1 Publishing date: 31/05/2018 Document title: ANNUAL REPORT ON CONTRACTUAL CONGESTION AT INTERCONNECTION POINTS We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Share this document

2 ACER ANNUAL REPORT ON CONTRACTUAL CONGESTION AT INTERCONNECTION POINTS 5 th edition Period covered: 2017 May 2018 (Corrigendum June 2018) PLEASE CONTACT DAVID MERINO ( , david.merino@acer.europa.eu) REGARDING THIS DOCUMENT FOR ANY QUESTIONS YOU MIGHT HAVE. Trg Republike Ljubljana Slovenia

3 Contents 1. Executive summary Introduction Scope of the Report Analysis of the quality of the data and methodology for cleaning the data ENTSOG Transparency Platform data Capacity booking platform data Approach to the congestion analysis and applied methodology Firm capacities Steps in congestion analysis Summary of the outcomes of the analysis Identified contractual congestion and its breakdown Extent of congestion at IP level: unsuccessful requests Analysis of offer and use of interruptible capacity and instances of interruptions Secondary trading and application of CMPs Secondary capacity trading at congested IP sides Application of CMPs Supplement A: Results of the 2017 day-ahead auctions Conclusions and recommendations Conclusions and implications Recommendations for TSOs, ENTSOG and NRAs Policy recommendation ANNEX 1: List of abbreviations ANNEX 2: Unsuccessful requests at congested IP sides in ANNEX 3: Capacity made available at congested IP sides through the application of CMPs ANNEX 4: Indicative list of contractually congested IP sides within the scope of the CMP GL ANNEX 5: List of the IP sides for which NRAs should require the FDA UIOLI application ANNEX 6: Map of 17 contractually congested IP sides in Europe in

4 1. Executive summary The Commission Guidelines on Congestion Management Procedures ( CMP GL ) 1 and its paragraph 2.2.1(2) stipulate that the Agency for the Cooperation of Energy Regulators ( the Agency ) has to publish a yearly report on contractual congestion at Interconnection points (IPs). The present Congestion Report is the fifth report presented on the basis of this provision. The CMP GL defines contractual congestion as a situation where at least one of the four criteria listed in paragraph 2.2.3(1) of the CMP GL is met. Therefore, this Report aims to identify contractual congestion at IPs in the European Union for products sold during 2017 for use in 2017, 2018 or The Report analyses where demand exceeded the offer of firm capacity, and, in line with paragraph 2.2.3(1)(d), at which IP sides no firm capacity product with a duration of one month or longer was offered. Based on the ENTSOG data sets and Booking platform data, the following conclusions can be drawn: a. Less than 7% (17) of the 262 IP sides in scope of the CMP GL were contractually congested in the reference period. Annex 4 presents the list of contractually congested IP side, while other formally congested and close to be congested IP sides are listed in the technical annex to the Report 2. For another 72 IP sides, products for the gas year 2018/19 were not offered in Based on both indicators, there is no conclusive evidence to assess whether contractual congestion has increased or decreased in 2017 compared to the previous year. b. The Firm Day-Ahead Use-It-Or-Lose-It (FDA UIOLI) mechanism is already applied at 8 of the 17 IP sides detected as contractually congested. This means that at the remaining 9 contractually congested IP sides, the respective National Regulatory Authorities (NRAs) shall require the relevant Transmission System Operators (TSOs) to implement and apply the FDA UIOLI mechanism, according to paragraph 2.2.3(1) of the CMP GL or show that the congested situation is unlikely to reoccur in the following three years. c. 11 of the 17 contractually congested IP sides are identified as congested based on the nonoffer of firm products with a duration of at least one month for use in the gas year 2017/18. Congestion signalled by the occurrence of auction premia is less prevalent and was identified for 6 IP sides. d. 9 of the 17 IP sides identified as contractually congested in this report were already assessed as congested in the Agency s Congestion Report 3 last year, and 10 of those in the Congestion Report the year before. e. Physical congestion, indicated by actual interruptions of interruptible capacity, occurred at 5 contractually congested IP sides with varying frequencies. f. Congestion management procedures (CMPs) have yielded additional capacity offers at the borders of 11 Member States in 2017, which is an improvement compared to the previous years. Oversubscription was applied in 6 Member States, with almost all additional capacity 1 Commission Decision of 24 August 2012 on amending Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks (2012/490/EU), OJ L 213/16, , 2 The list and the detailed congestion analysis results are published alongside the Congestion Report in The Technical Annex to the Report, available at: 9DEC-410B C311DC8}&file=Technical_Annex_to_the_Report_2017.xlsx&action=default. 3 ACER 2017 Implementation Monitoring Report on Contractual Congestion at Interconnection Points. oring%20report%20on%20contractual%20congestion%20at%20interconnection%20points.pdf 3

5 amounts offered on the Dutch and UK IP sides. Surrender was applied in 6 Member States, with a majority of additional amounts offered on the Czech IP sides. Due to ongoing data inconsistencies between data sources, the Agency provides recommendations on data and transparency addressed to ENTSOG, TSOs and NRAs at the end of the Report. 2. Introduction According to paragraph 2.2.1(2) of the Commission Guidelines on Congestion Management Procedures (hereafter, the CMP GL 4 ), the Agency for the Cooperation of Energy Regulators ( the Agency ) has a legal obligation to publish a yearly report on contractual congestion at interconnection points ( Congestion Report or Report ) by 1 June 5 of each year, starting from This fifth edition of the Report is based on data on firm capacity products sold in 2017 for use in 2017, 2018 and 2019, as published by each Transmission System Operator (TSO) on the ENTSOG Transparency Platform (ENTSOG TP). Publication of such data is regulated by Section 3 of Annex I to Regulation (EC) No 715/ and, where appropriate, the data are validated by National Regulatory Authorities (NRAs). The analysis covers bundled and unbundled firm products for CAM relevant IP sides. In addition to firm capacity products, the Agency needs to take into consideration capacity trading on the secondary market and the use of interruptible capacity, to the extent possible for full assessment of congestion status. The purpose of this Report is to identify contractual congestion at IPs between entry-exit zones in the European Union (EU), based on the definition in Article 2(21) of Regulation (EC) No 715/2009. In particular, the Report aims to detect whether at least one of the conditions set out in paragraph 2.2.3(1) of the CMP GL is met during the reference period, from 1 January 2017 to 31 December In cases, where the IP side is identified as congested, the application of the Firm Day-Ahead Use-It-Or-Lose-It (FDA UIOLI) CMP mechanism may be triggered. The concerned NRAs shall then require the respective TSOs to apply the FDA UIOLI mechanism at the congested IP (side), unless they show that a congested situation is unlikely to reoccur in the following three years 7. In such cases, the relevant NRAs may decide to terminate or not to request the application of the FDA UIOLI mechanism. 3. Scope of the Report The Report covers IP sides of cross-border and in-country IPs and VIPs in the EU and cross-border IPs between EU and non-eu countries to the extent that NRAs decided those points to be subject to the application of CMP GL and the Network Code on Capacity Allocation Mechanisms (NC CAM) 8. 4 Commission Decision of 24 August 2012 on amending Annex I to Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks (2012/490/EU), OJ L 213/16, , 5 The original deadline of 1 March was changed to 1 June of every year. 6 Regulation (EC) No 715/2009 of the European Parliament and of the Council of 13 July 2009 on conditions for access to the natural gas transmission networks and repealing Regulation (EC) No 1775/2005, OJ L211/36, , 7 For example, due to capacity becoming available by a physical expansion of the network or through the termination of longterm contracts. 8 COMMISSION REGULATION (EU) 2017/459 of 16 March 2017 establishing a network code on capacity allocation mechanisms in gas transmission systems and repealing Regulation (EU) No 984/

6 The Agency and ENTSOG have established a NC CAM/CMP GL IP scope list, which is regularly updated. It contains all the relevant IP sides that are subject to the annual congestion analysis. The most recent scope list contains 366 CAM relevant IP sides. Out of those 366 IP sides, 262 IP sides are within the scope of the CMP GL, as there is no firm technical capacity at the majority of the remaining 104 IP sides 9. All IPs within the scope of the CMP GL, including those found congested in the four previous Reports ( ), are reviewed in the fifth edition. Chapter 4 presents a short analysis on data quality and the methodology used for making the data, suitable for analysis ( data cleaning ). A summary of data quality issues highlights the possible improvements in the collection of raw data for more straightforward analyses in the future. The approach to the congestion analysis and the methodology is presented in Chapter 5, with the presented condition for labelling an IP side congested. Additionally, the different types of capacities and how they have been handled in the analysis, when it comes to firm or interruptible capacity, are discussed. The results of the analysis are presented in Chapter 6 with an additional commentary on unsuccessful requests and the use of interruptible capacities and the activation of interruptions that might signal physical congestion. The application of Congestion Management Procedures (CMPs) and information on secondary markets is presented in Chapter 7. Supplement A provides the results of the capacity auctions for day-ahead capacity. The Report does not assess a potential underuse of capacity ( capacity hoarding ) by individual shippers, as this would require an in-depth analysis based on individual network users data, which is not public. A detailed analysis of individual network users is the task of national regulators. The Agency already assists NRAs in this task by providing the list of congested IP sides, filtered by country, which could be used for a closer assessment. 4. Analysis of the quality of the data and methodology for cleaning the data 4.1 ENTSOG Transparency Platform data On 19 February 2018, the Agency received two bulk data export files from ENTSOG based on the data published on the ENTSOG Transparency Platform. The format of the files was specified by the Agency. The Agency received additionally a file with the CAM relevant IP sides. The first file the transport data file for 2017 covers daily data for each NC CAM IP side, on booking levels of firm/interruptible capacities, technical capacity, flows (physical, commercial flows and nominations) and actual interruptions. The second file the CMP file provides information on the oversubscription, FDA UILOI, surrender, long-term UIOLI, auction results, unsuccessful requests of capacity and non-availability of (firm) capacity products in 2017 and after, if available. In the course of the analysis, it became clear that the CMP file was, although clean and structured, incomplete and inconsistent and therefore could not be used as a single source for the congestion analysis. The comparison of the CMP file with the data available on the ENTSOG TP showed 9 In 2016, there were 247 CMP relevant IP sides. 5

