1 Page 1 of GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services. Refer to Description.1 UBC requirements for Indoor and Outdoor Unit Substations. 2.0 MATERIAL AND DESIGN REQUIREMENTS INDOOR UNIT SUBSTATIONS 2.1 Indoor Unit Substations General Requirements.1 The unit substation assembly shall be CSA approved 15 KV rated and be a completely unitized assembly of components as described in the next section..2 Outdoor fluid filled padmount unit substations are acceptable to UBC and shall meet the minimum requirements in sub-section 3.0 and only in coordination with Energy & Water Services - Electrical Technical Services..3 Switchgear located in sprinklered rooms, or rooms where the likelihood of water ingress could occur from above, shall have drip hoods installed on all cubicles. Openings for ventilation shall have suitable sprinkler protection. Where multiple cubicles are joined to form a single unit, individual drip hoods shall form a single continuous water barrier by means of factory provided upturned flanges or approved caulking methods..4 Rooms containing substations, transformers shall not be air conditioned..5 Unit Substation Components shall consist of:.1 15 KV switchgear..2 Main feeder and standby feeder cable entrance sections..3 Drawout, 15KV vacuum circuit breakers and protection relay..4 Cast coil transformer, (aluminum shall not be specified)..5 Metering..6 Secondary Distribution (if applicable)..6 Characteristics of the unit substation shall be:.1 Primary voltage.1 12,480 volts..2 Secondary voltage.1 347/600 volts or 120/208 volts..7 Transformer KV Rating.1 KVA rating as required..2 Fan cooling to provide 50% additional capacity..8 High voltage equipment shall be rated..1 3 phase 60 hertz KV BIL MVA interrupting capacity at 12.5 KV..9 Primary service connections shall be nominal 3 phase 3 wire 12.5 KV.

2 Page 2 of Secondary voltage shall be 347/600 volts 3 phase, 4 wire, or 120/208 volts 3 phase, 4 wire..11 Maximum allowable Arc Flash Hazard/Risk Category within any part of the unit substation between primary cable entrances and main secondary bus shall not exceed level 2 (8 cal/cm^2)..12 All equipment shall be housed in factory assembled enclosed cubicles. Adjacent cubicles shall be separated by metal barriers..13 Where it is necessary to construct the components in separate enclosures these, when mounted and bolted together, shall present a unified appearance as to height, form and color..14 All exterior surfaces shall be free from projections. Cubicle construction shall be rigid with formed metal corner posts and with all metal edges returned..15 Access to all individual components must be readily obtainable. All cubicles shall have hinged doors to allow for easy infrared scanning. Doors shall be maximum 1200 mm wide with a minimum 90 degree opening. All panels on which relays, meters, or instruments are mounted shall have a barriered compartment with hinged door. All hinges shall be concealed..16 Cubicles shall have heavy duty locks with common key or inter-lock..17 Access doors shall have two vault-type handles with padlocking feature or be secured with bolt(s) where required. This will allow easy infrared scanning..18 Interlocking shall be to Canadian Electrical Code and UBC Utility Requirements..19 Inside of cubicles shall be painted white or ASA 61 grey. Exterior shall be ASA 61 grey, two coats of high gloss enamel..20 All power connections shall be rigid bussing adequately supported for available fault currents. All equipment shall be wired at manufacturer s plant and required field connections wired to accessible load terminals. Grounding ball studs shall be affixed to bus at each cable entrance compartment and on the high voltage bus within the transformer section..21 All ground conductors including equipment ground shall be copper..22 A flat copper bonding strip of 0.50 sq. in. (1.3 sq. cm) minimum cross sectional area shall extend the length of the unit substation and be extended to all non-current carrying metal parts of the unit substation and the neutral grounding bus. Grounding ball studs shall be located for easy access during maintenance and shall be located within easy access of all door openings..23 All control fuses mounted in substation shall have downstream long life LED indicating lights, with nameplates, to indicate circuits are energized. Supply one set of spare fuses for all fuses locations..24 Provide wiring terminal box with terminal block for all outgoing control circuits and spare contacts. Terminal block shall be located where access is possible without de-energizing.

3 Page 3 of Corrosion resistant approved warning signs shall be securely mounted on the outside of the unit substation cubicles..26 All operating control and indicating equipment shall be clearly labeled with lamacoid labels. Provide engraved brass nameplates for each section and general nameplates directed by Engineer..27 All high voltage vaults must have floor drains and containment curbs..28 Approved manufacturers of unit substations are as follows:.1 Eaton..2 Electric Power Equipment..3 Schneider Electric..4 Unit Electrical Engineering (UEE)..5 Prime Engineering. 2.2 Performance Standards.1 Unit substation assembly installation shall comply with:.1 CSA C22.2 No. 31, current edition and CSA labeled..2 BC Hydro Requirements for Primary Substations Supplied at 12.0 KV and 25.0 KV..3 Canadian Electrical Code..4 BC Electrical Regulations and Bulletins..5 UBC Utility Standards. 2.3 Submittals.1 Shop drawings shall include:.1 All major electrical equipment..2 High voltage switch..3 Unit substation.1 High voltage breaker KV switchgear..3 Transformer cubicle..4 Protection and control..4 Factory Transformer Test Report test report of no-load and load losses, winding resistance tests and impedance test..5 Co-ordination study and curves..6 Secondary distribution..7 High voltage cable..8 High voltage terminations..9 Secondary bus..10 Distribution centre..11 Revenue metering..12 Seismic restraints..13 Ground pad..2 Submit the following test reports associated with the unit substation:.1 Production Tests - manufacturer s standard product test as requested in Section Commissioning of Electrical Systems Unit Substation Test - manufacturer s factory test on supplied unit substation as specified in Section Commissioning of Electrical Systems Site Commissioning - test report on site commission as specified in Section Commissioning of Electrical Systems 2.3.

4 Page 4 of 14.4 Factory Transformer Test Report test report of no-load and load losses, winding resistance tests and impedance test. Refer to Section Medium-Voltage Transformers, sentence 2.4.4, for required loss limits for various size transformers..3 Station Ground Resistance.1 Submit ground resistance test as outlined in Section Commissioning of Electrical Systems Cable Testing.1 Submit conductor and cable test reports as outlined in Section High Voltage Cables 2.12 Testing..5 Voltage Calibration.1 Submit voltage calibration report as outlined in Section Commissioning of Electrical Systems Seismic Certification.1 Submit certification of compliance with seismic requirements as specified in Section Vibration and Seismic Controls for Electrical Systems..7 Final Inspection Certificate.1 Submit a copy of the final provincial electrical inspection certificate..8 Operating & Maintenance Manuals.1 Operating and maintenance manuals shall be submitted..9 Project Record Documents.1 Project record documents shall be submitted as specified and as per CCDC standards..10 Shop drawings shall be submitted for review prior to construction. Shop drawings shall be AutoCAD or PDF with minimum 600 dpi resolution. Hard copies shall be on AO (841 mm x 1189 mm) sized drawings. Supply digital files with Shop Drawing submittal..11 Before assembly of the unit substation, submit the following information in digital format:.1 Electrical one-line diagram..2 Protective device co-ordination graph..3 Layout plan with dimensions..4 Reviewed and approved equipment cubicle drawing, including circuit breaker control wiring diagrams and key interlock scheme..5 Shop drawing information. 2.4 Drawing Requirements.1 AutoCAD Drawings Shall Include:.1 Equipment layout and overall dimensions..2 Equipment specifications..3 One line diagram..4 Relating information including relay specs; time-current graphs; wiring diagrams, and tripping system..5 Seismic support and restraints..6 Metering information..7 Terminal block wiring and labeling..8 Labels.

