1 Improving monitoring and control hardware cost at Totten Mine Ozzy Flores, Enrique Acuña Totten Mine, Vale Canada Limited, Sudbury, Ontario, Canada Totten Mine recently completed the project development, production ramp up phase and is running at full production, with a daily rate of 2200 tons. Totten is benefiting from an efficient automated ventilation system that includes control of main and auxiliary fans which can be started and shut down at any time from the surface central control room. In order to generate this level of control the mine utilizes a combination of industrial communication protocols (Profibus, Modbus) and Ethernet based communications (Profinet, Modbus TCP/IP). During the project phase of Totten Mine, construction relied heavily on the industrial communication protocols for monitoring and control of underground ventilation equipment such as fans, doors, dampers and ventilation monitoring stations. Since achieving full production, Totten Mine has made advances in the ability to monitor and control the ventilation equipment over Ethernet. As part of the current efforts to minimize and reduce capital and operational costs at the mine site, Totten Mine completed a study to compare the automation and control hardware currently in use with new proven technologies available in the market. The idea was to identify technologies with the potential to reduce the implementation cost for new mining levels that will be developed as part of the life of mine plan; but without compromising the current communication and control capabilities. This paper presents the initial state of the automation and control before the study, the alternatives considered, the discussion about the alternatives, the estimated savings and the final solution chosen for the mine which is currently under implementation. 1 Introduction Totten mine is one of six Vale mines in the Sudbury basin. It is located about 40 km South West of Sudbury and is the newest operating mine. During the project phase Totten was equipped with state of the art technology in terms of monitoring and control for ventilation systems. The mine has realized the benefits of such systems mainly in three areas: health and safety, production and energy savings. Monitoring the different levels and ramps from the surface control room enables the monitoring of gas and temperature conditions during the complete shift. Additionally, within the ABB 800xA program, alarms are set at different thresholds to alert if conditions change and ensures a safe underground environment for employees. Due to the capacity for controlling main fans speed, doors and regulators, the control room operator can allocate different airflow demands in different levels based on operation requirements and modify them during the shift as requested within the ventilation system limitations. As a result, the current manual control system installed at Totten mine has been able to deliver a 25% savings in terms of energy consumption compared to the same ventilation system running at full design speed. These savings have being achieved mainly at the primary level by adjusting the speed of main fans feeding the mine volume requirements and with the use of dampers in a PID (Proportional Integral Derivative) loop with airflow sensors to modulate the air volume across a level according to the expected requirements. Through the past few years of gained experience and cost reduction initiatives, the automation department has identified potential solutions for reducing the cost of the implemented systems. This has been done

2 without compromising current capabilities and also enabling an enhancement of system features. This paper introduces the initially installed communication and control design system and presents alternatives considered to improve the overall cost. A discussion on the relative costs and results is presented with details of the proposed new solution for the mine. 2 Initial state The initial design was composed of the typical infrastructure found at most underground mines. What is referred as the typical installation considers a controller (PLC) located in the area or level with motor control and instrumentation hardwired back to the controller. The initial design at Totten included DCS controllers located in the Electrical Sub Station (ESS) on each level access. The underground controllers communicated back to surface via an Ethernet based Process Control Network (PCN) allowing the monitoring and control signals to be displayed in Totten s Central Control Room as illustrated in Figure 1. CENTRAL CONTROL ROOM (SURFACE) ABB RIO PANEL - VMS VFD ABB RIO PANEL ABB RIO PANEL PROCESS CONTROL NETWORK U/G DCS CONTROLLER Profibus Network PCN Ethernet Network Analog / Digital Signals HPSSD Figure 1 Initial design overview schematic DAMPER (A) DAMPER (B) The initial design of the U/G ventilation control system included the following hardware components in order to provide remote control and monitoring capabilities to the Central Control Room. ABB DCS Controllers: These controllers were located at each Underground Electrical Sub Stations (ESS). The controller provided the DCS logic required for monitoring and control for the U/G Ventilation equipment located on the level. Profibus Network: Establishing communication between the DCS controllers and the underground ventilation equipment was done via an industrial communication protocol called Profibus. When initially designed, Profibus was the preferred and proven communication protocol between the DCS controllers and the underground ventilation equipment.

3 Underground Ventilation Equipment: The initial Underground Ventilation Equipment that was controlled comprised the following: o Fans (On/Off): Fans that required On/Off control utilized an ABB Universal Motor Controller () in order to provide overload protection as well as monitoring and control. Communication between the s and the DCS controller was established via Profibus. o Fans (Variable Frequency Drive): Fans that required variable speed control utilized an ABB Universal Motor Controller (VFD) in order to provide monitoring and speed control. Communication between the VFD s and the DCS controller was established via Profibus. Initially main fans and some of the largest auxiliary fans were equipped with VFD s. Due to operational issues to keep VFD s running underground only the main fans on surface are currently equipped with VFD s. o Ventilation Monitoring Stations (VMS s): Requirements to monitor CO, Airflow, Temperature (dry bulb), and Relative Humidity throughout the mine were initially designed with ABB Remote I/O (RIO) Panels and hardwired transmitters. These ABB RIO Panels were designed to have individual transmitters for CO (Dräger), Airflow (Accutron), Temperature and Relative Humidity (Vaisala) individually wired to analog inputs on the ABB RIO Panels. Communication between the ABB RIO Panels and the DCS controllers was established via Profibus. o Flextor Dampers: In order to control the airflow volume on each level the Flextor Dampers utilized Auma Actuators to modulate large mechanical Dampers to the open area required to establish the airflow requirements. For monitoring and control the initial design utilized ABB Remote I/O (RIO) Panels to hardwire the Auma Actuators control and monitoring signals. These ABB RIO Panels were designed to have the position feedback, fault indication, mode operation (local or remote), and desired set point wired to analog inputs and outputs as well as digital inputs. o High Pressure Steel Sectional Doors (HPSSD s): These doors help control ventilation throughout the mine by maintaining an open position to allow a desired airflow through the door. In order to monitor and control these doors the initial design only provided a desired set point via an analog output signal and position feedback via an analog input signal from the nearest DCS Controller or the nearest VMS. These doors were used as ventilation controls in locations that required infrequent access and still required regulation, for example the bottom of certain ventilation raises or ventilation transfer drifts. The initial ventilation control system did not have redundancy within the DCS controllers; which was problematic in the project development phase due to the frequent communication failures from damaged Profibus cables. When communication was offline the remote operation of fans, VMSs and monitoring was not available. However, the automation team developed a control philosophy that allowed full local control from pushbuttons on the fan starters so that the ventilation equipment did not have to rely solely on the DCS logic and Profibus communication network to establish control.

