1 FNM Expansion Training Webinar Cynthia Hinman Lead Client Trainer August 11, 2014 The information contained in these materials is provided for general information only and does not constitute legal or regulatory advice. The ultimate responsibility for complying with the ISO FERC Tariff and other applicable ISO PUBLIC laws, rules or 2014 regulations CAISO lies with you. In no event shall the ISO or its employees be liable to you or anyone else for any decision made or action taken in reliance on the information in these materials.

2 What is the purpose of this initiative? Reliability September 8 th event FERC-NERC finding 1: Lack of Updated External Networks in Next-Day Study Models FERC-NERC finding 2: Lack of Real-Time External Visibility Market efficiency More accurate model leads to more efficient dispatch Real-time congestion costs due to infeasible schedules Page 2

3 Phase 1 and Phase 2 changes October 1,

4 Applications impacted by this change Application What is it? Change Master File SIBR DAM/RTM Holds resource-specific information Bid/Schedule/Forecast submission Day-ahead and Real-time market Define external BAA scheduling points Transaction IDs will be created based on SC submission Receive transaction IDs, perform analysis which includes external BAA constraints and outages CMRI Market Reports Use transaction IDs (as applicable) in reports ADS Binding instructions Use transaction IDs (as applicable) in ADS instructions Settlements Market settlement information Use transaction IDs (as applicable) for settlements Use intertie/scheduling point combination Page 4

5 Objectives Why is the ISO making these changes?

6 Current full network model How do we model the external network today? As injections and withdrawals at the ISO intertie ISO does not model power exchanges between other balancing authority areas (BAAs) WECC (Illustrative interties in red) Page 6

7 Current full network model How do we schedule and price the external network today? As injections and withdrawals at the ISO intertie (aligned with modeling) ISO does not consider impact of external systems on cleared bids WECC (Illustrative interties in red) Page 7

8 The expansion of the full network model increases ISO s modeling capabilities. WECC (Illustrative interties in red) Modeled BAA WECC (Illustrative interties in red) Modeled BAA Slide 8

9 Full network model expansion If ISO wants to improve reliability and market efficiency, how will FNM expansion help? Will allow us to more accurately model loop flow Enhanced security analysis Better analysis and outage coordination Accurate HVDC modeling Page 9

10 Full network model expansion How will ISO achieve these objectives? Activity 1 Model new generation and load aggregation points and scheduling points Activity 2 - Enforce constraints for both scheduled and physical flow Activity 3 - Include variables in HVDC modeling Page 10

11 Activity 1 - Modeling New generation and load aggregation points, and scheduling points

12 Full network model expansion: Activity 1 - modeling How do we transition the modeling in the current FNM to expanded FNM? Phased approach start modeling neighboring BAAs and work towards rest of WECC Current initiative includes September 8 th entities, BPA and EIM Future phases to be decided Two types of BAAs Not modeled Modeled Page 12

13 Full network model expansion: Activity 1 - modeling Un-modeled and modeled BAAs BAAs not modeled at the FNM boundary Most like today s injection and withdrawal at interties Single point in the network Modeled BAAs Does not exist today Create base schedules estimated transactions not involving ISO but will impact physical flow on ISO interties Page 13

14 Base Schedules, Net Schedule Interchange Base Schedules - For EIM purposes, EIM resources do not participate in DAM, only in FMM/RTM - so need a base value to compute incremental or decremental quantity for settlements (IIE) - For modeled non-eim BAA, still account for MW flow but do not settle, (market awards will not exist) Net Schedule Interchange (NSI) - Net energy exported from a BAA if positive - Net energy imported into a BAA if negative (D) + (N) = (G) Demand + NSI = Generation Slide 14

15 Full network model expansion: Activity 1 - modeling How will ISO model the BAA once it has the data? Based on historical values from the state estimator, will use generation distribution factors (GDF) and load distribution factors (LDF) to distribute D, G, and N to each BAA Example assume BAA1 has: 1,100 MW of total generation (G) 1,000 MW of demand (D) 100 MW of net scheduled interchange (N) GDF and LDF (%) Base Schedule (MW) Gen Gen Load Load Assuming no losses, D + N = G NSI Page 15

16 Imports (exports) as incremental (decremental) to the base schedules Distribute demand forecast per BAA to load nodes - Use default load distribution factors (LDF) Distribute generation per BAA to resources - Identify Generation from Demand + Net Scheduled Interchange (NSI) = Generation (e.g., day-ahead schedules with ISO or other balancing authority areas, prior to the real-time market) - Use historical generation patterns using generation distribution factors (GDF), or based on state estimator solution in RTM Slide 16

17 Data sources for base schedule information Demand forecast for non-eim BAAs from WECC Interchange schedules between external BAAs WIT (WECC interchange tool) External transmission outages from Reliability Coordinator 17