7 around 2% of missing instances of CMP data in the CMP file. Occasionally, the data that were included in the CMP file was not available on the ENTSOG TP. The majority of instances with mismatching data were related to unavailable firm capacity, due to the different formatting of the date for the start or the end of the period of application of CMP 10. The CMP file needs to be reviewed with greater diligence by both TSOs and ENTSOG before its submission to the Agency in order to ensure that complete and correct information about CMPs is provided 11. The third file, with CAM relevant IP sides, includes a list of IPs with the operator and connected operator, the applicable Energy Identification Coding (EIC) codes for the IP and the operators, the connection of the IP to the relevant market zone, specification of the IP type and information on virtual flows. Moreover, this file contained inconsistencies, such as missing CAM relevant IP sides and wrongly included non-cam-relevant IP sides. The CMP relevant status was incorrect for 10 IP sides and was commented by TSO/NRAs and corrected in the process of reviewing the results. The Agency and ENTSOG are engaged in a constructive dialogue to improve the data that are input to the Agency's monitoring activities. This dialogue includes regular exchanges on data quality, Agency feedback on the identified data issues to ENTSOG and TSOs, and intensive checking by TSOs of the monitoring results that are based on data provided by ENTSOG. 4.2 Capacity booking platform data The auction reports from booking platforms contain most of the relevant information on the auction results, including the identification of the IPs, capacity products and types, offered and allocated capacity, tariffs, and auction premia. This information enables the analysis on contractual congestion at IP sides in line with conditions set out in paragraph 2.2.3(1) of the CMP GL. The data from auction reports enabled to detect products, where demand exceeded offer by comparing demanded volumes with allocated volumes per IP side per auction. The non-offer of firm products with a duration of at least one month or longer (paragraph 2.2.3(1) (d) of the CMP GL) was assessed for all IP sides by identifying which products of all respective product categories (months, quarters, years for the calendar year 2017 until the gas year 2018/19) were offered and all products with no auctions were marked as non-offered. Since some IP sides started only in 2017 or ended before the end of 2017, additionally the validity period of the IP (from transport file) had to be checked. 12 Unfortunately, the data on the booking platforms can only be analysed manually, auction by auction, due to the lack of consistent usage of IP names, and/or consistent application of the EIC codes. While the RBP and GSA platforms implement a consistent use of EIC codes and more or less of IP names, the PRISMA platform is lacking EIC codes of IP sides on numerous occasions and IP side names are inconsistent with the names used on ENTSOG TP. On the RBP booking platform, for some auction results, information on TSOs (both sides) was missing, preventing to define the direction of the flow, which was later reviewed by the concerned operators. Additionally, on some booking platforms, information on the reporting TSO is missing; therefore, the information could be only deduced based on the currency in which the capacity was auctioned. 10 The CMP file reports the beginning of a period as the first day of the month, while the ENTSOG TP reports it as the first day of the next month. 11 Besides the missing auction premia occurring in 2017 for IP sides auctioned on PRISMA and RBP, some smaller inconsistencies were found in the CMP file. Altogether 8 records were duplicated, all in the area of unsuccessful requests of the CMP file. On the other hand, in the ENTSOG TP file Capacities made available 1 IP side uses different EIC code and 1 IP side had no name in in the file. The list of unavailable products (months, quarters, gas years) for use at least in the 2017 and gas year 2017/18 is not complete and can therefore not be used as a reliable source to screen all the congestion indicators. 12 For instance, an IP that became operational in July 2017 would not have been able to offer capacity products that according to the CAM NC auction calendar (hosted by ENTSOG) are auctioned before July. The non-offer of firm products related to a period in which the IP was not valid has to be disregarded when evaluating the criteria in paragraph 2.2.3(1) (d). 6

8 All booking platforms were helpful and available to clarify and add information upon request of the Agency. The Agency is considering taking an initiative towards the three booking platforms to propose the voluntary adoption of a harmonised way of IP side identification for CAM auction reports. 5. Approach to the congestion analysis and applied methodology The concepts of contractual congestion and physical congestion are defined in Articles 2(21) and 2(23) of Regulation (EC) No 715/2009 in the following way: a. contractual congestion means a situation where the level of firm capacity demand exceeds the technical capacity; b. physical congestion means a situation where the level of demand for actual deliveries exceeds the technical capacity at some point in time. A frequent occurrence of physical congestion cannot be remedied through the application of CMPs, but should be addressed, where efficient to do so, by infrastructure expansions or, in some instances, via contractual arrangements, such as flow commitments. Contractual congestion, during time periods without physical congestion, can be tackled through the CMPs laid down in the CMP GL. The CMP GL contains certain conditions that require the application of the FDA UIOLI mechanism. The conditions which may lead to the application of the FDA UIOLI are set out in paragraph 2.2.3(1) of the CMP GL. In particular, FDA UIOLI shall be applied at IPs where, based on this Report, it is shown that demand exceeds supply, at the reserve price when auctions are used, in the course of capacity allocation procedures for products for use in either that year or in one of the subsequent two years: a. for at least three firm capacity products with a duration of one month, or b. for at least two firm capacity products with a duration of one quarter, or c. for at least one firm capacity product with a duration of one year or more, or d. where no firm capacity product with duration of one month or more has been offered. Therefore, the main purpose of this Report is to identify, for which IP sides at least one of these conditions is met during the analysed period. For the purpose of this Report, IP sides fulfilling at least one of the above-mentioned criteria are identified as contractually congested. That situation occurs if there is more market demand than offers for a certain capacity product for a distinct duration at a specific moment in time, which can be observed in the following ways: a. where auctions are used, congestion is apparent once the auction clears with an auction premium 13 ; b. in cases where auctions are not (yet) used and/or available firm capacity at the concerned IP is fully booked, the capacity demand exceeding the offer at the reference price could be indicated either as unsuccessful request for capacity and/or as demand for interruptible capacity that exceeds the typical demand for interruptible capacity at the IP. 13 The auction premium is a top-up paid by the successful bidder, on top of the reserve price at a specific IP. 7

9 All references to the occurrence of congestion or congested IPs in this Report should be understood in the light of the above definitions and criteria. Some of the IPs identified as contractually congested could also be physically congested. There can be cases of contractual congestion, which are not covered by the four criteria of paragraph 2.2.3(1) of the CMP GL; for example, contractual congestion can also occur on the day-ahead or within-day timeframe (and would still fall under the general definition of contractual congestion in Regulation (EC) No 715/2009). Such instances are not included in this Report. 5.1 Firm capacities The PRISMA platform commercialises multiple types of capacities, beyond firm and interruptible, namely: bfzk, BZK, DZK, DZK and FZK for the German and Austrian markets. For the purpose of the congestion analysis, these capacities were treated in the following way: Table 1: Types of capacity that are commercially available Type of Capacities Short Description of Capacities How to handle Capacities Definition Firm Firm capacity Firm FZK Free allocable capacities Firm Freely available allocable capacities allow transports within a whole market area and access to its virtual trading point without any limits.* bfzk Conditionally firm freely allocable capacities Firm A capacity product which offers a shipper the possibility to use a part of capacity within a TSO s network on a firm basis within certain temperature restrictions and a part on interruptible basis to the virtual trading point.* DZK Dynamically allocable capacities Firm DZK are firm capacities in case of balanced transport between certain entry and exit capacities and only interruptible by use of virtual trading point.* BZK restricted firm capacity Firm Restricted allocable capacities cannot be freely allocated due to physical reasons; the use of virtual trading point is not possible.* Interruptible interruptible interruptible Interruptible capacities allow transports in a whole market area and access to its virtual trading point on an interruptible basis.* backhaul capacity Virtual reverse flow Interruptible due to limits of physical flow In cases where a pipeline system allows physical gas flows in both directions, it is clear that capacity firm and interruptible can be offered to market participants in both directions. However, also in cases where it is technically not possible to physically transport gas in both directions, it is still possible for a TSO to offer capacity as a "counter flow" or "backhaul" in the other direction, on a virtual basis. Counter flow transports can be offered up to the maximum of the main flow, however generally only on an interruptible basis, as a TSO cannot guarantee the shipment of the counter flow gas under all circumstances.** * definitions from EASEE-gas/Edig@s CODE LISTS FOR VERSION 5 IMPLEMENTATIONS - Complete compilation of Edigas Code Lists used in the development of version 5 Edigas XML Documents; Current Version: 22, Current Release: 0, Release date: Available at: last accessed 27 April ** definition taken from Baltic Energy Market Interconnection Plan (BEMIP). Final Report for the High-level Group, p.13. Available at: last accessed 27 April Steps in congestion analysis To assess the existence of contractual congestion, auction reports covering the period from January 2017 to December 2017 were downloaded from the booking platforms websites, consolidated, filtered and arranged for the relevant data. Due to the above-mentioned limitations of 8

10 ENTSOG s CMP data, the ENTSOG data was used only for double-checking the outcome of the analysis based on the booking platforms data. Each IP side of the updated NC CAM / CMP IP scope list was attributed a unique ID constructed from TSO, TSO s EIC, IP name, IP s EIC, direction, connected TSO and connected TSO s EIC. Based on the unique IDs, reports were screened for those auctions at IPs where total capacity demand exceeded the offer and/or where auction premia occurred for monthly/quarterly/yearly products. Products with an auction premium at a specific IP side (or bundle) (unique ID) were listed in the results table, created on the basis of the updated NC CAM / CMP IP scope list. All consolidated auction reports were screened IP by IP for the offer and non-offer of capacity products of at least 1-month duration for the analysed period. The analysis focused on the offer and non-offer of firm bundled products followed by the non-offer of the unbundled firm entry or exit products. Where no firm product offers were found in auctions held in 2017, the IP side was marked as congested due to non-offer. For all IP sides, the offer of interruptible products was checked and recorded in the analysis. Virtual reverse-flow IP sides were identified based on the ENTSOG list of CAM relevant IP sides, previous congestion analyses and information from TSOs. All available CMP data on unsuccessful requests, capacity made available through CMPs, auction premia and non-availability of products stemming from the ENTSOG TP CMP export file were added to the results table, as they may signal congestion. In line with the conditions set out in paragraph 2.2.3(1) of the CMP GL, the IP sides for which auction premia and/or non-offers of firm products occurred were labelled as contractually congested in the results table (Annex 4). The reason for congestion was recorded as well. If auction premia occurred at a lower frequency than indicated in the CMP GL, the IP side was marked as close to be congested, following the practice of the previous Congestion Reports. The IP sides for which only the yearly product for the gas year 2018/19 was not offered, were labelled as formally congested 14, following again the practice of previous Reports. The remaining IP sides were considered not congested. For those IP sides found congested, further information on whether interruptible capacity was generally offered at an IP side was checked based on the booking platform data, and, if this was the case, it was assessed whether it was fully, partially or not at all booked (in terms of predefined time periods). The information on interruptible capacity bookings can be used as a proxy in the analysis to show that demand for capacity exceeded the actual offer of firm capacity. This is in line with the provision of the CMP GL to take into account the use of interruptible capacity. Additionally, the occurrence of actual interruptions of nominated interruptible capacity (as a possible indicator for physical congestion) was documented in the results table, based on ENTSOG s TP data (transport data, export file and online). For the identified contractually congested IP sides, it was also assessed and indicated: a. whether they were already found contractually congested in the previous four Congestion Reports; b. whether the FDA UIOLI mechanism is already applied; 14 Some TSOs do not (yet) offer gas yearly products beyond the front gas year or the gas yearly capacity for 2017/18 cannot be offered due to the short-term quota (i.e. capacity set aside according to Art. 8 (7b) of NC CAM). The congestion may therefore still disappear in the future. It should be noted that the NC CAM obliges the TSOs to offer at least the upcoming 5 gas years from July 2018 on. 9

