1 ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017
2 ELECTRICAL PLANT CONCEPT The electrical equipment, depending on the power plant / unit size and grid interconnection arrangement will mainly comprise the following: Generator & Excitation System 11 &132 kv Switchgears (Medium Voltage / High Voltage Systems) 400 V Switchgear / LV Power Distribution Automatic and Manual Synchronizing System DC System including batteries, battery chargers and DC distribution Uninterruptable Power Supply System Generator Step-up and Station Service / Auxiliary Transformers Motors LV / MV & Control Cables Electrical Control & Protection System Lighting and Small Power Services & Earthing and Lightning Protection System
3 ELECTRICAL PLANT CONCEPT For dimensioning, design and layout of the various plant components and installations, the following features and aspects will be considered: Ratings to safely cope with normal and fault conditions, the prevailing site conditions, avoiding any over-stressing of material and equipment Equipment to be of standard design, providing highest degree of safety, reliability, availability, redundancy and ease in operation Equipment arrangements to consider adequate space and access for transportation, installation, commissioning, operation and maintenance The layout, design and manufacturing of all electrical equipment shall comply with the latest edition of the relevant international standards
4 ELECTRICAL PLANT CONCEPT Pre-requisites for the selection of the main connections and station auxiliary power supply system are: the reliability of power supply to the consumer, simplicity in the design, operational flexibility, ease in maintenance and low capital and operation costs. GCB shall be in accordance with IEEE Std C37.013a
5 GENERATOR Three phase synchronous machines complying with IEC Equipped with state-of-the-art static or brushless excitation system with a digital Automatic Voltage Regulator (AVR) Designed for both interconnected and isolated load operation Closed air circuit water (CACW) cooling system with ducting and coolers. The power generated will be dispersed through appropriate voltage level transmission / sub-transmission lines Generator Main Parameters
6 MAIN DESIGN PARAMETERS OF 11 kv & 132 kv SWITCHGEARS
7 MAIN DESIGN PARAMETERS OF GENERATOR STEP-UP TRANSFORMER Parameters Unit Value Quantity 1 Type - Oil-filled Rating at IEC Conditions Rated Voltage Ratio MVA 25 kv / kv 11 / 132 Vector Group - Dyn11 Cooling - ONAN Tap Changer - NLTC Dimensions L x W x H mm x mm x mm 3700 x 2350 x 3900
8 MAIN DESIGN PARAMETERS OF STATION SERVICE TRANSFORMERS Parameters Unit Value No. of Auxiliary Transformers Qty 2 Type - Dry AN Rating at IEC Conditions kva 250 Rated Voltage Ratio kv / kv 11 /.4 Vector Group - Dyn11 Tap Changer - NLTC Impedance Voltage % 6.0 Frequency Hz 50 Dimensions (L x W x H) Mm 1350 x 740 x 1065 Total Weight Kg 990
9 Generator Protection Scheme
10 CONTROL SYSTEM DESIGN In order to take full advantage of the powerful features of the present day state-of-the art control systems, it is advisable that the control, protective and supervisory functions required for central operation of all the power plant facilities shall be implemented in a single Distributed Control System (DCS). The system typically performs the functions of data acquisition, signal conditioning, closed loop control, open loop control, alarm processing and annunciation, event recording, reporting, historical and real-time trend recording and communication with foreign devices/ systems Only well proven, state-of-art, with modern reliable design and commercially supported systems and equipment with established operating history in thermal power plants are to be deployed
11 CONTROL SYSTEM DESIGN Safety, Redundancy and Availability Requirements Safety and availability are of utmost importance for achieving the intended trouble-free plant operation. This can in general be achieved by pursuing two different strategies: Distribution of the system into several functional areas: i.e. in the event of outage of one system component only the appertaining section would be affected with the rest of the system remaining fully functional. Redundancy of system components lessening the probability of outage of essential functions. There shall be no potential for single points of failure in the DCS system. Failure of any single device shall not affect the ability of the system to communicate with other devices in the system. Redundant equipment, hardware and software, shall be continuously monitored for errors The DCS shall utilize redundancy of hardware and facilities at the supervisory and Human Machine Interface (HMI) levels and must be unitized at the automation level to match the mechanical/ process plant redundancy. Redundancy shall be ensured for all main (common) components like CPU, communication modules, power supplies etc
12 CONTROL SYSTEM DESIGN
13 Human Machine Interface (HMI) The Human Machine Interface (HMI) being the user interface for operator interaction with the DCS and the process provides a graphics-based visualization of the power generation process with the corresponding control and monitoring functions. It typically resides in a windows based workstation with a graphic Visual Display Unit (VDU) that communicates with data servers and process stations. The HMI shall be used for different functions: Operation, monitoring, and alarm handling of the process controlled by the DCS system. Diagnostic functions for fault analysis. Information management for business relevant data. Asset management for maintenance related tasks. Engineering functions for program and configuration changes. General management functions related to the IT infrastructure. The HMI shall follow an ergonomic, intuitive, and easy design and support the operator in his familiar way to operate the process.