18 Why do we need to use transaction IDs? The network model will be expanding and will provide multiple possibilities for scheduling with the ISO. Therefore using the master file for each resource s physical registration becomes impractical. Uniquely identifies static system resource bids and schedules Certain types of system resources will still be registered in the master file 18

19 Registered Intertie Resources Resources with resource adequacy obligations ETC/TOR contracts Certified to provide ancillary services IBAA agreements for transmission loss adjustment Trans Bay Cable resource ID Resource recirculating resource ID Losses, Inadvertent payback, emergency assistance MSS load following EIM transfer schedule defined by intertie and transmission service provider Slide 19

20 Intertie Transaction - fictitious examples Non-resource specific Physical Import bid : SC05-AMARGOSA_1_SN001-AMARGO-I-P-F-DECM01 SC05-AMARGOSA_1_SN001-AMARGO-I-P-F-DECM01.1 SC05-AMARGOSA_1_SN001-AMARGO-I-P-F-DECM01.2 SC05-AMARGOSA_1_SN001-AMARGO-I-P-F-DECM01.9 Non-resource specific Physical Export bid: SC05-AMARGOSA_1_SN001-AMARGO-E-P-F-DECM01 SC05-AMARGOSA_1_SN001-AMARGO-E-P-F-DECM01.1 Scheduling Coordinator Intertie Scheduling Point Primary Intertie Identifier Direction Bid Type Energy Type Purchase-Selling Entity Identifier Non-resource specific Physical Wheeling Import bid: SC05-AMARGOSA_1_SN001-AMARGO-I-P-W-DECM01 Non-resource specific Physical Wheeling Export bid: SC05-BLYTHE_1_N101-BLYTHE-E-W-P-DECM01 Page 20

21 SIBR UI Inter-tie Inter-tie 21

22 SIBR UI 22

23 SIBR UI 23

24 Intertie transaction inputs Field Scheduling Coordinator Scheduling Point Primary Tie Direction Bid Type Alternate Tie Energy Type Purchase- Selling Entity Identifier Description Scheduling Coordinator identifier (required) Intertie Scheduling Point identifier (required) Primary Intertie identifier (required) Direction (required): I for import, E for export Bid Type (inserted): P for physical, V for Virtual Alternate Intertie identifier (optional) Energy Type (required for physical transactions): F Firm N Non-Firm U Unit Contingent D Dynamic Interchange W Wheeling A registered Purchase-Selling Entity identifier (required for physical transactions); allow PSE, PSE.1, PSE.2 PSE.9 24

25 SIBR UI - Wheeling 25

26 SIBR UI Wheeling Counter Resource 26

27 SIBR UI Wheeling Hourly Components screen Intertie Transaction (not a registered resource) 27

28 SIBR UI Wheeling Hourly Components screen Registered resource 28

29 Go to Transaction ID Illustration document 29

30 Transaction ID 30

31 FMM Schedule Effective Intertie Transaction ID includes the primary tie information Effective Intertie will show which tie was used (primary or secondary, if applicable) 31

32 Changes are effective October 1, 2014 Required for new intertie resources Existing intertie resources should transition on the effective date above, however the mandatory transition date is April 1, 2015 Does not apply to resources that will be required to remain as registered intertie resources. 32

33 Activity 1 Modeling - Summary What will SC have to do different as a result of Activity 1? Provide transaction information for interties resources in SIBR Understand reporting changes in other applications What is importance of Activity 1 to the SC? More accurate modeling is a benefit for both reliability and settlement purposes Better outage coordination Reduce real-time congestion offset charges 33

34 Activity 2 Enforcing constraints Enforce constraints for both scheduled and physical flow

35 Full network model expansion: Activity 2 Activity 2 enforce constraints for both scheduled and physical flow on each intertie Current FNM only enforces scheduling constraint, but not physical constraint on each intertie Enforcing dual constraint Account for loop flow in the market solution Result in more accurate congestion management Lower congestion offset Page 35

36 Full network model expansion: Activity 2 Activity 2 accounting for loop flow Scheduled flow Modeled physical flow Provides counterflow in model Market model accounts for loop flow

37 Full network model expansion: Activity 2 Activity 2 enforce constraints for both scheduled and physical flow on each intertie Expanded FNM will enforce: A scheduling constraint based on the intertie declared in intertie bids against the operational limit of the intertie A physical constraint based on the modeled flows for an intertie taking into account the actual power flow contributions from all resource schedules in the FNM against the operational limit of the intertie NOTE: same operational limit of the specific intertie for both constraints Page 37