11 c. to which extent secondary capacity trading took place; d. whether auction premia also occurred at the day-ahead level in Summary of the outcomes of the analysis 6.1 Identified contractual congestion and its breakdown The results of the analysis of the auction reports and ENTSOG s TP data for firm products offered in 2017 for use in 2017, 2018 or 2019 for the 366 CAM-relevant IP sides are shown in Figure 1. Figure 2: Result of the congestion analysis of 366 CAM IP sides Distribution of IP sides based on status of congestion 100% = 366 CAM Relevant IP sides IP sides congested, 17 IP side close to be congested, 10 IP sides formally congested, 72 IP sides not congested, 163 IP sides out of scope, 104 According to the criteria set in sub-paragraphs (a) to (d) of paragraph 2.2.3(1) of the CMP GL, 17 IP sides were identified as congested. Application of sub-paragraphs (a) to (c) on auction premia resulted in 6 IP sides identified as congested, of which a. 1 IP side had congestion for all types of products (monthly, quarterly and yearly); b. 4 IP sides were congested only for quarterly products; c. 1 IP side was congested only for yearly products. The application of sub-paragraph (d) resulted in 11 IP sides being identified as congested due to the non-offer of the products. The number of IP sides congested due to the occurrence of auction premia as well as IP sides congested due to the non-offer has decreased compared to the previous year. Occurrences of auction premia decreased from 9 (2016) to 6 (2017) and occurrences of nonoffer from 14 (2016) to 11 (2017). Breaking down the congestion results according to the criteria of paragraphs 2.2.3(1) (a) (d) of the CMP GL, the following can be observed: 10

12 a. criterion a): auction premia for at least three monthly products did not occur at any IP side; b. criterion b): differently from the previous year, auction premia for at least two quarterly products for use within the front gas year (i.e. Gas Year 2017/18) triggered 5 contractual congestion instances (all bundle products 15 ); c. criterion c): auction premia for at least one gas yearly product occurred at 2 IP sides (1 bundle, 1 entry); d. criterion d): no firm capacity product with a duration of one month or more has been offered at 11 IP sides 16,17,18,19. Figure 3: Distribution of congested IP sides by triggers for being congested Majority of congested IP sides are congested due to "non offer", majority of auction premia occured on quarterly products 100% = 17 Auction premia for at least one gas yearly product - 1 Auction premia for at lest two quarterly products - 4 Auction premia for all products (M,Q,Y) % 65% due to auction premia due to non offer In addition to the label congested, IP sides have also been labelled as close to be congested and as formally congested. IP sides labelled as close to be congested had auction premia occurring at a lower frequency than the threshold determined in the CMP GL criteria, namely either 15 IP side OGE Oberkappel exit had auction premia on bundled and unbundled capacities for the same products, while IP side bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit had auction premia only on the bundle products, while the unbundled products did not have auction premia. 16 For the IP side Kulata (BG) / Sidirokastron (GR) BGT exit, the TSO noted that the technical capacity is long-term booked and only interruptible products are auctioned at the RBP booking platform. 17 For Liaison Nord Sud GRTgaz exit, the NRA and the TSO note that the IP side is subject to physical congestion and the IP side will disappear as from 1st November For Tarvisio-Arnoldstein, the Italian NRA notes that the capacity was offered as interruptible for use in 2016, 2017 and 2018 at the Tarvisio exit. Due to construction works ongoing until 2018 at Tarvisio exit and in order to guarantee the supply of Northern Italy, capacity products were offered only as interruptible capacity, given the status of the project. The works will be terminated in By that time, Italy will be ready to offer up to 40 mcm/d export capacity to Northern Europe. 19 For RC Thayngen-Fallentor TNBW exit, the TSO notes that due to capacity reduction at the cross-border transmission IP Thayngen-Fallentor, there was no firm capacity marketable during quarterly and monthly auctions, as all the remaining capacity was already marketed in the yearly auction. 11

13 twice per monthly product or once per quarterly product. IP sides labelled as formally congested had only the gas yearly product for the gas year 2018/19 not offered in In the Congestion Report for 2016, 78 IP sides were labelled as contractually congested, combining congested (23) and formally congested (55) IP sides. The analysis of 2017 data resulted in an increased number of contractually congested IP sides with 89 instances. In a number of cases, this non-offer does not necessarily hint to contractual congestion, as some TSOs have either decided not to offer capacity beyond one gas year ahead or the NC CAM capacity quota 20 prevented the offer of the Gas Year 2018/19 product. 163 IP sides (62% of the 262 IP sides within the scope of the CMP GL cf. section 2.1) were found not to be contractually congested in Comparison with the previous Congestion Reports shows that of the 17 IP sides identified as congested in 2017, 9 IP sides were already indicated as congested in , while in 2015 and and 6 of those same IP sides were found congested, respectively 22. In addition, of the 72 formally congested IP sides in 2017, 3 were congested in 2014, 9 were congested in 2015, while, in 2016, 4 were congested and 29 formally congested. The distribution of the congested IP sides across IP types is depicted in Figure 3 below. Most congestion is detected at cross-border IP sides, which also represent the majority of IP sides within the CMP GL scope list. 4 in-country cross-zonal IP sides, as well as 2 IP sides with third-countries (non-eu countries) and 1 IP side (of 1) virtual IP, constitute the remaining congested IP sides. Figure 4: Breakdown of congested IP sides by IP type Distribution of congested IP sides across IP types 100% = 17 with 3rd country, 2 cross-border VIP, 0 in-country, 4 cross-border, % of technical capacity has to be set aside for offers not earlier than in the auctions for quarterly products. 21 IP sides congested in 2017 that were congested in 2016 as well are: Bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit, BTG Kulata (BG) / Sidirokastron (GR) exit, Fluxys TENP GmbH Wallbach exit, GASCADE Kienbaum exit, GRTgaz Liaison Nord Sud exit, OGE Kienbaum entry, OGE Oberkappel exit, OGE Steinitz entry, SNAM RETE GAS Tarvisio (IT) / Arnoldstein (AT) exit. 22 BTG Kulata (BG) / Sidirokastron (GR) exit, GASCADE Kienbaum exit, OGE Kienbaum entry, OGE Oberkappel exit were labelled congested in all previous reports, whereas Bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit, OGE Steinitz entry were labelled congested in 2015 and

14 6.2 Extent of congestion at IP level: unsuccessful requests At IPs where all capacity products are offered via auctions, an indication of demand exceeding offer can easily be derived from the emergence of auction premia, whereby the volume of unsuccessful requests can be calculated by subtracting total allocated capacities from total demanded capacities at the reserve price. The unsuccessfully requested capacity amounts show to what extent an IP side is contractually congested. The PRISMA auction reports revealed auction premia (and therefore unsuccessful requests) for 8 IP sides 23. The RBP auction report showed a premium for 1 IP side. The combined information indicates that a total of 9 IP sides characterised by unsuccessful requests. At the same time, only for 4 out of the 17 congested IP sides, unsuccessful requests were reported on the ENTSOG TP. The reporting on the ENTSOG TP should be improved, as it does not cover all auction premia and resulting unsuccessful requests yet. The majority of unsuccessful requests at the 9 IP sides occurred for quarterly products (16 occurrences), followed by monthly products (10 occurrences) and gas year products (3). The largest volumes have been requested at the North-South link in France. A detailed table showing the volumes/extent of unsuccessful requests based on the auction reports is provided in Annex Analysis of offer and use of interruptible capacity and instances of interruptions Besides the occurrence of unsuccessful requests for firm capacity, the booking(s) of interruptible capacity can be used as an indicator of contractual congestion to the extent that the demand for capacity exceeds the technical capacity and under the assumption that those who booked interruptible capacity would have preferred firm capacity. Interruptible capacity was offered at 15 of the 17 IP sides for which contractual congestion was identified. As indicated in Figure 4 below, interruptible capacity was booked at more IP sides for use in Q2/2018 and Q3/2018 than in the earlier quarters of the gas year 2017/18, while the yearly product for the gas year 2018/19 was not booked at all. At 3 congested IP sides DESFA S.A.Kulata (BG) / Sidirokastron (GR) entry, Fluxys TENP GmbH Wallbach exit, Transgaz Negru Voda (RO) / Kardam (BG) entry no interruptible capacity was offered for use in The auction premia occurred for 5 bundled products involving 8 different IP sides. 13

15 Figure 5: Interruptible capacity offer, bookings & interruptions at the congested IP sides 2017 Number of congested IP sides with interruptible capacity Offered by TSO Booked for Q4-17 Booked for Q1-18 Booked for Q2-18 Booked for Q3-18 Booked for GY 17/18 Booked for GY 18/19 Actual interuptions YES NO Actual interruptions of nominated interruptible capacity mostly occurred at contractually congested IP sides with substantially booked interruptible capacity, which may indicate the existence of (temporary) physical congestion. Such instances of possible physical and contractual congestion have been observed at 5 IP sides (for a total number of 154 instances). For most of those IP sides, interruptions occurred for a limited number of days in 2017, ranging from 1 to 23 days. Interruptions occurred more often at 3 IP sides: 28 days at Oberkappel (Germany to Austria), 28 days at Oberkappel (Austria to Germany) and 74 days Liaison Nord Sud, within France. 7. Secondary trading and application of CMPs 7.1 Secondary capacity trading at congested IP sides The publication of PRISMA Secondary market data and the direct reporting of secondary trade data by TSOs to the Agency for the IP sides identified as congested has made more data available and, with it, the oversight of activities on the secondary market has further improved compared to what was possible for last year s Congestion Report. Nevertheless, with 5 IP sides out of 17, the number of congested IP sides for which secondary capacity was traded remained relatively low. The concluded trades on PRISMA Secondary market are summarised in Figure 5. Most trades were concluded for Fluxys TENP GmbH Wallbach exit, with 110 products and the majority being monthly and quarterly products, and for GRTgaz Liaison Nord Sud exit with 24 gas year products, 17 monthly products, and 3 non-standard products. These trading numbers indicate a vivid secondary market for capacity at these IP sides. Additionally, secondary trade information was made available for 17 of the 72 IP sides for which no firm capacity offer of the Gas Year 2018/19 was found on the primary market. 14

16 Figure 6: Number of secondary market trades at the congested IP sides 2017 (Number of trades) Number of secondary market trades at the congested IP sides - 5 congested IP sides GAS YEAR (2 IP sides) QUARTER (3 IP sides) MONTH (3 IP sides) NON STANDARD YEAR (2 IP sides) NON STANDARD (OTHER) (5 IP sides) In 2017, PRISMA Secondary has been increasingly used as a trading platform by shippers. For the 17 congested IP sides, mostly unbundled capacity was traded, with the exception of GRTgaz Liaison Nord Sud, on PRISMA Secondary. From the group of offered firm capacity products, predominantly monthly products were traded on PRISMA Secondary. The possibility to trade non-standard capacity products was predominantly used in In 2017, however, standard (monthly and quarterly) products are leading the secondary market, while use of non-standard products for congested IP sides decreased. 7.2 Application of CMPs According to ENTSOG s TP data, the overall application of CMPs and therefore days for which additional capacities were offered has further increased compared to the previous year. Figure 6 shows the number of days for which additional capacity was offered through the various CMPs at all IP sides. After a year of no application of the long-term Use-It-Or-Lose-It (LT UIOLI), this CMP was applied for a limited number of days in The (daily) instances of FDA UIOLI, which was only applied at the German and Austrian IP sides in 2017, has slightly decreased compared to the previous years. Most of the reported FDA UIOLI offers both in total numbers and capacity amounts occurred at the borders of the NCG market area, which encompasses more entry and exit IP sides than any of the other two market areas (Gaspool and Austria) where FDA UIOLI was applied in

