Environmental Monitoring Report. Loan 2671 & Grant 0218-KGZ: Power Sector Improvement Project. Semiannual Report January June 2016

Size: px
Start display at page:

Download "Environmental Monitoring Report. Loan 2671 & Grant 0218-KGZ: Power Sector Improvement Project. Semiannual Report January June 2016"

Transcription

1 Environmental Monitoring Report Semiannual Report January June 2016 Loan 2671 & Grant 0218-KGZ: Power Sector Improvement Project Prepared by OJSC National Electric Grid of Kyrgyzstan for the Kyrgyz Republic and the Asian Development Bank.

2 Table of Content Abbreviations... 3 I. Introduction Project Information Goal of the Project Project description Upgrading of substations SCADA Project implementation area Project Implementation Progress Project Organizational Structure... 6 II. ENVIRONMENTAL MONITORING Environmental monitoring... 6 III. ENVIRONMENTAL MANAGEMENT Environmental Management Plan On-Site Inspections and Audits PCBs Grievance Redress Mechanism Information Support Corrective Action Plan... 8 Appendix 1. List of participants of the training Polychlorinated biphenyls in energy sector conducted in NEGK on 25 May Appendix 2. Photos from the training Appendix 3. Photos of equipment at substations

3 Abbreviations ADB AMDA SAEPF PIU KR MoEn ME NEGK NEHK OAO EMP SSEMP PCBs IEE SCADA CAPS Asian Development Bank Automated Metering & Data Acquisition System State Agency for Environmental Protection and Forestry under the Government of the Kyrgyz Republic Project Implementation Unit Kyrgyz Republic Ministry of Energy Ministry of Economy National Electric Grid of Kyrgyzstan National Energy Holding of Kyrgyzstan Open type Joint Stock Company Environmental Management Plan Site Specific Environmental Management Plan polychlorinated biphenyls Initial environmental examination Supervisory Control and Data Acquisition System Central Asian Power System 3

4 I. Introduction This semiannual report on environmental monitoring, which covers the period of 1 January to 30 June 2016 for the Power Sector Improvement Project, was prepared in accordance with requirements of Initial environmental examination (IEE) developed in 2014, and approved by ADB. IEE received a positive opinion from the State Environmental Examination Unit of SAEPF on No /205. The objective of this semiannual report on environmental monitoring is a follow-up of the project activity for compliance with the requirements of the EMP. According to Safeguard Policy Statement of ADB (SPS, 2009), the Project is classified as category B. Its potential adverse environmental impacts are site-specific, few if any of them are irreversible. 1. Project Information 1.1. Goal of the Project (i) To advance transparency and accountability of commercial transactions in the power sector through establishment of the automated metering and data acquisition system; (ii) To improve overall efficiency and reliability of Kyrgyz power supply system through rehabilitation and upgrading of substations, and communications system Project description. The project aims at: (i) upgrading of substations; and (ii) establishment of Supervisory Control and Data Acquisition System (SCADA) to manage the system of energy equipment Upgrading of substations. Upgrading of substations through replacing dilapidated circuit breakers and instrument transformers that have reached their economic lives, are technologically obsolete, or do not meet the accuracy requirement for regional power trade will improve the reliability of the system SCADA Establishment of Supervisory Control and Data Acquisition System (SCADA) will connect seven major substations and the control centers via optical fiber. The system will allow improving overall efficiency and reliability of Kyrgyz power supply system and the CAPS. The Northern fiber-optic communication line (FOCL) will be installed under Lot 2 of the project for connecting several substations and facilities in Bishkek city, and laying fiber optic cable in Bishkek city. According to the scope of work, FOCL (fiber-optic communication line) will be installed for hanging on supports of transmission lines with a total length of 330 km in the following transmission lines 1 : i. 220 kv Glavnaya Chuiskaya (59.9 km); ii. 220 kv Chuiskaya Bystrovka (39.4 km); iii. 220 kv Bystrovka Ala-Archa (93.4 km); iv. 220 kv Ala-Archa Frunzenskaya (108.8 km); v. 110 kv Glavnaya Karagachovaya (8.3 km) vi. 110 kw Power and District Heating Plant (PDHP/ТЭЦ) Bishkek Parkovaya (11.8 km); vii. 110 kv Parkovaya Ala-Archa (7.8 km). 1 Information is provided by OAO NEGK 4

5 Laying of 16.2 km optical power ground wire in Bishkek city is carried out to connect the central control office (CCO) of NEGK to the main fiber-optic system. The following sections will be connected to the new telecommunication system by optical power ground wire (OPGW): ii. PDHP Bishkek CCO/NEGK (6.2 km); iii. PDHP Bishkek ChuPVES (Chui Enterprise of High-Voltage Networks) (4 km); iv. SS Karagachevaya CCO/NEGK (6 km) 1.3. Project implementation area. The project will be implemented at 107 substations in Chui, Issyk-Kul, Talas, Naryn, Osh and Jalal-Abad oblasts. (Figure 1) Scheme of the Main Electric Grid of the Kyrgyz Republic Figure 1. Power Sector Improvement Project implementation area, Lot 1 Upgrading of Substations Figure 2. Project implementation area, Lot 2 Laying of fiber-optic communication line (SCADA) in Chui oblast 1.4. Project Implementation Progress 5

