Installation Manual SMA CLUSTER CONTROLLER

Size: px
Start display at page:

Download "Installation Manual SMA CLUSTER CONTROLLER"

Transcription

1 SUNNY BOY Installation Manual SMA CLUSTER CONTROLLER ENGLISH ClusterController-US-IA-en-16 Version 1.6

2 Legal Provisions SMA Solar Technology America LLC Legal Provisions No part of this document may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means, be it electronic, mechanical, photographic, magnetic or otherwise, without the prior written permission of SMA Solar Technology America LLC. Neither SMA Solar Technology America LLC nor SMA Solar Technology Canada Inc. makes representations, express or implied, with respect to this documentation or any of the equipment and/or software it may describe, including (with no limitation) any implied warranties of utility, merchantability, or fitness for any particular purpose. All such warranties are expressly disclaimed. Neither SMA Solar Technology America LLC nor its distributors or dealers nor SMA Solar Technology Canada Inc. nor its distributors or dealers shall be liable for any indirect, incidental, or consequential damages under any circumstances. (The exclusion of implied warranties may not apply in all cases under some statutes, and thus the above exclusion may not apply.) Specifications are subject to change without notice. Every attempt has been made to make this document complete, accurate and up-to-date. Readers are cautioned, however, that product improvements and field usage experience may cause SMA Solar Technology America LLC and/or SMA Solar Technology Canada Inc. to make changes to these specifications without advance notice, or per contract provisions in those cases where a supply agreement requires advance notice. SMA shall not be responsible for any damages, including indirect, incidental or consequential damages, caused by reliance on the material presented, including, but not limited to, omissions, typographical errors, arithmetical errors or listing errors in the content material. Software licenses The licenses for the software modules used with this product can be found on the supplied CD. Trademarks All trademarks are recognized, even if not explicitly identified as such. Missing designations do not mean that a product or brand is not a registered trademark. The BLUETOOTH word mark and logos are registered trademarks of Bluetooth SIG, Inc. and any use of such marks by SMA Solar Technology AG is under license. Modbus is a registered trademark of Schneider Electric and is licensed by the Modbus Organization, Inc. QR Code is a registered trademark of DENSO WAVE INCORPORATED. Phillips and Pozidriv are registered trademarks of Phillips Screw Company. Torx is a registered trademark of Acument Global Technologies, Inc. 2 ClusterController-US-IA-en-16 Installation Manual

3 SMA Solar Technology America LLC Legal Provisions SMA Solar Technology America LLC 6020 West Oaks Blvd. Suite 300 Rocklin, CA U.S.A. SMA Solar Technology Canada Inc Matheson Blvd. E 7th Floor Mississauga, ON L4W 5K4 Canada Status: 4/25/2017 Copyright 2017 SMA Solar Technology America LLC. All rights reserved. Installation Manual ClusterController-US-IA-en-16 3

4 Important Safety Instructions SMA Solar Technology America LLC Important Safety Instructions SAVE THESE INSTRUCTIONS This manual contains important instructions for the following products: SMA Cluster Controller This manual must be followed when using this product. The product is designed and tested in accordance with international safety requirements, but as with all electrical and electronic equipment, certain precautions must be observed when installing and/or operating the product. To reduce the risk of personal injury and to ensure the safe installation and operation of the product, you must carefully read and follow all instructions, cautions and warnings in this manual. Warnings in this Document A warning describes a hazard to equipment or personnel. It calls attention to a procedure or practice, which, if not correctly performed or adhered to, could result in damage to or destruction of part or all of the SMA equipment and/or other equipment connected to the SMA equipment or personal injury. Symbol Description DANGER indicates a hazardous situation which, if not avoided, will result in death or serious injury. WARNING indicates a hazardous situation which, if not avoided, could result in death or serious injury. CAUTION indicates a hazardous situation which, if not avoided, could result in minor or moderate injury. NOTICE is used to address practices not related to personal injury. 4 ClusterController-US-IA-en-16 Installation Manual

5 SMA Solar Technology America LLC General Warnings General Warnings All electrical installations must be carried out in accordance with the local electrical standards and the National Electrical Code ANSI/NFPA 70 or the Canadian Electrical Code CSA C22.1. This document does not replace and is not intended to replace any local, state, provincial, federal or national laws, regulations or codes applicable to the installation and use of the product, including without limitation applicable electrical safety codes. All installations must conform with the laws, regulations, codes and standards applicable in the jurisdiction of installation. SMA assumes no responsibility for the compliance or non-compliance with such laws or codes in connection with the installation of the product. The product contains no user-serviceable parts. For all repair and maintenance, always return the unit to an authorized SMA Service Center. Before installing or using the product, read all of the instructions, cautions, and warnings in this manual. Wiring of the product must be made by qualified personnel only. Installation Manual ClusterController-US-IA-en-16 5

6 Table of Contents SMA Solar Technology America LLC Table of Contents 1 Information on this Document Validity Target Group Additional Information Symbols Typographies Nomenclature Safety Intended Use Safety Information Supported Products System Requirements Scope of Delivery Product Description Cluster Controller Type Label LEDs Display Keypad Mounting Requirements for Mounting Mounting the Cluster Controller Connection and Commissioning Overview of the Connection Area Functions of the Terminals and Pin Groups Cable Requirements Performing Pin Coding Preparing the Connection Cable Connecting the Cluster Controller to the Voltage Supply ClusterController-US-IA-en-16 Installation Manual

7 SMA Solar Technology America LLC Table of Contents 6.7 Checking and Setting the Cluster Controller System Time Connecting the Cluster Controller to a Speedwire Network Connecting the Cluster Controller to the LAN Connecting USB Data Carriers to the Cluster Controller Connecting Sensors to the Cluster Controller Connecting the Temperature Sensor Connecting an Irradiation Sensor Connecting Additional Sensors Connections for Grid Management Services Options for Implementing Grid Management Service Setpoints Digital Setpoint Signal Connection Options Connecting a Signal Source to a Digital Input for Active Power Limitation Connecting a Signal Source to a Digital Input for Reactive Power Setpoint Digital Signal Setpoint when Using Multiple Cluster Controllers Analog Setpoint Signal Connecting a Signal Source to an Analog Input for Active Power Limitation Connecting a Signal Source to an Analog Input for Reactive Power Setpoint Analog Setpoint Signal when Using Multiple Cluster Controllers Setpoint via Modbus Client Feedback of the Cluster Controller Feedback Options Connecting a Remote Terminal for Feedback via Digital Signal Connecting a Remote Terminal for Feedback via Analog Signal Feedback When Using Multiple Cluster Controllers Checking the Connections via the Display Configuring a Static LAN Setting Up a Modbus Data Connection Troubleshooting Installation Manual ClusterController-US-IA-en-16 7

8 Table of Contents SMA Solar Technology America LLC 7.1 LED States Operation LEDs Network Port LEDs Errors in the Cluster Controller or the Connected Devices Resetting the Cluster Controller Decommissioning Disassembling the Cluster Controller Packing the Product for Shipment Disposing of the Product Technical Data Accessories Compliance Information Contact ClusterController-US-IA-en-16 Installation Manual

9 SMA Solar Technology America LLC 1 Information on this Document 1 Information on this Document 1.1 Validity This document is valid for the SMA Cluster Controller (models "CLCON-10" and "CLCON-S-10") from hardware version A1 and from firmware version 1.03.xx.R. 1.2 Target Group The tasks described in this document must only be performed by qualified persons. Qualified persons must have the following skills: Training in the installation and configuration of IT systems Knowledge of how an inverter works and is operated Training in how to deal with the dangers and risks associated with installing and using electrical devices and installations Training in the installation and commissioning of electrical devices and installations Knowledge of the applicable standards and directives Knowledge of and compliance with this document and all safety information 1.3 Additional Information Links to additional information can be found at Document title "SMA SPEEDWIRE FIELDBUS" Document type Technical Information 1.4 Symbols Symbol Explanation Information that is important for a specific topic or goal, but is not safety-relevant Indicates a requirement for meeting a specific goal Desired result A problem that might occur Installation Manual ClusterController-US-IA-en-16 9

10 1 Information on this Document SMA Solar Technology America LLC 1.5 Typographies Typography Use Example bold Display texts Elements on a user interface Terminals Elements to be selected Elements to be entered > Connects several elements to be selected [Button] [Key] Button or key to be selected or pressed The value can be found in the field Energy. Select Settings. Enter 10 in the field Minutes. Select Settings > Date. Select [Next]. 1.6 Nomenclature Complete designation Large-scale PV power plant PV inverter SMA Cluster Controller SMA Energy Meter SMA Solar Technology AG SMA Solar Technology America LLC SMA Solar Technology Canada Inc. Designation in this document PV system Inverter Cluster Controller Energy Meter SMA 10 ClusterController-US-IA-en-16 Installation Manual

11 SMA Solar Technology America LLC 2 Safety 2 Safety 2.1 Intended Use The Cluster Controller is a device for monitoring and controlling SMA devices with Speedwire/ Webconnect interfaces in decentralized PV systems and large-scale PV power plants. The Cluster Controller model "CLCON-S-10" monitors up to 25 SMA devices with Speedwire/ Webconnect interface. The Cluster Controller model "CLCON-S-10" monitors up to 75 SMA devices with Speedwire/Webconnect interface. The Cluster Controller is an ITE class A device as per EN and is designed for industrial use. The product is designed for indoor use only. Use this product only in accordance with the information provided in the enclosed documentation and with the locally applicable standards and directives. Any other application may cause personal injury or property damage. Alterations to the product, e.g. changes or modifications, are only permitted with the express written permission of SMA. Unauthorized alterations will void guarantee and warranty claims and in most cases terminate the operating license. SMA shall not be held liable for any damage caused by such changes. Any use of the product other than that described in the Intended Use section does not qualify as the intended use. The enclosed documentation is an integral part of this product. Keep the documentation in a convenient place for future reference and observe all instructions contained therein. The type label must remain permanently attached to the product. 2.2 Safety Information This section contains safety information that must be observed at all times when working on or with the product. To prevent personal injury and property damage and to ensure long-term operation of the product, read this section carefully and observe all safety information at all times. Danger to life due to electric shock from touching an ungrounded product Touching an ungrounded product can cause a lethal electric shock. Ensure that the product is integrated in the existing overvoltage protection. Ground the enclosure of the product. Installation Manual ClusterController-US-IA-en-16 11

