1 California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Eric Leuze, Director of Compliance cc: ISO Board of Governors, ISO Officers Date: April 29, 2005 Re: Deferral of Uninstructed Deviation Penalties: Monitoring Plan and Stakeholder Process This memorandum requires Board action. EXECUTIVE SUMMARY In the interest of addressing certain significant stakeholder concerns, Management requested approval from the Board of Governors to conditionally defer the Uninstructed Deviation Penalty (UDP) beyond May 1, At the April 25, 2005 meeting of the Board by teleconference, Management explained its proposal to define objective criteria to determine whether deferral of UDP can be continued, and to initiate a stakeholder process to identify whether any UDP rules must be revised. At Management s request, the Board passed a motion on April 25 authorizing Management to continue deferring the Uninstructed Deviation Penalty (UDP) until the May 6 meeting. This memorandum presents Management s proposal for: 1) conditional deferral of UDP and a framework for defining the circumstances under which the ISO may seek an immediate effective date for UDP to provide a safety net for Summer 2005 operations, and 2) a schedule and plan for a stakeholder process to define outstanding questions and resolve any UDP design issues. Four criteria have been identified to provide objective measures of whether or not system conditions have degraded to such a point that action, such as seeking immediate implementation of UDP, is required. A method for establishing benchmarks for each of these criteria and threshold changes in those criteria are proposed, so that if the threshold values for any two of the criteria are exceeded in any report on performance, then the presumption is that the ISO should file a tariff amendment to make UDP effective, subject to Management s consideration of other factors and conclusion that immediate action is required. Management would begin publishing these bi-weekly reports on May 12, Because the premise of deferring implementation of UDP is that some changes in UDP rules may be necessary, Management also proposes that the Board authorize Management to include narrowly defined changes in UDP rules in any such tariff amendment to establish an effective date for UDP. In summary, Management seeks authority to file a tariff amendment during Summer 2005 for an immediate effective date for UDP, and, as Management determines necessary and appropriate, to increase the Tolerance Band to no more than 5 percent and/or to provide an exemption for brief excursions outside the Tolerance Band. Authority to file such a tariff amendment is contingent on Management s determination that: 1) Uninstructed deviations have contributed to significant degradation in operating conditions as indicated by two metrics that exceed the threshold criteria as specified in this memorandum, and 2) Immediate action to address such uninstructed deviations is required. Created by: EML CAISO LST UPDT: 4/21/ Blue Ravine Road Folsom, California Page 1 (916)

2 Recognizing that circumstances change, and that unanticipated conditions may well arise, Management does not propose that the Board obligate Management to file for an immediate effective date for UDP if any two of the threshold criteria are triggered, but that the Board allow Management the discretion to consider other relevant factors in determining whether filing for an immediate effective date is necessary. Should Management conclude that no filing should be made even though two or more of the threshold criteria have been triggered, Management will promptly enumerate the reasons for that conclusion for the Board s consideration, and the Board may then concur or direct Management to immediately file a tariff amendment immediately or take some other action at the Board s discretion. Moved, that the Board of Governors hereby authorizes Management to: 1) Defer action to implement the Uninstructed Deviation Penalty (UDP) until the Board provides further direction at its September 2005 meeting; 2) Move forward with the stakeholder process and monitoring plan as described in the memorandum of April 28; and 3) Take action as described in the April 28 Memorandum in the event that the conditions described in that memorandum arise. INTRODUCTION On October 1, 2004, the ISO implemented the market redesign features of Phase 1B of the Market Redesign and Technology Upgrade (MRTU) Project, which included the Real Time Market Application (RTMA). RTMA estimates the ISO s Imbalance Energy requirement, and based on bids and operating constraints submitted by Imbalance Energy resources, RTMA issues Dispatch Instructions every five minutes. The Uninstructed Deviation Penalty (UDP) provides an incentive that is critical under this integrated design to follow Dispatch Instructions and deliver expected Energy in each 10-minute Settlement Interval. 1 The purpose of this memo is to provide the proposed metrics that the ISO will monitor during the conditional deferral of UDP implementation, the threshold changes in those metrics that may indicate that the ISO should file UDP, additional information responsive to stakeholder comments, and an outline the ISO s plan for a stakeholder process. The ISO is Prepared to Implement UDP As explained in the April 21 Board memo, Management believes that the ISO has fully met the conditions that FERC established on UDP implementation, which included an electronic reporting mechanism for reporting changes in the availability of Generating Units, and multiple ramp rates to better reflect differences in capability across the full operating range of a Generating Unit. The January 21, 2005 Board memorandum specified four additional milestones that must be completed before UDP should be implemented. In brief, the status of accomplishment of these milestones follows: 1) Automated Dispatch System (ADS) connectivity issues were resolved on March 11, ) A modification to verify delivery of instructions issued through ADS Application Programming Interface (API) will be implemented by May 13, 2005; 1 For additional background, refer to the April 21, 2005 memorandum regarding Briefing on Revised Management Proposal for Implementation of Uninstructed Deviation Penalties, available at 2

