Acano solution. Acano X Series Server 1.6 Installation Guide. May E
|
|
- Alfred Singleton
- 6 years ago
- Views:
Transcription
1 Acano solution Acano X Series Server 1.6 Installation Guide May E
2 Contents Contents 1 Introduction Before You Start Safety information You will need the following equipment The Acano Server PIN Outs for Console Port Status Light Descriptions Front panel LEDs Back panel LEDs Hardware Installation Configuration Creating an Administrator Account Setting up the Network Interfaces for IPv Creating the Web Admin Interface Certificate Configuring the Web Admin Interface for HTTPS Access Appendix A DC Power Option Wiring and Safety Location Wiring 19 Overcurrent protection Figures Figure 1: Acano solution installation and deployment documentation... 3 Figure 2: Acano server front panel... 5 Figure 3: Acano server back panel with power units installed... 5 Figure 4: Fitting inside rail components to the Acano server sides... 8 Figure 5: Cage nut locations for the rack rails... 9 Figure 6: Location of the red button Acano solution: Acano X Series Server Installation Guide R E Page 2
3 Introduction 1 Introduction Follow this guide to fit the Acano X series server (the Acano server) into a rack, fit the power supplies, connect the cables, and power up. It also tells you how to achieve basic network connectivity with the Acano solution Release 1.6 software. Then go on to one of the Deployment Guides for other set up and configuration information see the figure below. Figure 1: Acano solution installation and deployment documentation In addition to this guide, the material shown in the figure above can be found at the Acano Documentation & software page. If you need any technical assistance with the configuration, or you want to report a suspected bug, support@acano.com. 1.1 Before You Start Safety information WARNING: Read the information at There you will find essential safety information to protect you and the equipment. Acano solution: Acano X Series Server Installation Guide R E Page 3
4 Introduction The Acano server weighs approximately 23 kg / 51 lbs. Do not attempt to lift it on your own at any time. Do not place it on top of any other equipment. Do not support it on the rack ears alone; they are not designed to be load-bearing. The power units do not have an on/off switch; the server will power on as soon as power is connected. Therefore do not do so until instructed. DC power option only: See Appendix A for additional safety information You will need the following equipment The Acano server comes with most of the components you need. The shipping box contains: One Acano X3, X2 or X1 server A box containing two power supplies A box containing a serial cable, two rack ears and accessories; and in some countries, power cables and their retaining clips Note: If you are using AC power and none of the supplied power cables are approved for your location or no cables are provided, you will need to provide them. Two rack rails. (These rails are not left- or right-handed but are packed in the correct installation orientation relative to the Acano server so be sure to maintain the correct orientation from back to front.) However, you must provide the following: A 2U space in a 4-post rack Up to five Ethernet patch cables. The cabling required depends on your network speed and the length of the cable run: 10GBASE-T: Cat 6 (patch) or Cat 6A, 1000BASE-T: Cat 5e, Cat 6 or Cat 6A, 100BASE-T: Cat 5e, Cat 6 or Cat 6A A selection of Philips and flat blade screwdrivers Acano solution: Acano X Series Server Installation Guide R E Page 4
5 The Acano Server 2 The Acano Server The front and back of the Acano server are shown in the figures below. Not all the connections are required during installation. OK and Warning status lights Console port Power units status lights Figure 2: Acano server front panel Power unit locations A and B Network interfaces A to D, each with two status lights ADMIN interface Expansion interface (not currently used) Figure 3: Acano server back panel with power units installed Acano solution: Acano X Series Server Installation Guide R E Page 5
6 The Acano Server 2.1 PIN Outs for Console Port The PIN outs for the Console port on the front of the Acano server are: Connector Description/Use 1 No connection 2 DTR (connected to pin 7) 3 Transmit data 4 Ground 5 Ground 6 Receive data 7 DSR (connected to pin 2) 8 No connection 2.2 Status Light Descriptions This section describes the behavior of the Acano server status lights (LEDs) Front panel LEDs There are four LEDs on the front of the Acano server: OK, Warning, Power Supply A and Power Supply B. They have the following behavior. OK Blue: normal operation Warning If on (red), check the cause urgently in the Web Admin Interface Status > General page. Supply A/B Blue: power supply is operating normally Flashing quickly: power supply is present but not functioning (i.e. not plugged in) Flashing slowly: power supply is not present Note: If either power supply LED is flashing; check the cause urgently in the Web Admin Interface Status > General page Back panel LEDs All five Ethernet ports (ADMIN and A to D) have the same LED behavior: Left Green: Link at 10G Acano solution: Acano X Series Server Installation Guide R E Page 6
7 The Acano Server Amber: Link at 1G Off: Link at 10/100M Right Green: Link up Blinking: Activity on link Off: Link down Acano solution: Acano X Series Server Installation Guide R E Page 7
8 Hardware Installation 3 Hardware Installation Note: The Acano server ships with two rack rails and this guide reflects that. The rack rails are not available for older Acano servers (before November 2013): if you need an older version of the Installation Guide contact support@acano.com. 1. Check that the rack sides are parallel and adjust them if necessary. 2. Open the Acano server packaging; remove the two small boxes and then with another person, using the handles provided, lift the server out of the box and onto a strong flat surface. 3. Open the accessories box and find: 12 x M4 screws for fixing the ears and rails to the server 12 x M5 cage nuts and 12 x M5 screws for fixing the rails and ears into the rack 4. Lift the rack rails out of the packaging, noting the orientation in each case; that is, which end goes at the front of the server. 5. Adjust the length of the rack rails to fit the depth of your rack. This may require repositioning the two screws holding the rear bracket on each rack rail. Tighten the screws securely. 6. Separate the rack rail inner section (which fits to the server) from the rack rail outer section using the release latch. 7. Screw one rack rail inner section to the appropriate side of the Acano server using the supplied M4 screws (see figure 3). Repeat for the other side. Figure 4: Fitting inside rail components to the Acano server sides 8. Using a Philips screwdriver fit the rack ears, one on each side of the server at the front using the remaining M4 screws (see figure 3). Acano solution: Acano X Series Server Installation Guide R E Page 8
