Managing DC Work Zones via a Citywide Transportation Management Plan. ITE Mid-Colonial District Annual Meeting May 20, 2014
|
|
- Kathlyn Heath
- 5 years ago
- Views:
Transcription
1 Managing DC Work Zones via a Citywide Transportation Management Plan ITE Mid-Colonial District Annual Meeting May 20, 2014
2 Presentation Outline The Team The Challenge The Approach Project Diagram Work Zone Tracking Tool (SmartNET) Traffic Analysis Tool Citywide TMP Document The Process The Look Ahead Questions 2
3 THE TEAM 3
4 The RK&K Team Telvent / Schneider Electric Rummel, Klepper & Kahl, LLP Precision Systems, Inc. DBE Software Development Incident Management TMP Support Strategic Transportation Initiatives DBE Transportation Demand Management Strategies Public Involvement Project Management TMP Development Traffic Modeling TMP Implementation & Monitoring DBE Stratacomm Public Outreach Media Relations Traffic Modeling Signal Coordination/ Optimization O.R. George & Associates, Inc. DBE Data Gathering Traffic Engineering 4
5 THE CHALLENGE 5
6 The Challenge 6
7 The Challenge 7
8 The Challenge 8
9 The Challenge 9
10 The Challenge Can we change this part of the Traffic Control Plan? We really need to get this work done next week! We have these 8 major projects going to construction next fall, what will traffic be like? We have a conflict! We closed the left lane and someone else is setting up to close the right lane! HELP! If we close this ramp for the next 2 months, what detour alternatives do we have? Why is the right lane closed again, when the utility company just finished their work? 10
11 THE APPROACH 11
12 The Approach DDOT Needs a Dynamic and Regional Approach to Managing Work Zones! Citywide TMP / Work Zone Project Management System Five-year moving period Proactively track and analyze work zone & special event impacts Identify areas of significant cumulative impacts Generate cost-effective mitigation strategies Timely responses to stakeholder question and concerns Improve safety and mobility 12
13 13
14 INPUTS Project information (DDOT, Developer, Utility, etc.) Detailed work zone information (user input) Road network information WORK ZONE TRACKING TOOL (SmartNET) OUTPUTS Configurable work zone reports Interactive work zone map Revised work zone schedules XML data feed to CapTop GOALS Avoid work zone location conflicts 14
15 INPUTS Roadway and traffic signal data Traffic volumes Traffic analysis scenario framework TRAFFIC ANALYSIS TOOL OUTPUTS Analysis summary reports Weekday peak period scenario results Regional congestion hot spot map TMP / MOT alternatives GOALS Identify and minimize cumulative work zone impacts 15
16 INPUTS National best practice research TMP Team input and lessons learned Community hot spots CITYWIDE TMP Document Development OUTPUTS 5-years worth of work zone mitigation strategies Customized regional TDM plans Mitigation strategy budget estimate GOALS Identify corridor / area work zone mitigation strategies 16
17 INPUTS Field observations Data capturing Performance measure objectives Lessons learned CITYWIDE TMP Implementation And Monitoring OUTPUTS Reduced congestion in work zones Reduced work zone crashes Improved public perception GOALS Improve safety and mobility in work zones END GOAL 17
18 The Approach: Work Zone Tracking Tool SmartNET Project information (DDOT, Developer, Utility, etc.) Detailed work zone information (user input) Road network information WORK ZONE TRACKING TOOL (SmartNET) Configurable work zone reports Interactive work zone map Revised work zone schedules XML data feed to CapTop Avoid work zone location conflicts 18
19 The Approach: Work Zone Tracking Tool Event Management Mapping Reporting Custom Monitoring 19
20 The Approach: Work Zone Tracking Tool 20
21 The Approach: Traffic Analysis Tool Custom mesoscopic simulation model Simulates operations during construction Link capacity reduction for work zones Roadway and traffic signal data Traffic volumes Traffic analysis scenario framework Generates various maps and tables TRAFFIC ANALYSIS TOOL Analysis summary reports Weekday peak period scenario results Regional congestion hot spot map TMP / MOT alternatives Identify and minimize cumulative work zone impacts 21
22 The Approach: Traffic Analysis Tool Project Map 22
23 The Approach: Traffic Analysis Tool Delay Map Intersections Segments Total Time or Percent Increase Level of Service Map 23
24 The Approach: Traffic Analysis Tool Hotspots Map 24
25 The Approach: Citywide TMP Document Produced Annually Focus on Cumulative Work Zone Impacts Does not replace project-specific TMPs Year 1 (Baseline) Scope Principle Arterials and Higher DDOT Capital Projects Weekday AM / PM Peaks National best practice research TMP Team input and lessons learned Community hot spots CITYWIDE TMP Document Development 5-years worth of work zone mitigation strategies Customized regional TDM plans Mitigation strategy budget estimate Identify corridor / area work zone mitigation strategies 25