5 Page 5 of 14.2 Electrical One-Line Diagram.1 The electrical one-line diagram shall show the connection of all the service entrance equipment. It shall contain the proposed service entrance relay settings..3 Protective Device Co-ordination Graph.1 A standard size 4 ½ x 5 cycle log-log graph shall be used for the co-ordination study. It is mandatory that the service entrance protective device setting be compatible and co-ordinate with UBC Energy & Water Services protective equipment. The manufacturer shall provide the required co-ordination study. Refer to Section Protective Device Coordination and Arc Flash Analysis..4 Equipment Drawing - Unit Substation.1 The unit substation shop drawings shall be submitted for review prior to assembly..2 The drawings shall show fully dimensioned equipment assembly details and the wiring diagram of the circuit breaker control scheme. 2.5 Metering Requirements.1 Metering shall be supplied by Switchgear Manufacturer at the project s cost and installed by manufacturer..2 Switchgear manufacturer to incorporate Schneider Electric PM8240 meter with i/o module meter into construction. 2.6 Testing & Commissioning.1 Factory tests shall be performed as specified in Section Commissioning of Electrical Systems. Provide written report of test results prior to shipment of unit substation..2 Provide written report of test results prior to energization of unit substation..3 Unit substation, when fully assembled, shall be made available for inspection in the factory by the Engineer..1 Unit substation to have factory test and site and commissioning as outlined in the Specification. 2.7 Cubical Specifications.1 Cable Entrance and Withdrawable Breaker Cubicles.1 Shall house incoming cable terminations with provision for stress cones and cable supports..2 Shall include grounding ball studs on both incoming buses..3 Shall house Capacitive Voltage Transformers (CVT)..4 Shall house Current Transformers (CT)..5 Shall house electrically operated withdrawable vacuum circuit breakers..6 Shall house electrical operating controls for breaker racking mechanism behind lockable door..7 Shall house electrical operating controls for breaker open/close override behind lockable door..8 Shall include viewing windows..9 Doors shall have provisions for heavy duty padlock..2 Transformer Cubicle.1 Shall house cast coil transformer. Aluminum transformers shall not be allowed..2 Ventilation louvers and fan cooling shall provide adequate cooling and ventilation.

6 Page 6 of Stress Cones.3 Access doors shall be interlocked with main breaker..4 May house metering equipment if not located in secondary distribution..5 Transformer mounting shall meet seismic requirements..1 Stress cones shall be Raychem Hot Shrink or 3M Cold Shrink termination kit for 4/0 XLPE 25 KV rated kV Cable Entrance.1 All components with the 15kV cable entrance section shall be fully accessible after substation installation..2 The cable entrance section shall house the 15kV Current Transformers (CT) and Capacitive Voltage Transformers (CVT)..3 Grounding ball studs shall be installed on all incoming feeder connections and shall be positioned to allow access after the equipment is installed..4 Cable support blocks shall be installed such that they do not interfere with cable terminations or cause undue mechanical stress to cable or connections. Supports blocks shall be constructed of electrically insulating material rated for the application. Support blocks shall utilize a clamping method to secure cables. Cable ties are not permitted Primary Bussing.1 15 KV primary copper bussing, minimum 600 Amp capacity kV Withdrawable Circuit Breakers.1 15kV, 3 pole, 600 Amp group operated vacuum circuit breaker with magnetic actuator..2 Each vacuum interrupter shall be mounted in molded epoxy housing with a minimum pole spacing of 210 mm. Vacuum interrupters shall be designed and rated as sealed for life..3 The breaker shall be operated by an electrically operated magnetic actuator controlled by position sensors and by electronic module. The energy required for operation shall be provided by integrated capacitors capable of storing sufficient energy for a complete operating cycle: open close open..4 The breaker shall have local control buttons for open and close with an emergency mechanical opening operation and shall include a position indicator..5 Rated interrupting capacity shall be minimum 300 MVA and 16kA RMS symmetrical at 15kV. Rated current 630 Amps. Rated duty cycle: open sec. - close/open - 15 sec. - close/open..6 Number of operations at rated current = 30,000. Number of operations under short circuit = Rated impulse withstand of 95 KV BIL..8 Breaker shall be type tested in accordance with ANSI Standard C57 and/or IEC , CEI 17-1 file 1375.

7 Page 7 of 14.9 Breaker shall be withdrawable type via motorized operator and manual racking lever..10 Electric operators shall be 24 or 48V DC type compatible with unit substation control voltage and be powered directly from the DC Battery System..11 The breaker shall have position sensors to prevent racking out while breaker is in the closed position..12 The breaker shall have an integrated lockable hasp for the provision of personal lockout with mechanical and electric interlock to prevent the breaker from being able to be racked in..13 The breaker shall be able to be fully racked in and out with the doors closed..14 The breaker door shall be able to be closed after applying personal padlocks to the breaker..15 All doors shall have provisions for padlocks..16 A window shall be provided to permit viewing of the breaker in both the open, closed and racked out position..17 Approved manufacturers are:.1 ABB.2 Eaton.3 Schneider Electric kV Breaker Trip.1 Tripping power shall be obtained from the DC battery system..2 The operating voltage for breaker trip shall be either 24 or 48 V DC..3 Auxiliary trip coils shall be DC operated and independent of availability of AC current..4 In addition, provide a shunt trip for over temperature and ground fault trip. Power to be from the DC battery system. Provide LED lamps for monitoring of shunt trip..5 Provide one set of NO and NC auxiliary contacts to indicate whether breaker is open or closed wired to a terminal block located in an outlet box at the top of the cubicle Relay Current Transformers and Zone of Protection.1 Current Transformers (CT) shall be installed within the switchgear to create a complete protection zone. The zone of protection shall include cable terminations for both incoming feeders, HV circuit breakers, main transformer and main secondary bus and distribution board..2 Provide window style, 600V, relay accuracy C100 CT s, ratio XX:5, in each 15kV cable entrance section. CT window shall be sized to allow for cable to pass through without interference to cable or its termination. CT s shall be permanently and securely mounted in switchgear cable entrance section..3 Provide window style, 600V, relay accuracy C100 CT s, ratio XXX:5 in the low voltage section. Locate CT s as close as possible to the secondary connections of the transformer to maximize the protection zone area. CT s shall be permanently and securely mounted in switchgear.

