Roads Proposed for Decommisioning

Size: px
Start display at page:

Download "Roads Proposed for Decommisioning"

Transcription

1 N N N Agg Agg Closed w/ EB; bridge at West Cr removed; no haul planned but rd accesses deferred stand 105, 17 acres, 1991 plantation; recommend decom; replacing str crossing may be prohibitive for one stand; pvt land owner in sect25 has road use permit in place; coordinate w/ land owner Road naturally decoming itself, although no EB; no mapped or observed managed stands; recommend KV plan for decom; EB only Road naturally decoming itself, although no EB; no stands in this analysis and no stands observed along road; recommend KV plan for decom MP 0.3 N Agg This segment starts at MP 0.3, just north of stand 142 and goes to end of rd at 1004; no managed stands; parallels upper reach of Farmer Ck; no stream crossings; plan to decom N N N N N Agg Nat Nat Nat Nat Not planned for haul w/ this analysis; no observed or mapped managed stands along rd; no future need for management; two stream crossings w/ pipes recommended to remove crossings; not future need for management crossings; no future need for management crossings; no future need for management crossings; no future need for management MP 2.97 N MP 0.25 N N MP 0.6 N N Nat This segment starts at south end of stand 211, approx MP 2.97 and goes to end of rd at pvt bdry; not needed for future mngmt; rd is nat surface and has drained poorly in past; stable now; gentle grades; recommend KV decom Agg Y This segment of rd starts at NF bdry (MP 0.25) and goes to end of rd at borrow pit; pit not needed; access to offsite stand 8; KV decom this segment Agg No haul planned; no mapped stands accessed; no streams; recommend decom Agg 0.40 DE This segment of rd starts at east edge of stand 311 or approx MP 0.6 and goes to end of rd; no streams; no mapped stand accessed; recommend decom Agg 0.10 DE Short benign rd; no managed stands accessed; no streams; recommend decom - Inventoried Roadles Area

2 N N N N N N N Agg Does not access mapped managed stands; no streams; would need re-opened to pull DR cmp and stabilze; evaluate on-ground needs during implementation Agg Road barricaded w/ old style barricade; re-do barricade w/ decom; rd does not access mapped managed stands; no streams; propose decom No access to mapped managed stands; no streams; recommend KV decom Agg No access to mapped managed stands; no streams; recommend KV decom Agg 0.30 DE Agg 0.30 DE Agg Road bermed closed; no access to mapped managed stands; no streams; recommend decom Road bermed closed; no access to mapped managed stands; no streams; recommend decom No accesses to mapped, managed stands; very short brushed over rd; no on ground decom work needed; passive decom; no streams MP 0.1 N Agg 0.20 DE This segment starts at approx MP 0.1; no haul planned; possible access for further treatment of thinning in a natural stands; check w/ silv; if no trtmt, recommend decom this segment starting just past stand 295; ; no streams N N N N Agg 0.29 DE No access to mapped stand; possible access to thinned natural stand; plan to decom if no further mngmt needs; no streams Agg No mapped managed stands accessed; decom w/ 127 rd during implementation; no streams Agg No access to managed stands; no streams; propose KV decom Agg Y No streams; accesses offsite stand; propose for KV decom after South Nestucca Sale harvest of managed stand N Agg 0.47 DE Y Accesses SAAT Unit 7, two str pipes for removal; recommend decom after South Nestucca Sale Harvest of managed stands N Agg 0.23 DE Y Accesses SAAT units 6 & 7; recommend decom after South Nestucca Sale harvest of managed stands N Agg 0.09 DE Y Accesses SAAT Unit 7, recommend decom after South Nestucca Sale Harvest of managed stands MP 0.2 N Agg This segment starts at 160 jct and goes to end of rd; not needed for access to stand 369; plan to KV decom rd; one stream cmp to remove Hydro - Inventoried Roadles Area

3 N N Agg Does not access mapped or observed stand; plan to KV decom; no streams Agg Does not access mapped or observed stand; plan to KV decom MP 3.3 N Agg This segment starts at MP 3.3 (s. end of stand 413) from rd 1400 and goes to the end of rd; no access to managed stands; 7 str pipes recommended for removal; rd on bdry Hydro/Fish N Road does not exist; was not located on ground or on 1989 air photo; believe this is a mapping error and road recommendation is office exercise of removing from system/data base GIS N N N Agg Y Two carsonite route markers found, both for ; first location is the one mapped, second road location accesses stand 309; recommend decom #1 location as a temp rd since it does not access managed stand; second location keep as 113 which accesses stand 309 and is inside Mt Hebo, mngmt of stand may be deferred due to ; possible access to pvt; not likely or confirmed Agg No access to managed stands; propose decom; no streams No access to managed stands; propose decom; no streams; decom w/ 114 rd N N N Agg Difficult to locate on grd; very grown over; no access to managed stand; decom w/ no ground work needed Difficult to locate on grd; very grown over; no access to managed stand; no access to pvt land due east; decom w/ no ground work needed; rd inside Mt Hebo ; possible access to pvt; not likely or confirmed Difficult to locate on grd; very grown over; no access to managed stand; decom w/ minimum work needed; KV decom w/ EB N N Agg 0.93 DE No haul planned; access to deferred stand 275 which is inside ; rd has two IS cmps;ok storage, remove w/ decom; some minor fill failures along rd Agg Does not access managed stands; no streams; on boundary; propose KV decom - Inventoried Roadles Area