3 3) The ISO published two months of advisory UDP results based on Settlement Quality data, by mid-march, and has now published more than three months of such results; 4) All required process improvements and software modifications to reduce UDP processing time were implemented in February and March The public comments offered at the April 25 Board meeting regarding ISO readiness to implement UDP are addressed in detail later in this memorandum. Phase 1B Business Objectives Are Aggressive Metrics previously identified for Phase 1B implementation provide a relevant starting point for the development of proposed metrics that the ISO will monitor during the conditional deferral of UDP. The Phase 1B business objectives are summarized below: 2 Improve Frequency Control An objective of a 10% improvement in performance on ACE was established. Changes in the ISO s success in meeting Control Performance Standards (CPS) since Phase 1B was implemented is one measure of whether the ISO has improved frequency control. Reduce Generation Deviations Although no specific reduction in uninstructed deviations was targeted, one objective standard might be the relationship between uninstructed deviations and a reliability target, such as CPS2 performance. Reduce Regulation Requirement A reduction in Regulation requirement of 10% to 20% was targeted when Phase 1B was implemented These business objectives provide a point of reference for the development of metrics related to the impact of uninstructed deviations. However, as discussed further below, the threshold criteria for implementation of UDP in Summer 2005 represent much less aggressive expectations for the success of Phase 1B the ISO may fall far short of the Phase 1B business objectives and still avoid tripping the threshold criteria and the associated presumption that UDP should be immediately implemented. Purpose of Proposed Threshold Criteria is Limited To be clear, Management does not propose that operation through September 2005 without tripping any threshold criteria would mean that UDP is unnecessary. The threshold criteria are being proposed to provide a test of whether or not conditions have deteriorated so significantly that the temporary suspension of UDP cannot be continued. In fact, it is possible that none of the threshold criteria for an immediate filing to make UDP effective are triggered, while at the same time the results may indicate that the ISO is falling far short of the business objectives established for the Phase 1B redesign of the ISO s real time market. For example, one business objective for the ISO s Imbalance Energy Market was to reduce Regulation requirement by 10 percent to 20 percent. In contrast, the threshold criterion for whether the ISO should consider seeking immediate implementation of UDP is an increase in Regulation requirement of 5 percent. 3 This difference illustrates the narrow purpose of the threshold criteria. 2 Phase 1B business objectives are described in Update on Phase 1B Roll-Out and Operation, presentation to ISO Board of Governors on November 10, 2004, page 9, available at 3 The metric calculated for the current period is compared to a calculation for a similar time period before Phase 1B was implemented. 3

