Centennial School District

Size: px
Start display at page:

Download "Centennial School District"

Transcription

1 Centennial School District Phone: x11011 Business Office Fax: Centennial Road Warminster, PA November 19, 2013 Server Virtualization Services RFP # Addendum No. 1 All Respondents: The following addendum is issued for the Server Virtualization RFP # Delete the following section: References Vendors submitting a proposal must provide three references and have expertise with Avamar Additional Requirements: 15. Respondent must be a Citrix Platinum level partner with the requisite levels of Citrix certifications (Citrix Certified Sr. Systems Consultant(s)). Revised Scope Description: The purpose of this project is to add datacenter automation, increase administrative efficiency, high reliability and business continuity, and the ability to leverage Centennial virtual infrastructure more efficiently. The District desires to upgrade its existing Citrix environment to XenApp 6.5 and secure it via Citrix Netscaler. The implementation of Citrix XenApp 6.5 will add application virtualization to the environment and to provide a method of centrally managing and delivering their applications. Respondent will provide a Citrix Certified Sr. Systems Consultant(s) and a Project Manager to perform the work outlined in the following objectives and deliverables. Objectives: Phase 1: XenServer implementation Implement and configure the XenServer environment. Migrate the existing Hyper-V VM infrastructure over to XenServer. Virtualize the remaining physical servers to highly available virtual machines within the XenServer Environment.

2 Phase 2: XenApp upgrade Secure the Citrix environment using Citrix Netscaler for internal and external access to the Web Interface. Configure, test and implement above Citrix XenApp 6.5 architecture. Deliverables: Phase 1: XenServer implementation 1. Thorough review of existing complimentary environments (AD, DNS, network layout, etc) to the extent that they play a role in the Citrix XenServer architecture. 2. Provide an architectural overview of Citrix XenServer solution as well as a design overview of Citrix XenServer s approach to high-availability, management, monitoring and design elements. 3. Thorough review of the recommended architecture\implementation plan with the IT staff at Centennial and modifications made to the plan if necessary. This will include a review with the IT staff regarding the physical host density as well as production server migration timeline. 4. Implementation of the XenServer infrastructure on five (5) hosts in the environment. 5. Migration of the existing Hyper-V virtual machines (up to ten virtual machines) to XenServer utilizing XenConvert. 6. Replace existing physical servers with the XenServer infrastructure utilizing XenConvert. 7. Test and remediation of the new XenServer environment as needed from a server-side functionality aspect. Advanced troubleshooting for client specific issues outside the range of server functionality will be considered out of scope from this statement of work. Phase 2: Xenapp Upgrade 1. Installation of the Citrix XenApp environment. This includes: a. Installing or upgrading the operating systems to MS Server bit on virtual machines. b. Installing and configuring terminal services or remote desktop services. c. Installing and configuring up to three (3) Citrix XenApp servers as virtual machines. 2

3 d. Assistance with installing and configuring all necessary applications. (maximum 5 applications, client will be required to install all client unique applications) e. Publishing and load balancing (XenApp load balancing) of all client requested applications. f. Delegated security permissions for XenApp farm management configured per client specifications. g. Installing and configuring Citrix licensing servers. h. Installing and configuring Citrix web interface. 2. Installation and configuration of Citrix Web Interface including the securing of it via Citrix Netscaler VPX appliance. 3. Testing of the new Citrix XenApp production environment and remediation of any items that require it. This testing is limited to the Citrix native functionality of the farm itself, i.e. published applications can be launched, users can print to bit/citrix Universal Print driver complaint standard printers, environment load balances correctly, and environment is accessible internally and externally. 4. Thorough as-built documentation of the new environment including Visio diagrams depicting the layout of the new XenApp environment. 5. Professional Citrix provided curriculum training. 6. Hands on training with Centennial IT staff to provide the knowledge necessary to manage the environment on a day to day basis. This will include the following: a. Explain the key features of the product and how to best utilize them. b. Review the various Citrix management consoles and how to perform the day to day functions within the consoles. c. Review and explain how to install, configure and manage applications in the Citrix XenApp environment. d. Explain how to configure the XenApp environment in how it relates assigning permissions and assigning various applications to various end users\groups. 3

4 Additional Hardware (SAN) 4

5 Optional Disaster Recovery Site Qty Item Number Description 2 UCSC-C220-M3S UCS C220 M3 SFF w/o CPU mem HDD PCIe PSU w/ rail kit 2 CON-SNTP-C220M3SF SMARTNET 24X7X4 UCS C220 M3 SFF w/o 2 UCSC-PSU-650W 650W power supply for C-series rack servers 2 UCSC-RAID-11-C220 Cisco UCS RAID SAS 2008M-8i Mezz Card for C220 (0/1/10/5/50) 4 N2XX-ABPCI01-M3 Broadcom 5709 Dual Port 1Gb w/toe iscsi for M3 Servers 12 N20-BBLKD UCS 2.5 inch HDD blanking panel 4 UCSC-HS-C220M3 Heat Sink for UCS C220 M3 Rack Server 2 UCSC-PSU-BLKP Power supply blanking panel/filler 2 UCSC-RAIL1 Rail Kit for C220 C22 C24 rack servers 4 UCS-CPU-E GHz E5-2650/95W 8C/20MB Cache/DDR3 1600MHz 32 UCS-MR-1X082RY-A 8GB DDR MHz RDIMM/PC /dual rank/1.35v 4 A03-D300GA2 300GB 6Gb SAS 10K RPM SFF HDD/hot plug/drive sled mounted 2 CAB-9K12A-NA Power Cord 125VAC 13A NEMA 5-15 Plug North America 5