38 Full network model expansion: Activity 2 Scheduling vs. physical constraints Scheduling constraint Honors contract paths and used for tagging intertie schedules No shift factors Considers physical bids and virtual bids Energy schedules are netted but ancillary services are not Enforced against limit of each intertie Currently enforced Physical constraint Models physical flows from schedules Shift factors Considers physical and virtual bids Energy schedules are netted Enforced against limit of each intertie New Generally same limit Page 38

39 Activity 2 - Enforcing Constraints - Summary What is the importance of Activity 2 to the SC? May see price impact due to congestion on other interties because of modeling the external network and enforcing physical constraints Enforcing both scheduling and physical constraints will take loop flow into account in market solution; lower real-time costs Expect a decrease use of exceptional dispatch 39

40 Activity 3 HVDC modeling Include variables in high voltage direct current transmission modeling not part of this release. Will be discussed in future training.

41 E-Tagging Rules

42 E-Tagging rules The transaction ID will replace the resource ID on the e-tag If the tag is for the next day in the day-ahead market timeframe or the next hour (HASP hour) in the real-time timeframe and the transaction ID and the tag do not match, the tag will be automatically denied by the scheduling system. If the tag is for a future trading day/hour and the transaction ID in the tag doesn t match, the tag will be approved per NAESB deadlines for taking action on an e-tag. Later on it will be revalidated after the market has run for the time period the tag is submitted. The transaction ID in the tag will be validated against the most recent transaction ID payload. If at that time the transaction ID and the tag do not match, scheduling system will automatically adjust the e-tag to zero 42

43 E-Tagging rules In any validation process, if the transaction ID matches, the tag is accepted A tag without a transaction ID or without a (Master File defined) resource ID, will be automatically rejected 43

44 Settlements Impact

45 Settlements Scheduling point and intertie will both be considered in settlements This will be accounted for in the attributes of the formulas. Old Attribute Financial Node New Attributes APNode APNode type Intertie ID Pricing Node Because there is a one-to-one correspondence between scheduling point and the intertie, the above change will have minimal system configuration impact (Phase 1 only, existing scheduling points) 45

46 Pre-Implementation Analysis

47 Pre-implementation analysis Powerflow-based modeling assessment showing the difference between the current and expanded FNM modeling Will compare the modeled versus actual unscheduled flow for a set of representative days for COI Palo Verde Eldorado-Mead Victorville-Lugo Internal constraints September Board of Governors briefing 47

48 FNM Expansion Phase 1 THANK YOU FOR ATTENDING! Questions: MarketTraining@caiso.com

49 References 49

50 References and additional information Business Requirements Specification 46A52171-EF30-47FA-8A2D-78A8D51C07F5 Draft Final Proposal FullNetworkModelExpansion.pdf Tariff Amendment t_fullnetworkmodelexpansion_er pdf 50

Scheduling Infrastructure Business Rules (SIBR) User Interface (UI) Update

Scheduling Infrastructure Business Rules (SIBR) User Interface (UI) Update Scheduling Infrastructure Business Rules (SIBR) User Interface (UI) Update Heidi Carder Senior Client Trainer, Training & Readiness February 21, 2018 The information contained in these materials is provided

More information

Powerex EIM Implementation Informational Call. Mark Holman, Powerex Don Tretheway, California ISO October 3, 2017

Powerex EIM Implementation Informational Call. Mark Holman, Powerex Don Tretheway, California ISO October 3, 2017 Powerex EIM Implementation Informational Call Mark Holman, Powerex Don Tretheway, California ISO October 3, 2017 Agenda Time Topic Presenter 9:00 9:05 Introduction Kristina Osborne, ISO 9:05 10:05 Powerex

More information

Forced and Planned Outage Substitution, RAAIM Pre-Calc

Forced and Planned Outage Substitution, RAAIM Pre-Calc Forced and Planned Outage Substitution, RAAIM Pre-Calc RSI 2017 Training January 17, 2018 1:00PM The information contained in these materials is provided for general information only and does not constitute

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix M... 2 Dynamic Scheduling Protocol (DSP)... 2 1. DYNAMIC SCHEDULES OF IMPORTS TO THE CAISO BALANCING AUTHORITY AREA... 2 1.2 Contractual Relationships... 2 1.3 Communications,

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Energy Imbalance Market Technical Workshop. BAA Real-Time Congestion Balancing Account August 12, 2013

Energy Imbalance Market Technical Workshop. BAA Real-Time Congestion Balancing Account August 12, 2013 Energy Imbalance Technical Workshop BAA Real-Time Congestion Balancing Account August 12, 2013 Overview BAA Real-Time Congestion Balancing Account Real Time Convergence Bid Settlement Slide 2 BAA Real-Time

More information

Resource Adequacy Pre-Market Simulation Training Workshop

Resource Adequacy Pre-Market Simulation Training Workshop Resource Adequacy Pre-Market Simulation Training Workshop Focusing on the following initiatives: Reliability Services Initiative (RSI) Capacity Procurement Mechanism (CPM) Replacement October 21, 2015

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 17. Transmission Ownership Rights (TORs)... 2 17.1 TRTC Instructions... 2 17.1.1 Responsibility to Create TRTC Instructions... 2 17.1.2 TOR Scheduling Coordinator Responsibilities...

