Verification Report. Esivere and Virtsu II

Size: px
Start display at page:

Download "Verification Report. Esivere and Virtsu II"

Transcription

1 Verification Report Esivere and Virtsu II Initial and First Periodic Verification of the JI project Esivere and Virtsu II Windpower Development in Estonia Report No , rev. 0 November 10, 2008 TÜV SÜD Industrie Service GmbH Carbon Management Service Westendstr Munich - GERMANY

2 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist Report No. Date of first issue Version Date of this revision Certificate No November 10, Subject: Initial and first Periodic Verification of a JI Project Executing Operational Unit: TÜV SÜD Industrie Service GmbH Carbon Management Service Westendstr Munich, GERMANY Client: Contract approved by: Report Title: Number of pages OÜ Nelja Energia Mr. Martin Kruus Estonia pst 1/3 - Tallinn Estonia Javier Castro Initial and First Periodic Verification of the Esivere and Virtsu II 22 (excluding cover page and annexes) Summary: The certification body Climate and Energy of TÜV SÜD Industrie Service GmbH has been ordered by OÜ Nelja Energia to carry out the initial and the first periodic verification of the Esivere and Virtsu II Windpower Development JI Project in Estonia. The verification team confirms that the project is implemented as planned and described in validated project design documents. Installed equipment being essential for generating emission reduction runs reliably and is calibrated appropriately. The monitoring system is in place and the project is generates GHG emission reductions. The underlying emission reduction report covers the monitored period from to The verification team confirms that the GHG emission reduction for the whole monitoring period is calculated without material misstatements. Our opinion relates to the project s GHG emissions and resulting GHG emissions reductions reported and related to the valid and registered project baseline and monitoring, and its associated documents. Based on the information we have seen and evaluated, we confirm the following statement: Reporting period: from October 01, 2005 to December 31, Verified emission in the above reporting period: Baseline Emissions: t CO2 Project Emissions : 0 t CO2 Emission Reductions: t CO2 The verification team also determined some few areas of risks for the project in the context of the monitoring system and environmental surveillance. Issues indicated as Forward Action Request should be submitted as indispensable information to the verification team of the next periodic verification. Work carried out by: Klaus Nürnberger (project manager) (GHG auditor, Local expert) Internal Quality Control by: Javier Castro

3 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist Abbreviations Abbreviations that have been used in the report here: AAU BLS CAR CO2 ERU FAR GHG IETA IVC JI KP MOS MP MVP PDD PTP PVC TÜV SÜD UNFCCC VVM Assigned Amount Unit Baseline Study Corrective Action Request Carbon Dioxide Emission Reduction Unit Forward Action Request Greenhouse Gas International Emission Trading Association Initial Verification Checklist Joint Implementation Kyoto Protocol Management and Operational System Monitoring Plan Monitoring and Verification Protocol Project Design Document OÜ Pakri Tuulepark Periodical Verification Checklist TÜV SÜD Industrie Service GmbH UN Framework Convention on Climate Change Validation and Verification Manual

4 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist Table of Contents 1 INTRODUCTION Objective Scope GHG Project Description METHODOLOGY Review of Documentation and Site Visits Resolution of Corrective and Forward Action Requests INITIAL VERIFICATION FINDINGS Remaining issues, CARs, FARs from determination Project Implementation Internal and External data Environmental and Social Indicators Management and Operational System Completeness of Monitoring Accuracy of Emission Reduction Calculations Quality of Evidence to Determine Emission Reductions Management System and Quality Assurance PROJECT SCORECARD VERIFICATION STATEMENT REFERENCES Annex 1: Initial Verification Checklist Annex 2: Periodic Verification Checklist

5 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist 1 INTRODUCTION Martin Kruus, managing director of Nelja Energia, the operator of the Esivere and Virtsu II wind parks has commissioned the certification body Climate and Energy of TÜV SÜD Industrie Service GmbH to verify the Esivere and Virtsu II Windpower Development Project in Estonia. The order includes the initial and first periodic verification of the project. This report summarizes the findings of the initial and first periodic verification. It is based on the Initial Verification Report Template Version 3.0, December 2003 and on the Periodic Verification Report Template Version 3.0, December 2003, both part of the Validation and Verification Manual (VVM) published by International Emission Trading Association (IETA). Initial and first periodic verification has been performed as one integrated activity. It consisted of a desk review of the project documents including baseline study, monitoring plan, determination (validation) report, emission reduction report and further documentations. The results of the final determination were documented by TÜV SÜD Industrie Service GmbH in the Final Determination Report: Determination of the Esivere and Virtsu II Wind Power Developments JI-Project, Estonia, report no , dated This final determination report indicates no remaining CAR s, FAR s or CR s. There was indicated only one outstanding issue - a formal, written Letter of Approval of Estonian Government should be provided. It is solved by now the Letter of Approval is issued by the Ministry of Environment on the 28. of December Specific national guidelines and procedures for JI projects in Estonia exist since April 2008, but only in draft version. First periodic verification is conducted for the period between and The periodic verification consisted of a desk review of the project documents and onsite-visit. The verification team consists of the following personnel: Klaus Nürnberger TÜV SÜD, Munich Project Manager, Team Leader OÜ Ekoekspert, Tallinn GHG Auditor, Local Expert Andre Starick TÜV SÜD, Munich Member of Sales Team, Assistant in Communication and Coordination 1.1 Objective The operator of the wind park, OÜ Nelja Energia, on behalf the project owner, Roheline Ring Tuulepargid OÜ, has commissioned an independent initial / first periodic verification of the Esivere and Virtsu II Windpower Development JI Project by TÜV SÜD. The objective of verification can be divided in Initial Verification and Periodic Verification: Initial Verification: The objective of an initial verification is to verify that the project is implemented as planned, to confirm that the monitoring system is in place and fully functional, and to assure that the project will generate verifiable emission reductions. A separate initial verification prior to the project entering into regular operations is not a mandatory requirement.

6 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist Periodic Verification: The objective of the periodic verification is to verify and confirm that: o actual monitoring systems and procedures are in compliance with the monitoring systems and procedures described in the monitoring plan; o the project has achieved the ERs claim for the verification period in compliance with the methodology laid down in the monitoring plan; o the GHG emission reduction data and express a conclusion with a high, but not absolute, level of assurance about whether the reported GHG emission reduction data is free of material misstatements; o the claimed ERs are real and additional to any that would have occurred in the baseline scenario as interpreted and developed in the baseline study (as part of the PDD) for Esivere and Virtsu II Windpower Development JI Project; o verifies that the reported GHG emission data is sufficiently supported by evidence, i.e. monitoring records; o the operation of the project continues to be in compliance with all Kyoto Protocol and modalities for JI projects. The verification shall consider both quantitative and qualitative information on emission reductions. Quantitative data comprises the monitoring reports submitted to the verifier by the project entity. Qualitative data comprises information on internal management controls, calculation procedures, and procedures for transfer, frequency of emissions reports, review and internal audit of calculations/data transfers. 1.2 Scope This report is based on JI rules established and published by JI-Supervisory Committee as well as requirements arising from CDM methodologies as far as such are applied in the project and rules valid for both CDM and JI. Furthermore all requirements arising from the Kyoto-Protocol and the Marrakesh accords are taken into account in this report. Further on the relevant criteria for this project are given the validated PDD including the Monitoring Plan. Verification scope is defined as an independent and objective review and ex post determination of the monitored reductions in GHG emissions. The verification is based on the submitted monitoring report, the validated project design documents including its monitoring plan. The verification also focuses on the implementation of the project as well, including all quality aspects of the monitoring activities. TÜV SÜD has, based on the recommendations in the Validation and Verification Manual, employed a risk-based approach in the verification, focusing on the identification of significant risks of the project implementation and the generation of verifiable Emission Reduction Units (ERUs) during Thus a consecutive verification is covered by scopes, as it is assessing: auditing regarding to the implementation of all recommendations of the last validation/determination protocol

7 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist all weaknesses and strengths of the applied management procedures the consistency, accuracy of data acquisition, data processing and transparent reporting the eligibility of monitoring processes and equipment and its calibration The verification is not meant to provide any consulting towards the client. However, stated requests for clarifications and/or corrective actions may provide input for improvement of the monitoring activities. On 24. March 2008 TÜV SÜD received the first version of the Monitoring Report (version 1.0). In order to get the Monitoring Report published some adjustments were carried out. The version 2.0 from 12. May 2008 was published. After desk review the audit team has been provided with a Monitoring Report and underlying data records on June 11, 2008 (Monitoring Report Version May 2008 with annexes), covering the period October 2005 to December This document serves as the basis for the assessment presented herewith. Studying the existing documentation belonging to this project, it was obvious that the competence and capability of the audit team performing the verification has to cover at least the following aspects: Knowledge of Kyoto Protocol and the Marrakech Accords Environmental and Social Impact Assessment Skills in environmental auditing (ISO 14000, EMAS) Quality assurance Technical aspects of wind energy Monitoring technologies and concepts Political, economical and technical conditions in host country According to these requirements TÜV SÜD has composed a project team in accordance with the appointment rules of the TÜV SÜD certification body climate and energy : Responsibility for the internal quality control of the project was Javier Castro, head of the certification body climate and energy. 1.3 GHG Project Description The main feature of the project is the energy production by wind turbines substituting electricity produced by mostly oil-shale fired power plants. The project is located in Hanila Municipality, about 140 km west from Tallinn, the capital of Estonia. The location is suitable for wind power due to its wind conditions and also from an environmental point of view. The project itself is bundled by his nature, consisting two separate wind parks: - Esivere Wind Park, consisting 4 Enercon E kw wind turbines, started to operate in October 2005; - Virtsu II, consisting 3 Enercon E70 E kw wind turbines, started to operate in April 2008.