6 Revised Pricing Sheet SERVER VIRTUALIZATION PROPOSAL PRICING SHEET RFP Number Centennial School District December 6, 2013 Business Office, Administration Building 433 Centennial Road Warminster, PA We propose to furnish a Server Virtualization System as per the specifications contained in the above referenced RFP: Year 1 Cost: Purchase Price, Installation (incl. shipping), Maintenance... $ Year 2-5 Maintenance (Renewed and paid annually - price guaranteed for 5 years)... $ Total Proposal cost: (Installation and Annual Cost)... $ Options Disaster Recovery Site $ Other Options (Please describe) $ Addendum(s) Received: No Yes (1 2 3 ) A Certified Check, Bank Check, or a Bid Bond in the amount of $ is enclosed. The Non-Collusion Affidavit is signed and attached Respondent Proposal or Reference # Special Instructions/exceptions: Authorized Signature Print Name Firm Name Address Phone Number Date Fax Number Are procurement cards (VISA) accepted for payment? YES or NO If procurement cards are accepted, are there any restrictions or conditions? Are ACH Payments accepted? YES or NO If ACH payments are accepted, are there any restrictions or conditions? 6

Milestone Definition Date. The date the document that announces the end-of-sale and end-of-life of a product is distributed to the general public.

Milestone Definition Date. The date the document that announces the end-of-sale and end-of-life of a product is distributed to the general public. Product End-of-Life Notice End-of-Sale and End-of-Life Announcement for the Legacy Fixed-Configuration s for Cisco Unified Communications on Cisco UCS B200, C210, and C200 M2 Servers EOL8229 Cisco announces

More information

NCSU ExoGENI Rack Networking. Tae Hwang, Solu;on

NCSU ExoGENI Rack Networking. Tae Hwang, Solu;on NCSU ExoGENI Rack Networking Tae Hwang, Solu;on Architect@Cisco I. Overview NCSU GENI Rack Overview Compute UCS- B and C series servers ASA FW Catalyst 2960 Nexus 3548 UCS Fabric Interconnect A & B Network

More information

Cisco Videoscape Distribution Suite Service Broker

Cisco Videoscape Distribution Suite Service Broker Solution Overview Cisco Videoscape Distribution Suite Service Broker Product Overview Cisco Videoscape Distribution Suite Service Broker (VDS SB) is responsible for performing client request routing in

More information

Cisco UCS Integrated Infrastructure for Big Data and Analytics

Cisco UCS Integrated Infrastructure for Big Data and Analytics 30 Total System Cost TPCx-HS Performance Metric /Performance 656,096 USD Apache Hadoop Compatible Software Cloudera Enterprise Edition V5.13.0 11.54 HSph@30TB 56,854.08 USD $/HSph@30TB Operating System

More information

Cisco UCS C220 M3 Rackmount Servers

Cisco UCS C220 M3 Rackmount Servers Cisco UCS C220 M3 Rackmount Servers The Cisco Unified Computing System (Cisco UCS) combines Cisco UCS C-Series Rack Servers and B-Series Blade Servers with networking and storage access into a single converged

More information

Cisco UCS C220 M3 Rackmount Servers

Cisco UCS C220 M3 Rackmount Servers MS IT Hardware EPL 3760 - Server Category Document Version: 20151204 Replaced Document Version: 20151020 Updated By: Mike Kling Date: December 04, 2015 Cisco UCS C220 M3 Rackmount Servers The Cisco Unified

More information

Cisco UCS Integrated Infrastructure for Big Data (Cisco UCS CPA v3)

Cisco UCS Integrated Infrastructure for Big Data (Cisco UCS CPA v3) Scale Factor Cisco UCS Integrated Infrastructure Total System Cost TPCx-HS Performance Metric /Performance 518,063 USD Apache Hadoop Compatible Software Cloudera Distribution for Apache Hadoop (CDH) 5.3.2

More information

Cisco UCS Integrated Infrastructure for Big Data

Cisco UCS Integrated Infrastructure for Big Data Scale Factor Cisco UCS Integrated Infrastructure Total System Cost TPCx-HS Performance Metric /Performance 861,868 USD Apache Hadoop Compatible Software Cloudera Distribution for Apache Hadoop (CDH) 5.3.2

More information

Cisco UCS Integrated Infrastructure for Big Data and Analytics

Cisco UCS Integrated Infrastructure for Big Data and Analytics Scale Factor Cisco UCS Integrated Infrastructure Total System Cost TPCx-HS Performance Metric /Performance 386,270 USD Apache Hadoop Compatible Software MapR Converged Community Edition, Version 5.0 10.12

More information

PURCHASING SECTION th Avenue, Surrey, B.C. V3T 1V8 Tel: Fax: ADDENDUM NO.

PURCHASING SECTION th Avenue, Surrey, B.C. V3T 1V8 Tel: Fax: ADDENDUM NO. PURCHASING SECTION 3450 04 th Avenue, Surrey, B.C. V3T V8 Tel: 604-590-7274 Fax: 604-599-0956 E-mail: purchasing@surrey.ca ADDENDUM NO. 2 REQUEST FOR QUOTATIONS (RFQ) NO.: 220-040-207-40 TITLE: CISCO ACI

More information

Release Notes for Cisco Media Origination System Release 2.6

Release Notes for Cisco Media Origination System Release 2.6 Release Notes for Cisco Media Origination System Release 2.6 First Published: May 2016 This publication describes the requirements, dependencies, and caveats for the Cisco Media Origination System (MOS)

More information

SMF PaaS 27 Engine Feature SMF PaaS 30 Capacity Back Up Enablement ziip Engine Feature 1 Per Engine Per Month $200.