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately in congestion management procedures.

More information

EIM Entity Readiness Criteria May 6, 2015

EIM Entity Readiness Criteria May 6, 2015 EIM Entity Readiness Criteria May 6, 2015 FERC Directive Regarding Readiness Criteria We therefore direct CAISO to submit a compliance filing within 60 days of issuance of this order, to revise the EIM

More information

Business Practice Manual for Managing Full Network Model. Version 910

Business Practice Manual for Managing Full Network Model. Version 910 Business Practice Manual for Managing Full Network Model Version 910 Last Revised: September 7November 16, 2016 Approval History Approval Date: October 1, 2009 Effective Date: October 1, 2009 BPM Owner:

More information

Business Requirements Specification

Business Requirements Specification Business Requirements Specification EIM Enhancements Winter 2017 Page 1 of 46 Revision History Date Version Description 7/31/2017 1.0 Create Document 8/15/2017 1.1 Include ESDER 1C for 9 BRQs that identified

More information

BPM Proposed Revision Requests (PRR): Summary Report Attachment 2

BPM Proposed Revision Requests (PRR): Summary Report Attachment 2 Proposed Revision Requests (): Summary Report Attachment 2 TITLE Reliability Requirements TITLE 215 Details related to the Forbidden Operating Region (FOR) implementation 214 Tracking change for Scarcity

More information

Coordinate Interchange

Coordinate Interchange Coordinate Interchange Purpose: The purpose of this standard is to define procedures for market participants to request the implementation of Interchange Transactions. Applicability: This Standard applies

More information

Coordinate Interchange

Coordinate Interchange Coordinate Interchange Purpose: The purpose of this standard is to define procedures for market participants to request the implementation of Interchange Transactions. Applicability: This Standard applies

More information

RIMS: Transmission Implementation Module

RIMS: Transmission Implementation Module RIMS: Transmission Implementation Module Resource Interconnection Management System (RIMS) Functional Enhancements Radha Madrigal Training and Readiness February 13, 2018 The information contained in these

More information

Business Practice Manual for Managing Full Network Model. Version 1213

Business Practice Manual for Managing Full Network Model. Version 1213 Business Practice Manual for Managing Full Network Model Version 1213 Last Revised: January 3, 2018January 24, 2018 Approval History Approval Date: October 1, 2009 Effective Date: October 1, 2009 BPM Owner:

More information

Market Participant User Guide ISO Reliability Requirements Application (IRR UI)

Market Participant User Guide ISO Reliability Requirements Application (IRR UI) Market Participant User Guide ISO Reliability Requirements Application (IRR UI) Version 1 Last Revised: November 21, 2011 ISO Public 1 of 84 Table of Contents 1. Introduction... 5 1.1 Resource Adequacy

More information

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision

More information

October 30, Secretary. above. that. attached. Folsom, CA. 250 Outcropping Way

October 30, Secretary. above. that. attached. Folsom, CA. 250 Outcropping Way California Independent System Operator October 30, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent

More information

Release Notes. OASIS Fall 2015 Application Release Version 1.0

Release Notes. OASIS Fall 2015 Application Release Version 1.0 Release Notes OASIS Fall 2015 Application Release 6.8.0 Version 1.0 September 17, 2015 REVISION HISTORY VERSION NO. DATE DESCRIPTION 1.0 09/17/2015 Initial version Page 2 of 12 Release Identification Application/System

More information

_ Dear Secretary Bose: The attached. Folsom, CA

_ Dear Secretary Bose: The attached. Folsom, CA California Independent System Operator June 29, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1 OATT Attachment Q-1 First Revision of Page 1 ATTACHMENT Q-1 Dynamic Scheduling This attachment contains the eligibility requirements and the terms and conditions for the provision of dynamic scheduling

More information

Base Schedule Aggregation Portal (BSAP) Interface Specification for BSAP Services

Base Schedule Aggregation Portal (BSAP) Interface Specification for BSAP Services Base Schedule Aggregation Portal (BSAP) Interface Specification for BSAP Services (Business Rules v 9.x(Fall 2018) or later) Version: 1.4 December 5, 2018 Revision History Date Version By Description 1.4

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Emilee Plouff, Contract Negotiation and Regulatory Contracts Joanne Bradley, Queue Management March 6, 2018 Interconnection Process

More information

SIBR/BSAP SIBR/BSAP has both a UI and API that will reflect changes during the DST Transition from PST to PDT.