8 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist All wind turbines are connected to the Estonian main grid, operated by the electrical utility Eesti Energia AS. At the time of the verification the Esivere Wind Park was fully operational. Virtsu II wind farm commissioning has been delayed due to the delays with reconstruction of grid connection point by national utility Eesti Energia. The trial production of the wind farm was started in April 2008, the produced wind energy was supplied to the grid. It is expected that the local municipality will issue the official user permit in the end of summer Involved project participants were: Martin Kruus, chairman of the Board of Nelja Energia, and also management board member of OÜ Roheline Ring Tuulepargid (RRT) Raimo Pirksaar, production manager of Nelja Energia Hannu Lamp, LHCarbon OÜ, consultant to Nelja Energia 2 METHODOLOGY The project assessment aims at being a risk based approach and is based on the methodology developed in the Validation and Verification Manual (for further information see an initiative of all Applicant Entities, which aims to harmonize the approach and quality of all such assessments. Based on the received documents (see article 6) a verification checklist (VC) has been prepared, consisting of the Initial Verification Checklist (IVC) and the Periodic Verification Checklist (PVC) according to the VVM. In order to ensure transparency, a verification protocol (checklist) was customized for the project, according to the Validation and Verification Manual. The protocol shows, in a transparent manner, criteria (requirements), means of verification and the results. The verification protocol serves the following purposes. These combined checklists serve the following purposes: - it organizes details of the audit procedure and clarifies the requirements a CDM/JI project is expected to meet; and - It ensures a transparent verification process where the verifier will document how a particular requirement has been proved and the result of the verification. During the verification a special focus was given to: - the correct implementation of the project (installations, monitoring equipment and procedures, quality assurance procedures) - the correctness of assumptions with impacts on the monitoring and verification process (e.g. baseline assumptions) - sustainable development and environmental performance parameters - training programs - allocation of responsibilities - the day-to-day operation of the system

9 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist After the document review the audit team conducted - an on-site inspection at the wind farm - interviews with the members of Nelja Energia and the consultant LHCarbon OÜ in Tallinn The findings are the essential part of this verification report, which is based on the verification protocols of the VVM. Those protocols consist of four tables one from the IVC, three from the PVC. The completed protocols (checklists) are enclosed in Annex 1 and Annex 2 to this report. The structure of the tables is shown in the following: Initial Verification Checklist table 1 OBJECTIVE Ref. COMMENTS Concl.(incl FARs/CARs) The requirements the project must meet. Gives reference to the legislation or agreement where the requirement is found. Description of circumstances and further conclusions. This is either acceptable based on evidence provided (OK), or a Corrective Action Request (CAR) of risk or non-compliance with stated requirements. The corrective action requests are numbered and presented to the client in the Verification report. Forward Action Requests (FARs) indicate essential risks for further periodic verifications Periodic Verification Checklist Table 1: Data Management System/Controls Expectations for GHG data management system/controls The project operator s data management system/controls are assessed to identify reporting risks and to assess the data management system s/control s ability to mitigate reporting risks. The GHG data management system/controls are assessed against the expectations detailed in the table. Score A score is assigned as follows: Full all best-practice expectations are implemented. Partial a proportion of the best practice expectations is implemented Limited this should be given if little or none of the system component is in place. Verifiers Comments (including Forward Action Requests) Description of circumstances and further commendation to the conclusion. This is either acceptable based on evidence provided (OK), or a Corrective Action Request (CAR) of risk or noncompliance with stated requirements. The corrective action requests are numbered and presented to the client in the Verification report. The Initial Verification has additional Forward Action Requests (FAR). FAR indicates essential risks for further periodic verifications Periodic Verification Checklist Table 2: GHG calculation procedures and management control testing

10 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist Identification of potential reporting risk Identification of potential reporting risks based on an assessment of the emission estimation procedures. Identification of key source data. Focus on those risks that impact the accuracy, completeness and consistency of the reported data. Identification, assessment and testing of management controls Identification of the key controls for each area with potential reporting risks. Assessment of adequacy of the key controls and eventually test that the key controls are actually in operation. Internal controls include, Understanding of responsibilities and roles, Reporting, reviewing and formal management approval of data; Procedures for ensuring data completeness, conformance with reporting guidelines, maintenance of data trails etc. Areas of residual risks Identification of areas of residual risks, i.e. areas of potential reporting risks where there are no adequate management controls to mitigate potential reporting risks Areas where data accuracy, completeness and consistency could be improved are highlighted. Periodic Verification Checklist Table 3: Detailed audit testing of residual risk areas and random testing Areas of residual risks List of residual areas of risks of Periodic Verification Checklist Table 2 where detailed audit testing is necessary. In addition, other material areas may be selected for detailed audit testing. Additional verification testing performed The additional verification testing performed is described. Testing may include: Sample cross checking of manual transfers of data Recalculation Spreadsheet walk throughs to check links and equations Inspection of calibration and maintenance records for key equipment Check sampling analysis results Discussions with process engineers who have detailed knowledge of process uncertainty/error bands. Conclusions and Areas Requiring Improvement (including FARs) Having investigated the residual risks, the conclusions are noted here. Errors and uncertainties are highlighted. CARs were not encountered during the verification process. However, the verification team has defined FARs, whenever - the current status requires a special focus on this item for the next consecutive verification, or

11 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist - an adjustment of the MVP is recommended. All FARs have to be reported to the verification team of the next Periodic Verification, which has to take into account all such findings. Duration of the verification Pre-Check of PDD for GSP: from March 24 to 12. May 2008 Desk-Review and Preparations: from June 11 to June 25, 2006 On-site verification: June 26, 2008 On-site clarifications: June 26, 2008 (in the Nelja Energia office) Emission Reduction Reporting Period: From October 01, 2005 to December 31, Review of Documentation and Site Visits The verification was performed as a desk review of the project documents including baseline study, monitoring plan, determination (validaqwtion) report, existing emission reduction report and further documentations. The results of the final determination were documented by TÜV SÜD Industrie Service GmbH in the Final Determination Report: Determination of the Esivere and Virtsu II Winf Power Developments JI-Project, Estonia, report no , dated This final determination report indicates no remaining CAR s, FAR s or CR s. There was indicated only one outstanding issue - a formal, written Letter of Approval of Estonian Government should be provided. It is solved by now the Letter of Approval is issued by the Ministry of Environment on the 28. of December Specific national guidelines and procedures for JI projects in Estonia exist since April 2008, but only in a draft version. The Monitoring Report (Ver. 3.1, May 30, 2008) was submitted to TÜV SÜD by LHCarbon OÜ in June The Monitoring Report was also published on the TÜV SÜD website Site visit included an on-site inspection at the wind farms, sub-stations of Main Grid, interviews with the members of Nelja Energia and the consultant LHCarbon in Tallinn. A complete list of all reviewed documents is available in article 6 (References) of this report. The main topics of the interview are summarized in Table 1. Table 1 Interview topics Interviewed persons Interview topics

12 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist Mr. Raimo Pirksaar, Production Manager of Nelja Energia OÜ Mr. Hannu Lamp LHCarbon OÜ, consultant to Nelja Energia OÜ Actual status of installation works (including measuring equipment in Main Grid sub-stations) Technical equipment and operation Monitoring plan Data collection, analysis, monitoring, storing Data uncertainty and residual risks Plausibility checks, double control system GHG calculation Compliance with national laws and regulations Environmental and social impacts Management and operational system 2.2 Resolution of Corrective and Forward Action Requests The objective of this phase of the verification was to resolve the requests for corrective actions and any other outstanding issues which needed to be clarified for TÜV SÜD`s positive conclusion on the GHG emission reduction calculation. No CARs have been identified during the initial and 1 st periodic verification. 3 Forward Action Requests have been defined for issues which do not effect the generation of emission reduction in the verified period, but shall be improved in order to ensure the reliability of future data and to avoid any major risk. To guarantee the transparency of the verification process, the FARs raised and responses that have been given are summarized in chapter 3 below and documented in more detail in the verification protocols in annex 1 and 2.

