DT TPG STATUS. Trigger meeting, September INFN Bologna; INFN Padova; CIEMAT Madrid. Outline: most updates on Sector Collector system

Size: px
Start display at page:

Download "DT TPG STATUS. Trigger meeting, September INFN Bologna; INFN Padova; CIEMAT Madrid. Outline: most updates on Sector Collector system"

Transcription

1 DT TPG STATUS Trigger meeting, September INFN Bologna; INFN Padova; CIEMAT Madrid Outline: most updates on Sector Collector system MTCC phase 1 lessons resume Open issues (Good) news from tests SC production update Installation plans 1

2 DT TPG at MTCC: Trigger & DAQ setup (phase 1) Detector Detector YB+1: Sector 10 MB1 MB2 MB3 YB+2: Sector 10 MB1 MB2 MB3 YB+2: Sector 11 MB1 MB2 MB3 YB+1: Sector 10 MB1 MB2 MB3 MB4L MB4R YB+2: Sector 10 MB1 MB2 MB3 MB4L MB4R YB+2: Sector 11 MB1 MB2 MB3 MB4 2 x LVDS cables / chamber Tower SC Crate YB+1: 1 SC board (sector 10) SC crate YB+2: 2 SC boards (sectors 10, 11) L1A (copper) 2 x LVDS cables / chamber Tower SC Crate YB+1: 1 ROS board (sector 10) SC crate YB+2: 2 ROS boards (sectors 10, 11) 3 (6) Opto fibers / sector Green barrack DTTF: 3 PHTF 1 WS 1 BS BS Trigger into LTC/CTC L1A L1A (fiber) Trigger Readout 1 DDU 1 Opto fiber / sector Green barrack Local (VME) or Global (S-link) DAQ 2

3 MTCC phase 1 resume Trigger set up with prototype Sector Collector boards Apart from understood/patched issues (see next slide), the system was very stable Software tools are still quite experts-only but main tasks (synchronization, test, monitoring) are implemented and functional Temperatures, optical power, link status, synchronization always monitored Trigger data spied and injected into DAQ in all runs DT Trigger configuration was flexible and updated upon request Minicrates configuration ( default, pointing...) Chamber masking at DTTF inputs Sector selection by Wedge Sorter Trigger generated by Barrel Sorter 3

4 Upgrades and issues in MTCC phase 1 Upgrades during phase 1: SC-ROS conflict: SC layout bug found and corrected Current, temperature, laser power monitoring Faulty MB1 opto link substituted with unused MB4 link Issues that were still there after phase 1: Opto-TX MB1 link frequent unlocks Opto to DTTF Low yeld in LVDS receivers production LVDS from MCs + cooling, + cabling,

5 (Good) news from the lab We were finally able to reproduce the MB1 link problem in the test bench We found and we fixed the source(s) of the problem: Uncorrect line termination that has an effect on the link locking ONLY on MB1 and ThetaMB3 (not used in MTCC phase 1) links Only 2 links out of 6 show this problem (correlation with GOL-to-Laser trace length) We tried several values of the termination and we could recover all unlocking links in our lab Test of the patched Opto-TX boards in MTCC setup within this week LVDS-RX yield problems only partially understood (with boundary scan etc) (but we have ~ 75 % of fully functional boards it is a production issue... But we want to improve it) 5

6 Plans/Firmware/Software for MTCC phase 2 We want to study the effects of magnetic field on DT chambers (specifically on MB1 stations) Runs dedicated to DTs during 1st week of MTCC phase 2 DTs will act as a service for the rest of phase 2 Firmwares in phase 2: Opto-RX firmware update (monitoring of link status etc.) No updates in LVDS-RX and Motherboard firmwares Firmwares are almost final; we still have to... Implement more test features in LVDS-RX Complete and test Eta Opto-RX (note, it is the same board as for PHTF! ) Software plans We still want to to finalize our software tools and build automatic procedures for production test benches before porting some tools 6

7 SC Production plans SC boards production made by two companies (in parallel) BGA-bonding test (JTAG) made by companies (for LVDS, OPTO-RX, OPTO-TX) Complete quality tests INFN Bologna Boards Q.ty (+spares) Preproduction Tests Boards delivery Tests Start Test End Opto Tx piggy 60 (15) Problems just Dec Q1 fixed! Dec Q1 Jan Q4 Opto Rx board 96 (20) Completed Dec Q1 Dec Q1 Jan Q4 LVDS Rx 2 ch piggy 230 (40) Low yield Dec Q2 Dec Q2 Jan Q4 almost fixed SC mother board 60 (15) Completed Dec Q1 Dec Q1 Jan Q4 LVDS Rx 4 ch piggy 10 (8) Design completed Dec Q4 Dec Q4 Feb Q1 NOTE: Systems for a complete wheel ready by beginning of january Systems for complete installation will be mid february 2007 from F.O. 7

8 SC Installation plans (draft 0) No Low Voltage in UX before March! From M.DV. 8

RESPONSIBILITIES CIEMAT, MADRID HEPHY, VIENNA INFN, PADOVA INFN, BOLOGNA INFN, TORINO U. AUTONOMA, MADRID & LV, HV PS SYSTEMS.