9 Hardware Installation 9. Attach the outer rail section to the sides of the rack using the supplied M5 screws and cage nuts (see figure 4). Use two screws at the back and two screws at the front of each rail (eight in total). 10. With another person, lift the server up to the rack and slide the two rail sections together on each side. 11. Secure the server in the rack with the rack ears using two M5 screws for each rack ear. Note: Do not support the Acano server on the rack ears alone. Figure 5: Cage nut locations for the rack rails 12. Unpack the box containing the two power supplies. They are identical. 13. Move to the back of the rack and slide the power supplies fully into the Power A and B slots in the back of the server until they latch (see Figure 2). Notes: Do not connect power to the server at this time. DC power option only: See Appendix A for DC wiring instructions. Do not switch on the power at this time. 14. Connect a network cable to the ADMIN interface and to your administrator network. This interface is used for various administrative functions and to upgrade the software version. (Both are outside the scope of this Installation Guide.) Connections to the ADMIN interface are via SSH or SFTP and possibly HTTPS depending on configuration. 15. Connect a network cable to the A interface and to your production or testing network. Depending on configuration, this media interface could also be used for access to the Web Admin Interface. An HTTPS connection is required attempting to connect using HTTP will fail. A certificate is required as explained in later sections. Note: Interfaces A to D will operate at the speed of the network switch that they are connected to. If you are using a speed of 10G be sure to use the appropriate cable for the Acano solution: Acano X Series Server Installation Guide R E Page 9
10 Hardware Installation speed and cable length. The interface LEDs show which speed is in use. See the section, LED descriptions. 16. If required, connect the other interfaces (B to D). Acano solution: Acano X Series Server Installation Guide R E Page 10
11 Configuration 4 Configuration 4.1 Creating an Administrator Account 17. Connect power: AC power option: connect both power units to the AC mains using the appropriate power cables and cable retaining clips for your location. There are no on/off switches; therefore the Acano server powers up immediately DC power option: switch on the DC power to the Acano server 18. Moving to the front of the server (see Figure 2), you see the two power unit status LEDs and the server status LED are on, indicating that the Acano server is powered and operational. 19. Connect the Acano server Console port to a terminal emulator using the serial cable supplied in the box. Use baud rate , 8 data bits, no parity and 1 stop bit Note: Be sure that the login prompt is displayed before proceeding, otherwise the server may still be booting up. 20. Using a Philips screwdriver loosen the two screws on the top front service hatch and hinge the cover upwards. You see the fan module on the left and a smaller area on the right with cables and connectors. In this area and behind the front grill are two small buttons: one red (labeled reset) and one black. Figure 6: Location of the red button Acano solution: Acano X Series Server Installation Guide R E Page 11
12 Configuration Note: The Acano server ships with no pre-configured admin account, this is a security feature. Follow the steps below to create the Admin account. 21. Carefully press the red (reset) button only. 22. Within 4 minutes of pressing this button log into the Acano server using the terminal emulator: user account is admin, no password will be requested. 23. Set up your admin account using the following command. user add admin admin 24. You will be prompted for a password which you must enter twice. 25. Close the hatch and push the screws down to secure the hatch, no screwdriver is needed. Note: When you log in subsequently, either via the Console port or ADMIN interface, using the admin account you will be asked for this password. 4.2 Setting up the Network Interfaces for IPv4 26. Configure the Network Interface speed To set network interface speed, duplex and auto-negotiation parameters use the iface command e.g. to display the current configuration on the Admin interface, type: iface admin In the examples below admin can be substituted by a (the A interface) to re-use the commands to configure that interface. To set the ADMIN interface to 1GE, full duplex type: iface admin 1000 full and to switch auto negotiation on or off, type: iface admin autoneg <on/off> We recommend that the network interface is set to auto negotiation unless you have a specific reason not to. 27. Configure the IP settings: a. Go on to step c if you are using static IP addresses. b. Configure to use DHCP To enable dhcp on the ADMIN interface type: ipv4 admin dhcp Note: There is a similar set of commands to use if you are using IPv6. See the MMP Command Reference for a full description. Then to find out the dhcp configured settings, type: ipv4 admin ipv4 a Go on to step 28. Acano solution: Acano X Series Server Installation Guide R E Page 12
13 Configuration c. Configure to use static IP addresses (skip this step if you are using DHCP) Use the IPV4 add command to add a static IP address to the interface with a specified subnet mask and default gateway. For example, to add address with prefix length 16 (netmask ) with gateway to the MMP, type: ipv4 admin add / To remove the IPv4 address, type. ipv4 admin del Set DNS Configuration: a. To output the dns configuration, type: dns b. To set the application DNS server, type: dns mmp add forwardzone <domain name> <server IP> Note: A forward zone is a pair consisting of a domain name and a server address: if a name is below the given domain name in the DNS hierarchy, then the DNS resolver can query the given server. Multiple servers can be given for any particular domain name to provide load balancing and fail over. A common usage will be to specify "." as the domain name i.e. the root of the DNS hierarchy which matches every domain name, i.e. if the server is on IP dns mmp add forwardzone c. Similarly, configure the DNS for the MMP. d. If you need to delete a DNS entry use: dns mmp del forwardzone <domain name> <server IP> for example: dns mmp del forwardzone Creating the Web Admin Interface Certificate The Web Admin is only accessible through HTTPS, you need to create a security certificate to install onto the Acano server so you can enable the Web Admin Interface and be able to log into it. The information in step 29 assumes that you trust Acano to meet requirements for the generation of a private key. If you prefer, you can generate the private key and the certificate externally using a public Certificate Authority (CA), and then load the externally generated key/certificate pair onto the MMP of the Acano server using SFTP. Go on to step 30 Note: if testing your Acano solution in a lab environment, you can generate a key and a selfsigned certificate on the Acano server. Self-signed certificates are not recommended for use in real deployments (see To create a selfsigned certificate and private key, log in to the MMP and use the command: pki selfsigned <key/cert basename> where <key/cert basename> identifies the key and certificate which will be generated e.g. Acano solution: Acano X Series Server Installation Guide R E Page 13