13 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist 3 INITIAL VERIFICATION FINDINGS In the following sections the findings of the verification are stated. The verification findings for each verification subject are presented as follows: The findings from the desk review of the final monitoring report and the findings from interviews during the follow up visit are summarized. A more detailed record of these findings can be found in the Initial Verification Protocol (Checklist) in annex 1. 1) Where TÜV SÜD had identified issues that needed clarification or that represented a risk to the fulfilment of the project objectives, a Corrective or Forward Action Request, respectively, have been issued. The Corrective and Forward Action Requests are stated, where applicable, in the following sections and are further documented in the Verification Protocols in the annex. The verification of the project resulted in 3 Forward Action Requests. No Corrective Action Requests were raised. 2) In the context of Forward Action Requests, risks have been identified, which may endanger the delivery of high quality CERs in the future, i.e. by deviations from standard procedures as defined by the MP. As a consequence, such aspects should receive a special focus during the next consecutive verification. A FAR may originate from lack of data sustaining claimed emission reductions. Forward Action Requests are understood as recommendation for future project monitoring; they are stated, where applicable, in the following sections and are further documented in the Verification Protocols (Checklists) in annex 1 and 2. 3) The final conclusions for verification subject are presented. The verification findings relate to the project implementation as documented and described in the final monitoring report. 3.1 Remaining issues, CARs, FARs from determination One task of verification is to check the remaining issues from the previous validation or issues which are clearly defined for assessment in the PDD. The final determination report ( Determination of the Esivere and Virtsu II Winf Power Developments JI-Project, Estonia, report no , dated ) indicates no remaining CAR s, FAR s or CR s. There was indicated only one outstanding issue - a formal, written Letter of Approval of Estonian Government should be provided. It is solved by now the Letter of Approval is issued by the Ministry of Environment on the 28. of December Specific national guidelines and procedures for JI projects in Estonia exist since April 2008, but only in a draft version.

14 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist 3.2 Project Implementation Discussion The scrutiny of a proper implementation of a project is a key issue of an Initial Verification, in order to have a climate change project ready for successful operation. The project itself is bundled by his nature, consisting two separate wind parks: - Esivere Wind Park, started to operate in October 2005; - Virtsu II wind farm commissioning has been delayed due to the delays with reconstruction of grid connection point by national utility Eesti Energia. The trial production of the wind farm was started in April 2008, the produced wind energy was supplied to the grid. It is expected that the local municipality will issue the official user permit in the end of summer The main contractor for both lots was Enercon, the manufacturer of the wind turbines. All wind turbines are connected to the Estonian main grid, operated by the electrical utility Eesti Energia AS. Esivere Wind Park is connected with Rõuste main grid 110 kv sub-station, Virtsu II is connected with Virtsu main grid 110 kv sub-station. Both sub-station have been constructed/rehabilitated by Eesti Energia. All details of the wind park were checked. Esivere wind park covers the 4 turbines (Enercon E kw), the cabin with the electrical and control equipment, 35-kV-transformer, main grid meter. Virtsu II wind park covers the 3 turbines (Enercon E kw), the cabin with the electrical and control equipment, 35-kV-transformer, main grid meter. All required metering systems have been identified and checked. The following meters are relevant for the calculation of emission reductions; they are all on the premises of the Eesti Energia 110 kv sub-stations: - Esivere wind park has main grid meter (35 kv) in Rõuste sub-station, which belongs to Eesti Energia. Main grid power meter Landis+Gyr ZDM405CT No , accuracy class 0,5, the testing label (calibration sticker) AE (June, 2005) is placed. The meter is within its first calibration period. The meter complies with the appropriate standards. - Virtsu II wind park has main grid meter (35 kv) in Virtsu sub-station, which belong to Eesti Energia. Main grid power meter Landis+Gyr ZDM405CT No , accuracy class 0,5, the testing label (calibration sticker) AE (June, 2007) is placed. The meter is within its first calibration period. The meter complies with the appropriate standards. Both main grid meters are 2-direction meters, measuring power supplied from the wind park and to the wind park. All turbines have their own power meters NZR 3x230/400Vg, belonging to the wind park and which are connected to the Enercon SCADA system. The project boundaries have not been changed. The Monitoring Plan (MP) defines the responsibilities to consolidate the data required for emission reduction calculations. Calculations are simple and restricted to entering monthly the production data into a predefined Excel spreadsheet.

15 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist The following parameters need to be obtained according to the monitoring plan: Electricity production (20 kv, continuous direct measurement) Electricity consumption from main grid (20 kv, continuous direct measurement) Production data from Enercon SCADA systems for plausibility checks Findings The verifier identified following findings (see also Initial and 1 st Periodic Verification Checklists in annex 1 and 2). OBJECTIVE COMMENTS Concl. Documentation of management and operational systems (IVC C.3) The Virtsu sub-station had to be extended/ rehabilitated as it is planned to construct the connection point also for Virtsu III wind park in the same Virtsu sub-station. Virtsu III wind park is under the development at the moment. For Virtsu II and III wind parks is constructed separate sub-station near to Eesti Energia s Virtsu substation. Connection point for both (Virtsu II and Virtsu III) windparks is common and it is located in Main Grid 110 kv side. In Windpark sub-station have both wind park separate measuring equipment in 20 kv side. It is expected, that Virtsu III wind park will start operation in spring Forward Action Request #1: The developer should ensure that Virtsu III wind farm, which is connected to the same substation, will have an own connection on 35 kv level and separate measuring system in order to separate the power generation from both wind parks the existing Virtsu II and the planned Virtsu III. FAR# Conclusion The project complies with the requirements, assuming appropriate handling of FAR #1 in the ongoing verification period. 3.3 Internal and External data Discussion The following parameters need to be obtained according to the monitoring plan: Electricity production (continuous direct measurement) Electricity consumption from main grid (continuous direct measurement)

16 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist Production data from Enercon SCADA systems for plausibility checks Even if the source of the electricity generation and the sink of the electricity demand is internal, the relevant meters are external (owned, maintained and read by Eesti Energia subsidiaries). Insofar they will be considered as external data. The only internal data set is the electricity generation metered by the Enercon Scada systems. This is used as backup source in case of a failure of the Main Grid meters. The production data are delivered by Eesti Energia on a monthly basis. The meters are in the Virtsu and Rõuste substations, under control of Eesti Energia. Both main grid meters are 2- direction meters, measuring power supplied from the wind park and to the wind park. The production data delivered by Eesti Energia are checked on a monthly basis against the respective Scada data. Any deviations can therefore be discovered immediately. In case of any problems with the Main Grid 110 kv meter itself or the lines to the connection points the data of the Enercon SCADA system can be used. As SCADA measures the production at the turbines, it gives slightly higher production values compared to the measuring meter values in Grid Connection Point (GCP). The difference is due to the losses in the grid between turbine and GCP and own consumption in wind park. There are two Enercon Scada systems one for Esivere and second for Virtsu II. Scada data are stored in the central Scada servers in the Rõuste (for Esivere) and Virtsu (for Virtsu II) 35/110 kv distribution stations. At the same time they are continuously transferred to the Enercon dispatch centre in Germany. The system is allowing obtaining data through communication and telephone network and therefore the operator has direct access to those data at any time and any place. In case measuring meters in Main Grid are not functioning, the electricity production data as indicated with SCADA system (minus estimated grid losses) will be used to calculate achieved emission reductions. According to the actual data during , the average grid losses have been calculated to be 1,7-1,95%. It is considered to be sufficient to deduct 2% from the Enercon SCADA electricity production figure in order to obtain the electricity production at GCP during periods of measuring meters failure. Up to now there was no malfunctioning of the power meter; therefore this backup rule has not yet been applied Findings The verifier identified following findings (see also Initial and 1 st Periodic Verification Checklists in annex 1 and 2). OBJECTIVE COMMENTS Concl. Troubleshooting procedures (IVC C.11) According to the latest Monitoring Plan (Ver. 1.0 May ) an internal double control system is implemented to avoid problems resulting from malfunctioning of Main Grid remote-control data acquisition system. Forward Action Request #2: Additional internal double control system shall be implemented as stated in the existing Monitoring Plan - the Main Grid production data have to be cross-checked with the readings of power meters. FAR#2

17 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist OBJECTIVE COMMENTS Concl Conclusion According to the agreement between 4Energia and Main Grid the power meter values have to be written down at least three times a year. Even more they should be written down always at the end of the next monitoring period. The project complies with the requirements, assuming appropriate handling of FAR #2 in the ongoing verification period. 3.4 Environmental and Social Indicators Discussion A full-scale Environmental Impact Assessment (EIA) has been carried out for both Esivere and Virtsu II projects in The EIA reports have been approved by Lääne County Regional Environmental Department which is a competent authority responsible for performing the duties of environmental supervision and post-project monitoring Findings The verifier identified following findings (see also Initial and 1 st Periodic Verification Checklists in annex 1 and 2). OBJECTIVE COMMENTS Concl. Environmental and social indicators (IVC F) For Esivere wind park the Lääne County Environmental Department have recommended an ongoing bird surveillance for 3 years prior to and starting from the operation of wind park. For Virtsu II wind park the bird surveillance is obligatory for 2 years after starting the operation of wind park. FAR#3 Forward Action Request #3: The results of bird surveillance shall be presented in written document (report) Conclusion The project complies with the requirements, assuming appropriate handling of FAR #3 in the ongoing verification period.

