DT TPG STATUS. Trigger meeting, September INFN Bologna; INFN Padova; CIEMAT Madrid. Outline: most updates on Sector Collector system
|
|
- Ruth Richardson
- 6 years ago
- Views:
Transcription
1 DT TPG STATUS Trigger meeting, September INFN Bologna; INFN Padova; CIEMAT Madrid Outline: most updates on Sector Collector system MTCC phase 1 lessons resume Open issues (Good) news from tests SC production update Installation plans 1
2 DT TPG at MTCC: Trigger & DAQ setup (phase 1) Detector Detector YB+1: Sector 10 MB1 MB2 MB3 YB+2: Sector 10 MB1 MB2 MB3 YB+2: Sector 11 MB1 MB2 MB3 YB+1: Sector 10 MB1 MB2 MB3 MB4L MB4R YB+2: Sector 10 MB1 MB2 MB3 MB4L MB4R YB+2: Sector 11 MB1 MB2 MB3 MB4 2 x LVDS cables / chamber Tower SC Crate YB+1: 1 SC board (sector 10) SC crate YB+2: 2 SC boards (sectors 10, 11) L1A (copper) 2 x LVDS cables / chamber Tower SC Crate YB+1: 1 ROS board (sector 10) SC crate YB+2: 2 ROS boards (sectors 10, 11) 3 (6) Opto fibers / sector Green barrack DTTF: 3 PHTF 1 WS 1 BS BS Trigger into LTC/CTC L1A L1A (fiber) Trigger Readout 1 DDU 1 Opto fiber / sector Green barrack Local (VME) or Global (S-link) DAQ 2
3 MTCC phase 1 resume Trigger set up with prototype Sector Collector boards Apart from understood/patched issues (see next slide), the system was very stable Software tools are still quite experts-only but main tasks (synchronization, test, monitoring) are implemented and functional Temperatures, optical power, link status, synchronization always monitored Trigger data spied and injected into DAQ in all runs DT Trigger configuration was flexible and updated upon request Minicrates configuration ( default, pointing...) Chamber masking at DTTF inputs Sector selection by Wedge Sorter Trigger generated by Barrel Sorter 3
4 Upgrades and issues in MTCC phase 1 Upgrades during phase 1: SC-ROS conflict: SC layout bug found and corrected Current, temperature, laser power monitoring Faulty MB1 opto link substituted with unused MB4 link Issues that were still there after phase 1: Opto-TX MB1 link frequent unlocks Opto to DTTF Low yeld in LVDS receivers production LVDS from MCs + cooling, + cabling,
5 (Good) news from the lab We were finally able to reproduce the MB1 link problem in the test bench We found and we fixed the source(s) of the problem: Uncorrect line termination that has an effect on the link locking ONLY on MB1 and ThetaMB3 (not used in MTCC phase 1) links Only 2 links out of 6 show this problem (correlation with GOL-to-Laser trace length) We tried several values of the termination and we could recover all unlocking links in our lab Test of the patched Opto-TX boards in MTCC setup within this week LVDS-RX yield problems only partially understood (with boundary scan etc) (but we have ~ 75 % of fully functional boards it is a production issue... But we want to improve it) 5
6 Plans/Firmware/Software for MTCC phase 2 We want to study the effects of magnetic field on DT chambers (specifically on MB1 stations) Runs dedicated to DTs during 1st week of MTCC phase 2 DTs will act as a service for the rest of phase 2 Firmwares in phase 2: Opto-RX firmware update (monitoring of link status etc.) No updates in LVDS-RX and Motherboard firmwares Firmwares are almost final; we still have to... Implement more test features in LVDS-RX Complete and test Eta Opto-RX (note, it is the same board as for PHTF! ) Software plans We still want to to finalize our software tools and build automatic procedures for production test benches before porting some tools 6
7 SC Production plans SC boards production made by two companies (in parallel) BGA-bonding test (JTAG) made by companies (for LVDS, OPTO-RX, OPTO-TX) Complete quality tests INFN Bologna Boards Q.ty (+spares) Preproduction Tests Boards delivery Tests Start Test End Opto Tx piggy 60 (15) Problems just Dec Q1 fixed! Dec Q1 Jan Q4 Opto Rx board 96 (20) Completed Dec Q1 Dec Q1 Jan Q4 LVDS Rx 2 ch piggy 230 (40) Low yield Dec Q2 Dec Q2 Jan Q4 almost fixed SC mother board 60 (15) Completed Dec Q1 Dec Q1 Jan Q4 LVDS Rx 4 ch piggy 10 (8) Design completed Dec Q4 Dec Q4 Feb Q1 NOTE: Systems for a complete wheel ready by beginning of january Systems for complete installation will be mid february 2007 from F.O. 7
8 SC Installation plans (draft 0) No Low Voltage in UX before March! From M.DV. 8
RESPONSIBILITIES CIEMAT, MADRID HEPHY, VIENNA INFN, PADOVA INFN, BOLOGNA INFN, TORINO U. AUTONOMA, MADRID & LV, HV PS SYSTEMS.