14 Configuration "pki selfsigned webserver" creates webserver.key and webserver.crt (which is self-signed). Then go on to step Follow this step if you trust that Acano meets the requirements for generation of private key material. This step explains how to generate a private key and the associated Certificate Signing Request with the MMP pki csr command, export them for signing by a CA, and then copying the signed certificate file on to the Acano server. a. Log in to the MMP and generate the private key and certificate signing request: pki csr <key/cert basename> [<attribute>:<value>] where: <key/cert basename> is a string identifying the new key and CSR (e.g. "xmpp" results in "xmpp.key" and "xmpp.csr" files) and the allowed but optional attributes are as follows and must be separated by a colon: CN: the commonname which should be on the certificate. Use the FQDN defined in DNS A record as the Common Name. Failure to do this will result in browser certificate errors. OU: is Organizational Unit O: Organization L: Locality ST: State C: Country address: Use quotes for values that are more than one word long, for example: pki csr example CN:example.com "OU:Accounts UK" "O:My Company" b. Send the CSR to one of the following: a Certificate Authority (CA), such as Verisign who will verify the identity of the requestor and issue a signed certificate. to a local or organizational Certificate Authority, such as an Active Directory server with the Active Directory Certificate Services Role installed. i. Transfer the file to the CA. ii. Issue the following command in the command line management shell on the CA server replacing the path and CSR name with your information: certreq -submit -attrib "CertificateTemplate:WebServer" C:\Users\Administrator\Desktop\certcsr.pem iii. After entering the command, a CA selection list is displayed similar to that below. Select the correct CA and click OK. Acano solution: Acano X Series Server Installation Guide R E Page 14
15 Configuration iv. Do one of the following: If your Windows account has permissions to issue certificates, you are prompted to save the resulting certificate, for example as webserver.pem. Go on to step c below. If you do not see a prompt to issue the resulting certificate, but instead see a message on the command prompt window that the 'Certificate request is pending: taken under submission', and listing the Request ID as follows. Note the RequestID and then follow the steps below before going on to step c below. v. Using the Server Manager page on the CA, locate the Pending Requests folder under the CA Role. vi. Right-click on the pending request that matches the Request ID given in CMD window and select All Tasks > Issue. Acano solution: Acano X Series Server Installation Guide R E Page 15
16 Configuration vii. The resulting signed certificate is in the Issued Certificates folder. Double-click on the certificate to open it and open the Details tab (see right). viii. Click Copy to File which starts the Certificate Export Wizard. ix. Select Base-64 encoded X.509 (.CER) and click Next. x. Browse to the location in which to save the certificate, enter a name such as cacert and click Next. Acano solution: Acano X Series Server Installation Guide R E Page 16
17 Configuration c. Transfer both the certificate (e.g. webserver.crt) to the MMP of the Acano server using SFTP. Acano solution: Acano X Series Server Installation Guide R E Page 17
18 Configuration CAUTION: If you are using a CA with the Web Enrolment feature installed, you may copy the CSR text including the BEGIN CERTIFICATE REQUEST and END CERTIFICATE REQUEST lines before submitting. After the certificate has been issued, copy only the certificate and not the Certificate Chain. Be sure to include all text including the BEGIN CERTIFICATE and END CERTIFICATE lines and paste into a text file. Then save the file as your certificate with a.pem,.cer or.crt extension. 4.4 Configuring the Web Admin Interface for HTTPS Access You can configure the Web Admin Interface to use one of the five Ethernet interfaces. 30. Establish a SSH connection again to the MMP of the Acano server and sign in. 31. Enter the following commands to configure the Web Admin Interface to use the Ethernet interface labeled ADMIN: webadmin certs webserver.key webserver.crt webadmin listen admin 443 webadmin enable Note: Be sure to use the same names as the certificates you uploaded in section Test that you can access the Web Admin Interface of the Acano server using the MMP user account that you created earlier, i.e. enter in your browser and login using the user account you created in step 3. You are now ready to configure the Acano server. See the appropriate Deployment Guide When you want to power off the Acano server be sure to sign into the MMP and use the shutdown command before you disconnect the power. Note: Any two interfaces of Acano solution must not be put into same subnet. The only the exception is that the ADMIN interface of a physical Acano server can be on the same subnet as one of the other interfaces (A to D) and is probably a common deployment. Acano solution: Acano X Series Server Installation Guide R E Page 18
19 DC Power Option Wiring and Safety Appendix A DC Power Option Wiring and Safety If you are using the DC power option for your Acano server, you must observe the following additional instructions. Location The Acano server must be installed in a restricted access location within the meaning of UL , IEC or equivalent (see Wiring Use 10 AWG wire for the RTN, -48V and ground (earth) connections. (The RTN is the positive power connection and the -48V is the negative power connection. The ground (earth) connection is to the chassis for safety.) Note: Generally, DC wiring colors are not standardized nationally. Follow the color scheme applicable to your facility. Overcurrent protection Use a 30A circuit breaker on the branch circuit connection to each power supply unit. The circuit breakers must be approved for use in your facility. Acano solution: Acano X Series Server Installation Guide R E Page 19
20 2015 Acano (UK) Ltd. All rights reserved. This document is provided for information purposes only and its contents are subject to change without notice. This document may not be reproduced or transmitted in any form or by any means, for any purpose other than the recipient s personal use, without our prior written permission. Acano and cospace are trademarks of Acano. Other names may be trademarks of their respective owners. Acano solution: Acano X Series Server Installation Guide R E Page 20
Acano solution. Virtualized Deployment R1.2 Installation Guide. Acano. December G
Acano solution Virtualized Deployment R1.2 Installation Guide Acano December 2014 76-1025-04-G Contents Contents 1 Introduction... 3 1.1 Before You Start... 3 1.1.1 About the Acano virtualized solution...