6 In May 2016 AK-AY ELEKTRIK, which is a contractor of NEGK for the Component 2: SCADA and AMDA, signed a contract with environmental specialist In May 2016 AK-AY ELEKTRIK recruited a subcontractor OsOO ChuiElectroStroy for works under Lot 2: Rehabilitation of supports and Laying of fiber-optic communication line. During the reporting period organizational and preparatory works for project implementation were carried out Project Organizational Structure The Project has Executing Agencies: National Energy Holding of Kyrgyzstan (NEHK), and Open type Joint Stock Company (OAO) National Electric Grid of Kyrgyzstan (NEGK). Due to the change of the structure of the Government of the Kyrgyz Republic in November 2015, the functions of the Ministry of Energy were transferred to the Ministry of Economy of the Kyrgyz Republic Ministry of Economy is responsible for: (i) capacity-building of NEGK regarding corporate and financial management, including development of business plan for NEGK; (ii) elaborating proposal for establishment of the settlement system for wholesale electricity supply transactions; and (iii) supervising NEGK's project implementation performance NEGK is responsible for: (I) installing communication system for recording electricity commercial consumption data, and collection of metering data through the national electric grid. This work includes installing meters and related equipment in substations of NEGK and facilities of electric power plants; (II) rehabilitation of about 54 substations by replacing circuit breakers, and current and voltage transformers; (III) installing communications and supervisory control and data acquisition system (SCADA) that includes the fiber-optic communication line that connects seven major NEGK substations and control centers; and (IV) ensuring NEGK support in Project implementation management AK-AY ELEKTRIK DIS TICARET KOLLEKTIF SIRKETI Contractor for supplying, designing, laying, and commissioning of optical fiber network of SCADA International consultant expert on SCADA and communications carries out independent supervision. II. ENVIRONMENTAL MONITORING 2.1. Environmental monitoring Environmental Monitoring was not envisaged this reporting period, since no physical works conducted. III. ENVIRONMENTAL MANAGEMENT 3.1. Environmental Management Plan In April 2016 NEGK developed and sent to ADB the Site Specific Environmental Management Plans (SSEMP) for Lot 1, and in May 2016 the Contractor AK- AY ELEKTRIK developed, and NEGK approved the SSEMP for Lot 2, after agreeing it with ADB: 1) SSEMP for Changing Oil-Filled Transformers at Substations of NEGK; 2) SSEMP for Changing Oil-Filled Circuit-Breakers at Substations of NEGK; 6

7 3) SSEMP for Changing PCB-free equipment: air, vacuum and electronegative gas circuit breakers, outdoor switchyards at Substations of NEGK; 4) SSEMP for 9 SCADA lines. SSEMPs include: (i) Types of environmental impacts; (ii) Suggested measures to mitigate environmental impacts; (iii) Management of road safety while transporting oils and equipment, including PCBs contaminated ones; (iv) Compliance with safety measures while working on equipment replacement; (v) Waste management, including toxic wastes, such as PCBs contaminated oils and equipment; (vi) Environmental Management System for implementation of EMP; (vii) Institutional conditions and measures on capacity development to implement the EMP; (viii) Grievance redress mechanism in the field; (ix) Monitoring and reporting. The potential negative impact on environment may be mitigated through implementation of EMP. Additional environmental investigations shall be continued during project implementation, and the EMP shall be updated depending on the new data obtained to achieve the project environmental goals On-Site Inspections and Audits On June 2016 the national environment safeguards consultant of NEGK visited substations: Frunzenskaya, Kara-Balta, Glavnaya in Chui oblast and Chui Enterprise of High- Voltage Networks to examine the situation on preparation of sites for temporary storage of equipment, which will be replaced under the ADB-funded Power Sector Improvement Project. During the visit to substations it was established that: 1) Sites for temporary storage of equipment released from transformer oil are not prepared at substations; 2) Oil-free equipment (air and vacuum circuit breakers) replaced in 2015 up to date is stored in designated sites until legal issues are addressed related to transfer of used equipment for scrap. As a result of visits to substations the proposals were sent to NEGK management: 1) Not to replace oil-filled equipment until the results of tests of transformer oil on PCBs are received; 2) Prepare the sites for temporary storage of circuit breakers, and current and voltage transformers after draining the oil and removing them from supports in accordance with requirements of project IEE and SanPiN Hygienic requirements to placement and treatment of production and consumption waste ; 3) Speed up the transfer of replaced not oil filled equipment (air circuit breakers) to recycling firms PCBs In May 2016, two express analyzers for transformer oil testing for presence of PCBs procured for grant funds allocated to the Ministry of Economy of the Kyrgyz Republic, which is the successor of the Ministry of Energy of the Kyrgyz Republic. However, due to procedure of registration of transfer between the parties of procurement of equipment, express analyzers as of 30 June 2016 were not yet received by NEGK. Therefore, the works on 107 substations of NEGK for oil testing for presence of PCBs in oil-filled equipment to be replaced (circuit breakers, and transformers) have not been carried out during the reporting period. 7

8 On May 25, 2016, the Environmental Consultant recruited by Ministry of Energy of the Kyrgyz Republic conducted a training Polychlorinated biphenyls in energy sector. The training was attended by 20 participants. The participants were specialists of high-voltage networks of Osh, Naryn, Jalal-Abad and Chui oblasts, which are part of NEGK, specialists of OAO Electric Power Plants, and OAO SeverElectro. (List of participants is in Appendix 1). Before the start of the civil works, NEGK submitted the schedule of transformer oil testing for presence of PCBs, which includes particular timing of transformer oil testing for presence of PCBs of oil filled circuit breakers to be replaced under the ADB-funded Power Sector Improvement Project for all substations. Given that as of 30 June 2016 express analyzers were not yet received by NEGK, the schedule will be finalized after the express analyzers are received by NEGK 3.4. Grievance Redress Mechanism Requirements for grievance redress mechanism of ADB Accountability Mechanism Policy (2012) and ADB Safeguard Policy Statement (SPS, 2009) principally meet the requirements of the Law of the Kyrgyz Republic On processing of complaints of citizens (2007). The existing differences in timing of processing the complaints, specified as 30 days in the Law of the Kyrgyz Republic, and 14 days specified in ADB Accountability Mechanism Policy, were eliminated by the Order of the General Director of the NEGK issued on May 22, The Order aims at NEGK s quick response to process the complaints. The received applications (written requests) and complaints are registered in the General Clerical Department of NEGK in the Log Book and handed over to Management for consideration. The nature and the subject matter of a complaint is taken into account, and the next step is to assign responsible person, who is competent to consider the complaint received, after that the complaint shall be considered within 30 days, the applicant or claimant shall be provided with an answer, that is noted in the Log as implemented. There were no complaints or requests received, related to the project, during the reporting period of Information Support In order to inform the public on the project implementation and measures to be taken to ensure environmental safety, NEGK continuously updates the information on project implementation progress and during the reporting period posted on the web-site the SSEMPs for two Lots Corrective Action Plan During the reporting period the project has been implemented in accordance with ADB Environmental Safeguards Policy, however there is some delay of project implementation due to an outstanding issue related to procurement of PCBs express analyzers. EMP provides for furnishing the sites that protect the soil from contamination by oil with rain water during temporary storage of oil circuit breakers and current and voltage transformers at the sites. However, during the reporting period, the sites have not been furnished and NEGK plans to start these works only in July Table 1 below specifies the progress of corrective actions to resolve the above issues, and which corrective actions should be implemented to comply with EMP. 8