4 Hwy 22 Y Agg Stored road w/ several failed bridges and road failure; geo-tech report on file; accesses approx 1 ac of pvt land; land owner has easement across NF lands; rd accesses stand 341 north of pvt land; potential to extend 1410 rd to access stand 341; issues are pvt land access needs and removal, stabilization of bridges and road fills; plan to decom last one mile of rd from section 35 pvt land bdry north to the end; ID team would like bridges removed on all portion of the road (stored and decomed); pipe count is estimated N Approx 250' long; blocked w/ single EB; doesn't access managed stand; recommed take road off system; not needed for future management; no on the ground work necessary N Agg Road to Battle Lake; road closed in 2010 including pulling pipes; deferred treatment stand 48 is along rd N Agg Deferred stand 51 at end of this rd, mostly alder; this rd is off of rd 117 which was closed in 2010; no streams; saw one DR pipe that may need pulling w/ decom N Road does not access any managed stands; upper ridgetop location w/ one seep crossing; fairly stable; ends at 140% slopes; decom w/ barricade and waterbars N Agg This segment of road starts at 83 junction, and goes to the east edge of stand 92; has one stream crossing; gentle grades, but doesn't access any managed lands; recommend decom w/ EB and water bars MP 2.0 N Agg This segment of rd begins at west end of stand 143, at hairpin corner in rd, and goes to the end of rd; there are no managed stands on this segment or the tributary 117 rd; stable flat grades on ridge location w/ no streams; plan to decom w/ barricade and water bars Jct 113 N Agg This segment starts at 113 jct and goes to end of rd; currently blocked by old style EB that should be replaced; rd sgmt has a failed stream crossing; fill 95% washed away; no managed stands along this portion of rd; plan to decom w/ pipe removals, rd stabilizing and water bars; video of washout available Hydro/Fish N Agg No managed stands along rd; plan to KV decom w/ barricade; low priority for waterbars; flat ridgetop location N Agg Road was built but no stand ever managed along road; road to nowhere; changed beginning termini to 122 from 8376 since rd 122 is needed for long-term management; 123 has two stream pipes and a few DR pipes for removal; KV decom - Inventoried Roadles Area

5 N N N Agg Road built; never used; no managed stands; KV decom; no pipes to remove; install EB Agg Road built; never used; no managed stands; number doesn't show up on maps, but 126 takes off from 125 rd; KV decom; no pipes to remove Road currently closed w/ EB (changed INFRA from OPML 2 to OPML 1); no managed stands along rd; plan to KV decom N MP 0.32 N MP N N Agg Agg Agg Could not find road; believe it does not exist; stub rd in section 23, south of 8376, just west of 136 jct; according to maps anyway; Update INFRA; no on the ground work needed This segment of road starts at the 117 jct and goes to end of rd; no mapped or observed managed stands; plan to KV decom; no streams This segment of road starts at MP 0.29 (second temp rd left) and goes to end of rd; no mapped or observed managed stands; plan to decom; no str Natural stand along rd; no future use of nat stand mngmt per silv ; no streams; a few DR cmps; plan to decom N Nat Short road (600') built to access rock/borrow pit; doesn't access stand 265 as map indicates; does not access any managed stand; pit not needed; plan to decom w/ EB MP 0.4 N N N Nat Agg 0.93 DE This segment of road starts at approx MP 0.4 or at s. edge of stand 206; road is very brushed in but has one stream pipe that should be removed; this segment does not access any managed stands and parallels Niagara Creek; old bridge is soon to fall into creek; also decom temp road w/ stream pipes on the far side of the bridge; all decom activity might be coordinated w/ fisheries planned instream placement of logs Does not access any mapped or observed managed stands; built, never used; gentle grades; grassy; EB only for decom activity No stands planned for haul w/ this analysis; rd accesses stand 049, deferrred; valley bottom rd w/ 5 stream pipes and several DR pipes recommended to remove w/ decom; OHV use is evident; rd blocked by large down log at MP 0.47 Wild/Fish/H ydro/geo/h eritage - Inventoried Roadles Area

6 MP 0.46 N N MP 1.96 N This segment of rd starts at the south end of stand 210 (approx MP 0.46) and goes to the end of the rd; no managed stands along this segment; rd has slumped; has sidecast fill Agg failure, cut bank failure and one DR cmp; rd would need re-built to remove cmp w/ decom; recommend leave for nat decom; consequence of continued failure minimal Does not access any managed stands; no streams; minimal decom work needed Agg 1.34 DE This segment starts at MP 1.96 or just s. of stand 214, at sight of last stream cmp or just beyond where there is a decent truck turn around; no mapped managed stands, two 70's vintage thinned stands; not needed for future mngmt Hydro/Geo Totals Inventoried Roadles Area

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax: ENVIRONMENTAL QUESTIONNAIRE City of Twentynine Palms Community Development Department 6136 Adobe Road Twentynine Palms, CA 92277 (760) 367-6799 Fax (760) 367-5400 29palms.org : Please complete each statement

More information

PREMIER DATA CENTER OPPORTUNITY ±64.31 ACRES OF LAND ENGLER BLVD AND HWY 212 Chaska, MN 55318

PREMIER DATA CENTER OPPORTUNITY ±64.31 ACRES OF LAND ENGLER BLVD AND HWY 212 Chaska, MN 55318 -$2.50/GROSS SF CLOVER PRESERVE DR PROPERTY HIGHLIGHTS + + Preliminary plat approved. Data center site, shovel ready + + 25MW service to the site via adjacent, double-ended substation with multiple feeds

More information

What is a Topographic Map?

What is a Topographic Map? Topographic Maps Topography From Greek topos, place and grapho, write the study of surface shape and features of the Earth and other planetary bodies. Depiction in maps. Person whom makes maps is called

More information

SALE LEASE CALL CENTER

SALE LEASE CALL CENTER SALE LEASE CALL CENTER 3500 Reynolds Road, Lakeland, FL 33803 PROPERTY HIGHLIGHTS 53,151 SF AVAILABLE CONFIGURED FOR BACK UP GENERATOR FIBER OPTIC CONNECTED WIRED FOR CALL CENTER 300 CUBICLES ON-SITE AMPLE

More information

APPENDIX A ASSESSMENT PROTOCOL

APPENDIX A ASSESSMENT PROTOCOL APPENDIX A ASSESSMENT PROTOCOL Stream segment Date River miles (from/to) A. Channel assessment A1. Current active/wet channel Degradation Revetment RIVER CORRIDOR ASSESSMENT SHEET 1 to 2.9 Severely Degraded

More information

Reconnaissance and Surveillance Leader s Course Map Reading self study worksheet (Tenino, Washington Map)

Reconnaissance and Surveillance Leader s Course Map Reading self study worksheet (Tenino, Washington Map) Reconnaissance and Surveillance Leader s Course Map Reading self study worksheet (Tenino, Washington Map) General Knowledge 1. Name the five Basic Colors on a map and what they represent? 1. 2. 3. 4. 5.