More informationAcano solution. Virtualized Deployment R1.7 Installation Guide. March G
Acano solution Virtualized Deployment R1.7 Installation Guide March 2016 76-1025-06-G Contents Contents 1 Introduction... 3 1.1 How to use this Guide... 3 1.2 Before You Start... 4 1.2.1 About the Acano
More informationAcano solution. Virtualized Deployment R1.1 Installation Guide. Acano. May D
Acano solution Virtualized Deployment R1.1 Installation Guide Acano May 2014 76-1025-03-D Contents Contents 1 Introduction... 3 1.1 Before You Start... 3 1.1.1 About the Acano virtualized solution... 3
More informationCisco Meeting Server. Cisco Meeting Server 2.0+ Installation Guide for Cisco Meeting Server 1000 and Virtualized Deployments.
Cisco Meeting Server Cisco Meeting Server 2.0+ Installation Guide for Cisco Meeting Server 1000 and Virtualized Deployments December 20, 2017 Cisco Systems, Inc. www.cisco.com Contents Change History 4
More informationCisco Meeting Server. Cisco Meeting Server 2.0+ Cisco Meeting Server 1000
2.0+ 1000 2018 7 11 ... 4 1... 5 1.1... 6 1.2... 7 1.3 Acano X MMP... 9 2... 10 2.1... 10 2.2 ware... 13 2.3 Hyper-V... 15 2.4 1000... 17 3... 27 3.1... 27 3.2 IPv4... 27 3.3... 29 3.4 Call Bridge... 30
More informationCisco Meeting Server. Cisco Meeting Server 2.0+ Installation Guide for Virtualized Deployments. January 06, Cisco Systems, Inc.
Cisco Meeting Server Cisco Meeting Server 2.0+ Installation Guide for Virtualized Deployments January 06, 2017 Cisco Systems, Inc. www.cisco.com Contents 1 Introduction 4 1.1 Overview of platforms 4 1.2
More informationInstalling and Managing the Switch
CHAPTER 2 This chapter describes how to install and manage the Cisco SFS 7008 system hardware and contains these sections: Safety, page 2-2 Preparing the Site, page 2-3 Rack-Mounting the Switch, page 2-4
More information1 Getting Started Installing & Configuring
Before you begin Installation and Setup Instructions for E-Series 60-Drive Trays E760 and E5660 controller-drive trays DE6600 expansion drive trays Unpack & Prepare Install Hardware Connect Drive Trays
More informationHardware Installation Guide Installation (x3350)
Title page Nortel Application Gateway 2000 Nortel Application Gateway Release 6.3 Hardware Installation Guide Installation (x3350) Document Number: NN42400-300 Document Release: Standard 04.03 Date: January
More informationBefore you begin. Unpack & Prepare. Install Hardware. Connect Drive Trays. Apply Power. Connect Data Hosts. Choose Management Method
Before you begin Installation and Setup Instructions for E-Series -Drive and 4-Drive Trays E700 and E5600 controller-drive trays DE600 and DE5600 expansion drive trays Unpack & Prepare Install Hardware
More informationHow to Set Up Your SRX4100 Services Gateway
How to Set Up Your SRX4100 Services Gateway The SRX4100 Services Gateway is a high-performance, scalable mid-range services gateway that consolidates security, next-generation firewall, and advanced threat
More informationBefore you begin. Unpack & Prepare. Install Hardware. Connect Hardware. Apply Power. Choose Management Method. Install & Use SANtricity Software
Before you begin Installation and Setup Instructions for EF-Series All-Flash Arrays EF550 and EF560 flash arrays DE5600 flash expansion trays Unpack & Prepare Before installing the hardware Confirm that
More informationReplacing the Power Supply
APPENDIX B This appendix includes information on how to replace the power supply for the Cisco AS550XM universal gateway and contains the following sections: Safety Recommendations, page B-1 Required Tools
More informationBefore you begin. Installation and Setup Instructions for E-Series 60-Drive Trays. Unpack & Prepare. Install Hardware. Connect Hardware.
Before you begin Installation and Setup Instructions for E-Series 60-Drive Trays E760, E5560, and E5660 controller-drive trays DE6600 expansion drive trays Unpack & Prepare Install Hardware Connect Hardware
More informationDX Application Acceleration Platform Quick Start
DX Application Acceleration Platform Quick Start Release 5.3 22 June 2007 Part No. 093-1816-001 Revision 3 Welcome to the Juniper DX 3200 and 3600 series data center application acceleration platforms.
More informationRemote Support Appliance Installation
Remote Support Appliance Installation 2017 Bomgar Corporation. All rights reserved worldwide. BOMGAR and the BOMGAR logo are trademarks of Bomgar Corporation; other trademarks shown are the property of
More informationInstalling the Cisco Unified Videoconferencing 3545 MCU
CHAPTER 2 Installing the Cisco Unified Videoconferencing 3545 MCU The Cisco Unified Videoconferencing 3545 MCU works together with a Cisco Unified Videoconferencing 3545 EMP Enhanced Media Processor (EMP)
More informationInstallation and Configuration Guide
Installation and Configuration Guide h-series 800-782-3762 www.edgewave.com 2001 2011 EdgeWave Inc. (formerly St. Bernard Software). All rights reserved. The EdgeWave logo, iprism and iguard are trademarks
More informationM5 and M10 Routers Power Supply and Power Cord Component Replacement Instructions
M5 and M10 Routers Power Supply and Power Cord Component Replacement Instructions Part No. 530-003244-01 Revision 1 27 July 2000 This document describes how to remove and replace the AC and DC power supplies,
More informationCisco TelePresence Supervisor MSE 8050
Cisco TelePresence Supervisor MSE 8050 Installation Guide 61-0012-09 July 2014 Contents General information 3 About the Cisco TelePresence Supervisor MSE 8050 3 Port and LED location 3 LED behavior 3 Installing
More informationPower Xpert Meter 2000 Gateway Card Kit
Quick Start Guide IL02601011E Rev. 2 December 2011 PXM 2250 PXM 2260 IQ 250 IQ 260 Power Xpert Meter 2000 Gateway Card Kit Table of Contents Remove the Meter From Service.... 2 Disconnect Power Connections,
More informationPower Xpert Meter 2000 Gateway Card Kit
Quick Start Guide IL02601011E PXM 2250 PXM 2260 IQ 250 IQ 260 Power Xpert Meter 2000 Gateway Card Kit Table of Contents Remove the Meter From Service... 2 Disconnect Power Connections, CTs, and Modbus....