SIBR/BSAP SIBR/BSAP has both a UI and API that will reflect changes during the DST Transition from PST to PDT. Daylight Saving Time (DST) Short Day Information The ISO transition from PST (Pacific Standard Time) to PDT (Pacific Daylight Time) on Sunday, March 12 will impact both UIs (user interfaces) and APIs (Automated

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection

More information

bcuc British Columbia Utilities Commission

bcuc British Columbia Utilities Commission January 26, 2018 bcuc British Columbia Utilities Commission Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700

More information

Open Access Transmission Tariff of Southern Companies

Open Access Transmission Tariff of Southern Companies Open Access Transmission Tariff of Southern Companies Procedures for Reserving Transmission Capacity for Future Load Growth, Designating/Undesignating Network Resources, and Arranging for Other Related

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure No. Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/ Applicability... 2 2.1. Background... 2 2.2. Scope... 2 2.3. Applicability... 3 3. Detail... 3 3.1. Format and Security Protocols...

More information

Workshop on PJM ARR and FTR Market 2012/2013

Workshop on PJM ARR and FTR Market 2012/2013 Workshop on PJM ARR and FTR Market 2012/2013 www.pjm.com PJM 2012 1 Training Objectives At the completion of this training, you should be able to Understand the concepts and principles of Auction Revenue

More information

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission The following White Paper proposes a draft methodology for determining the incremental amount of transfer capability that would be the basis for the quantity of Merchant Transmission CRRs to be allocated

More information

March 15, 2011 VIA ELECTRONIC FILING

March 15, 2011 VIA ELECTRONIC FILING California Independent System Operator Corporation VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20246 Re: California

More information

Upper vs. Lower Case BTMG. Resource Adequacy Subcommittee October 11, 2017

Upper vs. Lower Case BTMG. Resource Adequacy Subcommittee October 11, 2017 Upper vs. Lower Case BTMG Resource Adequacy Subcommittee October 11, 2017 Purpose & Key Takeaways Purpose: Address issue assigned to RASC by SC: Define lower case btmg and/or criteria such as MW threshold

More information

WECC Criterion INT-001-WECC-CRT-3

WECC Criterion INT-001-WECC-CRT-3 WECC Criterion INT-001-WECC-CRT-3 A. Introduction 1. Title: e-tag Requirements for WECC including Wrongful Denial of Request for Interchange (RFI) 2. Number: INT-001-WECC-CRT-3 3. Purpose: To manage Arranged

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

Energy Storage and Distributed Energy Resources Phase 2. Customer Partnership Group March 27, p.m. 2 p.m. (Pacific Standard Time)

Energy Storage and Distributed Energy Resources Phase 2. Customer Partnership Group March 27, p.m. 2 p.m. (Pacific Standard Time) Energy Storage and Distributed Energy Resources Phase 2 Customer Partnership Group March 27, 2018 1 p.m. 2 p.m. (Pacific Standard Time) Agenda Item Project Schedule Update New Baseline Requests - Submittal

More information

Interface Specification for OASIS

Interface Specification for OASIS Version: 3.06 Date: 03/28/2011 Author: Arul Jayaraman Technical Lead Interface Specification for OASIS Version: 3.06 04/15/2011 Revision History Date Version Description Author May 30, 2006 July 14, 2006

More information

Customer Market Results Interface (CMRI) Interface Specification Fall 2016 Release

Customer Market Results Interface (CMRI) Interface Specification Fall 2016 Release Customer Market Results Interface (CMRI) Interface Specification Fall 2016 Release : 3.5.0 February 3, 2016 Revision History Date Description 10/23/2013 2.0 Initial document release related to the Spring

More information

Resource Adequacy Pre-Market Simulation Training and Settlements Workshop

Resource Adequacy Pre-Market Simulation Training and Settlements Workshop Resource Adequacy Pre-Market Simulation Training and Settlements Workshop Focusing on the following initiatives: Reliability Services Initiative (RSI) Capacity Procurement Mechanism (CPM) Replacement Commitment

More information

Joint Energy Scheduling System User s Guide. March 2018

Joint Energy Scheduling System User s Guide. March 2018 GUIDE 14 Joint Energy Scheduling System User s Guide March 2018 Version: 2.4 Effective Date: 03/15/2018 This document was prepared by: NYISO Stakeholder Services New York Independent System Operator 10

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

More information

MOD Transmission Reliability Margin Implementation Document

MOD Transmission Reliability Margin Implementation Document Transmission Margin Implementation Document Transmission Margin Implementation Document For NERC Page 1 of 7 Transmission Margin Implementation Document 1.0 Purpose The California Independent System Operator