More information

Delineating the Stream Network and Watersheds of the Guadalupe Basin

Delineating the Stream Network and Watersheds of the Guadalupe Basin Delineating the Stream Network and Watersheds of the Guadalupe Basin Francisco Olivera Department of Civil Engineering Texas A&M University Srikanth Koka Department of Civil Engineering Texas A&M University

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 CERTIFICATE SHEET DCB

More information

Lab 2. Practice with ArcGIS

Lab 2. Practice with ArcGIS Lab 2. Practice with ArcGIS Purpose: To practice map composition and printing in ArcGIS To Do and Hand In: Compose, print, and hand in two maps, described below. Maps due in lab one week after assignment.

More information

±19.92 ACRES MIXED USE ZONED LAND SENECA & N. VIRGINIA, RENO, NV 89506

±19.92 ACRES MIXED USE ZONED LAND SENECA & N. VIRGINIA, RENO, NV 89506 MIXED USE ZONED LAND SENECA & N. VIRGINIA, STEAD BLVD. Lemmon Valleys Shopping Center Submarket: Per EDAWN s EPIC Report, the North Reno submarket is set to experience growth of ±8,054 people and ±4,932

More information

Channel Conditions in the Onion Creek Watershed. Integrating High Resolution Elevation Data in Flood Forecasting

Channel Conditions in the Onion Creek Watershed. Integrating High Resolution Elevation Data in Flood Forecasting Channel Conditions in the Onion Creek Watershed Integrating High Resolution Elevation Data in Flood Forecasting Lukas Godbout GIS in Water Resources CE394K Fall 2016 Introduction Motivation Flooding is

More information

George Mason University Department of Civil, Environmental and Infrastructure Engineering. Dr. Celso Ferreira Prepared by Lora Baumgartner

George Mason University Department of Civil, Environmental and Infrastructure Engineering. Dr. Celso Ferreira Prepared by Lora Baumgartner George Mason University Department of Civil, Environmental and Infrastructure Engineering Dr. Celso Ferreira Prepared by Lora Baumgartner Exercise Topic: Getting started with HEC RAS Objective: Create

More information

APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE:

APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE: APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE: New 240 kv Montana Alberta Tie Ltd. (MATL) Substation 120S and Reconfigure 240kV Transmission Line 923L AltaLink Management Ltd. 2611 3 rd

More information

(TSZ) 4: 5: 6: 7: : 9: 10: 11: (2030 AM

(TSZ) 4: 5: 6: 7: : 9: 10: 11: (2030 AM APPENDIX A: Maps Figure 1: Corridor Improvement Map Figure 2: Project Location Map Figure 3: FEMA Floodplain and USGS Quadrangle Maps Figure 4: Tree Removal Maps Figure 5: Mobile Source Air Toxics (MSAT)

More information

BASIC MATHEMATICS FOR CADASTRAL MAPPING

BASIC MATHEMATICS FOR CADASTRAL MAPPING BASIC MATHEMATICS FOR CADASTRAL MAPPING Chapter 5 2015 Cadastral Mapping Manual 5-1 Introduction Data which a mapper must use to solve problems comes from a myriad of sources both new and old. The general

More information

Redboat RMP Alternative 2 Timber Harvest and Road Development Map 1

Redboat RMP Alternative 2 Timber Harvest and Road Development Map 1 0 -D -A -G -D -D -C -D -F -E -C -C 0 0-J 0-H 0-J -G -D 0 0-C 0 0 0 0 0 0 0 0 0 0 0 0 Heart Elbow 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Mishike 0 Plymouth 0 0 Compiled by the Ottawa NF on // using the most current

More information

Q44 Generation Interconnection

Q44 Generation Interconnection A subsidiary of Pinnacle West Capital Corporation Q44 Generation Interconnection Interconnection Facilities Study APS Contract No. 52129 By Arizona Public Service Company Transmission Planning August 19,

More information

Welcome. Metro North Transmission Project Vancouver Community Information Open House March 9, About the Metro North Transmission Project

Welcome. Metro North Transmission Project Vancouver Community Information Open House March 9, About the Metro North Transmission Project Welcome Metro North Transmission Project Vancouver Community Information Open House March 9, 207 Thank you for attending this Community Information Open House about the Metro North Transmission Project.

More information

Wireless Telecommunication Facility. Project Narrative

Wireless Telecommunication Facility. Project Narrative Wireless Telecommunication Facility Project Narrative Applicant: Owner: Rep.: 2785 Mitchell Drive Walnut Creek, CA 94598 Southern California Joint Pole Committee 279 E. Arrow Hwy, Ste. 104 San Dimas, CA

More information

LIST OF AMENDMENTS TO ZONING BYLAW NO. 801, 1999

LIST OF AMENDMENTS TO ZONING BYLAW NO. 801, 1999 LIST OF AMENDMENTS TO ZONING BYLAW NO. 801, 1999 Bylaw Amendment 826 Lot B, DL. 31, Plan 26227 257 Hwy. 97 South Add craft & souvenir sales including fabric sales & business office as a principal permitted

More information

PLSS 3 MILE RULE SUBDIVISION OF. Warm Springs Indian Reservation

PLSS 3 MILE RULE SUBDIVISION OF. Warm Springs Indian Reservation CASE STUDY PLSS 3 MILE RULE SUBDIVISION OF SECTIONS (INDIAN LANDS) Warm Springs Indian Reservation OR.Searching for 100+ Year Old Sticks and Stones with Autocad and dsurvey Grade GPS Equipment Warm Springs

More information

AutoCAD Civil 3D 2010 Education Curriculum Instructor Guide Unit 4: Environmental Design