26 The Approach: Citywide TMP Document Describes Citywide Work Zone Project Management System SmartNET Traffic Analysis Tool Identifies major projects, key corridors, and potential conflict areas Provides recommendations for mitigation strategies Transportation Demand Management (TDM) Public Outreach Formalizes five-year plan for implementing work zone mitigation strategies Documents success of program through performance measures 26
27 THE PROCESS 27
28 The Process Step One: Review major projects construction staging and schedule to determine project needs. New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 28
29 The Process Step 2: Input project information into SmartNET mapping tool with initial emphasis on avoidance of work zone conflicts using interactive process to adjust schedules. New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 29
30 The Process Step 2: Input project information into SmartNET mapping tool with initial emphasis on avoidance of work zone conflicts using interactive process to adjust schedules. New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 30
31 The Process Step Three: Traffic Analysis Tool is updated nightly to include new projects from SmartNET to identify and analyze cumulative work zone impacts New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 31
32 The Process Step Three: Traffic Analysis Tool is updated nightly to include new projects from SmartNET to identify and analyze cumulative work zone impacts New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 32
33 The Process Step Four: Hot Spot maps and various related reports generated daily to communicate system-wide concerns that need higher level DDOT coordination New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 33
34 Legend: Anticipated Impacts Mild Moderate Severe
35 Hotspot #2: Massachusetts Ave NW Legend: Anticipated Impacts Mild Moderate Severe Hotspot #1: K Street NW Jan
36 Hotspot #2: Massachusetts Ave NW Legend: Anticipated Impacts Mild Moderate Severe Hotspot #1: K Street NW Feb
37 Hotspot #2: Massachusetts Ave NW Legend: Anticipated Impacts Mild Moderate Severe Hotspot #1: K Street NW Mar
38 Hotspot #2: Massachusetts Ave NW Hotspot #6: U Street NW Hotspot #3: Georgia Ave NW Hotspot #4: New York Ave NW Legend: Anticipated Impacts Mild Moderate Severe Hotspot #1: K Street NW Hotspot #5: DC 295 (Kenilworth Ave) Apr
39 Hotspot #2: Massachusetts Ave NW Hotspot #6: U Street NW Hotspot #3: Georgia Ave NW Hotspot #4: New York Ave NW Legend: Anticipated Impacts Mild Moderate Severe Hotspot #1: K Street NW Hotspot #5: DC 295 (Kenilworth Ave) May
40 Hotspot #2: Massachusetts Ave NW Hotspot #6: U Street NW Hotspot #3: Georgia Ave NW Hotspot #4: New York Ave NW Legend: Anticipated Impacts Mild Moderate Severe Hotspot #5: DC 295 (Kenilworth Ave) Jun
41 Hotspot #6: U Street NW Hotspot #3: Georgia Ave NW Hotspot #4: New York Ave NW Legend: Anticipated Impacts Mild Moderate Severe Hotspot #5: DC 295 (Kenilworth Ave) Jul
42 Hotspot #7: 16 th Street NW Hotspot #6: U Street NW Hotspot #3: Georgia Ave NW Hotspot #4: New York Ave NW Legend: Anticipated Impacts Mild Moderate Severe Aug
43 Hotspot #7: 16 th Street NW Hotspot #6: U Street NW Hotspot #3: Georgia Ave NW Hotspot #4: New York Ave NW Legend: Anticipated Impacts Mild Moderate Severe Sep
44 The Process Step Four: Hop Spot maps and various related reports generated daily to communicate system wide concerns that need higher level DDOT coordination New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 44
45 The Process Step Five: DDOT implements mitigation strategies of the Citywide TMP or addresses the need to modify / implement new appropriate mitigation strategies New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 45
46 Work Zone Mitigation Strategies Goal: Maximize mobility while minimizing impacts Supplement project-specific mitigation strategies Two (2) primary types of regional mitigation strategies Citywide initiatives Targeted strategies for identified hotspots 46
47 Citywide Initiatives Use of Citywide Work Zone Project Management System Software Tools SmartNET to avoid work zone conflicts Traffic Analysis Tool to avoid cumulative impacts Promote coordination between projects Citywide Work Zone Project Management Website Portal for travelers to obtain work zone information Recommendations for alternative routes & travel modes Comprehensive map of all major construction activities Construction schedules Major TDM strategies 1 of 3 47
48 Citywide Initiatives Public Information Campaign Targeted outreach along critical corridors Goals: Alert the public about potential impacts and means to avoid them Improve public awareness and understanding of major projects Modify travel habits to reduce congestion Tools: Public opinion survey Advanced Strategy Online (ASO) Brochures & Fact Sheets Traditional & Social Media Portable Changeable Message Signs (PCMS) 2 of 3 48