More information

Standard Authorization Request Form

Standard Authorization Request Form Standard Authorization Request Form Title of Proposed Standard: Project 2009-02: Real-time Reliability Monitoring and Analysis Capabilities Original Request Date: June 4, 2009 Revised Date: January 15,

More information

Table of Contents. TOP TOP BA Data Request and Specification Guidelines. Operating Procedure

Table of Contents. TOP TOP BA Data Request and Specification Guidelines. Operating Procedure No. 3140 Table of Contents Purpose... 2 Responsibilities... 2 2. Scope/Applicability... 4 2.1 Background... 4 2.2 Scope / Applicability... 4 3. Detail... 5 3.1... 5 Introduction... 5 3.2 Data Specification

More information

NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION

NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION NARUC Energy Regulatory Partnership Program The Public Services Regulatory Commission of Armenia and The Iowa Utilities Board Janet Amick Senior Utility

More information

Settlement Files Publication Contingency Provisions

Settlement Files Publication Contingency Provisions Files Publication Contingency Provisions VERSION 2.0: AUGUST 30, 2016 Table of Contents 1 Introduction... 3 1.1 Revision History... 3 1.2 Related Documents... 3 1.3 Document Purpose and Scope... 3 2 Statement

More information

An Introduction to Network Codes & The Links Between Codes

An Introduction to Network Codes & The Links Between Codes An Introduction to Network Codes & The Links Between Codes April 2014 About ENTSO-E 41 TSOs from 34 countries 532 million citizens served 828 GW generation 305 Thousand Km of transmission lines Ten-Year

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 978 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE MP 1.1 Objective

More information

WECC Board of Directors. Approved Regional Criteria

WECC Board of Directors. Approved Regional Criteria Document name Category Document date July 29, 2010 Adopted/approved by WECC Interchange Authority Backup (WIAB) Regional Criterion ( ) Regional Reliability Standard (X) Regional Criterion ( ) Policy (

More information

Customer Market Results Interface (CMRI) Interface Specification Fall 2018Independent 2019 Release

Customer Market Results Interface (CMRI) Interface Specification Fall 2018Independent 2019 Release Customer Market Results Interface (CMRI) Interface Specification Fall 2018Independent 2019 Release : 3.8.12 September 6Feburary 6, 20182019 Revision History Date Description 10/23/2013 2.0 Initial document

More information

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call

More information

Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor

Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor May 10, 2017 ISAS Salt Lake City, UT WECC Standard TOP 007 WECC 1a Title: System Operating Limits Purpose: To limit instances where

More information

EXHIBIT A: PROJECT SCOPE AND SCHEDULE The Project consists of the activities and delivery dates identified in this Exhibit A, implemented in accordance with the Agreement. The Parties have included a schedule

More information

Business Practice Manual Change Management Meeting

Business Practice Manual Change Management Meeting Business Practice Manual Change Management Meeting Name Chris Kirsten Date May 24, 2011 Web Address: https://www.webmeeting.att.com Meeting Number: 5114682337 Access code: 9842446 Teleconference Dial-in

More information

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012 CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of

More information

Residual Auction Revenue Rights Enhancement

Residual Auction Revenue Rights Enhancement Residual Auction Revenue Rights Enhancement Brian Chmielewski Sr. Analyst, Market Simulation Department Markets and Reliability Committee December 22, 2016 Solution Package Overview - Package A Proposed

More information

Entergy Arkansas, Inc. Transition Plan Technical Conference #1

Entergy Arkansas, Inc. Transition Plan Technical Conference #1 Entergy Arkansas, Inc. Transition Plan Technical Conference #1 May 5, 2010 1 Why Technical Conferences? Complex subject matter Venue for stakeholders to develop an awareness and understanding of the issues

More information

Designation and Termination of Network Resources

Designation and Termination of Network Resources Transmission & Reliability Services Business Practice: Designation and Termination of Network Resources Posted: February 8, 2010 Effective: May 3, 2010 Revision No.: 5 1. Purpose The purpose of this business

More information

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure 1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the

More information

New Resource Implementation & Market Modeling

New Resource Implementation & Market Modeling New Resource Implementation & Market Modeling Resource Interconnection Fair February 24, 2016 Page 1 Topics Discuss the New Resource Implementation (NRI) process. Structure and timeline for any resource

More information

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California

More information

I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff)

I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff) I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff) * MISO will add the underlined text provided by the Owners Committee to Section 34.2 of the Tariff with

More information

Report Platform Migration

Report Platform Migration Systems Interface User Group (SIUG) Report Platform Migration Overview and Opportunities for Testing May 3, 2011 Report Platform Migration - Overview The California ISO is planning to release software