SMF PaaS 27 Engine Feature SMF PaaS 30 Capacity Back Up Enablement ziip Engine Feature 1 Per Engine Per Month $200. SIN Sirius Part Number Description Qty Unit of Measure UMC IBM Mainframe Systems 132 52 SMF PaaS 1 Tier One MIPS (0 99) 1 Per Installed MIP Per Month $64.18 132 52 SMF PaaS 2 Tier Two MIPS (100 800) 1

More information

Cisco UCS Integrated Infrastructure for Big Data

Cisco UCS Integrated Infrastructure for Big Data Scale Factor Cisco UCS Integrated Infrastructure Total System Cost TPCx-HS Performance Metric /Performance 842,308 USD Apache Hadoop Compatible Software IBM Open Platform (IBM IOP) 4.1 22.26 HSph@ 37,839.54

More information

Cisco UCS 5100 Series Blade Server Chassis

Cisco UCS 5100 Series Blade Server Chassis Document Version: 20170320 Replaced Document Version: 20161028 Date: March 20, 2017 Cisco UCS 5100 Series Blade Server Chassis The Cisco UCS 5100 Series Blade Server Chassis is a crucial building block

More information

Cisco UCS Mini. Report Date: November 20, 2017 Total System Cost TPCx-IoT Performance Metric Price/Performance 142, IoTps

Cisco UCS Mini. Report Date: November 20, 2017 Total System Cost TPCx-IoT Performance Metric Price/Performance 142, IoTps Cisco UCS Mini Total System Cost TPCx-IoT Performance Metric Price/Performance 133,662 USD 142,493.85 IoTps 0.94 USD $/IoTps DBMS Software 300 Million HBase 1.2.1 On Cloudera Distribution for Apache Hadoop

More information

Cisco UCS C240 M3 NEBS High-Density Rack Server (Small Form Factor Disk Drive Model)

Cisco UCS C240 M3 NEBS High-Density Rack Server (Small Form Factor Disk Drive Model) Spec Sheet Cisco UCS C240 M3 NEBS High-Density Rack Server (Small Form Factor Disk Drive Model) CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR. SAN JOSE, CA, 95134 REV A.1 MARCH 27, 2013 WWW.CISCO.COM

More information

ITEM 8 INFORMATION TECHNOLOGY 416 West Fourth Street Davenport, Iowa Approval of Server and Storage Acquisition

ITEM 8 INFORMATION TECHNOLOGY 416 West Fourth Street Davenport, Iowa Approval of Server and Storage Acquisition ITEM 8 INFORMATION TECHNOLOGY 416 West Fourth Street Davenport, Iowa 52801-1187 Ph: (563) 328-4100 Fax: (563) 326-8669 www.scottcountyiowa.com July 22, 2014 To: From: Subject: Dee F. Bruemmer, County Administrator

More information

Cisco Systems, Inc. First Edition. January 8, 2015

Cisco Systems, Inc. First Edition. January 8, 2015 Cisco Systems, Inc. TPC Express Benchmark HS (TPCx-HS) Full Disclosure Report for Cisco UCS Integrated Infrastructure for Big Data (Cisco UCS CPA v2) using Red Hat Enterprise Linux Server 6.4 and MapR

More information

Cisco TelePresence Server on Virtual Machine

Cisco TelePresence Server on Virtual Machine Cisco TelePresence Server on Virtual Machine Installation Guide 4.1(1.85) March 2015 Contents General information 4 About the Cisco TelePresence Server on Virtual Machine 4 Licensing 4 Co-residency support

More information

Release Notes for Cisco Media Origination System Release 2.4.1

Release Notes for Cisco Media Origination System Release 2.4.1 Release Notes for Cisco Media Origination System Release 2.4.1 First Published: September 2015 This publication describes the requirements, dependencies, and caveats for the Cisco Media Origination System

More information

REQUEST FOR FORMAL QUOTATIONS. Server Virtualization / SAN Solution

REQUEST FOR FORMAL QUOTATIONS. Server Virtualization / SAN Solution The Corporation of the Town of Tecumseh REQUEST FOR FORMAL QUOTATIONS Server Virtualization / SAN Solution April 28, 2011 *** The Corporation of the Town of Tecumseh 917 Lesperance Rd. Tecumseh, Ontario

More information

PRICE QUOTATION - CNUSD - WIRELESS CORE REV1

PRICE QUOTATION - CNUSD - WIRELESS CORE REV1 DIMENSION DATA Corporate Address: North America, Inc 11006 Rushmore Drive, Suite 300, Charlotte, NC 28277 United States PRICE QUOTATION - CNUSD - WIRELESS CORE REV1 Quote Name: CNUSD - rev1 Quote Status:

More information

Cisco UCS C260 M2 Rackmount Servers 30 -

Cisco UCS C260 M2 Rackmount Servers 30 - MS IT Hardware EPL 3760 - Servers Document Version: 20140701 Replaced Document Version: N/A Updated By: Mike Kling Date: July 1, 2014 hardware disc smrtnt disc Cisco UCS C260 M2 Rackmount Servers 30 -

More information

SCIENCE AND TECHNOLOGY ORGANIZATION CENTRE FOR MARITIME RESEARCH AND EXPERIMENTATION

SCIENCE AND TECHNOLOGY ORGANIZATION CENTRE FOR MARITIME RESEARCH AND EXPERIMENTATION SCIENCE AND TECHNOLOGY ORGANIZATION CENTRE FOR MARITIME RESEARCH AND EXPERIMENTATION RFQ CMRE 17-012 La Spezia, 7 September 2017 SUBJECT: REQUEST FOR QUOTATION (RFQ) NO. CMRE-17-012, FOR THE PROVISION

More information

Products Item Description Taxable Qty Unit Price Total

Products Item Description Taxable Qty Unit Price Total visit us at www.ams.net Price Quote Order #72019 City of Pittsburg City of Pittsburg - UC and Network Upg V4 City of Pittsburg 65 Civic Avenue 1st Floor Pittsburg, CA 94565-3814 ATTN: Jitendra Kaneria