12 2 Safety SMA Solar Technology America LLC Danger to life due to electric shock Under fault conditions, when working on the power supply circuit there may be dangerous voltages present on the product. With permanently connected power supply units, ensure that there is a disconnection unit (e.g. circuit breaker) present outside of the power supply unit. With pluggable power supply units, ensure that the outlet for the power supply unit is close to the power supply unit. The disconnect unit and the outlet for the power supply unit must be freely accessible at all times. Damage to the product due to moisture The product is not splash-proof (IP20 (NEMA 1)). Moisture can penetrate the product and damage it. Only use the product in a dry, indoor environment. 2.3 Supported Products SMA Products Availability of SMA products in your country Not all SMA products are available in all countries. For information on whether an SMA product is available in your country, visit the website of your country's SMA subsidiary at or contact your distributor. The Cluster Controller can establish a connection to and display data on the following SMA products that are equipped with Speedwire communication: Inverters: All inverters with integrated or retrofitted Speedwire/Webconnect interface Information on whether an inverter has an integrated Speedwire/Webconnect interface or can be retrofitted with a Speedwire/Webconnect interface can be found on the inverter product page at 12 ClusterController-US-IA-en-16 Installation Manual

13 SMA Solar Technology America LLC 2 Safety Other products: SMA Com Gateway SMA Energy Meter SMA Fuel Save Controller SMA Grid Gate of device type "GRIDGATE-20" from firmware version 1.0 SMA Power Plant Controller Sunny Places Sunny Portal Products from other manufacturers Sensors: Irradiation sensors that can output a current signal in the range from 0 ma to 20 ma Temperature sensors with a Pt100 measuring shunt or a Pt1000 measuring shunt Other sensors that can output a current signal in the range from 0 ma to 20 ma or a voltage signal in the range from 10 V to +10 V Signal receivers and digital and analog signal sources: Signal sources with relay contacts Signal sources that provide digital output signals Signal sources that can output current signals in the range from 0 ma to 20 ma Signal sources that can output voltage signals in the range from 10 V to +10 V Signal receivers that can process current signals in the range from 0 ma to 20 ma Routers and network switches: Routers and network switches for Fast Ethernet with a data transfer rate of at least 100 Mbit/s All network components used must support the IGMP version 1 protocol (IGMPv1). Power supply units: In addition to the top-hat rail power supply unit offered as an accessory (see Section 10, page 88), the Cluster Controller supports power supply units with the following properties: Maximum output current including short circuit: 8 A Maximum output apparent power: 100 VA DC output voltage: 24 V Nominal current: minimum 1.8 A 2.4 System Requirements Supported web browsers: Microsoft Internet Explorer from version 8 Mozilla Firefox from version 3.6 Installation Manual ClusterController-US-IA-en-16 13

14 2 Safety SMA Solar Technology America LLC Recommended display resolution: Minimum 1,024 pixels x 768 pixels 14 ClusterController-US-IA-en-16 Installation Manual

15 SMA Solar Technology America LLC 3 Scope of Delivery 3 Scope of Delivery Check the scope of delivery for completeness and any externally visible damage. Contact your distributor if the scope of delivery is incomplete or damaged. Figure 1: Components included in the scope of delivery Position Quantity Designation A 1 Cluster Controller B 1 Three-pole plug C 1 Two-pole plug* D 2 Five-pole plug E 8 Six-pole plug** F 2 Eight-pole plug G 2 Coding element H 20 Cable tie with caption field I 8 Shield clamp with ring terminal lug K 1 Ring terminal lug L 1 Fastening screw M 2 Washer N 1 Tooth lock washer O 1 Split lock washer P 1 CD with product documentation Q 1 Quick reference guide for commissioning and supplementary sheet for noting down connected devices * Reserved for future applications. Keep the plug in a safe place. ** Two of the eight plugs are reserved for future applications. Keep the two plugs in a safe place. Installation Manual ClusterController-US-IA-en-16 15

16 4 Product Description SMA Solar Technology America LLC 4 Product Description 4.1 Cluster Controller The Cluster Controller is a device for monitoring and controlling SMA devices with Speedwire/ Webconnect interfaces in decentralized PV systems and large-scale PV power plants. The Cluster Controller model "CLCON-S-10" monitors up to 25 SMA devices with Speedwire/ Webconnect interface. The Cluster Controller model "CLCON-S-10" monitors up to 75 SMA devices with Speedwire/Webconnect interface. The Cluster Controller primarily performs the following tasks: Set-up of the Speedwire network Reading out, provision and administration of PV system data Configuring device parameters Feedback on current total active power of the system Implementation and feedback of grid operator setpoints for active power limitation and reactive power operation under grid management services Implementation and feedback of setpoints for active power limitation when PV electricity is directly marketed Sending alarms in the event of critical system statuses Sending the system data to an FTP server and/or the Sunny Portal Internet portal Performing updates for the Cluster Controller and the inverters Figure 2: Design of the Cluster Controller Position A B C D Designation LEDs Connection areas Keypad Display 16 ClusterController-US-IA-en-16 Installation Manual

17 SMA Solar Technology America LLC 4 Product Description Reading out, provision and administration of PV system data The Cluster Controller is the central communication unit for the system and continuously reads out the data of the devices in the system (e.g. inverters, sensors). The Cluster Controller then makes this system data available via the display, user interface and Modbus data interface. In addition, the PV system data can be displayed, evaluated and managed using Sunny Portal. Configuring device parameters You can configure specific parameters of individual devices or entire device classes via the user interface of the Cluster Controller. You must be logged into the user group Installer on the Cluster Controller. The device parameters that can be configured, if any, depend on the device and the rights of the user group. You may only change grid-sensitive device parameters (SMA Grid Guard parameters) with the approval of the grid operator and using your personal SMA Grid Guard code. Sending alarms in the event of critical system statuses You have the option of receiving prompt information on critical system statuses via . The Cluster Controller automatically sends a notification if alarm-related events occur in the system. Feedback on current total active power of the system You have the option of being informed of the total active power currently generated by the inverters that have been detected by the Cluster Controller via an analog current output signal. Implementation and feedback of grid operator setpoints for active power limitation and reactive power operation under grid management services With the Cluster Controller, as part of grid management services you can implement different grid operator setpoints for active power limitation and reactive power operation of your system. The Cluster Controller can implement the setpoints using open-loop control or closed-loop control. For Cluster Controller systems without self-consumption and with direct limitation of active power feed-in, the operating mode Open-loop control is used. In this operating mode, the Cluster Controller can receive the setpoints either in the form of digital or analog signals, or via Modbus. The different types of signal source can be combined so that, for example, the setpoints for the active power limitation are received as digital signals and the reactive power setpoints are received as analog signals: For Cluster Controller systems with self-consumption, the operating mode Closed-loop control is used. In this operating mode, you can regulate the active power fed in by the system at the grid-connection point and limit it e.g. to a fixed percentage value. In agreement with your grid operator, you can use the user interface of the Cluster Controller to configure which setpoints of the Cluster Controller are to be transmitted to the connected inverters depending on the respective signal. In addition, you can use a digital response contact or an analog current output signal to inform the grid operator of the setpoints (if any) for active power limitation and reactive power operation that are currently being used in the system. Installation Manual ClusterController-US-IA-en-16 17

18 4 Product Description SMA Solar Technology America LLC Implementation and feedback of setpoints for active power limitation when PV electricity is directly marketed The PV current generated by your system can be directly marketed. The Cluster Controller can receive setpoints for active power limitation from the direct marketer as digital or analog signals or via Modbus. The "CLCON-S-10" model provides a Modbus register for sending setpoints via Modbus. The model "CLCON-10" provides two Modbus registers. The Cluster Controller can provide feedback about the current feed-in power of the system to the direct marketer via digital or analog signals. To avoid conflicts when different setpoints are used by the grid operator and the direct marketer, the Cluster Controller always implements the setpoint that more strongly limits the active power of the system. Sending the system data to an FTP server and/or the Sunny Portal Internet portal The Cluster Controller can automatically send the system data that has been read out to an arbitrary FTP server and/or the Sunny Portal Internet portal via the Internet. The Cluster Controller establishes the connection to the FTP server and/or Sunny Portal e.g. via a router. 18 ClusterController-US-IA-en-16 Installation Manual

19 SMA Solar Technology America LLC 4 Product Description Performing updates for the Cluster Controller and the inverters You have the option of performing updates for the Cluster Controller and the inverters in the system. You can perform the updates automatically or manually. The update source can be the SMA Update Portal or a USB data carrier with update files downloaded from the Internet. Alternatively, you can also upload the update files directly from the computer via the user interface of the Cluster Controller. Figure 3: Decentralized large-scale PV power plant with Cluster Controller and implementation of grid operator setpoints via open-loop control (example) Position A B C D E F G H Designation Module temperature sensor PV system Outside temperature sensor Irradiation sensor Cluster Controller Sunny Portal Router Ripple control receiver or remote terminal unit Installation Manual ClusterController-US-IA-en-16 19

20 4 Product Description SMA Solar Technology America LLC Position I K L M Designation Grid station Control room Grid control room Utility grid Figure 4: Decentralized large-scale PV power plant with Cluster Controller and implementation of grid operator setpoints via closed-loop control (example) Position A B C D E Designation Module temperature sensor PV system Outside temperature sensor Irradiation sensor Cluster Controller 20 ClusterController-US-IA-en-16 Installation Manual