More informationIBM. Rack Installation Instructions
IBM Rack Installation Instructions Review the documentation that comes with your rack cabinet for safety and cabling information. When installing your server in a rack cabinet, consider the following:
More informationPrivileged Access Appliance Hardware Installation
Privileged Access Appliance Hardware Installation 2017 Bomgar Corporation. All rights reserved worldwide. BOMGAR and the BOMGAR logo are trademarks of Bomgar Corporation; other trademarks shown are the
More informationInstallation and Configuration Guide
CYBERSECURITY, EVOLVED EdgeWave iprism Web Security Installation and Configuration Guide V8.0 15333 Avenue of Science, Suite 100 San Diego, CA 92128 Give us a call 1-855-881-2004 Send us an email: info@edgewave.com
More informationM40e and M160 CIP Installation Instructions
Part No. 530-005365-01 Revision 2 23 January 2002 CIP Description This document describes how to remove and replace the Connector Interface Panel (CIP) on a Juniper Networks M40e Internet router or M160
More informationQuick start guide for p5 520 ( )
Quick start guide for p5 520 (9111-520) 1 Before you begin This Quick start guide contains an abbreviated set of setup instructions designed to help you quickly unpack and set up a standard system. Users
More informationInstallation and Configuration Guide
Installation and Configuration Guide Trademark Notices Comtrol, NS-Link, and DeviceMaster are trademarks of Comtrol Corporation. Microsoft and Windows are registered trademarks of Microsoft Corporation.
More informationBefore you begin. Unpack & Prepare. Install Hardware. Connect Drive Shelves. Apply Power. Connect Data Hosts. Connect Ethernet Cables
efore you begin Installation and Setup Instructions for E-Series E5760 and E860 Shelves E5760 and E860 controller shelves DE60C drive shelf Unpack & Prepare Install Hardware Connect Drive Shelves pply
More informationSwitchBlade Switch Controller Quick Install Guide
SwitchBlade Switch Controller Quick Install Guide SwitchBlade Switch Controller Quick Install Guide Document Number. Copyright 2002-2005 Allied Telesyn International, Corp. 19800 North Creek Parkway, Suite
More informationDX 32xx and DX 36xx Quick Start
Release 5.2 9 August 2006 Part No. 093-1816-000 Revision 1 Welcome to the Juniper DX 3200 and 3600 series data center application acceleration platforms. This quick start describes how to install a DX
More informationCascade Sensor Installation Guide. Version 8.2 March 2009
Cascade Sensor Installation Guide Version 8.2 March 2009 Trademarks Riverbed, the Riverbed logo, Riverbed Cascade, and Cascade are trademarks of Riverbed Technology, Inc. Intel is a registered trademark
More informationCisco TelePresence Video Communication Server. Getting started
Cisco TelePresence Video Communication Server Getting started D14350.04 November 2010 Contents Contents Contents 2 General information 3 About the Cisco TelePresence Video Communication Server (Cisco VCS)
More informationIBM TotalStorage NAS 200 Model 25T. Quick Start Instructions
IBM TotalStorage NAS 200 Model 25T Quick Start Instructions First Edition (October 2002) Copyright International Business Machines Corporation 2002. All rights reserved. US Government Users Restricted
More informationRack Installation Instructions
Rack Installation Instructions Review the documentation that comes with your rack cabinet for safety and cabling information. When installing your server in a rack cabinet, consider the following: v Two
More informationSCOPIA 100 MCU Quick Start
SCOPIA 100 MCU Quick Start Version 5.6 Multipoint Conferencing Unit NOTICE 2000-2008 RADVISIONLtd. All intellectual property rights in this publication are owned by RADVISION Ltd and are protected by Italy
More informationVTRAK E-Class/J-Class Quick Start Guide
VTRAK E-Class/J-Class Quick Start Guide Version.0 Firmware 3.9 008 Promise Technology, Inc. All Rights Reserved. VTrak Quick Start Guide About This Guide This Quick Start Guide shows you how to install
More informationPower Xpert Meter 2000 Gateway Card Kit
Quick Start Guide IL02601011E PXM 2250 PXM 2260 IQ 250 IQ 260 Power Xpert Meter 2000 Gateway Card Kit Table of Contents Remove the Meter From Service.... 2 Disconnect Power Connections, CTs, and Modbus....