2 RESPONSIBILITIES CIEMAT, MADRID HEPHY, VIENNA INFN, PADOVA INFN, BOLOGNA INFN, TORINO U. AUTONOMA, MADRID & LV, HV PS SYSTEMS 4 5 2 Crates w/bp 2 TIM 3 ROS-25 3 TRG SC 2 RO PP 6 SC crate: 3 units 2
More informationnext in Oct (28 th in Madrid) sep 20,2005 DT MTCC working group report
DT in Magnet-Test&Cosmics-Challenge (MTCC) (Aachen, Bologna, Madrid, Padova, Torino, Vienna) Report prepared by Marco Dallavalle, presented by Carlos Willmott four DT workshops: focus and monitor the work
More informationDTTF muon sorting: Wedge Sorter and Barrel Sorter
DTTF muon sorting: Wedge Sorter and Barrel Sorter 1 BS, it sorts the 4 best tracks out of max 24 tracks coming from the 12 WS of barrel Vienna Bologna PHTF 72 x Vienna Bologna Padova 12 WS, each one sorts
More informationDTTF muon sorting: Wedge Sorter and Barrel Sorter
DTTF muon sorting: Wedge Sorter and Barrel Sorter 1 BS, it sorts the 4 best tracks out of max 24 tracks coming from the 12 WS of barrel Vienna Bologna PHTF 72 x Vienna Bologna Padova 12 WS, each one sorts
More informationStatus of Trigger Server electronics
Status of Trigger Server electronics Trigger boards TB Server board SB Topics: Trigger Server Status TSS screening TSM and SB pre-production tests LVDS Jitter tolerance measures Trigger Server Status update
More informationRPC Trigger Overview
RPC Trigger Overview presented by Maciek Kudla, Warsaw University RPC Trigger ESR Warsaw, July 8th, 2003 RPC Trigger Task The task of RPC Muon Trigger electronics is to deliver 4 highest momentum muons
More informationUltra-short reference for the MTCC-shifter arriving in USC55
Ultra-short reference for the MTCC-shifter arriving in USC55 (12 th July 2007) MTCC machines vs USC55 machines cmsdaquser0 cmsusr0 login as dtdqm passwd dtfed0 cms-dt-dcs-yb0.cern.ch login as dcs passwd
More informationBES-III off-detector readout electronics for the GEM detector: an update
BES-III off-detector readout electronics for the GEM detector: an update The CGEM off-detector collaboration ( INFN/Univ. FE, INFN LNF, Univ. Uppsala ) 1 Outline Reminder Update on development status Off-detector
More informationTrack-Finder Test Results and VME Backplane R&D. D.Acosta University of Florida
Track-Finder Test Results and VME Backplane R&D D.Acosta University of Florida 1 Technical Design Report Trigger TDR is completed! A large amount effort went not only into the 630 pages, but into CSC Track-Finder
More informationCSC Trigger Motherboard
CSC Trigger Motherboard Functions of TMB Tests: Performance at summer 2003 test beam Radiation, magnetic fields, etc. Plans for TMB production and testing 1 Cathode LCT CSC Trigger Requirements Identify
More informationUSCMS HCAL FERU: Front End Readout Unit. Drew Baden University of Maryland February 2000
USCMS HCAL FERU: Front End Readout Unit Drew Baden University of Maryland February 2000 HCAL Front-End Readout Unit Joint effort between: University of Maryland Drew Baden (Level 3 Manager) Boston University
More informationWBS Trigger. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Status Review November 20, 2003
WBS 3.1 - Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status Review November 20, 2003 This talk is available on: http://hep.wisc.edu/wsmith/cms/trig_lehman_nov03.pdf US CMS
More informationTrigger Report. W. H. Smith U. Wisconsin. Calorimeter & Muon Trigger: Highlights Milestones Concerns Near-term Activities CMS
Trigger Report W. H. Smith U. Wisconsin Calorimeter & Muon Trigger: Highlights Milestones Concerns Near-term Activities Calorimeter Trigger Highlights, Milestones, Activities: Receiver Card Prototype delivered
More informationMuon Trigger Electronics in the Counting Room
Muon Trigger Electronics in the Counting Room Darin Acosta University of Florida April 2000 US CMS DOE/NSF Review: April 11-13, 2000 1 Outline Overview of the CSC trigger system Sector Receiver (WBS: 3.1.1.2)