14 Other Important DCS Features Engineering Workstation (EWS) The EWS shall support all the up-to-date standards in respect to structuring, configuring, programming, and commissioning. It shall communicate with the entire DCS system in order to execute all necessary work on the entire user-software package. Fault Diagnostics All failures and anomalies in the DCS shall be automatically detected and alarmed identifying the kind of failure and the malfunctioning module. Sequence of Events Recording, Post Trip Reports and Printed Logs Sequence of event recording shall be provided as integral part of the DCS to record and print trips and causes of trips for quick diagnostics of fault and remedial action. Post trip reports shall include a compilation of analogue and binary signals which are relevant and specific for a given trip event. Process Controllers, I/O Modules & Field Bus Redundant Process Controllers are must. The Process Controllers execute the control tasks in the system. Measuring devices, I/O devices, drives, and actuators shall be connected to the process stations by cables carrying analogue or binary values, or by standard fieldbuses.
15 Other Important DCS Features Workstation Hardware, Data Servers and Printers Workstations consisting of PC like computer with sufficient computing power and RAM memory, a standard, and a function key keyboard, a pointing device and reasonable sized flat screen displays shall be located in the Central Control Room (CCR). All workstations shall be equipped with double monitors. The data servers shall provide the necessary functions for an undisturbed operation even when two hard disc drives fail simultaneously A sufficient number of high reliable, low noise, industrial duty monochrome, and color laser printers shall be used to execute all the different printing tasks. Power Supply Modules Power supply modules in the DCS cabinets shall be redundant and shall be fed from two independent sources Master Clock A GPS Master Clock System with appropriate slave clocks shall be used for time synchronization of DCS and the connected computer systems.
16 TYPICAL DCS CONFIGURATION
17 Thank You for Your Kind Attention
Airfield Lighting Control System
Airfield Lighting Control System ALCS Style 2 ALCS Style 3 Reference to Standards ICAO: Annex 14, Volume I, current edition Aerodrome Design Manual, Part 5 FAA: AC 150/5345-56 (current edition) L-890 Airfield
More informationOur Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium
Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium Voltage Panels and Enclosures designed and built with
More informationMics KERYS FEATURE MAN-MACHINE INTERFACE MODULARITY / PROTECTION MEASUREMENTS / CONTROL ARCHITECTURE COMMUNICATION PRODUCT PLUS POINTS KER/GB-2004/1
Mics KERYS FEATURE MAN-MACHINE INTERFACE MODULARITY / PROTECTION MEASUREMENTS / CONTROL ARCHITECTURE COMMUNICATION PRODUCT PLUS POINTS KER/GB-2004/1 Building on the experience acquired with the MICS Process
More informationAutomation System Solutions
Automation System Solutions Automation Systems for Power Grid, Power Plant and Industries NR Electric Corporation Automation for Power Grid Substation Automation System Conventional Substation Automation
More informationLoad Management of Industrial Facilities Electrical System Using Intelligent Supervision, Control and Monitoring Systems
Load Management of Industrial Facilities Electrical Using Intelligent Supervision, and Monitoring s Selahattin Kucuk TÜPRAŞ İzmit Refinery selahattin.kucuk@tupras.com.tr Fahrettin Arslan Istanbul University
More informationDevelopment Of EMCS In Power Plants
Development Of EMCS In Power Plants Eng. H.S.Mohamed, Dr. S.A.Nagy,Dr. S.K.EL-Sayed Dept. of Electrical Engineering Al-Azhar University Cairo, Egypt h_alazhary@yahoo.com Abstract Recently improvement of
More informationOctober 05, ECE 421 Session 12. Utility SCADA and Automation. Presented by: Chris Dyer
ECE 421 Session 12 October 05, 2017 Utility SCADA and Automation Presented by: Chris Dyer Utility SCADA & Automation Chris Dyer, P.E. BSEE University of Idaho, 1997 SCADA & Automation Engineer POWER Engineers,
More informationDistributed Generation Requirements Update
Distributed Generation Requirements Update Toronto Hydro has updated its real time monitoring and control requirements for Distributed Generation facilities. The latest version of the Distributed Generation
More informationBuilding Energy Management Training Systems
Building Energy Management Training Systems 3466-00 LabVolt Series Datasheet Festo Didactic en 120 V - 60 Hz 03/2019 Table of Contents General Description 2 Courseware 2 Topic Coverage 2 List of Available
More information1. Project Description
Page No: 1 of 16 1. Project Description 1.1 Introduction This document outlines protection, monitoring and control requirements for the shared network assets associated with establishment of Tarrone Terminal
More informationTitle System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP)
Discipline Engineering Standard - NSW Category Electrical Title s Reference Number PCP 07 - (RIC Standard: EP 99 00 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards
More informationEFASOLAR PVStation Solutions
www.efacec.com EFASOLAR PVStation Solutions EFASOLAR PVStation EFASOLAR PVStation Solutions 0,5 MW 1 x EFASOLAR 50 0,50 MW 1 x EFASOLAR 500M 1 MW 1,46 MW Efacec is a century-long experienced company in
More informationBlueprint Data Center
Systems and Applications for Data Center Siemens Industy 1. Overview / Purpose In EM EA the datacenter market is seen as one of the fastest growing of the energy businesses. This blueprint is designed
More informationOC IEEE IAS/PES Meeting February 21, 2013
San Diego International Airport: Building For The Future, Through Underground Distribution Automation and SCADA OC IEEE IAS/PES Meeting February 21, 2013 1 Presenter: Randy Denton, PE Under Ground Utility
More informationChapter 2 State Estimation and Visualization
Chapter 2 State Estimation and Visualization One obvious application of GPS-synchronized measurements is the dynamic monitoring of the operating conditions of the system or the dynamic state estimation
More informationNovember 29, ECE 421 Session 28. Utility SCADA and Automation. Presented by: Chris Dyer
ECE 421 Session 28 November 29, 2018 Utility SCADA and Automation Presented by: Chris Dyer Utility SCADA & Automation Chris Dyer, P.E. BSEE University of Idaho, 1997 SCADA & Automation Engineer POWER Engineers,
More informationsiemens.com/energy/transformers FITformer REG The adaptable distribution transformer Answers for energy.