More information

Addendum No. 1. Joliet Junior College 1215 Houbolt Road Joliet, IL DATE: July 21, 2016

Addendum No. 1. Joliet Junior College 1215 Houbolt Road Joliet, IL DATE: July 21, 2016 Addendum No. 1 DATE: July 21, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Respondents SUBJECT: Addendum No. 1 PROJECT NAME: Network Electronics for City Center Campus,

More information

Cisco Media Origination System

Cisco Media Origination System Data Sheet Cisco Media Origination System Product Overview The Cisco Videoscape Media Origination System (MOS) is a cloud-based media origination platform that streamlines deployment of advanced services,

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group October 7, 2011 INVITATION TO BID The City of Norwalk is soliciting bids for the Norwalk Public Schools, Information Technology Department for Data Center Core Switching

More information

Cisco UCS Integrated Infrastructure for Big Data

Cisco UCS Integrated Infrastructure for Big Data Scale Factor Cisco UCS Integrated Infrastructure TPCxHS Rev. 1.3.0 TPCPricing Rev. 2.1.0 Total System Cost TPCxHS Performance Metric Price/Performance 428,489 USD Apache Hadoop Compatible Software MapR

More information

Cisco UCS B200 M2 Blade Server

Cisco UCS B200 M2 Blade Server SpecSheet Cisco UCS B200 M2 Blade Server Overview The Cisco UCS B200 M2 Blade Server is a two-socket, half-width blade server, using Intel s Xeon 5500 and 5600 Series processors with 12 DIMM slots, one

More information

Cisco TelePresence VCS CE1000 Appliance

Cisco TelePresence VCS CE1000 Appliance Cisco TelePresence VCS CE1000 Appliance Installation Guide X8.2 or later D15056.02 June 2014 Contents Introduction 3 About this document 3 About the Cisco VCS appliance 3 Related documents 4 Training 4

More information

Request for Quotation (RFQ) BRAC Bank Limited

Request for Quotation (RFQ) BRAC Bank Limited Request for Quotation (RFQ) BRAC Bank Limited BRAC Bank Limited has planned to upgrade their existing Enterprise Network Systems for new generation banking and better customer experience. The Quotation

More information

Cisco UCS C24 M3 High-Density Small Form Factor Rack-Mount Server

Cisco UCS C24 M3 High-Density Small Form Factor Rack-Mount Server This product has been discontinued Spec Sheet Cisco UCS C24 M3 High-Density Small Form Factor Rack-Mount Server CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR. SAN JOSE, CA, 95134 REV B.13 MARCH

More information

Re: Procurement of Hardware ( Servers, Thin Clients, Printers, Network Equipments)

Re: Procurement of Hardware ( Servers, Thin Clients, Printers, Network Equipments) Ref: FSM/Computer/HW-New Block/2013 Date: 26 th April, 2013 Re: Procurement of Hardware ( Servers, Thin Clients, Printers, Network Equipments) FORE School of Management (FSM) has been established by the

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group August 7, 2012 INVITATION TO BID The City of Norwalk, Information Technology Department, is soliciting bids for Computer Server Hardware and VMware vsphere Enterprise

More information

Cisco Systems, Inc. TPC Express Benchmark TM IoT (TPCx-IoT)

Cisco Systems, Inc. TPC Express Benchmark TM IoT (TPCx-IoT) Cisco Systems, Inc. TPC Express Benchmark TM IoT (TPCx-IoT) Full Disclosure Report for Cisco UCS Mini Blade Server Chassis (with 4 Cisco UCS B200M4 Servers) using HBase 1.2.1 on Cloudera Distribution for

More information

Request for Proposal

Request for Proposal 311 South East Street Telephone: (912) 729-5687 Kingsland, GA 31548 Fax: (912) 729-1489 Dr. William C. Hardin, Superintendent Request for Proposal Project: Camden County Schools (CCS) is accepting proposals

More information

Cisco Connected Safety and Security UCS C220

Cisco Connected Safety and Security UCS C220 Data Sheet Cisco Connected Safety and Security UCS Platform Series The Cisco Connected Safety and Security (CSS) Unified Computing System (UCS ) Platform Series offers you performance and density for deploying

More information

CVE-400-1I Engineering a Citrix Virtualization Solution

CVE-400-1I Engineering a Citrix Virtualization Solution CVE-400-1I Engineering a Citrix Virtualization Solution The CVE-400-1I Engineering a Citrix Virtualization Solution course teaches Citrix engineers how to plan for and perform the tasks necessary to successfully

More information

CMB-207-1I Citrix Desktop Virtualization Fast Track

CMB-207-1I Citrix Desktop Virtualization Fast Track Page1 CMB-207-1I Citrix Desktop Virtualization Fast Track This fast-paced course covers select content from training courses CXA-206: Citrix XenApp 6.5 Administration and CXD-202: Citrix XenDesktop 5 Administration

More information

Purchasing Department Finance Group INVITATION TO BID. PROJECT # 3299 Document length seven (7) pages DEADLINE 2:00 PM May 2, 2013

Purchasing Department Finance Group INVITATION TO BID. PROJECT # 3299 Document length seven (7) pages DEADLINE 2:00 PM May 2, 2013 Purchasing Department Finance Group April 18, 2013 INVITATION TO BID The City of Norwalk is soliciting bids for the City s Information Technology Department for Data Center Core Switch Equipment for the

More information

Data Center solutions for SMB

Data Center solutions for SMB Data Center solutions for SMB VSPEX proven infrastructure Cisco Connect 2013 Ciprian Pirv Vendor Distri Integrator Vendor: Vendor: R&D, Marketing R&D, Marketing Distributor: Financing, stocks & logistics,

More information

Q1: Were you looking for any Software Assurance with any of the Microsoft Windows or SQL?