AutoCAD Civil 3D 2010 Education Curriculum Instructor Guide Unit 4: Environmental Design AutoCAD Civil 3D 2010 Education Curriculum Instructor Guide Unit 4: Environmental Design Lesson 2 Watershed Analysis Overview In this lesson, you learn about how AutoCAD Civil 3D software is used to analyze

More information

COMMERCIAL SITE AT GENERATION PARK

COMMERCIAL SITE AT GENERATION PARK COMMERCIAL SITE AT GENERATION PARK 77.9 Acre Site on Lockwood Road Generation Park Location Map Close Proximity to Major Destinations & Transportation Corridors Generation Park Features 4,000-acre master-planned

More information

MSVE CTMP - APPENDIX 3 SITE ACCESS POINTS & TRAFFIC ROUTES

MSVE CTMP - APPENDIX 3 SITE ACCESS POINTS & TRAFFIC ROUTES MSVE LT19 KNOCKNAGAEL TOMATIN 275KV REINFORCEMENT OVERHEAD LINE CTMP - APPENDIX 3 SITE ACCESS POINTS & TRAFFIC ROUTES CLIENT Management System Plan LT19-CTMP-A3 CTMP Appendix 3 - Site Access Points & Traffic

More information

±41.56 ACRES RESIDENTIAL LAND SENECA & N. VIRGINIA, RENO, NV 89506

±41.56 ACRES RESIDENTIAL LAND SENECA & N. VIRGINIA, RENO, NV 89506 RESIDENTIAL LAND SENECA & N. VIRGINIA, STEAD BLVD. Lemmon Valleys Shopping Center North Valleys Commerce Center 1.4MM Marys Gone Crackers, Exxel Outdoors Walmart Supercenter LEMMON DR N VIRGINIA LogistiCenter

More information

CABLE AMPACITY PROGRAM (CYMECAP) STUDY: MANHOLE Prepared by

CABLE AMPACITY PROGRAM (CYMECAP) STUDY: MANHOLE Prepared by CABLE AMPACITY PROGRAM (CYMECAP) STUDY: MANHOLE 2445 Prepared by BC HYDRO AUGUST 2008 Table of Contents Background... 2 Ductbank on South West... 3 Ampacities at Maximum... 3 at Recent Maximum Demands...

More information

March 4, Billy and Amber Lyons Lyons Car Wash 8601 J.B. Baxley Rd. #40 Benton, AR RE: AFIN: Permit No.

March 4, Billy and Amber Lyons Lyons Car Wash 8601 J.B. Baxley Rd. #40 Benton, AR RE: AFIN: Permit No. March 4, 2009 Billy and Amber Lyons Lyons Car Wash 8601 J.B. Baxley Rd. #40 Benton, AR 72015 RE: AFIN: 63-00519 Permit No.: 4814-WG-CW Dear Mr. and Mrs. Lyons: On February 6, 2009, I performed a routine

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

Automated Enforcement of High Resolution Terrain Models April 21, Brian K. Gelder, PhD Associate Scientist Iowa State University

Automated Enforcement of High Resolution Terrain Models April 21, Brian K. Gelder, PhD Associate Scientist Iowa State University Automated Enforcement of High Resolution Terrain Models April 21, 2015 Brian K. Gelder, PhD Associate Scientist Iowa State University Problem Statement High resolution digital elevation models (DEMs) should

More information

Appendix C.6. Best Management Practices for Construction Activities

Appendix C.6. Best Management Practices for Construction Activities Appendix C.6 Best Management Practices for Construction Activities In accordance with Section F.2 of San Diego Regional Water Quality Control Board (RWQCB) Order 2001-01 (Permit), the City of La Mesa has

More information

WMS 10.1 Tutorial Hydraulics and Floodplain Modeling HEC-RAS Analysis Learn how to setup a basic HEC-RAS analysis using WMS

WMS 10.1 Tutorial Hydraulics and Floodplain Modeling HEC-RAS Analysis Learn how to setup a basic HEC-RAS analysis using WMS v. 10.1 WMS 10.1 Tutorial Hydraulics and Floodplain Modeling HEC-RAS Analysis Learn how to setup a basic HEC-RAS analysis using WMS Objectives Learn how to build cross sections, stream centerlines, and

More information

WMS 9.0 Tutorial Hydraulics and Floodplain Modeling HEC-RAS Analysis Learn how to setup a basic HEC-RAS analysis using WMS

WMS 9.0 Tutorial Hydraulics and Floodplain Modeling HEC-RAS Analysis Learn how to setup a basic HEC-RAS analysis using WMS v. 9.0 WMS 9.0 Tutorial Hydraulics and Floodplain Modeling HEC-RAS Analysis Learn how to setup a basic HEC-RAS analysis using WMS Objectives Learn how to build cross sections, stream centerlines, and bank

More information

Appendix A Existing Surface Utilities

Appendix A Existing Surface Utilities Appendix A Existing Surface Utilities PRELIMINARY INFRASTRUCTURE STUDY PROPOSED DUSEL SITE GILES COUNTY, VIRGINIA Prepared for: Kimballton Deep Underground Science and Engineering Laboratory Kimballton

More information

User Manual. For Geographical Information System. Last Updated: 1-July-2013 Document No. : - 1 Document version: - 1

User Manual. For Geographical Information System. Last Updated: 1-July-2013 Document No. : - 1 Document version: - 1 User Manual For Geographical Information System Client: Department of Mines and GIS Government of Karnataka Last Updated: 1-July-2013 Document No. : - 1 Document version: - 1 (Geographical Information

More information

2. AREAL PHOTOGRAPHS, SATELLITE IMAGES, & TOPOGRAPHIC MAPS

2. AREAL PHOTOGRAPHS, SATELLITE IMAGES, & TOPOGRAPHIC MAPS LAST NAME (ALL IN CAPS): FIRST NAME: 2. AREAL PHOTOGRAPHS, SATELLITE IMAGES, & TOPOGRAPHIC MAPS Instructions: Refer to Exercise 3 in your Lab Manual on pages 47-64 to answer the questions in this work