21 SMA Solar Technology America LLC 4 Product Description Position F G H I K L M N O Designation Industrial load Sunny Portal Router Ripple control receiver or remote terminal unit Energy meter Control room Grid control room Grid station Utility grid 4.2 Type Label The type label clearly identifies the product. The type label can be found on the back of the enclosure. You can read off the following data from the type label: Device type (Type) Serial Number Hardware version (Version) Model Device-specific characteristics You will require the information on the type label to use the product safely and when seeking customer support from Service (see Section 12 "Contact", page 90). Symbols on the Type Label Symbol Designation Explanation CAN ICES-3 (A)/ NMB-3(A) C-Tick IC marking Indoors The product complies with the requirements of the applicable Australian EMC standards. The product complies with the requirements of the applicable Canadian EMC standards. The product is only suitable for indoor installation. FCC designation The product complies with the requirements of the applicable FCC standards. Installation Manual ClusterController-US-IA-en-16 21

22 4 Product Description SMA Solar Technology America LLC Symbol Designation Explanation CE marking WEEE designation Data matrix code The product complies with the requirements of the applicable EU directives. Do not dispose of the product together with household waste but in accordance with the locally applicable disposal regulations for electronic waste. 2D code for device-specific characteristics 4.3 LEDs Operation LEDs LED Designation Explanation Power LED Status LED Data carrier status LED Shows whether the Cluster Controller is starting or is in operation (see Section 7.1 "LED States", page 72) Shows the status of the Cluster Controller and the connected devices as well as the communication status of the system and the status of the grid management services (see Section 7.1 "LED States", page 72) Shows the status of the connected USB data carrier (see Section 7.1 "LED States", page 72) Network Port LEDs Colors and functionality of the network port LEDs are not standardized The colors and functionalities of the network port LEDs are not standardized. The colors used by SMA for the link/activity LED and the speed LED as well as the corresponding functionalities can deviate in products supplied by third-party manufacturers. 22 ClusterController-US-IA-en-16 Installation Manual

23 SMA Solar Technology America LLC 4 Product Description Figure 5: Network port LEDs Position Designation Color Explanation A Link/activity LED Green Shows the status and the activity of the network connection (see Section "Network Port LEDs", page 75) B Speed LED Yellow Shows the network connection speed (see Section "Network Port LEDs", page 75) 4.4 Display The display shows information on the Cluster Controller and the connected devices as well as the system status and the system configuration. The display contrast can be configured. The display languages are "German" and "English". You can change the display language via the Cluster Controller user interface. Figure 6: Cluster Controller display (example) Position Designation Explanation A Title line Displays the title of the display view The system time is always displayed. B Data lines Displays text and numeric values The numeric values for measurement or yield data are displayed with units. Overview of the Display Views Display view Start view Explanation Displayed when the Cluster Controller starts up; includes the current firmware version of the Cluster Controller Installation Manual ClusterController-US-IA-en-16 23

24 4 Product Description SMA Solar Technology America LLC Display view System overview Yield data System status Cluster Controller Sunny Portal settings Analog inputs Digital inputs Meteorology Active power limitation Reactive power setpoint Grid management services External communication Speedwire Modbus settings Settings Explanation Displays the system status, the current daily yield, the nominal system power and the current setpoints for active power and reactive power If no button on the keypad is pressed within five minutes, the Cluster Controller switches to the display view System overview. Displays the yield data of the system Displays the current system status The number of inverters detected by the Cluster Controller and the status of the inverters is displayed here. Displays the status and device information of the Cluster Controller When a USB data carrier is inserted into USB port 1, information on the current memory usage of the USB data carrier will be displayed. Displays the configured upload frequency and the date of the last successful data upload to Sunny Portal Displays the analog inputs with the current level value and unit Displays the digital inputs in binary form The digital inputs are summarized in two groups here. Displays the measured values of the connected irradiation sensor and the connected temperature sensors Displays the current setpoint for active power limitation with the setpoint size and the date of the last configuration change Displays the current reactive power setpoint and the date of the last configuration change Displays the setpoint type and the signal sources selected via the Cluster Controller user interface for the grid management services Displays the settings for the LAN Displays the settings for the Speedwire network Displays the Modbus settings with the activated network protocols and the corresponding network ports Enables the display contrast to be changed and the Cluster Controller to be partially or fully reset (see Section 7.3, page 80) 4.5 Keypad Designation Explanation Any button Activates the display illumination Arrow buttons ( ) Changes display views and selects specific display lines 24 ClusterController-US-IA-en-16 Installation Manual

25 SMA Solar Technology America LLC 4 Product Description Designation [OK] [ESC] i Explanation Confirms the selected action Cancels the selected action Opens the display view System status Installation Manual ClusterController-US-IA-en-16 25

26 5 Mounting SMA Solar Technology America LLC 5 Mounting 5.1 Requirements for Mounting Requirements for the mounting location: Product can cause radio interference in living areas The product is a device of ITE class A (EN 55022) and can cause radio interference in living areas. Take suitable measures for shielding radio waves when the Cluster Controller is used in the vicinity of living areas. The mounting location must be indoors. The ambient conditions at the mounting location must be suitable for the operation of the Cluster Controller (see Section 9, page 84). The mounting location must be protected against dust, moisture and corrosive substances. Maximum permitted cable lengths: Observe the maximum cable length of 100 m (328 ft) each between any two nodes in the Speedwire network and in the LAN. When connecting a digital or analog signal source (e.g. remote terminal unit, ripple control receiver), observe the maximum cable length of 30 m (98 ft) from the Cluster Controller to the signal source. When connecting a temperature sensor using the four-conductor connection technology, observe the maximum cable length of 20 m (65 ft) from the Cluster Controller to the temperature sensor. When connecting a temperature sensor using the two-conductor connection technology, observe the maximum cable length of 2.5 m (8 ft) from the Cluster Controller to the temperature sensor. Minimum clearances: The minimum clearances must be maintained to ensure adequate heat dissipation. 26 ClusterController-US-IA-en-16 Installation Manual

27 SMA Solar Technology America LLC 5 Mounting Figure 7: Minimum clearances Permitted and prohibited mounting positions: The Cluster Controller must be mounted so that the ventilation slots face upward and downward. This ensures optimum heat dissipation. Figure 8: Permitted and prohibited mounting positions 5.2 Mounting the Cluster Controller Requirements: A top-hat rail must be available. The top-hat rail must 35 mm (1.4 in) wide. Installation Manual ClusterController-US-IA-en-16 27

28 5 Mounting SMA Solar Technology America LLC In order to mount the Cluster Controller, the top-hat rail must be at least 26 cm (10.3 in) long. When a top-hat rail power supply unit is used, the top-hat rail must be correspondingly longer. The top-hat rail must be securely mounted on the wall or in the switch cabinet. Procedure: Use the rear-side upper retainers to hook the Cluster Controller into the upper edge of the tophat rail and press down toward the top-hat rail. This will hook the spring-mounted top-hat rail locking mechanism on the Cluster Controller onto the lower edge of the top-hat rail. The top-hat rail locking mechanism snaps into place. 28 ClusterController-US-IA-en-16 Installation Manual

29 SMA Solar Technology America LLC 6 Connection and Commissioning 6 Connection and Commissioning 6.1 Overview of the Connection Area Figure 9: Overview of the connection area Position Quantity Designation Explanation A 1 X1 Terminal for the voltage supply B 1 Terminal for grounding C 1 1 USB port for exporting system data D 1 2 USB port for updates E 1 X2 Digital outputs F 1 X3 Reserved for future applications G 1 X4 Digital inputs H 1 X5 Digital inputs I 1 X8 Analog inputs K 1 X7 Terminals for temperature sensors L 1 X6 Analog outputs M 2 X13, X14 Network ports for connecting the LAN Installation Manual ClusterController-US-IA-en-16 29

30 6 Connection and Commissioning SMA Solar Technology America LLC Position Quantity Designation Explanation N 2 X11, X12 Reserved for future applications O 2 X9, X10 Network ports for connecting the inverters (Speedwire) 6.2 Functions of the Terminals and Pin Groups The digital and analog terminals of the Cluster Controller are divided into pin groups. Each pin group forms one of the digital or analog inputs or outputs. On the enclosure, the upper row of contact pins is marked with A and the lower row is marked with B. The contact pins are counted from left to right. The division of terminals into pin groups and the functions of the pin groups are described in the following table. For the pin groups of terminals X2 and X6 there are several functions to choose from. You can find all selectable functions on the user interface of the Cluster Controller. In the following table you can find the factory-set function. Terminal Pin group Pin Function X1 1 to 3 Voltage supply X2 Digital output 1 Relay A Digital output 2 Relay B Digital output 3 Relay C A1 to A3 Fault indicator contact for the status Error 4 A to 6 A Fault indicator contact for the status Warning or Error B1 to B3 Response contact for the current active power limitation in grid management services X3 Reserved for future applications X4 Digital input 1 A1 to A3 Signal 1 of 4 for the active power limitation in grid management services Digital input 2 4 A to 6 A Signal 2 of 4 for the active power limitation in grid management services Digital input 3 B1 to B3 Signal 3 of 4 for the active power limitation in grid management services Digital input 4 B4 to B6 Signal 4 of 4 for the active power limitation in grid management services 30 ClusterController-US-IA-en-16 Installation Manual