RESPONSIBILITIES CIEMAT, MADRID HEPHY, VIENNA INFN, PADOVA INFN, BOLOGNA INFN, TORINO U. AUTONOMA, MADRID & LV, HV PS SYSTEMS. 2 RESPONSIBILITIES CIEMAT, MADRID HEPHY, VIENNA INFN, PADOVA INFN, BOLOGNA INFN, TORINO U. AUTONOMA, MADRID & LV, HV PS SYSTEMS 4 5 2 Crates w/bp 2 TIM 3 ROS-25 3 TRG SC 2 RO PP 6 SC crate: 3 units 2

More information

next in Oct (28 th in Madrid) sep 20,2005 DT MTCC working group report

next in Oct (28 th in Madrid) sep 20,2005 DT MTCC working group report DT in Magnet-Test&Cosmics-Challenge (MTCC) (Aachen, Bologna, Madrid, Padova, Torino, Vienna) Report prepared by Marco Dallavalle, presented by Carlos Willmott four DT workshops: focus and monitor the work

More information

DTTF muon sorting: Wedge Sorter and Barrel Sorter

DTTF muon sorting: Wedge Sorter and Barrel Sorter DTTF muon sorting: Wedge Sorter and Barrel Sorter 1 BS, it sorts the 4 best tracks out of max 24 tracks coming from the 12 WS of barrel Vienna Bologna PHTF 72 x Vienna Bologna Padova 12 WS, each one sorts

More information

DTTF muon sorting: Wedge Sorter and Barrel Sorter

DTTF muon sorting: Wedge Sorter and Barrel Sorter DTTF muon sorting: Wedge Sorter and Barrel Sorter 1 BS, it sorts the 4 best tracks out of max 24 tracks coming from the 12 WS of barrel Vienna Bologna PHTF 72 x Vienna Bologna Padova 12 WS, each one sorts

More information

Status of Trigger Server electronics

Status of Trigger Server electronics Status of Trigger Server electronics Trigger boards TB Server board SB Topics: Trigger Server Status TSS screening TSM and SB pre-production tests LVDS Jitter tolerance measures Trigger Server Status update

More information

RPC Trigger Overview

RPC Trigger Overview RPC Trigger Overview presented by Maciek Kudla, Warsaw University RPC Trigger ESR Warsaw, July 8th, 2003 RPC Trigger Task The task of RPC Muon Trigger electronics is to deliver 4 highest momentum muons

More information

Ultra-short reference for the MTCC-shifter arriving in USC55

Ultra-short reference for the MTCC-shifter arriving in USC55 Ultra-short reference for the MTCC-shifter arriving in USC55 (12 th July 2007) MTCC machines vs USC55 machines cmsdaquser0 cmsusr0 login as dtdqm passwd dtfed0 cms-dt-dcs-yb0.cern.ch login as dcs passwd

More information

BES-III off-detector readout electronics for the GEM detector: an update

BES-III off-detector readout electronics for the GEM detector: an update BES-III off-detector readout electronics for the GEM detector: an update The CGEM off-detector collaboration ( INFN/Univ. FE, INFN LNF, Univ. Uppsala ) 1 Outline Reminder Update on development status Off-detector

More information

Track-Finder Test Results and VME Backplane R&D. D.Acosta University of Florida

Track-Finder Test Results and VME Backplane R&D. D.Acosta University of Florida Track-Finder Test Results and VME Backplane R&D D.Acosta University of Florida 1 Technical Design Report Trigger TDR is completed! A large amount effort went not only into the 630 pages, but into CSC Track-Finder

More information

CSC Trigger Motherboard

CSC Trigger Motherboard CSC Trigger Motherboard Functions of TMB Tests: Performance at summer 2003 test beam Radiation, magnetic fields, etc. Plans for TMB production and testing 1 Cathode LCT CSC Trigger Requirements Identify

More information

USCMS HCAL FERU: Front End Readout Unit. Drew Baden University of Maryland February 2000

USCMS HCAL FERU: Front End Readout Unit. Drew Baden University of Maryland February 2000 USCMS HCAL FERU: Front End Readout Unit Drew Baden University of Maryland February 2000 HCAL Front-End Readout Unit Joint effort between: University of Maryland Drew Baden (Level 3 Manager) Boston University

More information

WBS Trigger. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Status Review November 20, 2003

WBS Trigger. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Status Review November 20, 2003 WBS 3.1 - Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status Review November 20, 2003 This talk is available on: http://hep.wisc.edu/wsmith/cms/trig_lehman_nov03.pdf US CMS

More information

Trigger Report. W. H. Smith U. Wisconsin. Calorimeter & Muon Trigger: Highlights Milestones Concerns Near-term Activities CMS

Trigger Report. W. H. Smith U. Wisconsin. Calorimeter & Muon Trigger: Highlights Milestones Concerns Near-term Activities CMS Trigger Report W. H. Smith U. Wisconsin Calorimeter & Muon Trigger: Highlights Milestones Concerns Near-term Activities Calorimeter Trigger Highlights, Milestones, Activities: Receiver Card Prototype delivered