More information

Balancing Programme 1

Balancing Programme 1 Balancing Programme 1 CONTENTS CONTENTS... 22 DISCLAIMER... 33 1 INTRODUCTION... 44 2 BALANCING REGIME WITHIN THE BELUX AREA... 55 2.1 GENERAL PRINCIPLES OF MARKET-BASED BALANCING... 55 2.2 MARKET-BASED

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE

More information

Uninstructed Deviation Penalty Charge Types 4470, and 4480

Uninstructed Deviation Penalty Charge Types 4470, and 4480 Description Uninstructed Deviation Penalty Charge Types 4470, and 4480 This section of the Dispute Submittal Guide describes the information pertinent to charges for Uninstructed Deviation Penalties, specifically

More information

Demand Response User Guide DRRS Enhancement Market Simulation. Version 1.0 August 18, 2016

Demand Response User Guide DRRS Enhancement Market Simulation. Version 1.0 August 18, 2016 Demand Response User Guide DRRS Enhancement Market Simulation Version 1.0 August 18, 2016 Table of Contents INTRODUCTION... 5 Purpose... 5 Definitions... 6 DEMAND RESPONSE PROVIDER (DRP)... 10 Executing

More information

Agreements & Queue Management

Agreements & Queue Management Agreements & Queue Management Resource Interconnection Fair February 24, 2016 Page 1 Interconnection Process Map You are here Page 2 Topics 1. Generator Interconnection Agreement (GIA) 2. Affected Systems

More information

Business Practice. Non-Firm Transmission Service Request Processing

Business Practice. Non-Firm Transmission Service Request Processing Business Practice Non-Firm 1. General Policies 1.1 Transmission Service Reservation (TSR) priorities are established for Non-Firm pointto-point (PTP) transmission service in accordance with APS s Open

More information

Date of Data Refresh:

Date of Data Refresh: 4/2/18-4/8/18 4/9/18-4/15/18 4/16/18-4/22/18 4/23/18-4/29/18 4/30/18-5/6/18 8/13/18-8/19/18 8/20/18-8/26/18 8/27/18-9/2/18 9/3/18-9/9/18 Date of Data Refresh: 4/6/18 4:23 PM 5/7/18-5/13/18 5/14/18-5/20/18

More information

S90. SEMOpx Transitional Registration Guide DO NOT SEND BACK. Date: 17/05/2017 Document; Revision: 1.2

S90. SEMOpx Transitional Registration Guide DO NOT SEND BACK. Date: 17/05/2017 Document; Revision: 1.2 SEMOpx Transitional Registration Guide DO NOT SEND BACK Date: 17/05/2017 Document; Revision: 1.2 SEMOpx Transitional Registration Guide This document outlines the application requirements for existing

More information

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service Improvement and Power District Original Sheet No. F-1 ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service 1.0 This Form of Service Agreement for Wholesale Network

More information

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan Quarter 3, (Q3) Generation Deliverability Assessment Study Plan Background and Purpose of Study Phases I & II Generation and Import Deliverability Studies were completed that established the deliverability

More information

Wheeling Charge Exemptions Due to ETCs

Wheeling Charge Exemptions Due to ETCs Objective Wheeling Charge Exemptions Due to ETCs Process to notify the ISO of wheeling charge exemptions due to existing transmission contracts. Overview Wheeling charges are assessed to energy exported

More information

Energy Storage and Distributed Energy Resources Phase 2 Implementation

Energy Storage and Distributed Energy Resources Phase 2 Implementation Energy Storage and Distributed Energy Resources Phase 2 Implementation Customer Partnership Group January 29, 2018 1:00 p.m. 2:00 p.m. (Pacific Standard Time) Public Agenda Item Project Schedule Update

More information

Proposed Improvements for NERC MOD Standards July 10, 2012

Proposed Improvements for NERC MOD Standards July 10, 2012 Agenda Item 3.6 Planning Committee Meeting September 18-19, 2012 Proposed Improvements for NERC MOD Standards July 10, 2012 Background This paper outlines proposed improvements for NERC Reliability Standards

More information

Introduction to Generation Availability Data System (GADS) Wind Reporting

Introduction to Generation Availability Data System (GADS) Wind Reporting Introduction to Generation Availability Data System (GADS) Wind Reporting Registration and Reporting Fundamentals Donna Pratt, Performance Analysis Manager-Data Analytics NERC Webinar April 26, 2017 Topics

More information

Business Practice. 1.2 Resources must meet certain FERC specified requirements in order to qualify as Designated Network Resources.