More information

CHAPTER 01 Basics of Surveying

CHAPTER 01 Basics of Surveying CHAPTER 01 Basics of Surveying 1.1 How do plane surveys and geodetic surveys differ? Plane surveying assumes all horizontal measurements are taken on a single plane and all vertical measurements are relative

More information

Planning: Administrative Permits Instructions

Planning: Administrative Permits Instructions Building and Development Services Department 1112 Manatee Ave West, Suite 408 Bradenton, FL 34205 Phone: (941) 749-3012 ManateeBADSOnline@mymanatee.org www.mymanatee.org Planning: Administrative Permits

More information

Understanding Geospatial Data Models

Understanding Geospatial Data Models Understanding Geospatial Data Models 1 A geospatial data model is a formal means of representing spatially referenced information. It is a simplified view of physical entities and a conceptualization of

More information

This guide will tell you all you need to know about the new Front Desk application which can be found on the main Peoria County GIS website.

This guide will tell you all you need to know about the new Front Desk application which can be found on the main Peoria County GIS website. New Front Desk Quick Guide, 2014 At a First Glance This guide will tell you all you need to know about the new Front Desk application which can be found on the main Peoria County GIS website. When you

More information

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801 GORE BUILDING 238 N. Massachusetts Avenue, Lakeland, FL 33801 CDB LOCATION REDEVELOPMENT PROJECT MUNN PARK HISTORIC DISTRICT INCENTIVES AVAILABLE ADJACENT PARKING INCLUDED BK698301 Phone: (863) 683-3425

More information

Web-Distributed, Geo-temporal, Integrated Information Systems The Apache County Experience

Web-Distributed, Geo-temporal, Integrated Information Systems The Apache County Experience Web-Distributed, Geo-temporal, Integrated Information Systems The Apache County Experience Josephine R. Wyman Chief Executive Paphun Wangmutitakul Principal Programmer Max M. Wyman, Ph.D. Principal Scientist

More information

Information Technology Community Involvement

Information Technology Community Involvement Information Technology Community Involvement Tom Hoover Associate Vice Chancellor Helping students achieve through technology Information Technology at the University of Tennessee Chattanooga is focused

More information

TSR A & B - FACILITIES STUDY REPORT

TSR A & B - FACILITIES STUDY REPORT TSR-11-0502A & B - FACILITIES STUDY REPORT Transmission Service Request No. TSR-11-0502A&B 2 x 25 MW Wind Energy Generating Facilities From POI on Gladstone Walsenburg 230 kv Line to Ojo Substation 345

More information

City Of Niagara Falls, NY SPRING RFP Brochure Buffalo Avenue and 8411 Troy Avenue

City Of Niagara Falls, NY SPRING RFP Brochure Buffalo Avenue and 8411 Troy Avenue RFP Brochure 8450 nue and 8411 Troy Avenue The City of Niagara Falls is seeking competitive development proposals for the site of the former Wendt s Dairy property Message from the Mayor Dear Developer,

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 12, 2015 DATE: December 1, 2015 SUBJECT: SP-84-U-15-1 USE PERMIT ASSOCIATED WITH A SITE PLAN for a telecommunications facility; located

More information

37 SOUTH LAKESIDE OFFICE PARK

37 SOUTH LAKESIDE OFFICE PARK 4705 S. Old Hwy 37, Lakeland, Fl 33813 PROPERTY HIGHLIGHTS FREESTANDING OFFICES SOUTH LAKELAND 5,000 SF AVAILABLE RECENTLY REMODELED MATURE, SERENE LANDSCAPING AMPLE ON-SITE PARKING SIX ACRE OFFICE PARK

More information

- Freehaul: Distance with which there is a fixed price for excavating, hauling, and dumping regardless of the distance moved.

- Freehaul: Distance with which there is a fixed price for excavating, hauling, and dumping regardless of the distance moved. mp UFreehaul, Overhaul, and Mass Haul Diagram: Normally, cost of excavation includes; cost of transporting of material (unwanted soil) from either cut or fill for a maximum distance called the Ufreehaul

More information

MLEP Intermediate GPS Workshop Exercise Two Using Maps

MLEP Intermediate GPS Workshop Exercise Two Using Maps During this exercise, you will scale coordinates from a map and enter them into the GPS receiver. This requires a ruler (provided) and all calculations require a paper and pencil. During this exercise,

More information

I-4 DISTRIBUTION WAREHOUSE

I-4 DISTRIBUTION WAREHOUSE The Perfect I-4 Location To Serve The Central Florida Market 4343 North Frontage Road, Lakeland, Florida Interior 112,000 DAILY I-4 TRAFFIC (2017) TAMPA SITE LAKELAND ORLANDO PROPERTY HIGHLIGHTS 22,130

More information

LD20493 From AutoCAD Civil 3D to Storm and Sanitary Analysis - Pond Design Using Volume-Grading Tools

LD20493 From AutoCAD Civil 3D to Storm and Sanitary Analysis - Pond Design Using Volume-Grading Tools LD20493 From AutoCAD Civil 3D to Storm and Sanitary Analysis - Pond Design Using Volume-Grading Tools Kevin Larkin LSC Design, Inc. Learning Objectives Learn how to dynamically model stormwater ponds using

More information

Understanding Topographic Maps

Understanding Topographic Maps Understanding Topographic Maps 1. Every point on a contour line represents the exact same elevation (remember the glass inserted into the mountain). As a result of this every contour line must eventually

More information

GREEN VALLEY LAWN CARE & SNOW PLOW JOLIET, IL SITE MOWING PRICE (PER YEAR) MAINT. PRICE (PER YEAR)

GREEN VALLEY LAWN CARE & SNOW PLOW JOLIET, IL SITE MOWING PRICE (PER YEAR) MAINT. PRICE (PER YEAR) ULATION CITY OF JOLIET - DEPARTMENT OF PUBLIC UTILITIES PROJECT: 2017 LAWN MOWING SERVICES - UTILITIES ENGINEER'S ESTIMATE - 2017: $ 55,000.00 BIDS OPENED: March 14, 2017, at 9:45 A.M. LOCATION: 150 W.