18 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist 3.5 Management and Operational System Discussion The management and operational system (MOS) is documented in the MP Monitoring plan of Esivere and Virtsu II Wind Power JI Project, version 1.0, May 30, It is the basic document to manage and operate the wind park and to produce the ER reports. The Monitoring Plan provides all required details on qualifications. Due to the limited number of the involved people and their direct participation in the development of the MOS, the personnel has appropriate competences, capabilities and qualifications. Data storing is explicitly mentioned in the MP. Production data history is stored electronically as received from Main Grid and also as printouts as described above. Data is also stored in: 1) Main Grid, as an owner of measuring meters, 2) Main Grid/EE in form of electricity sale invoices issued by Roheline Ring Tuulepargid OÜ, 3) RRT bookkeeping as issuer of electricity sale invoices, 4) Enercon SCADA RRT (Roheline Ring Tuulepargid) and Nelja Energia also create regular backups of the computer hard drives. All records are maintained in paper and electronic form until the end of 2014 for verification. Monitoring and verification reports will be archived together with electricity production reports. Responsible person at RRT for handling the electricity production data and compilation of monitoring reports is the member of the management board (Martin Kruus). As all everyday business of RRT is managed by renewable operator company OÜ Nelja Energia (4energia) under a management agreement, 4energia also takes care of monitoring and verification activities for RRT. The responsible person at 4energia is the production manager (Raimo Pirksaar). 4energia may subcontract third parties to assist in the process (LHCarbon OÜ, represented by Hannu Lamp). Due to the limited complexity of the GHG calculation approach no specific processes for internal verification have been defined. This is part of the overall responsibility of the PTP management Findings None Conclusion The project complies with the requirements. Periodic Verification Findings

19 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist 3.6 Completeness of Monitoring Discussion The reporting procedures reflect the monitoring plan ( Monitoring plan of Esivere and Virtsu II Wind Power JI Project, version 1.0, May 30, 2008). Before this the monitoring procedures fixed in a PDD has been followed. No changes to the monitoring plan are required Findings See FAR#2 in article Conclusion The project complies with the requirements, assuming appropriate handling of FAR #2 in the ongoing verification period. 3.7 Accuracy of Emission Reduction Calculations Discussion Besides the grid emission factor no further estimates or default data are used. The emission factor is calculated based to the principles stated in the PDD/Baseline study and which is valid for the whole crediting period (EFy= tco2/mwh). The produced amount of electricity supplied to the main grid is measured by a calibrated power meters, which are connected to the remote-control system of the Main Grid. GHG emissions are calculated according the formula presented in the PDD and in the Monitoring Plan taking into account net electricity production and calculated emission factor. Audit team confirms that emission reduction calculations have been performed according to the MP Findings None Conclusion The project complies with the requirements, assuming appropriate handling of FARs in the ongoing verification period.

20 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist 3.8. Quality of Evidence to Determine Emission Reductions Discussion Calculation of emission reductions are based on external data (basis: Eesti Energia). The relevant electricity meters as source of those data were checked directly. They are subject to Eesti Energia s standards. For plausible check and in case of failure of power meters the data from Enercon SCADA system is used, which gives production data of turbines without grid losses (between turbines and substation). Taking of periodic power meter readings from Eesti Energia substation should secure the reliability of Main Grid data. Further on, entering and processing of those data in the monitoring excel sheet was checked as well as recalculation of the sum of those data Findings None Conclusion The project complies with the requirements. 3.9 Management System and Quality Assurance Discussion Due to the straightforward approach for calculating GHG emission reductions the existing management system is appropriate and quality assurance is guaranteed Findings See FAR#2 in article Conclusion The project complies with the requirements, assuming appropriate handling of FAR #2 in the ongoing verification period.

21 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist 4. PROJECT SCORECARD The conclusions on this scorecard are based on the revised monitoring report. Risk Areas Conclusions Summary of findings and comments Baseline Emissions Project Emissions Emission Reductions Completeness Accuracy Source coverage/ boundary definition Physical Measurement and Analysis Data calculations All relevant sources are covered by the monitoring plan and the boundaries of the project are defined correctly and transparently. State-of-the-art technology is applied in an appropriate manner. Appropriate back-up solutions are provided. To prevent any future problems, FAR#1 shall be implemented. Emission reductions are calculated correctly. Consistency Data management & reporting Changes in the project The data management process relies to some extent on the input of the national utility and the turbine vendor. Potential for improvement is indicated by FAR#2. Results are consistent to underlying raw data.

22

23 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist 6 REFERENCES 1. On-site interview at 4Energia OÜ and site-visit by auditing team Verification team on-site: OÜ Ekoekspert Interviewed persons: Raimo Pirksaar 4Energia OÜ Hannu Lamp LHCarbon OÜ Raul Kõllamaa Siemens Electroservice (representing Eesti Energia Main Grid) Category 1 Documents: Documents provided by the Client that relate directly to the GHG components of the project. These have been used as direct sources of evidence for the initial verification conclusions. Reference No. Document 2 Project Design Document for Esivere and Virtsu II Wind Power Developments. ECON Analysis, March Esivere and Virtsu II Wind Power Development Baseline Study. ECON Analysis, Final Determination Report Esivere and Virtsu II Wind Power Developments. JI Project, Estonia. Report No , March TÜV Industrie Service GmbH 5 Monitoring Plan of Esivere and Virtsu 2 Wind Power, version 1, May 30, Monitoring Report No 1 for period Esivere and Virtsu II Wind Power JI Project.Version 3.1, May 30, Esivere and Virtsu 2 Monitoring Protocol and ER calculation. Excel sheet. 8 Esivere grid loss calculations. Excel sheet 9 Esivere production data. Esivere 2007 production data Excel sheets 10 Letter of Approval, issued by Ministry of Environment of Estonia on the , no /15942

24 Initial and First Periodic Verification of the JI Project: Esivere and Virtsu II Initial Verification Checklist Annex 1 Initial Verification Checklist

25 Klaus Nürnberger - Initial Verification Checklist - 1 of 13 Initial Verification Checklist A. Opening Session OBJECTIVE Ref. COMMENTS Concl.(incl FARs/CARs) A.1. Introduction to audits The intention and the target of the audit were introduced to the participants of the audit. Participants at the audit on the part of the owner, Roheline Ring Tuulepargid OÜ, the operator, Nelja Energia OÜ and consultant LHCarbon OÜ: Raimo Pirksaar, OÜ Nelja Energia, Production Manager Hannu Lamp, LHCarbon OÜ, consultant to OÜ Nelja Energia Participants at the audit on the part of TÜV SÜD, OÜ Ekoekspert, Tallinn A.2. Clarification of access to data archives, records, plans, drawings etc. A.3. Contractors for equipment and installation works Who has installed the equipment? Who was contracted for planning etc.? The verification team got open access to all required plans, data, records, drawings and to all relevant facilities. 1 The construction and erection of wind turbines has been divided into two lots, as the project itself is bundled, consisting two separate wind parks - Esivere Wind Park, consisting 4 Enercon E kw wind turbines, started to operate in October 2005; - Virtsu II, consisting 3 Enercon E70 E kw wind turbines, is in stage of testing. The main contractor for both lots was Enercon, the manufacturer of the A-1 Report No rev. 00 This document is a part of the Validation and Verification Manual

26 Klaus Nürnberger - Initial Verification Checklist - 2 of 13 OBJECTIVE Ref. COMMENTS A.4. Actual status of installation works Project installation should be finished at time of initial verification in so far as the project should be ready to generate emission reductions afterwards. B. Open issues indicated in validation report Especially in projects which are not yet registered at CDM-EB or JI-SB, there might be some outstanding issues which should have been indicated by the validation report. wind turbines. Both main grid 110 kv sub-station have been constructed/rehabilitated by Eesti Energia. The Virtsu sub-station had to be extended/ rehabilitated as it is planned to construct the connection point also for Virtsu III wind park in the same Virtsu Wind Park sub-station. For Virtsu II and III wind parks is constructed separate sub-station near to Eesti Energia s Virtsu substation. The construction works in the Virtsu windpark substation are over. Connection point for both windparks is common and it is located in Main Grid 110 kv side. In Windpark sub-station have both wind park separate measuring equipment in 20 kv side. 1 The erection, testing and commissioning of the Esivere wind park finished in September 2005, all turbines became operational at the end of September Virtsu II wind farm commissioning has been delayed due to the delays with reconstruction of grid connection point by national utility Eesti Energia. The trial production of the wind farm was started in April 2008, the produced wind energy was supplied to the grid. Virtsu II wind farm became fully operational at the end of April 2008.Local municipality will issued the official user permit end of summer B.1. Missing steps to final approval 10 The project meets all relevant UNFCCC and Estonian requirements. The Letter of Approval is issued by the Ministry of Environment on the Concl.(incl FARs/CARs) A-2 Report No rev. 00 This document is a part of the Validation and Verification Manual