More information

Muon Trigger Electronics in the Counting Room

Muon Trigger Electronics in the Counting Room Muon Trigger Electronics in the Counting Room Darin Acosta University of Florida April 2000 US CMS DOE/NSF Review: April 11-13, 2000 1 Outline Overview of the CSC trigger system Sector Receiver (WBS: 3.1.1.2)

More information

CMX (Common Merger extension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011

CMX (Common Merger extension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011 (Common Merger extension module) Y. Ermoline for collaboration Preliminary Design Review, Stockholm, 29 June 2011 Outline Current L1 Calorimeter trigger system Possible improvement to maintain trigger

More information

Trigger Layout and Responsibilities

Trigger Layout and Responsibilities CMS EMU TRIGGER ELECTRONICS B. Paul Padley Rice University February 1999 Trigger Layout and Responsibilities Basic Requirements z Latency: < 3.2 us z Fully pipelined synchronous architecture, dead time

More information

WBS Trigger. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review June 5, 2002

WBS Trigger. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review June 5, 2002 WBS 3.1 - Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review June 5, 2002 This talk is available on: http://hep.wisc.edu/wsmith/cms/trig_lehman_plen02.pdf W. Smith, U. Wisconsin,

More information

Mezzanine card specifications for Level-2 Calorimeter Trigger Upgrade

Mezzanine card specifications for Level-2 Calorimeter Trigger Upgrade CDF/DOC/TRIGGER/CDFR/8533 Mezzanine card specifications for Level-2 Calorimeter Trigger Upgrade L. Sartori 1, A. Bhatti 2, A. Canepa 3, M. Casarsa 4, M. Covery 2, G. Cortiana 5, M. Dell Orso 1, G. Flanagan

More information

CMX Hardware Overview

CMX Hardware Overview Hardware Overview Chip Brock, Dan Edmunds, Philippe Laurens@MSU Yuri Ermoline @CERN Wojciech Fedorko @UBC Michigan State University 12-May-2014 Common Merger extended module () 12-May-2014 2 Overall project

More information

Trigger Server: TSS, TSM, Server Board

Trigger Server: TSS, TSM, Server Board Trigger Server: TSS, TSM, Server Board Selection of two best muon candidates in one chamber and ghost suppression Parallel architecture Two stage processing to Sector Collector (LVDS link) Inside Minicrate

More information

Ignacy Kudla, Radomir Kupczak, Krzysztof Pozniak, Antonio Ranieri

Ignacy Kudla, Radomir Kupczak, Krzysztof Pozniak, Antonio Ranieri *** Draft *** 15/04/97 *** MK/RK/KTP/AR *** ***use color print!!!*** RPC Muon Trigger Detector Control Ignacy Kudla, Radomir Kupczak, Krzysztof Pozniak, Antonio Ranieri $Ã&06 Ã*(1(5$/ RPC Muon Trigger

More information

Control and Monitoring of the Front-End Electronics in ALICE

Control and Monitoring of the Front-End Electronics in ALICE Control and Monitoring of the Front-End Electronics in ALICE Peter Chochula, Lennart Jirdén, André Augustinus CERN, 1211 Geneva 23, Switzerland Peter.Chochula@cern.ch Abstract This paper describes the

More information

Data Acquisition in Particle Physics Experiments. Ing. Giuseppe De Robertis INFN Sez. Di Bari

Data Acquisition in Particle Physics Experiments. Ing. Giuseppe De Robertis INFN Sez. Di Bari Data Acquisition in Particle Physics Experiments Ing. Giuseppe De Robertis INFN Sez. Di Bari Outline DAQ systems Theory of operation Case of a large experiment (CMS) Example of readout GEM detectors for

More information

CMX Hardware Status. Chip Brock, Dan Edmunds, Philippe Yuri Ermoline, Duc Bao Wojciech UBC

CMX Hardware Status. Chip Brock, Dan Edmunds, Philippe Yuri Ermoline, Duc Bao Wojciech UBC Hardware Status Chip Brock, Dan Edmunds, Philippe Laurens@MSU Yuri Ermoline, Duc Bao Ta @CERN Wojciech Fedorko @ UBC Michigan State University 25-Oct-2013 Outline Review of hardware project (Some) hardware

More information

The Compact Muon Solenoid Experiment. CMS Note. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. CMS Note. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS NOTE 998/ The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH- GENEVA 3, Switzerland 8 July 998 A simplified Track Assembler I/O for the

More information

Prototype Opto Chip Results

Prototype Opto Chip Results Prototype Opto Chip Results K.K. Gan, H.P. Kagan, R.D. Kass, J. Moore, S. Smith The Ohio State University Nov 5, 2008 K.K. Gan ATLAS Tracker Upgrade Workshop 1 Outline Introduction VCSEL driver chip PIN

More information

TOF Electronics. J. Schambach University of Texas Review, BNL, 2 Aug 2007

TOF Electronics. J. Schambach University of Texas Review, BNL, 2 Aug 2007 TOF Electronics J. Schambach University of Texas Review, BNL, 2 Aug 2007 1 Outline Electronics Overview Trigger & DAQ Interfaces Board Status, Tests & Plans 2 Electronics for One Side 3 Tray Level Electronics

More information

Electronics on the detector Mechanical constraints: Fixing the module on the PM base.