49 Citywide Initiatives Transportation Demand Management (TDM) Review existing, approved TDM plans Develop new customized TDM plans and manage the implementation of TDM plans along critical corridors Commuter Club 3 of 3 Members will be able to track work zone construction and the best ways to avoid disruptions 49
50 Mitigation Strategies For Hotspots Schedule Changes Example: Should start of 16 th Street project be delayed to avoid cumulative impacts with U Street project? Changeable Message Signs (CMS) Use existing permanent signs or temporary portable signs Public Outreach for Affected Communities Promote alternate routes and off-peak travel Highway Advisory Radio (HAR) Reconsider Peak Hour Lane Closures Establish congestion threshold to re-open lanes Automatic speed and volume detection 1 of 2 50
51 Mitigation Strategies For Hotspots Signal Timing Adjustments Real-Time Traveler Information Coordination with MDOT / CHART Transit Incentives / Bridge Bucks Transit Improvements Add circulator buses, bus pull-off areas, bus pre-emption Geometric Changes Reversible lane, restrict turn movements, modify lane configurations, restrict parking during peak hours 2 of 2 51
52 Work Zone Mitigation Budget Mitigation budget developed for next five years Proactive approach Make work zone mitigation a priority, not an afterthought 52
53 The Process Step Five: DDOT implements mitigation strategies of the Citywide TMP or addresses the need to modify / implement new appropriate mitigation strategies New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 53
54 The Process Step One: Restart the process back at step one when new projects come online. New Project Information Refine Mitigation Strategies Load Into SmartNET Generate / Update Hotspots Run Analysis Tool 54
55 THE LOOK AHEAD 55
56 The Look Ahead Refine Work Zone Tracking Tool (SmartNET) 56
57 The Look Ahead Enhance Traffic Analysis Tool 57
58 The Look Ahead Update Work Zone Documentation 58
59 The Look Ahead Field observations Data capturing Performance measure objectives Lessons learned CITYWIDE TMP Implementation And Monitoring Reduced congestion in work zones Reduced work zone crashes Improved public perception Improve safety and mobility in work zones 59
60 The Look Ahead Implement work zone mitigation strategies 60
61 The Look Ahead Monitor work zone mitigation strategies 61
62 QUESTIONS 62
63 63
Managing DC Work Zones: DDOT s Citywide Transportation Management Plan
Managing DC Work Zones: DDOT s Citywide Transportation Management Plan ARTBA National Work Zone Management Conference September 20, 2016 1 Outline Citywide Transportation Management Plan (TMP) Citywide
More informationMetrobus 30s Line Enhancements
Customer Service, Operations and Safety Committee Action Item III-C February 14, 2008 Metrobus 30s Line Enhancements Washington Metropolitan Area Transportation Authority Board Action/Information Summary
More informationDulles Area Transportation Association
Dulles Area Transportation Association February 8, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Scope Multimodal improvements
More informationSAFETY ON THE IH 35 EXPANSION PROJECTS. Andy Petter, P.E. - Waco District
SAFETY ON THE IH 35 EXPANSION PROJECTS Andy Petter, P.E. - Waco District Presentation IH 35 Expansion through the Waco District Safety Requirements on the Projects IH 35 Safety Summit Meetings Crash Data
More informationSmarter Work Zones Webinar Series
Smarter Work Zones Webinar Series Webinar #3: Smarter Work Zone Corridor-Based Project Coordination Martha Kapitanov, John Habermann, and Steve Brink Efficiency through technology and collaboration October
More informationCrystal Springs Upland School Transportation Demand Management Plan. March 2016
Crystal Springs Upland School Transportation Demand Management Plan March 06 CONTENTS Introduction... Transportation Demand Management (TDM) Program.... Background/Survey of Existing Student Commuting
More information2014 REPORT. Distracted Driving. on I-95 in Northern Virginia
2014 REPORT Distracted Driving on I-95 in Northern Virginia Distracted Driving on Interstate 95 The National Safety Council estimates that as of May 6, 2014 there have already been 354,913+ crashes this
More informationThe Maryland Transit Administration. A Plan to Connect Baltimore
The Maryland Transit Administration A Plan to Connect Baltimore 1 What We ve Heard Over 1,100 stakeholder comments submitted through the Bus Network Improvement Project (BNIP) Six workshops, three pop-up
More informationTRANSPORTATION DEPARTMENT Business Plan
TRANSPORTATION DEPARTMENT 2018 Business Plan Today s Agenda Mission Department Overview Planning Initiatives Commission Priorities and 2018 Budget Requests Five-year Plan Department of Transportation Mission
More informationTravel Time on the Highway 7 Corridor YORK REGION. Robert Bruce President TPA North America Inc.