Q1: Were you looking for any Software Assurance with any of the Microsoft Windows or SQL? February 12, 2016 To: All Prospective Bidders Re: 3 Legal Notice No. GD 16-01 Servers & Server Software Following are questions received and RTA s responses: Q1: Were you looking for any Software Assurance

More information

CORRIGENDUM / AMENDMENT-1 TO REQUEST FOR PROPOSAL FOR REPLACEMENT OF END OF LIFE NETWORKING DEVICES. CORRIGENDUM / AMENDMENT-1 Dated: 02 Nov 2017

CORRIGENDUM / AMENDMENT-1 TO REQUEST FOR PROPOSAL FOR REPLACEMENT OF END OF LIFE NETWORKING DEVICES. CORRIGENDUM / AMENDMENT-1 Dated: 02 Nov 2017 CORRIGENDUM / AMENDMENT-1 Dated: 02 Nov 2017 With reference to the query received from vendors (bidders), following are the amendments to the RFP Reference No. IT-08/2017-18 dated 12/10/2017 1) Under Requirement

More information

Virtual Environment For Yemen Mobile

Virtual Environment For Yemen Mobile Virtual Environment For Yemen Mobile 1- Bidders Qualification: Any bidder could consider himself as a qualified bidder who has the right to participate at the bidding activity if he submits the required

More information

Cisco UCS E-Series Servers

Cisco UCS E-Series Servers Data Sheet Cisco UCS E-Series Servers Product Overview Cisco UCS E-Series Servers, part of the Cisco Unified Computing System (Cisco UCS), are next-generation power-optimized general-purpose x86 64-bit

More information

Cisco UCS C240 M4 Rack Server with Lightning Ascend Gen. II SAS SSDs from SanDisk 36TB Data Warehouse Fast Track Reference Architecture

Cisco UCS C240 M4 Rack Server with Lightning Ascend Gen. II SAS SSDs from SanDisk 36TB Data Warehouse Fast Track Reference Architecture WHITE PAPER Cisco UCS C240 M4 Rack Server with Lightning Ascend Gen. II SAS SSDs from SanDisk 36TB Data Warehouse Fast Track Reference Architecture Based on the SQL Server 2014 Data Warehouse Fast Track

More information

Cisco UCS C240 M4 Rack Server with Lightning Ascend Gen. II SAS SSDs from SanDisk 36TB Data Warehouse Fast Track Reference Architecture

Cisco UCS C240 M4 Rack Server with Lightning Ascend Gen. II SAS SSDs from SanDisk 36TB Data Warehouse Fast Track Reference Architecture WHITE PAPER Cisco UCS C240 M4 Rack Server with Lightning Ascend Gen. II SAS SSDs from SanDisk 36TB Data Warehouse Fast Track Reference Architecture Based on the SQL Server 2016 Data Warehouse Fast Track

More information

COURSE OUTLINE IT TRAINING

COURSE OUTLINE IT TRAINING CMB-207-1I Citrix XenApp and XenDesktop Fast Track Duration: 5 days Overview: This fast-paced course covers select content from training courses CXA-206 and CXD- 202 and provides the foundation necessary

More information

Troubleshooting Server Disk Drive Detection and Monitoring

Troubleshooting Server Disk Drive Detection and Monitoring Troubleshooting Server Disk Drive Detection and Monitoring This chapter includes the following sections: Support for Local Storage Monitoring, page 1 Prerequisites for Local Storage Monitoring, page 2

More information

Cisco Systems, Inc. Red Hat Enterprise Linux Server Release 7.4. TPC Express Benchmark HS (TPCx-HS) Full Disclosure Report. for

Cisco Systems, Inc. Red Hat Enterprise Linux Server Release 7.4. TPC Express Benchmark HS (TPCx-HS) Full Disclosure Report. for Cisco Systems, Inc. TPC Express Benchmark HS (TPCx-HS) Full Disclosure Report Cisco UCS Integrated Infrastructure for Big Data and Analytics for (with 17 UCS C240M5 Servers) using Cloudera Enterprise Edition

More information

Anna Independent School District

Anna Independent School District Anna Independent School District 501 S. Sherley Avenue Anna Texas 75409 www.annaisd.org Phone: 972-924-1000 Fax: 972-924-1001 Request for Proposals (RFP) Spring 2015 Computer Hardware Refresh The Technology

More information

Cisco UCS C460 M2 High-Performance Rack-Mount Server

Cisco UCS C460 M2 High-Performance Rack-Mount Server SpecSheet Cisco UCS C460 M2 High-Performance Rack- Mount Server Overview The Cisco UCS C460 M2 High-Performance Rack-Mount Server (Figure 1) is a four-rack-unit (4RU) server supporting the Intel Xeon processor

More information

Citrix XenApp 6.5 Administration

Citrix XenApp 6.5 Administration Citrix XenApp 6.5 Administration CXA206; 5 Days, Instructor-led Course Description Citrix XenApp 6.5 Administration training course provides the foundation necessary for administrators to effectively centralize

More information

Data Protection for Cisco HyperFlex with Veeam Availability Suite. Solution Overview Cisco Public

Data Protection for Cisco HyperFlex with Veeam Availability Suite. Solution Overview Cisco Public Data Protection for Cisco HyperFlex with Veeam Availability Suite 1 2017 2017 Cisco Cisco and/or and/or its affiliates. its affiliates. All rights All rights reserved. reserved. Highlights Is Cisco compatible

More information

Course CXA-206: Citrix XenApp 6.5 Administration

Course CXA-206: Citrix XenApp 6.5 Administration Course CXA-206: Citrix XenApp 6.5 Administration Course Length: 5 days Overview Citrix XenApp 6.5 Administration training course provides the foundation necessary for administrators to effectively centralize