Electronics on the detector Mechanical constraints: Fixing the module on the PM base. PID meeting Mechanical implementation ti Electronics architecture SNATS upgrade proposal Christophe Beigbeder PID meeting 1 Electronics is split in two parts : - one directly mounted on the PM base receiving

More information

Status and planning of the CMX. Wojtek Fedorko for the MSU group TDAQ Week, CERN April 23-27, 2012

Status and planning of the CMX. Wojtek Fedorko for the MSU group TDAQ Week, CERN April 23-27, 2012 Status and planning of the Wojtek Fedorko for the MSU group TDAQ Week, CERN April 23-27, 2012 : CMM upgrade Will replace CMM: Backplane rate 40 160Mbs Crate to system rate (LVDS) 40 160Mbs Cluster information

More information

First Operational Experience from the LHCb Silicon Tracker

First Operational Experience from the LHCb Silicon Tracker First Operational Experience from the LHCb Silicon Tracker 7 th International Hiroshima Symposium on Development and Application of Semiconductor Tracking Devices The LHCb Silicon Tracker Installation

More information

RT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters

RT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters RT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters Nicolas Chevillot (LAPP/CNRS-IN2P3) on behalf of the ATLAS Liquid Argon Calorimeter Group 1 Plan Context Front-end

More information

Prototyping NGC. First Light. PICNIC Array Image of ESO Messenger Front Page

Prototyping NGC. First Light. PICNIC Array Image of ESO Messenger Front Page Prototyping NGC First Light PICNIC Array Image of ESO Messenger Front Page Introduction and Key Points Constructed is a modular system with : A Back-End as 64 Bit PCI Master/Slave Interface A basic Front-end

More information

DHCAL Readout Back End

DHCAL Readout Back End DHCAL Readout Back End Eric Hazen, John Butler, Shouxiang Wu Boston University Two DCOL Options (1) Use CMS-DCC Already exists, so Lower cost? Quicker? Obsolete components Not optimized for DCAL Copper

More information

HCAL TPG and Readout

HCAL TPG and Readout HCAL TPG and Readout CMS HCAL Readout Status CERN Tullio Grassi, Drew Baden University of Maryland Jim Rohlf Boston University CMS/CERN. Nov, 2001 HCAL TriDAS 1 CMS TriDAS Architecture Data from CMS FE

More information

US CMS TriDAS US CMS Meeting. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 8, 2006

US CMS TriDAS US CMS Meeting. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 8, 2006 US CMS TriDAS 2006 Click to edit Master title style US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 8, 2006 Outline: Calorimeter Trigger Status Endcap Muon Trigger Status

More information

Detector Control System for Endcap Resistive Plate Chambers

Detector Control System for Endcap Resistive Plate Chambers Detector Control System for Endcap Resistive Plate Chambers Taimoor Khurshid National Center for Physics, Islamabad, Pakistan International Scientific Spring March 01, 2010 Contents CMS Endcap RPC Hardware

More information

FT Cal and FT Hodo DAQ and Trigger

FT Cal and FT Hodo DAQ and Trigger FT Cal and FT Hodo DAQ and Trigger Outline FT-Cal and FT-Hodo read-out electronics FT-Cal and FT-Hodo DAQ and trigger FADC250 firmware CTP firmware for FT-Cal and FT-Hodo FT-Cal and FT-Hodo crates and

More information

Status of the CSC Trigger. Darin Acosta University of Florida

Status of the CSC Trigger. Darin Acosta University of Florida Status of the CSC Trigger Darin Acosta University of Florida Outline Status of the CSC Track-Finder Status of the CSC Local Trigger PHOS4 Experience TTC Jitter Measurements CPT Week, April 2002 2 Darin

More information

Detector Control LHC

Detector Control LHC Detector Control Systems @ LHC Matthias Richter Department of Physics, University of Oslo IRTG Lecture week Autumn 2012 Oct 18 2012 M. Richter (UiO) DCS @ LHC Oct 09 2012 1 / 39 Detectors in High Energy

More information

The Compact Muon Solenoid Experiment. CMS Note. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. CMS Note. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS NOTE 998/4 The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH-2 GENEVA 23, Switzerland 29 July 998 Muon DTBX Chamber Trigger Simulation

More information

EMU FED. --- Crate and Electronics. ESR, CERN, November B. Bylsma, S. Durkin, Jason Gilmore, Jianhui Gu, T.Y. Ling. The Ohio State University

EMU FED. --- Crate and Electronics. ESR, CERN, November B. Bylsma, S. Durkin, Jason Gilmore, Jianhui Gu, T.Y. Ling. The Ohio State University EMU FED --- Crate and Electronics B. Bylsma, S. Durkin, Jason Gilmore, Jianhui Gu, T.Y. Ling The Ohio State University ESR, CERN, November 2004 EMU FED Design EMU FED: Outline FED Crate & Custom Backplane

More information

CLARO QA at Milano-Bicocca

CLARO QA at Milano-Bicocca CLARO QA at Milano-Bicocca http://claro.mib.infn.it Angelo Cotta Ramusino, Massimiliano Fiorini, Roberto Malaguti INFN and University of Ferrara, Italy Paolo Carniti, Lorenzo Cassina, Claudio Gotti, Matteo