8 Page 8 of 14.4 The Arc Flash Hazard category within any area covered by the Zone of Protection shall not exceed level 2 (8 cal/cm^2) Protection Relay.1 Overcurrent and short circuit protection shall be provided by a single Schweitzer Engineering Laboratories (SEL) 700GT+ series relay..2 The SEL relay shall also provide protection for primary and secondary ground faults..3 Protection shall be of the circuit closing type with programmable current range from 0.1 to 96.0 amps..4 CT inputs shall be rated for 5 amp CT secondary..5 The SEL relay shall be powered directly from the DC Battery System..6 The SEL relay shall be surface mounted on the switchgear Capacitive Voltage Transformers.1 Three (3) Capacitive Voltage Transformers (CVT) shall be installed in each 15kV cable entrance section..2 CVT s shall be mounted on the line side of each 15kV breaker and used exclusively for the purposes of synchronization check only as required in CVT s shall have a voltage rating of at least 22kV to permit high potential cable testing kV Feeder Synchronization Check.1 Provide synchronization check to confirm correct phase relationship between both normal and alternate 12kV feeders..2 The synchronization check shall be incorporated into a single SEL 700G relay, as part of 2.14, and be capable of accepting the voltage outputs from the capacitive voltage transformers (CVT) for the purposes of synchronization comparison only..3 The device shall monitor each of the three phases of each feeder to ensure correct phase relationship..4 The device shall electrically lock out the operating controls for both 15kV breakers to prevent paralleling in the event of incorrect phasing..5 The device shall electrically lock out the operating control for any breaker attempting to close on a dead bus..6 The device shall illuminate a pilot light in the event of an out of synch condition..7 The device shall not interfere with the open operation of any breaker..8 The device shall be powered directly from the DC Battery System Breaker Remote Operation.1 Both the normal and alternate breakers shall normally be operated remotely via control cabinet located in an area outside of the arc flash protection boundary.

9 Page 9 of 14.2 The control cabinet shall house a single operating switch to transfer from one feeder to the other..3 The control cabinet shall house operating controls to open and close individual 15kV breakers..4 The control cabinet shall house pilot lamps to indicate breaker position for both 15kV feeders..5 A time delay shall be incorporated of up to 15 seconds before the first action for the purposes of transferring between feeders or closing an individual breaker. This time delay will allow sufficient time for anyone that may still be within an arc flash protection zone to safely exit the area before the breakers operate. There shall be no time delay associated with opening an individual breaker..6 Control wiring between the unit substation and the control cabinet may be via individual control wires, fibre optic cables or a combination of both..7 All breaker operations shall be supplied from the DC Battery System..8 The control cabinet shall have a hinged cover with provision for a heavy duty padlock..9 The control cabinet controls shall look similar to that in UBC Standard Drawing E Location of Auxiliary and Control Equipment.1 All components used for protection and control shall be housed in a separately barriered compartment from any high voltage equipment. This also applies to all auxiliary components including terminals, relays and pilot lamps..2 Provide a 27mm conduit extending from the barriered control section of each feeder to a junction box on top of the substation equipment to allow for connection to external devices or monitoring equipment DC Battery System.1 Provide 24 or 48 volt DC battery system complete with heavy duty charger. Batteries shall have sufficient storage capacity to fully operate the circuit breakers (open close open), pilot lights and protection and control system in the event of a power failure..2 Batteries shall store sufficient energy to ably maintain, monitor and control for up to 24 hours..3 The DC charger shall be fed directly from the substation at 120 volts..4 The DC charger shall have output relays with Form C dry contacts for the following conditions:.1 AC power loss.2 Charger failure.3 DC power loss.5 The DC charger shall have an internal audible alarm that will annunciate during any of the above abnormal conditions..6 The DC Battery System may be located in a separately barriered section of the switchgear or stand-alone outside of the switchgear. The system shall be designed such that any

10 Page 10 of 14 component of the system can be readily and safely accessed without shutting down the substation Main Secondary Breaker.1 A main secondary breaker, 600 or 208 volt, is not preferred..2 In lieu of a secondary main breaker, provide current transformers (CT) to perform necessary overload, short circuit protection and Arc Flash Hazard Category reduction as outlined in Section Primary Unit Substations, A main secondary breaker may only be provided for the purposes of derating downstream buses or as approved by UBC Energy & Water Services. 3.0 MATERIAL AND DESIGN REQUIREMENTS OUTDOOR UNIT SUBSTATIONS 3.1 Outdoor Unit Substations General Requirements.1 Substation assembly shall be CSA, cul or field (SPE-1000) certified KV, 16kA rated, switchgear, environmentally friendly fluid or gas insulated with integrated high voltage main feeder and standby feeder cable entrance section..3 Fluid filled transformer and integrated vacuum fault interrupter, with FR3 Envirotemp insulating fluid..4 Overcurrent protection and auxiliary control components KV Outdoor Switchgear Minimum Requirements.1 16kA rated equipment maintenance free design..2 Dead front cable entrance and exit sections. Cable connections shall be IEEE kV, 600 amp deadbreak type..3 Cable connection bushings shall be minimum 36 from bottom of equipment..4 Environmentally friendly fluid or gas insulating medium only. Air insulated equipment shall not be permitted..5 2 separate high voltage 3 phase fully load break rated isolating switches (2 ways) in a loop/feed through configuration within in common tank..6 Each operating switch shall have one cable entrance connection with a 3 rd outgoing cable connection directly on the common bus..7 Cable entrance and exit connections shall not be located on same side as operating components..8 Cable entrance and exit connections shall only be mounted on back or side walls. Cable connections shall not be permitted on top or bottom of equipment.

11 Page 11 of 14.9 Load break isolating switches shall have either 2 operable positions, Closed-Open or 3 operable positions, Closed-Open-Ground..10 Load break Isolating switches shall be padlockable in the Open position to meet WorkSafe BC requirements..11 Ability to operate load break isolating switches independently of each other while energized..12 Large viewing window(s) for load break isolating switch contact position verification..13 Approved manufacturers of outdoor gas or fluid insulated switchgear are: a) Eaton/Cooper b) G&W Electric c) S&C Electric d) Prime Engineering 3.3 Fluid Filled Transformer with Integrated Vacuum Fault Interrupter Minimum Requirements.1 XXXX kva 3 Phase Transformer.2 Insulating fluid FR3 environmentally friendly fluid for transformers.3 Integrated single vacuum fault interrupter (VFI) device installed by transformer manufacturer fully immersed in common tank.4 Factory supplied external 3 phase self-powered protection controller with auxiliary shunt trip inputs in a NEMA 4 enclosure.5 VFI operating handle and contact position viewing window in separate section from HV or LV cable entrances..6 Cooling Welded Panel Type Radiators.7 Coatings ANSI 61 grey 3 mil.8 Touch Up Paint (aerosol cans) (Qty: 2).9 Notifications Standard Aluminum Nameplate.10 Notifications CSA, cul Listed & Labeled.11 Nitrogen Blanket Nitrogen blanket With Purge Valve.12 Liquid Level Gauge Liquid Level Gauge.13 Liquid Temp Gauge Liquid Temp Gauge with Alarm Contacts.14 Pressure Vacuum Gauge Pressure Vacuum Gage.15 Pressure Relief Cover Mounted Pressure Relief Device.16 Valves Upper Fill Valve (1").17 Valves Drain Valve (2") with Sampler.18 Tank Designed for Seismic Zone 4 Area.19 Tank Designed for Skid Mounting, Continuous 4 5 Tilt.20 Tank Welded Main Cover with Handhole.21 Tank Manhole Cover (Qty: 1).22 Tank Stainless Steel Ground Pads.23 Installation Location Outdoor.24 Temperature Rise Cooling Class KNAN.26 Frequency Impedance 5% - 7% max.28 Efficiency Standard CSA C Elevation Designed for operation at 1000 m (3300 ft) above sea level.30 High Voltage 12,480 Delta.31 Primary Conductor copper.32 Primary BIL 95 kv.33 Taps 2 2.5% taps above and 2 2.5% taps below nominal.34 High Voltage Bushings, IEEE 386, 15kV 600amp deadbreak