9 Status of Corrective Actions Plan Table 1 # Environmental issues identified 1. Absence of portable PCB analyzers for rapid test of 2. Absence or presence of PCBs in transformer oil 3. Absence of SSEMP for SCADA 4. Absence of SSEMP for upgrading of substations 5 Absence of sites for temporary storage of old equipment including oil filled equipment Corrective actions taken Procurement of express analyzers for testing transformer oils for PCBs Conducting of trainings and testing of transformer oil for presence/absence of PCBs Development of SSEMP for SCADA Development of SSEMP for upgrading of substations Furnishing the site for temporary storage of old equipment including oil filled equipment Due Date March 2016 April June 216 January- February 2016 January February 2016 June 2016 Compliance Responsible for implementation/ supervision Not ME, NEGK complied with Not complied with Complied with Complied with Not complied with ME, NEGK NEGK NEGK NEGK In order to achieve the compliance with project IEE and EMP, the following corrective actions should be carried out in close cooperation with ADB, ME, and Contractor (Table 2). Table 2 Plan of Corrective Actions # Environmental issues identified 1. Absence of portable PCB analyzers for rapid test of transformer oil 2. Absence or presence of PCBs in transformer oil 3. Absence of sites for temporary storage of old equipment including oil filled equipment Corrective actions taken Procurement of express analyzers for testing transformer oils for PCBs Conducting of trainings and testing of transformer oil for presence/absence of PCBs Furnishing the site for temporary storage of old equipment including oil filled equipment Due Date July - September 2016 July - September 2016 July - September 2016 Responsible for implementation/ supervision ME, NEGK ME, NEGK NEGK 9

10 Appendix 1. List of participants of the training Polychlorinated biphenyls in energy sector conducted in NEGK on 25 May

11 11

12 Appendix 2. Photos from the training Exhibit 1 Exhibit 2 12

13 Appendix 3. Photos of equipment at substations Exhibit 3. SF6 circuit breakers installed at Frunzenskaya substation instead of air circuit breakers Exhibit 4. Current and voltage transformers to be replaced at Frunzenskaya substation 13

14 Exhibit 5. Oil-filled circuit-breakers to be replaced at Kara-Balta substation under the project Exhibit 6. SF6 circuit breakers installed at Glavnaya substation instead of air circuit breakers 14

15 Exhibit 7. New current and voltage transformers to be installed at Glavnaya substation instead of old ones 15

Prepared by the Joint Stock Company National Electric Grid of Kyrgyzstan for the Kyrgyz Republic and the Asian Development Bank.

Prepared by the Joint Stock Company National Electric Grid of Kyrgyzstan for the Kyrgyz Republic and the Asian Development Bank. Environmental Monitoring Report Bi-annual Report Covering the period of January June 2015 KGZ: Power Sector Improvement Project Project Number: 43456-023 ADB Loan/Grant Number: L2671/G0218-KGZ Prepared:

More information

Project Features. Power Sector Improvement Project (RRP KGZ ) $ 44.8 million (62.7% grant % loan) ADF amount:

Project Features. Power Sector Improvement Project (RRP KGZ ) $ 44.8 million (62.7% grant % loan) ADF amount: Power Sector Improvement Project (RRP KGZ 43456-02) Project Concept Outline Project Features ADF amount: ADF Country allocation: ADF Regional allocation: PPTA Budget (TASF IV): Sector (subsectors): Themes:

More information

Good Practice in Implementation of Grievance Redress Mechanism (GRM)

Good Practice in Implementation of Grievance Redress Mechanism (GRM) Good Practice in Implementation of Grievance Redress Mechanism (GRM) Ketevan Chomakhidze Environmental Specialist United Water Supply Company of Georgia (UWSCG) SUMMARY Legislation and institutional framework

More information

Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB)

Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB) Asian Development Bank Project Number: 2974-GEO Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB) Bi-Annual Land Acquisition and Resettlement Plan, November 2013

More information

Port Moresby Power Grid Development Project.

Port Moresby Power Grid Development Project. Environmental Monitoring Report Semi-annual Report January 2017 Port Moresby Power Grid Development Project. Prepared by PNG Power Limited for the Asian Development Bank. This Semi-annual Environmental

More information

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement Decision 21617-D01-2016 Crystal Lake 722S Substation October 5, 2016 Alberta Utilities Commission Decision 21617-D01-2016 Crystal Lake 722S Substation Proceeding 21617 Application 21617-A001 October 5,

More information

UAE Nuclear Energy Program Overview

UAE Nuclear Energy Program Overview UAE Nuclear Energy Program Overview Workshop on Nuclear Power Newcomers and International Cooperative Actions November 3 rd,2009 Ambassador Hamad Al Kaabi Permanent Representative of the UAE to the IAEA

More information

APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE:

APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE: APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE: New 240 kv Montana Alberta Tie Ltd. (MATL) Substation 120S and Reconfigure 240kV Transmission Line 923L AltaLink Management Ltd. 2611 3 rd

More information

GEORGIA: GEORGIAN SUSTAINABLE URBAN TRANSPORT INVESTMENT PROGRAM, Tranche 3

GEORGIA: GEORGIAN SUSTAINABLE URBAN TRANSPORT INVESTMENT PROGRAM, Tranche 3 Loan Number: 3063 -GEO Project Number: 42414-043 Reporting period: March -August, 2014 GEORGIA: GEORGIAN SUSTAINABLE URBAN TRANSPORT INVESTMENT PROGRAM, Tranche 3 (Financed by the Asian Development Bank)

More information

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho TERMS OF REFERENCE Scaling-up Renewable Energy Program (SREP) Joint Mission September 27-29, 2017 Lesotho 1 SUMMARY 1. Mission objectives. The main objective of the Joint Mission ( the Mission ) is to

More information

"China WEEE" Development and Tendency Report

China WEEE Development and Tendency Report European Electrical and Electronics Industry 欧洲电气电子行业机构 "China WEEE" Development and Tendency Report "China WEEE" Regulation Regulations of the Administration of the Collection and Disposal of Waste Electrical

More information

GEO: Urban Services Improvement Investment Program (Tranche 3)

GEO: Urban Services Improvement Investment Program (Tranche 3) Environmental Monitoring Report Bi-annual Report January June 2015 GEO: Urban Services Improvement Investment Program (Tranche 3) Prepared by Ketevan Chomakhidze, Environmental Safeguards Specialist United

More information

Section I. GENERAL PROVISIONS

Section I. GENERAL PROVISIONS LAW OF THE RUSSIAN FEDERATION NO. 5151-1 OF JUNE 10, 1993 ON CERTIFICATION OF PRODUCTS AND SERVICES (with the Additions and Amendments of December 27, 1995, March 2, July 31, 1998) Federal Law No. 154-FZ

More information

ADDENDUM # 3. To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar at JFK Long-Term Parking Lot:

ADDENDUM # 3. To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar at JFK Long-Term Parking Lot: PROCUREMENT DEPARTMENT 4 WORLD TRADE CENTER 150 GREENWICH STREET, 21ST FL. NEW YORK, NY 10007 12/7/2018 ADDENDUM # 3 To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar

More information

KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT)

KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT) KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT) 1. DIRECTOR, LEARNING & DEVELOPMENT - LOWER KABETE Reporting to the Director General, Campus Directors will be responsible for

More information

NATIONAL PROGRAMME Chapter 15 Telecommunication and Post. Telecommunication and Post

NATIONAL PROGRAMME Chapter 15 Telecommunication and Post. Telecommunication and Post Introduction Telecommunication and Post The n legislation in the field of telecommunication and post is almost in full incompliance with that of the EU, except for certain legal rules on general legal

More information

Annual Report for the Utility Savings Initiative

Annual Report for the Utility Savings Initiative Report to the North Carolina General Assembly Annual Report for the Utility Savings Initiative July 1, 2016 June 30, 2017 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY http://portal.ncdenr.org Page

More information

Electric Utility Facility Connection Requirements

Electric Utility Facility Connection Requirements City of Coffeyville Municipal Light and Power Electric Utility Facility Connection Requirements Approved: Date: Version Date Change Tracking Reviewer/Editor 1.0 June, 2010 Original document. Steve McGie

More information

AIR SITUATION DATA EXCHANGE

AIR SITUATION DATA EXCHANGE MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN The Swiss Federal Department of Defense, Civil Protection and Sport (DDPS) AND Federal Ministry of Defense of the Federal Republic of Germany AND SUPREME HEADQUARTERS

More information

Public Private Partnerships for sustainable and smart cities. Milano, 4 July 2017

Public Private Partnerships for sustainable and smart cities. Milano, 4 July 2017 Public Private Partnerships for sustainable and smart cities Milano, 4 July 2017 PPP FOR CITIES PPP FOR CITIES International Centre of Excellence The United Nations Economic Commission for Europe (UNECE)

More information

Legal framework of ensuring of cyber security in the Republic of Azerbaijan

Legal framework of ensuring of cyber security in the Republic of Azerbaijan Legal framework of ensuring of cyber security in the Republic of Azerbaijan Bakhtiyar N.Mammadov Ministry of Communications and Information Technologies Head of Legal and HR Department ITU WSIS Thematic

More information

Generation, Transmission, and End User Facilities

Generation, Transmission, and End User Facilities Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 978 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE MP 1.1 Objective

More information

ENMAX Power Corporation

ENMAX Power Corporation Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L September 15, 2017 Alberta Utilities Commission Decision 22769-D01-2017 Transmission Lines 138-1.80L and 138-1.81L Proceeding 22769 Application

More information

SSC Transformation Initiative Fairness Monitoring Services

SSC  Transformation Initiative Fairness Monitoring Services SSC Email Transformation Initiative Fairness Monitoring Services Fairness Monitoring Final Report Date of Submission: 14 June, 2013 Submitted To: Director General Operational Integrity Sector Departmental

More information

Sapphire Wind Farm 330/33kV Substation

Sapphire Wind Farm 330/33kV Substation Signature projects: Projects: Project Edison AusNet Sapphire Wind Farm 330/33kV Substation TransGrid Zinfra constructed 330/33kV substation and transmission line as part of the cut in works for the Sapphire

More information

DESCRIPTION OF COST ALLOCATION METHODOLOGY

DESCRIPTION OF COST ALLOCATION METHODOLOGY Filed: September, 00 EB-00-00 Exhibit G Schedule Page of 0 DESCRIPTION OF COST ALLOCATION METHODOLOGY.0 INTRODUCTION This schedule provides an overview of the cost allocation methodology used to allocate