More information

Update on PRad GEMs, Readout Electronics & DAQ

Update on PRad GEMs, Readout Electronics & DAQ Update on PRad GEMs, Readout Electronics & DAQ Kondo Gnanvo University of Virginia, Charlottesville, VA Outline PRad GEMs update Upgrade of SRS electronics Integration into JLab DAQ system Cosmic tests

More information

The Compact Muon Solenoid Experiment. CMS Note. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. CMS Note. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS NOTE 2002/xxx The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Draft of 1 January 2002 Link System and Crate

More information

The CMS Global Calorimeter Trigger Hardware Design

The CMS Global Calorimeter Trigger Hardware Design The CMS Global Calorimeter Trigger Hardware Design M. Stettler, G. Iles, M. Hansen a, C. Foudas, J. Jones, A. Rose b a CERN, 1211 Geneva 2, Switzerland b Imperial College of London, UK Matthew.Stettler@cern.ch

More information

APV-25 based readout electronics for the SBS front GEM Tracker

APV-25 based readout electronics for the SBS front GEM Tracker APV-25 based readout electronics for the SBS front GEM Tracker Authors: Evaristo Cisbani, Paolo Musico Date: 26/June/2014 Version: 1.0 APV-25 based readout electronics for the SBS front GEM Tracker...

More information

A Possible Redundancy System for Opto-Links

A Possible Redundancy System for Opto-Links A Possible Redundancy System for Opto-Links A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State University P. Buchholz, A. Wiese,

More information

Quad Module Hybrid Development for the ATLAS Pixel Layer Upgrade

Quad Module Hybrid Development for the ATLAS Pixel Layer Upgrade Quad Module Hybrid Development for the ATLAS Pixel Layer Upgrade Lawrence Berkeley National Lab E-mail: kedunne@lbl.gov Maurice Garcia-Sciveres, Timon Heim Lawrence Berkeley National Lab, Berkeley, USA

More information

CMS Trigger/DAQ HCAL FERU System

CMS Trigger/DAQ HCAL FERU System CMS Trigger/DAQ HCAL FERU System Drew Baden University of Maryland October 2000 http://macdrew.physics.umd.edu/cms/ Honest assessment: About 3 months behind schedule. TRIDAS Overall Project Timelines Expected

More information

Level-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout

Level-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout Level-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout Panagiotis Gkountoumis National Technical University of Athens Brookhaven National Laboratory On

More information

ATLAS DCS Overview SCADA Front-End I/O Applications

ATLAS DCS Overview SCADA Front-End I/O Applications Overview SCADA Front-End I/O Applications ATLAS TDAQ week, July 6th 2001, H.J.Burckhart 1 SCX1 USA15 Common Infrastructure PC Local Area Network Server Operation Local Control Stations (LCS) Expert Subdetector

More information

Results on Array-based Opto-Links

Results on Array-based Opto-Links Results on Array-based Opto-Links, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, D. Pignotti, S. Smith, M. Strang The Ohio State University P. Buchholz, A. Wiese, M. Ziolkowski Universität

More information

HCAL Trigger Readout

HCAL Trigger Readout HCAL Trigger Readout HTR Status and Clocking Issues D. Baden, T. Grassi http://www.physics.umd.edu/hep/esr_dec_2002.pdf 1 FE/DAQ Electronics S-Link: 64 bits @ 25 MHz Trigger Primitives READ-OUT Crate CAL

More information

GEM chambers for SoLID Nilanga Liyanage. University of Virginia

GEM chambers for SoLID Nilanga Liyanage. University of Virginia GEM chambers for SoLID Nilanga Liyanage University of Virginia PVDIS GEM configuration Current proposal to instrument locations 4, 5, 6, 7, and 8 with GEM: need to determine the number of GEM layers required

More information

Testing Discussion Initiator

Testing Discussion Initiator 27 th February 2003 Testing Discussion Initiator C.N.P.Gee Rutherford Appleton Laboratory C. N. P. Gee February 2003 2 C. N. P. Gee February 2003 3 JEP Tests (1) Step Test Items required Provided by 0

More information

Activity on GEM by the Rome group since last meeting

Activity on GEM by the Rome group since last meeting OLYMPUS Collaboration DESY 24/Feb/21 Activity on GEM by the Rome group since last meeting Salvatore Frullani / INFN-Rome Sanità Group 1 Outline DESY test beam 9-2 December SBS Technical Review JLab 22

More information

Construction of a compact DAQ-system using DSP-based VME modules

Construction of a compact DAQ-system using DSP-based VME modules Abstract We have developed a DSP based data-acquisition syustem(daq) system, based on the DSP. The system utilizes VME boards with one or two s. Our intension was to consturct a compact DAQ framework which

More information

Velo readout board RB3. Common L1 board (ROB)

Velo readout board RB3. Common L1 board (ROB) Velo readout board RB3 Testing... Common L1 board (ROB) Specifying Federica Legger 10 February 2003 1 Summary LHCb Detectors Online (Trigger, DAQ) VELO (detector and Readout chain) L1 electronics for VELO

More information

MDC Optical Endpoint. Outline Motivation / Aim. Task. Solution. No Summary Discussion. Hardware Details, Sharing Experiences and no Politics!