17 Occurences (days) ACER CONGESTION REPORT, 5 th edition Figure 7: Development of CMP application (occurrences reported on the ENTSOG TP for all IP sides) Reported CMP application for all IP sides increased for oversubscription, surrender and LT UIOLI, whereas FDA UIOLI decreased in FDA UIOLI Oversubscription Surrender LT UIOLI in Q in Q4 for 2014 in Q4 for 2015 in Q4 for 2016 in Q4 for 2017 The extent of application (the number of instances in days) of oversubscription has increased in 2017 compared to the previous year; almost 85% of the reported applications still concern IP sides of the Dutch TSO GTS. The number of days for which capacity products were surrendered during 2017 for use in that year increased around 30% compared to Again, the majority (72% of the days) of products and amounts were surrendered at Dutch IP sides followed by the UK (17%). The CMP application in 2014, 2015, 2016 and 2017 leading to an additional offer of capacity at congested and non-congested IP sides is compared in Figure 7. While the number of IP sides for which capacity was offered through oversubscription was almost the same in 2015 and 2016 (-2 compared to 2015) and 2017 (+1 compared to 2015), the application has not reduced the number of contractually congested IP sides (since oversubscription was not applied at the congested IP sides). On the other hand, its application may have prevented contractual congestion at some of the IP sides. 16

18 Number of IP sides ACER CONGESTION REPORT, 5 th edition Figure 8: Development of the number of congested vs. non-congested IP sides for which CMPs have led to additional capacity availability (number of IP sides) Development of CMP application (occurrences reported on the ENTSOG TP for all IP sides) FDA UIOLI Oversubscription Surrender LT UIOLI at congested IP sides at non-congested IP sides At 8 IP sides where the FDA UIOLI mechanism is applied, congestion was identified in 2017 (-3 compared to 2016). Although the FDA UIOLI mechanism cannot resolve contractual congestion for products beyond the day, it increases the amount of FDA capacity available to the market, supporting spot market price convergence even in the reverse flow direction at unidirectional IPs. Still, for 123 CMP relevant IP sides, no capacity made available via FDA UIOLI was reported on the ENTSOG TP. The reasons for this may include the non-application of the FDA UIOLI mechanism due to the 10% threshold 24 or the absence of contractual congestion. It may also be that capacity was made available, but the data was not reported on the ENTSOG TP; however, the possibility of missing data has not been investigated. For 2 IP sides marked as congested due to auction premia bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit and OGE Oberkappel exit the ENTSOG TP includes data on the FDA UIOLI. For the other IP sides marked as congested due to auction premia, this data was not included in the ENTSOG s TP CMP file. However, PRISMA data shows that firm capacities were traded for all 5 congested IP sides on the PRISMA platform. Additionally, Kulata (BG)/Sidirokastron (GR) Desfa entry IP side had available firm day-ahead capacities on the RBP platform, while no data was available on the ENTSOG TP. 11 Member States reported capacity amounts made available via CMPs, while in 2016 this happened only in 7 Member States. As shown in Figure 6, a predominant increase of surrender and oversubscription CMP processes has been observed in 2017, while LT UIOLI was reported for the first time. 24 Sub-paragraph of the CMP GL specifies that paragraph 3 shall not apply to network users persons or undertakings and the undertakings they control pursuant to Article 3 of Regulation (EC) No 139/2004 holding less than 10 % of the average technical capacity in the preceding year at the interconnection point. 17

19 Average GWh/d ACER CONGESTION REPORT, 5 th edition Figure 9: Capacity made available [averaged GWh/d] via CMPs in the EU (according to ENTSOG s TP data) 2017 (GWh/d) CMP application in 2017 was only reported for IP sides of 11 Member States largest capacity amounts were made available at Dutch and UK border sides NL UK CZ SE AT FR DE ES PT PL BG UIOLIShortTerm UIOLILongTerm 8.58 Oversubscription Surrender Annex 3 provides an overview of the average capacity made available in 2017 via the various CMPs at each of the congested IP sides for which data reported was greater than 0. Annex 4 shows for each of the 17 congested IP sides, whether capacity was made available via CMPs or not. Whether and to which extent any capacity released by CMPs was booked cannot be determined, since publications of capacity offers (at the booking platforms) and of capacity bookings (at the ENTSOG TP) do not differentiate the origin of the offered capacity. 18

20 8. Supplement A: Results of the 2017 day-ahead auctions The analysis presented in this Congestion Report focused on the criteria of paragraph 2.2.3(1) (a) (d) of the CMP GL. Knowing the congestion of the IP sides at the day-ahead level could bring in an additional assessment criterion. The results of day-ahead auctions may facilitate the NRA s decision to enforce the FDA UIOLI application at specific contractually congested IP sides. The analysis of the three booking platforms auction reports for day-ahead auctions has revealed the following findings. The results of the PRISMA platform shows 60 IP sides with at least one auction that resulted in auction premia for day-ahead auctions. 5 of those IP sides 25 are already labelled as congested on long-term products in line with the criteria of sub-paragraphs 2.2.3(1) (a) (c) of the CMP GL and 3 more IP sides 26 are labelled as congested due to non-offer in line with criteria of sub-paragraph 2.2.3(1) (d) of the CMP GL. In addition to the IP sides labelled as congested, 8 IP sides labelled as close to be congested and 14 labelled as formally congested resulted with auction premia on day-ahead market. These are the 10 IP sides with the highest occurrences of auction premia on day-ahead market: a. GCA Überackern ABG (AT) / Überackern (DE) 21Z E entry 96 b. GCA Überackern SUDAL (AT) / Überackern 2 (DE) 21Z entry 96 c. GRTgaz Liaison Nord Sud 21Z L exit 86 d. OGE Oberkappel 21Z G exit 71 e. bayernets Überackern SUDAL (AT) / Überackern 2 (DE) 21Z exit 64 f. Fluxys TENP GmbH Wallbach 21Z exit 55 g. GTS Bunde (DE) / Oude Statenzijl (L) (NL) (GTG Nord) 21Z G exit 49 h. SNAM RETE GAS Tarvisio (IT) / Arnoldstein (AT) 21Z A entry 45 i. Energinet Ellund 21Y---A001A002-8 exit 42 j. OGE Ellund 21Z entry 42 The results of the RBP platform show only 1 IP side with auction premia on the day-ahead market, being Mosonmagyaróvár (AT>HU) FGSZ entry, which had 9 occurrences of auction premia. 25 bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit; GCA Oberkappel entry; GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry; GRTgaz Liaison Nord Sud exit; OGE Oberkappel exit. 26 Fluxys TENP GmbH Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) entry; GCA Überackern ABG (AT) / Überackern (DE) entry; GRTD Oberkappel exit. 19

21 Figure 10: CMP relevant IP side with auction premia on DA market % = 59 IP sides Not congested Formally congested Close to be congested Congested due auction premia Congested due non-offer 9. Conclusions and recommendations 9.1 Conclusions and implications Compared to last year s Congestion Report, in which 23 IP sides (9% of the 247 IP sides within the scope of the CMP GL) were identified as congested, the number of congested IP sides has decreased to 17 (~6.5 % of the 262 IP sides within the scope of the CMP GL); this number disregards the 72 IP sides where only the Gas Year 2018/19 has not been offered. For the 17 contractually congested IP sides listed in Annex 4, the FDA UIOLI mechanism should be implemented pursuant to paragraphs 2.2.1(4) and 2.2.3(1) of the CMP GL. The FDA UIOLI mechanism is already applied at 8 of these 17 IP sides. This means that at the remaining 9 contractually congested IP sides (cf. Annex 5), the respective NRA shall require the relevant TSO(s) to implement and apply the FDA UIOLI mechanism, unless it is shown that a congested situation is unlikely to reoccur in the following three years. These IP sides currently have not implemented and applied oversubscription or surrender rules since October 2013 and, according to the ENTSOG TP data, there was no capacity made available via any of the CMPs in The NRAs should investigate the reasons why CMPs are not applied, in particular for those IP sides that were found congested already in previous Reports. The full implementation and application of CMPs even as a preventive measure at potentially congested IP sides should be facilitated, monitored and enforced by the respective NRAs. The map in Annex 6 may assist in determining whether the contractually congested IP side is the only one connecting two entry-exit zones, which makes a congested situation even more critical in terms of restricting the free flow of gas across the Union. The existence of capacity hoarding cannot be checked in this Report, as, in order to do so, individual shipper data on capacity utilisation would be needed, which is not publicly available. Such data could be requested by NRAs from TSOs or network users and based on the Agency s findings 20

22 and detailed data sets accessible in this Report, the NRAs could complete the analysis, as necessary. 9.2 Recommendations for TSOs, ENTSOG and NRAs Although an overall improvement has been achieved on data quality, the experience gained in producing this Report indicates that the recommendations from the previous Report are still relevant. The Agency also notes that progress on improving data quality, allowing for automated data processing and making the data available on a single platform, has been limited. In order to improve data availability and consistency and, ultimately, transparency the Agency provide the following recommendations: a. ENTSOG/TSOs shall ensure that auction results with premia (in particular from PRISMA) and data on all non-available capacity products are uploaded on the ENTSOG TP, as required by the CMP GL. b. The alignment of EIC codes and of IP names and format ( unique identifier 27 ) used for the IPs in the NC CAM scope list on both the ENTSOG TP and on booking platforms is a necessary step to allow the consistent use of these identifiers by TSOs and ENTSOG to enable efficient and automated data processing for all stakeholders. c. Based on the findings presented in this Report, ENTSOG shall adapt and publish the updated CAM/CMP IP scope list on its TP. d. The ENTSOG TP should aim to incorporate information on bundled capacities Policy recommendation On the basis of the experience gained in producing this Congestion Reports and as a result of the discussions following the Agency s public consultation of the congestion indicators in September 2016, the Agency reiterates the following recommendations to the European Commission: a. The Commission may consider amending the CMP GL to review how the full effectiveness of the CMP measures can best be achieved, in particular, if CMPs are applied as a preventive measure 29, before contractual congestion occurs. Further, the following recommendations from last year s Congestion Report are still valid and restated: a. The Commission may consider aligning criterion d) of paragraph 2.2.3(1) of the CMP GL with the other congestion criteria. The current reading of criterion d) considers an IP side not congested if at least one month was offered out of 12 months in the preceding year s rolling monthly auction procedures. b. Alternatively, criterion d) could be aligned with the timeframes of criteria b) or a) as follows: At least six [but minimum three] monthly products should be offered at an IP in order for it not to be considered contractually congested. 27 An IP side can be uniquely identified only with a combination of the following: IP name, TSO, direction, connected TSO. 28 Currently, some commercial information on capacity products (e.g. on bundling and the level of firmness and allocability of firm capacity) is not available on the ENTSOG TP. Such data is only publicly accessible through the reporting of the three booking platforms. In order to comply fully with CMP GL s obligation to report on auction premia on the ENTSOG TP, at least an indicator on whether the auction premia occurred for bundled or unbundled capacity products is necessary. For the future it would be desirable to have a single platform for all public gas transport data related to CAM, CMP, balancing and tariff data to enable stakeholders to efficiently access all the required information in a harmonised form(at). 29 At least at those IP sides which are found potentially congested or close to be congested, or where the TSOs can anticipate any risk for contractual congestion occurring. 21