31 SMA Solar Technology America LLC 6 Connection and Commissioning Terminal Pin group Pin Function X5 Digital input 5 A1 to A3 Signal 1 of 4 for the reactive power setpoint in grid management services Digital input 6 4 A to 6 A Signal 2 of 4 for the reactive power setpoint in grid management services Digital input 7 B1 to B3 Signal 3 of 4 for the reactive power setpoint in grid management services Digital input 8 B4 to B6 Signal 4 of 4 for the reactive power setpoint in grid management services X6 Analog current output 1 A1 to A3 Analog current output for feedback on current active power limitation in grid management services Analog current output 2 4 A to 6 A Analog current output for feedback on current reactive power setpoint in grid management services Analog current output 3 B1 to B3 Analog current output for feedback on the current total active power (as a percentage) of the inverters recorded by the Cluster Controller X7 Temperature input 1 A1 to A5 Analog input for connecting an external temperature sensor Temperature input 2 B1 to B5 Analog input for connecting a module temperature sensor X8 Analog current input 1 A1 to A4 Analog current input for connecting an irradiation sensor or for measuring the active power feed-in at the grid-connection point Analog current input 2 A5 to A8 Analog current input for active power limitation in grid management services or for measuring the active power feed-in at the grid-connection point Analog current input 3 B1 to B4 Analog current input for reactive power setpoint in grid management services or for measuring the active power feed-in at the grid-connection point Analog voltage input 4 B5 to B8 Analog voltage input for connecting a sensor X9, X10 1 to 8 Network ports for connection to the inverters (Speedwire) Installation Manual ClusterController-US-IA-en-16 31

32 6 Connection and Commissioning SMA Solar Technology America LLC Terminal Pin group Pin Function X11, X12 Reserved for future applications X13, X14 1 to 8 Network ports for connection to LAN 6.3 Cable Requirements UV resistance of connection cables Connection cables to be laid outdoors must be UV-resistant or routed in a UV-resistant cable channel. Terminal Grounding Voltage supply Digital inputs Digital outputs Analog inputs, analog outputs and temperature inputs (conductor) Analog inputs (connection cable) Cable requirements Conductor cross-section: 2.5 mm² (14 AWG) Maximum cable length: 30 cm (11 in) Number of insulated conductors: at least two Conductor cross-section: 0.2 mm² to 1.5 mm² (32 AWG to 16 AWG) Maximum cable length: 3 m (9.8 ft) Number of insulated conductors: at least two Conductor cross-section: 0.2 mm² to 1.5 mm² (32 AWG to 16 AWG) Maximum cable length: 30 m (98 ft) Number of insulated conductors: at least two Conductor cross-section: 0.2 mm² to 1.5 mm² (32 AWG to 16 AWG) Maximum cable length: 30 m (98 ft) Conductor cross-section: 1.5 mm (16 AWG) Cable length: 32 cm (12 in) Number of insulated conductors: at least two Shielding: yes Conductor cross-section: 0.2 mm² to 1.5 mm² (32 AWG to 16 AWG) Maximum cable length: 30 m (98 ft) 32 ClusterController-US-IA-en-16 Installation Manual

33 SMA Solar Technology America LLC 6 Connection and Commissioning Terminal Analog outputs (connection cable) Temperature inputs (connection cable) Inverter (Speedwire) LAN Cable requirements Number of insulated conductors: at least two Shielding: yes Conductor cross-section: 0.2 mm² to 1.5 mm² (32 AWG to 16 AWG) Maximum cable length: 3,000 m (9,840 ft) Number of insulated conductors for tolerance ±2 C (±3.6 F): at least two Number of insulated conductors for tolerance ±0.5 C (±0.9 F): at least four Conductor cross-section: at least 4 x 0.25 mm² (4 x 24 AWG) External cable diameter: 4.5 mm to 7.0 mm (0.18 in to 0.28 in) Maximum cable length for four-conductor connection technology: 20 m (65 ft) Maximum cable length for two-conductor connection technology: 2.5 m (8 ft) Number of insulated conductor pairs and insulated conductor cross-section: at least 2 x 2 x 0.22 mm² (2 x 2 x 24 AWG) External diameter: the maximum external diameter depends on the size of the cable gland or the conduit (see the installation manual of the Speedwire/Webconnect interface) Cable type: 100BaseTx, from Cat5 with shielding S-UTP, F- UTP or higher Plug type: RJ45 of Cat5, Cat5e, Cat6, Cat6a Cat7 plugs cannot be used. Cable length between two nodes: max. 50 m (164 ft) with patch cable, max. 100 m (328 ft) with installation cable Number of insulated conductor pairs and insulated conductor cross-section: at least 2 x 2 x 0.22 mm² (2 x 2 x 24 AWG) Cable type: 100BaseTx, from Cat5 with shielding S-UTP, F- UTP or higher Plug type: RJ45 of Cat5, Cat5e, Cat6 or Cat6a. Cat7 plugs cannot be used. Cable length between two nodes: max. 50 m (164 ft) with patch cable, max. 100 m (328 ft) with installation cable Installation Manual ClusterController-US-IA-en-16 33

34 6 Connection and Commissioning SMA Solar Technology America LLC 6.4 Performing Pin Coding Pin coding prevents confusion when using multipole connectors, e.g. in the event of removal and later re-insertion of a multipole plug. Using the coded pins, you can be sure of inserting a multipole plug into the correct terminal. Tip: perform pin coding for all multipole connections now, even if you do not wish to use all multipole connections at this point. Then you will not need to perform pin coding later for the multipole connections that you are not currently using. Code the pins correctly When selecting the pins to be coded, be sure to code different pins for each terminal and for each pin row. Procedure: 1. Insert one of the coding tabs on the coding element, parallel to the conductor axis, into the pin to be coded. 2. Remove the coding tab from the coding element by snapping it off. 3. On the multipole plug, remove the key from the conductor entry that will receive the coded pin when connected to the Cluster Controller. 6.5 Preparing the Connection Cable Always proceed as follows to prepare connection cables for connection to multipole plugs. 1. Strip 40 mm (1.57 in) of cable sheath from the end of the connection cable to which the multipole plug is to be attached. 2. Perform the following additional steps for the connection cables for the analog inputs, the analog outputs and the temperature inputs: 34 ClusterController-US-IA-en-16 Installation Manual

35 SMA Solar Technology America LLC 6 Connection and Commissioning Trim the cable shield of the connection cable to 15 mm (0.59 in). Fold the surplus cable shield back over the cable sheath. Press the shield clamp onto the cable shield. The cable shield must be clamped under the shield clamp as completely as possible. Depending on the number of connection cables, split the wire required for shielding into pieces with a length 40 mm (1.57 in). Remove 6 mm (0.24 in) of the cable sheath and strip off the insulation by 6 mm (0.24 in) at both ends of the insulated conductor. Insert the insulated conductor at one end of the wire into the ring terminal lug of the shield clamp and crimp with a crimping tool. 3. Trim unneeded insulated conductors flush with the cable sheath. 4. Strip off the conductor insulation by 6 mm (0.24 in). Installation Manual ClusterController-US-IA-en-16 35

36 6 Connection and Commissioning SMA Solar Technology America LLC The connection cable is prepared for connection to the multipole plug. 6.6 Connecting the Cluster Controller to the Voltage Supply Danger to life due to electric shock from touching an ungrounded product Touching an ungrounded product can cause a lethal electric shock. Ensure that the product is integrated in the existing overvoltage protection. Ground the enclosure of the product. Danger to life due to electric shock Under fault conditions, when working on the power supply circuit there may be dangerous voltages present on the product. With permanently connected power supply units, ensure that there is a disconnection unit (e.g. circuit breaker) present outside of the power supply unit. With pluggable power supply units, ensure that the outlet for the power supply unit is close to the power supply unit. The disconnect unit and the outlet for the power supply unit must be freely accessible at all times. Damage to the product due to condensation If the product is moved from a cold environment to a warm environment, condensation may form in the product. When there is a large temperature difference, wait for the product to reach room temperature before connecting to the voltage supply. Make sure the product is dry. 36 ClusterController-US-IA-en-16 Installation Manual

37 SMA Solar Technology America LLC 6 Connection and Commissioning Procedure: To connect the Cluster Controller to the voltage supply, perform the following actions in the specified order. The exact procedure is described in the following sections. Connecting the Grounding Conductor to the Cluster Controller Connecting the Power Supply Unit Connecting the grounding conductor to the Cluster Controller Additionally required material (not included in the scope of delivery): 1 grounding conductor (see Section 6.3 "Cable Requirements", page 32) Procedure: 1. Remove 10 mm (0.39 in) of the cable sheath from the grounding conductor. 2. Insert the insulated conductors into the ring terminal lug and crimp with a crimping tool. 3. Connect the grounding conductor to the grounding terminal. Observe the position of the terminal (see Section 6.1, page 29). Observe the order given below and hand-tighten the fastening screw (torque: 0.8 Nm (7.08 in-lb)): Fastening screw Split lock washer Washer Ring terminal lug with grounding conductor Washer Tooth lock washer Connecting the power supply unit Additionally required material (not included in the scope of delivery): 1 power supply unit (see Section 10 "Accessories", page 88) 1 AC connection cable 1 cable for connecting the power supply unit to the Cluster Controller (see Section 6.3 "Cable Requirements", page 32) Installation Manual ClusterController-US-IA-en-16 37

38 6 Connection and Commissioning SMA Solar Technology America LLC If you are not using the top-hat rail power supply unit available as an accessory for the Cluster Controller, the power supply unit you are using must meet the requirements detailed below. Requirements for the power supply unit: Maximum output current including short circuit: 8 A Maximum output apparent power: 100 VA DC output voltage: 24 V Nominal current: minimum 1.8 A Requirement: The connection cable must be prepared for connection to the multipole plug (see Section 6.5, page 34). Figure 10: Pin assignment for terminal X1 Pin Signal Explanation 1 Not assigned Reserved for future applications 2 24 V Input voltage 24 V DC 3 GND Ground Procedure: 1. Mount the power supply unit (see the manufacturer manual). 2. Connect the connection cable to the power supply unit (see the manufacturer manual). Trim the unused insulated conductors up to the cable sheath and write down the conductor colors. 3. Connect the connection cable to the three-pole plug. Unlock conductor entries 2 and 3 with a screwdriver and insert the insulated conductors into the conductor entries. Observe the pin assignment. 4. Connect the three-pole plug to terminal X1 on the Cluster Controller. 5. Connect the AC connection cable to the power supply unit (see the manufacturer manual). 38 ClusterController-US-IA-en-16 Installation Manual