More information

Vendor: Citrix. Exam Code: 1Y Exam Name: Designing Citrix XenDesktop 7.6 Solutions. Version: Demo

Vendor: Citrix. Exam Code: 1Y Exam Name: Designing Citrix XenDesktop 7.6 Solutions. Version: Demo Vendor: Citrix Exam Code: 1Y0-401 Exam Name: Designing Citrix XenDesktop 7.6 Solutions Version: Demo DEMO QUESTION 1 Which option requires the fewest components to implement a fault-tolerant, load-balanced

More information

Answers to questions asked prior to the deadline of 5pm, November 14, 2018;

Answers to questions asked prior to the deadline of 5pm, November 14, 2018; Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 November

More information

[Procurement Officer] Within 10 days of signing of PO. [30] days after receipt of invoice. Binding period of the quote [7] days *

[Procurement Officer] Within 10 days of signing of PO. [30] days after receipt of invoice. Binding period of the quote [7] days * REQUEST FOR QUOTATION SERVERS SUPPLIER NAME: RFQ specific information RFQ Ref Number MiDS Con-611/014 Date of issue [011/1/014] Deadline for receiving Quotes Contact Person For technical questions (Point

More information

MT. PROSPECT PARK DISTRICT REQUEST FOR PROPOSAL REQUEST FOR STATEMENTS OF INTEREST, QUALIFICATIONS, PERFORMANCE DATA AND COST PROPOSAL

MT. PROSPECT PARK DISTRICT REQUEST FOR PROPOSAL REQUEST FOR STATEMENTS OF INTEREST, QUALIFICATIONS, PERFORMANCE DATA AND COST PROPOSAL MT. PROSPECT PARK DISTRICT REQUEST FOR PROPOSAL REQUEST FOR STATEMENTS OF INTEREST, QUALIFICATIONS, PERFORMANCE DATA AND COST PROPOSAL WEB SITE DESIGN SERVICES Issue Date: December 19, 2017 Mt. Prospect

More information

Ionia Public Schools Ionia, Michigan Request for Proposal

Ionia Public Schools Ionia, Michigan Request for Proposal Ionia Public Schools Ionia, Michigan Request for Proposal Computer Equipment Network Electronics & Wireless Infrastructure Ionia Public Schools Attn: Tim Blackmer Director of Technology 250 E. Tuttle Road

More information

Services Catalogue Australia

Services Catalogue Australia Services Catalogue Australia Westcon-Comstor Services works with our resellers and vendors to discover, develop and deliver opportunities that provide greater strategic insight, richer margin and longer-term

More information

C-Series Servers Meat and Tators

C-Series Servers Meat and Tators C-Series Servers Meat and Tators Jimmy Ray Purser Chief Geek, TechWiseTV 2006 Cisco Systems, Inc. All rights reserved. 1 When it comes to Servers 2006 Cisco Systems, Inc. All rights reserved. 2 Unified

More information

StorNext M440 Site Planning Guide

StorNext M440 Site Planning Guide StorNext M440 Contents StorNext M440 Site Planning Guide Included with Your StorNext M440... 1 Professional Installation Requirements. 2 Site Requirements... 2 Shipping Information... 3 StorNext M440 System

More information

Company Name S.I.S.D. Vendor Number E-Rate SPIN Number Company Contact Address City, State ZipCode Phone Fax Website

Company Name S.I.S.D. Vendor Number E-Rate SPIN Number Company Contact Address City, State ZipCode Phone Fax  Website Company Name S.I.S.D. Vendor Number E-Rate SPIN Number Company Contact Address City, State ZipCode Phone Fax Email Website Socorro Independent School District VoIP Installations for New Schools RFP No.

More information

Actual4Test. Actual4test - actual test exam dumps-pass for IT exams

Actual4Test.   Actual4test - actual test exam dumps-pass for IT exams Actual4Test http://www.actual4test.com Actual4test - actual test exam dumps-pass for IT exams Exam : 1Y0-402 Title : Citrix XenApp and XenDesktop 7.15 Assessment, Design, and Advanced Configurations Vendor

More information

Vendor must indicate at what level its proposed solution will meet the College s requirements as delineated in the referenced sections of the RFP:

Vendor must indicate at what level its proposed solution will meet the College s requirements as delineated in the referenced sections of the RFP: Vendor must indicate at what level its proposed solution will the College s requirements as delineated in the referenced sections of the RFP: 2.3 Solution Vision Requirement 2.3 Solution Vision CCAC will

More information

Cisco Secure Network Server

Cisco Secure Network Server Data Sheet Cisco Secure Network Server Product Overview Granting and denying network access has evolved beyond simple user name and password verifications. Today, additional attributes related to users

More information

Cisco Secure Network Server

Cisco Secure Network Server Data Sheet Cisco Server Product Overview Granting and denying network access has evolved beyond simple user name and password verifications. Today, additional attributes related to users and their devices

More information

EPUB // UCS C200 M2 SPEC SHEET EBOOK

EPUB // UCS C200 M2 SPEC SHEET EBOOK 07 February, 2018 EPUB // UCS C200 M2 SPEC SHEET EBOOK Document Filetype: PDF 334.23 KB 0 EPUB // UCS C200 M2 SPEC SHEET EBOOK End-of-Sale and End-of-Life Announcement for the Cisco UCS C200 M2 High-Density

More information

NEC Express5800/D120h System Configuration Guide

NEC Express5800/D120h System Configuration Guide NEC Express5800/D120h System Configuration Guide Introduction This document contains product and configuration information that will enable you to configure your system. The guide will ensure fast and