27 Klaus Nürnberger - Initial Verification Checklist - 3 of 13 OBJECTIVE Ref. COMMENTS 28. December Specific national guidelines and procedures for JI projects in Estonia exist since April 2008, but only in draft version. The verification team did not identify any missing steps. Concl.(incl FARs/CARs) C. Implementation of the project This part is covering the essential checks during the on-site inspection at the project s site, which is indispensably for an initial verification C.1. Physical components Check the installation of all required facilities and equipment as described by the PDD. 1 All details of the wind park were checked. Esivere wind park covers the 4 turbines (Enercon E kw), the cabin with the electrical and control equipment, 35-kV-transformer, main grid meter. Virtsu II wind park covers the 3 turbines (Enercon E kw), the cabin with the electrical and control equipment, 35-kV-transformer, main grid meter. C.2. Project boundaries Check whether the project boundaries are still in compliance with the ones indicated by the PDD. C.3. Monitoring and metering systems Check whether the required metering systems have been installed. The meters have to comply with appropriate quality standards applicable for the used technology. 1 The project boundaries were checked. They are in compliance with the ones indicated in the PDD. 1 All required metering systems have been identified and checked. The following meters are relevant for the calculation of emission reductions; they are all on the premises of the Eesti Energia 110 kv sub-stations: - Esivere wind park has main grid meter (110 kv) in Rõuste substation, which belongs to Eesti Energia. The power meter itself belong to Eesti Energia too. Main grid power meter Landis+Gyr ZDM405CT No , the testing label (calibration FAR#1 A-3 Report No rev. 00 This document is a part of the Validation and Verification Manual

28 Klaus Nürnberger - Initial Verification Checklist - 4 of 13 OBJECTIVE Ref. COMMENTS sticker) AE (June, 2005) is placed. The meter is within its first calibration period. The meter complies with the appropriate standards. - Virtsu II wind park has main grid meter (110 kv) in Virtsu substation, which belongs to Eesti Energia. The power meter itself belongs to Eesti Energia too. Main grid power meter Landis+Gyr ZDM405CT No , the testing label (calibration sticker) AE (June, 2007) is placed. The meter is within its first calibration period. The meter complies with the appropriate standards. Both main grid meters are 2-direction meters, measuring power supplied from the wind park and to the wind park. All turbines have their own power meters NZR 3x230/400Vg, belonging to the wind park and which are connected to the Enercon SCADA system. Concl.(incl FARs/CARs) Virtsu III wind park, which is under the development at the moment, has already a separate power meter at the same Virtsu 110 kv wind park sub-station. It is expected, that Virtsu III wind park will start operation in spring Forward Action Request #1: The developer should ensure that Virtsu III wind farm, which is connected to the same substation, will have an own connection on 35 kv level and separate measuring system in order to separate the power generation from both wind parks the existing Virtsu II and the planned Virtsu III. C.4. Data uncertainty 1 The meters were sealed and had valid calibration stickers (see item A-4 Report No rev. 00 This document is a part of the Validation and Verification Manual

Validation Report. Consorzio Stabile Globus. 2009, March 20 th

Validation Report. Consorzio Stabile Globus. 2009, March 20 th Validation Report Consorzio Stabile Globus VALIDATION OF THE REVISED MONITORING PLAN OF: LANDFILL GAS RECOVERY AND ELECTRICITY GEN- ERATION AT MTONI DUMPSITE REPORT NO. 1263674 2009, March 20 th TÜV SÜD

More information

Validation Report 11 September 2007

Validation Report 11 September 2007 Validation Report DCM SHRIRAM CONSOLIDATED LTD. VALIDATION OF THE REVISED MONITORING PLAN OF THE REGISTERED CDM-PROJECT NO. 0332 AJBAPUR SUGAR COMPLEX COGENERATION PROJECT REPORT NO. 962892-RM 11 September

More information

Validation Report. Bioheat International B.V. the registered CDM-Project No TBrazil. 2007, July 18

Validation Report. Bioheat International B.V. the registered CDM-Project No TBrazil. 2007, July 18 Validation Report Bioheat International B.V. TValidation of the Revised Monitoring Plan of the registered CDM-Project No 0231 TCamil Itaqui Biomass Electricity Generation Project TBrazil REPORT NO. 964544-RM

More information

Gold Standard Validation Report

Gold Standard Validation Report Gold Standard Validation Report DATANG ZHANGZHOU WIND POWER CO., LTD; CHINA Gold Standard Validation of the Fujian Zhangpu Liuao 45MW Wind Power Project, China Report No. 948571 30 August 2007 TÜV SÜD

More information

The Accreditation and Verification Regulation - Verification report

The Accreditation and Verification Regulation - Verification report EUROPEAN COMMISSION DIRECTORATE-GENERAL CLIMATE ACTION Directorate A - International and Climate Strategy CLIMA.A.3 - Monitoring, Reporting, Verification Guidance Document The Accreditation and Verification

More information

Verification Report. Report No

Verification Report. Report No Verification Report World Bank Carbon Finance Unit 2 nd Periodic Verification of the Registered JI Project Stargard Geothermal District Heating Project ITL project ID: PL1000059 Monitoring period #2: 01.01.2006

More information

Requirements for Certification Bodies

Requirements for Certification Bodies ISCC PLUS 251 Requirements fo Certification Bodies Requirements for Certification Bodies ISCC PLUS 251 V 1.0 Copyright notice ISCC 2012 This ISCC document is protected by copyright. It is freely available

More information

The IETA/PCF Validation & Verification Manual

The IETA/PCF Validation & Verification Manual The IETA/PCF & Manual Introduction and way forward Einar Telnes, DNV Certification Bonn, June 7,2003 Introduction Initiated as a preliminary Manual fall 2000 Designed to facilitate an early start for projects

More information

EA Document for Recognition of Verifiers under the EU ETS Directive

EA Document for Recognition of Verifiers under the EU ETS Directive Publication Reference EA-6/03: 2010 Mandatory Document EA Document for Recognition of Verifiers under the EU ETS Directive PURPOSE This document has been prepared by a working group under the direction

More information

How validation and verification work in JCM. 22 January 2014 Kenta Usui Climate and Energy Area, IGES

How validation and verification work in JCM. 22 January 2014 Kenta Usui Climate and Energy Area, IGES How validation and verification work in JCM 22 January 2014 Kenta Usui Climate and Energy Area, IGES 1 TPE is a quality keeper in JCM Joint Committee Development and revision of guidelines Project registration

More information

Issue Brief: Taking Quality Assurance Seriously in Carbon Markets

Issue Brief: Taking Quality Assurance Seriously in Carbon Markets JULY 2010 Issue Brief: Taking Quality Assurance Seriously in Carbon Markets GHG Verification Issues for Policymakers Contents 1 GHG Verification Issues for Policymakers 2 Background on the Issue of GHG

More information

APPROVAL SHEET PROCEDURE INFORMATION SECURITY MANAGEMENT SYSTEM CERTIFICATION. PT. TÜV NORD Indonesia PS - TNI 001 Rev.05

APPROVAL SHEET PROCEDURE INFORMATION SECURITY MANAGEMENT SYSTEM CERTIFICATION. PT. TÜV NORD Indonesia PS - TNI 001 Rev.05 APPROVAL SHEET PROCEDURE INFORMATION SECURITY MANAGEMENT SYSTEM CERTIFICATION PT. TÜV NORD Indonesia PS - TNI 001 Rev.05 Created : 20-06-2016 Checked: 20-06-2016 Approved : 20-06-2016 Indah Lestari Karlina

More information

Rules for LNE Certification of Management Systems

Rules for LNE Certification of Management Systems Rules for LNE Certification of Management Systems Application date: March 10 th, 2017 Rev. 040716 RULES FOR LNE CERTIFICATION OF MANAGEMENT SYSTEMS CONTENTS 1. PURPOSE... 3 2. SCOPE... 3 3. DEFINITION

More information

Scheme Document. For more information or help with your application contact BRE Global on +44 (0) or

Scheme Document. For more information or help with your application contact BRE Global on +44 (0) or Page: Page 1 of 15 1. Introduction This certification scheme has been designed to promote sustainable production of construction products and materials. Responsible sourcing includes organisational management,

More information

"Energy and Ecological Transition for the Climate" Label Control and Monitoring Plan Guidelines

Energy and Ecological Transition for the Climate Label Control and Monitoring Plan Guidelines MINISTRY OF ENVIRONMENT, ENERGY AND THE SEA "Energy and Ecological Transition for the Climate" Label Control and Monitoring Plan Guidelines Contents FOREWORD... 3 INTRODUCTION... 4 I. INITIAL CERTIFICATION

More information

CFS v2.0. Procedures. Valid since: 26. May 2008

CFS v2.0. Procedures. Valid since: 26. May 2008 Procedures Valid since: 26. May 2008 Content 1. Process to become Validated...4 1.1. Creation of Login... 4 1.2. Preparation and upload of Documents... 4 1.3. Submission of Documents... 4 1.4. Validation...