39 SMA Solar Technology America LLC 6 Connection and Commissioning 6. Danger to life due to electric shock Lethal voltages are present at the connection point of the utility grid. Disconnect the connection point from voltage sources and ensure that the connection point is voltage-free. 7. Connect the other end of the AC connection cable to the voltage supply. 8. Connect the connection point to the utility grid. The power LED ( ) on the Cluster Controller is glowing red for two seconds, then it is permanently glowing green. The status LED ( ) is glowing corresponding to the current device status (see Section 7.1, page 72). The Cluster Controller is ready for operation after a maximum of one minute. Is the power LED ( ) glowing permanently red, the status LED ( ) glowing yellow or red and the Cluster Controller not starting? Possible fault cause: the voltage supply is too low. Ensure that the voltage supply is sufficient (see Section 9, page 84). If the problem persists, contact the Service (see Section 12, page 90). 6.7 Checking and Setting the Cluster Controller System Time Before connecting the Cluster Controller to the Speedwire network and before commissioning the inverters, you must check the Cluster Controller display to verify that the correct system time is displayed on the Cluster Controller. If the correct system time is not displayed, you must set the correct system time via the Cluster Controller user interface. This way, you can avoid inconsistencies in the time settings of the inverters. Available display languages The display languages of the Cluster Controller are German and English. The default language is English. You can only change the display language to German via the Cluster Controller user interface by selecting German as the user interface language and then logging in. Additionally required material (not included in the scope of delivery): 1 network cable (see Section 6.3 "Cable Requirements", page 32) Requirements: The Cluster Controller must be connected to the voltage supply and be in operation (see Section 6.6, page 36). A computer must be available for access to the user interface of the Cluster Controller (see Section 2.4, page 13). Installation Manual ClusterController-US-IA-en-16 39

40 6 Connection and Commissioning SMA Solar Technology America LLC Procedure: 1. Connect the computer directly to the Cluster Controller using the network cable. Connect the network cable to the network port X13 or X14 on the Cluster Controller. 2. Select the display view External communication and read and write down the IP address of the Cluster Controller from the line IP address. Tip: if you wish to integrate the Cluster Controller in a static LAN, you will also need the IP address for the network configuration (see Section 6.14, page 71). 3. Call up the IP address of the Cluster Controller via the web browser. The login page opens: The login page does not open? Possible error cause: you have not written down the IP address correctly or you have not entered it correctly. Enter the correct IP address and confirm the entry with the enter key. If the problem persists, read the troubleshooting information (see Section 7.2 "Errors in the Cluster Controller or the Connected Devices", page 76). 4. Select the desired language in the upper area of the login page. 5. Log in either as User or as Installer with the corresponding default system password for the user group. This makes the language change take effect on the user interface and on the display: User group User 0000 Installer 1111 The user interface opens. The user interface does not open? Default system password Cause: You have not entered the default system password for the selected user group correctly. On the login page, enter the correct default system password for the selected user group and confirm the entry with the enter key. 6. Select the Cluster Controller in the system tree and select the menu Settings in the device menu. 7. Select the parameter group Device > Time settings. 8. If required, use the drop-down list Standard/daylight saving time conversion on to set automatic conversion between standard and daylight saving time. 9. In the field Set system time, set the current date and time of the system. 10. In the drop-down list Time zone, select the time zone in which the system is located. 40 ClusterController-US-IA-en-16 Installation Manual

User Manual SMA CLUSTER CONTROLLER

User Manual SMA CLUSTER CONTROLLER SUNNY BOY User Manual SMA CLUSTER CONTROLLER ENGLISH ClusterController-US-BA-en-16 Version 1.6 Legal Provisions SMA Solar Technology America LLC Legal Provisions No part of this document may be reproduced,

More information

User Manual SMA CLUSTER CONTROLLER

User Manual SMA CLUSTER CONTROLLER SUNNY BOY User Manual SMA CLUSTER CONTROLLER ENGLISH ClusterController-BA-en-16 Version 1.6 Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in these documents is property

More information

User Manual SMA CLUSTER CONTROLLER

User Manual SMA CLUSTER CONTROLLER User Manual SMA CLUSTER CONTROLLER ClusterController-BA-en-11 Version 1.1 ENGLISH Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in this document is the property of

More information

Installation Manual SMA SENSOR MODULE

Installation Manual SMA SENSOR MODULE Installation Manual SMA SENSOR MODULE ENGLISH MDSEN-US-40-IA-en-11 Version 1.1 Legal Provisions SMA Solar Technology America LLC Legal Provisions No part of this document may be reproduced, stored in a

More information

Installation Manual SMA RS485 MODULE

Installation Manual SMA RS485 MODULE Installation Manual SMA RS485 MODULE MD.485-US-40 (PC-485.BG1) ENGLISH MD485-US-40-IA-en-10 Version 1.0 Legal Provisions SMA Solar Technology America LLC Legal Provisions No part of this document may be

More information

ennexos Operating manual SMA DATA MANAGER M with SUNNY PORTAL powered by ennexos EDMM-US-10-BE-en-11 Version 1.1 DATA MANAGER V Digital Input

ennexos Operating manual SMA DATA MANAGER M with SUNNY PORTAL powered by ennexos EDMM-US-10-BE-en-11 Version 1.1 DATA MANAGER V Digital Input Operating manual SMA DATA MANAGER M with SUNNY PORTAL powered by ennexos - + 10-30V DC X1 ennexos DATA MANAGER SUNNY BOY Digital Input RS485 ENGLISH EDMM-US-10-BE-en-11 Version 1.1 Legal Provisions SMA

More information

ennexos Operating manual SMA DATA MANAGER M with SUNNY PORTAL powered by ennexos EDMM-US-10-BE-en-10 Version 1.0 DATA MANAGER V Digital Input

ennexos Operating manual SMA DATA MANAGER M with SUNNY PORTAL powered by ennexos EDMM-US-10-BE-en-10 Version 1.0 DATA MANAGER V Digital Input Operating manual SMA DATA MANAGER M with SUNNY PORTAL powered by ennexos - + 10-30V DC X1 ennexos DATA MANAGER SUNNY BOY Digital Input RS485 ENGLISH EDMM-US-10-BE-en-10 Version 1.0 Legal Provisions SMA

More information

PV Inverter SUNNY BOY 2000HF-US/2500HF-US/3000HF-US

PV Inverter SUNNY BOY 2000HF-US/2500HF-US/3000HF-US PV Inverter SUNNY BOY 2000HF-US/2500HF-US/3000HF-US User Manual HF_STP_US-BUS095110 TBUS-20HF Version 1.0 CA US Power curve or energy curve of the past 16 feedin hours or past 16 days (switching the display

More information

ennexos Operating manual SMA DATA MANAGER M with SUNNY PORTAL powered by ennexos EDMM-10-BE-en-14 Version 1.4 DATA MANAGER V Digital Input

ennexos Operating manual SMA DATA MANAGER M with SUNNY PORTAL powered by ennexos EDMM-10-BE-en-14 Version 1.4 DATA MANAGER V Digital Input Operating manual SMA DATA MANAGER M with SUNNY PORTAL powered by ennexos - + 10-30V DC X1 ennexos DATA MANAGER SUNNY BOY Digital Input RS485 ENGLISH EDMM-10-BE-en-14 Version 1.4 Legal Provisions SMA Solar

More information

System Manual COMPACT MV POWER PLATFORM

System Manual COMPACT MV POWER PLATFORM System Manual COMPACT MV POWER PLATFORM CoMVPP-SH-US_en-20 98-126200.01 Version 2.0 AMERICAN ENGLISH Legal Provisions SMA America, LLC Legal Provisions Copyright 2014 SMA America, LLC. All rights reserved.

More information

PV Inverter SUNNY BOY 3000TL-US / 3800TL-US / 4000TL-US / 5000TL-US / 6000TL-US / 7000TL-US / 7700TL-US

PV Inverter SUNNY BOY 3000TL-US / 3800TL-US / 4000TL-US / 5000TL-US / 6000TL-US / 7000TL-US / 7700TL-US PV Inverter SUNNY BOY 3000TL-US / 3800TL-US / 4000TL-US / 5000TL-US / 6000TL-US / 7000TL-US / 7700TL-US User Manual SB3-5TLUS22-BA-en-14 Version 1.4 CA US SMA America, LLC Legal Provisions Legal Provisions

More information

User Manual Webconnect Systems in SUNNY PORTAL

User Manual Webconnect Systems in SUNNY PORTAL User Manual Webconnect Systems in SUNNY PORTAL SPortalWebcon-US-BA-en-14 Version 1.4 AMERICAN ENGLISH Legal Provisions Legal Provisions Copyright 2018. All rights reserved. No part of this document may

More information

Device for Plant Monitoring SUNNY WEBBOX with Bluetooth Wireless Technology

Device for Plant Monitoring SUNNY WEBBOX with Bluetooth Wireless Technology Device for Plant Monitoring SUNNY WEBBOX with Bluetooth Wireless Technology Installation Manual SWebBox20-IA-en-12 Version 1.2 EN Table of Contents Table of Contents 1 Information on this Manual.........................