Travel Time on the Highway 7 Corridor YORK REGION Robert Bruce President TPA North America Inc. Presentation Overview Introduction to vivanext project Project Description Bluetooth Traffic Monitoring Overview
More informationCornerstone of downtown; Gateway to the state
Paving the information highway Building public trust through reliable communications Brian Manthey Communications Officer Marquette Interchange Team Wisconsin Department of Transportation September 12,
More informationSTATEWIDE INTEGRATED TRANSPORTATION RELIABILITY PROGRAM
STATEWIDE INTEGRATED TRANSPORTATION RELIABILITY PROGRAM Southern Nevada Kick Off Workshop May 25, 2011 AGENDA Welcome ITRP Background/Overview Issuesand Priorities in Southern Nevada Southern Nevada ITRP
More informationVeirs Mill Road Metrobus Improvements Request to Conduct Public Hearing
Customer Services, Operations, and Safety Committee Board Information Item III-B September 24, 2009 Veirs Mill Road Metrobus Improvements Request to Conduct Public Hearing Washington Metropolitan Area
More informationThe Promise and Challenges of Creating Intelligent Travelers. Presented by Melanie Crotty, Director Traveler Information &Coordination MTC
The Promise and Challenges of Creating Intelligent Travelers Presented by Melanie Crotty, Director Traveler Information &Coordination MTC 1 Questions to Answer 1. What are the impacts of traveler information
More informationBus Circulator Feasibility Study Scope of Work March 12, 2018
The City of Hyattsville Comprehensive Transportation and Infrastructure Study Bus Circulator Feasibility Study Scope of Work March 12, 2018 Project Approach At the request of the City of Hyattsville, Toole
More informationMountain Corridor Incident Management Program
Mountain Corridor Incident Management Program Colorado Department of Transportation Background The I- Incident Management study was initiated in response to CDOT s I- MIS. The resulting program was the
More informationCouncil of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013
Council of State Governments Takoma Langley Transit Center Purple Line Project Briefing October 28, 2013 Takoma Langley Transit Center Purpose and Need Provide a safe, attractive and efficient facility
More informationNCTCOG MTP Policy Bundle Application for TXDOT
MTP Policy Application Acknowledgement I hereby certify that all information provided and contained herein is complete, accurate, and true. I am authorized to provide information on behalf of my agency.
More informationRural Intersection Collision Avoidance System (RICAS)
Rural Intersection Collision Avoidance System (RICAS) US 53 and STH 77 KICK OFF MEETING presented to RICAS Advisory Group presented by RICAS Research Team February 3, 2009 Agenda 1. Introductions (5 min.)
More informationCITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES
CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES SEPA TRANSPORTATION CONCURRENCY - ROAD IMPACT FEES Introduction Revised February 2004 These guidelines describe how to prepare a traffic study, or Traffic
More informationSouth Central ROP Projects
Pennsylvania Department of Transportation ROP Overview and Summary South Central ROP Projects November 2007 77 INCIDENT MANAGEMENT (IM) Draft Version 1 July 2007-40 - IM 1: SOUTH CENTRAL PA ITS DEPLOYMENT
More informationUpgrading Traffic Signals to Enable a Connected Vehicle Test Bed Somerville, Massachusetts
Upgrading Traffic Signals to Enable a Connected Vehicle Test Bed Somerville, Massachusetts Presented in The 2018 ITE Northeastern District Meeting in Lake George, NY May 22 nd, 2018 ORGANIZATION OF THE
More informationPART 2. SIGNS Chapter 2L. Changeable Message Signs
PART 2. SIGNS Chapter 2L. Changeable Message Signs TABLE OF CONTENTS Chapter 2L. CHANGEABLE MESSAGE SIGNS Page Section 2L. Description of Changeable Message Signs.................................... 2L-
More informationThe Final Rule on Work Zone Safety and Mobility
Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba, Federal Highway Administration Talking Operations
More informationTreating Potential Back- of-queue Safety. Developed By:
Treating Potential Back- of-queue Safety Hazards Developed By: 1 Module Objectives Discuss the hazards associated with queuing caused by work zones Describe steps to quantify work zone impacts, determine
More informationRegional Transit System (RTS) BRT Feasibility Study Project Kick-Off. Project Management Team Meeting May 22, 2008
Regional Transit System (RTS) BRT Feasibility Study Project Kick-Off Project Management Team Meeting May 22, 2008 Agenda Welcome and Introductions National Bus Rapid Transit Institute (NBRTI) Overview