More information

Voluntary Carbon Standard 2007 Validation Report Template

Voluntary Carbon Standard 2007 Validation Report Template VCS 2007 Validation Report Template Voluntary Carbon Standard 2007 Validation Report Template 19 November 2007 Validation Report: Name of Verification company: TÜV SÜD Industrie Service GmbH Carbon Management

More information

CASA External Peer Review Program Guidelines. Table of Contents

CASA External Peer Review Program Guidelines. Table of Contents CASA External Peer Review Program Guidelines Table of Contents Introduction... I-1 Eligibility/Point System... I-1 How to Request a Peer Review... I-1 Peer Reviewer Qualifications... I-2 CASA Peer Review

More information

Ref No: RACS/PCS/10 Page 1 of 7. Revision No: 00 Revision Date: October 1, 2018 PRODUCT CERTIFICATION SCHEME FOR ELECTRICAL EQUIPMENT

Ref No: RACS/PCS/10 Page 1 of 7. Revision No: 00 Revision Date: October 1, 2018 PRODUCT CERTIFICATION SCHEME FOR ELECTRICAL EQUIPMENT Ref No: RACS/PCS/10 Page 1 of 7 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) to assure that Electrical

More information

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679)

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679) Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679) Adopted on 4 December 2018 Adopted 1 Contents 1 Introduction... 3 2

More information

SAAS Procedure 201B. SAAS Competence and Maintenance Requirements for SA8000 Social Accountability Program Managers, Auditors and Allied Experts

SAAS Procedure 201B. SAAS Competence and Maintenance Requirements for SA8000 Social Accountability Program Managers, Auditors and Allied Experts 1 2 3 4 5 6 SAAS Procedure 201B SAAS Competence and Maintenance Requirements for SA8000 Social Accountability Program Managers, Auditors and Allied Experts 7 8 9 10 For Use By Certification Bodies Performing

More information

VER + Verification Report

VER + Verification Report VER + Verification Report The World Bank Group Fifth Periodic Verification of the Puck Wind Farm Generation Project in the Gniezdzewo area near the Puck Commune in the Republic of Poland Report No. 600500948

More information

ARTICLE 29 DATA PROTECTION WORKING PARTY

ARTICLE 29 DATA PROTECTION WORKING PARTY ARTICLE 29 DATA PROTECTION WORKING PARTY 18/EN WP261 Article 29 Working Party Draft Guidelines on the accreditation of certification bodies under Regulation (EU) 2016/679 Adopted on 6 february 2018 1 THE

More information

PRODUCT CERTIFICATION SCHEME FOR ENERGY DRINKS

PRODUCT CERTIFICATION SCHEME FOR ENERGY DRINKS Ref No: RACS/PCS/11 Page 1 of 6 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) that Energy Drinks

More information

The Transaction Log under the Kyoto Protocol

The Transaction Log under the Kyoto Protocol Working Paper No. 9 (2003), Annex II Pre-sessional consultations on registries Bonn, Germany, 2 June 2003 The Transaction Log under the Kyoto Protocol Functional Specification Draft version Page

More information

TURKISH ACCREDITATION AGENCY. Training, Promotion and Information Directorate

TURKISH ACCREDITATION AGENCY. Training, Promotion and Information Directorate TURKISH ACCREDITATION AGENCY Training, Promotion and Information Directorate About us... Main field of activity of the Training, Promotion and Information Directorate (TPID) is organizing the training

More information

EVALUATION AND APPROVAL OF AUDITORS. Deliverable 4.4.3: Design of a governmental Social Responsibility and Quality Certification System

EVALUATION AND APPROVAL OF AUDITORS. Deliverable 4.4.3: Design of a governmental Social Responsibility and Quality Certification System EVALUATION AND APPROVAL OF AUDITORS Deliverable 4.4.3: Design of a governmental Social Responsibility and Quality Certification System 1 TABLE OF CONTENTS 1. Scope and field of Application 3 2. Normative

More information

Minimum Requirements For The Operation of Management System Certification Bodies

Minimum Requirements For The Operation of Management System Certification Bodies ETHIOPIAN NATIONAL ACCREDITATION OFFICE Minimum Requirements For The Operation of Management System Certification Bodies April 2011 Page 1 of 11 No. Content Page 1. Introduction 2 2. Scope 2 3. Definitions

More information

PEFC Certification System Netherlands - Certification Procedures

PEFC Certification System Netherlands - Certification Procedures PCSN SCHEME DOCUMENT PCSN IV Issue 2 10-03-2017 PEFC Certification System Netherlands - Certification Procedures PEFC Netherlands Kokermolen 11 3994 DG Houten The Netherlands Tel: +31 30 693 0040 Fax:

More information

CDM Validation and Verification Manual

CDM Validation and Verification Manual CDM Validation and Verification Manual (CDM-VVM) Comments by Öko-Institut as invited by the call for public comments from 16 May to 15 June 2008 Berlin, 15 June 2008 Öko-Institut Novalisstraße 10 D-10115

More information

Determination Report

Determination Report Determination Report DETERMINATION OF THE JI-PROJECT: Revamping and Modernization of the Alchevsk Steel Mill, Ukraine REPORT NO. 947241 April 23, 2008 TÜV SÜD Industrie Service GmbH Carbon Management Service

More information

ASSEMBLY 37TH SESSION

ASSEMBLY 37TH SESSION International Civil Aviation Organization WORKING PAPER A37-WP/22 26/5/10 Agenda Item 17: Environmental protection ASSEMBLY 37TH SESSION EXECUTIVE COMMITTEE UNITED NATIONS CLIMATE NEUTRAL INITIATIVE (Presented

More information

GUIDELINE. of the European Committee for Welding of Railway Vehicles (ECWRV) ( ) PART 1

GUIDELINE. of the European Committee for Welding of Railway Vehicles (ECWRV) ( ) PART 1 GUIDELINE of the European Committee for Welding of Railway Vehicles (ECWRV) (2016-05-10) PART 1 Procedure for the application of EN 15085 and certification of welding manufacturers for welding railway

More information

PRODUCT CERTIFICATION SCHEME FOR MECHANICAL-CUSTOMIZED VEHICLES

PRODUCT CERTIFICATION SCHEME FOR MECHANICAL-CUSTOMIZED VEHICLES Ref No: RACS/SOP/57 Page 1 of 6 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) that Mechanical Customized

More information

Reviewed by ADM(RS) in accordance with the Access to Information Act. Information UNCLASSIFIED.

Reviewed by ADM(RS) in accordance with the Access to Information Act. Information UNCLASSIFIED. Assistant Deputy Minister (Review Services) Reviewed by in accordance with the Access to Information Act. Information UNCLASSIFIED. Security Audits: Management Action Plan Follow-up December 2015 1850-3-003

More information

Inhalt. Description of Certification Procedure ISO 22000, HACCP and DIN 15593

Inhalt. Description of Certification Procedure ISO 22000, HACCP and DIN 15593 Inhalt 1. CERTIFICATION PROCEDURE... 2 1.1 Audit Preparation... 2 1.2 Audit Stage 1... 2 1.3 Audit Stage 2 Certification Audit... 3 1.4. Issue of Certificate... 3 2. SURVEILLANCE AUDIT... 3 3. RECERTIFICATION

More information

EA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits

EA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits Publication Reference EA-7/05 EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits PURPOSE This document has been prepared by a task force under the direction of the European Cooperation

More information

IBD CERTIFICAÇÕES. Fair Trade Certification Step by step. Welcome to IBD!

IBD CERTIFICAÇÕES. Fair Trade Certification Step by step. Welcome to IBD! IBD CERTIFICAÇÕES Fair Trade Certification Step by step Welcome to IBD! We have developed this guide to provide you with all the necessary information about the Fair Trade certification process. Index

More information

CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS

CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS Approved By: Executive: Accreditation: Mpho Phaloane Revised By: RBI STC Working Group Members Date

More information

Description of the TÜV NORD CERT certification procedure GMP+ FC (Feed Certification scheme) of GMP+ International B.V. (NL)

Description of the TÜV NORD CERT certification procedure GMP+ FC (Feed Certification scheme) of GMP+ International B.V. (NL) Certific ation Table of contents 1 CERTIFICATION PROCEDURE... 3 1.1 Audit Preparation... 3 1.2 Establishment of readiness for certification... 3 1.3 Temporary approval... 3 1.4 Audit Stage 2 Certification

More information

Data Processing Clauses

Data Processing Clauses Data Processing Clauses The examples of processing clauses below are proposed pending the adoption of standard contractual clauses within the meaning of Article 28.8 of general data protection regulation.

More information

FSC STANDARD. Standard for Multi-site Certification of Chain of Custody Operations. FSC-STD (Version 1-0) EN

FSC STANDARD. Standard for Multi-site Certification of Chain of Custody Operations. FSC-STD (Version 1-0) EN FOREST STEWARDSHIP COUNCIL INTERNATIONAL CENTER FSC STANDARD Standard for Multi-site Certification of Chain of Custody Operations FSC-STD-40-003 (Version 1-0) EN 2007 Forest Stewardship Council A.C. All

More information

PRODUCT CERTIFICATION SCHEME FOR METROLOGY SYSTEM

PRODUCT CERTIFICATION SCHEME FOR METROLOGY SYSTEM Ref No: RACS/PCS/20 Page 1 of 8 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) that Metrology System

More information

ACCREDITATION: A BRIEFING FOR GOVERNMENTS AND REGULATORS

ACCREDITATION: A BRIEFING FOR GOVERNMENTS AND REGULATORS ACCREDITATION: A BRIEFING FOR GOVERNMENTS AND REGULATORS Accreditation is continuously gaining recognition as an important technical tool in the delivery of objectives across an increasing range of policy

More information

Audit and Certification Process of GUTcert for

Audit and Certification Process of GUTcert for Audit and Certification Process of GUTcert for PRODUCT CERTIFICATION ACC. TO ISO 17065 Sustainable Biomass acc. ISCC and REDcert GUT Certifizierungsgesellschaft für Managementsysteme mbh Umweltgutachter