4 The cost of completely automating the underground ventilation infrastructure was significant; with the majority of the cost associated with the requirement of ABB hardware in order to establish Profibus communication between the underground DCS controllers and the fans ( s), RIO Panels (VMS s and Flextors). An additional cost of Engineering was required to develop multiple schematics and wiring diagrams as well as labor costs for installation and wiring all the various electrical and communication panels. 3 Control strategies considered In an effort to increase automation capabilities and at the same time reduce the cost of extending the automation infrastructure at Totten mine, the Automation team began to look at alternatives in hardware and technology. The objective was to minimize costs, but maintain or improve the control and monitoring capabilities of the existing hardware. The options were evaluated based on the following criteria: cost, technical capability or functionality, ease of installation, maintainability and best practices from other mines if pertinent. It is important to note that at the beginning of the evaluation process the communication capabilities of the DCS controllers over Ethernet had not been tested. Therefore, the initial hardware alternatives focused on finding a solution that was able to communicate over Profibus. However, the testing of Ethernet was being conducted in parallel to the hardware alternative evaluations. As the evaluation continued the focus shifted to fully explore the capabilities of the DCS controller over Ethernet and the evaluations of alternative hardware expanded to include solutions that were able to communicate over Ethernet instead of Profibus, as the ability to use Ethernet would allow the mine to leverage the extensive underground Ethernet and Wireless network installed at Totten. Below is a breakdown of each ventilation hardware component and the major items the Automation team focused on improving. 3.1 Ventilation Monitoring Stations (VMS) The high cost of RIO Panels, associated Engineering requirements (schematics, loop diagrams, wiring diagrams and network drawings among others) and Installation factors forced the team to look at alternatives. The evaluation started with solutions that would utilize a communication protocol rather than hard-wired signals back to the DCS or RIO Panels. Figure 2 illustrates the original design. The different costs considered for the VMS are listed as follows. RIO Panels o ABB panel Individual Transmitters o Accutron M Series unit o Dräger (CO sensor) o Vaisala (Dry bulb temperature and relative humidity) Engineering Costs o Schematics o Wiring Diagrams Installation o Large Panels o Extensive Wiring o Numerous Cables

5 Figure 2 Original Ventilation Monitoring Station Design ABB Remote I/O Panel The options considered for the VMS s are listed as follows: Accutron Profibus: Accutron provided a potential solution that utilized a Communication Gateway (Anybus) to convert Modbus to Profibus as presented in Figure 3. However the solution was a proof of concept with the risk of not providing reliable communication back to the DCS. The solution also required extensive configuration setup to get the unit online. Figure 3 Accutron Profibus option Maestro Profibus: Maestro provided another potential solution that utilized and completely integrated a system that was able to provide not only Air Flow but CO, RH, and Temperature sensors, all in a single integrated unit. The unit utilized a Modbus communication link to communicate to each sensor which allowed the unit to transmit this data over Ethernet (Modbus TCP/IP) as presented in Figure 4. Figure 4 Maestro Profibus option However, at this point the Ethernet communication capabilities of the DCS were still not proven. Therefore, Maestro was required to provide a Profibus solution in order for the mine DCS to communicate to the Vigilante unit. The proposed solution also required a Communication Gateway (Anybus) which again required extensive configuration setup to bring the unit online; however, the communication was seen to be reliable.

6 Maestro Modbus TCP/IP: Since the Maestro Vigilante already had Ethernet (Modbus TCP/IP) communication capabilities it was the preferred solution to test with the DCS. At this point the DCS communication capabilities with Ethernet had been proven and the mine was ready to begin communicating to devices on the Ethernet network as presented in Figure 5. However the Profibus connection was maintained until the Ethernet network connection proved to be reliable. Figure 5 Maestro Modbus TCP/IP option VMS hardware selected: Totten s automation team selected the Maestro Vigilante solution for Ventilation Monitoring Stations moving forward, as presented in Figure 6, until such a time when other equivalent competitive solutions are readily available in the market. Figure 6 VMS hardware selected option The ability to communicate via Ethernet (Modbus TCP/IP) and provide additional diagnostic capabilities was a major factor in the decision to select this device. The compact size and integration between all the sensors in a single panel was also a benefit with the Vigilante. The most advantageous feature of this device is its ability to be powered over Ethernet. With the fully integrated instrument cluster, the engineering cost for individual schematics and wiring diagrams were eliminated and with the ability to be powered via Ethernet (POE), there was no longer the need for installation of multiple cables. Essentially this reduced the installation time to that required to erect a small panel and attach a single Category 5 (CAT5) cable. The initial estimate indicated that a savings of 40% of the initially installed system could be achieved. 3.2 Flextors Dampers The same cost of the RIO Panels, Engineering requirements (schematics, loop diagrams, wiring diagrams, network drawings, etc), and Installation factors also lead to a review of options for

7 the Flextor Damper automation requirements. The evaluation started with reviewing solutions that would utilize a communication protocol rather than hard-wired signals back to the DCS or RIO Panels as presented in Figure 7. The different component costs considered for the flextor damper are listed as follows: RIO Panels o ABB panel Limited Control / Monitoring o Position Feedback o Position Set point o Fault Feedback o Mode of Operation Local/Remote Engineering Costs o Schematics o Wiring Diagrams Installation o Large Panels o Extensive Wiring o Numerous Cables ABB RIO PANEL DAMPER (A) DAMPER (B) Figure 7 Original Flextor Damper Design ABB Remote I/O Panel The options considered for the flextor damper are listed as follows: Siemens RIO Profibus & Profinet: Evaluation of the RIO hardware from Siemens included determining the cost of the hardware and designing a sample panel layout. Despite the fact that the RIO solution met the communication and hardware requirements the cost of the hardware yielded minimal cost savings in comparison to the existing ABB solution. Also, the size of the panel in order to accommodate the hardware was of similar size to the existing solution.

8 Maestro AD4 / AD8 Ethernet Remote I/O Profibus: Evaluations of the AD4 /AD8 RIO hardware from Maestro with Profibus communication included testing the hardware in the Totten test environment in order to determine if the hardware was a viable alternative. Since the Ethernet capability of the DCS controller was not proven at this point, a protocol gateway that would convert the native communication of the AD4 (Modbus TCP/IP) to Profibus needed to be incorporated as presented in Figure 8. This proved to be very cumbersome in terms of initial configuration and required individual configurations dependent on the device the AD4 was controlling (VMS or Flextor). MAESTRO AD4 DAMPER (A) DAMPER (B) Figure 8 Maestro AD4 / AD8 Ethernet Remote I/O Profibus option Maestro AD4 / AD8 Ethernet Remote I/O Modbus TCP/IP: Evaluations of the AD4 /AD8 RIO hardware from Maestro with Modbus TCP/IP communication included testing the hardware in the Totten test environment in order to determine if the hardware was a viable alternative as presented in Figure 9. The testing concluded that communication over Modbus TCP/IP was a viable alternative and included the benefit of eliminating the protocol gateway (Anybus Gateway) that was required in the initial evaluation of the Maestro AD4 / AD8 RIO. Another advantage was that the unit was able to be powered over Ethernet (POE). Auma Actuator Profibus: The Automation team initially considered communicating directly to the Auma actuators via Profibus; and evaluated the communication parameters available via Profibus in order to determine if the appropriate controls and monitoring parameters were available. This evaluation consisted of reviewing the communication manuals and discussions with the Auma manufacture, where it was determined that Profibus would be a viable alternative instead of hardwiring the signals to a RIO panel. The cost analysis determined that there was only a slight increase in price associated with equipping the Auma actuators with communication capabilities.