More informationDesign Considerations for Real-time Arterial Performance Measurement Systems Using Transit Bus Probes
Design Considerations for Real-time Arterial Performance Measurement Systems Using Transit Bus Probes Abraham Emmanuel & David Zavattero Chicago Department of Transportation Project Goals Estimate traffic
More informationCedar Rapids ITS Deployment Project
Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders
More informationStudy Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6100 Block Georgia Avenue NW Study Area and Location District PSA Ward ANC Phase Description 4 402 4
More information2014 ITS 3C Summit GDOT TMC Reconfiguration
2014 ITS 3C Summit GDOT TMC Reconfiguration September 16, 2014 Project Objectives Accommodate Current & Future Needs Improve Operational Efficiency Enhance GDOT-SRTA Operational Synergy Minimize Construction
More informationVirginia Connected Corridor
Virginia Connected Corridor NATMEC 2016 Mike Mollenhauer Director, Center for Technology Implementation Virginia Tech Transportation Institute 5/4/2016 Virginia Connected Corridor In 2014, VDOT and VTTI
More informationConnected & Automated Vehicle Activities
MDOT State Highway Administration Connected & Automated Vehicle Activities National Rural ITS Conference October 2018 MDOT s CAV Working Group MDOT s CAV Working Group Open discussions on CAV with TBUs,
More informationNorthern Virginia Transportation Authority
IV Northern Virginia Transportation Authority March 23, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation 66 Outside the Beltway Project Scope Multimodal improvements to
More informationMaximizing Asset ROI for Self & Clients in a Public Sector Setting. July 16 th San Diego
Maximizing Asset ROI for Self & Clients in a Public Sector Setting July 16 th San Diego State of Washington Population: 7.53 M Area: 71,303 Sq. Miles Population density: 107 population/mi² Puget Sound
More informationSite 40. Recreational Center
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Georgia Avenue S/B at Missouri Avenue NW Study Area and Location District PSA Ward ANC Phase Description
More informationStudy Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Military Road NW Study Area and Location District PSA Ward ANC Phase Description
More informationTRANSPORTATION DEMAND MANAGEMENT (TDM) PLAN FOR MINNETONKA
TRANSPORTATION DEMAND MANAGEMENT (TDM) PLAN FOR MINNETONKA Kyle Burrows Kristina Nesse Andrew Owen Renan Snowden Humphrey School of Public Affairs University of Minnesota AGENDA Transportation Demand Management:
More informationHonorable Mayor and Members of the City Council. Memorandum of Understanding: Interstate 80 Integrated Corridor Mobility (I-80 ICM) Project
Office of the City Manager CONSENT CALENDAR May 1, 2012 To: From: Honorable Mayor and Members of the City Council Christine Daniel, Interim City Manager Submitted by: Andrew Clough, Director, Public Works
More informationOpening the New Woodrow Wilson Memorial Bridge: Planning & Implementing a Major Traffic Switch
Opening the New Memorial : Planning & Implementing a Major Traffic Switch Scott C. Crumley, P.E., P.T.O.E. Manager March 26, 2009 1 Agenda Background The Major Milestone: Opening the New to Traffic Challenges
More informationSite 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Calvert Street NW Study Area and Location District PSA Ward ANC Phase Description
More informationTHEA CV PILOT OVERVIEW, STATUS, CHALLENGES, AND LESSONS LEARNED
THEA CV PILOT OVERVIEW, STATUS, CHALLENGES, AND LESSONS LEARNED 2 WHAT IS THEA? INDEPENDENT Agency of the State A local, user-financed public agency Financed through revenue bonds Supported by user tolls
More informationSouth Central Pennsylvania Regional Operations Plan Candidate Project Listing (DRAFT)
South Central Pennsylvania Regional Operations Plan Candidate Project Listing (DRAFT) APPLICABILITY South Central PA ITS Deployment Plan Update Lebanon County ITS deployment Lancaster County ITS deployment
More informationTransportation & Mobility
Transportation & Mobility October 11, 2017 October 11, 2017 Community Dialogue Series Session 3: Transportation & Mobility YOU ARE NOT STUCK IN TRAFFIC. YOU ARE TRAFFIC. October 11, 2017 Community Dialogue
More informationAway from Isolation: Caltrans Arterial Management
Away from Isolation: Caltrans Arterial Management David Man CALTRANS TRAFFIC OPERATIONS NOV 19, 2015 1 Agenda Introduction Basic Facts Past Present Future 2070s and Cabinets 2 Basic Facts 5,000 State traffic
More informationSACOG Board of Directors