More informationHPE Intelligent Power Distribution Unit Installation Instructions
HPE Intelligent Power Distribution Unit Installation Instructions Important safety information For important safety, environmental, and regulatory information, see Safety and Compliance Information for
More informationCajun P333R. Quick Start Guide. Unpack 1. Rack mount (optional) 2. Power up 3. Connect the cables 4. Configure 5. Run Web-based Manager (optional)
Cajun P333R Quick Start Guide Unpack 1 Rack mount (optional) 2 Power up 3 Connect the cables 4 Configure 5 Run Web-based Manager (optional) 6 1 Unpack Check the package contents for the following: E If
More informationQuick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport
PTX5000 Packet Transport Router Quick Start September 2017 Part Number: 530-066788 Revision 01 This document describes how to install the Juniper Networks PTX5000 Packet Transport Router. Contents Quick
More informationIBM Systems. Quick start guide for IBM System p5 505 ( )
IBM Systems Quick start guide for IBM System p5 505 (9115-505) 1 Before you begin This Quick start guide contains an abbreviated set of setup instructions designed to help you quickly unpack and set up
More informationN3150 Installation and Setup Instructions
IBM System Storage N350 Installation and Setup Instructions Covering the N350 model GC27-426-0 Notices Mail comments to: IBM Corporation Attention Department GZW 9000 South Rita Road Tucson, AZ 85744-000
More informationBefore you begin. Unpack & Prepare. Install Hardware. Connect Drive Shelves. Apply Power. Connect Data Hosts. Connect Ethernet Cables
Before you begin Installation and Setup Instructions for E-Series E57, EF570, E8, and E8 Shelves E57, EF570, E8, and E8 controller shelves DEC and DEC drive shelves Unpack & Prepare Install Hardware Connect
More informationH3C S12500 Routing Switch Series
H3C S12500 Routing Switch Series Quick Installation Guide Hangzhou H3C Technologies Co., Ltd. http://www.h3c.com Document version: APW201-20131030 Copyright 2013, Hangzhou H3C Technologies Co., Ltd. and
More informationHow to Set Up Your SRX550 High Memory Services Gateway
How to Set Up Your SRX550 High Memory Services Gateway The SRX550 High Memory Services Gateway is a large branch office gateway that combines security, routing, switching, and WAN interfaces with next-generation
More informationMcAfee Network Security Platform
NTBA Appliance T-1200 and T-600 Quick Start Guide Revision C McAfee Network Security Platform This guide is a high-level description of how to install and configure McAfee Network Threat Behavior Analysis
More informationInstalling the Cisco SFS 3504 Server Switch
CHAPTER 3 This chapter describes how to mount your Cisco SFS 3504 Server Switch on a rack, boot the Cisco SFS 3504 Server Switch, and configure basic services. For advanced configuration information, see
More informationN3240 Installation and Setup Instructions
IBM System Storage N3240 Installation and Setup Instructions Covering the N3240 model GA32-2203-01 Notices Mail comments to: IBM Corporation Attention Department GZW 9000 South Rita Road Tucson, AZ 85744-0001
More informationDell Storage Center. Getting Started Guide. SCv2000 and SCv2020 Storage System. Regulatory Model: E09J, E10J Regulatory Type: E09J001, E10J001
Dell Storage Center SCv2000 and SCv2020 Storage System Getting Started Guide Regulatory Model: E09J, E10J Regulatory Type: E09J001, E10J001 Notes, Cautions, and Warnings NOTE: A NOTE indicates important
More informationCodian IP VCR IP VCR 2200 Series
Codian IP VCR IP VCR 2200 Series Getting Started Codian IP VCR IP VCR 2200 Series Getting Started Copyright Codian 2006. All rights reserved. This Getting Started Guide may not be copied, photocopied,
More informationHow to Set Up Your SRX300 Services Gateway
How to Set Up Your SRX300 Services Gateway The SRX300 Services Gateway consolidates security, routing, switching, and WAN interfaces for small retail offices. With advanced threat mitigation capabilities,
More informationPIX 520. PIX 520 Product Overview CHAPTER
CHAPTER 5 PIX 520 This chapter guides you through the installation of the PIX 520, and includes the following sections: PIX 520 Product Overview, page 5-1 Installing the PIX 520, page 5-4 PIX 520 Feature
More informationINSTALLATION INSTRUCTIONS FOR THE BV10-100/1000
INSTALLATION INSTRUCTIONS FOR THE BV10-100/1000 This document describes the basic steps for installing your BV10-100 or BV10-1000. For detailed information about the BV10-100/1000, see the Ethernet Performance
More information24-Port 100/1000X SFP + 4-Port 10G SFP+ Managed. Metro Ethernet Switch MGSW-28240F. Quick Installation Guide
24-Port 100/1000X SFP + 4-Port 10G SFP+ Managed Metro Ethernet Switch MGSW-28240F Quick Installation Guide Table of Contents 1. Package Contents... 3 2. Requirements... 4 3. Wiring DC Power Inputs... 5
More informationJunos WebApp Secure 5.0 Hardware Guide
Junos WebApp Secure 5.0 Hardware Guide Junos WebApp Secure 5.0 Hardware Guide This document contains a specification for the MWS1000 hardware appliance, as well as instructions for installation into a
More informationSwitched Rack Power Distribution Unit
Switched Rack Power Distribution Unit AS-216-520-30A-L530 Installation and Quick Start Contents Product Description and Inventory...................... 1 AS-216-520-30A-L530....................... 1 Additional
More informationManager Appliance Quick Start Guide
Revision D Manager Appliance Quick Start Guide The Manager Appliance runs on a pre-installed, hardened McAfee Linux Operating System (MLOS) and comes pre-loaded with the Network Security Manager software.
More informationJuniper Secure Analytics Quick Start Guide
Juniper Secure Analytics Quick Start Guide The instructions in this guide help you connect the Juniper Secure Analytics (JSA) appliance to your network. For details, see the JSA Hardware Guide at http://www.juniper.net/techpubs/en_us/release-independent/jsa/information-products/p
More informationCisco TelePresence Video Communication Server. Getting started
Cisco TelePresence Video Communication Server Getting started D14350.08 December 2013 Contents Contents Contents 2 General information 3 About the Cisco TelePresence Video Communication Server (Cisco VCS)
More informationDMC SNMP Module for Chassis-Based Media Converter Manual. Rev. 01 (JUN. 2002) 1907MCB RECYCLABLE
DMC-1002 SNMP Module for Chassis-Based Media Converter Manual Rev. 01 (JUN. 2002) 1907MCB10016000 RECYCLABLE TABLE OF CONTENTS ABOUT THIS GUIDE... 2 FEATURES...2 UNPACKING...2 CONFIGURING THE SYSTEM...