12 Page 12 of High Voltage Bushing location Sidewall minimum 36 AFF volt donut style XX:5 C100 (C50 minimum) CT s (3) field mounted within incoming cable section.37 Primary Phasing H3 H2 H1 (Left to Right).38 Low Voltage 600Y/347 Wye solidly grounded.39 Secondary Conductor copper.40 Secondary BIL 30 kv.41 Secondary Bushing Location Sidewall.42 Secondary Phasing X1 X2 X3 XO (Left to Right).43 Integrated overcurrent protection and controls section (see item 6 below) 3.4 Secondary Cabinet Minimum Requirements.1 Secondary Cabinet Front access door, including either 2 padlockable handles or a single padlockable handle and 2 tamperproof pentahead bolts..2 Secondary Cabinet Side access panel volt donut style XXX:5 C100 (C50 minimum) CT s (3) permanently mounted at secondary phase bushings. 3.5 Overcurrent Protection and Auxiliary Control Equipment Minimum Requirements.1 Provide minimum 500VA 600/ V station service transformer with DIN rail mounted primary and secondary class CC fuses..2 Provide 120VAC - 24VDC power supply c/w sealed lead acid battery backup. Batteries shall be sufficiently sized to provide protection and control for up to 24 hours. Batteries shall be provided by UBC..3 24VDC power supply shall have integrated form C relay output and local audible alarm that activate on loss of AC or general trouble..4 Provide 24VDC powered SEL 700 GT+ relay for primary, secondary 50/51 and ground fault protection..5 Provide 120VAC, 75W silicone wafer heaters (Watlow or equivalent), thermostatically controlled, mounted in SEL relay section..6 Provide 600 volt donut style CTs, field mounted, in transformer high voltage cable entrance section..7 Provide (3) 15.3 kv MCOV surge arrestors with 600 amp IEEE 386 connection for installation in high voltage cable entrance section..8 Provide 600 volt donut style CTs, factory mounted, on secondary transformer bushings..9 All auxiliary equipment including relays, heaters, lights etc. shall be powered from the station service transformer and located within transformer primary cable entrance section or operating switch section within separately barriered swing out enclosure..10 All operating and control components shall be located behind lockable NEMA 3R or 4 rated panel covers.

13 Page 13 of Approved Manufacturers of Outdoor Transformers and Associated Enclosures.1 Eaton/Cooper.2 Vantran Industries.3 Partner Technologies Inc. PTI.4 Prime Engineering.5 Schneider Electric 3.7 Relay Current Transformers and Zone of Protection.1 Primary and secondary Current Transformers (CTs) shall be installed within the transformer enclosure to create a complete protection zone. The zone of protection shall include all components within the entire transformer enclosure and incorporate the VFI, transformer and secondary supply cables..2 The Arc Flash Hazard category within any area covered by the Zone of Protection shall not exceed level 2 (8 cal/cm^2)..3 The SEL 700GT+ relay shall act as the main protection device for the zone of protection and programmed with the following settings: a) HV 50/51 b) HV 51N c) LV 50/51 d) LV 51G.4 All other ancillary protective devices (49, 63, etc.), if used, shall connect into the SEL 700GT relay..5 The factory supplied protection controller (if provided) shall act as a backup protection device and shall effectively coordinate with the SEL 700GT+ relay..6 Refer to UBC standard drawing E1-2b for Protection and Control Single Line. 3.8 Switchgear and Transformer Cable Interconnection.1 High Voltage cable interconnection between the switchgear and transformer shall be installed by UBC Energy & Water Services only and charged to the project..2 All protection and control equipment wiring shall be installed by the contractor. 3.9 Concrete Equipment Pad and Seismic Anchoring.1 The contractor shall design and provide the concrete equipment pad and all interconnecting conduits..2 15kV switchgear and transformer shall be physically separated by the minimum requirements of the equipment supplier and applicable codes with a minimum of 300mm clearance between equipment..3 UBC Energy & Water Services shall approve all concrete pad layouts along with all protective bollard locations or architectural surrounds prior to any installation..4 UBC Energy & Water Services may refuse permanent power connection to any installation that is not installed as per approved layout design.

14 Page 14 of 14.5 The contractor shall ensure all seismic anchoring requirements are met as per UBC Technical Guidelines section Grounding and Bonding.1 Counterpoise grounding and bonding shall be designed, installed and tested as per UBC Technical Guidelines section ***END OF SECTION***

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV 16346-1 3a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

The City of Winnipeg Dry Type Transformers up to 600 V Primary Section Bid Opportunity No Page 1 of 2

The City of Winnipeg Dry Type Transformers up to 600 V Primary Section Bid Opportunity No Page 1 of 2 The City of Winnipeg Dry Type Transformers up to 600 V Primary Section 26121601 Bid Opportunity No. 1196-2014 Page 1 of 2 Part 1 General 1.1 RELATED REQUIREMENTS.1 Section 26 05 01 - Common Work Results

More information

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical Issued for Review Section 26 28 16.01 Air Circuit Breakers Page 1 of 7 PART 1 GENERAL 1.1 GENERAL.1 This specification serves to define requirements for a replacement of low voltage circuit breaker of

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION SWITCHBOARDS

SECTION SWITCHBOARDS SECTION 26 24 13 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Switchboards 2. Commercial Metering Switchboards 3. Non-Utility Power Meters (Microprocessor-Based Metering Equipment) PART 2 - PRODUCTS

More information

TECHNICAL SPECIFICATION FOR MEDIUM VOLTAGE METAL-CLAD SWITCHGEAR (15 KV)

TECHNICAL SPECIFICATION FOR MEDIUM VOLTAGE METAL-CLAD SWITCHGEAR (15 KV) 1.1 DESCRIPTIONS OF WORK A. The Bidder shall furnish and install the equipment as specified herein and as shown on the contract drawings. B. The switchgear and circuit breakers shall be manufactured by

More information

SECTION DISCONNECT SWITCHES

SECTION DISCONNECT SWITCHES SECTION 16440 DISCONNECT SWITCHES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION PANELBOARDS

SECTION PANELBOARDS SECTION 16450 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for panelboards providing fault interrupting capability and overcurrent protective devices. 1.02 REFERENCE STANDARDS A.

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 26 24 11 This section specifies the furnishing, installation, and connection of the distribution switchboards. 1.2 RELATED WORK: A. Section 13 05 41, SEISMIC RESTRAINT

More information

Medium Voltage Metal-Enclosed Power Capacitor Banks

Medium Voltage Metal-Enclosed Power Capacitor Banks 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Medium Voltage Metal-Enclosed Power Capacitor Banks General Northeast Power System s (NEPSI's) medium

More information

SERIES SD3800 / SD3810 SPECIFICATION

SERIES SD3800 / SD3810 SPECIFICATION SERIES SD3800 / SD3810 SPECIFICATION SOLID DIELECTRIC SINGLE SIDED 15 KV & 25 KV PADMOUNTED VACUUM LOAD INTERRUPTERS AND VACUUM FAULT INTERRUPTERS WITH VISIBLE DISCONNECTS MANUALLY OPERATED / REMOTELY

More information

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM>

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM> SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

Medium Voltage Metal-Enclosed Harmonic Filter Systems

Medium Voltage Metal-Enclosed Harmonic Filter Systems 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Medium Voltage Metal-Enclosed Harmonic Filter Systems General NEPSI s armorvar, medium voltage metal-enclosed

More information

Elastimold Molded Vacuum Recloser - MVR

Elastimold Molded Vacuum Recloser - MVR Subject: Elastimold Recloser Technical Specification Date: 4/24/12 File: MVR-RS-0412 Page: 1 of 6 1.0 SCOPE Elastimold Molded Vacuum Recloser - MVR 1.1 This specification covers electrical and mechanical

More information

These specifications describe requirements for a power distribution unit (PDU) distributing power to sensitive loads.