9 DAMPER (A) DAMPER (B) Figure 9 Maestro AD4 / AD8 Ethernet Remote I/O Modbus TCP/IP option Auma Actuator Ethernet (Modbus TCP/IP): At this point in the evaluation process, the Automation team had proven the Ethernet capabilities of the DCS controllers. Therefore, the Auma actuators were able to be evaluated through communication via Ethernet and proved to be a success by easily integrating the Ethernet Auma actuators into the Totten test environment. Full control and monitoring capabilities were established and it was discovered that there were significant diagnostic features available by utilizing the communication capabilities of the Auma actuator instead of hard wiring the signals to RIO panels. Flextor Damper hardware selected: Initially the Automation team selected the Maestro AD4 RIO solution for interfacing with the Flextor Damper Auma Actuators and began implementing the Automation designs for several levels. However, after the completion of the Ethernet testing with the DCS Controllers, the Automation team chose to operate the Flextor Dampers with Auma actuators with Ethernet communication as presented in Figure 10. DAMPER Figure 10 Flextor damper hardware selected option Despite a small increase in price for an actuator with Ethernet, the overall cost of the Automation of the Flextor Damper is greatly reduced because the RIO panels are no longer required. Eliminating the RIO panels reduced the cost of hardware, engineering requirements (Schematics, Wiring Diagrams, and Panel Layouts) and installation since previous multiple runs

10 of cables and wiring were reduced to termination of a power cable and a single communication cable (CAT5). 3.3 On/Off Fan Control The initial design considered local DCS controllers at each ESS and communication to fan starters utilizing Profibus in addition to the ABB hardware utilized to establish this type of communication between the DCS controller and the s. This strategy had a higher fixed cost which initiated the automation team to look at alternatives for On/Off fan control. The component costs considered for the on/off fan control are listed as follows: Fan Starter Hardware o ABB o 24V DC Power Supply o Profibus Connector DCS Hardware o Local DCS controller required o Profibus Communication Modules Engineering Costs o Schematics (Fans, Pumps, Jumbo, DCS Panel) o Wiring Diagrams (Fans, Pumps, Jumbo, DCS Panel) o Panel Layout (DCS Panel) Installation o Large Panels (DCS Panel) o Extensive Wiring (Fan Starters, DCS Panel) o Numerous Cables (Fans Starter, DCS Panel) The options considered for the On/Off fan control are as follows: Procentec Profibus Hub: The first alternative evaluated was the Procentec Profibus Hub which was a more cost effective solution by providing multiple network Profibus connections to a single DCS controller. Rather than multiple ABB Profibus communication modules within the DCS cabinet, the Procentec Profibus Hub allowed for a single ABB Profibus communication module; which reduced the number of communication modules resulting in a significant savings since these modules are very expensive. Schneider Electric - Tesys T: Another Vale Mine was utilizing the Tesys T for On/Off fan control so it was chosen as a viable alternative to evaluate in order to leverage existing experiences. The Automation team evaluated the Tesys T by successfully integrating a single unit into the Totten test environment. The Tesys T did offer the same remote control capabilities with some additional monitoring capabilities as well as utilizing Ethernet (Modbus TCP/IP) for communication. However, after completing the evaluation it was discovered that the Tesys T could not duplicate the local control functionality that the ABB provided. In terms of cost the Tesys T did offer some cost reduction, the unit itself was less expensive than the ABB and it did not require a separate 24V DC power supply since the unit was able to be powered with 120V AC. ABB with Profinet PNQ Module: ABB had released their newest version of the 100, the 100.3, which was able to connect to the ABB PNQ Module.

11 This module allowed up to four to be connected to the PNQ Module. The PNQ module allowed these four s to communicate over Ethernet (Profinet) with a single CAT5 connection. The Automation team evaluated if the combination of the new and the PNQ modules offered the same functionality as the existing Profibus s. The and the PNQ modules were successfully integrated into Totten s test environment and all existing monitoring and controls were able to be maintained with this new hardware. Figure 11 ABB with Profinet PNQ Module option On/Off fan control hardware selected: The Automation team initially focused on reducing the cost of expanding the Profibus network, but with the successful testing of the DCS controller communication over Ethernet (Profinet) between the controller and the newly improved it was decided that future levels would utilize Ethernet as the preferred means of monitoring and control for On/Off fans. Therefore, the hardware selected was the combination of the ABB and the Profinet PNQ Module. The savings included eliminating the need for multiple Profibus Communication Modules since four s would be able to be communicated to the DCS controller with a single Ethernet connection as opposed to requiring the expensive Profibus communication modules. The are also able to be powered by 120V AC thus eliminating the need for a 24V DC Power Supply for each fan starter. However, the most significant savings realized by utilizing Ethernet instead of Profibus was eliminating the need for the Profibus connectors since the cost of a single Profibus connector was almost the price of the itself. Another significant advantage to Ethernet was that it removed the requirement of having the program for each fan reside in the local DCS controller allowing the network connection to be made to any network switch instead of the local DCS. The initial savings was estimated to be at least 60% of the initial hardware cost. Figure 12 presents the end state of the monitoring and control hardware as a result of the modifications previously described. 4 Conclusions Establishing the Ethernet communications between the underground ventilation equipment and the DCS controller proved to be the most significant innovation during the evaluation process. The selection process for each hardware alternative initially began with finding a Profibus solution however with the implementation of Ethernet as a means of communicating to the DCS Controllers the selection criteria changed and the Automation team concentrated on finding a suitable Ethernet solution for each alternative.

12 CENTRAL CONTROL ROOM (SURFACE) DCS MASTER CONTROLLER SURFACE UNDERGROUND PNQ22 PROCESS CONTROL NETWORK & SHARED NETWORK DAMPER VENTILATION MONITORING STATION Ethernet Network (PCN or SHARED) Wireless Network Figure 12 End state of monitoring and control hardware DAMPER Another significant decision that the Automation team made was to no longer install underground DCS controllers at the ESS. The new control and monitoring philosophy would include the implementation of a Master DCS Controller on surface with communication to the underground ventilation equipment utilizing the Ethernet network infrastructure. This design would allow a single controller to hold all the underground ventilation programming and eliminate the need for constant changes to individual controllers when equipment was installed or removed. The new design essentially eliminated the cost of the DCS hardware, panels, and wiring for future ESS s as well as significantly reducing the installation and logistic cost associated with getting this hardware underground and installed. From a programming point of view the Master DCS Controller would also allow the standardization and optimization of the DCS logic in a central controller. The Automation team could now essentially preprogram the entire ventilation requirements on future levels and if underground ventilation equipment was moved, the underground program would always exist for that piece of equipment, as opposed to transferring the program from one controller to another. The work presented in this paper allowed the automation team at Totten mine to significantly improve the time and cost to install monitoring and control hardware without compromising any of the previously available capabilities and features. In addition, more features became available in terms of the diagnostics capability of the system when required for trouble shooting. Ongoing work is quantifying the initial cost of installing the current system and the savings that have been achieved to-date. Additionally Totten mine has tracked the energy savings obtained through the implementation of the ventilation controlled system to estimate the pay back for future application at other Vale sites.