More information

WORKPAPERS TO PREPARED DIRECT TESTIMONY OF DAVID BUCZKOWSKI ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY BEFORE THE PUBLIC UTILITIES

WORKPAPERS TO PREPARED DIRECT TESTIMONY OF DAVID BUCZKOWSKI ON BEHALF OF SOUTHERN CALIFORNIA GAS COMPANY BEFORE THE PUBLIC UTILITIES Application of SOUTHERN CALIFORNIA GAS ) COMPANY for authority to update its gas ) requirement and base rates ) effective January 1, 2019 (U 904-G) ) Application No. 17-10- Exhibit No.: (SCG-11-CWP) WORKPAPERS

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1.Name of the Project Country: The Republic of the Union of Myanmar Project: Communication Network Improvement Project Loan Agreement: March 26, 2015 Loan Amount: 10,500

More information

Corridor Management Committee. January 12, 2017

Corridor Management Committee. January 12, 2017 Corridor Management Committee January 12, 2017 1 Today s Topics Chair s Remarks 2017 Project Activity Overview Updated Corridor Flyover Video: Preview 2017 Meeting Schedule 2 3 Chair s Update 2016 Major

More information

Atras Network Communications

Atras Network Communications Atras Network Communications Guide to Information and Communications Technology (ICT) Standards developed and published by the Telecommunications Industry Association (TIA) The Telecommunications Industry

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/81/41 21 May 2018 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE MONTREAL

More information

Generator Interconnection Process. Wholesale Transmission Overview

Generator Interconnection Process. Wholesale Transmission Overview 1 Generator Interconnection Process Wholesale Transmission Overview 2 This presentation summarizes the FERC-approved Generator Interconnection Procedures (GIP) in Appendix Y of the California Independent

More information

INFORMATIZATION AND COMMUNICATION DEVELOPMENT TRENDS IN ARMENIA

INFORMATIZATION AND COMMUNICATION DEVELOPMENT TRENDS IN ARMENIA INFORMATIZATION AND COMMUNICATION DEVELOPMENT TRENDS IN ARMENIA PRESENTED BY HOVHANNES STEPANYAN CHIEF SPECIALIST OF THE FOREIGN RELATIONS AND PROGRAMS DEPARTMENT MINISTRY OF TRANSPORT AND COMMUNICATION

More information

HIGH VOLTAGE CONTRACTORS. Winnipeg The Pas Snow Lake - Thompson

HIGH VOLTAGE CONTRACTORS. Winnipeg The Pas Snow Lake - Thompson HIGH VOLTAGE CONTRACTORS Winnipeg The Pas Snow Lake - Thompson DESIGN BUILD MAINTAIN AMPS Powerline Incorporated is a high voltage electrical service provider of choice for new high voltage electrical

More information

Sector(s) Public administration- Information and communications (50%), General public administration sector (50%)

Sector(s) Public administration- Information and communications (50%), General public administration sector (50%) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC28685

More information

Annual Training plan 2018

Annual Training plan 2018 Annual Training plan 2018 Leadership,, HR, Creativity, Secretary Courses Sr. No. Course Name Date Venue Fees U.S $ January 1. Time & Stress 7-11/1/2018 Abu Dhabi 2600 2. Legal Writing Skills 7-11/1/2018

More information

CHAPTER 13 ELECTRONIC COMMERCE

CHAPTER 13 ELECTRONIC COMMERCE CHAPTER 13 ELECTRONIC COMMERCE Article 13.1: Definitions For the purposes of this Chapter: computing facilities means computer servers and storage devices for processing or storing information for commercial

More information

JEAS-Accredited Environmental Assessor Qualification Scheme

JEAS-Accredited Environmental Assessor Qualification Scheme JEAS-Accredited Environmental Assessor Qualification Scheme Osamu Kajitani, President Japan Association of Environment Assessment (JEAS) Abstract The Japan Association of Environment Assessment (JEAS)

More information

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

SOUTH TEXAS ELECTRIC COOPERATIVE, INC. SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection

More information

EXHIBIT A: PROJECT SCOPE AND SCHEDULE The Project consists of the activities and delivery dates identified in this Exhibit A, implemented in accordance with the Agreement. The Parties have included a schedule

More information

Meeting of PPCR Pilot Countries and Regions May 1-3, 2013 Washington D.C., United States. Progress Updates from PPCR Pilots

Meeting of PPCR Pilot Countries and Regions May 1-3, 2013 Washington D.C., United States. Progress Updates from PPCR Pilots Meeting of PPCR Pilot Countries and Regions May 1-3, 2013 Washington D.C., United States Progress Updates from PPCR Pilots Country/regional pilot: Tajikistan Please describe any advances made in the following

More information

LAW OF THE REPUBLIC OF KAZAKSTAN «ON CERTIFICATION»

LAW OF THE REPUBLIC OF KAZAKSTAN «ON CERTIFICATION» April 27\ 99 Draft LAW OF THE REPUBLIC OF KAZAKSTAN «ON CERTIFICATION» This Law shall establish legal basis of certification of products, quality systems and production, (further processes), works and

More information

REPORT 2015/149 INTERNAL AUDIT DIVISION

REPORT 2015/149 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/149 Audit of the information and communications technology operations in the Investment Management Division of the United Nations Joint Staff Pension Fund Overall results

More information

Chapter 18 SaskPower Managing the Risk of Cyber Incidents 1.0 MAIN POINTS

Chapter 18 SaskPower Managing the Risk of Cyber Incidents 1.0 MAIN POINTS Chapter 18 SaskPower Managing the Risk of Cyber Incidents 1.0 MAIN POINTS The Saskatchewan Power Corporation (SaskPower) is the principal supplier of power in Saskatchewan with its mission to deliver power

More information

Ministry of the Environment and Climate Change District Overview Sandra Thomas September 30, 2014

Ministry of the Environment and Climate Change District Overview Sandra Thomas September 30, 2014 Ministry of the Environment and Climate Change District Overview Sandra Thomas September 30, 2014 Ministry Overview Outline Key District Office Functions Compliance - Durham York Energy Centre 2 What We

More information

Implementation of projects to increase energy efficiency in high-voltage power transmission systems

Implementation of projects to increase energy efficiency in high-voltage power transmission systems Implementation of projects to increase energy efficiency in high-voltage power transmission systems Sergey Katyshev JSC KEGOC 28 30 September, 2010 Astana International Energy Efficiency Forum Agenda 1.