More information

Installation Manual SUNNY HOME MANAGER

Installation Manual SUNNY HOME MANAGER Installation Manual SUNNY HOME MANAGER HoMan-IA-en-17 Version 1.7 ENGLISH Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in this document is the property of SMA Solar

More information

hdpv.org Ampt Communications Unit Installation Manual D

hdpv.org Ampt Communications Unit Installation Manual D hdpv.org Ampt Communications Unit Installation Manual 57070008-1 D 2 Copyright 2016-2019 Ampt LLC. All rights reserved. No part of this document may be reproduced, retransmitted, or copied in any form

More information

Manual Version: V1.00. Video Decoder Quick Guide

Manual Version: V1.00. Video Decoder Quick Guide Manual Version: V1.00 Video Decoder Quick Guide Thank you for purchasing our product. If there are any questions, or requests, please do not hesitate to contact the dealer. Copyright Copyright 2016 Zhejiang

More information

ILUMEN PID SOLUTION INDOOR OUTDOOR ILUMEN PIDBOX MINI INSTALLATION MANUAL. Ilumen PIDbox mini Version 1.5

ILUMEN PID SOLUTION INDOOR OUTDOOR ILUMEN PIDBOX MINI INSTALLATION MANUAL. Ilumen PIDbox mini Version 1.5 ILUMEN PID SOLUTION ILUMEN PIDBOX MINI INSTALLATION MANUAL INDOOR OUTDOOR Ilumen PIDbox mini Version 1.5 1 TABLE OF CONTENT 1 Information on this manual... 3 1.1 Validity... 3 1.2 Target group... 3 1.3

More information

Communication Interface for SMA Inverters SMA BLUETOOTH PIGGY-BACK

Communication Interface for SMA Inverters SMA BLUETOOTH PIGGY-BACK Communication Interface for SMA Inverters SMA BLUETOOTH PIGGY-BACK Installation Guide BTPB-IEN112112 98-0014212 Version 1.2 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Notes on this

More information

Central Inverter MV POWER PLATFORM 1.0 MW / 1.25 MW / 1.44 MW MV POWER PLATFORM 1.5 MW / 1.6 MW Enclosure Version without Disconnect Unit

Central Inverter MV POWER PLATFORM 1.0 MW / 1.25 MW / 1.44 MW MV POWER PLATFORM 1.5 MW / 1.6 MW Enclosure Version without Disconnect Unit Central Inverter MV POWER PLATFORM 1.0 MW / 1.25 MW / 1.44 MW MV POWER PLATFORM 1.5 MW / 1.6 MW Enclosure Version without Disconnect Unit Installation Manual MVPP_E-IA-US_en-10 98-4033310 Version 1.0 US

More information

PV Inverter SUNNY BOY 3000TL-US / 3800TL-US / 4000TL-US / 5000TL-US

PV Inverter SUNNY BOY 3000TL-US / 3800TL-US / 4000TL-US / 5000TL-US PV Inverter SUNNY BOY 3000TL-US / 3800TL-US / 4000TL-US / 5000TL-US Installation Manual SB3-5TLUS22-IA-en-13 Version 1.3 CA US Copyright 2013 SMA America, LLC. All rights reserved. No part of this document

More information

Installing and Configuring Rialto Analytic Appliances

Installing and Configuring Rialto Analytic Appliances Installing and Configuring Rialto Analytic Appliances Important Safety Information This manual provides installation and operation information and precautions for the use of this camera. Incorrect installation

More information

Installation- and Operating instructions for CU Ethernet Controller with USB Input. Version: 1.4 Date:

Installation- and Operating instructions for CU Ethernet Controller with USB Input. Version: 1.4 Date: Installation- and Operating instructions for CU8880-0010 Ethernet Controller with USB Input Version: 1.4 Date: 2018-04-12 Table of contents Table of contents 1. 2. 3. 4. 5. General instructions 2 Notes

More information

Solar Combiner Enclosure

Solar Combiner Enclosure Installation Instructions Solar Combiner Enclosure Catalog Numbers 1000-SB006, 1000-SB012 Topic Page Description 1 Important Safety Instructions 3 Nameplate Data 4 Planning for Installation 4 Install the

More information

Installation Guide. QBox-V6. Standalone/Spare V6 SDI QBox. Standalone/Spare V6 SDI QBox. Part No. A

Installation Guide. QBox-V6. Standalone/Spare V6 SDI QBox. Standalone/Spare V6 SDI QBox. Part No. A Installation Guide Standalone/Spare V6 SDI QBox QBox-V6 Standalone/Spare V6 SDI QBox Part No. A9009-0004 EN www.autocue.com Copyright 2017 All rights reserved. Original Instructions: English All rights

More information

IO-AO6X I/O Expansion Module 6 Isolated Analog Outputs

IO-AO6X I/O Expansion Module 6 Isolated Analog Outputs IO-AO6X I/O Expansion Module 6 Isolated Analog Outputs The IO-AO6X is an I/O Expansion Module that can be used in conjunction with specific Unitronics OPLC controllers. The module offers 6 12-bit isolated

More information

USP-070-B08 USP-104-B10, USP-104-M10 USP-156-B10

USP-070-B08 USP-104-B10, USP-104-M10 USP-156-B10 UniStream HMI Panel Installation Guide USP-070-B10, USP-070-B08 USP-104-B10, USP-104-M10 USP-156-B10 Unitronics UniStream platform comprises control devices that provide robust, flexible solutions for

More information

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B.

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B. Vision OPLC Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V290-19-C30B and V290-19-T40B. General Description Vision OPLCs are programmable

More information

User Manual SUNNY CENTRAL 2200-US SUNNY CENTRAL 1850-US

User Manual SUNNY CENTRAL 2200-US SUNNY CENTRAL 1850-US User Manual SUNNY CENTRAL 2200-US SUNNY CENTRAL 1850-US SC1850-2200-US-BA-en-11 98-132300.02 Version 1.1 ENGLISH Legal Provisions SMA America, LLC Legal Provisions Copyright 2015 SMA America, LLC. All

More information

USER GUIDE. AXIS T8120 Midspan 15 W 1-port ENGLISH

USER GUIDE. AXIS T8120 Midspan 15 W 1-port ENGLISH USER GUIDE AXIS T8120 Midspan 15 W 1-port ENGLISH Legal Considerations Video and audio surveillance can be prohibited by laws that vary from country to country. Check the laws in your local region before

More information

Installation Manual SMA SENSOR MODULE

Installation Manual SMA SENSOR MODULE Installation Manual SMA SENSOR MODULE MD.SEN-40 (PC-SENS.BG1) ENGLISH MDSEN-40-IA-en-10 Version 1.0 Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in these documents

More information

sonnen Installation Practical

sonnen Installation Practical sonnen Installation Practical sonnen Components sonnenbatterie eco 8.0 Single Phase System Components 4 sonnenbatterie eco 8.0 Single Phase System Components 5 sonnenbatterie eco 8.0 Single Phase System

More information

This guide provides basic information for Unitronics Models 230/260/280/290 (Non-color Screens).

This guide provides basic information for Unitronics Models 230/260/280/290 (Non-color Screens). Vision OPLC Installation Guide Models 230/260/280/290 (Non-color Screens) This guide provides basic information for Unitronics Models 230/260/280/290 (Non-color Screens). General Description Vision OPLCs

More information

High Speed Remote I/O Module

High Speed Remote I/O Module High Speed Remote I/O Module EXF-RC15 The Unitronics EXF-RC15 is a High Speed Remote I/O Module that offers three High Speed Counter inputs and four high speed outputs. Overall, the EXF-RC15 offers 9 digital

More information

User Manual SUNNY HOME MANAGER in SUNNY PORTAL

User Manual SUNNY HOME MANAGER in SUNNY PORTAL User Manual SUNNY HOME MANAGER in SUNNY PORTAL HoMan_Portal-BA-en-18 Version 1.8 ENGLISH Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in these documents is property

More information

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual.

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual. The power behind competitiveness Delta Infrasuite Power Management Power Distribution Unit User Manual www.deltapowersolutions.com Save This Manual This manual contains important instructions and warnings

More information

V E1B Snap-in I/O Module

V E1B Snap-in I/O Module V200-18-E1B Snap-in I/O Module The V200-18-E1B plugs directly into the back of compatible Unitronics OPLCs, creating a selfcontained PLC unit with a local I/O configuration. Features 16 isolated digital

More information

Operating Manual MULTICLUSTER BOX 12

Operating Manual MULTICLUSTER BOX 12 Operating Manual MULTICLUSTER BOX 12 MC-BOX-12-3-20-BE-en-10 Version 1.0 ENGLISH Legal Provisions Legal Provisions The information contained in this document is the property of. Publishing its content,

More information

Central Inverter MV POWER PLATFORM 1.0 MW / 1.25 MW / 1.44 MW MV POWER PLATFORM 1.5 MW / 1.6 MW Open/Canopy Version with Disconnect Unit

Central Inverter MV POWER PLATFORM 1.0 MW / 1.25 MW / 1.44 MW MV POWER PLATFORM 1.5 MW / 1.6 MW Open/Canopy Version with Disconnect Unit Central Inverter MV POWER PLATFORM 1.0 MW / 1.25 MW / 1.44 MW MV POWER PLATFORM 1.5 MW / 1.6 MW Open/Canopy Version with Disconnect Unit Operating and Maintenance Manual MVPP_OCD-WH-US_en-10 98-4032310

More information

Operating instructions. Speed monitor D / / 2014

Operating instructions. Speed monitor D / / 2014 Operating instructions Speed monitor D200 80005257 / 00 05 / 2014 Contents 1 Preliminary note...4 1.1 Symbols used...4 1.2 Warning signs used...4 2 Safety instructions...5 2.1 General...5 2.2 Target group...5

More information

System Monitoring SUNNY WEBBOX

System Monitoring SUNNY WEBBOX System Monitoring SUNNY WEBBOX Technical Description SWebBox-TEN101232 98-0002232 Version 3.2 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Notes on this Manual..............................