More informationCMX (Common Merger extension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011
(Common Merger extension module) Y. Ermoline for collaboration Preliminary Design Review, Stockholm, 29 June 2011 Outline Current L1 Calorimeter trigger system Possible improvement to maintain trigger
More informationTrigger Layout and Responsibilities
CMS EMU TRIGGER ELECTRONICS B. Paul Padley Rice University February 1999 Trigger Layout and Responsibilities Basic Requirements z Latency: < 3.2 us z Fully pipelined synchronous architecture, dead time
More informationWBS Trigger. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review June 5, 2002
WBS 3.1 - Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review June 5, 2002 This talk is available on: http://hep.wisc.edu/wsmith/cms/trig_lehman_plen02.pdf W. Smith, U. Wisconsin,
More informationMezzanine card specifications for Level-2 Calorimeter Trigger Upgrade
CDF/DOC/TRIGGER/CDFR/8533 Mezzanine card specifications for Level-2 Calorimeter Trigger Upgrade L. Sartori 1, A. Bhatti 2, A. Canepa 3, M. Casarsa 4, M. Covery 2, G. Cortiana 5, M. Dell Orso 1, G. Flanagan
More informationCMX Hardware Overview
Hardware Overview Chip Brock, Dan Edmunds, Philippe Laurens@MSU Yuri Ermoline @CERN Wojciech Fedorko @UBC Michigan State University 12-May-2014 Common Merger extended module () 12-May-2014 2 Overall project
More informationTrigger Server: TSS, TSM, Server Board
Trigger Server: TSS, TSM, Server Board Selection of two best muon candidates in one chamber and ghost suppression Parallel architecture Two stage processing to Sector Collector (LVDS link) Inside Minicrate
More informationIgnacy Kudla, Radomir Kupczak, Krzysztof Pozniak, Antonio Ranieri
*** Draft *** 15/04/97 *** MK/RK/KTP/AR *** ***use color print!!!*** RPC Muon Trigger Detector Control Ignacy Kudla, Radomir Kupczak, Krzysztof Pozniak, Antonio Ranieri $Ã&06 Ã*(1(5$/ RPC Muon Trigger
More informationControl and Monitoring of the Front-End Electronics in ALICE
Control and Monitoring of the Front-End Electronics in ALICE Peter Chochula, Lennart Jirdén, André Augustinus CERN, 1211 Geneva 23, Switzerland Peter.Chochula@cern.ch Abstract This paper describes the
More informationData Acquisition in Particle Physics Experiments. Ing. Giuseppe De Robertis INFN Sez. Di Bari
Data Acquisition in Particle Physics Experiments Ing. Giuseppe De Robertis INFN Sez. Di Bari Outline DAQ systems Theory of operation Case of a large experiment (CMS) Example of readout GEM detectors for
More informationCMX Hardware Status. Chip Brock, Dan Edmunds, Philippe Yuri Ermoline, Duc Bao Wojciech UBC
Hardware Status Chip Brock, Dan Edmunds, Philippe Laurens@MSU Yuri Ermoline, Duc Bao Ta @CERN Wojciech Fedorko @ UBC Michigan State University 25-Oct-2013 Outline Review of hardware project (Some) hardware
More informationThe Compact Muon Solenoid Experiment. CMS Note. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland
Available on CMS information server CMS NOTE 998/ The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH- GENEVA 3, Switzerland 8 July 998 A simplified Track Assembler I/O for the
More informationPrototype Opto Chip Results
Prototype Opto Chip Results K.K. Gan, H.P. Kagan, R.D. Kass, J. Moore, S. Smith The Ohio State University Nov 5, 2008 K.K. Gan ATLAS Tracker Upgrade Workshop 1 Outline Introduction VCSEL driver chip PIN
More informationTOF Electronics. J. Schambach University of Texas Review, BNL, 2 Aug 2007
TOF Electronics J. Schambach University of Texas Review, BNL, 2 Aug 2007 1 Outline Electronics Overview Trigger & DAQ Interfaces Board Status, Tests & Plans 2 Electronics for One Side 3 Tray Level Electronics
More informationElectronics on the detector Mechanical constraints: Fixing the module on the PM base.