More information

Lheidli T enneh Final Agreement. Lands

Lheidli T enneh Final Agreement. Lands Lheidli T enneh Final Agreement Lands Introduction Treaty Components Self-government Lands Resources Fiscal Relationship Lands: Introduction 2000 Lands selection strategy 2003 AIP lands package - rural

More information

P. O. Box 52025, MS POB100 Phoenix, Arizona (602) Feb 9, 2018

P. O. Box 52025, MS POB100 Phoenix, Arizona (602) Feb 9, 2018 P. O. Box 52025, MS POB100 Phoenix, Arizona 85072-2025 (602) 236-8788 philip.augustin@srpnet.com Feb 9, 2018 Peter Mackin Chair, WECC Studies Subcommittee Utility System Efficiencies, Inc. Phone: (916)

More information

New Features The new CBA site features a number of improvements over the previous incarnation of the site:

New Features The new CBA site features a number of improvements over the previous incarnation of the site: New Features The new CBA site features a number of improvements over the previous incarnation of the site: Optimized Work Stream: Features, functions and activities of the site have been centralized into

More information

NEWPORT BUSINESS PARK

NEWPORT BUSINESS PARK LOCATION MAP FOR LEASE NORTH NEWPORT ROAD Platte Ave. Academy Blvd. Powers Blvd. Peterson AFB Airport Rd. CONTACT US Fountain Blvd. -1090 N. NEWPORT RD. Powers Blvd. COS Airport OPPORTUNITY OVERVIEW Class

More information

Exhibit 25.A. June 2, [First Name] [Last Name] [Suffix] [Address_1] [Address_2] [City], [State] [Zip]

Exhibit 25.A. June 2, [First Name] [Last Name] [Suffix] [Address_1] [Address_2] [City], [State] [Zip] June 2, 2017 [First Name] [Last Name] [Suffix] [Address_1] [Address_2] [City], [State] [Zip] Application of Pedernales Electric Cooperative, Inc. to Amend its Certificate of Convenience and Necessity for

More information

Treasure Map. Output. Output a single integer, which is the maximum amount of gold that you can collect.

Treasure Map. Output. Output a single integer, which is the maximum amount of gold that you can collect. Treasure Map You have found a treasure map! The map leads you to several gold mines. The mines each produce gold each day, but the amount of gold that they produce diminishes each day. There are paths

More information

Solving Problems with Similar Triangles

Solving Problems with Similar Triangles Solving Problems with Similar Triangles xample 1: Given that lines and are parallel in the figure to the right, determine the value of x, the distance between points and. Solution: First, we can demonstrate

More information

Subdivision Application Form

Subdivision Application Form Applicant Information 1. Property Titleholder Subdivision Application Form Ravalli County Planning Department 215 South 4 th Street, Suite F, Hamilton, MT 59840 / (406) 375-6530 / planning@rc.mt.gov Name:

More information

Public Works 2017 Budget Presentation. Public Works What We Do

Public Works 2017 Budget Presentation. Public Works What We Do Public Works 2017 Budget Presentation Public Works What We Do The Public Works Department interacts with all citizens of the county and our visitors for which our work activities have a direct impact.

More information

FINAL Examination Paper (COVER PAGE) Time : 8.00 am am Reading Time : 10 Minutes

FINAL Examination Paper (COVER PAGE) Time : 8.00 am am Reading Time : 10 Minutes Session : August 2013 FINAL Examination Paper (COVER PAGE) Programme : Diploma in Civil Engineering Course : EGC2170 : Surveying 2 Date of Examination : December 09, 2013 Time : 8.00 am 10.10 am Reading

More information

Environmental Impact Questionnaire

Environmental Impact Questionnaire Community Development Department 11 English Street Petaluma, CA 94952 Phone: 707-778-4301 Email: cdd@ci.petaluma.ca.us Web: www.cityofpetaluma.net/cdd Building Geographic Information Systems Housing Neighborhood

More information

Roadway Alignments and Profiles

Roadway Alignments and Profiles NOTES Module 15 Roadway Alignments and Profiles In this module, you learn how to create horizontal alignments, surface profiles, layout (design) profiles, and profile views in AutoCAD Civil 3D. This module

More information

Archway Portfolio South Bend, Indiana

Archway Portfolio South Bend, Indiana Industrial Portfolio Available for Sale or Lease in the US 31 Business Park 4491 Mayflower Road 5681 Cleveland Road Snapshot 4491 Mayflower Road Building: 77,000 SF Land: 3.2 Acres Zoned: Light Industrial

More information

Review Sheet for Second Midterm Mathematics 1300, Calculus 1

Review Sheet for Second Midterm Mathematics 1300, Calculus 1 Review Sheet for Second Midterm Mathematics 300, Calculus. For what values of is the graph of y = 5 5 both increasing and concave up? 2. Where does the tangent line to y = 2 through (0, ) intersect the

More information

Geographic Surfaces. David Tenenbaum EEOS 383 UMass Boston

Geographic Surfaces. David Tenenbaum EEOS 383 UMass Boston Geographic Surfaces Up to this point, we have talked about spatial data models that operate in two dimensions How about the rd dimension? Surface the continuous variation in space of a third dimension

More information

DIGISENSOR CO., LTD MDS COMPASS DEPTH METER & ALTIMETER MODULE. Description. Application

DIGISENSOR CO., LTD MDS COMPASS DEPTH METER & ALTIMETER MODULE. Description. Application MDS-12-0110 COMPASS DEPTH TER & ALTITER MODULE Pressure range: 0 11 bar. Integrated 2D Compass. Integrated pressure sensor. Integrated 16 bits ADC. Integrated low power 8 bits MCU. 3-wire synchronous serial