Design Benefits. Teo Puay Yong Pepperl+Fuchs. On Behalf of FF Marketing Society. The Future is Digital. 1 The Future is Digital

Design Benefits. Teo Puay Yong Pepperl+Fuchs. On Behalf of FF Marketing Society. The Future is Digital. 1 The Future is Digital Design Benefits The Future is Digital Teo Puay Yong Pepperl+Fuchs On Behalf of FF Marketing Society 1 The Future is Digital Design Benefits from Applying Foundation Fieldbus Bus structure and Wiring Loop

More information

MaestroLink Basic. AirScout airflow meters into any network switch and allow MaestroLink to scan the network and self-populate the equipment.

MaestroLink Basic. AirScout airflow meters into any network switch and allow MaestroLink to scan the network and self-populate the equipment. MaestroLink Basic MaestroLink Basic allows a visual interface to Maestro's Air Quality Stations right on the ventilation team's desktop. Simply plug in Maestro Vigilante AQS air quality stations or No

More information

Features and Benefits of XeteX Controls. Other Unit Control Functions. Energy Recovery Functions

Features and Benefits of XeteX Controls. Other Unit Control Functions. Energy Recovery Functions Controls Guide for XeteX Units Beyond meeting the typical specification and performance requirements, controlling the equipment is usually the most important success factor for HVAC projects. XeteX provides

More information

Description: IRB-540 Robot with 6-axis Flexi-Wrist Manipulator, S4P Controller, Conveyor Tracking, and Analog Paint Regulation (APR)

Description: IRB-540 Robot with 6-axis Flexi-Wrist Manipulator, S4P Controller, Conveyor Tracking, and Analog Paint Regulation (APR) Standard Module # Description: IRB-540 Robot with 6-axis Flexi-Wrist Manipulator, S4P Controller, Conveyor Tracking, and Analog Paint Regulation (APR) The IRB-540 Flexi-Wrist finishing robot is specifically

More information

Power Xpert C445 Competitive Comparison

Power Xpert C445 Competitive Comparison Power Xpert C445 Competitive Comparison CPCD Product Line April 2015 Benefit over all competitors Advanced monitoring / control algorithms Motor efficiency, peak demand alarming, motor torque Eaton C445

More information

Data Center Optimized Controls

Data Center Optimized Controls Data Center Optimized Controls Controls Agenda 30 min. Emerson Control Products icom (Dynamic Thermal Optimization) 20 min. Station Rotation Station 1: Controller Challenge Station 2: Wireless Demo 5 min.

More information

Deaerator and Surge Tank Control

Deaerator and Surge Tank Control July 6, 2018 Deaerator and Surge Tank Control Product Description The deaerator (DA), surge tank (ST), and condensate tank shall have a control system equal to a series TS control system. The system shall

More information

General. Remote I/O A4/1.

General. Remote I/O A4/1. www.stahl.de > Intrinsically safe Ex ia IIC, Ex e, Ex na or Ex nl inputs and outputs > Fieldbus communication: Modbus RTU, Profibus DP V0 and DP V1 HART, Industrial Ethernet, Modbus TCP, EtherNet/IP, PROFINET

More information

F02 SERIES ELECTRIC ACTUATORS

F02 SERIES ELECTRIC ACTUATORS F02 SERIES ELECTRIC ACTUATORS F02 Series Overview A WORLD OF EXPERIENCE Biffi has been a leading manufacturer of valve actuators for more than 50 years. As one of the few manufacturers with a global presence,

More information

30 top tips to tackle HVAC challenges No.15 - BACnet

30 top tips to tackle HVAC challenges No.15 - BACnet ABB DRIVES AND MOTORS 30 top tips to tackle HVAC challenges - BACnet 1 Not all drives feature BACnet BACnet is a data communication protocol mainly used in the building automation and HVAC industry (heating,

More information

and Emerging Instrument Technologies

and Emerging Instrument Technologies FLUOR and Emerging Instrument Technologies SmartPlant Implementation Team By John Dressel The Challenge of Emerging Technologies New and emerging technologies bring new challenges to the Instrumentation

More information

Siemens tiastar TM Motor Control Center (MCC)

Siemens tiastar TM Motor Control Center (MCC) Siemens tiastar TM Motor Control Center (MCC) Page 1 Siemens 2011. All rights reserved. tiastar Motor Control Centers Smart tiastar Motor Control Centers Smart June 2013 Page 2 tiastar Motor Control Centers

More information

SmartWire-DT In panel and on machine wiring solutions. Revolutionizing in-panel control wiring and on-machine connection of sensors and actuators

SmartWire-DT In panel and on machine wiring solutions. Revolutionizing in-panel control wiring and on-machine connection of sensors and actuators SmartWire-DT In panel and on machine wiring solutions Revolutionizing in-panel control wiring and on-machine connection of sensors and actuators SmartWire-DT Changing the way panels... Reduce cost throughout

More information

Small Scale PA. Presented by: James Powell, P.Eng. Restricted Siemens AG 20XX All rights reserved.

Small Scale PA. Presented by: James Powell, P.Eng. Restricted Siemens AG 20XX All rights reserved. Small Scale PA Presented by: James Powell, P.Eng. siemens.com/answers Agenda What has changed? The application The HART solution The problem with HART/ why PA The PA solutions How do the economics work

More information

Distributed Control Systems in New Nuclear Power Plants

Distributed Control Systems in New Nuclear Power Plants IYNC 2008 Interlaken, Switzerland, 20 26 September 2008 Paper No. 235 ABSTRACT Distributed Control Systems in New Nuclear Power Plants Author Joseph Doerfler Westinghouse Electric Company 4350 Northern

More information

Benefits, offering and references

Benefits, offering and references DOC ID: 9AKK107045A9180 DISTRIBUTION SOLUTIONS Digital medium-voltage switchgear Benefits, offering and references Contents Digital switchgear for medium-voltage applications Digital switchgear definition

More information

CHORE-TRONICS 3 Whole House Controller

CHORE-TRONICS 3 Whole House Controller CHORE-TRONICS 3 Whole House Controller Featuring easy-to-navigate touch screen and color display with instant graphing SM Chore-Time s Controls and Software Provide Better and More Convenient House Management

More information

SCADA Software. 3.1 SCADA communication architectures SCADA system

SCADA Software. 3.1 SCADA communication architectures SCADA system 3 SCADA Software 3.1 SCADA communication architectures 3.1.1 SCADA system A supervisory control and data acquisition (SCADA) system means a system consisting of a number of remote terminal units (RTUs)

More information

For normal duty, design the VFD voltage level at 480 Volt, 3 Phase, 60 Hertz. (In Canada, 600 Volt, 3 Phase, 60 Hertz.)