PID meeting Mechanical implementation ti Electronics architecture SNATS upgrade proposal Christophe Beigbeder PID meeting 1 Electronics is split in two parts : - one directly mounted on the PM base receiving
More informationStatus and planning of the CMX. Wojtek Fedorko for the MSU group TDAQ Week, CERN April 23-27, 2012
Status and planning of the Wojtek Fedorko for the MSU group TDAQ Week, CERN April 23-27, 2012 : CMM upgrade Will replace CMM: Backplane rate 40 160Mbs Crate to system rate (LVDS) 40 160Mbs Cluster information
More informationFirst Operational Experience from the LHCb Silicon Tracker
First Operational Experience from the LHCb Silicon Tracker 7 th International Hiroshima Symposium on Development and Application of Semiconductor Tracking Devices The LHCb Silicon Tracker Installation
More informationRT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters
RT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters Nicolas Chevillot (LAPP/CNRS-IN2P3) on behalf of the ATLAS Liquid Argon Calorimeter Group 1 Plan Context Front-end
More informationPrototyping NGC. First Light. PICNIC Array Image of ESO Messenger Front Page
Prototyping NGC First Light PICNIC Array Image of ESO Messenger Front Page Introduction and Key Points Constructed is a modular system with : A Back-End as 64 Bit PCI Master/Slave Interface A basic Front-end
More informationDHCAL Readout Back End
DHCAL Readout Back End Eric Hazen, John Butler, Shouxiang Wu Boston University Two DCOL Options (1) Use CMS-DCC Already exists, so Lower cost? Quicker? Obsolete components Not optimized for DCAL Copper
More informationHCAL TPG and Readout
HCAL TPG and Readout CMS HCAL Readout Status CERN Tullio Grassi, Drew Baden University of Maryland Jim Rohlf Boston University CMS/CERN. Nov, 2001 HCAL TriDAS 1 CMS TriDAS Architecture Data from CMS FE
More informationUS CMS TriDAS US CMS Meeting. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 8, 2006
US CMS TriDAS 2006 Click to edit Master title style US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 8, 2006 Outline: Calorimeter Trigger Status Endcap Muon Trigger Status
More informationDetector Control System for Endcap Resistive Plate Chambers
Detector Control System for Endcap Resistive Plate Chambers Taimoor Khurshid National Center for Physics, Islamabad, Pakistan International Scientific Spring March 01, 2010 Contents CMS Endcap RPC Hardware
More informationFT Cal and FT Hodo DAQ and Trigger
FT Cal and FT Hodo DAQ and Trigger Outline FT-Cal and FT-Hodo read-out electronics FT-Cal and FT-Hodo DAQ and trigger FADC250 firmware CTP firmware for FT-Cal and FT-Hodo FT-Cal and FT-Hodo crates and
More informationStatus of the CSC Trigger. Darin Acosta University of Florida
Status of the CSC Trigger Darin Acosta University of Florida Outline Status of the CSC Track-Finder Status of the CSC Local Trigger PHOS4 Experience TTC Jitter Measurements CPT Week, April 2002 2 Darin
More informationDetector Control LHC
Detector Control Systems @ LHC Matthias Richter Department of Physics, University of Oslo IRTG Lecture week Autumn 2012 Oct 18 2012 M. Richter (UiO) DCS @ LHC Oct 09 2012 1 / 39 Detectors in High Energy
More informationThe Compact Muon Solenoid Experiment. CMS Note. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland
Available on CMS information server CMS NOTE 998/4 The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH-2 GENEVA 23, Switzerland 29 July 998 Muon DTBX Chamber Trigger Simulation
More informationEMU FED. --- Crate and Electronics. ESR, CERN, November B. Bylsma, S. Durkin, Jason Gilmore, Jianhui Gu, T.Y. Ling. The Ohio State University
EMU FED --- Crate and Electronics B. Bylsma, S. Durkin, Jason Gilmore, Jianhui Gu, T.Y. Ling The Ohio State University ESR, CERN, November 2004 EMU FED Design EMU FED: Outline FED Crate & Custom Backplane
More informationCLARO QA at Milano-Bicocca
CLARO QA at Milano-Bicocca http://claro.mib.infn.it Angelo Cotta Ramusino, Massimiliano Fiorini, Roberto Malaguti INFN and University of Ferrara, Italy Paolo Carniti, Lorenzo Cassina, Claudio Gotti, Matteo
More informationUpdate on PRad GEMs, Readout Electronics & DAQ