More information

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet Reference: ZD23 Version: 1.1 Issue date: 15 May 2014 Contents 1 Scope... 3 2 Deer Park Terminal

More information

The GCC Interconnection Grid

The GCC Interconnection Grid GCC Interconnection Authority The GCC Interconnection Grid ME Power & Water Conference Abu Dhabi, UAE Nabeel H. Al-Maskati, PhD Hassan K. Al-Asaad, Asaad, MBA March 2007 Background Gulf Cooperation Council

More information

6/5/ Michael Hojnicki Chief of Technology and Administrative Services

6/5/ Michael Hojnicki Chief of Technology and Administrative Services Technology Update 6/5/2018 - Michael Hojnicki Chief of Technology and Administrative Services Projects Completed in 2017 Open Checkbook Published Network & Phone Upgrade High Level Design Competitive Bid

More information

12 January 2018, ADB Indonesia Resident Mission, Jakarta

12 January 2018, ADB Indonesia Resident Mission, Jakarta Agency-Level Use of the Country Safeguard System for Indonesia s State Electricity Company Perusahaan Listrik Negara (PLN) Summary of Consultations with Civil Society Organizations 12 January 2018, ADB

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE

More information

Progress Report on the GCC Electricity Grid Interconnection in the Middle East

Progress Report on the GCC Electricity Grid Interconnection in the Middle East GULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY Progress Report on the GCC Electricity Grid Interconnection in the Middle East by: Adnan Al-Mohaisen, GM, GCCIA Luc Chausse, Project Director, SNC-Lavalin

More information

Pilot Study on Big Data: Philippines. World Telecommunications/ICT Indicators Symposium (WTIS) November 2017 Hammamet, Tunisia

Pilot Study on Big Data: Philippines. World Telecommunications/ICT Indicators Symposium (WTIS) November 2017 Hammamet, Tunisia Pilot Study on Big Data: Philippines World Telecommunications/ICT Indicators Symposium (WTIS) 14-16 November 2017 Hammamet, Tunisia Background, Objective, Scope - In June 2016, ITU initiated a pilot project

More information

Motorola Mobility Binding Corporate Rules (BCRs)

Motorola Mobility Binding Corporate Rules (BCRs) Motorola Mobility Binding Corporate Rules (BCRs) Introduction These Binding Privacy Rules ( Rules ) explain how the Motorola Mobility group ( Motorola Mobility ) respects the privacy rights of its customers,

More information

(Ordinance of the Ministry of Posts and Telecommunications No. 64-November 16,

(Ordinance of the Ministry of Posts and Telecommunications No. 64-November 16, This English translation of the Civil Code has been prepared (up to the revisions of Act No. 80 of 2008 (These Rules shall come into effect as from the date of promulgation. (Some provisions shall come

More information

MATERIALS DIVISION MEMORANDUM SIGNATURE:

MATERIALS DIVISION MEMORANDUM SIGNATURE: MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Revision of Materials MOI Chapter 1 General Instructions NUMBER: MD 359-13 SPECIFIC SUBJECT: Revision of Materials MOI Section 115 Materials Certification

More information

DIGITAL CENTRAL ASIA SOUTH ASIA (CASA) PROGRAM. Transport and ICT Global Practice World Bank

DIGITAL CENTRAL ASIA SOUTH ASIA (CASA) PROGRAM. Transport and ICT Global Practice World Bank DIGITAL CENTRAL ASIA SOUTH ASIA (CASA) PROGRAM Rajendra Singh, Senior Regulatory Specialist ICT Sector Unit November 1 2, 2017 Sixth session of the Asia Pacific Information Superhighway (AP IS) Steering

More information

Three Year Follow up Request to Grand Jury Updated March 2, 2018

Three Year Follow up Request to Grand Jury Updated March 2, 2018 RECOMMENDATIONS AND RESPONSES: Grand Jury Year: 2016-17 Is Orange County Ready for Zika? It Takes a Village to Handle Mosquito- Borne Virus R.4. The Grand Jury recommends The recommendation requires further

More information

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston Decision Summary EBRO File No.: 16EBR001.R Issue: The Ministry

More information

Data Processing Clauses

Data Processing Clauses Data Processing Clauses The examples of processing clauses below are proposed pending the adoption of standard contractual clauses within the meaning of Article 28.8 of general data protection regulation.

More information

NOTICES FROM MEMBER STATES

NOTICES FROM MEMBER STATES C 400/4 EN Official Journal of the European Union 13.11.2014 NOTICES FROM MEMBER STATES Notice from the Government of the Hellenic Republic concerning Directive 94/22/EC of the European Parliament and

More information

Grievance Committee Primer (Short Guidelines)

Grievance Committee Primer (Short Guidelines) Primer (Short Guidelines) 2014 March 2014 1. Purpose The Mechanism (GM), implemented by the Redress (GRC), will do the following: Provide feedback to company representatives and government officials so

More information

GreenS DEPARTMENT OF ENVIRONMENT MINISTRY OF AGRICULTURE, RURAL DEVELOPMENT & ENVIRONMENT NATALIA GEORGIOU

GreenS DEPARTMENT OF ENVIRONMENT MINISTRY OF AGRICULTURE, RURAL DEVELOPMENT & ENVIRONMENT NATALIA GEORGIOU GreenS Green public procurement supporters for innovative and sustainable institutional change 1st International Webinar about the GPP implementation challenges and solutions DEPARTMENT OF ENVIRONMENT

More information

Your One Source for Federal Solutions

Your One Source for Federal Solutions Your One Source for Federal Solutions GSA Contract Vehicles Dedicated Federal and Technical Teams Local Presence, International Network About WESCO The WESCO Federal Advantage Government Team Commitment

More information

6. Environmental Assessment Framework

6. Environmental Assessment Framework E2631 6. Environmental Assessment Framework Introduction This energy efficiency project will lend funds to industrial enterprises and to Energy Management Companies (ESCOs) for eligible energy efficient

More information

WEB ACCESSIBILITY. I. Policy Section Information Technology. Policy Subsection Web Accessibility Policy.