MDC Optical Endpoint. Outline Motivation / Aim. Task. Solution. No Summary Discussion. Hardware Details, Sharing Experiences and no Politics! MDC Optical Endpoint Outline Motivation / Aim Hardware Details, Sharing Experiences and no Politics! Task Architecture of MDC-System Solution Optical Data Transport: MDC-Endpoint Timing Fanout and Power-Supply

More information

TDC Readout Board, TRBv2. Outline. Motivation / Aim TRB V2. Problems, problems, problems... and the solution :-) Summary. projects with TRBv2 platform

TDC Readout Board, TRBv2. Outline. Motivation / Aim TRB V2. Problems, problems, problems... and the solution :-) Summary. projects with TRBv2 platform TDC Readout Board, TRBv2 Outline Motivation / Aim TRB V2 projects with TRBv2 platform Problems, problems, problems... and the solution :-) Summary 1 Motivation / Aim Main Problem: The limitation of the

More information

S-LINK: A Prototype of the ATLAS Read-out Link

S-LINK: A Prototype of the ATLAS Read-out Link : A Prototype of the ATLAS Read-out Link Erik van der Bij, Robert McLaren, Zoltán Meggyesi EP-Division CERN, CH-1211 Geneva 23 Abstract The ATLAS data acquisition system needs over 1500 read-out links

More information

Muon Port Card Upgrade Status May 2013

Muon Port Card Upgrade Status May 2013 CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013 MPC Upgrade Requirements Be able to deliver all 18 trigger primitives from the EMU peripheral crate to the upgraded Sector Processor Preserve

More information

The WaveDAQ system: Picosecond measurements with channels

The WaveDAQ system: Picosecond measurements with channels Stefan Ritt :: Muon Physics :: Paul Scherrer Institute The WaveDAQ system: Picosecond measurements with 10 000 channels Workshop on pico-second photon sensors, Kansas City, Sept. 2016 0.2-2 ns DRS4 Chip

More information

SVT detector Electronics Status

SVT detector Electronics Status SVT detector Electronics Status On behalf of the SVT community Mauro Citterio INFN Milano Overview: - SVT design status - F.E. chips - Electronic design - Hit rates and data volumes 1 SVT Design Detectors:

More information

GLAST. Prototype Tracker Tower Construction Status

GLAST. Prototype Tracker Tower Construction Status Prototype Tracker Tower Construction Status June 22, 1999 R.P. Johnson Santa Cruz Institute for Particle Physics University of California at Santa Cruz 1 1 11 2 3 5 4 Prototype Tracker Tower Configuration

More information

First experiences with the ATLAS pixel detector control system at the combined test beam 2004

First experiences with the ATLAS pixel detector control system at the combined test beam 2004 Nuclear Instruments and Methods in Physics Research A 565 (2006) 97 101 www.elsevier.com/locate/nima First experiences with the ATLAS pixel detector control system at the combined test beam 2004 Martin

More information

Challenges and performance of the frontier technology applied to an ATLAS Phase-I calorimeter trigger board dedicated to the jet identification

Challenges and performance of the frontier technology applied to an ATLAS Phase-I calorimeter trigger board dedicated to the jet identification Challenges and performance of the frontier technology applied to an ATLAS Phase-I calorimeter trigger board dedicated to the jet identification B. Bauss, A. Brogna, V. Büscher, R. Degele, H. Herr, C. Kahra*,

More information

LVL1 e/γ RoI Builder Prototype

LVL1 e/γ RoI Builder Prototype LVL e/γ RoI Builder Prototype RoI / s matching and zero suppression Receiver RoI VME Receiver RoI Control Receiver RoI S-Link Interface Receiver Output - LVL / Supervisor RoI Builder discussion - Verilog/VHDL

More information

The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments September 2004, BOSTON, USA

The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments September 2004, BOSTON, USA Carmen González Gutierrez (CERN PH/ED) The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 17 September 2004, BOSTON, USA Outline: 9 System overview 9 Readout

More information

The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System

The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System The Track-Finding Processor for the Level- Trigger of the CMS Endcap Muon System D. Acosta, A. Madorsky (Madorsky@phys.ufl.edu), B. Scurlock, S.M. Wang University of Florida A. Atamanchuk, V. Golovtsov,

More information

Front End Electronics. Level 1 Trigger

Front End Electronics. Level 1 Trigger 0. CMS HCAL rigger and Readout Electronics Project he overall technical coordination for the HCAL trigger and readout electronics (ri- DAS) project will be located in the Maryland HEP group, led by Drew

More information

Calorimeter Trigger Hardware Update

Calorimeter Trigger Hardware Update Calorimeter Trigger Hardware Update T. Gorski, P. Klabbers, W. H. Smith, S. Dasu,, J. Tikalsky, D. Seemuth, A. Farmahini-Farahani, A. Perugupalli University of Wisconsin November 15, 2012 1 UW CTP-6 MMC

More information

Radiation-Hard/High-Speed Parallel Optical Links

Radiation-Hard/High-Speed Parallel Optical Links Radiation-Hard/High-Speed Parallel Optical Links K.K. Gan, H. Kagan, R. Kass, J. Moore, D.S. Smith The Ohio State University P. Buchholz, M. Ziolkowski Universität Siegen July 3, 2013 K.K. Gan RD13 1 Outline