Update on PRad GEMs, Readout Electronics & DAQ Kondo Gnanvo University of Virginia, Charlottesville, VA Outline PRad GEMs update Upgrade of SRS electronics Integration into JLab DAQ system Cosmic tests
More informationThe Compact Muon Solenoid Experiment. CMS Note. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland
Available on CMS information server CMS NOTE 2002/xxx The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Draft of 1 January 2002 Link System and Crate
More informationThe CMS Global Calorimeter Trigger Hardware Design
The CMS Global Calorimeter Trigger Hardware Design M. Stettler, G. Iles, M. Hansen a, C. Foudas, J. Jones, A. Rose b a CERN, 1211 Geneva 2, Switzerland b Imperial College of London, UK Matthew.Stettler@cern.ch
More informationAPV-25 based readout electronics for the SBS front GEM Tracker
APV-25 based readout electronics for the SBS front GEM Tracker Authors: Evaristo Cisbani, Paolo Musico Date: 26/June/2014 Version: 1.0 APV-25 based readout electronics for the SBS front GEM Tracker...
More informationA Possible Redundancy System for Opto-Links
A Possible Redundancy System for Opto-Links A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State University P. Buchholz, A. Wiese,
More informationQuad Module Hybrid Development for the ATLAS Pixel Layer Upgrade
Quad Module Hybrid Development for the ATLAS Pixel Layer Upgrade Lawrence Berkeley National Lab E-mail: kedunne@lbl.gov Maurice Garcia-Sciveres, Timon Heim Lawrence Berkeley National Lab, Berkeley, USA
More informationCMS Trigger/DAQ HCAL FERU System
CMS Trigger/DAQ HCAL FERU System Drew Baden University of Maryland October 2000 http://macdrew.physics.umd.edu/cms/ Honest assessment: About 3 months behind schedule. TRIDAS Overall Project Timelines Expected
More informationLevel-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout
Level-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout Panagiotis Gkountoumis National Technical University of Athens Brookhaven National Laboratory On
More informationATLAS DCS Overview SCADA Front-End I/O Applications
Overview SCADA Front-End I/O Applications ATLAS TDAQ week, July 6th 2001, H.J.Burckhart 1 SCX1 USA15 Common Infrastructure PC Local Area Network Server Operation Local Control Stations (LCS) Expert Subdetector
More informationResults on Array-based Opto-Links
Results on Array-based Opto-Links, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, D. Pignotti, S. Smith, M. Strang The Ohio State University P. Buchholz, A. Wiese, M. Ziolkowski Universität
More informationHCAL Trigger Readout
HCAL Trigger Readout HTR Status and Clocking Issues D. Baden, T. Grassi http://www.physics.umd.edu/hep/esr_dec_2002.pdf 1 FE/DAQ Electronics S-Link: 64 bits @ 25 MHz Trigger Primitives READ-OUT Crate CAL
More informationGEM chambers for SoLID Nilanga Liyanage. University of Virginia
GEM chambers for SoLID Nilanga Liyanage University of Virginia PVDIS GEM configuration Current proposal to instrument locations 4, 5, 6, 7, and 8 with GEM: need to determine the number of GEM layers required
More informationTesting Discussion Initiator
27 th February 2003 Testing Discussion Initiator C.N.P.Gee Rutherford Appleton Laboratory C. N. P. Gee February 2003 2 C. N. P. Gee February 2003 3 JEP Tests (1) Step Test Items required Provided by 0
More informationActivity on GEM by the Rome group since last meeting
OLYMPUS Collaboration DESY 24/Feb/21 Activity on GEM by the Rome group since last meeting Salvatore Frullani / INFN-Rome Sanità Group 1 Outline DESY test beam 9-2 December SBS Technical Review JLab 22
More informationConstruction of a compact DAQ-system using DSP-based VME modules
Abstract We have developed a DSP based data-acquisition syustem(daq) system, based on the DSP. The system utilizes VME boards with one or two s. Our intension was to consturct a compact DAQ framework which
More informationVelo readout board RB3. Common L1 board (ROB)
Velo readout board RB3 Testing... Common L1 board (ROB) Specifying Federica Legger 10 February 2003 1 Summary LHCb Detectors Online (Trigger, DAQ) VELO (detector and Readout chain) L1 electronics for VELO
More informationMDC Optical Endpoint. Outline Motivation / Aim. Task. Solution. No Summary Discussion. Hardware Details, Sharing Experiences and no Politics!