More informationQuick Install Guide. ibypass TM I2BP-4x Rev A 11/14
- Quick Install Guide ibypass TM 40-10 I2BP-4x10 913-2106-01 Rev A 11/14 PLEASE READ THESE LEGAL NOTICES CAREFULLY. Trademarks and Copyrights Net Optics, and ibypass TM are registered trademarks of Net
More informationPIX 535. PIX 535 Product Overview CHAPTER
CHAPTER 7 PIX 535 This chapter describes the installation of the PIX 535, and includes the following sections: PIX 535 Product Overview Installing a PIX 535 PIX 535 Feature Licenses Installing Failover
More informationTroubleshooting 1240AG Series Lightweight Access Points
CHAPTER 4 Troubleshooting 1240AG Series Lightweight Access Points This chapter provides troubleshooting procedures for basic problems with the 1240AG series lightweight access point (AIR-LAP1242AG or AIR-LAP1242G).
More informationIndustrial 24-Port 10/100/1000Mbps Managed Gigabit. Switch (-40~75 degrees C) with 4 Shared SFP Ports IGSW-24040T. Quick Installation Guide
Industrial 24-Port 10/100/1000Mbps Managed Gigabit Switch (-40~75 degrees C) with 4 Shared SFP Ports IGSW-24040T Quick Installation Guide Table of Contents 1. Package Contents... 3 2. Requirements... 4
More informationEMC Celerra NS-120 System (Dual Blade) Installation Guide
EMC Celerra NS- System (Dual Blade) Installation Guide P/N -7-88 Rev A EMC believes the information in this publication is accurate as of its publication date. The information is subject to change without
More informationHP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions
HP UPS R/T3000 G2 Installation Instructions Overview The HP UPS R/T3000 G2 features a 2U rack-mount with convertible tower design and offers power protection for loads up to a maximum of 3300 VA/3000 W
More informationRealPresence Access Director System Administrator s Guide
[Type the document title] Polycom RealPresence Access Director System Administrator s Guide 2.1.0 March 2013 3725-78703-001A Polycom Document Title 1 Trademark Information POLYCOM and the names and marks
More informationSun StorageTek SL48 Tape Library Getting started
Sun StorageTek SL48 Tape Library Getting started IMPORTANT: Shipping Lock: The shippinglockmustberemovedfor the robotics to work properly. A robot move error is displayed if the shipping lock is not removed.
More informationTFC-1600MM Media Conversion System. Management Configuring Guide
TFC-1600MM Media Conversion System Management Configuring Guide CONFIGURING THE SYSTEM This chapter provides network managers and system administrators with information about how to configure the Media
More informationA TCP/IP network CAT 5 cable If the network is faster than 10baseT a switching hub will be needed Static IP address
Requirements A TCP/IP network CAT 5 cable If the network is faster than 10baseT a switching hub will be needed Static IP address Power Up A Reader with an Ethernet adaptor installed and the network cable
More informationPIX 515/515E. PIX 515/515E Product Overview CHAPTER
CHAPTER 4 PIX 515/515E This chapter describes how to install the PIX 515/515E, and includes the following sections: PIX 515/515E Product Overview Installing a PIX 515/515E PIX 515/515E Feature Licenses
More information8-Port 10/100Mbps + 2G TP/SFP Combo. Managed Industrial Switch ISW-1022M / ISW-1022MT / ISW-1022MP / ISW-1022MPT / ISW-1033MT
8-Port 10/100Mbps + 2G TP/SFP Combo Managed Industrial Switch ISW-1022M / ISW-1022MT / ISW-1022MP / ISW-1022MPT / ISW-1033MT Quick Installation Guide Table of Contents 1. Package Content... 3 2. Requirements...
More informationAdding or Replacing a PCI Card
Caution There are static-sensitive electronics inside the unit. Before you handle any parts, make sure you are working at a static-controlled workstation and that you are properly grounded. Three PCI cards
More informationIndustrial 8-Port 10/100/1000T 802.3af/at PoE + 2-Port 100/1000X SFP Managed Switch with Wide Operating Temperature
Industrial 8-Port 10/100/1000T 802.3af/at PoE + 2-Port 100/1000X SFP Managed Switch with Wide Operating Temperature IGS-10020PT / IGS-10020HPT Quick Installation Guide Version 1.0 Table of Contents 1.
More informationCisco Meeting Server. Cisco Meeting Server Release 2.0. Certificate Guidelines for Single Combined Server Deployments. January 12,
Cisco Meeting Server Cisco Meeting Server Release 2.0 Certificate Guidelines for Single Combined Server Deployments January 12, 2018 Cisco Systems, Inc. www.cisco.com Contents Change History 4 1 Introduction
More informationCisco TelePresence TelePresence Server MSE 8710
Cisco TelePresence TelePresence Server MSE 8710 Installation Guide 61-0025-05 August 2013 Contents General information 3 About the Cisco TelePresence Server MSE 8710 3 Port and LED locations 3 LED behavior
More informationQuick Start Guide LES1308A, LES1316A LES1332A, LES1348A. Securely manage data center and network equipment from anywhere in the world.
LES1308A, LES1316A LES1332A, LES1348A 8-/16-/32-/48-Port Advanced Console Server with GSM Modem QS Guide Quick Start Guide Securely manage data center and network equipment from anywhere in the world.