These specifications describe requirements for a power distribution unit (PDU) distributing power to sensitive loads. 1 General 1.1 Summary These specifications describe requirements for a power distribution unit (PDU) distributing power to sensitive loads. 1.2 Standards The PowerHub 2 PDU shall be listed to the applicable

More information

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System Part 1 General 1.01 Summary A. These specifications describe

More information

SECTION PANELBOARDS. A. NECA (National Electrical Contractors Association) -Standard of Installation

SECTION PANELBOARDS. A. NECA (National Electrical Contractors Association) -Standard of Installation SECTION 26 24 16 PANELBOARDS PART 1 -GENERAL 1.1 SUMMARY A. Section includes distribution and branch circuit panelboards, electronic grade branch circuit panelboards, [and load centers]. 1.2 REFERENCES

More information

Underground Distribution Switchgear

Underground Distribution Switchgear Underground Distribution Switchgear Type VFI, Vacuum Fault Interrupter Switchgear Functional Specification Guide Functional Specification for 15 kv, 25 kv, or 35 kv Underground Distribution Switchgear

More information

Metal-enclosed interrupter 5 kv-15 kv usa.siemens.com/siebreak

Metal-enclosed interrupter 5 kv-15 kv usa.siemens.com/siebreak SIEREK switchgear Metal-enclosed interrupter 5 kv-15 kv usa.siemens.com/siebreak SIEREK Metal-Enclosed Interrupter Switchgear Selection and pplication Guide SIEREK medium-voltage metal-enclosed interrupter

More information

NU-LEC. Loop Automation. Reclosers & Sectionalizers

NU-LEC. Loop Automation. Reclosers & Sectionalizers NU-LEC Loop Automation Reclosers & Sectionalizers 1 NU-LEC LLC NU-LEC LLC is a wholly unit of NU-LEC Industries, Pty, Ltd. Sales and service center for United States, Canada, and the Caribbean. Warehouse

More information

Document C0. Use for:

Document C0. Use for: Date: July 27, 2015 Document C0 Use for: Connection of Electric Generation that will operate with an Open Transition (Category 1) between the Ameren System and the Generator or operate with a Synchronized

More information

PDI Modular Compact Remote Power Panel

PDI Modular Compact Remote Power Panel Guide Specifications (Revision 000, 6/17/2016) 1 GENERAL 1.1 Summary These specifications describe requirements for a remote power panel (RPP) distributing power to sensitive loads. These specifications

More information

S&C IntelliRupter PulseCloser Fault Interrupter Overhead Source-Transfer Application

S&C IntelliRupter PulseCloser Fault Interrupter Overhead Source-Transfer Application Overhead Source-Transfer Application Detailed Functional Specification Guide 1.0 GENERAL 1.01 The automated distribution fault-interrupting system shall conform to the following specification. 1.02 The

More information

5.1. Motor Protection and Monitoring. Contents. Product Overview. Monitoring Relays. D64R Series Digital Ground Fault Relays...

5.1. Motor Protection and Monitoring. Contents. Product Overview. Monitoring Relays. D64R Series Digital Ground Fault Relays... .1 Ground Fault Relays and Monitors Contents Description Current.................. Phase................... Voltage.................. Ground Fault Relays and Monitors D64R Series Digital Ground Fault Relays....

More information

Series 2400 Paralleling Switchgear

Series 2400 Paralleling Switchgear Series 2400 Paralleling Switchgear SERIES 2400 PARALLELING SWITCHGEAR TYPICAL SERIES 2400 MULTIPLE GENERATOR/UTILITY PARALLELING SWITCHGEAR Intelligent, Configurable Switchgear for Distributed Generation,

More information

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. SECTION 26 43 00 SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. 1.2 DEFINITIONS A. ATS:

More information

SECTION SWITCHGEAR

SECTION SWITCHGEAR SECTION 26 23 13 SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE

More information

AIR COOLED MODULAR RECTIFIER

AIR COOLED MODULAR RECTIFIER CONTROLLED POWER COMPANY SPECIFICATIONS AIR COOLED MODULAR RECTIFIER Spc1800a1 5JAN1999 SPECIFICATION S-1800-A MODULAR (REMOVABLE AND NON-REMOVABLE MODULES) AIR COOLED RECTIFIER Standard output power range:

More information

PLT. Breaker-based transfer switch open, closed or soft transition amps. Specification sheet

PLT. Breaker-based transfer switch open, closed or soft transition amps. Specification sheet Specification sheet PLT Breaker-based transfer switch open, closed or soft transition 800 3000 amps Description PLT breaker-based transfer switches are designed for operation and switching of electrical

More information

SECTION ( ) LIGHTING CONTROL PANELBOARD

SECTION ( ) LIGHTING CONTROL PANELBOARD (26 24 16.02) LIGHTING CONTROL PANELBOARD PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install Lighting Control Panelboards as specified and as shown on the contract drawings. B. The Lighting

More information

1. Coordination of series-rated devices is permitted where indicated on Drawings.

1. Coordination of series-rated devices is permitted where indicated on Drawings. SECTION 16055 - OVERCURRENT PROTECTIVE DEVICE COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1993 Specifications CSJ s 0924-06-221,etc. & 0924-06-223 SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1. Description. This specification describes the minimum acceptable requirements for a weatherproof

More information

S&C IntelliRupter PulseCloser Outdoor Distribution (15.5 kv and 27 kv)

S&C IntelliRupter PulseCloser Outdoor Distribution (15.5 kv and 27 kv) Outdo Distribution (15.5 kv and 27 kv) Detailed Functional Specification Guide 1.0 GENERAL 1.01 The automated distribution fault interrupting system shall confm to the following specification. 1.02 The

More information

Meter Enclosure and Equipment Standards

Meter Enclosure and Equipment Standards Meter Enclosure and Equipment Standards (a) (b) General Requirements: CITY OF OCALA UTILITY SERVICES METER ENCLOSURE AND EQUIPMENT STANDARDS: (1) To avoid the costs associated with having to replace unacceptable

More information

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum)

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum) Section 16306 50/60-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER Index PART 1 GENERAL PART 2 PRODUCTS 1.1 References 2.1 Frequency Converters 1.2 Factory Tests 2.2 Conduit and Fittings 1.3 Submittals 2.3

More information

Model KEP. Transfer Switch Standard Features. Automatic Transfer Switches Service Entrance Rated. Enclosed Contact Power Switching Units.