Business Practice. 1.2 Resources must meet certain FERC specified requirements in order to qualify as Designated Network Resources. Business Practice 1. General 1.1 Primary Network Service is a long-term firm service and should only be used by Network Customers when reserving and scheduling delivery of energy from Designated Network

More information

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support TOP/IRO Standards RC Users Group January 21, 2016 Vic Howell Manager, Operations Engineering Support Saad Malik Manager, Real-Time Operations Engineering New/Revised TOP & IRO Standards November 19, 2015,

More information

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting Contingency Reserve Sharing; Ancillary Services Market Presented to the JCM Joint Stakeholder Meeting 1 Agenda Products and Nature of Current Services Contingency Reserve Sharing Group (CRSG) Agreement

More information

WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES

WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES Published: February 2018 IMPORTANT NOTICE Purpose The Australian Energy Market Operator has prepared this document to provide information about the Wholesale Electricity

More information

Outage Management System Customer Partnership Group. November 2017

Outage Management System Customer Partnership Group. November 2017 Outage Management System Customer Partnership Group November 2017 Customer Partnership Group Scope and Objective Created in response to customer s request to have more involvement in the planning, design

More information

Published: December 15, 2016 Revised: December 15, 2016

Published: December 15, 2016 Revised: December 15, 2016 Market Participant Guide: SPP 2017 Congestion Hedging Published: December 15, 2016 Revised: December 15, 2016 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion

More information

Introduction to the NYISO

Introduction to the NYISO Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the

More information

Published: December 15, 2017 Revised: December 15, 2017

Published: December 15, 2017 Revised: December 15, 2017 Market Participant Guide: SPP 2018 Congestion Hedging Published: December 15, 2017 Revised: December 15, 2017 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection

More information

SoCalGas ENVOY. Backbone Transportation Service User Guide

SoCalGas ENVOY. Backbone Transportation Service User Guide SoCalGas ENVOY Backbone Transportation Service User Guide TABLE OF CONTENTS 1 Introduction to Backbone Transportation Service... 3 2 My Contract Rights... 5 2.1 Navigating My Contract Rights... 5 3 Buy

More information

PHASE I ENERGY STORAGE: LESSONS LEARNED

PHASE I ENERGY STORAGE: LESSONS LEARNED PHASE I ENERGY STORAGE: LESSONS LEARNED ESAG Meeting, June 28, 2018 Innovation Research and Development Table of Contents 1. History and Background 2. Pre-Commissioning: Challenges experienced 3. Project

More information

Hetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process

Hetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process California Independent System Operator & Hetch Hetchy Water and Power of the City and County of San Francisco Joint Transmission Planning Base Case Preparation Process This is a living document. Please

More information

Small Hydro Regulatory and Permitting Requirements California

Small Hydro Regulatory and Permitting Requirements California Small Hydro Regulatory and Permitting Requirements California Lon W. House, Ph.D. 530.409.9702 Water & Energy Small Hydro Regulatory and Compliance FERC QF, Small Hydro License or Exemption EIA Generator

More information

Residual Auction Revenue Rights

Residual Auction Revenue Rights Residual Auction Revenue Rights Brian Chmielewski Sr. Analyst, Market Simulation Department Market Implementation Committee November 2, 2016 Overview Auction Revenue Rights (ARRs) prorated in Stage 1B

More information

Residual Auction Revenue Rights

Residual Auction Revenue Rights Residual Auction Revenue Rights Brian Chmielewski Sr. Analyst, Market Simulation Department Markets and Reliability Committee November 17, 2016 Overview Auction Revenue Rights (ARRs) prorated in Stage

More information

AC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland

AC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland The 8 th Electric Power Control Centers Workshop June 5-8, 2005, Les Diablerets, Switzerland Panel Session "Monitoring and Control of Large Interconnections under Normal and Emergency Operating Conditions"

More information

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Expanding Metering and Telemetry Options Technical Stakeholder Initiative Expanding Metering and Telemetry Options Technical Stakeholder Initiative April 24, 2013 Todays Agenda Time Topic Presenter 10:00 10:10 Opening Comments/Introductions Khaled Abdul-Rahman 10:10 10:20 Stakeholder

More information

Business Practice Manual Change Management Meeting

Business Practice Manual Change Management Meeting Business Practice Manual Change Management Meeting Name Chris Kirsten Date February 26, 2013 Web Address: https://www.webmeeting.att.com Meeting Number: 5114682337 Access code: 9842446 Teleconference Dial-in

More information

WECC Criterion INT-001-WECC-CRT-2.13

WECC Criterion INT-001-WECC-CRT-2.13 WECC Criterion INT-001-WECC-CRT-2.13 A. Introduction 1. Title: e-tag Requirements for WECC including Wrongful Denial and Loss of Communication ProceduresRequest for Interchange (RFI) 2. Number: INT-001-WECC-CRT-2.13

More information

Peak Reliability Coordination Services in the West March 30, 2018

Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability, 2018. 1 Peak Reliability Coordination Services in the West Peak s fundamental mission is to enhance and promote the reliability

More information