SACOG Board of Directors Item #15-9-4 Consent September 10, 2015 Adopt Transportation Demand Management Funding Program Guidelines Issue: Guidelines for SACOG s FY 2015/16 Transportation Demand Management
More informationADAPTIVE SIGNAL CONTROL FOR CORRIDOR MANAGEMENT. AASHTO SCOTE Meeting Savannah, GA June 6, 2016
ADAPTIVE SIGNAL CONTROL FOR CORRIDOR MANAGEMENT AASHTO SCOTE Meeting Savannah, GA June 6, 2016 Presentation Overview Overview on Adaptive Signal Control ASC Technology Defined Data-Driven Traffic Management
More informationAn Analysis of TDM Impacts on a Corridor Segment
An Analysis of TDM Impacts on a Corridor Segment Phil Winters, CUTR TDM Program Director Liren Zhou, Graduate Research Assistant Sachin Rai, ITS Research Associate Nevine Georggi, TDM Research Associate
More informationI-20 EAST TEXAS CORRIDOR STUDY. TxDOT Planning Conference, Corpus Christi June 4 th, 2014
I-20 EAST TEXAS CORRIDOR STUDY TxDOT Planning Conference, Corpus Christi June 4 th, 2014 Table of Contents 1 Introduction 3-5 2 I-20 East Texas Corridor Advisory Committee 6-10 3 Study Schedule 11-12 4
More informationNorth American Portability Management, LLC LNPA Transition Contingency Rollback. Industry Discussion July 12 th, 2017
North American Portability Management, LLC LNPA Transition Contingency Rollback Industry Discussion July 12 th, 2017 Agenda Introduction Transition overview, definition of rollback, and background Rollback
More informationBellevue s Traffic Adaptive Signals
What we ll cover Bellevue s Traffic Adaptive Signals SCATS Phase 1 Implementation SCATS Operations Responsiveness New Features Some Initial Results 2011 Program and Beyond Final Thoughts ITE Quad Mtg April
More informationTransportation Data for Chicago Traffic Management Center. Abraham Emmanuel Deputy Commissioner, CDOT
Transportation Data for Chicago Traffic Management Center Abraham Emmanuel Deputy Commissioner, CDOT Chicago Traffic Management Center (TMC) Proposed in the early 2000s with a core building and Advanced
More informationTransportation Demand Management (TDM) Plan
Transportation Demand Management (TDM) Plan WELCOME TO COMMUNITY MEETING #2 AGENDA 5:30 6:10 PM Presentation, including Q&A 6:10 PM Open House 6:30 PM Meeting Adjourns Please sign in and fill out a comment
More informationUDOT Freeway and Traffic Signal Performance Metrics
UDOT Freeway and Traffic Signal Performance Metrics September 26, 2016 Grant Farnsworth, PE, PTOE UDOT Traffic Mobility Engineer Kelly Burns Eric Rasband Utah Demographics Speed Report Benefit of Past
More informationTransportation Demand Management Plan for Greater Sudbury
Transportation Demand Management Plan for Greater Sudbury Presentation to: City Council Marisa Talarico, M.Pl. Active Transportation Coordinator June 12, 2018 What is Transportation Demand Management?
More informationCollaborative Intelligent Transportation Systems (ITS) Initiatives with Neighbouring Jurisdictions
STAFF REPORT ACTION REQUIRED Collaborative Intelligent Transportation Systems (ITS) Initiatives with Neighbouring Jurisdictions Date: March 21, 2011 To: From: Wards: Reference Number: Public Works and
More informationAutomated Traffic Enforcement Technology Guidelines. Province of Alberta
Automated Traffic Enforcement Technology Guidelines Province of Alberta Automated Traffic Enforcement Technology Guidelines Province of Alberta A. PREAMBLE Automated traffic enforcement technology is an
More informationArizona State Troopers Highway Patrol Division Sergeant John Paul Cartier
Arizona State Troopers Highway Patrol Division Sergeant John Paul Cartier Average Annual Number of Responders Struck and Killed Nationally 12 Law Enforcement Officers 5 Fire and Rescue Personnel 60 Towing
More informationThe Practical Side of Cell Phones as Traffic Probes
The Practical Side of Cell Phones as Traffic Probes The information contained in this document is considered proprietary, and may not be reproduced or redistributed without the consent of Delcan Inc. Cell
More informationPennsylvania Safety Transportation and Research Track (PennSTART) April 10, 2018
Pennsylvania Safety Transportation and Research Track April 10, 2018 1 Purpose and Need Evaluate the need and demand for a PA-based, Mid-Atlantic TIM Training Facility Centrally located facility offering:
More information2017 STP PROJECT APPLICATION (OREGON)
Project Title Section 1. Applicant Information Name of Lead Agency/ Organization Address Phone Number Name & Title of Contact Person Email Address Certified Local Public Agency (Yes/No) Section 2. Project
More informationAn Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model