Model KEP. Transfer Switch Standard Features. Automatic Transfer Switches Service Entrance Rated. Enclosed Contact Power Switching Units. Model KEP Automatic Transfer Switches Service Entrance Rated Controller D Decision-Makerr MPAC 1500 Ratings Power Switching Device Molded case (MCCB) Insulated Case (ICCB) Current Voltage, Frequency 200

More information

MCFCW-06-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 18,000 BTUH

MCFCW-06-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 18,000 BTUH MCFCW-06-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 18,000 BTUH 1 Chilled and Hot Water Fan Coil High Static 4-Pipe Nominal

More information

ASCO 920 Remote Control (RC) Switches

ASCO 920 Remote Control (RC) Switches Maximum reliability and excellent value ASCO 920 Remote Control (RC) Switches ASCO 920 Remote Control Switch in Type Enclosure The ASCO 920 is designed as a feeder disconnect switch for load capacities

More information

Model KEP. Transfer Switch Standard Features. Automatic Transfer Switches Service Entrance Rated. Enclosed Contact Power Switching Units.

Model KEP. Transfer Switch Standard Features. Automatic Transfer Switches Service Entrance Rated. Enclosed Contact Power Switching Units. Model KEP Automatic Transfer Switches Service Entrance Rated Controller D Decision-Makerr MPAC 1500 Ratings Power Switching Device Current Voltage, Frequency Molded case (MCCB) Insulated Case (ICCB) 200

More information

MEDIUM VOLTAGE PRODUCTS. UniSec Air-insulated medium voltage secondary distribution switchgear Informed choice for safety

MEDIUM VOLTAGE PRODUCTS. UniSec Air-insulated medium voltage secondary distribution switchgear Informed choice for safety MEDIUM VOLTAGE PRODUCTS UniSec Air-insulated medium voltage secondary distribution switchgear Informed choice for safety 2 UNISEC AIR-INSULATED MEDIUM VOLTAGE SECONDARY DISTRIBUTION SWITCHGEAR Operator

More information

Power Control Systems

Power Control Systems Power Control Systems Power Control Systems for Virtually Any Control Strategy Power Control Systems for: Emergency generator control Emergency generator control with load demand sensing Emergency generator

More information

ATTACHMENT C. 15kV GENERATOR CIRCUIT BREAKERS & 15KV STATION SERVICES SWITCHGEAR FOR HOLM POWER PLANT GENERATOR LINE BREAKER 52G ADDITION

ATTACHMENT C. 15kV GENERATOR CIRCUIT BREAKERS & 15KV STATION SERVICES SWITCHGEAR FOR HOLM POWER PLANT GENERATOR LINE BREAKER 52G ADDITION 1. SCOPE 1.01 SCOPE OF WORK A. The Contractor shall design, manufacture, test and deliver two (2) complete 15kV, 4000A generator rated breakers, two (2) 1200A feeder breakers, enclosures and all incoming,

More information

MCFCW-20-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 60,000 BTUH

MCFCW-20-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 60,000 BTUH MCFCW-20-4HS-1 (4-Pipe) High Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 60,000 BTUH 1 Chilled and Hot Water Fan Coil High Static 4-Pipe Nominal

More information

Electrical Demand Specification (Reference SOP: )

Electrical Demand Specification (Reference SOP: ) Project: Equipment Description: Location: Equipment No.: Project No: Protocol No.: Content Index 1. GENERAL...3 Design Standards...3 1.1. Standards...3 2. DESIGN...3 2.1. Safety...3 2.2. Circuit protection...3

More information

MCFCW-08-4LS-1 (4-Pipe) Low Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 24,000 BTUH

MCFCW-08-4LS-1 (4-Pipe) Low Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 24,000 BTUH MCFCW-08-4LS-1 (4-Pipe) Low Static Chilled/Hot Water Ceiling Concealed Cased Fan Coil 208/230V 4-Pipe Heating & Cooling Fan Coil 24,000 BTUH 1 Chilled and Hot Water Fan Coil Low Static 4-Pipe Nominal Size:

More information

2.) Cabinet setup and preset data shall, as standard, be fully user programmable on a per cabinet or system wide basis.

2.) Cabinet setup and preset data shall, as standard, be fully user programmable on a per cabinet or system wide basis. A21 DIMMER CABINET SPECIFICATION. GENERAL. A.) Overview. 1.) The dimmer cabinets shall be fully digital, designed specifically for architectural and entertainment lighting applications, and shall consist

More information

1510 MOTOR CONTROLLERS

1510 MOTOR CONTROLLERS SECTION 262913- MOTOR CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of contract, including general and supplementary conditions and Division 1 specification section,

More information

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9 PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6

More information

Maximum Reliability & Excellent Value. Features. UL Listed Withstand & Close-On Ratings. Series 300 Power Transfer Switches

Maximum Reliability & Excellent Value. Features. UL Listed Withstand & Close-On Ratings. Series 300 Power Transfer Switches Series 300 Power Transfer Switches Maximum Reliability & Excellent Value With a Series 300 Transfer Switch, you get a product backed by ASCO Power Technologies, the industry leader responsible for virtually

More information

11 kv Indoor Switchgear - SCADA Controlled

11 kv Indoor Switchgear - SCADA Controlled Specification 11 kv Indoor Switchgear - SCADA Controlled Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by the

More information

Bulletin Installation of solar photovoltaic systems Rules , , , , and

Bulletin Installation of solar photovoltaic systems Rules , , , , and Bulletin 64-5-0 Installation of solar photovoltaic systems Rules 64-060, 64-200, 64-214, 84-020, 84-024 and 84-030 Scope (1) Introduction (2) Disconnecting means (a) Disconnecting means for solar photovoltaic

More information

MESP TECHNICAL SPECIFICATION FOR 22 kv METAL ENCLOSED SWITCHGEAR

MESP TECHNICAL SPECIFICATION FOR 22 kv METAL ENCLOSED SWITCHGEAR Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR 22 kv Version: 2 Issued: 19 th December 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical

More information

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD)

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD) SECTION 26 29 23 VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD) PART 1 -GENERAL 1.1 SYSTEM DESCRIPTION A. Definitions: The Variable Speed AC Motor Drive (hereafter referred to as "VFD") shall be designed to

More information

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5 Central Hudson Gas & Electric Corporation (CHG&E) Interconnection Protection Requirements for Distributed Generators of Greater than 300 kva Connected in Parallel with the CHG&E Electrical Delivery System

More information

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 September 2011 STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 MATERIAL SPECIFICATIONS FOR WEIGH-IN-MOTION SYSTEM The

More information

BSPD Surge Protective Devices

BSPD Surge Protective Devices BUSSMANN Supersedes December 2016 SERIES BSPD Surge Protective Devices High capacity Type 1 and Type 2 SPDs for overvoltage protection on Contents Description Page Introduction 2 Applications 2 Features

More information

Free-Stand Universal-Cutout Disconnects Type 12 Modular Free-Stand Disconnects and Accessories

Free-Stand Universal-Cutout Disconnects Type 12 Modular Free-Stand Disconnects and Accessories Spec-00252 Free-Stand Universal-Cutout Disconnects Type 12 Modular Free-Stand Disconnects and Accessories Modular Disconnect Enclosure, Type 12 INDUSTRY STANDARDS UL 508A Listed; Type 12; File No. E61997

More information

Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium

Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium Voltage Panels and Enclosures designed and built with

More information

CENTERLINE 2500 Motor Control Centers

CENTERLINE 2500 Motor Control Centers CENTERLINE 2500 Motor Control Centers High Performance Motor Control Centers and Switch Gear Meeting IEC 61439-2 Product Description Allen-Bradley CENTERLINE 2500 motor control centers (MCCs) are designed

More information

ELG4125: System Protection

ELG4125: System Protection ELG4125: System Protection System Protection Any power system is prone to 'faults', (also called short-circuits), which occur mostly as a result of insulation failure and sometimes due to external causes.