siemens.com/energy/transformers FITformer REG The adaptable distribution transformer Answers for energy. Variable input voltage, constant output voltage Modern networks adapt to prevailing conditions,
More informationHitachi s Latest Supervisory, Operation and Control System for Thermal Power Station
Hitachi Review Vol. 52 (2003), No. 2 111 Hitachi s Latest Supervisory, Operation and Control System for Thermal Power Station Isao Kume Shigeki Adachi Kazuo Furudate OVERVIEW: Hitachi supplied Jiangxi
More informationMONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES
MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES 1. Introduction Real time monitoring and control is necessary to ensure public and employee safety and to protect the integrity
More informationIEC unites low-and medium-voltage
25 PROTECTION AND SAFETY IEC 61850 unites low-and medium-voltage IEC 61850 can be used with ABB s low-voltage (LV) intelligent electronic devices (IEDs) such as medium-voltage (MV) protection relays and
More informationABB Digital medium-voltage switchgear
NAMIBIA AMEU/AEDU MARCH 2018 ABB Digital medium-voltage switchgear Barry Addinall UniGear Digital Contents 1. Digital switchgear 2. Complexity of Distribution networks 3. New technologies using digital
More informationEOS REMSDAQ CALLISTO NX TYPE E RTU
Document Number: EOS 05-9306 Network(s): Summary: ENGINEERING OPERATING STANDARD EOS 05-9306 REMSDAQ CALLISTO NX TYPE E RTU EPN, LPN, SPN This standard details the application, installation and operation
More informationHARDWARE OF SUPERVISORY CONTROL & DATA ACQUISITION SYSTEM
Chapter 3 HARDWARE OF SUPERVISORY CONTROL & DATA ACQUISITION SYSTEM Dr. H.K. VERMA Distinguished Professor Department of Electrical and Electronics Engineering School of Engineering and Technology SHARDA
More informationSession Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers
Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power 1. Abstract Dinesh Mithanthaya Design Manager, Horizon Power Higher capacity substation power transformers ( 5MVA),are
More informationINTER PLANT STANDARD STEEL INDUSTRY
INTER PLANT STANDARD STEEL INDUSTRY PARTICULAR REQUIREMENTS OF ROLLING MILL VVVF DRIVES IPSS: 1-10-043-15 IPSS CORRESPONDING IS DOES NOT EXIST 0. FOREWORD 0.1 This Inter Plant Standard has been prepared
More informationSubstation automation products. MicroSCADA Pro for substation automation
Substation automation products for substation automation Perfect control anywhere, anytime is an investment for today and tomorrow. Start, for instance, with monitoring or gateway functionality and integrate
More informationSubstation SCADA Monitoring
Substation SCADA Monitoring Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Substations are a critical component
More informationNon-conventional instrument transformers Advanced GIS substations with IEC LE process bus
Non-conventional instrument transformers Advanced GIS substations with IEC 61850-9-2LE process bus Content Towards the digital GIS substations Optimized substation design NCIT for gas-insulated switchgears
More informationElectrical Integration with Smart Communication
Electrical Integration with Smart Communication New possibilities with Industrial Ethernet ABB Group September 24, 2009 Slide 1 Unified Integration Approach MES and Business Systems Knowledge Portals as
More informationToday, utilities are focusing on improving or maintaining