23 c. With respect to paragraph of the CMP GL, the Commission may consider clarifying: c.i. until when the Agency shall produce congestion reports (or under which conditions the reports are not required anymore); c.ii. an implementation period for the FDA UIOLI mechanism, if congestion is identified at IP sides only after 1 July 2017 and the respective NRA has decided to require the TSO to implement and apply the FDA UIOLI mechanism. d. The Commission may also consider to extend the scope of contractual congestion to the day-ahead timeframe between hubs (requiring the Agency to assess auction premia and the non-offer of firm day-ahead products at a cross-zonal level), which could then also result in an obligatory application of the FDA UIOLI mechanism at IPs/VIPs/IP sides between the corresponding market areas, to promote a short-term gas market price convergence. e. In addition, it should be further clarified that Article 6 of Regulation (EU) No 984/2013 regarding the joint method to maximise capacity and the dynamic approach to capacity calculation (re-calculation), takes priority over the application of oversubscription in the yearly, quarterly and monthly timeframe. 22

24 ANNEX 1: List of abbreviations ACER CAM CMP DZK EC ENTSOG EU FDA FZK IP NC NRA TP TSO UIOLI Agency for the Cooperation of Energy Regulators ( the Agency ) Capacity Allocation Management (Gas) Congestion Management Procedures (Gas) Dynamically allocable capacity European Commission European Network of Transmission System Operators for Gas European Union Firm Day-Ahead Use-It-Or-Lose-It Freely allocable capacity (firm) Interconnection Point Network Code National Regulatory Authority (ENTSOG) Transparency Platform Transmission System Operator Use-It-or-Lose-It 23

25 ANNEX 2: Unsuccessful requests at congested IP sides in 2017 Unsuccessful requests [Product] M = Month in 2017 Q = Quarter GY = Gas Year Unsuccessful requests [volumes] in 2017 kwh/d Operator Point Connected Direction Operators Direction Booking Platform bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit GCA 2017 DEC BUNDLE PRISMA bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit GCA Q1-18 BUNDLE PRISMA bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit GCA Q2-18 BUNDLE PRISMA bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit GCA Q3-18 BUNDLE PRISMA Fluxys TENP GmbH Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) entry Fluxys Belgium 2017 JUL ENTRY PRISMA Fluxys TENP GmbH Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) entry Fluxys Belgium 2017 JUN ENTRY PRISMA Fluxys TENP GmbH Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) entry Fluxys Belgium 2017 MAY ENTRY PRISMA GCA Oberkappel entry 2017 JUL ENTRY PRISMA GCA Oberkappel entry 2017 JUN ENTRY PRISMA GCA Oberkappel entry 2017 MAY ENTRY PRISMA GCA Oberkappel entry OGE Q2-18 BUNDLE PRISMA GCA Oberkappel entry OGE Q3-18 BUNDLE PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets 2017 DEC BUNDLE PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets 2017 JUL ENTRY 0 PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets 2017 JUN ENTRY PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets 2017 MAR ENTRY PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets 2017 MAY ENTRY 0 PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets 2017 NOV ENTRY PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets Q1-18 BUNDLE PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets Q2-18 BUNDLE PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets Q2-18 ENTRY PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets Q3-18 BUNDLE PRISMA GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry bayernets Q3-18 ENTRY PRISMA GRTgaz Liaison Nord Sud exit 2017 APR BUNDLE PRISMA GRTgaz Liaison Nord Sud exit 2017 DEC BUNDLE PRISMA GRTgaz Liaison Nord Sud exit 2017 FEB BUNDLE PRISMA GRTgaz Liaison Nord Sud exit 2017 JUL BUNDLE PRISMA GRTgaz Liaison Nord Sud exit 2017 NOV BUNDLE PRISMA GRTgaz Liaison Nord Sud exit 2017 OCT BUNDLE PRISMA GRTgaz Liaison Nord Sud exit 2018 JAN BUNDLE PRISMA GRTgaz Liaison Nord Sud exit GY 17/18 BUNDLE PRISMA GRTgaz Liaison Nord Sud exit GY 18/19 BUNDLE PRISMA GRTgaz Liaison Nord Sud exit Q1-18 BUNDLE PRISMA GRTgaz Liaison Nord Sud exit Q2-18 BUNDLE PRISMA GRTgaz Liaison Nord Sud exit Q3-18 BUNDLE PRISMA GRTgaz Liaison Nord Sud exit Q4-17 BUNDLE PRISMA OGE Oberkappel exit GCA Q2-18 BUNDLE PRISMA OGE Oberkappel exit GCA Q2-18 EXIT PRISMA OGE Oberkappel exit GCA Q3-18 BUNDLE PRISMA OGE Oberkappel exit GCA Q3-18 EXIT PRISMA DESFA S.A. Kulata (BG) / Sidirokastron (GR) entry BTG GY 17/18 ENTRY 2552 RBP 24

26 ANNEX 3: Capacity made available at congested IP sides through the application of CMPs LT UIOLI- Avg value of the capacity in kwh/d made available at the point for 2017 FDA UIOLI - Avg value of the capacity in kwh/d made available at the point for 2017 Surrender - Avg value of the capacity in kwh/d made available at the point for 2017 Oversubscription - Avg value of the capacity in kwh/d made available through the application of the pointed CMP in 2017 No Operator Point Direction Booking Platform Connected Operators 1 bayernets Überackern SUDAL (AT) / Überackern 2 (DE) exit PRISMA GCA BTG Kulata (BG) / Sidirokastron (GR) exit RBP DESFA S.A DESFA S.A. Kulata (BG) / Sidirokastron (GR) entry RBP BTG Fluxys TENP GmbH Eynatten 2 (BE) // Lichtenbusch / Raeren (DE) entry PRISMA Fluxys Belgium Fluxys TENP GmbH Wallbach exit PRISMA Swissgas GASCADE Kienbaum exit PRISMA OGE GCA Oberkappel entry PRISMA OGE GCA Überackern ABG (AT) / Überackern (DE) entry PRISMA bayernets 0 0* GCA Überackern SUDAL (AT) / Überackern 2 (DE) entry PRISMA bayernets GRTD Oberkappel exit PRISMA GCA GRTgaz Liaison Nord Sud exit PRISMA OGE Kienbaum entry PRISMA GASCADE OGE Oberkappel exit PRISMA GCA OGE Steinitz entry PRISMA ONTRAS Gastransport G SNAM RETE GAS Tarvisio (IT) / Arnoldstein (AT) exit PRISMA TAG GmbH TNBW RC Thayngen-Fallentor exit PRISMA Erdgas Ostschweiz Transgaz Negru Voda I (RO) / Kardam (BG) entry RBP BTG * GCA applies FDA UIOLI at this IP side since 1 October Due to technical reasons, the data on CMP capacities made available through FDA UIOLI was not uploaded to ENTSOG TP by GCA.

27 ANNEX 4: Indicative list of contractually congested IP sides within the scope of the CMP GL No Operator Point Direction Booking Platform Connected Operators 1 bayernets Überackern SUDAL (AT) exit PRISMA GCA yes yes 11 yes yes yes no yes yes yes 2 BTG Kulata (BG) / Sidirokastrexit RBP DESFA S.A. yes no no yes yes yes yes 3 DESFA S.A. Kulata (BG) / Sidirokastrentry RBP BTG no no no no yes (no GY17/18) 4 Fluxys TENP GmbH Eynatten 2 (BE) // Lichteentry PRISMA Fluxys Belgium yes yes no yes PRISMA no yes 5 Fluxys TENP GmbH Wallbach exit PRISMA Swissgas yes yes yes yes PRISMA yes close yes yes yes 6 GASCADE Kienbaum exit PRISMA OGE yes yes no no no yes yes yes yes 7 GCA Oberkappel entry PRISMA OGE yes yes no no PRISMA no close yes 8 GCA Überackern ABG (AT) / Üentry PRISMA bayernets yes yes no no yes* 9 GCA Überackern SUDAL (AT) entry PRISMA bayernets yes yes no no yes yes yes yes (no GY17/18) yes 10 GRTD Oberkappel exit PRISMA GCA yes yes 28 no yes yes no yes close yes 11 GRTgaz Liaison Nord Sud exit PRISMA yes yes 74 yes no PRISMA yes yes yes yes (bundle) 12 OGE Kienbaum entry PRISMA GASCADE yes yes no yes no yes yes yes yes 13 OGE Oberkappel exit PRISMA GCA yes yes 29 yes yes PRISMA no yes yes yes yes 14 OGE Steinitz entry PRISMA ONTRAS Gastransport Gyes yes 2 no yes yes no yes yes yes 15 SNAM RETE GAS Tarvisio (IT) / Arnoldsteexit PRISMA TAG GmbH yes yes no no no yes 16 TNBW RC Thayngen-Fallentor exit PRISMA Erdgas Ostschweiz yes no yes no yes 17 Transgaz Negru Voda I (RO) / Karentry RBP BTG no no no * GCA applies FDA UIOLI at this IP side since 1 October Due to technical reasons, the data on CMP capacities made available through FDA UIOLI was not uploaded to ENTSOG TP by GCA. Interruptible offered? Interruptible booked? Number of interruptions? Rep. unsuccessful requests? CMP application? Secondary capacity trading on PRISMA / RBP? Has this IP side been (indicatively) contractually congested in Q4/13? Congested in 2014? Congested in 2015? Congested in 2016? FDA UIOLI already implemented? 26

28 ANNEX 5: List of the IP sides for which NRAs should require the FDA UIOLI application The list shows the congested IP sides, for which the FDA UIOLI mechanism needs to be implemented according to paragraph 2.2.3(1) of the CMP GL, unless it is shown that a congested situation is unlikely to reoccur in the following three years. No Operator Point Direction Booking Connected Platform Operators 1 BTG Kulata (BG) / Sidirokastron (GR) exit RBP DESFA S.A. yes no no yes yes yes yes no 2 DESFA S.A. Kulata (BG) / Sidirokastron (GR) entry RBP BTG no no no no yes (no GY17/18) no 3 GCA Überackern ABG (AT) / Überackern (DE) entry PRISMA bayernets yes yes no no no 4 GRTgaz Liaison Nord Sud exit PRISMA yes yes 74 yes no PRISMA yes yes yes yes (bundle) no 5 SNAM RETE GAS Tarvisio (IT) / Arnoldstein (AT) exit PRISMA TAG GmbH yes yes no no no yes no 6 Transgaz Negru Voda I (RO) / Kardam (BG) entry RBP BTG no no no no Interruptible offered? Interruptible booked? Number of interruptions? Rep. unsuccessful requests? CMP application? Secondary capacity trading on PRISMA / RBP? Has this IP side been (indicatively) contractually congested in Q4/13? Congested in 2014? Congested in 2015? Congested in 2016? FDA UIOLI already implemented? The technical capacity of the point is long-term booked, so Bulgarian gas transmission operator offers at the RBP interruptible capacity products, including annual, quarterly, monthly, day-ahead and daily. GCA applies FDA UIOLI at this IP side since 1 October Due to technical reasons, the data on CMP capacities made available through FDA UIOLI was not uploaded to ENTSOG TP by GCA. Liaison Nord-Sud is a point subject to physical congestion and then not relevant regarding CMP guidelines which are considering contractual congestion only. In addition this point will disappear as from 1st November The capacity was offered as interruptible for use in 2016, 2017 and 2018 at the Tarvisio exit. Due to construction works ongoing until 2018 at Tarvisio exit and in order to guarantee the supply of Northern Italy, capacity products were offered only as interruptible capacity, given the current status of the project. The works will be terminated in By that time, Italy will be ready to offer up to 40 mcm/d export capacity to Northern Europe. Only virtual reverse flow (backhaul) possible at this point direction and therefore interruptible (unidirectional IP where firm capacity is offered only in the exit direction) (please see also column M and N). This point direction is not relevant as per CMP GL. NRA/TSO comment 27

29 ANNEX 6: Map of 17 contractually congested IP sides in Europe in 2017 The key: Cross-border IP Congested Exit (non offer) In-country cross-zonal IP Congested Entry (non offer) Congested Entry and Exit (non offer) Congested Exit (auction premia) Congested Entry (auction premia) Congested Entry and Exit (auction premia) Note 1: all IP sides marked with an arrow were found to be congested because of non-offer of firm capacity products with a duration of either one month or longer in 2017 or because of the occurrence of auction premia. Note 2: the list of IP sides represented on the map is found in Annex 4 (one arrow in case both entry and exit are congested) Tarvisio (exit, Italy): no firm offers due to construction works until 2018 (see detailed explanation in Annex 5) Map source: ENTSOG Capacity Map 7/2017 ( 28

Policy and regulatory framework: what are the next challenges to tackle?