More information

RSB Standard for participating operators

RSB Standard for participating operators Type of document: RSB International Standard Status: Approved for certification Date: 1 March 2011 Version 2.0 RSB Standard for participating operators RSB reference code: RSB-STD-30-001 Published by the

More information

Description of the certification procedure MS - ISO 9001, MS - ISO 14001, MS - ISO/TS and MS BS OHSAS 18001, MS - ISO 45001, MS - ISO 50001

Description of the certification procedure MS - ISO 9001, MS - ISO 14001, MS - ISO/TS and MS BS OHSAS 18001, MS - ISO 45001, MS - ISO 50001 The certification of a management system based on standard ISO 9001, ISO 14001, ISO/TS 29001, BS OHSAS 18001, ISO 45001 or ISO 50001, consists of the offer and contract phase, the audit preparation, performance

More information

RSPO Certification Step by step

RSPO Certification Step by step RSPO Certification Step by step Index Terms and definitions... 3 Objectives and applicable certification schemes... 5 Evaluation procedures... 7 Certification request... 7 Critical analysis of certification

More information

Independent Assurance Statement

Independent Assurance Statement Independent Assurance Statement Scope and Objectives DNV GL Business Assurance USA, Inc. (DNV GL) was commissioned by Lockheed Martin Corporation (Lockheed Martin) to conduct independent assurance of its

More information

PRODUCT CERTIFICATION SCHEME FOR CHILDREN TOYS

PRODUCT CERTIFICATION SCHEME FOR CHILDREN TOYS Ref No: RACS/PCS/22 Page 1 of 8 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) that Children Toys

More information

TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS

TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS Target2-Securities Project Team TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS Reference: T2S-07-0270 Date: 09 October 2007 Version: 0.1 Status: Draft Target2-Securities - User s TABLE OF CONTENTS

More information

Global Specification Protocol for Organisations Certifying to an ISO Standard related to Market, Opinion and Social Research.

Global Specification Protocol for Organisations Certifying to an ISO Standard related to Market, Opinion and Social Research. CONTENTS i. INTRODUCTION 3 ii. OVERVIEW SPECIFICATION PROTOCOL DOCUMENT DEVELOPMENT PROCESS 4 1. SCOPE 5 2. DEFINITIONS 5 3. REFERENCES 6 4. MANAGEMENT STANDARDS FOR APPROVED CERTIFICATION BODIES 6 4.1

More information

TURKISH STANDARDS INSTITUTION

TURKISH STANDARDS INSTITUTION TURKISH STANDARDS INSTITUTION NEW GLOBAL OLD APPROACH REGULATIONS CONFORMITY ASSESSMENT PROCEDURES AND PRINCIPLES Board Decision : 29.04.2014 Date 50.-236 Validity date : 05.05.2014 CHAPTER ONE Objective,

More information

PROTERRA CERTIFICATION PROTOCOL V2.2

PROTERRA CERTIFICATION PROTOCOL V2.2 PROTERRA CERTIFICATION PROTOCOL V2.2 TABLE OF CONTENTS 1. Introduction 2. Scope of this document 3. Definitions and Abbreviations 4. Approval procedure for Certification Bodies 5. Certification Requirements

More information

Section Qualifications of Audit teams Qualifications of Auditors Maintenance and Improvement of Competence...

Section Qualifications of Audit teams Qualifications of Auditors Maintenance and Improvement of Competence... Section 9. SFI 2010-2014 Audit Procedures and Auditor Qualifications and Accreditation Updated January 2011 Section 9 Introduction... 3 1. Scope... 3 2. Normative Reference... 3 3. Terms and Definitions...

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

EXAM PREPARATION GUIDE

EXAM PREPARATION GUIDE When Recognition Matters EXAM PREPARATION GUIDE PECB Certified ISO 22000 Lead Implementer www.pecb.com The objective of the Certified ISO 22000 Lead Implementer examination is to ensure that the candidate

More information

Provider Monitoring Process

Provider Monitoring Process Provider Monitoring Process This statewide provider monitoring process is applicable for all providers including direct vendors, Agency with Choice (AWC) Financial Management Services (FMS) providers and

More information

Scheme Document SD 003

Scheme Document SD 003 Scheme Document SD 003 Management Systems (ISO 9001, ISO 14001, BS OHSAS 18001 & PN111 Factory Production Control) SD 003 Rev 03.6 10 Oct 2013 Page 1 of 13 (blank) SD 003 Rev 03.6 10 Oct 2013 Page 2 of

More information

ISO/IEC INTERNATIONAL STANDARD

ISO/IEC INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO/IEC 27006 Second edition 2011-12-01 Information technology Security techniques Requirements for bodies providing audit and certification of information security management systems

More information

ISACA Cincinnati Chapter March Meeting

ISACA Cincinnati Chapter March Meeting ISACA Cincinnati Chapter March Meeting Recent and Proposed Changes to SOC Reports Impacting Service and User Organizations. March 3, 2015 Presenters: Sayontan Basu-Mallick Lori Johnson Agenda SOCR Overview

More information

REPORT 2015/149 INTERNAL AUDIT DIVISION

REPORT 2015/149 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/149 Audit of the information and communications technology operations in the Investment Management Division of the United Nations Joint Staff Pension Fund Overall results

More information

Internal Audit Report. Electronic Bidding and Contract Letting TxDOT Office of Internal Audit

Internal Audit Report. Electronic Bidding and Contract Letting TxDOT Office of Internal Audit Internal Audit Report Electronic Bidding and Contract Letting TxDOT Office of Internal Audit Objective Review of process controls and service delivery of the TxDOT electronic bidding process. Opinion Based

More information

PRODUCT CERTIFICATION SCHEME FOR MILK AND DAIRY PRODUCTS

PRODUCT CERTIFICATION SCHEME FOR MILK AND DAIRY PRODUCTS Ref No: RACS/PCS/16 Page 1 of 8 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) to assure that Milk

More information

Information technology Security techniques Requirements for bodies providing audit and certification of information security management systems

Information technology Security techniques Requirements for bodies providing audit and certification of information security management systems Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO/IEC 27006 Third edition 2015-10-01 Information technology Security techniques Requirements for bodies providing audit and certification of information

More information

DEMO OF ISO/IEC 17025:2017 AWARENESS AND AUDITOR TRAINING PPT PRESENTATION KIT

DEMO OF ISO/IEC 17025:2017 AWARENESS AND AUDITOR TRAINING PPT PRESENTATION KIT DEMO OF ISO/IEC 17025:2017 AWARENESS AND AUDITOR TRAINING PPT PRESENTATION KIT CONTENTS OF ISO/IEC 17025:2017 AWARENESS AND AUDITOR TRAINING PPT PRESENTATIONS TRAINING KIT ISO/IEC 17025:2017 Awareness

More information

BRE Global Limited Scheme Document SD 186: Issue No December 2017

BRE Global Limited Scheme Document SD 186: Issue No December 2017 BRE Global Limited Scheme Document SD 186: Issue No. 11.1 Commercial-in-Confidence Page 1 of 9 Introduction This certification scheme has been designed to promote the use of sustainable materials and

More information

LICS Certification Scheme

LICS Certification Scheme LICS Certification Scheme LICS Certified Community Interpreting Service Provider Language Industry Certification System Release date: V1.0, 2009-08-15 Austrian Standards plus GmbH, Heinestrasse 38, A-1020

More information

Personnel Certification Program

Personnel Certification Program Personnel Certification Program ISO 9001 (QMS) / ISO 14001 (EMS) Form PC1000 Last Updated 9/11/2017 Page 1 of 14 INDEX Auditor Certification Quality or Environmental Program Pg 3-4 Certification Status

More information

PRODUCT CERTIFICATION SCHEME FOR ORGANIC PRODUCTS

PRODUCT CERTIFICATION SCHEME FOR ORGANIC PRODUCTS Ref No: RACS/SOP/36 Page 1 of 6 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) to assure that Organic

More information

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public

More information

EXAM PREPARATION GUIDE

EXAM PREPARATION GUIDE EXAM PREPARATION GUIDE PECB Certified ISO 50001 Lead Auditor The objective of the PECB Certified ISO 50001 Lead Auditor examination is to ensure that the candidate has the knowledge and skills to plan

More information

Interpretations for the SFI Standards and Rules. January 2017

Interpretations for the SFI Standards and Rules. January 2017 Interpretations for the SFI 2015-2019 Standards and Rules January 2017 Official SFI Standard Interpretations contained in this document are auditable requirements 1 Table of Contents Table of Contents...