TRANSFORMER MONITORING Trends in continuous on-line condition monitoring ABSTRACT The article describes new trends in the field of continuous on-line condition monitoring of transformers. These trends
More informationSIGMA. Advanced Generator Protection and Control. Short Form Catalogue
Short Form Catalogue SIGMA Advanced Generator Protection and Control Generator protection, synchronizing and load sharing Power management system Easy to install and commission Control most governors/avrs
More informationBenefits, offering and references
DOC ID: 9AKK107045A9180 DISTRIBUTION SOLUTIONS Digital medium-voltage switchgear Benefits, offering and references Contents Digital switchgear for medium-voltage applications Digital switchgear definition
More informationA P P L I C A T I O N
Circuit Breaker timing test set 16 timing channels Motion and speed analyzer Built-in 200 A microohmmeter Up to 4 trip/close coils control Static and dynamic contact resistance measurement Suitable for
More informationImportant Considerations in Testing and Commissioning Digital Relays
Important Considerations in Testing and Commissioning Digital Relays Drew Welton, Beckwith Electric Co. Inc. Will Knapek, OMICRON electronics Corp. USA Justification Digital technology in protection relays
More informationApproval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9
PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6
More informationAUTOMATION OF POWER DISTRIBUTION USING SCADA
1 2 ABSTRACT In every substation certain measurements, supervision, control, operation and protection functions are necessary. Traditionally these functions were performed manually by system operator from
More informationOvation Ethernet Link Controller Module Data Sheet
Ovation Ethernet Link Controller Module Features: Provides native Ethernet connectivity capability at the I/O level Enables faster, more efficient integration of robust data from third-party devices Dedicated
More informationOT 257 AC. Operating Terminal for High Voltage AC System Control FEATURES BENEFITS APPLICATIONS
OT 257 AC Operating Terminal for High Voltage AC System Control The operating terminal OT 257 is our state-of-the art product, which allows comfortable and flexible control of high voltage test transformer
More informationENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER
smallhydro PRIME ENGINEERING LIMITED IS AN ELECTRICAL ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, IMPLEMENTATION AND MAINTENANCE. OUR TEAM OF PROFESSIONALS
More informationGE Zenith ZDEC Modular Paralleling Switchgear
GE Zenith ZDEC 2020 Modular Paralleling Switchgear ZDEC 2020 Has the Solution Healthcare and Critical Facilities Demand Generator Paralleling Systems that are Flexible design compatible with multiple brands
More informationTel: AC Power for Business-Critical Continuity TM
Tel: +852-2690-4118 AC Power for Business-Critical Continuity TM Anticipating Technology Changes Through Adaptive Architecture Today, you need a power infrastructure that can work across your enterprise
More informationPackage Substation. The efficient solution for your electrical distribution network
Package Substation The efficient solution for your electrical distribution network Why Prefabricated Substations? Biosco, safe and effective substations Safety: A fully tested electrical equipment > Much
More informationSOUTH TEXAS ELECTRIC COOPERATIVE, INC.
SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection
More information5.2 MW, Pod-based build, Chilled Water, ft 2
[Reference Design 65] 5.2 MW, Pod-based build, hilled Water, 85000 ft 2 DESIGN OVERVIEW Data enter apacity 5.2 MW Target Availability Tier III with 2N power distribution and less-redundant generator configuration
More informationControl and Protection System Win-TDC
HVDC Control & Protection Control and Protection System Win-TDC HVDC Aysen -SIC Basics of HVDC Basic Design Equipment Info Control & Protection Station Design Logistics Project Management Maintenance 1
More informationUPS. centric Hot scalable modular 3-phase UPS Delivers 25 up to 200 kva/kw INFINITE POWER. Mission Critical Applications
INFINITE POWER Mission Critical Applications UPS UNINTERRUPTIBLE POWER SUPPLY centric Hot scalable modular 3-phase UPS Delivers 25 up to 200 kva/kw Rack-mountable modules designed for blades, data-center,
More informationI/A Series Remote Terminal Unit (RTU) RTU 20 for Oil, Gas, and Water SCADA Applications
I/A Series Remote Terminal Unit (RTU) RTU 20 for Oil, Gas, and Water SCADA Applications RTU 20 OVERVIEW The I/A Series RTU 20 is an Intelligent Remote Device capable of performing a full range of control
More informationSPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station
SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet Reference: ZD23 Version: 1.1 Issue date: 15 May 2014 Contents 1 Scope... 3 2 Deer Park Terminal
More informationMESP MODULAR SUBSTATION USER REQUIREMENTS
Engineering Specification Electrical Networks MODULAR SUBSTATION USER Version: 2 Issued: November 2015 Owner: Head of Engineering/Electrical Approved By: Head of Engineering/Electrical PRINTOUT MAY NOT
More informationEarth-fault Relay SPAJ 110 C. Product Guide
Issued: April 1999 Status: Updated Version: C/12.04.2006 Data subject to change without notice Features Low-set neutral overcurrent stage with definite time or inverse time characteristic High-set neutral
More informationHPP Kidatu (4x50 MW) - Control System Upgrade AUTOMATION
HPP Kidatu (4x50 MW) - Control System Upgrade AUTOMATION Location - Plant - End User About Location Kidatu is a town in southern Tanzania, located in Kilombero district, Morogoro region. The local population
More informationEmerson Network Power provides customers with technical support. Users may contact the nearest Emerson local sales office or service center.
Liebert PSA iton User Manual Version: V2.8 Revision date: November 14, 2005 Emerson Network Power provides customers with technical support. Users may contact the nearest Emerson local sales office or
More informationModel HM-535 Power Supply Installation and Service Instructions
Model HM-535 Power Supply Installation and Service Instructions 430-535 0104 2004 Heritage MedCall, Inc SENTRY INSTALLATION & SERVICE INSTRUCTIONS POWER SUPPLY UNIT Model HM-535 IMPORTANT SAFETY INSTRUCTIONS
More informationJim McGhee, Utility Market Manager, RuggedCom Inc.