More informationPower Supply and Fan Module Installation
3 CHAPTER This chapter describes how to remove and install a new or replacement power supply or fan module in a Catalyst 3750-E or Catalyst 3560-E switch. See these sections: Installation Overview, page
More informationCascade Express Installation Guide. Version 8.2 March 2009
Cascade Express Installation Guide Version 8.2 March 2009 Trademarks Riverbed, the Riverbed logo, Riverbed Cascade, and Cascade are trademarks of Riverbed Technology, Inc. Intel is a registered trademark
More informationEMC Celerra NS-120 System (Single Blade) Installation Guide
EMC Celerra NS- System (Single Blade) Installation Guide P/N 3-7-88 Rev A4 EMC believes the information in this publication is accurate as of its publication date. The information is subject to change
More informationPerle SMI Media Converter Installation Guide
Perle SMI Media Converter Installation Guide P/N 5500316-14 Overview This guide contains instructions necessary for the installation and operation of the Perle SMI Media Converter. This media converter
More informationSCOPIA 100 Gateway Quick Start Version 5.6
SCOPIA 100 Gateway Quick Start Version 5.6 NOTICE 2000-2008 RADVISION Ltd. All intellectual property rights in this publication are owned by RADVISION Ltd and are protected by United States copyright laws,
More informationSetting Up Your Cisco Unified Videoconferencing 3500 Gateway
CHAPTER 2 Setting Up Your Cisco Unified Videoconferencing 3500 Gateway This section describes the following topics: Physical Description, page 2-1 Preparing for Installation of the Cisco Unified Videoconferencing
More informationSetting Up Your Cisco Unified Videoconferencing 3515 MCU
CHAPTER 2 Setting Up Your Cisco Unified Videoconferencing 3515 MCU This section describes the following topics: Physical Description, page 2-1 Preparing for Installation, page 2-2 Verifying the Package
More informationN3220 Installation and Setup Instructions
IBM System Storage N3220 Installation and Setup Instructions Covering the N3220 model GA32-2202-01 Notices Mail comments to: IBM Corporation Attention Department GZW 9000 South Rita Road Tucson, AZ 85744-0001
More informationCisco TelePresence MCU MSE 8510
Cisco TelePresence MCU MSE 8510 Installation Guide 61-0021-04 August 2013 Contents General information 3 About the Cisco TelePresence MCU MSE 8510 3 Port and LED locations 3 LED behavior 3 Installing the
More informationCisco Meeting Server. Single Server Simplified Setup Guide. October 26, 2018
Cisco Meeting Server Single Server Simplified Setup Guide October 26, 2018 Cisco Systems, Inc. www.cisco.com What's new What's new Version October 25, 2018 Change First version published. Single Server
More informationHP UPS R/T3000 ERM. Overview. Precautions. Installation Instructions
HP UPS R/T3000 ERM Installation Instructions Overview The ERM consists of two battery packs in a 2U chassis. The ERM connects directly to a UPS R/T3000 or to another ERM. Up to two ERM units can be connected.
More informationQuick start guide for i5 520 ( or )
Quick start guide for i5 520 (9405-520 or 9406-520) 1 Before you begin This Quick start guide contains an abbreviated set of setup instructions designed to help you quickly unpack and set up a standard
More informationGETTING STARTED GUIDE. Cisco Small Business. NSS2000 Series Network Storage System
GETTING STARTED GUIDE Cisco Small Business NSS2000 Series Network Storage System 2008 Cisco Systems, Inc. All rights reserved. OL-17953-01 Contents Chapter 1: Introduction 1 Benefits 1 About this Guide
More informationRemote Console Manager with GSM Modem QS Guide
LES1204A-3G-R2 Remote Console Manager with GSM Modem QS Guide Quick Start Guide This Quick Start Guide helps you through installation, configuration, and local operation. For more details, refer to the
More informationWireless Network Video Recorder
LD2R/LD2R500 Wireless Network Video Recorder User Guide Version 1.0 PREFACE Thank you for purchasing the Wireless Network Video Recorder, an IP based device that installed on your network, which can be
More informationFor details on using the LX, access online help from the application, or download help in PDF format from the Support page on Raritan's website.
Dominion LX Quick Setup Guide Thank you for your purchase of the Dominion LX. The LX is the industry's highest quality, most affordable digital KVM (Keyboard, Video, Mouse) switch for your growing SMB
More informationHow to Set Up Your SRX340 Services Gateway
How to Set Up Your SRX340 Services Gateway The SRX340 Services Gateway consolidates security, routing, switching, and WAN interfaces for midsize distributed enterprises. With advanced threat mitigation
More informationGTm 5140 Installation and Admin Guide 20 November 2017
GTm 5140 Installation and Admin Guide 20 November 2017 Contents About the GTm 5140 codec 3 The connectors 3 LEDs 4 Dimensions 4 About the touchscreen controller 5 Lync/Skype for Business/Exchange requirements
More informationCHASSIS INSTALLATION GUIDE
SUPER SC942S-600 SC942i-600/550 SC942 CHASSIS INSTALLATION GUIDE 1.0 SUPER SC942 Chassis User's Guide Table of Contents Chapter I: Unpacking and Check Lists... 1-3 Chapter 2: Installation Procedures...
More informationInstalling the Cisco 2524 and Cisco 2525 Routers
CHAPTER 3 Installing the Cisco 2524 and Cisco 2525 Routers This chapter guides you through the installation of the Cisco 2524 and Cisco 2525 routers and includes the following sections: Required Tools
More informationQuick Start Guide. Remote Console Manager Quick Start Guide
LES1202A-R2 LES1203A-M-R2 LES1204A-R2 Remote Console Manager Quick Start Guide Quick Start Guide This quick start guide helps you through installation, configuration, and local operation. For more details,
More informationL2+ Managed Metro Ethernet Switch MGSW / MGSD Series
L2+ Managed Metro Ethernet Switch MGSW / MGSD Series Quick Installation Guide Table of Contents 1. Package Contents... 3 2. Requirements... 4 3. Wiring DC Power Inputs... 5 4. Terminal Setup... 6 5. Logon
More information