An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model The Congestion Management Process Federal Regulations state that all metropolitan planning organizations must carry
More informationTMC of the Future. Matt Lee Associate Vice President
TMC of the Future Matt Lee Associate Vice President Overview Traffic Operations Centers Transportation Management Centers TMCs are transforming to be more proactive in addressing recurring as well as non-recurring
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: Resolution: Yes No TITLE: Incident Customer Communications PURPOSE: To provide an update
More informationIntelligent Work Zones on Traffic Critical Projects
Intelligent Work Zones on Traffic Critical Projects Mid-Continent Transportation Research Symposium Ames, Iowa August 19, 2015 Tim Simodynes, ITS Engineer Four Main Causes of Delay Recurring Congestion
More informationEnergy Action Plan 2015
Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015
More informationDowntown Bus Service Review
Bus Service Photograph source: TransLink You gave us some great ideas to improve the bus network downtown. Now we want your feedback on promising design concepts. Join us at one of four open houses! Saturday,
More informationStudy Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 35 Block Massachusetts Avenue NW Study Area and Location District PSA Ward ANC Phase Description 2 24
More informationIoannis Psarros Department of Civil Engineering and Intermodal Freight Transportation Institute, Memphis, TN
Ioannis Psarros Department of Civil Engineering and Intermodal Freight Transportation Institute, Memphis, TN CIVL 7904/8904: Traffic Flow Theory (Spring 2014) April 5, 2014 Transportation Research Increased
More informationIntegrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO
Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017 Chattanooga 2045 RTP Chattanooga 2045 RTP addresses both transportation supply and demand Continued
More informationLAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY
LAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY L-DC REGIONAL ITS ARCHITECTURE AND STRATEGIC DEPLOYMENT PLAN EXECUTIVE SUMMARY The Lawrence-Douglas County Metropolitan Planning Organization (L- DC MPO) has
More informationDAVID WOLFE TMC Operations & Incident Management Specialist
DAVID WOLFE TMC Operations & Incident Management Specialist Professional Background Education Temple University, B.A. - Communications Licenses/Certificates FEMA NIMS: ICS-100 ICS-200 ICS-300 ICS-400 IS-700
More informationTraffic Impact Analysis Shotwell Road Residential Clayton, NC
Shotwell Road Residential Clayton, NC TABLE O CONTENTS 1. INTROUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3. Adjacent Land Uses...2 1.4. Existing Roadways...2
More informationTemporary Traffic Control (Maintenance of Traffic) Training Handbook
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION Temporary Traffic Control (Maintenance of Traffic) Training Handbook OFFICE OF DESIGN - ROADWAY STANDARDS SECTION JANUARY 2016 TALLAHASSEE, FLORIDA Page 1
More informationTHE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9
THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental
More informationTHE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9
THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental
More informationNorth American Portability Management, LLC LNPA Transition Contingency Rollback. Industry Working Session January 16 th, 2018
North American Portability Management, LLC LNPA Transition Contingency Rollback Industry Working Session January 16 th, 2018 Agenda Resubmission Aid Issue 2 Refinements and updated plan Decision Process
More informationEngaging Maryland toward CAV advancements Christine Nizer, Administrator
Engaging Maryland toward CAV advancements Christine Nizer, Administrator Maryland Department of Transportation Motor Vehicle Administration Maryland CAV activities Overall goal: Maryland is open for business
More informationTraveler Information System
Traveler Information System Regional Safety Advisory Committee January 27, 2017 Marian Thompson, P.E. Transportation System Operations Supervisor 511DFW.org 511DFW Regional in DFW Multimodal 2 511DFW.org
More informationTransportation Impact Assessment Monitoring Report (TIAMR) Tool. User Manual
Transportation Impact Assessment Monitoring Report (TIAMR) Tool User Manual Table of Contents Introduction... 3 Compliance Requirements... 4 How to Use the Tool... 5 Tool Overview... 5 Using the Reporting
More informationMeeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.