For normal duty, design the VFD voltage level at 480 Volt, 3 Phase, 60 Hertz. (In Canada, 600 Volt, 3 Phase, 60 Hertz.) Introduction The Variable Frequency Drive Design Guidelines provides design criteria and specifications used in the procurement and application of variable frequency drives (VFDs). Table of Contents 1.

More information

Madrid, 25 y 26 de mayo de 2015 ABB Automation Days Wireless Instrumentation

Madrid, 25 y 26 de mayo de 2015 ABB Automation Days Wireless Instrumentation Madrid, 25 y 26 de mayo de 2015 ABB Automation Days Wireless Instrumentation Discovering the Unknown Rising demand for monitoring of process values by Increasing efficiency, reducing waste (raw materials,

More information

WIRELESS REMOTE ASSET MONITORING & CONTROL

WIRELESS REMOTE ASSET MONITORING & CONTROL WIRELESS REMOTE ASSET MONITORING & CONTROL www.signal-fire.com info@signal-fire.com 978.212.2868 SIGNALFIRE TOOL KIT Free, easy to use PC configuration and diagnostics software. Supports wireless configuration

More information

survey, 71% of respondents listed Improving capacity planning as a top driver for buying DCIM 1.

survey, 71% of respondents listed Improving capacity planning as a top driver for buying DCIM 1. :: In a recent Uptime Institute survey, 71% of respondents listed Improving capacity planning as a top driver for buying DCIM 1. 2 Maintain Assess Control ROI Monitor Optimize The Need for a Better Approach

More information

At Miele, Beckhoff bus terminals represent the corner points of remote automation

At Miele, Beckhoff bus terminals represent the corner points of remote automation A P P L I C A T I O N R E P O R T 04/98 Electronic bus terminals in the assembly lines of washing machines and driers At Miele, Beckhoff bus terminals represent the corner points of remote automation Miele

More information

Practical Programmable Logic Controllers (PLCs) for Automation and Process Control. Contents

Practical Programmable Logic Controllers (PLCs) for Automation and Process Control. Contents Practical Programmable Logic Controllers (PLCs) for Automation and Process Control Contents 1 Introduction to the PLC 1 1.1 Introduction 1 1.2 Basic Block Diagram of the PLC 2 1.3 Size of the PLC System

More information

Sustain.Ability Honeywell Users Group EMEA. Adriano Canale How Universal I/O Can Help Save Design Cost and Project Execution Time

Sustain.Ability Honeywell Users Group EMEA. Adriano Canale How Universal I/O Can Help Save Design Cost and Project Execution Time Sustain.Ability. 2012 Honeywell Users Group EMEA Adriano Canale How Universal I/O Can Help Save Design Cost and Project Execution Time Customer Needs Challenges: - Project becoming increasingly complex

More information

Lowering Lifecycle Costs

Lowering Lifecycle Costs Lowering Lifecycle Costs with Intelligent Motor Control Centers Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Presented and Authored by Jeff M. Miller, PE, ENV

More information

AUMA 50 YEARS OF ELECTIC ACTUATON

AUMA 50 YEARS OF ELECTIC ACTUATON AUMA 50 YEARS OF ELECTIC ACTUATON Motor controls and remote communication Werner Laengin, AUMA Germany ONCE UPON A TIME. 2 THE HISTORY OF COMMUNICATION All these communication protocols are now standardised

More information

Communicative controller for VAV systems

Communicative controller for VAV systems FCR015 Communicative controller for VAV systems Summary FCR015 is a communicative controller for heating and cooling panels and a VAV (variable air volume) damper. It measures temperature and CO 2 concentration

More information

Product Family: Electro Mechanical Relays Number: AN-LC-008

Product Family: Electro Mechanical Relays Number: AN-LC-008 APPLICATION NOTE THIS INFORMATION PROVIDED BY AUTOMATIONDIRECT.COM TECHNICAL SUPPORT These documents are provided by our technical support department to assist others. We do not guarantee that the data

More information

4/8/ nd Annual OTCO WW Workshop W/WW Product Overview ACQ550. ABB Slide 1

4/8/ nd Annual OTCO WW Workshop W/WW Product Overview ACQ550. ABB Slide 1 4/8/2015 52 nd Annual OTCO WW Workshop W/WW Product Overview ACQ550 Slide 1 Drive Basics Why Use Adjustable Speed Drives? Reduced Energy Consumption Improved Process Control / Efficiency Increased Product

More information

Solve Compliance, Integration & Process Challenges Using Rich Data From Your Instrumentation

Solve Compliance, Integration & Process Challenges Using Rich Data From Your Instrumentation Solve Compliance, Integration & Process Challenges Using Rich Data From Your Instrumentation How Digital Mass Flow Controllers & Ethernet-Based Architectures Enhance Biotechnology Systems Solve compliance,

More information

Embedded systems extend automation

Embedded systems extend automation Embedded systems extend automation System 800xA incorporates numerous embedded applications Kai Hansen, Tomas Lindström, Lars Mårtensson, Hans Thilderkvist Users expect and demand more functionality from

More information

Simple Machines success stories Build together...

Simple Machines success stories Build together... The efficiency of Telemecanique branded solutions Used in combination, Telemecanique products provide quality solutions, meeting all your Automation & Control applications requirements. Simple Machines

More information

Revolutionizing control wiring

Revolutionizing control wiring SmartWire-DT Panel Wiring Solutions Revolutionizing control wiring 797-6925 Fax: (215) 221-1201 www.royalelectric.com SmartWire-DT Changing the way panels are wired. Reduce cost throughout the value chain.

More information

ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS

ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017 ELECTRICAL PLANT CONCEPT The electrical equipment, depending

More information

Dräger REGARD 7000 Control System

Dräger REGARD 7000 Control System Dräger REGARD 7000 Control System When you need to monitor and analyze a number of various gases and vapors, the Dräger REGARD 7000 is a modular and highly expandable analysis tool. Suitable for gas warning

More information

Simplified Digital Connectivity using MODBUS TCP/IP for iseries Instruments. MODBUS Master Device (PLC, PC, Data logger, etc)

Simplified Digital Connectivity using MODBUS TCP/IP for iseries Instruments. MODBUS Master Device (PLC, PC, Data logger, etc) Simplified Digital Connectivity using MODBUS TCP/IP for iseries Instruments August 20, 2009 The Thermo Scientific line of iseries instruments has advanced communication features that can be utilized with

More information

SmartWire-DT In-panel and on-machine wiring solutions. Revolutionizing in-panel control wiring and on-machine connection of sensors and actuators

SmartWire-DT In-panel and on-machine wiring solutions. Revolutionizing in-panel control wiring and on-machine connection of sensors and actuators In-panel and on-machine wiring solutions Revolutionizing in-panel control wiring and on-machine connection of sensors and actuators Changing the way panels... Reduce cost throughout the value chain. T

