affairs P Power. Possibilities Cereal Hudson A FORTIS COMPANY July 28, 2017 Via Electronic Filing By Hand Honorable Kathleen Burgess,
More informationPublished: December 15, 2016 Revised: December 15, 2016
Market Participant Guide: SPP 2017 Congestion Hedging Published: December 15, 2016 Revised: December 15, 2016 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion
More informationIP Traffic Exchange Market Developments and Policy Challenges
IP Traffic Exchange Market Developments and Policy Challenges BEREC/OECD Workshop Brussels, 2 November 2011 Dennis Weller Navigant Economics wellerdennis@mac.com Page 1 Growth of the Internet» Two billion
More informationA.I Task Order 1 - Technical and Analytical Services 1. SCOPE OF WORK. Deliverablc(s): CPUC Implementation Plan Filed. EXHIBIT A: Scope of Services
EXHIBIT A: Scope of Services A.I Task Order 1 - Technical and Analytical Services SMUD and VCEA agree to the following services, terms, and conditions described in this Task Order. This Task Order is for
More informationColstrip Transmission System. Transmission Service and Interconnection Processes and Procedures
APPENDIX A COLSTRIP TRANSMISSION SYSTEM TRANSMISSION SERVICE AND INTERCONNECTION PROCESSES AND PROCEDURES Colstrip Transmission System Transmission Service and Interconnection Processes and Procedures
More informationApril 11, 2016 VIA ELECTRONIC FILING
April 11, 2016 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest Power Pool, Inc., Docket No.
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 17. Transmission Ownership Rights (TORs)... 2 17.1 TRTC Instructions... 2 17.1.1 Responsibility to Create TRTC Instructions... 2 17.1.2 TOR Scheduling Coordinator Responsibilities...
More informationWestern Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document
Western Area Power Administration (WAPA) Transmission System Policy Document This Business Practice documents the Western Area Power Administration (WAPA) policy, as implemented by WAPA s Power System
More informationRocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH
Exhibit RMP (RTL-1) BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Rick T. Link May 31, 2017 Pre-Issuance Bidders Conference Presentation
More informationState Perspectives on the Midwest ISO regional Stakeholder Process: The Indiana Utility Regulatory Commission
State Perspectives on the Midwest ISO regional Stakeholder Process: The Indiana Utility Regulatory Commission October 21, 2010 Dave Johnston Beth Krogel Roads Indiana Utility Regulatory Commission (IURC)
More informationUnderstanding Energy Economics and Optimization Technology for the Strategic Development of Microgrids
Understanding Energy Economics and Optimization Technology for the Strategic Development of Microgrids H.G. Chissell Managing Director 484 534 2225 hgchissell@viridityenergy.com Viridity Energy - Recognized
More informationMountain West Transmission Group. WECC MIC Update October 17, 2017
Mountain West Transmission Group WECC MIC Update October 17, 2017 Agenda Overview Mountain West Activities Mountain West Analyses Mountain West Next Steps 2 Mountain West Overview 3 What is the Mountain
More informationComcast Full Year and Fourth Quarter Results Meet or Exceed All Operating and Financial Targets Setting Stage For Continued Growth in 2004
Comcast Full Year and Fourth Quarter Results Meet or Exceed All Operating and Financial Targets Setting Stage For Continued Growth in 2004 Comcast Cable Delivers $6.35 Billion of Operating Cash Flow in
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION NOTICE INVITING POST-TECHNICAL CONFERENCE COMMENTS. (June 3, 2016)
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Review of Generator Interconnection Agreements and Procedures American Wind Energy Association Docket No. RM16-12-000 Docket No. RM15-21-000
More informationFY18 FULL-YEAR RESULTS 31 AUGUST 2018 NEXTDC LIMITED ACN
FY18 FULL-YEAR RESULTS 31 AUGUST 2018 NEXTDC LIMITED ACN 143 582 521 FY18 HIGHLIGHTS REVENUE $161.5m +31% UNDERLYING EBITDA 1 $62.6m +28% UTILISATION 40MW +28% CUSTOMERS 972 +26% PARTNERS 470+ 60+ NETWORKS
More informationCITY OF LOS ANGELES DEPARTMENT OF WATER AND POWER 2017 REFORM OF ELECTRIC TRANSMISSION TARIFF AND ELECTRIC TRANSMISSION RATES
ing 1 DWP 104 Tab: Control Sheet Cells: H25-H27 - Please provide the studies and documentation that yielded the Receiving Station Study Reclassifications. [The studies relied on by Jennifer Tripp are attached
More informationGeneration, Transmission, and End User Facilities
Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3
More informationTransmission Service Reference Manual. May 08, 2017
Transmission Service Reference Manual May 08, 2017 Revision History Revision History Date or Version Number April 29, 2015 Version 1.0 May 08, 2017 Version 2.0 Author Shari Brown Julie Gerush Change Description
More informationAC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland
The 8 th Electric Power Control Centers Workshop June 5-8, 2005, Les Diablerets, Switzerland Panel Session "Monitoring and Control of Large Interconnections under Normal and Emergency Operating Conditions"
More informationSmall Hydro Regulatory and Permitting Requirements California
Small Hydro Regulatory and Permitting Requirements California Lon W. House, Ph.D. 530.409.9702 Water & Energy Small Hydro Regulatory and Compliance FERC QF, Small Hydro License or Exemption EIA Generator
More informationSouthwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual. Version 2.0 Last Updated: November 2012
Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual Version 2.0 Last Updated: November 2012 Copyright 2012 Nexant, Inc. All rights reserved. Nexant, Inc. P a g
More informationGenerator Interconnection Process. Wholesale Transmission Overview
1 Generator Interconnection Process Wholesale Transmission Overview 2 This presentation summarizes the FERC-approved Generator Interconnection Procedures (GIP) in Appendix Y of the California Independent
More informationATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service
Improvement and Power District Original Sheet No. F-1 ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service 1.0 This Form of Service Agreement for Wholesale Network
More informationNOKIA FINANCIAL RESULTS Q3 / 2012
Nokia Internal Use Only NOKIA FINANCIAL RESULTS Q3 / 2012 Conference Call October 18, 2012 15.00 / Helsinki 08.00 / New York Stephen Elop / President & CEO Timo Ihamuotila / CFO Matt Shimao / Head of Investor
More informationPLANNING FOR THE TRANSMISSION NETWORK
PLANNING FOR THE TRANSMISSION NETWORK Page 1 of 1 TABLE OF CONTENTS 1. CONTEXT.... PLANNING METHOD OF THE TRANSMISSION NETWORK....1 Design and Planning of the Transmission Network.... Planning Process
More informationCampus Energy Plant Tufts University. IDEA Microgrid Conference 2017 Optimizing the Economics of a Combined Heat and Power Project November 8, 2017
Tufts University IDEA Microgrid Conference 2017 Optimizing the Economics of a Combined Heat and Power Project November 8, 2017 1 Overview Presentation Overview: Campus and Project Overview Economic Considerations
More informationSmall Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation
Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016
More informationRegulating and pricing network access
Regulating and pricing network access László Szabó ERRA Training 5-8 March, 2013, Budapest Lecture outline Network: an essential infrastructure Getting connected Pricing the use of existing electricity
More informationDistributed Generation Interconnection in Illinois
Distributed Generation Interconnection in Illinois David Rearden January 31, 2014 1a In the beginning Electricity system was vertically integrated: the utility generated the electricity, transmitted to
More informationSouthern California Edison. Leading the Way in Electricity TM
Southern California Edison Leading the Way in Electricity TM Smart Metering Essentials at SCE End-Use Energy Reductions through Monitoring, Feedback, and Behavior Modification Precourt Institute for Energy
More informationAvailable Transfer Capability Definitions and Determination
Available Transfer Capability Definitions and Determination A framework for determining available transfer capabilities of the interconnected transmission networks for a commercially viable electricity
More informationWestern Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document
Western Area Power Administration (WAPA) Transmission System Policy Document This Business Practice documents the Western Area Power Administration (WAPA) policy, as implemented by WAPA s Power System
More informationJanuary 19, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426
January 19, 2017 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 RE: Southwest Power Pool, Inc., Docket No. ER17- Submission of Network
More informationData Miner 2 Release Notes Release 18.09
Data Miner 2 Release Notes Release 18.09 Release Date: September 24, 2018 New Features: 1. New feeds These feeds will be available from September 25, 2018 onwards Enhancements: Real Time Temperature Sets
More informationPublic Service Company of New Mexico
Public Service Company of New Mexico Open Transmission Planning Meeting November 2, 2017 Albuquerque, NM INTRODUCTION Public Stakeholder Meeting Order 890 Objective to improve transparency and stakeholder
More informationENERGY STORAGE. CAN WE LEAVE STORAGE TO THE MARKET? ESNA Energy Storage conference, 29 January Mike Wilks, Director
ENERGY STORAGE CAN WE LEAVE STORAGE TO THE MARKET? ESNA Energy Storage conference, 29 January 2014 Mike Wilks, Director PÖYRY IS EUROPE S LEADING ENERGY MANAGEMENT CONSULTANCY Europe s leading management
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection
More informationDesignation and Termination of Network Resources
Transmission & Reliability Services Business Practice: Designation and Termination of Network Resources Posted: February 8, 2010 Effective: May 3, 2010 Revision No.: 5 1. Purpose The purpose of this business
More informationBusiness Practice. Non-Firm Transmission Service Request Processing
Business Practice Non-Firm 1. General Policies 1.1 Transmission Service Reservation (TSR) priorities are established for Non-Firm pointto-point (PTP) transmission service in accordance with APS s Open
More informationSmall Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility
Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS
More informationFNM Expansion Training Webinar
FNM Expansion Training Webinar Cynthia Hinman Lead Client Trainer August 11, 2014 The information contained in these materials is provided for general information only and does not constitute legal or
More informationAnnual General Meeting.
Annual General Meeting. 2018 Peter James Chairman 20th November 2018 Macquarie Telecom Group 3 Key Business Highlights. 6% 19% 20% 19% Revenue $233.1m EBITDA $47.8m NPAT $17.0m EPS 80.9cps Eight consecutive
More informationUtility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547
Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of
More information