WEB ACCESSIBILITY. I. Policy Section Information Technology. Policy Subsection Web Accessibility Policy. WEB ACCESSIBILITY I. Policy Section 15.0 Information Technology II. Policy Subsection 15.2 Web Accessibility Policy III. Policy Statement Grand Rapids Community College is actively committed to providing

More information

GROUND FAULT CIRCUIT INTERUPTERS

GROUND FAULT CIRCUIT INTERUPTERS Title: GFCI Effective Date: 11/14/2014 Control Number: THG_0031 Revision Number: 1 Date: 10/21/2015 Annual Review Completed: 5/13/2015 GROUND FAULT CIRCUIT INTERUPTERS CONTENTS I. PURPOSE II. GENERAL REQUIREMENTS

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE

More information

Continuously Operating GPS Reference Network. Jim Waters, PE, RLS Assistant Director, Design Division

Continuously Operating GPS Reference Network. Jim Waters, PE, RLS Assistant Director, Design Division Continuously Operating GPS Reference Network Jim Waters, PE, RLS Assistant Director, Design Division TDOT began discussions internally about a possible Continuously Operating Reference Network in 1999

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

SECTION 114 MATERIALS CERTIFICATION SCHOOLS PROGRAM

SECTION 114 MATERIALS CERTIFICATION SCHOOLS PROGRAM VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: MATERIALS CERTIFICATION SCHOOLS PROGRAM SPECIFIC SUBJECT: Revisions to the Materials Certification Schools policies

More information

Annex 2. Procurement Plan by VEA/ISEA PMU for 2011

Annex 2. Procurement Plan by VEA/ISEA PMU for 2011 losure uthorized Public Disclosure uthorized Public Disclosure uthorized Public Disclosure uthorized nnex 2. Procurement Plan by V/IS PMU for 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 Pack. Comp.

More information

The City of Mississauga may install Closed Circuit Television (CCTV) Traffic Monitoring System cameras within the Municipal Road Allowance.

The City of Mississauga may install Closed Circuit Television (CCTV) Traffic Monitoring System cameras within the Municipal Road Allowance. Policy Number: 10-09-02 Section: Roads and Traffic Subsection: Traffic Operations Effective Date: April 25, 2012 Last Review Date: Approved by: Council Owner Division/Contact: For information on the CCTV

More information

Post ECC EIA Process. Orientation/Training on the Philippine Environmental Impact Statement System (PEISS) for LGUs Davao City 28 October 2015

Post ECC EIA Process. Orientation/Training on the Philippine Environmental Impact Statement System (PEISS) for LGUs Davao City 28 October 2015 Post ECC EIA Process Orientation/Training on the Philippine Environmental Impact Statement System (PEISS) for LGUs Davao City 28 October 2015 The EIA Process and the Project Cycle Findings and recommendations

More information

Statement of Organization, Functions, and Delegations of Authority: Office of the

Statement of Organization, Functions, and Delegations of Authority: Office of the This document is scheduled to be published in the Federal Register on 07/27/2016 and available online at http://federalregister.gov/a/2016-17737, and on FDsys.gov 4184-40P DEPARTMENT OF HEALTH AND HUMAN

More information

GAS. POWER. WATER. TELCO. POWER

GAS. POWER. WATER. TELCO. POWER GAS. POWER. WATER. TELCO. POWER Who is Zinfra? Zinfra is a leading power, gas, water and telco infrastructure service provider. We offer a comprehensive range of engineering, construction and maintenance

More information

Situation and Outlook of PPP Infrastructure Development in Indonesia

Situation and Outlook of PPP Infrastructure Development in Indonesia Situation and Outlook of PPP Infrastructure Development in Indonesia Dedy S. Priatna, PhD Deputy Minister for Infrastructure National Development Planning Agency (Bappenas) PPP Infrastructure Investment

More information

Government Resolution No of February 15, Resolution: Advancing National Regulation and Governmental Leadership in Cyber Security

Government Resolution No of February 15, Resolution: Advancing National Regulation and Governmental Leadership in Cyber Security Government Resolution No. 2443 of February 15, 2015 33 rd Government of Israel Benjamin Netanyahu Resolution: Advancing National Regulation and Governmental Leadership in Cyber Security It is hereby resolved:

More information

PG&E Transmission Interconnection Handbook

PG&E Transmission Interconnection Handbook Table of Contents TABLE OF CONTENTS... 1 UPDATE HISTORY... UP-1 INTRODUCTION... IN-1 I-1. PURPOSE... IN-1 I-2. INTRODUCTORY DEFINITIONS... IN-1 I-3. HANDBOOK APPLICABILITY... IN-2 I-3.1. New Load, New

More information

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949 Areas of for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949 1 st February 2014 1 Foreword Introduction The IATF recognizes certification

More information

Substation SCADA Monitoring

Substation SCADA Monitoring Substation SCADA Monitoring Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Substations are a critical component

More information

Chapter 21 Environmental management

Chapter 21 Environmental management Chapter 21 Environmental management November 2013 Table of contents 21. Environmental management... 21-1 21.1 Purpose of this chapter... 21-1 21.2 Environmental management process... 21-1 21.2.1 Overview...