More information

The White Rabbit Project

The White Rabbit Project WR Project Status 1/ 1 The White Rabbit Project Technical introduction and status report T. W lostowski BE-CO Hardware and Timing section CERN November 11, 2010 WR Project Status 2/ 1 Introduction Outline

More information

Trigger and Data Acquisition at the Large Hadron Collider

Trigger and Data Acquisition at the Large Hadron Collider Trigger and Data Acquisition at the Large Hadron Collider Acknowledgments (again) This overview talk would not exist without the help of many colleagues and all the material available online I wish to

More information

A 3-D Track-Finding Processor for the CMS Level-1 Muon Trigger

A 3-D Track-Finding Processor for the CMS Level-1 Muon Trigger A 3-D Track-Finding Processor for the CMS Level-1 Muon Trigger D.Acosta, B.Scurlock*, A.Madorsky, H.Stoeck, S.M.Wang Department of Physics, University of Florida, Gainesville, FL 32611, USA V.Golovtsov,

More information

The ALICE trigger system for LHC Run 3

The ALICE trigger system for LHC Run 3 The ALICE trigger system for LHC Run 3, D. Evans, K.L. Graham, A. Jusko, R. Lietava, O. Villalobos Baillie and N. Zardoshti School of Physics and Astronomy, The University of Birmingham, Edgbaston, Birmingham,

More information

TEST, QUALIFICATION AND ELECTRONICS INTEGRATION OF THE ALICE SILICON PIXEL DETECTOR MODULES

TEST, QUALIFICATION AND ELECTRONICS INTEGRATION OF THE ALICE SILICON PIXEL DETECTOR MODULES TEST, QUALIFICATION AND ELECTRONICS INTEGRATION OF THE ALICE SILICON PIXEL DETECTOR MODULES I.A.CALI 1,2, G.ANELLI 2, F.ANTINORI 3, A.BADALA 4, A.BOCCARDI 2, G.E.BRUNO 1, M.BURNS 2, M.CAMPBELL 2, M.CASELLE

More information

Readout Systems. Liquid Argon TPC Analog multiplexed ASICs SiPM arrays. CAEN 2016 / 2017 Product Catalog

Readout Systems. Liquid Argon TPC Analog multiplexed ASICs SiPM arrays. CAEN 2016 / 2017 Product Catalog Readout Systems Liquid Argon TPC Analog multiplexed ASICs SiPM arrays CAEN 2016 / 2017 Product Catalog 192 Readout Systems SY2791 Liquid Argon TPC Readout System The SY2791 is a complete detector readout

More information

1 / 5. End of Life Notification: RuggedCom RuggedSwitch RS500. November 30, Dear Valued Customers,

1 / 5. End of Life Notification: RuggedCom RuggedSwitch RS500. November 30, Dear Valued Customers, End of Life Notification: RuggedCom RuggedSwitch RS500 November 30, 2009 Dear Valued Customers, As part of RuggedCom s ongoing product lifecycle management, the RuggedCom RuggedSwitch RS500 5-Port Unmanaged

More information

Overview of SVT DAQ Upgrades. Per Hansson Ryan Herbst Benjamin Reese

Overview of SVT DAQ Upgrades. Per Hansson Ryan Herbst Benjamin Reese Overview of SVT DAQ Upgrades Per Hansson Ryan Herbst Benjamin Reese 1 SVT DAQ Requirements and Constraints Basic requirements for the SVT DAQ Continuous readout of 23 040 channels Low noise (S/N>20 to

More information

SRS scalable readout system Status and Outlook.

SRS scalable readout system Status and Outlook. SRS scalable readout system Status and Outlook Hans.Muller@cern.ch SRS corner stones Complete RO system from detector to Online software Conceived independent of detector type scalable, very small to very

More information

GLAST Silicon Microstrip Tracker Status

GLAST Silicon Microstrip Tracker Status R.P. Johnson Santa Cruz Institute for Particle Physics University of California at Santa Cruz Mechanical Design Detector Procurement Work list for the Prototype Tracker Construction. ASIC Development Hybrids

More information

System overview Production status. MPD firmware upgrade. Front Tracker boards SID equipment Back Tracker (UVa) FIR blocks Optical interface

System overview Production status. MPD firmware upgrade. Front Tracker boards SID equipment Back Tracker (UVa) FIR blocks Optical interface 1 GEM Readout and DAQ System overview Production status Front Tracker boards SID equipment Back Tracker (UVa) MPD firmware upgrade FIR blocks Optical interface Paolo Musico and Evaristo Cisbani 2 APV25

More information

ATLAS TileCal Demonstrator Main Board Design Review

ATLAS TileCal Demonstrator Main Board Design Review ATLAS TileCal Demonstrator Main Board Design Review Fukun Tang, Kelby Anderson and Mark Oreglia The University of Chicago 4/24/2013 Mini Review For Main Board Design 1 Main/Daughter Board Readout Structure

More information

Beam test measurements of the Belle II vertex detector modules

Beam test measurements of the Belle II vertex detector modules Beam test measurements of the Belle II vertex detector modules Tadeas Bilka Charles University, Prague on behalf of the Belle II Collaboration IPRD 2016, 3 6 October 2016, Siena, Italy Outline Belle II