More information

HPE ProLiant ML110 Gen10 Server

HPE ProLiant ML110 Gen10 Server Digital data sheet HPE ProLiant ML110 Gen10 Server ProLiant ML Servers What's new New SMB focused offers regionally released as Smart Buy Express in the U.S. and Canada, Top Value in Europe, and Intelligent

More information

Oxford School District 224 Bramlett Boulevard Oxford, MS (662)

Oxford School District 224 Bramlett Boulevard Oxford, MS (662) Oxford School District 224 Bramlett Boulevard Oxford, MS 38655 (662) 234-3541 www.oxfordsd.org Request for Proposals (RFP) - Sale of Computer Equipment Proposal Deadline Thursday, December 7, 2017 at 10:00am

More information

TECHNICAL SPECIFICATIONS + TECHNICAL OFFER

TECHNICAL SPECIFICATIONS + TECHNICAL OFFER ANNEX II + III : TECHNICAL SPECIFICATIONS + TECHNICAL OFFER Contract title : Supply of Information & Communication Technology Hardware Publication reference: 2017/386304 10/1/1.1/1.2.2a p 1 / Columns 1-2

More information

INVITATION TO BID NORTH HAVEN PUBLIC SCHOOLS

INVITATION TO BID NORTH HAVEN PUBLIC SCHOOLS FINANCE INVITATION TO BID NORTH HAVEN PUBLIC SCHOOLS Sealed bids for purchase, installation and labor for Storage Area Network and VMware Host Upgrade for the North Haven Public Schools will be received

More information

Certification Document macle GmbH IBM System xx3650 M4 03/06/2014. macle GmbH IBM System x3650 M4

Certification Document macle GmbH IBM System xx3650 M4 03/06/2014. macle GmbH IBM System x3650 M4 macle GmbH IBM System x3650 M4 1 Executive summary After performing all tests, the Certification Document macle GmbH IBM System x3650 M4 system has been officially certified according to the Open-E Hardware

More information

Purchasing Services (305) FAX (305) January 31, 2011

Purchasing Services (305) FAX (305) January 31, 2011 Purchasing Services (305) 348-2161 FAX (305) 348-3600 January 31, 2011 ITB 01-006 Purchase, Maintenance, and Installation of Four (4) IBM P750 Servers ADDENDUM #1 Re: Revised Calendar of Events and Exhibit

More information

Citrix - CXD Deploying App and Desktop Solutions with Citrix XenApp and XenDesktop 7.6

Citrix - CXD Deploying App and Desktop Solutions with Citrix XenApp and XenDesktop 7.6 Citrix - CXD-300 - Deploying App and Desktop Solutions with Citrix XenApp and XenDesktop 7.6 Duration: 5 Days Course Price: $4,995 Course Description Course Overview This training course provides students

More information

Cisco UCS C220 M3 High-Density Rack Server (Large Form Factor Hard Disk Drive Model)

Cisco UCS C220 M3 High-Density Rack Server (Large Form Factor Hard Disk Drive Model) This product has been discontinued Spec Sheet Cisco UCS C220 M3 High-Density Rack Server (Large Form Factor Hard Disk Drive Model) CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR SAN JOSE, CA, 95134

More information

Dutch-Bangla Bank Limited

Dutch-Bangla Bank Limited Dutch-Bangla Bank Limited IT Operation Division, Head Office Rupayan Z.R. Plaza, 4 th Floor House No # 46, Road No # 9A Dhanmondi R/A, Dhaka-1209 Ref: DBBL/100/017/2019/011 January 06, 2019 Tender Schedule

More information

An Oracle Technical White Paper October Sizing Guide for Single Click Configurations of Oracle s MySQL on Sun Fire x86 Servers

An Oracle Technical White Paper October Sizing Guide for Single Click Configurations of Oracle s MySQL on Sun Fire x86 Servers An Oracle Technical White Paper October 2011 Sizing Guide for Single Click Configurations of Oracle s MySQL on Sun Fire x86 Servers Introduction... 1 Foundation for an Enterprise Infrastructure... 2 Sun

More information

SPARC T5-4 Server. Total System Cost Composite Query per Hour Metric Price / Performance

SPARC T5-4 Server. Total System Cost Composite Query per Hour Metric Price / Performance SPARC T5-4 Server TPC-H Rev. 2.16.0 TPC-Pricing 1.7.0 Report Date: November 25, 2013 Total System Cost Composite Query per Hour Metric Price / Performance $1,755,709 USD 377,594.3 QphH@10,000GB $4.65/QphH@10,000GB

More information

vstart 50 VMware vsphere Solution Specification

vstart 50 VMware vsphere Solution Specification vstart 50 VMware vsphere Solution Specification Release 1.3 for 12 th Generation Servers Dell Virtualization Solutions Engineering Revision: A00 March 2012 THIS WHITE PAPER IS FOR INFORMATIONAL PURPOSES

More information

NEC Express5800/R120h-2M System Configuration Guide

NEC Express5800/R120h-2M System Configuration Guide NEC Express5800/R120h-2M System Configuration Guide Introduction This document contains product and configuration information that will enable you to configure your system. The guide will ensure fast and

More information

AUTHORIZE CITY MANAGER TO PURCHASE TECHNOLOGY NETWORK UPGRADES

AUTHORIZE CITY MANAGER TO PURCHASE TECHNOLOGY NETWORK UPGRADES STAFF REPORT MEETING DATE: June 4, 2013 TO: City Council 75 Rowland Way #200 Novato, CA 94945-3232 (415) 899-8900 FAX (415) 899-8213 www.novato.org FROM: SUBJECT: Cathy Capriola, Assistant City Manager

More information

1 SAP HANA Remote Monitoring

1 SAP HANA Remote Monitoring Page 1 of 5 Service Description: Cisco Managed for Data Center: SAP HANA Technology Addendum to Cisco Managed for Enterprise Common Service Description This document referred to as a Technology Addendum