Policy and regulatory framework: what are the next challenges to tackle? Policy and regulatory framework: what are the next challenges to tackle? Alberto Pototschnig Director GIE Annual Conference Venice, TITRE 23 May 2013 Achieving the Internal Gas Market by 2014 (and beyond)

More information

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010 Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG-71-03 7 December 2010 Council of European Energy Regulators ASBL 28 rue le Titien, 1000 Bruxelles Arrondissement judiciaire de

More information

Description of the issue Comments Responsible Timing State of Play end Nov. 16. Dec 2016, Implementation beginning of point

Description of the issue Comments Responsible Timing State of Play end Nov. 16. Dec 2016, Implementation beginning of point Description of the issue Comments Responsible Timing of Play Austria No full Capacity Allocation Project plan of concerned TSOs and Agreement by Mechanism Network Code (CAM TSOs (Gas Connect National Dec,

More information

Auction Calendar 2016/2017 for Capacity Allocation Mechanism Network Code

Auction Calendar 2016/2017 for Capacity Allocation Mechanism Network Code CAP633-15 Version date: January 14 2016 Calendar 2016/2017 for Capacity Allocation Mechanism Network Code EXPLANATORY NOTE/DISCLAIMER The Network Code on Capacity Allocation Mechanisms in Gas Transmission

More information

Auction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code

Auction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code CAP682-16 Version date: October 07 2016 Calendar 2017/2018 for Capacity Allocation Mechanism Network Code EXPLANATORY NOTE/DISCLAIMER The Network Code on Capacity Allocation Mechanisms in Gas Transmission

More information

European Developments

European Developments European Developments Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup

More information

ENTSOG update and view on Germany

ENTSOG update and view on Germany ENTSOG update and view on Germany Ulrich Ronnacker Vienna, 8 th November 2011 2 Agenda ENTSOG ENTSOG work programme, processes, challenges View on Germany TRAC-X primary uniform capacity plattform Market

More information

All Baltic CCR TSOs amended proposal for the fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July

All Baltic CCR TSOs amended proposal for the fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July All Baltic CCR TSOs amended proposal for the fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation

More information

Business Requirements Specification for the. Nomination and Matching Procedures. In Gas Transmission Systems (NOM BRS)

Business Requirements Specification for the. Nomination and Matching Procedures. In Gas Transmission Systems (NOM BRS) 27 May 2015 Rev14 1 2 3 4 for the In Gas Transmission Systems (NOM BRS) 5 6 Version 0 Revision 14 2015-05-27 7 8 ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax: +32 2 894

More information

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017 Energy Regulators OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017 9 february 2017 ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG THE AGENCY FOR THE COOPERATION OF

More information

Joint consultation by the German gas transmission system operators

Joint consultation by the German gas transmission system operators Joint consultation by the German gas transmission system operators as part of an application to the Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway (below referred to

More information

Follow up VIP consultation

Follow up VIP consultation #1 Follow up VIP consultation Agenda Implementation as proposed in the workshop Summary of comments received General impression Attention points Trigger points #2 European obligation to implement VIPs

More information

GAS INTERCONNECTION POLAND LITHUANIA (GIPL) STATUS AND POTENTIAL IMPACT ON THE BALTIC STATES MARKET

GAS INTERCONNECTION POLAND LITHUANIA (GIPL) STATUS AND POTENTIAL IMPACT ON THE BALTIC STATES MARKET GAS INTERCONNECTION POLAND LITHUANIA (GIPL) STATUS AND POTENTIAL IMPACT ON THE BALTIC STATES MARKET Tartu, 17 April 2018 GIPL POLISH SECTION GIPL pipeline (PL side) ---------------------------------------------------

More information

ENTSOG s Response to ACER s Document for the Consultation Template foreseen by Article 26(5) of the TAR NC

ENTSOG s Response to ACER s Document for the Consultation Template foreseen by Article 26(5) of the TAR NC ENTSOG s Response to ACER s Document for the Consultation Template foreseen by Article 26(5) of the TAR NC Summary Approved by ENTSOG s Board on ENTSOG welcomes the opportunity to respond to ACER s document

More information

REMIT reporting and UMM data collection schema modifications

REMIT reporting and UMM data collection schema modifications Brussels 8 December 2016 REMIT reporting and UMM data collection schema modifications ENTSOG proposal Maria Gerova Transparency Adviser Background 2 Overview Background > ENTSOG Proposal for REMIT Schema

More information

REGIONAL GAS MARKET COORDINATION GROUP. Progress report No. 2 December 2015 February 2017

REGIONAL GAS MARKET COORDINATION GROUP. Progress report No. 2 December 2015 February 2017 REGIONAL GAS MARKET COORDINATION GROUP Progress report No. 2 December 2015 February 2017 Approved by the Regional Gas Market Coordination Group on May 23, 2017 BACKGROUND European Union (EU) strives for

More information

Stakeholder Joint Working Session TRANS AUSTRIA GASLEITUNG GmbH NEP

Stakeholder Joint Working Session TRANS AUSTRIA GASLEITUNG GmbH NEP Stakeholder Joint Working Session 2016 TRANS AUSTRIA GASLEITUNG GmbH NEP 2017-2026 Vienna, 29.06.2016 Overview TAG GmbH as company The TAG pipeline system Capacity products Highlights 2016 Market survey

More information

Subject: Open letter on REMIT transaction reporting data quality

Subject: Open letter on REMIT transaction reporting data quality Head of the Market Integrity and Transparency Department Ljubljana, 16 February 2017 ACER-VZ-IZ-pp-2017-94 To whom it may concern Subject: Open letter on REMIT transaction reporting data quality Dear Sir

More information

20 December All TSOs of the Capacity Calculation Region Hansa, taking into account the following: Page 1 of 7

20 December All TSOs of the Capacity Calculation Region Hansa, taking into account the following: Page 1 of 7 Capacity Calculation Region Hansa TSOs Proposal for Coordinated Redispatching and Countertrading methodology in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing

More information

On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation. Mark Copley 27/05/14

On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation. Mark Copley 27/05/14 On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation Mark Copley 27/05/14 1) Why integrate markets? 2) The legal framework 3) The European Target Model 4)

More information

Business Requirements Specification For the. Network Code

Business Requirements Specification For the. Network Code 1 2 3 4 For the Nomination (NOM) Network Code 5 6 Draft Version 0 Revision 8 Approved ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax: +32 2 894 5101; info@entsog.eu, www.entsog.eu,

More information

Day Ahead Fallback proposal Explanatory note

Day Ahead Fallback proposal Explanatory note 31 March 2017 Disclaimer This explanatory document is submitted by all TSOs to all NRAs for information and clarification purposes only accompanying the Channel TSOs proposal for fallback procedures in

More information

XBID Launch Information Package Published February 2018

XBID Launch Information Package Published February 2018 XBID Launch Information Package Published February 2018 1. Purpose of this document This document centralises, consolidates and comprehensively describes the necessary information which is useful for market

More information

The Agency s Work Programme Outline for 2016

The Agency s Work Programme Outline for 2016 The Agency s Work Programme Outline for 2016 Alberto Pototschnig Director Volker Zuleger Head of Market Monitoring Department Dennis Hesseling Head of Gas Department Presentation for stakeholders, 3 June

More information

Much more than Rules need to be in place by 2014

Much more than Rules need to be in place by 2014 Much more than Rules need to be in place by 2014 Alberto Pototschnig Director CEER 2012 Annual Conference Energy TITRE Infrastructure and Energy Efficiency Brussels, 25 January 2012 A strong momentum The

More information

European Network of Transmission System Operators for Electricity (ENTSO-E) GCRP - November 2009

European Network of Transmission System Operators for Electricity (ENTSO-E) GCRP - November 2009 European Network of Transmission System Operators for Electricity (ENTSO-E) GCRP - November 2009 Contents Who are ENTSO-E? Background and legal standing Activities and Remit European Network Code Development

More information

SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline

SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline on Capacity Allocation and Congestion Management February

More information

ENTSO-E working to fulfill the 3 rd Package

ENTSO-E working to fulfill the 3 rd Package ENTSO-E working to fulfill the 3 rd Package Regulators Role in Developing Infrastructure, Florence February 7 2012 Geoffrey Feasey, ENTSO-E Corporate Affairs Manager ENTSOE s role in implementing European

More information

Regional Booking Platform User Manual To users with Network Users roles

Regional Booking Platform User Manual To users with Network Users roles Regional Booking Platform User Manual To users with Network Users roles 1 Table of Contents 1 Master data... 6 1.1 Users... 6 1.1.1 List of users... 6 1.1.2 Enter a new user (to your own organization)...

More information

BoR (11) 08. BEREC Report on Alternative Voice and SMS Retail Roaming Tariffs and Retail Data Roaming Tariffs

BoR (11) 08. BEREC Report on Alternative Voice and SMS Retail Roaming Tariffs and Retail Data Roaming Tariffs BEREC Report on Alternative Voice and SMS Retail Roaming Tariffs and Retail Data Roaming Tariffs February 2011 1. Overview This BEREC Report on Alternative Retail Voice and SMS Roaming Tariffs and Retail

More information

The 13 th Progress Report on the Single European Telecoms Market 2007: Frequently Asked Questions

The 13 th Progress Report on the Single European Telecoms Market 2007: Frequently Asked Questions MEMO/08/17 Brussels, 19 March 2008 The 13 th Progress Report on the Single European Telecoms Market 2007: Frequently Asked Questions 1. What is the objective of the 13 th Progress Report on the Single

More information

ACM Policy rule on the provision of information concerning internet speeds

ACM Policy rule on the provision of information concerning internet speeds Please note that, although every effort has been made to ensure this translation is accurate and consistent, it is for informational purposes only. In case of any dispute or inconsistencies, the Dutch

More information

INSPIRE status report

INSPIRE status report INSPIRE Team INSPIRE Status report 29/10/2010 Page 1 of 7 INSPIRE status report Table of contents 1 INTRODUCTION... 1 2 INSPIRE STATUS... 2 2.1 BACKGROUND AND RATIONAL... 2 2.2 STAKEHOLDER PARTICIPATION...