MDC Optical Endpoint Outline Motivation / Aim Hardware Details, Sharing Experiences and no Politics! Task Architecture of MDC-System Solution Optical Data Transport: MDC-Endpoint Timing Fanout and Power-Supply
More informationTDC Readout Board, TRBv2. Outline. Motivation / Aim TRB V2. Problems, problems, problems... and the solution :-) Summary. projects with TRBv2 platform
TDC Readout Board, TRBv2 Outline Motivation / Aim TRB V2 projects with TRBv2 platform Problems, problems, problems... and the solution :-) Summary 1 Motivation / Aim Main Problem: The limitation of the
More informationS-LINK: A Prototype of the ATLAS Read-out Link
: A Prototype of the ATLAS Read-out Link Erik van der Bij, Robert McLaren, Zoltán Meggyesi EP-Division CERN, CH-1211 Geneva 23 Abstract The ATLAS data acquisition system needs over 1500 read-out links
More informationMuon Port Card Upgrade Status May 2013
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013 MPC Upgrade Requirements Be able to deliver all 18 trigger primitives from the EMU peripheral crate to the upgraded Sector Processor Preserve
More informationThe WaveDAQ system: Picosecond measurements with channels
Stefan Ritt :: Muon Physics :: Paul Scherrer Institute The WaveDAQ system: Picosecond measurements with 10 000 channels Workshop on pico-second photon sensors, Kansas City, Sept. 2016 0.2-2 ns DRS4 Chip
More informationSVT detector Electronics Status
SVT detector Electronics Status On behalf of the SVT community Mauro Citterio INFN Milano Overview: - SVT design status - F.E. chips - Electronic design - Hit rates and data volumes 1 SVT Design Detectors:
More informationGLAST. Prototype Tracker Tower Construction Status
Prototype Tracker Tower Construction Status June 22, 1999 R.P. Johnson Santa Cruz Institute for Particle Physics University of California at Santa Cruz 1 1 11 2 3 5 4 Prototype Tracker Tower Configuration
More informationFirst experiences with the ATLAS pixel detector control system at the combined test beam 2004
Nuclear Instruments and Methods in Physics Research A 565 (2006) 97 101 www.elsevier.com/locate/nima First experiences with the ATLAS pixel detector control system at the combined test beam 2004 Martin
More informationChallenges and performance of the frontier technology applied to an ATLAS Phase-I calorimeter trigger board dedicated to the jet identification
Challenges and performance of the frontier technology applied to an ATLAS Phase-I calorimeter trigger board dedicated to the jet identification B. Bauss, A. Brogna, V. Büscher, R. Degele, H. Herr, C. Kahra*,
More informationLVL1 e/γ RoI Builder Prototype
LVL e/γ RoI Builder Prototype RoI / s matching and zero suppression Receiver RoI VME Receiver RoI Control Receiver RoI S-Link Interface Receiver Output - LVL / Supervisor RoI Builder discussion - Verilog/VHDL
More informationThe ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments September 2004, BOSTON, USA
Carmen González Gutierrez (CERN PH/ED) The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 17 September 2004, BOSTON, USA Outline: 9 System overview 9 Readout
More informationThe Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System