TO WHOM IT MAY CONCERN: NOTICE OF RE-SCHEDULED BOARD MEETINGS This is notice that the re-scheduled meetings of the Board of Directors of the New Jersey Transit Corporation, NJ Transit Rail Operations,
More informationMETRO SHORT RANGE TRANSIT PLAN FY Executive Summary May 2009 DIVERSIFIED TRANSPORTATION SOLUTIONS
METRO SHORT RANGE TRANSIT PLAN FY 2010 2014 2014 Executive Summary May 2009 DIVERSIFIED TRANSPORTATION SOLUTIONS OVERVIEW Purpose of Metro SRTP Develop multi year strategic plan to improve transit quality,
More informationFairfax County Comprehensive Transit Plan and Transit Development Plan
Fairfax County Comprehensive Transit Plan and Transit Development Plan Board Transportation Committee December 1, 2015 Randy White Stuart Boggs Fairfax County County of Fairfax, Virginia Overview Background
More informationConcept Definition Report Adaptive Urban Signal Control Integration (AUSCI) Project. Executive Summary -- August 1995
Executive Summary -- August 1995 This summary highlights the work performed as part of the AUSCI Concept Definition Report. Additional supporting and background material is presented in a separate document
More informationSpeed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Study Area and Location District PSA Ward ANC Phase Description
More informationConnecting a Mobile York Region
Connecting a Mobile York Region Presentation to ITS Canada Victoria 2014 Gregg Loane, P.Eng. June 1, 2014 Connecting a Mobile York Region Overview Who is York Region? York s ITS Program Background Data
More informationAPPENDIX A TDM Development Guideline
Appendix A: TDM Development Guideline APPENDIX A TDM Development Guideline Appendix A: TDM Development Guideline Page A.1 1 INTRODUCTION AND OVERVIEW 1.1 About This Guideline This guideline contains information
More informationUpdating NTCIP 1202 (Actuated Signal Controllers) to Support a Connected Vehicle Environment. Authors
Updating NTCIP 1202 (Actuated Signal Controllers) to Support a Connected Vehicle Environment Jean Johnson NEMA 1300 North 17 th Street, Suite 900 Rosslyn, VA 22209 (703) 841-3226 jean.johnson@nema.org
More informationUnderstanding the Potential for Video Analytics to Support Traffic Management Functions
Understanding the Potential for Video Analytics to Support Traffic Management Functions Project Summary Slides November 2014 ENTERPRISE Program Program Goals Facilitate rapid progress in the development
More information511 DFW TRAVELER INFORMATION LESSONS LEARNED
511 DFW TRAVELER INFORMATION LESSONS LEARNED Brief History of 511 March 8, 1999-- the US DOT petitioned the Federal Communications Commission (FCC) for national traveler information number. July 21, 2000
More informationPanel Discussion ITS Roll-Out Plans from Road Authorities Across Canada
Moderator: Roger Browne, M.A.Sc., P. Eng. Co-Chair ATMS Committee ITS Canada Brigid Canil, P. Eng. Co-Chair ATMS Committee ITS Canada Panel Discussion ITS Roll-Out Plans from Road Authorities Across Canada
More informationRecommendation to Board. Final Action
MOTION NO. M2017-59 City of Seattle Center City Mobility Plan Agreement MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION 05/04/2017 05/25/2017 Recommendation
More informationRoute 18 New Brunswick Improvement Project
The State of New Jersey Department of Transportation Route 18 New Brunswick Improvement Project February 17, 2011 PMO Organization Chart Project Team Purpose and Need Improve motorist safety & traffic
More informationTrack 1 // Collaboration & Partnerships
Track 1 // Collaboration & Partnerships 1.1 Designate Single Point of Contact to serve as an consistent entry point for companies seeking to deploy in San Francisco. There is often a lack of trust and
More informationSpeed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel
Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel Study Area and Location District PSA Ward ANC Phase Description
More informationAn Analysis of TDM Impacts on a Corridor Segment Research Findings
An Analysis of TDM Impacts on a Corridor Segment Research Findings Phil Winters, CUTR TDM Program Director Liren Zhou, Graduate Research Assistant Sachin Rai, ITS Research Associate Nevine Georggi, TDM
More informationROADWAY LIGHTING CURFEW
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS Rhode Island Department of Transportation ROADWAY LIGHTING CURFEW IMPLEMENTATION PLAN March 25, 21 TABLE OF CONTENTS INTRUDUCTION/OVERVIEW... 1 1.1. ANTICIPATED
More informationImplementation Plan FY
Implementation Plan FY 2013 2015 January 18, 2012 Financial Integrity - Address the District's Structural Deficit - Financially support the District's reinvention of its family of services - Promote funding
More informationCoordinated Highways Action Response Team
Coordinated Highways Action Response Team PANEL 3: EVENT RESPONSE TOOLS YOU CAN USE AT YOUR AGENCY Richard R. Dye CHART Systems Administrator Maryland State Highway Administration I-95 CORRIDOR COALITION
More informationTown of Georgetown Comprehensive Plan
Town of Georgetown Comprehensive Plan Town Council Kick-Off Meeting w/planning Commission August 24, 2016 Meeting Agenda Introductions Scope of Services Schedule Public Outreach Community Survey SWOT Analysis
More informationTSM&O Strategic Plan; STAMP Action Plan: Implementation Focus. Florida Section ITE & ITS Florida Annual Meeting, November 1-3, 2017
TSM&O Strategic Plan; STAMP Action Plan: Implementation Focus Florida Section ITE & ITS Florida Annual Meeting, November 1-3, 2017 Agenda 1. TSM&O Strategic Plan Implementation 2. Statewide Arterial Management
More information