More information

LUCAS COUNTY ADMINISTRATOR Chris Zimo One Government Center Suite 370 Toledo, Ohio UNITED STATES Phone: (419) Fax:

LUCAS COUNTY ADMINISTRATOR Chris Zimo One Government Center Suite 370 Toledo, Ohio UNITED STATES Phone: (419) Fax: Pricing Proposal Quotation #: 5704290 Description: Microsoft Windows Server 2008 R2 Datacenter Created On: Jul-31-2012 Valid Until: Aug-24-2012 LUCAS COUNTY ADMINISTRATOR Chris Zimo One Government Center

More information

Cisco Systems, Inc. Red Hat Enterprise Linux Server Release 6.7

Cisco Systems, Inc. Red Hat Enterprise Linux Server Release 6.7 Cisco Systems, Inc. TPC Express Benchmark HS (TPCx-HS) Full Disclosure Report for Cisco UCS Integrated Infrastructure for Big Data (with 8 Cisco UCS S3260 2-Node Servers) using IBM Open Platform (IBM IOP)

More information

Cisco UCS C210 M2 General-Purpose Rack-Mount Server

Cisco UCS C210 M2 General-Purpose Rack-Mount Server Spec Sheet Cisco UCS C210 M2 General-Purpose Rack-Mount Server CISCO SYSTEMS PUBLICATION HISTORY 170 WEST TASMAN DR. SAN JOSE, CA, 95134 REV A.3 DECEMBER 2, 2011 WWW.CISCO.COM CONTENTS OVERVIEW...............................................

More information

19-20 LAN Revision and Refresh Project

19-20 LAN Revision and Refresh Project 19-20 LAN Revision and Refresh Project Project Summary The Vernon Township School District seeks to enable savings on maintenance, cooling, space, and other operational costs by creating a consolidation

More information

Data Sheet FUJITSU Storage ETERNUS CS200c S4

Data Sheet FUJITSU Storage ETERNUS CS200c S4 Data Sheet FUJITSU Storage ETERNUS CS200c S4 Data Sheet FUJITSU Storage ETERNUS CS200c S4 Integrated Backup Appliance for the Digital World ETERNUS CS Data Protection Appliances ETERNUS CS data protection

More information

Cisco UCS Integrated Infrastructure for Big Data

Cisco UCS Integrated Infrastructure for Big Data Total System Cost TPCxHS Performance Metric /Performance 3,831,761 RMB 10 Apache Hadoop Compatible Software Transwarp Data Hub V4.6 12.18 HSph@10TB 314,594.50 RMB /HSph@10TB Operating System Other Software

More information

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin within the Vendor Self Service portal at wvoasis.gov.

More information

Artico NAS Storage Appliance Site Planning Guide

Artico NAS Storage Appliance Site Planning Guide Artico NAS Storage Appliance Contents Artico NAS Storage Appliance Site Planning Guide Site Requirements... 2 Shipping Information... 2 System Components... 3 Specifications... 8 Selecting an Installation

More information

Cisco UCS C24 M3 Server

Cisco UCS C24 M3 Server Data Sheet Cisco UCS C24 M3 Rack Server Product Overview The form-factor-agnostic Cisco Unified Computing System (Cisco UCS ) combines Cisco UCS C-Series Rack Servers and B-Series Blade Servers with networking

More information

IOmark- VM. HP HP ConvergedSystem 242- HC StoreVirtual Test Report: VM- HC b Test Report Date: 27, April

IOmark- VM. HP HP ConvergedSystem 242- HC StoreVirtual Test Report: VM- HC b Test Report Date: 27, April IOmark- VM HP HP ConvergedSystem 242- HC StoreVirtual Test Report: VM- HC- 150427- b Test Report Date: 27, April 2015 Copyright 2010-2015 Evaluator Group, Inc. All rights reserved. IOmark- VM, IOmark-

More information

ATTACHMENT 1 Vendor Compliance Matrix Request for Proposal 3093 CCAC Infrastructure Upgrade Phase 1: Campus Core Switch Upgrade Project

ATTACHMENT 1 Vendor Compliance Matrix Request for Proposal 3093 CCAC Infrastructure Upgrade Phase 1: Campus Core Switch Upgrade Project Vendor must indicate at what level its proposed solution will the College s requirements as delineated in the referenced sections of the RFP: 2.3 Solution Vision 2.3 Solution Vision The vendor of the selected

More information

PHILADELPHIA GAS WORKS

PHILADELPHIA GAS WORKS Q1 Q2 Q3 Q4 QUESTIONS Regarding section 2.2.1 Hosting Services. The last bullet on page 6 states Primary Data center facility to be located in Philadelphia. Does this just confirm that PGW already has

More information

Exam : 1Y Citrix XenApp and XenDesktop 7.15 Assessment, Design and Advanced Configurations. Title : Version : V8.02

Exam : 1Y Citrix XenApp and XenDesktop 7.15 Assessment, Design and Advanced Configurations. Title : Version : V8.02 Exam : 1Y0-402 Title : Citrix XenApp and XenDesktop 7.15 Assessment, Design and Advanced Configurations Version : V8.02 1 / 12 1.Scenario: A Citrix Architect needs to design a new XenApp and XenDesktop

More information

DATE: September 30, All Offerors. Angela R. Young Executive Director of Contracting. RFP No , Data Center Hardware and Services

DATE: September 30, All Offerors. Angela R. Young Executive Director of Contracting. RFP No , Data Center Hardware and Services BOARD OF EDUCATION Linda McCain, President Linda P. Bryant, Vice President Julia C. Bernath Gail Dean Catherine Maddox Katie Reeves Kenneth Zeff, Interim Superintendent DATE: September 30, 2015 TO: FROM:

More information