More information

V E2B Snap-in I/O Module

V E2B Snap-in I/O Module V200-18-E2B Snap-in I/O Module The V200-18-E2B plugs directly into the back of compatible Unitronics OPLCs, creating a selfcontained PLC unit with a local I/O configuration. Features 16 isolated digital

More information

Operating instructions. Switching amplifier DN0210 DN / / 2015

Operating instructions. Switching amplifier DN0210 DN / / 2015 Operating instructions Switching amplifier DN0210 DN0220 UK 80011079 / 00 01 / 2015 Contents 1 Preliminary note...4 1.1 Symbols used...4 1.2 Warning signs used...4 2 Safety instructions...5 2.1 General...5

More information

Maintenance Manual SUNNY CENTRAL 500CP-US/CA / 500CP-US/CA 600V / 630CP-US/CA / 720CP-US/CA / 750CP-US/CA / 800CP-US/CA / 850CP-US/CA / 900CP-US/CA

Maintenance Manual SUNNY CENTRAL 500CP-US/CA / 500CP-US/CA 600V / 630CP-US/CA / 720CP-US/CA / 750CP-US/CA / 800CP-US/CA / 850CP-US/CA / 900CP-US/CA Maintenance Manual SUNNY CENTRAL 500CP-US/CA / 500CP-US/CA 600V / 630CP-US/CA / 720CP-US/CA / 750CP-US/CA / 800CP-US/CA / 850CP-US/CA / 900CP-US/CA SCCP-US-WH-US_en-30 98-123900.01 Version 3.0 AMERICAN

More information

EX-RC1 Remote I/O Adapter

EX-RC1 Remote I/O Adapter EX-RC1 Remote I/O Adapter The EX-RC1 interfaces between Unitronics Vision OPLCs and remote I/O Expansion Modules distributed throughout your system. The adapter is connected to a PLC via CANbus. Each adapter

More information

V E1B Snap-in I/O Module

V E1B Snap-in I/O Module V200-18-E1B Snap-in I/O Module The V200-18-E1B plugs directly into the back of compatible Unitronics OPLCs, creating a selfcontained PLC unit with a local I/O configuration. Features 16 isolated digital

More information

Central-Inverter SUNNY CENTRAL 500HE-US

Central-Inverter SUNNY CENTRAL 500HE-US Central-Inverter SUNNY CENTRAL 500HE-US Installation Guide SC500HEUS-IA-IUS110211 98-4017511 Version 1.1 US SMA America, LLC Legal Restrictions Copyright 2011 SMA America, LLC. All rights reserved. No

More information

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description Vision OPLC V350-35-R34/V350-J-R34 Installation Guide The Unitronics V350-35-R34/V350-J-R34 offers the following onboard I/Os: 22 Digital Inputs, configurable via wiring to include 2 Analog and 3 HSC/Shaft-encoder

More information

SINAMICS G130. Terminal Module 150 (TM150) Operating Instructions 03/2013 SINAMICS

SINAMICS G130. Terminal Module 150 (TM150) Operating Instructions 03/2013 SINAMICS SINAMICS G130 Operating Instructions 03/2013 SINAMICS s Safety information 1 General information 2 SINAMICS SINAMICS G130 Mechanical installation 3 Electrical installation 4 Technical specifications 5

More information

CPCI-PS24 24V-Power Supply

CPCI-PS24 24V-Power Supply 24V-Power Supply Hardware Manual to Product I.2301.21 esd electronic system design gmbh Vahrenwalder Str. 207 30165 Hannover Germany http://www.esd.eu Phone: +49 (0) 511 3 72 98-0 Fax: +49 (0) 511 3 72

More information

Vision OPLC V TR6/V350-J-TR6

Vision OPLC V TR6/V350-J-TR6 Vision OPLC V350-35-TR6/V350-J-TR6 Installation Guide The Unitronics V350-35-TR6/V350-J-TR6 offers the following onboard I/Os: 8 Digital Inputs, configurable via wiring to include 2 Analog (current/voltage)

More information

PM Series Power Meter

PM Series Power Meter PM Series Power Meter Quick Setup Guide - PMC-1000, PMC- 1001, PMM-1000, PMB-1960 Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See

More information

Micro-OPLC Installation Guide

Micro-OPLC Installation Guide Jazz OPLC Micro-OPLC Installation Guide 6 Digital Inputs, 4 Relay Outputs 6 Digital, 2 Analog/Digital, 2 Analog Inputs, 6 Relay Outputs Before using this product, the user must read and understand this

More information

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service.

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service. PM Series Power Meter QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB-1960 Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See NFPA

More information

Conductive Level Controller

Conductive Level Controller Conductive Level Controller 61F-D21T-V1 Ideal for level control for industrial facilities and equipment. Outputs can be set to self-hold at ON or OFF using self-holding circuits. Sensitivity adjustment

More information

5504 Thermocouple Analog Input Module

5504 Thermocouple Analog Input Module 550 Thermocouple Analog Input Installation, Operation and Maintenance Setup Manual 5/9/0 Safety Information The information provided in this documentation contains general descriptions and/or technical

More information

8 Troubleshooting. 8.1 Forgotten Password

8 Troubleshooting. 8.1 Forgotten Password SMA Solar Technology America LLC 8.1 Forgotten Password If you have forgotten the password for the inverter, you can unlock the inverter with a Personal Unlocking Key (PUK). For each inverter, there is

More information

Installation Manual SUNNY HOME MANAGER

Installation Manual SUNNY HOME MANAGER Installation Manual SUNNY HOME MANAGER HoMan-IA-en-19 Version 1.9 ENGLISH Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in these documents is property of SMA Solar

More information

Operating manual POWER PLANT CONTROLLER

Operating manual POWER PLANT CONTROLLER Operating manual POWER PLANT CONTROLLER POWER PLANT CONTROLLER ENGLISH PPC-A1-BE-en-20 98-113900.03 Version 2.0 Legal Provisions SMA Solar Technology AG Legal Provisions The information contained in these

More information

rcc.1081 Installation Instructions

rcc.1081 Installation Instructions rcc.1081 Installation Instructions Table of Contents Introduction...1 Specifications...2 Mounting...3 Wiring...5 Wiring Method...7 BACnet Network Wiring...8 Setting BACnet Address...9 Setting the BACnet

More information

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description Uni-I/O Modules Installation Guide UID-0808R, UID-0808T, UID-1600,UID-0016R, UID-0016T Uni-I/O is a family of Input/Output modules that are compatible with the UniStream control platform. This guide provides

More information

SIRIUS CAPACITOR MODULE User Manual. Model number: A-1.7C-M-SD-G Version 1.0; Release Date: April 2018

SIRIUS CAPACITOR MODULE User Manual. Model number: A-1.7C-M-SD-G Version 1.0; Release Date: April 2018 SIRIUS CAPACITOR MODULE User Manual Model number: 3550-48-A-1.7C-M-SD-G Version 1.0; Release Date: April 2018 Introduction The Sirius Capacitor Module ( Sirius ) is supercapacitor-based storage that uses

More information

SIWAREX JB Aluminum Housing. Instruction Manual Edition 03/2006

SIWAREX JB Aluminum Housing. Instruction Manual Edition 03/2006 s SIWAREX JB Aluminum Housing Instruction Manual Edition 03/2006 Table of Contents Table of Contents... 2 Warning and Safety Terms... 3 General... 4 1 Technical Description... 5 1.1 Area of Application...

More information

Accessories for Sunny Central Disconnect Unit for Sunny Central 250U / 500U / 500HE-US/CA and Sunny Central CP

Accessories for Sunny Central Disconnect Unit for Sunny Central 250U / 500U / 500HE-US/CA and Sunny Central CP Accessories for Sunny Central Disconnect Unit for Sunny Central 250U / 500U / 500HE-US/CA and Sunny Central CP Installation Guide DisconACDC_SCUS-IUS103110 98-4009010 Version 1.0 US 2 DisconACDC_SCUS-IUS103110

More information

V E2B Snap-in I/O Module

V E2B Snap-in I/O Module i4 Automation Ltd - 01480 395256 V200-18-E2B Snap-in I/O Module The V200-18-E2B plugs directly into the back of compatible Unitronics OPLCs, creating a selfcontained PLC unit with a local I/O configuration.

More information

OPLC Installation Guide

OPLC Installation Guide Samba OPLC SM35-J-R20/SM43-J-R20 SM70-J-R20 SM35-J-T20/SM43-J-T20 SM70-J-T20 OPLC Installation Guide 12 Digital Inputs, include 1 HSC/Shaft-encoder Input, 2 Analog inputs (only when the digital inputs

More information

B63/ NS MS. EtherNet/IP LINK

B63/ NS MS. EtherNet/IP LINK 3 609 929 B63/ IMenip 2008-09 NS MS EtherNet/IP LINK 3 609 929 B63/2008-09 IMenip Bosch Rexroth AG 15/76 Table of Contents About this document................. 16 General safety instructions............

More information

Analog Monitor Installation Manual

Analog Monitor Installation Manual Analog Monitor Installation Manual Part Number: 144-23919 Copyright 2011 Magnetek 1. Preface and Safety Magnetek manufactures products used as components in a wide variety of industrial systems and equipment.

More information

Power supply module, bus connection module

Power supply module, bus connection module s 8 183 8183p01, p02 TX-I/O Power supply module, bus connection module TXS1.12F10 TXS1.EF10 Each I/O row begins with one of these devices TXS1.12F10 power supply module Up to 4 power supply modules can

More information

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1 Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.keithley.com Model 2460-KIT Screw Terminal Connector Kit Description The Model 2460-KIT Screw Terminal Connector Kit

More information

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual Omnitron Systems Technology, Inc. 1 iconverter 19-Module Managed Power Chassis User s Manual 27 Mauchly, #201, Irvine, CA 92618 Phone: (949) 250-6510; Fax: (949) 250-6514 2 Omnitron Systems Technology,

More information

PV Inverter SUNNY BOY 2500TL Single Tracker SUNNY BOY 3000TL Single Tracker

PV Inverter SUNNY BOY 2500TL Single Tracker SUNNY BOY 3000TL Single Tracker PV Inverter SUNNY BOY 2500TL Single Tracker SUNNY BOY 3000TL Single Tracker Installation Manual SB25-30TLST-21-IA-en-13 Version 1.3 EN Table of Contents Table of Contents 1 Information on this Document.......................