More information

Building Energy Management Training Systems

Building Energy Management Training Systems Building Energy Management Training Systems 3466-00 LabVolt Series Datasheet Festo Didactic en 120 V - 60 Hz 03/2019 Table of Contents General Description 2 Courseware 2 Topic Coverage 2 List of Available

More information

The new generation of dedicated HVAC drives

The new generation of dedicated HVAC drives The new generation of dedicated HVAC drives Contents Selection guides p. 8 Presentation p. 14 References p. 18 Bus and communication networks p. 26 Motor starters p. 28 Altivar 212 Orientated towards performance,

More information

at Machine Level in Industrial Automation

at Machine Level in Industrial Automation ETSI #67 - The Wireless Factory 13 June 2008 Wireless at Machine Level in Industrial Automation Bruno FORGUE EMEA Marketing Manager The Wireless Factory Wireless at Machine Level Introduction Typical factory

More information

Retro-Commissioning Report

Retro-Commissioning Report 10 Retro-Commissioning Report Retro-Commissioning Retro-Commissioning is the process for identifying intrinsic operational and energy related issues in the facilities DDC system and providing a mechanism

More information

24/48V Battery Bank Ah High Cycling Long Life

24/48V Battery Bank Ah High Cycling Long Life Outdoor Power Cabinets, 48V DC Free Cooled with Combined Air-Con. PreFactory assembled with 19 inch Power sub rack, 2 or 4 battery Shelf s, 3U DCAC Panel combined with rectifiers 2U or 4U Power Module

More information

Aged Care Security Solutions. security.gallagher.com

Aged Care Security Solutions. security.gallagher.com Aged Care Security Solutions security.gallagher.com Aged care security solutions The safety of residents and staff is the most important thing. Our objective at Gallagher is to create innovative solutions

More information

Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs. ISA/Honeywell Webinar 10 November 2016

Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs. ISA/Honeywell Webinar 10 November 2016 Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs ISA/Honeywell Webinar 10 November 2016 2 Before we begin: Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs Listen

More information

GE Energy. Bently Nevada * Essential Insight.mesh * Wireless Condition Monitoring

GE Energy. Bently Nevada * Essential Insight.mesh * Wireless Condition Monitoring GE Energy Bently Nevada * Essential Insight.mesh * Wireless Condition Monitoring Increasing Reliability in Plants Today No matter where an asset sits in the plant, the need to understand its health has

More information

Project Execution Best Practices

Project Execution Best Practices Project Execution Best Practices Tips & Tricks based on lessons learnt 1 Successful Implementation & Improved Operation Temporary vs. Permanent Communication Ad-hoc Communication: Handheld field communicators

More information

Front End Engineering and Design (FEED)

Front End Engineering and Design (FEED) Front End Engineering and Design (FEED) Freedom to Choose. Power to Integrate. Yeo Hwee Khoen Honeywell On behalf of Fieldbus Foundation 1 Freedom to Choose. Power to Integrate. FEED Benefits Applying

More information

Uniform parameterisation, operation, and monitoring of intelligent switchboards

Uniform parameterisation, operation, and monitoring of intelligent switchboards Uniform parameterisation, operation, and monitoring of intelligent switchboards SIVACON S8 diagnostics station Consistently well informed: Recording of device status and energy values To increase operational

More information

Profibus and Modbus: a comparison

Profibus and Modbus: a comparison James Powell, P. Eng. Profibus and Modbus: a comparison We live in a multi-protocol world and this will likely not change anytime soon. Different protocols work better in different applications. I have

More information

Chilled Water Computer Room Air Handler (CRAH) Critical Infrastructure for the World s Leading Data Centers

Chilled Water Computer Room Air Handler (CRAH) Critical Infrastructure for the World s Leading Data Centers Chilled Water Computer Room Air Handler (CRAH) Critical Infrastructure for the World s Leading Data Centers DATA CENTER COOLING EXPERTISE Data Center managers have unique needs. Nortek Air Solutions listens

More information

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management Name Doug Demian Title Application Engineer Date November 7 & 8, 2012 Rev 5058-CO900C Copyright 2012 Rockwell

More information

August 2017 Welcome Design Topic Product Focus

August 2017 Welcome Design Topic Product Focus EngineeringAdvantage Newsletter August 2017 In This Issue: Welcome Design Topic Smart Buildings Product Focus Siemens Total Room Automation Welcome to Siemens EngineeringAdvantage Newsletter We hope you

More information

IQ-MP Gateway. Version apr Electrocom Rødeledsvej 95 DK-5700 Svendborg Denmark Tel :

IQ-MP Gateway. Version apr Electrocom Rødeledsvej 95 DK-5700 Svendborg Denmark Tel : IQ-MP Gateway Version 4.009 28. apr. 2011 Electrocom Rødeledsvej 95 DK-5700 Svendborg Denmark Tel : +45 8880 7580 www.electrocom.dk p. 2 Description The IQ-MP Gateway is a communications module, which

More information

SE7600E Series Application Guide

SE7600E Series Application Guide SE7600E Series Application Guide Schneider Electric SE7600E Series RTU Controller with IAQ Control Application Guide CONTENTS Solution Overview 2 Product Overview 3 Features & Benefits 3 System Overview

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

The Design and Development of the Precision Planter Sowing Depth Control System

The Design and Development of the Precision Planter Sowing Depth Control System Sensors & Transducers 2014 by IFSA Publishing, S. L. http://www.sensorsportal.com The Design and Development of the Precision Planter Sowing Depth Control System 1 Liping WEN, 2 Xiongfei FAN, 1 Zhao LIU,

More information

Accord Builder. User Guide

Accord Builder. User Guide User Guide Document: V 3.6 User Guide R01 V3.6 User Guide R01 Page 1 of 110 Table of Contents 1 Introduction... 7 2 General Summary and Definitions... 8 2.1 Accord Platform and Plant... 8 2.2 PLC Control

More information

Design and delivery of a Control System for an Aluminum Smelter. Skúli Björn Jónsson

Design and delivery of a Control System for an Aluminum Smelter. Skúli Björn Jónsson Design and delivery of a Control System for an Aluminum Smelter. Skúli Björn Jónsson Our experience Aluminum industry Building Management Systems Pharmaceuticals Food and Beverage Oil & Gas Today's Topics

More information

CONTROLS. Quantum HD. Heavy Duty Performance In High Definition

CONTROLS. Quantum HD. Heavy Duty Performance In High Definition CONTROLS Quantum HD Heavy Duty Performance In High Definition CONTROLS Quantum HD Industrial Refrigeration Controller Quantum HD with Unity Architecture Quantum HD control panels make equipment management

More information

Transformative Wave Technologies Kent, Washington

Transformative Wave Technologies Kent, Washington Transformative Wave Technologies Kent, Washington www.transformativewave.com manufacturers of the North America s Leading Energy Efficiency Solution for Constant Volume HVAC Systems The CATALYST converts

More information

INTRODUCING THE S V ADJUSTABLE SPEED DRIVE

INTRODUCING THE S V ADJUSTABLE SPEED DRIVE MOTORS & DRIVES ADJUSTABLE SPEED DRIVES (ASD) GROUP INTRODUCING THE S15 600 V ADJUSTABLE SPEED DRIVE Extreme Performance Micro-Drive - Heavy Duty, Compact, and Durable ASD SUPPORT NEWS: Toshiba s heavy