The Track-Finding Processor for the Level- Trigger of the CMS Endcap Muon System D. Acosta, A. Madorsky (Madorsky@phys.ufl.edu), B. Scurlock, S.M. Wang University of Florida A. Atamanchuk, V. Golovtsov,
More informationFront End Electronics. Level 1 Trigger
0. CMS HCAL rigger and Readout Electronics Project he overall technical coordination for the HCAL trigger and readout electronics (ri- DAS) project will be located in the Maryland HEP group, led by Drew
More informationCalorimeter Trigger Hardware Update
Calorimeter Trigger Hardware Update T. Gorski, P. Klabbers, W. H. Smith, S. Dasu,, J. Tikalsky, D. Seemuth, A. Farmahini-Farahani, A. Perugupalli University of Wisconsin November 15, 2012 1 UW CTP-6 MMC
More informationRadiation-Hard/High-Speed Parallel Optical Links
Radiation-Hard/High-Speed Parallel Optical Links K.K. Gan, H. Kagan, R. Kass, J. Moore, D.S. Smith The Ohio State University P. Buchholz, M. Ziolkowski Universität Siegen July 3, 2013 K.K. Gan RD13 1 Outline
More informationThe White Rabbit Project
WR Project Status 1/ 1 The White Rabbit Project Technical introduction and status report T. W lostowski BE-CO Hardware and Timing section CERN November 11, 2010 WR Project Status 2/ 1 Introduction Outline
More informationTrigger and Data Acquisition at the Large Hadron Collider
Trigger and Data Acquisition at the Large Hadron Collider Acknowledgments (again) This overview talk would not exist without the help of many colleagues and all the material available online I wish to
More informationA 3-D Track-Finding Processor for the CMS Level-1 Muon Trigger
A 3-D Track-Finding Processor for the CMS Level-1 Muon Trigger D.Acosta, B.Scurlock*, A.Madorsky, H.Stoeck, S.M.Wang Department of Physics, University of Florida, Gainesville, FL 32611, USA V.Golovtsov,
More informationThe ALICE trigger system for LHC Run 3
The ALICE trigger system for LHC Run 3, D. Evans, K.L. Graham, A. Jusko, R. Lietava, O. Villalobos Baillie and N. Zardoshti School of Physics and Astronomy, The University of Birmingham, Edgbaston, Birmingham,
More informationTEST, QUALIFICATION AND ELECTRONICS INTEGRATION OF THE ALICE SILICON PIXEL DETECTOR MODULES
TEST, QUALIFICATION AND ELECTRONICS INTEGRATION OF THE ALICE SILICON PIXEL DETECTOR MODULES I.A.CALI 1,2, G.ANELLI 2, F.ANTINORI 3, A.BADALA 4, A.BOCCARDI 2, G.E.BRUNO 1, M.BURNS 2, M.CAMPBELL 2, M.CASELLE
More informationReadout Systems. Liquid Argon TPC Analog multiplexed ASICs SiPM arrays. CAEN 2016 / 2017 Product Catalog
Readout Systems Liquid Argon TPC Analog multiplexed ASICs SiPM arrays CAEN 2016 / 2017 Product Catalog 192 Readout Systems SY2791 Liquid Argon TPC Readout System The SY2791 is a complete detector readout
More information1 / 5. End of Life Notification: RuggedCom RuggedSwitch RS500. November 30, Dear Valued Customers,
End of Life Notification: RuggedCom RuggedSwitch RS500 November 30, 2009 Dear Valued Customers, As part of RuggedCom s ongoing product lifecycle management, the RuggedCom RuggedSwitch RS500 5-Port Unmanaged
More informationOverview of SVT DAQ Upgrades. Per Hansson Ryan Herbst Benjamin Reese
Overview of SVT DAQ Upgrades Per Hansson Ryan Herbst Benjamin Reese 1 SVT DAQ Requirements and Constraints Basic requirements for the SVT DAQ Continuous readout of 23 040 channels Low noise (S/N>20 to
More informationSRS scalable readout system Status and Outlook.