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor

More information

A Regulatory Perspective on Distributed Generation

A Regulatory Perspective on Distributed Generation A Regulatory Perspective on Distributed Generation Southwest Electrical Metering Association Spring Meeting Galveston June 10, 2015 Darryl Nelson Rates and Regulatory Agenda Why Rules are Needed Texas

More information

GOVERNMENT OF THE RUSSIAN FEDERATION RESOLUTION. No. 128 dated 8 February, 2018 MOSCOW

GOVERNMENT OF THE RUSSIAN FEDERATION RESOLUTION. No. 128 dated 8 February, 2018 MOSCOW GOVERNMENT OF THE RUSSIAN FEDERATION RESOLUTION No. 128 dated 8 February, 2018 MOSCOW On approval of Rules of control on the sites of production (including processing) and dispatch of quarantine products

More information

Next-generation Nødnett in commercial networks Approach for further work

Next-generation Nødnett in commercial networks Approach for further work Next-generation Nødnett in commercial networks Approach for further work Memorandum prepared jointly by the Norwegian Directorate for Civil Protection (DSB) and the Norwegian Communications Authority (Nkom)

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4802 Project Name. ECOWAS Broadband Connectivity Program Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4802 Project Name. ECOWAS Broadband Connectivity Program Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4802 Project Name ECOWAS Broadband Connectivity Program Region AFRICA Sector Telecommunications (60%); General information and communications

More information

PEFC Certification System Netherlands - Certification Procedures

PEFC Certification System Netherlands - Certification Procedures PCSN SCHEME DOCUMENT PCSN IV Issue 2 10-03-2017 PEFC Certification System Netherlands - Certification Procedures PEFC Netherlands Kokermolen 11 3994 DG Houten The Netherlands Tel: +31 30 693 0040 Fax:

More information

Instrumentation, Control and Automation

Instrumentation, Control and Automation Instrumentation, Control and Automation Unit - ICA08 Install, Use and Maintain SCADA Systems This training specification has been developed from the utilities engineering technician standard. The specification

More information

ADB s Energy Program in Myanmar

ADB s Energy Program in Myanmar ADB s Energy Program in Myanmar March 2014 Chong Chi Nai Director, Energy Division Southeast Asia Regional Department 1 Current Sector Context Low electrification ratio Need to develop cost effective way

More information

Certification program PCWU-3

Certification program PCWU-3 The certification program of utility products type 3 of the certification program according to PN-EN ISO/IEC 17067 Number: Page: 1 z 8 MS-0013527 Is valid from: 01.03.2016 Prepared: Tomasz Marcinek Approved:

More information

ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER

ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER smallhydro PRIME ENGINEERING LIMITED IS AN ELECTRICAL ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, IMPLEMENTATION AND MAINTENANCE. OUR TEAM OF PROFESSIONALS

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 29, 2016

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 29, 2016 TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 29, 2016 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER SHIFT RAPID

More information

(Islamabad, March 2015) MEDIUM TERM VISION FOR ENERGY CONNECTIVITY IN THE SAARC REGION

(Islamabad, March 2015) MEDIUM TERM VISION FOR ENERGY CONNECTIVITY IN THE SAARC REGION The 8 th Japan-SAARC Energy Symposium (Islamabad, 10-11 March 2015) MEDIUM TERM VISION FOR ENERGY CONNECTIVITY IN THE SAARC REGION Ahmar Ismail Director, SAARC Secretariat Kathmandu, Nepal South Asian

More information

DECREE OF THE MINISTER OF COMMUNICATION AND INFORMATION TECHNOLOGY NUMBER : 20/PER/M.KOMINFO/12/2010

DECREE OF THE MINISTER OF COMMUNICATION AND INFORMATION TECHNOLOGY NUMBER : 20/PER/M.KOMINFO/12/2010 DECREE OF THE MINISTER OF COMMUNICATION AND INFORMATION TECHNOLOGY NUMBER : 20/PER/M.KOMINFO/12/2010 ON MANAGEMENT INFORMATION SYSTEM AND MONITORING OF SUBDISTRICT INTERNET SERVICE BY THE GRACE OF GOD

More information

MEMORANDUM OF COOPERATION BETWEEN THE INDUSTRIAL AND PRODUCT SAFETY POLICY GROUP OF THE MINISTRY OF ECONOMY, TRADE AND INDUSTRY OF JAPAN AND

MEMORANDUM OF COOPERATION BETWEEN THE INDUSTRIAL AND PRODUCT SAFETY POLICY GROUP OF THE MINISTRY OF ECONOMY, TRADE AND INDUSTRY OF JAPAN AND MEMORANDUM OF COOPERATION BETWEEN THE INDUSTRIAL AND PRODUCT SAFETY POLICY GROUP OF THE MINISTRY OF ECONOMY, TRADE AND INDUSTRY OF JAPAN AND THE DEPARTMENT OF INDUSTRIAL WORKS and THE DEPARTMENT OF INDUSTRIAL

More information

Equipment Strategy For High Voltage Circuit Breakers

Equipment Strategy For High Voltage Circuit Breakers Current version: 23/05/2018 EXTERNAL USE Page 1 of 7 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References... 3 1.4 Defined terms... 3 1.5 Monitoring and compliance... 3

More information

DIPLOMA COURSE IN INTERNAL AUDIT

DIPLOMA COURSE IN INTERNAL AUDIT DIPLOMA COURSE IN INTERNAL AUDIT Course Objective: Internal Audit is an assurance and consulting service that reviews the efficiency and effectiveness of the internal control.. It assists management at

More information

The available Block Areas are presented at the Map 1 and are delimited by the following geographical coordinates: Block Area Longitude Latitude

The available Block Areas are presented at the Map 1 and are delimited by the following geographical coordinates: Block Area Longitude Latitude 5.11.2014 EN Official Journal of the European Union C 390/7 Notice from the Government of the Hellenic Republic concerning Directive 94/22/EC of the European Parliament and of the Council on the conditions