More information

Reporting of electricity and gas transportation contracts

Reporting of electricity and gas transportation contracts Reporting of electricity and gas transportation contracts Tomaž Vižintin Market Monitoring Department 9 th Public Workshop on REMIT implementation Ljubljana, 10 December 2014 Outline Reporting of transportation

More information

ENTSOG s template for non-binding demand indications by network users for incremental capacity

ENTSOG s template for non-binding demand indications by network users for incremental capacity CAP0693-16_ Final ENTSOG s template for non-binding demand indications by network users for incremental DISCLAIMER Please note that this template lists information required by Transmission System Operators

More information

Forum Energia Regulation of energy markets Klaus Gerdes Lisbon, October 19th 2006

Forum Energia Regulation of energy markets Klaus Gerdes Lisbon, October 19th 2006 Klaus Gerdes Lisbon, October 19th 2006 Agenda I. European regulatory framework II. Regulatory challenges in the energy sector III. Opportunities for PwC EU&M European regulatory framework The European

More information

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679)

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679) Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679) Adopted on 4 December 2018 Adopted 1 Contents 1 Introduction... 3 2

More information

EU Harmonisation of Maintenance Publications at Interconnection Points 13/11/2015

EU Harmonisation of Maintenance Publications at Interconnection Points 13/11/2015 EU Harmonisation of Maintenance Publications at Interconnection Points 13/11/2015 Provision of Maintenance Information at Interconnection Points - EU Harmonisation Background: European Regulation EC 715/2009

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL INFORMATION SOCIETY AND MEDIA

EUROPEAN COMMISSION DIRECTORATE-GENERAL INFORMATION SOCIETY AND MEDIA Ref. Ares(2011)514527-12/05/2011 EUROPEAN COMMISSION DIRECTORATE-GENERAL INFORMATION SOCIETY AND MEDIA Electronic Communications Policy Implementation of Regulatory Framework (I) Brussels, 6th May 2011

More information

COMMISSION REGULATION (EU) No /.. of XXX

COMMISSION REGULATION (EU) No /.. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION REGULATION (EU) No /.. of XXX amending Commission Regulation (EC) No 1275/2008 with regard to ecodesign requirements for standby, off mode

More information

Consolidation Team INSPIRE Annex I data specifications testing Call for Participation

Consolidation Team INSPIRE Annex I data specifications testing Call for Participation INSPIRE Infrastructure for Spatial Information in Europe Technical documents Consolidation Team INSPIRE Annex I data specifications testing Call for Participation Title INSPIRE Annex I data specifications

More information

ACER Notification Platform

ACER Notification Platform ACER Notification Platform Public User Guide Version 2.0 20 March 2018 Trg Republike 3 1000 Ljubljana Slovenia Contents Table of figures... 3 1. Introduction... 4 1.1 Purpose and Audience of this Guide...

More information

Electricity Market Integration 2.0 in Central and South East Europe Potential benefits: markets and institutions

Electricity Market Integration 2.0 in Central and South East Europe Potential benefits: markets and institutions Electricity Market Integration 2.0 in Central and South East Europe Potential benefits: markets and institutions Jasmina Trhulj, Head of Electricity Unit, Energy Community Secretariat 2 nd Central and

More information

ENISA s Position on the NIS Directive

ENISA s Position on the NIS Directive ENISA s Position on the NIS Directive 1 Introduction This note briefly summarises ENISA s position on the NIS Directive. It provides the background to the Directive, explains its significance, provides

More information

COMMITTEE FOR PROPRIETARY MEDICINAL PRODUCTS (CPMP) GUIDELINE ON REQUIREMENTS FOR PLASMA MASTER FILE (PMF) CERTIFICATION

COMMITTEE FOR PROPRIETARY MEDICINAL PRODUCTS (CPMP) GUIDELINE ON REQUIREMENTS FOR PLASMA MASTER FILE (PMF) CERTIFICATION The European Agency for the Evaluation of Medicinal Products Evaluation of Medicines for Human Use London, 26 February 2004 COMMITTEE FOR PROPRIETARY MEDICINAL PRODUCTS (CPMP) GUIDELINE ON REQUIREMENTS

More information

The latest update of power market in Latvia

The latest update of power market in Latvia The latest update of power market in Latvia Ainārs Meņģelsons Public Utilities Commission of Latvia Director of Energy Department 21st Baltic Electricity Market Forum, Vilnius, May 3, 2016 Content Some

More information

Introduction to the ENTSOG Common Data Exchange Solutions

Introduction to the ENTSOG Common Data Exchange Solutions Introduction to the ENTSOG Common Data Exchange Solutions Version 0 Revision 0 ENTSOG AISBL ; Av. de Cortenbergh 100, 1000-Brussels ; Tel : +32 2 894 5100 ; Fax : +32 2 894 5101; http : entsog.eu info@entsog.eu,,

More information

ANNUAL REPORT Securing Europe s. energy future. implementing the internal market for gas ENTSOG A FAIR PARTNER TO ALL!

ANNUAL REPORT Securing Europe s. energy future. implementing the internal market for gas ENTSOG A FAIR PARTNER TO ALL! ANNUAL REPORT 2017 Securing Europe s energy future implementing the internal market for gas ENTSOG A FAIR PARTNER TO ALL! Contents INTRODUCTIONS AND OVERVIEW 4 President s Foreword 5 2017 from the General

More information

The European Single Electronic Format (ESEF)

The European Single Electronic Format (ESEF) ESMA REGULAR USE 4 July 2018 The European Single Electronic Format (ESEF) TEG / CFSS meeting Objectives set out in the Transparency Directive Directive 2004/109/EC as revised by Directive 2013/50/EU (relevant

More information

Report of the Working Group on mhealth Assessment Guidelines February 2016 March 2017

Report of the Working Group on mhealth Assessment Guidelines February 2016 March 2017 Report of the Working Group on mhealth Assessment Guidelines February 2016 March 2017 1 1 INTRODUCTION 3 2 SUMMARY OF THE PROCESS 3 2.1 WORKING GROUP ACTIVITIES 3 2.2 STAKEHOLDER CONSULTATIONS 5 3 STAKEHOLDERS'

More information

EWRN European WEEE Registers Network

EWRN European WEEE Registers Network EWRN Comments Concerning Article 16 subparagraph 3 of the WEEE Directive Recast July 13 th, 2010 email: info@ewrn.org web: www.ewrn.org Page 1 (EWRN) EWRN is an independent network of 10 National Registers

More information

ARTICLE 29 DATA PROTECTION WORKING PARTY

ARTICLE 29 DATA PROTECTION WORKING PARTY ARTICLE 29 DATA PROTECTION WORKING PARTY 18/EN WP261 Article 29 Working Party Draft Guidelines on the accreditation of certification bodies under Regulation (EU) 2016/679 Adopted on 6 february 2018 1 THE

More information

Annex II of the Memorandum of Understanding of the Central and South-Eastern European Gas Connectivity (CESEC) High Level Group. Action Plan 2.

Annex II of the Memorandum of Understanding of the Central and South-Eastern European Gas Connectivity (CESEC) High Level Group. Action Plan 2. Annex II of the Memorandum of Understanding of the Central and South-Eastern European Gas Connectivity (CESEC) High Level Group Action Plan 2.0 Since the July 2015 CESEC High Level Group Meeting, where

More information

Country-specific notes on Waste Electrical and Electronic Equipment (WEEE)

Country-specific notes on Waste Electrical and Electronic Equipment (WEEE) EUROPEAN COMMISSION EUROSTAT Directorate E: Sectoral and regional statistics E-2: Environmental Statistics and Accounts; Sustainable Development Country-specific notes on Waste Electrical and Electronic

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Brussels, 29.6.2010 COM(2010)356 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE

More information

Procedures for cross-border transmission capacity assessments PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS.

Procedures for cross-border transmission capacity assessments PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS. PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS October 2001 1/13 Table of contents 1 INTRODUCTION... 4 2 GENERAL GUIDELINES... 5 3 BASE CASE CONSTRUCTION... 6 3.1 NETWORK MODEL... 6 3.1

More information

We appreciate your feedback

We appreciate your feedback Publishing date: 02/07/2014 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document REMIT ELECTRICITY NOMINATIONS REPORTING

More information

Terms and Conditions for the Subscription Window Of February 2017 ( TCSW )

Terms and Conditions for the Subscription Window Of February 2017 ( TCSW ) Terms and Conditions for the Subscription Window Of February 2017 ( TCSW ) For Quality Conversion Services ( Services Offered ) Party s information Company Name:...... Country of incorporation:. Registered

More information

ACCESS CODE FOR TRANSMISSION. Attachment B: Subscription & Allocation of Services

ACCESS CODE FOR TRANSMISSION. Attachment B: Subscription & Allocation of Services ACCESS CODE FOR TRANSMISSION Attachment B: Subscription & Allocation of Services Based on version approved by CREG on 23 February 2017 1 of 49 Table of contents Table of contents... 2 1 Definitions...

More information

TRANSMISSION PROGRAMME.

TRANSMISSION PROGRAMME. TRANSMISSION PROGRAMME Based on Article 112 of the Royal Decree of 23 December 2010 on the Code of Conduct regarding access to natural gas transmission networks www.fluxys.com 2 CONTENTS CONTENTS... 3

More information

Guidelines. on the security measures for operational and security risks of payment services under Directive (EU) 2015/2366 (PSD2) EBA/GL/2017/17

Guidelines. on the security measures for operational and security risks of payment services under Directive (EU) 2015/2366 (PSD2) EBA/GL/2017/17 GUIDELINES ON SECURITY MEASURES FOR OPERATIONAL AND SECURITY RISKS UNDER EBA/GL/2017/17 12/01/2018 Guidelines on the security measures for operational and security risks of payment services under Directive

More information

User Manual for the delivery of a new national Natura 2000 database to the Commission. Version 1.1

User Manual for the delivery of a new national Natura 2000 database to the Commission. Version 1.1 User Manual for the delivery of a new national Natura 2000 database to the Commission Version 1.1 The Natura 2000 network of protected sites consists of the sites classified under the Birds Directive first

More information

REMIT Reporting Service

REMIT Reporting Service REMIT Reporting Service User Guide Version:1.1 31 March 2015 Deleted: 19 Contents 1. Introduction... 4 2. REMIT Reporting Services Agreement... 5 2.1 Subscription to Services-Registry of Subscribed Users

More information

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL) Stage 01: Modification Proposal Grid Code GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL) Purpose of Modification: This modification seeks to make changes

More information

EUROPEAN COMMISSION. Commission Decision concerning Case FR/2015/1736: Symmetric remedies for FTTH deployments in France

EUROPEAN COMMISSION. Commission Decision concerning Case FR/2015/1736: Symmetric remedies for FTTH deployments in France EUROPEAN COMMISSION Brussels, 18.6.2015 C(2015) 4261 final Autorité de régulation des communications électroniques et des postes (ARCEP ) 7, square Max Hymans F-75730 Paris-Cedex 15 France For the attention

More information

An Introduction to Network Codes & The Links Between Codes

An Introduction to Network Codes & The Links Between Codes An Introduction to Network Codes & The Links Between Codes April 2014 About ENTSO-E 41 TSOs from 34 countries 532 million citizens served 828 GW generation 305 Thousand Km of transmission lines Ten-Year

More information

Directive on Security of Network and Information Systems

Directive on Security of Network and Information Systems European Commission - Fact Sheet Directive on Security of Network and Information Systems Brussels, 6 July 2016 Questions and Answers The European Parliament's plenary adopted today the Directive on Security

More information

This report was prepared by the Information Commissioner s Office, United Kingdom (hereafter UK ICO ).