More information

Streaming Readout, the JLab perspective. Graham Heyes Data Acquisition Support Group Jefferson Lab

Streaming Readout, the JLab perspective. Graham Heyes Data Acquisition Support Group Jefferson Lab Streaming Readout, the JLab perspective Graham Heyes Data Acquisition Support Group Jefferson Lab Introduction After the 12 GeV accelerator upgrade all four halls took production data in Spring of this

More information

Production and Quality Assurance of Detector Modules for the LHCb Silicon Tracker

Production and Quality Assurance of Detector Modules for the LHCb Silicon Tracker Production and Quality Assurance of Detector Modules for the LHCb Silicon Tracker Olaf Steinkamp for Dmytro Volyanskyy Physik-Institut der Universität Zürich 10th ICATPP Conference on Astroparticle, Particle,

More information

SP02 to/from DT Interface Test

SP02 to/from DT Interface Test 1. Hardware SP to/from DT Interface Test 9U VME Track Finder Crate Clock and Control Board (CCB), running under the TTC clock of 4.79 MHz (otherwise the SP PLL will not lock to the CCB clock!) Sector Processor

More information

STAR BEMC TDC VME Interface & Programming Reference Preliminary 5/21/01

STAR BEMC TDC VME Interface & Programming Reference Preliminary 5/21/01 STAR BEMC TDC VME Interface & Programming Reference Preliminary 5/21/01 Overview The STAR Barrel EMC Tower Data Collector is comprised of six 6U VME cards residing in a crate on the STAR platform. The

More information

The WIDAR Correlator

The WIDAR Correlator The WIDAR Correlator Sean M. Dougherty Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada Objectives Highlights Critical Design Review Hardware

More information

HCAL FE/DAQ Overview

HCAL FE/DAQ Overview HCAL FE/DAQ Overview CAL REGIONAL TRIGGER Trigger Primitives DAQ RUI DAQ DATA SLINK64 [1 Gbit/s] C P U D C C H T R H T R H T R READ-OUT Crate (in UXA) 18 HTRs per Readout Crate TTC 16 bits @ 80 MHz FRONT-END

More information

Radiation-Hard ASICS for Optical Data Transmission in the First Phase of the LHC Upgrade

Radiation-Hard ASICS for Optical Data Transmission in the First Phase of the LHC Upgrade Radiation-Hard ASICS for Optical Data Transmission in the First Phase of the LHC Upgrade A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The

More information

Deployment of the CMS Tracker AMC as backend for the CMS pixel detector

Deployment of the CMS Tracker AMC as backend for the CMS pixel detector Home Search Collections Journals About Contact us My IOPscience Deployment of the CMS Tracker AMC as backend for the CMS pixel detector This content has been downloaded from IOPscience. Please scroll down

More information

Presentation Outline. Data Concentrator Card for ECAL. ECAL Data Volume and Raw Data generation. DCC Conceptual Design

Presentation Outline. Data Concentrator Card for ECAL. ECAL Data Volume and Raw Data generation. DCC Conceptual Design Data Concentrator Card for ECAL Presentation Outline ECAL Data Volume and Raw Data generation DCC Conceptual Design Modeling and Simulation of the Hardware DCC TEAM DCC Requirements João Varela ECAL Raw

More information

TPC FRONT END ELECTRONICS Progress Report

TPC FRONT END ELECTRONICS Progress Report TPC FRONT END ELECTRONICS Progress Report CERN 1 July 2002 FEE TEAM: Bergen CERN Darmstadt TU Frankfurt Heidelberg Lund Oslo Luciano Musa - CERN 1 TPC FEE - ARCHITECTURE (1/2) BASIC READOUT CHAIN drift

More information

A real time electronics emulator with realistic data generation for reception tests of the CMS ECAL front-end boards

A real time electronics emulator with realistic data generation for reception tests of the CMS ECAL front-end boards Available on CMS information server CMS CR 2005/029 November 4 th, 2005 A real time electronics emulator with realistic data generation for reception tests of the CMS ECAL front-end s T. Romanteau Ph.

More information

Frontend Control Electronics for the LHCb upgrade Hardware realization and test

Frontend Control Electronics for the LHCb upgrade Hardware realization and test First Prototype of the muon Frontend Control Electronics for the LHCb upgrade Hardware realization and test V. Bocci, G. Chiodi, P. Fresch et al. International Conference on Technology and Instrumentation

More information

SoLID GEM Detectors in US

SoLID GEM Detectors in US SoLID GEM Detectors in US Kondo Gnanvo University of Virginia SoLID Collaboration Meeting @ Jlab, 01/13/2016 Outline Overview of SoLID GEM Trackers Large area GEM R&D @ UVa Update on APV25 Electronics

More information

Control slice prototypes for the ALICE TPC detector

Control slice prototypes for the ALICE TPC detector Control slice prototypes for the ALICE TPC detector S.Popescu 1, 3, A.Augustinus 1, L.Jirdén 1, U.Frankenfeld 2, H.Sann 2 1 CERN, Geneva, Switzerland, 2 GSI, Darmstadt, Germany, 3 NIPN E, Bucharest, Romania

More information