More information

SECTION METAL-CLAD MEDIUM VOLTAGE SWITCHGEAR (VacClad-W)

SECTION METAL-CLAD MEDIUM VOLTAGE SWITCHGEAR (VacClad-W) METAL-CLAD MEDIUM VOLTAGE SWITCHGEAR (VacClad-W) PART 1 GENERAL 1.01 1.02 1.03 1.04 SCOPE The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings.

More information

INTEGRATED AUTOMATION ACTUATORS AND OPERATORS

INTEGRATED AUTOMATION ACTUATORS AND OPERATORS 25 34 13.13 - PART 1 - GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide complete Valve Actuators and Operators as shown on the drawings, control diagrams, herein, or in other Sections of the

More information

SmartClose 3-phase, Synchronous Close Vacuum Capacitor Switch

SmartClose 3-phase, Synchronous Close Vacuum Capacitor Switch installation instructions SmartClose 3-phase, Synchronous Close Vacuum Capacitor Switch 2013 Hubbell Incorporated hpsliterature@hubbbell.com hubbbellpowersystems.com The equipment covered by these installation

More information

920 Remote Control (RC) Switches

920 Remote Control (RC) Switches 920 Remote Control (RC) Switches ASCO is the global leader in power switching and controls ASCO 920 PRODUCT SPECIFICATIONS SWITCH ONLY (PANELBOARD MOUNTING) 1,2,3 () DIMENSIONS, IN.(MM) WIDTH HEIGHT DEPTH

More information

INSTALLATION PRODUCTS CAA GROUP OCTOBER 2018 Elastimold. Tru-Break switchgear module

INSTALLATION PRODUCTS CAA GROUP OCTOBER 2018 Elastimold. Tru-Break switchgear module INSTALLATION PRODUCTS CAA GROUP OCTOBER 2018 Elastimold Tru-Break switchgear module Tru-Break switchgear module agenda Design platform and value Product specifications Operation Configuration examples

More information

Solid Dielectric Switchgear

Solid Dielectric Switchgear CATALOG GW5-TS09 MARCH, 2009 Solid Dielectric Switchgear Providing load and fault interrupting switching for systems rated through 38kV, 800A continuous, 12.5kA symmetrical interrupting Submersible vault

More information

ENhanced TEChnology. Solid insulated vacuum recloser for power distrbution system thru 15kV, 27kV, 38kV V 3.1

ENhanced TEChnology.   Solid insulated vacuum recloser for power distrbution system thru 15kV, 27kV, 38kV V 3.1 ENhanced TEChnology www.entecene.co.kr Solid insulated vacuum recloser for power distrbution system thru 15kV, 27kV, 38kV V 3.1 General features We, ENTEC introduce a Solid Insulated Vacuum Recloser encapsulated

More information

OSM PRODUCT GUIDE. OSM AUTOMATIC CIRCUIT RECLOSER 15kV, 27kV & 38kV Models

OSM PRODUCT GUIDE. OSM AUTOMATIC CIRCUIT RECLOSER 15kV, 27kV & 38kV Models OSM PRODUCT GUIDE OSM AUTOMATIC CIRCUIT RECLOSER 15kV, 27kV & 38kV Models 1. Product Guide OSM Automatic Circuit Recloser 15kV 27kV 38kV Models Introduction INTRODUCTION The OSM15, OSM27 and OSM38 automatic

More information

Jockey Pump Controllers

Jockey Pump Controllers BR081001EN Microprocessor Based with Color Touchscreen Product Description ACROSS THE LINE Controllers operate across-the-line. Full voltage is applied to the motor for starting by the use of a single

More information

Model: KEP. Transfer Switch Standard Features. Automatic Transfer Switches Service Entrance Rated. Enclosed Contact Power Switching Units.

Model: KEP. Transfer Switch Standard Features. Automatic Transfer Switches Service Entrance Rated. Enclosed Contact Power Switching Units. Model: KEP Automatic Transfer Switches Service Entrance Rated Controller D Decision-Makerr MPAC 1500 Ratings Power Switching Device Molded case (MCCB) Insulated Case (ICCB) Current Voltage, Frequency 200

More information

reliable company...caterpillar

reliable company...caterpillar The markets most reliable technology... from the industryʼs most reliable company...caterpillar Caterpillar switchgear with PowerLynx technology has been designed to integrate hand-inglove with Caterpillar

More information

Metal-enclosed interrupter 5 kv-15 kv usa.siemens.com/siebreak

Metal-enclosed interrupter 5 kv-15 kv usa.siemens.com/siebreak SIEREK-VC switchgear Metal-enclosed interrupter 5 kv-15 kv usa.siemens.com/sierek SIEREK-VC Metal-Enclosed Interrupter Switchgear Selection and pplication Guide SIEREK-VC medium-voltage, metal-enclosed

More information

ENhanced TEChnology. Solid insulated vacuum recloser for power distribution system thru 15kV, 27kV, 38kV. Ver.

ENhanced TEChnology.  Solid insulated vacuum recloser for power distribution system thru 15kV, 27kV, 38kV. Ver. ENhanced TEChnology www.entecene.co.kr Solid insulated vacuum recloser for power distribution system thru 15kV, 27kV, 38kV Ver. 081226 General features We, ENTEC introduce a Solid Insulated Vacuum Recloser

More information

Vacuum-Break Switches

Vacuum-Break Switches Vacuum-Break Switches DAS Three-Phase Switches and idc Control Functional Specification Guide 1. Scope This specification describes the features and ratings of the DAS switch. The DAS switch shall be a

More information

JK Series POWER DISTRIBUTION. Solid State Starters Medium Voltage A

JK Series POWER DISTRIBUTION. Solid State Starters Medium Voltage A POWER DISTRIBUTION JK Series Solid State Starters Medium Voltage 200-400-600-720A SOLID STATE STARTER JKSSS4+ Series The JKSSS Series of motor starter is the result of extensive research and development.

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 5 APPR:LWB:DBP:07-31-13

More information

Medium-Voltage Circuit Breaker-Type Automatic Transfer Switches and Bypass/Isolation Switches

Medium-Voltage Circuit Breaker-Type Automatic Transfer Switches and Bypass/Isolation Switches Medium-Voltage Circuit Breaker-Type Automatic Transfer Switches and Bypass/Isolation Switches RTS SERIES RTS Series Medium-Voltage Circuit Breaker-Type Automatic Transfer Circuit breaker medium-voltage

More information

VisoVac padmount fault interrupter

VisoVac padmount fault interrupter Network Protector Catalog Data CA024003EN New Issue VisoVac padmount fault interrupter General The medium voltage padmount vacuum fault interrupter from Eaton delivers economical, reliable and flexible

More information

UNT1100 Series. Binary Output Jumpers AO2 AO1 AO3 AO4 AOCM AOCM AOCM AOCM AO1. AI Switches Job Information N2 Address. Ref N2+ N2- ADDR 0 = ALL OPEN

UNT1100 Series. Binary Output Jumpers AO2 AO1 AO3 AO4 AOCM AOCM AOCM AOCM AO1. AI Switches Job Information N2 Address. Ref N2+ N2- ADDR 0 = ALL OPEN 1 2 8 4 AI6 R R Installation Bulletin UNT1100 Issue Date 0309 UNT1100 Series Introduction The Unitary (UNT) controller (UNT1100 Series) is a digital controller with applications for air handling units,

More information

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet Reference: ZD23 Version: 1.1 Issue date: 15 May 2014 Contents 1 Scope... 3 2 Deer Park Terminal

More information

E-Series General Specifications

E-Series General Specifications -Series General Specifications Ideally suited for higher amperage applications. Available with front and back mounting, screw terminals, stud terminals and heavy duty box wire connectors for solid wire

More information

GENERAL UL th EDITION BID SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC.