First Practical Experience with IEEE 1588 High Precision Time Synchronization in High Voltage Substation with IEC 61850 Process Bus Jim McGhee, Utility Market Manager, RuggedCom Inc. (JimMcGhee@RuggedCom.com)
More informationDGBV-EP DIGITAL GENERATOR AND GENERATOR-TRANSFORMER UNIT PROTECTION. Field of application
DGBV-EP DIGITAL GENERATOR AND GENERATOR-TRANSFORMER UNIT PROTECTION Field of application The devices of the EuroProt complex protection family are modular devices. The modules are selected, assembled and
More informationRotabloc Diesel Rotary UPS Systems
Rotabloc Diesel Rotary UPS Systems Simply Reliable Solutions for Continuous Data Center Power IEM Power Systems Rotary UPS is a fully integrated system comprising the RBT UPS Module, Engine Genset, Switchgear,
More informationBattery charger. Power plants. Substations. Rail and infrastructure. Industry. Thyristor controlled with controller GMU
Battery charger Thyristor controlled with controller GMU Power plants Substations Rail and infrastructure Industry Battery charger Thyristor controlled with controller GMU Battery back-up DC-power supply
More informationKohler EW 6000TX. Transformer-based. (UPS kVA)
(UPS 10 600kVA) Three-phase UPS for computer rooms, data centres, precision instruments, and industrial processes. 10 200 kva PF = 0.9 Small footprint High effciency 92% All series touchscreen design Galvanic
More informationDeploying Digital Substations: Experience with a Digital Substation Pilot in North America. Harsh Vardhan, R Ramlachan GE Grid Solutions, USA
Deploying Digital Substations: Experience with a Digital Substation Pilot in North America Harsh Vardhan, R Ramlachan GE Grid Solutions, USA Wojciech Szela, Edward Gdowik PECO, USA SUMMARY Though IEC 61850
More informationIDS SAS. Station Automation System for Complex Applications
IDS SAS Station Automation System for Complex Applications IDS SAS The IDS SAS automation system for switchgear significantly reduces costs and efforts for the installation of secondary equipment and enables
More informationCompany main topic [ Product ] TracFeed DCP2. English. Multifunctional Device for Control and Protection in DC switchgear.
Company main topic [ Product ] TracFeed DCP2 English Multifunctional Device for Control and Protection in DC switchgear Made in Germany 2 TracFeed DCP Our well-known brand name TracFeed DCP is a well-known
More informationALLTEC PROTECTION PYRAMID TM FOR PHOTOVOLTAIC SOLAR FIELD
64 Catalyst Drive Canton, North Carolina, 28716 USA +1.828.646.9290 +1.828.646.9527 (Fax) +1.800.203.2658 (Toll Free) www.alltecglobal.com ALLTEC PROTECTION PYRAMID TM FOR PHOTOVOLTAIC SOLAR FIELD Photovoltaic
More informationSIPROTEC 5 Application Note
www.siemens.com/protection SIPROTEC 5 Application Note SIP5-APN-001: Properties and Functional Structure Answers for infrastructure and cities SIPROTEC 5 Properties SIPROTEC 5 - Application: SIP5-APN-001
More informationNetwork Configuration Document Selection for New Substations Framework
Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...