More information

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description Uni-I/O Wide Modules Installation Guide UID-W1616R, UID-W1616T Uni-I/O Wide is a family of Input/Output modules that are compatible with the UniStream control platform. Wide Modules are 1.5 times as wide

More information

Chore-Tronics Mobile Server

Chore-Tronics Mobile Server Chore-Tronics Mobile Server Installation & Operator s Instruction Manual Contact your nearby Chore-Time distributor or representative for additional parts and information. Chore-Time Group A division of

More information

Agilent 34826A BenchLink Data Logger for 34980A. Getting Started Guide. Agilent Technologies

Agilent 34826A BenchLink Data Logger for 34980A. Getting Started Guide. Agilent Technologies Agilent 34826A BenchLink Data Logger for 34980A Getting Started Guide Agilent Technologies Notices Agilent Technologies, Inc. 2006 No part of this manual may be reproduced in any form or by any means (including

More information

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description Uni-I/O Modules Installation Guide UID-0808THS Uni-I/O is a family of Input/Output modules that are compatible with the UniStream control platform. This guide provides basic installation information for

More information

Installation manual plugs and connectors with screw connection (16/32 A)

Installation manual plugs and connectors with screw connection (16/32 A) EN Installation manual plugs and connectors with screw connection (16/32 60003213 Issue 04.2016 2016-04-01 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3

More information

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description Uni-I/O Modules Installation Guide UIA-0402N Uni-I/O is a family of Input/Output modules that are compatible with the UniStream control platform. This guide provides basic installation information for

More information

Z-Wave 4-in-1 Multi Sensor HZS-300E/HZS-300A

Z-Wave 4-in-1 Multi Sensor HZS-300E/HZS-300A Copyright Z-Wave 4-in-1 Multi Sensor Copyright 2015 by PLANET Technology Corp. All rights reserved. No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system,

More information

M215 (M215-60) Safety

M215 (M215-60) Safety M215 QUICK INSTALL GUIDE M215 (M215-60) Safety Important Safety Information This document contains important instructions to use during installation and maintenance of the Enphase M215 Microinverter. To

More information

Firmware Update with SD Card SUNNY BOY WINDY BOY SUNNY TRIPOWER

Firmware Update with SD Card SUNNY BOY WINDY BOY SUNNY TRIPOWER Firmware Update with SD Card SUNNY BOY WINDY BOY SUNNY TRIPOWER Technical Description NG_UpdSD-TB-TEN114530 Version 3.0 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Information on

More information

Network Camera. Quick Guide DC-B1203X. Powered by

Network Camera. Quick Guide DC-B1203X. Powered by Network Camera Quick Guide DC-B1203X Powered by Safety Precautions English WARNING RISK OF ELECTRIC SHOCK DO NOT OPEN WARNING: TO REDUCE THE RISK OF ELECTRIC SHOCK, DO NOT REMOVE COVER (OR BACK). NO USER-SERVICEABLE

More information

Stacking Module. Installation Guide AT-MCF2000S. PN Rev A

Stacking Module. Installation Guide AT-MCF2000S. PN Rev A Stacking Module AT-MCF2000S Installation Guide PN 613-000708 Rev A Copyright 2007 Allied Telesis, Inc. All rights reserved. No part of this publication may be reproduced without prior written permission

More information

IO-DI8-TO8, IO-DI8-TO8-L I/O Expansion Modules 8 Inputs, 8 Outputs

IO-DI8-TO8, IO-DI8-TO8-L I/O Expansion Modules 8 Inputs, 8 Outputs IO-DI8-TO8, IO-DI8-TO8-L I/O Expansion Modules 8 Inputs, 8 Outputs The IO-DI8-TO8 and IO-DI8-TO8-L are I/O expansion modules that can be used in conjunction with specific Unitronics OPLC controllers. The

More information

Device for Plant Monitoring SUNNY WEBBOX with Bluetooth Wireless Technology

Device for Plant Monitoring SUNNY WEBBOX with Bluetooth Wireless Technology Device for Plant Monitoring SUNNY WEBBOX with Bluetooth Wireless Technology Installation Guide SWebBox20-IEN110711 98-0023211 Version 1.1 EN SMA Solar Technology AG Table of Contents Table of Contents

More information

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description Uni-I/O Modules Installation Guide UIS-04PTN Uni-I/O is a family of Input/Output modules that are compatible with the UniStream control platform. This guide provides basic installation information for

More information

Z-Wave Ceiling-mount Smoke Detector HZS-200E/HZS-200A

Z-Wave Ceiling-mount Smoke Detector HZS-200E/HZS-200A Z-Wave Ceiling-mount Smoke Detector Copyright Z-Wave Ceiling-mount Smoke Detector Copyright 2015 by PLANET Technology Corp. All rights reserved. No part of this publication may be reproduced, transmitted,

More information

Vision OPLC. V T38 Installation Guide. General Description

Vision OPLC. V T38 Installation Guide. General Description Vision OPLC V130-33-T38 Installation Guide The Unitronics V130-33-T38 offers the following onboard I/Os: 22 Digital Inputs, configurable via wiring to include 2 Analog and 2 HSC/Shaft-encoder Inputs 16

More information

Operating instructions AS-i SmartLine module AC3200 AC /00 06/2016

Operating instructions AS-i SmartLine module AC3200 AC /00 06/2016 Operating instructions AS-i SmartLine module AC3200 AC3201 80237876/00 06/2016 Contents 1 Preliminary note...3 1.1 Symbols used...3 1.2 Warnings used...3 2 Safety instructions...3 2.1 General...3 2.2 Target

More information

Installation- and Operating instructions for CU Port USB 2.0 Hub. Version: 1.3 Date:

Installation- and Operating instructions for CU Port USB 2.0 Hub. Version: 1.3 Date: Installation- and Operating instructions for CU8005-0000 4-Port USB 2.0 Hub Version: 1.3 Date: 2018-04-27 Table of contents Table of contents 1 Foreword 3 1.1 Notes on the Documentation 3 1.1.1 Liability

More information

Card Enrollment Station. User Manual UD05870B

Card Enrollment Station. User Manual UD05870B Card Enrollment Station User Manual UD05870B User Manual 2017 Hangzhou Hikvision Digital Technology Co., Ltd. This manual is applied for D8E series card enrollment station. It includes instructions on

More information

Model#: IN-DO3MIRF 3MP Outdoor Dome with True Day/Night, IR, Basic WDR, Fixed lens

Model#: IN-DO3MIRF 3MP Outdoor Dome with True Day/Night, IR, Basic WDR, Fixed lens Model#: IN-DO3MIRF 3MP Outdoor Dome with True Day/Night, IR, Basic WDR, Fixed lens Hardware User Manual (PoE) 2013/03/06 Table of Contents Precautions... 3 Introduction... 4 Package Contents... 4 Safety

More information

BCM2 Series Branch Circuit Monitors Quick Setup Guide

BCM2 Series Branch Circuit Monitors Quick Setup Guide BCM2 Series Branch Circuit Monitors Quick Setup Guide Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See NFPA 70E in the USA, or applicable

More information

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Raritan DANGER!

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Raritan DANGER! QUICK SETUP GUIDE BCM2 Series Branch Circuit Monitors Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See NFPA 70E in the USA, or applicable

More information

EL1142 Series. IEC / IEEE 1613 Hardened 2-Port 10/100BASE-TX to 2-Port 100BASE-FX Media Converter. User s Guide

EL1142 Series. IEC / IEEE 1613 Hardened 2-Port 10/100BASE-TX to 2-Port 100BASE-FX Media Converter. User s Guide EL1142 Series IEC 61850 / IEEE 1613 Hardened 2-Port 10/100BASE-TX to 2-Port 100BASE-FX Media Converter User s Guide All Rights Reserved Dissemination or reproduction of this document, or its contents,

More information

NI PXI-1042 Series Power Supply Shuttle

NI PXI-1042 Series Power Supply Shuttle USER GUIDE NI PXI-1042 Series Power Supply Shuttle Introduction Unpacking The NI PXI-1042 Series power supply shuttle is a replacement part for the NI PXI-1042 Series chassis. To minimize downtime caused

More information

PV Inverter SUNNY BOY 5000-US / 6000-US / 7000-US / 8000-US

PV Inverter SUNNY BOY 5000-US / 6000-US / 7000-US / 8000-US PV Inverter SUNNY BOY 5000-US / 6000-US / 7000-US / 8000-US Installation Manual SB50US-80US-IA-en-36 TBUS-SB50_60_70US Version 3.6 CA US SMA America, LLC Legal Restrictions Copyright 2011 SMA America,

More information

E600 VX01 Installation guide

E600 VX01 Installation guide E600 VX01 Installation guide illuminfx Dimensions 2007 Viso Systems ApS, Denmark All rights reserved. No part of this manual may be reproduced, in any form or by any means, without permission in writing

More information

PV Rapid Shutdown device

PV Rapid Shutdown device PV Rapid Shutdown device Installation and Operation Manual Solis-RSD-1G(1:1) Solis-RSD-1G(2:2) Manufacturer: Ginlong (Ningbo) Technologies Co.,Ltd., Ningbo, Zhejiang, P.R.China US Office: 565 Metro Pl.

More information

HITACHI. EH-150 series PLC EH-RTD8 Resistance Temperature Detective input module Instruction manual. Safety precautions

HITACHI. EH-150 series PLC EH-RTD8 Resistance Temperature Detective input module Instruction manual. Safety precautions HITACHI EH-150 series PLC Resistance Temperature Detective input module Instruction manual Thank you for purchasing a Hitachi Programmable Logic Controller. To operate it safely, please read this instruction

More information

Mounting and Operating Instructions (Simple Programming) Art.No..: , published: 10/2003

Mounting and Operating Instructions (Simple Programming) Art.No..: , published: 10/2003 Mounting and Operating Instructions (Simple Programming) Art.No..: 732.29.125, published: 10/2003 Wall Terminal 2000 V.7 Art. No. Model Trans. Format Art. No. Model Trans. Format 917.01.101 Int., 1 Relay

More information