GENERAL UL th EDITION BID SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC. [Refer to Engineering Notes at End of Spec] Section [16XXX] [264XXX] - SURGE PROTECTIVE DEVICES (SPDs) PART 1 - GENERAL 1.1 SCOPE A. This section includes Surge Protective Devices (SPDs) for low-voltage

More information

SECTION ELECTRIC METERING

SECTION ELECTRIC METERING SECTION 26 27 13 ELECTRIC METERING SPEC WRITER NOTES: Use this section only for NCA projects Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers. 4. Electronic-grade panelboards.

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers. 4. Electronic-grade panelboards. SECTION 26 24 16 - PANELBOARDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

LOW VOLTAGE BYPASS/ISOLATION BREAKER BASED AUTOMATIC TRANSFER SWITCHES SECTION 16496D

LOW VOLTAGE BYPASS/ISOLATION BREAKER BASED AUTOMATIC TRANSFER SWITCHES SECTION 16496D (26 36 23.04) LOW VOLTAGE BYPASS/ISOLATION BREAKER BASED AUTOMATIC TRANSFER SWITCHES PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the low voltage automatic transfer switch and

More information

DIVISION 16 SECTION Surge Protective Device Submittal (SPD)

DIVISION 16 SECTION Surge Protective Device Submittal (SPD) DIVISION 16 SECTION 16289 Surge Protective Device Submittal (SPD) PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary

More information

Presented by: Oscar Araujo Photovoltaic Solutions Manager. 4 th Canadian German Solar PV Conference March 2 nd 2011

Presented by: Oscar Araujo Photovoltaic Solutions Manager. 4 th Canadian German Solar PV Conference March 2 nd 2011 Photovoltaic Solutions Make the most of your solar PV project Presented by: Oscar Araujo Photovoltaic Solutions Manager 4 th Canadian German Solar PV Conference March 2 nd 2011 Agenda Solutions for Renewable

More information

Installation and Operation Manual

Installation and Operation Manual Installation and Operation Manual APC 2X Series Hardwire Products PMP2X-A PMF2X-A PMG2X-A PMH2X-A APC hardwired products are designed to provide specification-grade performance at the service entrance,

More information

KMP A3. Air Insulated Medium Voltage Switchgear Powerful. Safe. Highly Available

KMP A3. Air Insulated Medium Voltage Switchgear Powerful. Safe. Highly Available KMP A3 Air Insulated Medium Voltage Switchgear Powerful. Safe. Highly Available High power switchgear systems For primary applications The name MediPower represents powerful medium voltage energy distribution

More information

HUBBELL SPIKESHIELD Wired-In Branch Panels Surge Protective Device (SPD)

HUBBELL SPIKESHIELD Wired-In Branch Panels Surge Protective Device (SPD) HUBBELL SPIKESHIELD Wired-In Branch Panels Surge Protective Device (SPD) Instruction Bulletin 8222-0513B Retain for future use. SPIKESHIELD Wired-In Branch Panels 8222-0513B 05/2012 Table of Contents Precautions...

More information

Solid insulated vacuum recloser for power distribution system thru 15kV, 27kV, 38kV Version 3.3

Solid insulated vacuum recloser for power distribution system thru 15kV, 27kV, 38kV Version 3.3 www.entecene.co.kr Solid insulated vacuum recloser for power distribution system thru 15kV, 27kV, 38kV Version 3.3 General features We, ENTEC introduce a Solid Insulated Vacuum Recloser encapsulated with

More information

Strand Lighting Specification

Strand Lighting Specification I. DIGITAL ENVIRON 90 DIMMER CABINET(S) A. GENERAL 1. The dimmer cabinets shall be fully digital, designed specifically for architectural and entertainment lighting applications, and shall consist of 6

More information

Free-Stand Stainless Steel Preferred-Cutout Disconnects Stainless Steel Heavy Duty Disconnects US 5,634,357 D 385,7683 BULLETIN: A28S4

Free-Stand Stainless Steel Preferred-Cutout Disconnects Stainless Steel Heavy Duty Disconnects US 5,634,357 D 385,7683 BULLETIN: A28S4 763.422.2600 SPEC-00385 L763.422.2211 DISCONNECT FREE-STAND STAINLESS STEEL PREFERRED-CUTOUT DISCONNECTS STAINLESS STEEL HEAVY DUTY DISCONNECTS Free-Stand Stainless Steel Preferred-Cutout Disconnects Stainless

More information

MV Network Switchgear, Protection and Control

MV Network Switchgear, Protection and Control MV Network Switchgear, Protection and Control Ravinder Negi Manager, Services Execution INDIA Schneider Electric, New Delhi. Agenda An Overview MV Network Basic Definitions Circuit breaker Switchgear Control

More information

Identify and understand the operation of common bus. After this presentation you will be able to: Identify common bus arrangements

Identify and understand the operation of common bus. After this presentation you will be able to: Identify common bus arrangements Introduction to Bus Protection By Matt Horvath, P.E. November 6, 2018 Electrical Buses Physical and Electrical Junction A bus is a critical element of a power system, as it is the point of convergence

More information

Specif ications. S&C Remote Supervisory Vista Underground Distribution Switchgear Outdoor Distribution (15.5 kv through 38 kv)

Specif ications. S&C Remote Supervisory Vista Underground Distribution Switchgear Outdoor Distribution (15.5 kv through 38 kv) Outdoor Distribution (15.5 kv through 38 kv) Specif ications Conditions of Sale STANDARD: The seller s standard conditions of sale set forth in Price Sheet 150 apply, except as modified under "SPECIAL

More information

Free-Stand Universal-Cutout Disconnects Type 12 Modular Free-Stand Disconnects and Accessories

Free-Stand Universal-Cutout Disconnects Type 12 Modular Free-Stand Disconnects and Accessories 763.422.2600 SPEC-00252 N763.422.2211 DISCONNECT FREE-STAND UNIVERSAL-CUTOUT DISCONNECTS TYPE 12 MODULAR FREE-STAND DISCONNECTS AND ACCESSORIES Free-Stand Universal-Cutout Disconnects Type 12 Modular Free-Stand

More information

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Labels. 3. Wire markers. 4. Conduit markers. 5. Underground Warning Tape. 6. Lockout

More information

SECTION 16496E ATS MOLDED CASE WITH ATC 900 CONTROLLER

SECTION 16496E ATS MOLDED CASE WITH ATC 900 CONTROLLER ATS MOLDED CASE WITH ATC 900 CONTROLLER PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install the low voltage automatic transfer switches having the ratings, features/accessories and enclosures as specified

More information