More information

Georeferencing of Scanned Aerial Imagery and Change Detection

Georeferencing of Scanned Aerial Imagery and Change Detection Georeferencing of Scanned Aerial Imagery and Change Detection For: Janet Finlay GISC9231- Remote Sensing John Bull B.Sc Candidate GIS-GM Candidate 3 Jasmin Crescent St. Catharines, Ontario Table of Contents

More information

Civil 3D Introduction

Civil 3D Introduction Civil 3D Introduction Points Overview Points are data collected by surveyors which represent existing site conditions (elevations, boundaries, utilities, etc.). Each point is numbered (or named) and has

More information

Forest Technology: Apps, Maps, Phones, and Drones

Forest Technology: Apps, Maps, Phones, and Drones Forest Technology: Apps, Maps, Phones, and Drones TFA Annual Meeting 2018 Darian Yawn LandMark Spatial Solutions, LLC Forest Technology Company Sales, Training, Support GIS Consulting, Repairs, Rentals

More information

CEEN Engineering Measurements Final Exam Fall 2001 Closed Book, Calculator Required 3 Hour Time Limit

CEEN Engineering Measurements Final Exam Fall 2001 Closed Book, Calculator Required 3 Hour Time Limit NAME Score CEEN 113-1 Engineering Measurements Final Exam Fall 001 Closed Book, Calculator Required 3 Hour Time Limit 1. (10 pts) You are interested in determining the height of a building. You are unable

More information

Swan Creek BMP Retrofit Database User s Manual

Swan Creek BMP Retrofit Database User s Manual Swan Creek BMP Retrofit Database User s Manual Toledo Metropolitan Area Council of Governments Lucas County Soil and Water Conservation District September, 2012 This project was funded through the Lake

More information

City of Airdrie Capital Budget & Plan

City of Airdrie Capital Budget & Plan City of Airdrie 2019-2028 Capital Budget & Plan COMMUNITY INFRASTRUCTURE 2019-2028 Capital Budget & Plan Manager Building Operations/Waste & Recycle, Fleet Kathleen Muretti Building Operations Fleet Services

More information

Wednesday, July 15, Author: Eldris Ferrer Gonzalez, M.Sc. Engineering CSA Group

Wednesday, July 15, Author: Eldris Ferrer Gonzalez, M.Sc. Engineering CSA Group Twenty ninth Annual ESRI International User Conference Wednesday, July 15, 2009 Author: Eldris Ferrer Gonzalez, M.Sc. Engineering CSA Group Introduction to Valenciano Project LIDAR Survey for Valenciano

More information

Working with Profiles

Working with Profiles Tennessee Association of Professional Land Surveyors 2016 Annual Conference Murfreesboro Working with Profiles In Carlson Software Presented by Who Is That CAD Girl? Jennifer DiBona is a long time CAD

More information

PACIFIC CENTER Anaheim, California

PACIFIC CENTER Anaheim, California HYDROLOGY REPORT PACIFIC CENTER Anaheim, California Prepared for Hines Company 4000 MacArthur Blvd. Suite 110 Newport Beach, CA 92660 949.313.2230 Prepared by Fuscoe Engineering, Inc. 16795 Von Karman,

More information

FOR LEASE GATEWAY BUSINESS PARK INDUSTRIAL FLEX SPACE 3525 E POST RD, LAS VEGAS, NV

FOR LEASE GATEWAY BUSINESS PARK INDUSTRIAL FLEX SPACE 3525 E POST RD, LAS VEGAS, NV FOR LEASE $ ST 0.70 AR /S TIN F N G R NN AT E! INDUSTRIAL FLEX SPACE 3525 E POST RD, LAS VEGAS, NV - 89120 ZONED: M-D, COUNTY APN: 161-31-410-031 CONSTRUCTION: 2001 GLA: 54,157 PARKING: 2.86 CAM: $0.16/SF±

More information

HOW TO USE THE VERMONT DAM SCREENING TOOL

HOW TO USE THE VERMONT DAM SCREENING TOOL HOW TO USE THE VERMONT DAM SCREENING TOOL Introduction This web map is intended for watershed managers, conservation practitioners, landowners, and others to view and interact with the results of the Vermont

More information

Gaston County GIS. Interactive Mapping Website

Gaston County GIS. Interactive Mapping Website Gaston County GIS Interactive Mapping Website The Gaston County GIS mapping website optimizes the available window viewing area and has interactive tools, collapsible menus and movable windows. This map

More information

As a GIS technician, your job will be to take the available data and develop suitability maps for the site.

As a GIS technician, your job will be to take the available data and develop suitability maps for the site. Study Guide: Geographic Informations Systems Area: Land-use Analysis with ArcView 3.x Subject: Using Soil maps to Assess site suitability Objectives: Upon completing this study guide you should be able

More information

Roundabout Design Using AutoCAD Civil 3D 2010 Intersection Tools

Roundabout Design Using AutoCAD Civil 3D 2010 Intersection Tools Roundabout Design Using AutoCAD Civil 3D 2010 Intersection Tools Marie-Pierre Lebel Consortech Solutions CV214-1 Learn how to leverage the new intersection design tools from AutoCAD Civil 3D 2010 for use

More information

1000 PARK DRIVE LAWRENCE, PA OFFICE BUILDING DATA CENTER LAND

1000 PARK DRIVE LAWRENCE, PA OFFICE BUILDING DATA CENTER LAND LAWRENCE, PA 15055 CBRE is pleased to present this real estate opportunity for purchase. This listing includes a 4 story, 58,092 square foot HQ office building and separate ancillary 25,548 SF data center

More information

GIS BASED VEGETATION MANAGEMENT INVENTORY SYSTEM

GIS BASED VEGETATION MANAGEMENT INVENTORY SYSTEM GIS BASED VEGETATION MANAGEMENT INVENTORY SYSTEM VT TRANSCO, VELCO, VETCO VT TRANSCO LLC: Owns the Assets Transmission Lines: 650 Miles of 115 kv to 450 kv D.C. Stations: 44 Acres of Rights-of-Way: Approx.