More informationLiebert. EXS from 10 to 20 kw. Optimized and integrated three-phase UPS solution with high efficiency power protection
Liebert EXS from 10 to 20 kw Optimized and integrated three-phase UPS solution with high efficiency power protection LIEBERT EXS from 10 to 20 kva Vertiv Vertiv designs, builds and services mission critical
More informationProcontrol P14 Complete power plant control system
Procontrol P14 Complete power plant control system 2VAA004575C en Update Module Description PROCONTROL P14 final.indd 1 10.11.2015 07:23:35 Reliable and effective power plant automation 1 ABB launched
More informationDGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION. Application field
DGSZV-EP DIGITAL GALVANIC LONGITUDINAL DIFFERENTIAL PROTECTION The digital galvanic longitudinal differential protection of type DGSZV-EP is part of device family named EuroProt. This short description
More informationEtherCAT P combines ultra-fast communication and power supply in a single cable
PC Control 01 2016 technology One Cable Automation the path to plug-and-play automation without control cabinets combines ultra-fast communication and power supply in a single cable With, Beckhoff is expanding
More information9.6 MW, Traditional IT and OCP-compatible, Indirect Air Economizer, m 2
[Reference esign 62] 9.6 MW, Traditional IT and OC-compatible, Indirect Air Economizer, 16970 m 2 ESIGN OVERVIEW ata Center IT Capacity 9.6 MW Target Availability Tier III with 2N power distribution and
More informationCO General Specifications GS48D62Z00-00E-N GENERAL. ProSafe-COM extended communication system
General Specifications GS48D62Z00-00E-N CO-962-00 ProSafe-COM extended communication system GENERAL Figure 1 ProSafe-COM extended communication system is a multiple protocol communication interface connecting
More informationGrid Automation packaged solutions Optimal automation of medium voltage grids
Grid Automation packaged solutions Optimal automation of medium voltage grids Application principles of the Zone concept Grid Automation (GA) packaged solutions The zone concept offers a method to analyze
More informationSubstation Automation Products. Generator protection REG670/650 Relion 670 and 650 series
Substation Automation Products Generator protection REG670/650 Relion 670 and 650 series A new protection standard for your valuable assets Based on ABB s extensive experience, REG670 and REG650 IEDs (Intelligent
More informationSWITCHGEAR. XLM Switchgear
SWITCHEA XLM Switchgear Cat generator set paralleling switchgear has been designed to integrate with Cat EMCP3 generator set controls. Now you get greater efficiency, reliability and dependability all
More informationSafety Instrumented System (SIS)
Instrumented System (SIS) Independent system composed of sensors, logic solvers, and final control elements for the purpose of: SIS 1) Shutdown: Automatically taking the process to a safe state when predetermined
More informationEquipment Strategy for Voltage Transformers Strategy
Equipment Strategy for Voltage Transformers Strategy Current version: 19/06/2018 EXTERNAL USE Page 1 of 6 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References... 3 1.4
More informationSmall Generator Interconnection System Impact Study Report. Completed For Q0047
Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection
More informationPower Networks Demonstration Centre
European Research Infrastructure supporting Smart Grid Systems Technology Development, Validation and Roll Out TRANSNATIONAL ACCESS PROVISION RESEARCH INFRASTRUCTURE DESCRIPTION AND TRANSNATIONAL ACCESS
More informationPeter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO!
Peter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO! Abstract Gain a basic understanding of an electrical control management system Exposure to a number of technology
More informationDesign Guidelines for SCADA & DSA
Design Guidelines for SCADA & 28 th February 2017 28 FEBRUARY 2017 ISSUE 4 PREPARED BY: PRINCIPAL ENGINEER SCADA & MANAGER AUTHORISED BY: MANAGER SECONDARY SYSTEMS DOCUMENT NUMBER: ISSUE 4 This plan is
More informationRotabloc Diesel Rotary UPS Systems
Rotabloc Diesel Rotary UPS Systems Simply Reliable Solutions for Continuous Data Center Power IEM Power Systems Rotary UPS is a fully integrated system comprising the RBT UPS Module, Engine Genset, Switchgear,
More informationElectrical Demand Specification (Reference SOP: )
Project: Equipment Description: Location: Equipment No.: Project No: Protocol No.: Content Index 1. GENERAL...3 Design Standards...3 1.1. Standards...3 2. DESIGN...3 2.1. Safety...3 2.2. Circuit protection...3
More informationEDS SCADA NUMBERING SYSTEM
Document Number: EDS 05-9007 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 05-9007 SCADA NUMBERING SYSTEM This standard describes the system for numbering SCADA wiring within switchgear