SRS scalable readout system Status and Outlook Hans.Muller@cern.ch SRS corner stones Complete RO system from detector to Online software Conceived independent of detector type scalable, very small to very
More informationGLAST Silicon Microstrip Tracker Status
R.P. Johnson Santa Cruz Institute for Particle Physics University of California at Santa Cruz Mechanical Design Detector Procurement Work list for the Prototype Tracker Construction. ASIC Development Hybrids
More informationSystem overview Production status. MPD firmware upgrade. Front Tracker boards SID equipment Back Tracker (UVa) FIR blocks Optical interface
1 GEM Readout and DAQ System overview Production status Front Tracker boards SID equipment Back Tracker (UVa) MPD firmware upgrade FIR blocks Optical interface Paolo Musico and Evaristo Cisbani 2 APV25
More informationATLAS TileCal Demonstrator Main Board Design Review
ATLAS TileCal Demonstrator Main Board Design Review Fukun Tang, Kelby Anderson and Mark Oreglia The University of Chicago 4/24/2013 Mini Review For Main Board Design 1 Main/Daughter Board Readout Structure
More informationBeam test measurements of the Belle II vertex detector modules
Beam test measurements of the Belle II vertex detector modules Tadeas Bilka Charles University, Prague on behalf of the Belle II Collaboration IPRD 2016, 3 6 October 2016, Siena, Italy Outline Belle II
More informationStreaming Readout, the JLab perspective. Graham Heyes Data Acquisition Support Group Jefferson Lab
Streaming Readout, the JLab perspective Graham Heyes Data Acquisition Support Group Jefferson Lab Introduction After the 12 GeV accelerator upgrade all four halls took production data in Spring of this
More informationProduction and Quality Assurance of Detector Modules for the LHCb Silicon Tracker
Production and Quality Assurance of Detector Modules for the LHCb Silicon Tracker Olaf Steinkamp for Dmytro Volyanskyy Physik-Institut der Universität Zürich 10th ICATPP Conference on Astroparticle, Particle,
More informationSP02 to/from DT Interface Test
1. Hardware SP to/from DT Interface Test 9U VME Track Finder Crate Clock and Control Board (CCB), running under the TTC clock of 4.79 MHz (otherwise the SP PLL will not lock to the CCB clock!) Sector Processor
More informationSTAR BEMC TDC VME Interface & Programming Reference Preliminary 5/21/01
STAR BEMC TDC VME Interface & Programming Reference Preliminary 5/21/01 Overview The STAR Barrel EMC Tower Data Collector is comprised of six 6U VME cards residing in a crate on the STAR platform. The
More informationThe WIDAR Correlator
The WIDAR Correlator Sean M. Dougherty Dominion Radio Astrophysical Observatory Herzberg Institute of Astrophysics National Research Council Canada Objectives Highlights Critical Design Review Hardware
More informationHCAL FE/DAQ Overview
HCAL FE/DAQ Overview CAL REGIONAL TRIGGER Trigger Primitives DAQ RUI DAQ DATA SLINK64 [1 Gbit/s] C P U D C C H T R H T R H T R READ-OUT Crate (in UXA) 18 HTRs per Readout Crate TTC 16 bits @ 80 MHz FRONT-END
More informationRadiation-Hard ASICS for Optical Data Transmission in the First Phase of the LHC Upgrade
Radiation-Hard ASICS for Optical Data Transmission in the First Phase of the LHC Upgrade A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The
More informationDeployment of the CMS Tracker AMC as backend for the CMS pixel detector
Home Search Collections Journals About Contact us My IOPscience Deployment of the CMS Tracker AMC as backend for the CMS pixel detector This content has been downloaded from IOPscience. Please scroll down
More informationPresentation Outline. Data Concentrator Card for ECAL. ECAL Data Volume and Raw Data generation. DCC Conceptual Design
Data Concentrator Card for ECAL Presentation Outline ECAL Data Volume and Raw Data generation DCC Conceptual Design Modeling and Simulation of the Hardware DCC TEAM DCC Requirements João Varela ECAL Raw
More informationTPC FRONT END ELECTRONICS Progress Report
TPC FRONT END ELECTRONICS Progress Report CERN 1 July 2002 FEE TEAM: Bergen CERN Darmstadt TU Frankfurt Heidelberg Lund Oslo Luciano Musa - CERN 1 TPC FEE - ARCHITECTURE (1/2) BASIC READOUT CHAIN drift
More informationA real time electronics emulator with realistic data generation for reception tests of the CMS ECAL front-end boards
Available on CMS information server CMS CR 2005/029 November 4 th, 2005 A real time electronics emulator with realistic data generation for reception tests of the CMS ECAL front-end s T. Romanteau Ph.
More informationFrontend Control Electronics for the LHCb upgrade Hardware realization and test
First Prototype of the muon Frontend Control Electronics for the LHCb upgrade Hardware realization and test V. Bocci, G. Chiodi, P. Fresch et al. International Conference on Technology and Instrumentation
More informationSoLID GEM Detectors in US
SoLID GEM Detectors in US Kondo Gnanvo University of Virginia SoLID Collaboration Meeting @ Jlab, 01/13/2016 Outline Overview of SoLID GEM Trackers Large area GEM R&D @ UVa Update on APV25 Electronics
More informationControl slice prototypes for the ALICE TPC detector
Control slice prototypes for the ALICE TPC detector S.Popescu 1, 3, A.Augustinus 1, L.Jirdén 1, U.Frankenfeld 2, H.Sann 2 1 CERN, Geneva, Switzerland, 2 GSI, Darmstadt, Germany, 3 NIPN E, Bucharest, Romania
More information