More information

Offset System Essential Elements Final Recommendations Paper July 2010

Offset System Essential Elements Final Recommendations Paper July 2010 Offset System Essential Elements Final Recommendations Paper July 2010 Table of Contents 1 Executive Summary... 1 2 Purpose and Background... 1 3 Definition of an Offset... 2 3.1 Offset... 2 3.2 Other

More information

KENYA ACCREDITATION SERVICE

KENYA ACCREDITATION SERVICE KENAS-GUD-010 01 22/06/2013 22/07/2013 GUD 1 of 9 Approval and Authorisation Completion of the following signature blocks signifies the review and approval of this Document. Name Job Title / Role Signature

More information

Date yyyy-mm-dd binding declaration GASTEC QA GENERAL REQUIREMENTS

Date yyyy-mm-dd binding declaration GASTEC QA GENERAL REQUIREMENTS Date yyyy-mm-dd binding declaration GASTEC QA GENERAL REQUIREMENTS 253/160324 Foreword Kiwa These have been approved by the GASTEC QA Board of Experts, in which all relevant parties in the field of gas-related

More information

IPC Certification Scheme IPC QMS/EMS Auditors

IPC Certification Scheme IPC QMS/EMS Auditors Page 1 of 16 International Personnel Certification Association I P C CERTIFICATION SCHEME IPC QUALITY/ENVIRONMENTAL MANAGEMENT SYSTEM AUDITORS ISSUE 1 Page 2 of 16 International Personnel Certification

More information

Report. Certificate Z Rev. 00. SIMATIC Safety System

Report. Certificate Z Rev. 00. SIMATIC Safety System Report to the Certificate Z10 067803 0020 Rev. 00 Safety-Related Programmable System SIMATIC Safety System Manufacturer: Siemens AG Gleiwitzer Str. 555 D-90475 Nürnberg Revision 1.1 dated 2019-02-07 Testing

More information

By Cornelia Wawretchek. The Drug Manufacturer s Guide to Site Master Files

By Cornelia Wawretchek. The Drug Manufacturer s Guide to Site Master Files By Cornelia Wawretchek The Drug Manufacturer s Guide to Site Master Files ISBN: 978-3-943267-69-3 A Process Approach to Pharmaceutical Quality Systems A Guide to ICH Q10 Compliance Where a product trademark,

More information

DIPLOMA COURSE IN INTERNAL AUDIT

DIPLOMA COURSE IN INTERNAL AUDIT DIPLOMA COURSE IN INTERNAL AUDIT Course Objective: Internal Audit is an assurance and consulting service that reviews the efficiency and effectiveness of the internal control.. It assists management at

More information

EXAM PREPARATION GUIDE

EXAM PREPARATION GUIDE When Recognition Matters EXAM PREPARATION GUIDE PECB Certified ISO 22000 Lead Auditor www.pecb.com The objective of the Certified ISO 22000 Lead Auditor examination is to ensure that the candidate has

More information

Certification Description of Malaysia Sustainable Palm Oil (MSPO) Standard

Certification Description of Malaysia Sustainable Palm Oil (MSPO) Standard The certification of a management system based on standard Malaysia Sustainable Palm Oil Standard (MSPO) respectively, consists of the offer and contract phase, the audit preparation, performance of the

More information

Global Wind Organisation CRITERIA FOR THE CERTIFICATION BODY

Global Wind Organisation CRITERIA FOR THE CERTIFICATION BODY Global Wind Organisation CRITERIA FOR THE CERTIFICATION BODY December 2015 (Version 3) 1 Contents 1. Introduction... 5 2. Criteria for approval of a Certification Body... 5 3. Selection of audit team members

More information

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949 Areas of for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949 1 st February 2014 1 Foreword Introduction The IATF recognizes certification

More information

ORDINANCE ON EMPLOYMENT PROMOTION (AZAV) INFORMATION SECURITY MANAGEMENT SYSTEMS ACCORDING TO DIN ISO/IEC (INCL. IT SECURITY CATALOGUE)

ORDINANCE ON EMPLOYMENT PROMOTION (AZAV) INFORMATION SECURITY MANAGEMENT SYSTEMS ACCORDING TO DIN ISO/IEC (INCL. IT SECURITY CATALOGUE) Audit and Certification Process of GUTcert for QUALITY MANAGEMENT SYSTEMS ACCORDING TO ISO 9001 ENVIRONMENTAL MANAGEMENT SYSTEMS ACCORDING TO ISO 14001 ENERGY MANAGEMENT SYSTEMS ACCORDING TO ISO 50001

More information

Turn carbon into an asset

Turn carbon into an asset Climate protection is an asset, enabling costs to be cut and revenues generated. Trust a qualified partner that offers services for climate change projects throughout the world. Value added by TÜV SÜD

More information

ISO/IEC INTERNATIONAL STANDARD

ISO/IEC INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO/IEC 14143-2 First edition 2002-11-15 Information technology Software measurement Functional size measurement Part 2: Conformity evaluation of software size measurement methods

More information

ISO/IEC TR TECHNICAL REPORT

ISO/IEC TR TECHNICAL REPORT TECHNICAL REPORT ISO/IEC TR 27019 First edition 2013-07-15 Information technology Security techniques Information security management guidelines based on ISO/IEC 27002 for process control systems specific

More information

EXAM PREPARATION GUIDE

EXAM PREPARATION GUIDE When Recognition Matters EXAM PREPARATION GUIDE PECB Certified ISO/IEC 20000 Lead Auditor www.pecb.com The objective of the Certified ISO/IEC 20000 Lead Auditor examination is to ensure that the candidate

More information

IATF - International Automotive Task Force Rules for achieving and maintaining IATF Recognition IATF Rules 5 th Edition Sanctioned Interpretations

IATF - International Automotive Task Force Rules for achieving and maintaining IATF Recognition IATF Rules 5 th Edition Sanctioned Interpretations Rules for achieving and maintaining IATF Recognition IATF Rules 5 th Edition Sanctioned Interpretations The Rules for achieving and maintaining IATF Recognition 5 th Edition for IATF 16949 ( Rules 5 th

More information

Guidelines 1/2018 on certification and identifying certification criteria in accordance with Articles 42 and 43 of the Regulation 2016/679

Guidelines 1/2018 on certification and identifying certification criteria in accordance with Articles 42 and 43 of the Regulation 2016/679 Guidelines 1/2018 on certification and identifying certification criteria in accordance with Articles 42 and 43 of the Regulation 2016/679 Adopted on 25 May 2018 Contents 1. Introduction... 2 1.1. Scope

More information

RSB Procedure for Certification Bodies and Auditors

RSB Procedure for Certification Bodies and Auditors Type of document: RSB Procedure Status: Approved for Certification Date of approval: 01.03.2017 Date of publication: 20.03.2017 Version: 3.2 RSB Procedure for Certification Bodies and Auditors RSB reference

More information

Checklist According to ISO IEC 17065:2012 for bodies certifying products, process and services

Checklist According to ISO IEC 17065:2012 for bodies certifying products, process and services Name of Certifying Body Address of Certifying Body Case number Date of assessment With several locations Yes No Assessed locations: (Name)/Address: (Name)/Address: (Name)/Address: Assessed area (technical

More information

1.0 TITLE: Auditing Procedure. 2.0 PURPOSE: To provide an outline and instructions on the GMCS auditing process of clients.

1.0 TITLE: Auditing Procedure. 2.0 PURPOSE: To provide an outline and instructions on the GMCS auditing process of clients. Page 1 1.0 TITLE: Auditing Procedure 2.0 PURPOSE: To provide an outline and instructions on the GMCS auditing process of clients. 3.0 RESPONSIBILITY: GMCS auditors and personnel are responsible for following

More information

EXAM PREPARATION GUIDE

EXAM PREPARATION GUIDE When Recognition Matters EXAM PREPARATION GUIDE PECB Certified ISO 9001 Lead Auditor www.pecb.com The objective of the PECB Certified ISO 9001 Lead Auditor examination is to ensure that the candidate possesses

More information

REVISION 5. International Automotive Task Force TRANSITION STRATEGY ISO/TS IATF Dated 1 March

REVISION 5. International Automotive Task Force TRANSITION STRATEGY ISO/TS IATF Dated 1 March REVISION 5 Dated 1 March 2018 International Automotive Task Force TRANSITION STRATEGY ISO/TS 16949 IATF 16949 2 CONTENTS Foreword Revision 1 dated 3 October 2016 Revision 2 dated 21 November 2016 Revision

More information

IAF Guidance on the Application of ISO / IEC Guide 65:1996

IAF Guidance on the Application of ISO / IEC Guide 65:1996 IAF GD5:2004 International Accreditation Forum, Inc. IAF Guidance Document IAF Guidance on the Application of ISO / IEC Guide 65:1996 General Requirements for Bodies operating Product Certification Systems

More information

Audit Report. The Prince s Trust. 27 September 2017

Audit Report. The Prince s Trust. 27 September 2017 Audit Report The Prince s Trust 27 September 2017 Contents 1 Background 1 1.1 Scope 1 1.2 Audit Report and Action Plan Timescales 2 1.3 Summary of Audit Issues and Recommendations 3 1.4 Risk Rating of

More information

An unofficial translation, in case of any discrepancies between the English version and the original Swedish version the latter will prevail.

An unofficial translation, in case of any discrepancies between the English version and the original Swedish version the latter will prevail. An unofficial translation, in case of any discrepancies between the English version and the original Swedish version the latter will prevail. Consolidated version of The Swedish Board for Accreditation

More information

Fair Oaks Dairy Farm, LLC Cyclus Designed Digester Project CAR477 Climate Action Reserve

Fair Oaks Dairy Farm, LLC Cyclus Designed Digester Project CAR477 Climate Action Reserve Fair Oaks Dairy Farm, LLC Cyclus Designed Digester Project CAR477 Climate Action Reserve 12/09/2011 TUV SUD America, Inc 10 Centennial Drive, Peabody Massachusetts, USA 01960 GHG_F_09.08, Rev 2 Effective

More information