More information

Innovative features and solutions for SIVACON S8 siemens.com/sivacon-s8

Innovative features and solutions for SIVACON S8 siemens.com/sivacon-s8 SIVACON S8 plus Innovative features and solutions for SIVACON S8 siemens.com/sivacon-s8 Innovations at your command SIVACON S8 plus Profit from exciting features SIVACON S8 plus is ready for the challenges

More information

PROFIBUS PA Fault-Finding and Maintenance Tools

PROFIBUS PA Fault-Finding and Maintenance Tools PROFIBUS PA Fault-Finding and Maintenance Tools Andy Verwer Verwer Training & Consultancy Ltd Steve Dickenson Pepperl+Fuchs UK PROFIBUS PROFIBUS is a very reliable and cost effective technology. It is

More information

The SCADA Connection: Moving Beyond Auto Dialers

The SCADA Connection: Moving Beyond Auto Dialers WHITE PAPER The SCADA Connection: Moving Beyond Auto Dialers ABSTRACT: Auto dialers have long been used to report alarms in SCADA installations. While they are useful for notifying users of alarm states,

More information

Your choice for wall and panel mounted AC drives. Emotron FDU & VFX IP20/21 up to 132 kw

Your choice for wall and panel mounted AC drives. Emotron FDU & VFX IP20/21 up to 132 kw Your choice for wall and panel mounted AC drives Emotron FDU & VFX IP20/21 up to 132 kw Globally well proven The IP20/21 versions of the globally well proven Emotron FDU and Emotron VFX AC drives are optimized

More information

18.0 CONTROLS PLATFORM AND AUTOMATION

18.0 CONTROLS PLATFORM AND AUTOMATION SEWPCC Upgrading/Expansion Conceptual Design Report SECTION 18 - Table of Contents 18.0 CONTROLS PLATFORM AND AUTOMATION...18.1 18.1 INTRODUCTION...18.1 18.2 SYSTEM INFORMATION...18.1 18.3 FUNCTIONAL REQUIREMENTS

More information

WHAT YOU NEED TO KNOW ABOUT SCR POWER CONTROLLERS FUNCTIONS, FEATURES, AND EFFICIENCIES

WHAT YOU NEED TO KNOW ABOUT SCR POWER CONTROLLERS FUNCTIONS, FEATURES, AND EFFICIENCIES WHAT YOU NEED TO KNOW ABOUT SCR POWER CONTROLLERS FUNCTIONS, FEATURES, AND EFFICIENCIES ABSTRACT Temperature regulation is required in nearly every manufacturing process, typically for the purposes of

More information

Industry must meet strict Government air

Industry must meet strict Government air BESTECH s remote control weather balloon launcher. Industry must meet strict Government air emission regulations while maximizing its productivity and profitability. The road to environmental and economic

More information

Fernando Tani, ABB Brazil, Jornadas Técnicas ABB en Chile Electrical integration with IEC61850 Benefits for the mining industry

Fernando Tani, ABB Brazil, Jornadas Técnicas ABB en Chile Electrical integration with IEC61850 Benefits for the mining industry Fernando Tani, ABB Brazil, Jornadas Técnicas ABB en Chile 2015 Electrical integration with IEC61850 Benefits for the mining industry Global trends & challenges Mining Industry CAPEX OPEX Energy supply

More information

21 st Century Landfill Technology: Telemetry, Automation, and Alternative Power Sources

21 st Century Landfill Technology: Telemetry, Automation, and Alternative Power Sources 21 st Century Landfill Technology: Telemetry, Automation, and Alternative Power Sources Automation Automation provides for the starting and stopping of the operating system without the need of additional

More information

Programmable logic controllers : industrial control / Khaled Kamel, Eman Kamel. New York [etc.], cop Spis treści

Programmable logic controllers : industrial control / Khaled Kamel, Eman Kamel. New York [etc.], cop Spis treści Programmable logic controllers : industrial control / Khaled Kamel, Eman Kamel. New York [etc.], cop. 2014 Spis treści Preface ix 1 Introduction to PLC Control Systems and Automation 1 1.1 Control System

More information

SMARTER. 2 VENTACITY MAKES BUILDINGS ABOUT HVAC2

SMARTER. 2 VENTACITY MAKES BUILDINGS ABOUT HVAC2 2 VENTACITY MAKES BUILDINGS SMARTER. Smarter Building Cloud Services Offers: Portfolio of Buildings ALWAYS HEALTHY. ALWAYS EFFICIENT Online Dashboard LTE ALWAYS HEALTHY. ALWAYS EFFICIENT Smarter Building

More information

Ring Instrumentation and Controls

Ring Instrumentation and Controls Chapter 14 Ring Instrumentation and Controls This chapter describes the technical design of the g-2 cryogenic and vacuum control system and other process systems supporting the experiment. This control

More information

Communication Interface

Communication Interface Communication Interface Com'X 200 Technical data sheet Communications Functions and characteristics PB112041 Ethernet GPRS data logger function The collects and stores wages consumptions (Water, Air, Gas,

More information

Designing a new IEC substation architecture

Designing a new IEC substation architecture Designing a new IEC 61850 substation architecture Gerrit Dogger Senior Product and Application Specialist Cooper Power Systems gerrit.dogger@cybectec.com Garry Tennese Station Integration Specialist Manitoba

More information

Premium Integration How easy integration can be

Premium Integration How easy integration can be Products Solutions Services Premium Integration How easy integration can be Slide 1 Subject How easy integration can be Would it not be nice to have your devices connected to a digital bus (e.g. EtherNet/IP)

More information

Exercise 5-1. Electrical Circuit and Panel EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Detailed electrical schematic

Exercise 5-1. Electrical Circuit and Panel EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Detailed electrical schematic Exercise 5-1 Electrical Circuit and Panel EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with the trainer electrical schematic and components. DISCUSSION OUTLINE The Discussion

More information

Automation solutions Drives, PLC, motion, motors and safety

Automation solutions Drives, PLC, motion, motors and safety Automation solutions Drives, PLC, motion, motors and safety Motion control solutions Scalable software solutions IEC61131-3 programming environment PLCopen motion library Scalable controller family Scada

More information

SCC Inc. TS Series. Technical Instructions. Document No. TS-4000 March 10, TS-CE Combustion Enclosures with LMV5.

SCC Inc. TS Series. Technical Instructions. Document No. TS-4000 March 10, TS-CE Combustion Enclosures with LMV5. TS-CE Combustion Enclosures with LMV5 March 10, 2017 Description TS-CE series combustion enclosure with Siemens LMV5 linkageless controller sets the standard for combustion control and monitoring technologies.