More information

Heavy Industrial / Corporate Office Campus

Heavy Industrial / Corporate Office Campus Heavy Industrial / Corporate Office Campus -Priced at: $80 Sq.Ft. -131,040 square feet (+/-) -8.8 Acres (+/-) -18 Megawatt Electrical Service -500,000 Gallons per-day Water Service 1270 SE Monmouth Cutoff

More information

The Design of Telemetry Acquisition and Analysis Vans for Testing Construction and Mining Equipment

The Design of Telemetry Acquisition and Analysis Vans for Testing Construction and Mining Equipment The Design of Telemetry Acquisition and Analysis Vans for Testing Construction and Mining Equipment Item Type text; Proceedings Authors Jury, Owen T. Publisher International Foundation for Telemetering

More information

(801) Spanish Fork Power. 860 East 4500 South Suite 312 Salt Lake City, UT 84107

(801) Spanish Fork Power. 860 East 4500 South Suite 312 Salt Lake City, UT 84107 (801) 288-4033 info@comlinkls.com Spanish Fork Power 860 East 4500 South Suite 312 Salt Lake City, UT 84107 S P A N I S H F O R K C I T Y Municipal Power Substation Siting & Capital Project Study October

More information

WMS 9.1 Tutorial Hydraulics and Floodplain Modeling Floodplain Delineation Learn how to us the WMS floodplain delineation tools

WMS 9.1 Tutorial Hydraulics and Floodplain Modeling Floodplain Delineation Learn how to us the WMS floodplain delineation tools v. 9.1 WMS 9.1 Tutorial Hydraulics and Floodplain Modeling Floodplain Delineation Learn how to us the WMS floodplain delineation tools Objectives Experiment with the various floodplain delineation options

More information

GRC COMPLEX F O R S A L E. CONTACT: Robert Boggess. 65,723± sq ft Cold Storage. 21,600± sq ft Freezer Storage. 29,149± sq ft Dry Storage

GRC COMPLEX F O R S A L E. CONTACT: Robert Boggess. 65,723± sq ft Cold Storage. 21,600± sq ft Freezer Storage. 29,149± sq ft Dry Storage GRC COMPLEX 535 S. Fir Street Medford, Oregon F O R S A L E CONTACT: Robert Boggess PHONE: (541) 608-1732 FAX: (541) 772-2135 EMAIL: rboggess@naumes.com 65,723± sq ft Cold Storage 21,600± sq ft Freezer

More information

ROCKSIDE WOODS BLVD. INDEPENDENCE, OHIO 44131

ROCKSIDE WOODS BLVD. INDEPENDENCE, OHIO 44131 DEVELOPMENT DEVELOPMENT SUMMARY: Available for Sale along Rockside Woods Blvd. and Brecksville Road (Route 21) are (7) seven development ready sites. These sites can serves a variety of uses including

More information

GeoRadar Division IDS Australasia

GeoRadar Division IDS Australasia IDS Australasia Radar tools for detecting and mapping of sub surface utilities Company Overview IDS is a world leader in Radar technology solutions to Civil and Defence markets IDS currently employs ~400

More information

DEM Artifacts: Layering or pancake effects

DEM Artifacts: Layering or pancake effects Outcomes DEM Artifacts: Stream networks & watersheds derived using ArcGIS s HYDROLOGY routines are only as good as the DEMs used. - Both DEM examples below have problems - Lidar and SRTM DEM products are

More information

Go Beyond Security. Multi Location Surveillance & Remote Operation Management...at your finger tips. Warehouse. Sales Office. Showroom.

Go Beyond Security. Multi Location Surveillance & Remote Operation Management...at your finger tips. Warehouse. Sales Office. Showroom. Go Beyond Security Sales Office Warehouse Showroom Retail Store Factory Multi Location Surveillance & Remote Operation Management...at your finger tips for Multi Location Surveillance envigil IP+ is best

More information

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016 TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING

More information

Newsletter 11. Faithfully yours, Shlomi Sivan, CEO Sivan Design D.S Ltd April, Sales Phone: , Ext: 4

Newsletter 11. Faithfully yours, Shlomi Sivan, CEO Sivan Design D.S Ltd April, Sales Phone: , Ext: 4 Newsletter 11 The year ended Dec. 2006 was a very successful year for the CivilCAD 2006 software; with a growth of 70% in the sales volume, we have exceeded 3200 users, and 1000 customers. Our participation

More information

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford GRC COMPLEX South Fir Street - Medford Naumes, Inc. P.O. Box 996 2 Barnett Road Medford, OR 97501 Phone 541.772.6268 Fax 541.772.2135 NO AGENCY, REPRESENTATION OR COMMISSION This Property Profile is being

More information

2015 HDR, all rights reserved.

2015 HDR, all rights reserved. 2015 HDR, all rights reserved. An Alternative to HEC-GEORAS: Overview & Comparison of AutoCAD River & Flood Analysis Module Ron Branyon, PE, CFM George Doubleday, EIT, CFM Brandon Hilbrich, PE, CFM TFMA

More information

5.5 Right Triangles. 1. For an acute angle A in right triangle ABC, the trigonometric functions are as follow:

5.5 Right Triangles. 1. For an acute angle A in right triangle ABC, the trigonometric functions are as follow: 5.5 Right Triangles 1. For an acute angle A in right triangle ABC, the trigonometric functions are as follow: sin A = side opposite hypotenuse cos A = side adjacent hypotenuse B tan A = side opposite side

More information

1. Create a customer account.

1. Create a customer account. The web team request process has been update to provide a faster and fairer service to the entire university. This document will help you through the new process. Please bookmark our new portal. https://westernsydneyu.atlassian.net/servicedesk/customer/portal/2/

More information

Manitoba Hydro TSR Facility Study Meeting CapX Transmission Owners Proposal/Study Approach

Manitoba Hydro TSR Facility Study Meeting CapX Transmission Owners Proposal/Study Approach Manitoba Hydro TSR Facility Study Meeting CapX Transmission Owners Proposal/Study Approach How should the CapX TO s approach the response to the MISO Request For Proposal for the MH TSR Facility Study?

More information