More information10 kva 3/1 15 kva 3/1 20 kva 3/1 10 kva 3/3 15 kva 3/3 20 kva 3/3 30 kva 3/3 40 kva 3/3 UOUS SERV WARRANTY
OF CONTINUOUS SERVICE YEARS WARRANTY B8000 FXS 10-40kVA BORRI B8000 FXS With disturbances to the electrical supply being one of the major causes of IT downtime, the UPS system is regarded as the most critical
More informationElectrical Equipment and Comprehensive Power Grid Solutions
Integration into the future Electrical Equipment and Comprehensive Power Grid Solutions About us Joint-Stock Company Rusatom Automated Control Systems (JSC RASU) is a subsidiary of State Atomic Energy
More informationLiebert. NXC from 10 to 200 kw. Compact and Reliable Power in a Fully Integrated Packaged Solution
Liebert NXC from 10 to 200 kw Compact and Reliable Power in a Fully Integrated Packaged Solution LIEBERT NXC from 10 to 200 kva Vertiv Vertiv designs, builds and services mission critical technologies
More informationDesigning a new IEC substation architecture
Designing a new IEC 61850 substation architecture Gerrit Dogger Senior Product and Application Specialist Cooper Power Systems gerrit.dogger@cybectec.com Garry Tennese Station Integration Specialist Manitoba
More informationRelion 630 series. Load-shedding controller PML630 High performing load-shedding solution for industrial and utility power networks
Relion 630 series Load-shedding controller PML630 High performing load-shedding solution for industrial and utility power networks Integrated load-shedding and protection solution The PML630 is a freely-configurable
More informationSwitchgear Design Impacts the Reliability of Backup Power Systems
Switchgear Design Impacts the Reliability of Backup Power Systems December 2010/AT307 by Reza Tajali, P.E. Square D Power Systems Engineering Make the most of your energy SM Revision #1 12/10 When a cascaded
More informationPower System Network Simulator (PSNsim)
The PSNsim is hardware simulator that simulates all parts of power system from generation to utilization. The PSNsim is a scaled down model of the real power system that provides an experimental environment
More informationSRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016
SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016 BY H S W Karunaratne Assistant Director - Engineering Sri Lanka Standards Institution. 1 DEFINITIONS Ac module:
More informationReal-time Power System Operation. Energy Management Systems. Introduction
1 Real-time Power System Operation Energy Management Systems Introduction The time frame for Power Systems Operation varies from a few seconds to a week. To assist with the operation of the system, modern
More informationImproved power supply after Fukushima and OPC in Japanese BWRs
BWR-club workshop on Robust Power in Uppsala Improved power supply after Fukushima and OPC in Japanese BWRs May 3 rd, 2017 Hitachi-GE Nuclear Energy, Ltd Masashi Sugiyama Hitachi-GE Nuclear Energy, Ltd.
More informationPOWER GRIDS. We are bridging the gap. Enabling Digital Substations.
POWER GRIDS We are bridging the gap. Enabling Digital s. 2 A B B D i g i ta l S u b s tat i o n s ABB s Digital provides customers in the utility sector with unmatched control and efficiency. The digital
More informationDIMINISHING THE REQUIREMENT OF POWER USING PLC AND SCADA SYSTEMS IN POWER GRID SYSTEM
DIMINISHING THE REQUIREMENT OF POWER USING PLC AND SCADA SYSTEMS IN POWER GRID SYSTEM Mr. T. Vignesh Assistant Professor, Department of EEE, Jay Shriram Group of Institutions, Tirupur, Tamilnadu, India
More informationDesign Benefits. Teo Puay Yong Pepperl+Fuchs. On Behalf of FF Marketing Society. The Future is Digital. 1 The Future is Digital
Design Benefits The Future is Digital Teo Puay Yong Pepperl+Fuchs On Behalf of FF Marketing Society 1 The Future is Digital Design Benefits from Applying Foundation Fieldbus Bus structure and Wiring Loop
More informationRT4F-120V/20A-WAC RECTIFIER
The RT4F-120V/20A-WAC is a switched mode rectifier/charger module designed to provide up to 20A of output current into a 120V nominal system. This charger has been designed for use in conjunction with
More informationThe Power of Modularity
Protectplus M600 The Power of Modularity to protect critical applications Protectplus M600 Flexible, scalable and smart It s our business to make your power security easy UPS systems from AEG Power Solutions
More informationSCADA Training - T&D Automation
SCADA Training - T&D Automation Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq This course covers all the
More informationAdvanced Monitoring Solutions for Critical Electric Power Transmission & Distribution Assets
Advanced Monitoring Solutions for Critical Electric Power Transmission & Distribution Assets www.intellisaw.com The Case for Critical Asset* Monitoring The vast majority of critical assets in the field
More informationINTERCONNECTION FACILITIES STUDY REPORT
Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES
More information