More information

-----other notes This picture was taken from here:

-----other notes This picture was taken from here: This is an introduction to programmable logic controllers - PLCs for short. Here is a picture of a simple one. A programmable logic controller is unit of hardware used to control and automate an industrial

More information

A Guide to the Automation Body of Knowledge

A Guide to the Automation Body of Knowledge A Guide to the Automation Body of Knowledge 2nd Edition Vernon L. Trevathan, Editor Table of Contents Preface, xv Basic Continuous Control, 1 1 Process Instrumentation, 3 1.1 Introduction, 3 1.2 Pressure,

More information

THE NEXT GENERATION TUNNEL CONTROLLER FROM KESSELTRONICS

THE NEXT GENERATION TUNNEL CONTROLLER FROM KESSELTRONICS THE NEXT GENERATION TUNNEL CONTROLLER FROM KESSELTRONICS THE NEXT GENERATION TUNNEL CONTROLLER FROM KESSELTRONICS REMOTE ACCESS Remote Tunnel Controller offers you the flexibility to manage your site from

More information

CombustionMaster Control Solutions. Unique Combustion Control for Gas and/or Oil-Fired Boilers

CombustionMaster Control Solutions. Unique Combustion Control for Gas and/or Oil-Fired Boilers CombustionMaster Control Solutions Unique Combustion Control for Gas and/or Oil-Fired Boilers Unique Combustion Control Solution for Gas and/or Oil-Fired Boilers The CombustionMaster system from Rockwell

More information

CitectSCADA Delivers Lower Operations and Maintenance Costs, Increased Mobility of Personnel and Access to Real-time Information to Moranbah

CitectSCADA Delivers Lower Operations and Maintenance Costs, Increased Mobility of Personnel and Access to Real-time Information to Moranbah Shell Coal Mining CitectSCADA Delivers Lower Operations and Maintenance Costs, Increased Mobility of Personnel and Access to Real-time Information to Moranbah Moranbah North underground coal mine is situated

More information

FLOTTWEG TOUCH CONTROL Intelligent Automation for Your Decanter

FLOTTWEG TOUCH CONTROL Intelligent Automation for Your Decanter FLOTTWEG TOUCH CONTROL Intelligent Automation for Your Decanter FLOTTWEG TOUCH CONTROL Everything Under Control Monitoring the individual functions of your centrifuge (e.g. adjusting the differential speed)

More information

Lukasz Zwalinski PH/DT

Lukasz Zwalinski PH/DT Chiller control system 11.08.2011 Lukasz Zwalinski PH/DT Project requirements General requirements: Ensure stable long, safe and automatic operation without presence of the operators Provide safe shut-down

More information

Master Panel. Specifications. Document No. TS-2010 February 15, Product Description. Sample Specification

Master Panel. Specifications. Document No. TS-2010 February 15, Product Description. Sample Specification SCC Inc. Master Panel Product Description February 15, 2017 The Master Panel shall provide lead/lag control and time based, automatic rotation of up to eight (8) boilers, when used in conjunction with

More information

ASHNuN. Fundamentals of HVAC Control Systems. Robert McDowell and Ross Montgomery are the authors of the

ASHNuN. Fundamentals of HVAC Control Systems. Robert McDowell and Ross Montgomery are the authors of the Fundamentals of HVAC Control Systems Robert McDowell and Ross Montgomery are the authors of the 2009 edition of Fundamentals of HVAC Control Systems. This book is a revision of an earlier edition authored

More information

Easy and efficient asset management for your business

Easy and efficient asset management for your business Easy and efficient asset management for your business PERFORMANCE MADE SMARTER Featuring Monitoring of process values Diagnostics Device programming Simulation of process values TEMPERATURE I.S. INTERFACES

More information

AIAS. Technical description

AIAS. Technical description Fans Air Handling Units Air Distribution Products Fire Safety Air Curtains AIAS - and Efficient Heating Demand Products Controlled Tunnel Ventilation Fans 1 / 4 AIAS Technical description 2 / 9 AIAS -

More information

ENGINEERED SOLUTIONS. Solutions for Any Application. us.mitsubishielectric.com/fa/en/

ENGINEERED SOLUTIONS. Solutions for Any Application. us.mitsubishielectric.com/fa/en/ ENGINEERED SOLUTIONS Solutions for Any Application us.mitsubishielectric.com/fa/en/ Engineered Solutions for Any Application Manufactured to the highest standards in UL approved facilities, the Engineered

More information

InstrumentationTools.com

InstrumentationTools.com Author: Instrumentation Tools Categories: PLC Tutorials PLC Ladder Logic : Contacts and coils The most elementary objects in Ladder Diagram programming are contacts and coils, intended to mimic the contacts

More information

SCC Inc. TS-D Series. Technical Instructions. Document No. TS-3000 March 10, Deaerator, Surge and/or Condensate Control Panel.

SCC Inc. TS-D Series. Technical Instructions. Document No. TS-3000 March 10, Deaerator, Surge and/or Condensate Control Panel. Deaerator, Surge and/or Condensate Control Panel March 10, 2017 Description A TS-D series control system manages lead/lag operation of an individual deaerator (DA), surge, condensate, or a combination

More information

Herculine Electric Actuator Solutions

Herculine Electric Actuator Solutions Herculine Electric Actuator Solutions ENGINEERED FOR EXCEPTIONAL RELIABILITY, ACCURATE POSITIONING AND LOW MAINTENANCE Herculine Electric Actuator Solutions for Dampers and Valves Electric Actuators HercuLine

More information

One. SAEL s.r.l. Burgo Toscolano

One. SAEL s.r.l. Burgo Toscolano SAEL s.r.l. One week of fault at the Toscolano Jagenberg sheeter was enough to push for a deep revamping of the electrical drive machine. The stop was caused by a fault of the existing drives equipment

More information

Gallagher Vapour Recovery Monitoring

Gallagher Vapour Recovery Monitoring Gallagher Vapour Recovery Monitoring Local VR Site Monitoring THE STATUS DISPLAY ENABLES SITE OPERATORS TO COMPLY WITH VR LEGISLATION. THE LAWS AND GUIDELINES FOR THE NEW SOUTH WALES VAPOUR RECOVERY REGULATIONS

More information

Breaking the Limits of Analog Technology. Key attributes of the technology that makes FOUNDATION fieldbus suitable for process control

Breaking the Limits of Analog Technology. Key attributes of the technology that makes FOUNDATION fieldbus suitable for process control Breaking the Limits of Analog Technology Key attributes of the technology that makes FOUNDATION fieldbus suitable for process control FOUNDATION Fieldbus Started with a Few Simple Ideas: Reduce cabling

More information

Technologic 502 Variable Speed Pump Controller

Technologic 502 Variable Speed Pump Controller Qualify for Green Building Incentive Programs and Rebates Achieve LEED Certification Sustainable Water Conservation and Energy Efficiency Reduced Environmental Impact Lower Electric and Water Utility Costs

More information

Electrical Integration with Smart Communication

Electrical Integration with Smart Communication Electrical Integration with Smart Communication New possibilities with Industrial Ethernet ABB Group September 24, 2009 Slide 1 Unified Integration Approach MES and Business Systems Knowledge Portals as

More information