This report was prepared by the Information Commissioner s Office, United Kingdom (hereafter UK ICO ). REPORT TO THE 38 th INTERNATIONAL CONFERENCE OF DATA PROTECTION AND PRIVACY COMMISSIONERS - MOROCCO, OCTOBER 2016 ON THE 5 th ANNUAL INTERNATIONAL ENFORCEMENT COOPERATION MEETING HELD IN MANCHESTER, UK,

More information

Network and Information Security Directive

Network and Information Security Directive Network and Information Security Directive Provisions + ENISA s activities Dr Evangelos Ouzounis Head of Secure Infrastructure and Services Unit, ENISA European Union Agency for Network and Information

More information

Data Exchange with TSOs in the Context of Ex-ante Balancing. Vienna, October 2016

Data Exchange with TSOs in the Context of Ex-ante Balancing. Vienna, October 2016 Data Exchange with TSOs in the Context of Ex-ante Balancing Vienna, Data Exchange with TSOs Introduction Changes in the data formats in comparison to previous versions Date exchange in the context of nomination

More information

Gas Sector Development in Ukraine. Focus on selection of GTS partner and unbundling. Milan Sedláček, eustream, a.s.

Gas Sector Development in Ukraine. Focus on selection of GTS partner and unbundling. Milan Sedláček, eustream, a.s. eustream, a.s. Votrubova 11/A, 821 09 Bratislava www.eustream.sk Gas Sector Development in Ukraine Focus on selection of GTS partner and unbundling May 2018, Budapest Milan Sedláček, eustream, a.s. Eustream

More information

Electricity Market Development in the Energy Community. Janez Kopač, Energy Community Secretariat 1 st SEERC Power Conference Portorož, 7 June 2016

Electricity Market Development in the Energy Community. Janez Kopač, Energy Community Secretariat 1 st SEERC Power Conference Portorož, 7 June 2016 Electricity Market Development in the Energy Community Janez Kopač, 1 st SEERC Power Conference Portorož, 7 June 2016 The Energy Community Extending the EU internal energy market to South East Europe and

More information

Cross-Border participation in the GB Capacity Market. Elaine O Connell 15 th January 2015

Cross-Border participation in the GB Capacity Market. Elaine O Connell 15 th January 2015 Cross-Border participation in the GB Capacity Market Elaine O Connell 15 th January 2015 Agenda Capacity Market Results Cross border participation in the GB Capacity Market Next Steps 2 Capacity Market

More information

Cybersecurity Policy in the EU: Security Directive - Security for the data in the cloud

Cybersecurity Policy in the EU: Security Directive - Security for the data in the cloud Cybersecurity Policy in the EU: The Network and Information Security Directive - Security for the data in the cloud Microsoft Commitment to Cybersecurity Security at the heart of our products and services

More information

Regulatory Notice 14-39

Regulatory Notice 14-39 Regulatory Notice 14-39 Electronic Filing New Template Available on FINRA Firm Gateway for Compliance With SEA Rule 17a-5(f)(2) (Statement Regarding Independent Public Accountant) Executive Summary In

More information

NOTIFICATION FORM. Section 1 Market definition

NOTIFICATION FORM. Section 1 Market definition NOTIFICATION FORM Section 1 Market definition 1.1 The relevant product/service market. Is this market mentioned in the Recommendation on relevant markets? The notified draft measures concern the market

More information

Mobile telephones/international roaming frequently asked questions (see also IP/05/161)

Mobile telephones/international roaming frequently asked questions (see also IP/05/161) MEMO/05/44 Brussels, 10 th February 2005 Mobile telephones/international roaming frequently asked questions (see also IP/05/161) What is international roaming? International roaming provides subscribers

More information

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public

More information

Public consultation on the revision of the Recommendation on relevant markets

Public consultation on the revision of the Recommendation on relevant markets PER E-MAIL cnect-relevant-markets@ec.europa.eu EUROPEAN COMMISSION DG Communications Networks, Content & Technology Regulatory Coordination and Markets Unit (B3) BU33 6/26 CM Groep Konijnenberg 30 4825

More information

Regulating Cyber: the UK s plans for the NIS Directive

Regulating Cyber: the UK s plans for the NIS Directive Regulating Cyber: the UK s plans for the NIS Directive September 2017 If you are a digital service provider or operate an essential service then new security and breach notification obligations may soon

More information

BEREC Public debriefing

BEREC Public debriefing BEREC Public debriefing from the 31th BEREC plenary meetings Sébastien Soriano, BEREC Chair 2017 Elisabeth Dornetshumer, Co-Chair of the Roaming Expert Group Michiel van Dijk, Co-Chair of the Net Neutrality

More information

OPINION ON THE DEVELOPMENT OF SIS II

OPINION ON THE DEVELOPMENT OF SIS II OPINION ON THE DEVELOPMENT OF SIS II 1 Introduction In an attempt to ensure that the second-generation Schengen information system SIS II complies with the highest standards of data protection, the Joint

More information

Data Processing Agreement

Data Processing Agreement Data Processing Agreement Merchant (the "Data Controller") and Nets (the "Data Processor") (separately referred to as a Party and collectively the Parties ) have concluded this DATA PROCESSING AGREEMENT

More information

Technical Balance Group Regulations

Technical Balance Group Regulations Page 1 of 59 Technical Regulations relating to the Balance Group Contract Page 2 of 59 List of abbreviations Abbreviation ACK ANC ANO BG BGM BT CAI CONS CC CCP CCT COT DA DB AG DSO DTD ENTSO-E ESRD ESS-IG

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

International Roaming Charges: Frequently Asked Questions

International Roaming Charges: Frequently Asked Questions MEMO/06/144 Brussels, 28 March 2006 International Roaming Charges: Frequently Asked Questions What is international mobile roaming? International roaming refers to the ability to use your mobile phone

More information

National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010

National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010 National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010 NG European Transparency Project (ETP): Background IT project launched to facilitate implementation

More information

EA Document for Recognition of Verifiers under the EU ETS Directive

EA Document for Recognition of Verifiers under the EU ETS Directive Publication Reference EA-6/03: 2010 Mandatory Document EA Document for Recognition of Verifiers under the EU ETS Directive PURPOSE This document has been prepared by a working group under the direction

More information

Regulating and pricing network access

Regulating and pricing network access Regulating and pricing network access László Szabó ERRA Training 5-8 March, 2013, Budapest Lecture outline Network: an essential infrastructure Getting connected Pricing the use of existing electricity

More information

(Text with EEA relevance) (OJ L 172, , p. 10)

(Text with EEA relevance) (OJ L 172, , p. 10) 02012R0531 EN 15.06.2017 003.002 1 This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions

More information

COMMISSION IMPLEMENTING DECISION (EU)

COMMISSION IMPLEMENTING DECISION (EU) L 127/32 18.5.2016 COMMISSION IMPLEMTING DECISION (EU) 2016/770 of 14 April 2016 establishing a common format for the submission of information concerning the operation of the procedures pursuant to Regulation

More information

13543/17 PhL/at 1 DG G 3 B

13543/17 PhL/at 1 DG G 3 B Council of the European Union Brussels, 24 October 2017 (OR. en) 13543/17 UD 239 NOTE From: To: General Secretariat of the Council Permanent Representatives Committee/Council No. prev. doc.: ST 12287/5/17

More information

TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM

TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM Carlo SABELLI GO 15 San Francisco April 13 2016 42 TSOs in ENTSO-E the European Network for Transmission System Operators for Electricity 42 TSOs from

More information

REMIT Data Services FAQ

REMIT Data Services FAQ REMIT Data Services FAQ Datum / Date 02/09/2015 Ort / Place Dokumentversion / Document Release Leipzig, Paris, Brøndby 0001B Table of Contents 1. General information... 3 2. General questions... 4 2.1.

More information

BALANCING SYSTEM IN POLAND. Vienna, December 12 th 2017

BALANCING SYSTEM IN POLAND. Vienna, December 12 th 2017 BALANCING SYSTEM IN POLAND Vienna, December 12 th 2017 GAZ-SYSTEM - INTRODUCTORY INFORMATION 100% SHARES HELD BY STATE TREASURY CERTIFIED TSO FOR NATIONAL TRANSMISION SYSTEM IN POLAND CERTIFIED ISO FOR

More information

2016 COM ebcd-twg Doc. No. PWG-403 / 2016 November 15, 2016 (8:37 AM)

2016 COM ebcd-twg Doc. No. PWG-403 / 2016 November 15, 2016 (8:37 AM) EBCD WORKING GROUP (ebcd-twg) Original: English SUMMARY REPORT - 2016 Introduction This serves as a general report to the Commission on the overall status of ebcd system development and implementation

More information

ORDINANCE ON NUMBER PORTABILITY. Unofficial consolidated text 1

ORDINANCE ON NUMBER PORTABILITY. Unofficial consolidated text 1 ORDINANCE ON NUMBER PORTABILITY (Official Gazette No. 42/09 and 62/11) Unofficial consolidated text 1 I. GENERAL PROVISIONS Contents and purpose Article 1 This Ordinance shall lay down the manner, conditions

More information

(Non-legislative acts) REGULATIONS

(Non-legislative acts) REGULATIONS 15.12.2012 Official Journal of the European Union L 347/1 II (Non-legislative acts) REGULATIONS COMMISSION IMPLEMENTING REGULATION (EU) No 1203/2012 of 14 December 2012 on the separate sale of regulated

More information

Guidelines 1/2018 on certification and identifying certification criteria in accordance with Articles 42 and 43 of the Regulation 2016/679

Guidelines 1/2018 on certification and identifying certification criteria in accordance with Articles 42 and 43 of the Regulation 2016/679 Guidelines 1/2018 on certification and identifying certification criteria in accordance with Articles 42 and 43 of the Regulation 2016/679 Adopted on 25 May 2018 Contents 1. Introduction... 2 1.1. Scope

More information

Network Code on Emergency and Restoration - Implementation Guide for the Communication Systems Requirements. Final VERSION

Network Code on Emergency and Restoration - Implementation Guide for the Communication Systems Requirements. Final VERSION Network Code on Emergency and Restoration - Implementation Guide for the Communication Systems Requirements Final VERSION September 2018 1 TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 COMMUNICATION SYSTEM

More information