4 Limited Changes to UDP Design Will Be Considered As noted in the April 21 Board memo, some Market Participants have argued that there are certain circumstances in which UDP cannot be avoided due to unrecognized operating constraints, such as steam inertia. The ISO believes that additional analysis of advisory UDP results and information from stakeholders will be useful in determining whether there are circumstances where UDP is imposed because an operating constraint has not been recognized. If the ISO concludes that some portion of UDP assessments may arise due to the existence of unrecognized operating constraints, then some modification of UDP rules may be appropriate. The ISO does not propose to customize the UDP rules for every technology, but has identified two categories of changes that may mitigate the UDP risk associated with any unrecognized operating constraints. First, the ISO will consider expanding the Tolerance Band. Although the New York ISO uses a tolerance band similar to the ISO s existing design, which is based on 3 percent of the maximum capability of a generating facility, the ISO is willing to consider an expansion of the Tolerance Band up to 5 percent. This expansion would allow additional minor deviations if necessary due to unspecified operating or design characteristics of a Generating Unit. The ISO will be particularly interested in identifying, where possible, some of the root causes of deviations that would be subject to UDP if the Tolerance Band is only 3 percent, and why an expanded Tolerance Band is necessary. The second possible change the ISO has identified is to provide a limited exemption for brief excursions outside the Tolerance Band. The ISO understands that the New York ISO provides such an accommodation for up to three dispatch intervals or 15 minutes to mitigate the possible consequences of operating constraints such as steam inertia, and is interested in exploring whether such an accommodation would be effective in addressing any operating constraints that RTMA does not recognize. In the event that the threshold criteria are triggered and Management is required to consider a tariff amendment for an immediate effective date for UDP, Management is requesting authority to consider modification of UDP rules. With the Board s approval, the amendment to the ISO Tariff seeking an immediate effective date for UDP may incorporate the following specific changes: an increase in the Tolerance Band up to and including 5 percent of the maximum capability (PMax) and/or an exemption for brief excursions outside the Tolerance Band. The ISO Does Not Believe Changes to SLIC or RTMA are Required In the April 21 Board memorandum, the ISO described several stakeholder concerns that Management does not at this time believe should delay UDP implementation. However, the ISO will provide an opportunity for stakeholders to provide additional information and explain these concerns, which include contentions that SLIC is too cumbersome and that RTMA dispatch is too unpredictable. As noted in the April 21 memo, the ISO acknowledges that reporting outages can be cumbersome, and is reviewing possible design changes to improve the supplier s access to outage information and the efficiency with which changes in availability can be reported. The ISO again affirms its belief that SLIC functionality fully meets FERC's condition that the ISO provide a proven means of allowing electronic reporting of outages and derates. The ISO knows of no circumstance in which SLIC limitations would prevent a supplier from reporting a change in operating status necessary to avoid UDP within 30 minutes after such an event occurs. Nonetheless, the ISO intends to invite stakeholders to comment on SLIC, provide examples of problems, and explain the specific limitations that prevent a supplier from reporting timely changes in availability necessary to avoid UDP. The ISO also reaffirms its commitment to evaluate RTMA performance and the volatility of the Imbalance Energy Market to determine whether there are any changes in rules for how the Imbalance Energy Market is used to balance the system. As Management has noted, RTMA appears to be operating consistent with its design, and there are no guarantees that any reduction in volatility can be achieved. However, the ISO will provide additional 4

5 information on RTMA operation and will invite stakeholder comments, examples and analysis with regard to RTMA design deficiencies or performance shortfalls. At the June Board meeting, Management will present its conclusions regarding the scope of issues relevant to UDP implementation. MONITORING PLAN This section defines proposed metrics and criteria for the ISO s consideration in determining whether immediate implementation of UDP may be appropriate. Four metrics are identified, and would be periodically published to objectively characterize the performance of the Imbalance Energy Market and the impact of uninstructed deviations. The first report would be issued on May 19, Appendix 1 provides an illustration of a summary of the calculations that will be developed. This summary, together with supporting documentation, will be published in each bi-weekly report. Approach For each metric, a margin of difference is defined to represent an unacceptably large degradation in performance. The metric for the benchmark period is adjusted by the margin to define the threshold criterion. This threshold criterion is compared to the metric calculated for the current period. If the metric calculated for the current period exceeds the threshold criterion, then that criterion is triggered. Measurement and Reporting The ISO proposes to use a rolling measurement interval of 8 weeks, and to calculate the metrics every two weeks. One significant question is what data should be used, involving a critical trade-off between the timeliness and the accuracy of the calculated metrics. If the metrics are calculated using data available shortly after the trade day, then accuracy will suffer, as significant changes to Expected Energy due to verbal instructions and other issues may occur several days after the Trade Day. Conversely, if the ISO uses data reflected in Preliminary Settlement Statements, then there is a delay of several weeks between operating period and the calculation of the metrics. Although the ISO will consider whether some other option is available, Management now proposes to rely on Preliminary Settlement Statement data. 5 However, if any conditions arise that suggest an unacceptable degradation of performance, then the ISO will not wait until the metrics are calculated, but will promptly alert the Board and FERC, and take other actions, as necessary. The ISO will use existing tariff authority, such as the Enforcement Protocol, to address event-specific problems where, for example, a supplier fails to comply with an operating order. Measurement Interval Using an interval as short as one week or even one month may be unreasonable due to the increased volatility one would expect with respect to any metric over a shorter measurement interval. A longer duration of 8 weeks is proposed. Margin of Difference A separate margin is proposed for each metric. The margins are estimates of what would represent unacceptably large degradations in performance. 4 The May 19 report will present metrics for the benchmark period of January 21, 2004 to March 17, 2004 and for the current period of January 21, 2005 to March 17, The benchmark period and current period will roll two weeks with each biweekly report. 5 From October through mid-january, the ISO relied on data that was available before settlement statements were published in the interest of providing more timely advisory UDP results. Based on that experience, the ISO concluded that accuracy must take precedence over timeliness, and in mid-january time began publishing advisory results based on data used for Preliminary Settlement Statements. 5

6 Reporting A rolling 8-week calculation is proposed to be published bi-weekly. The calculated metrics will be reported on the ISO Home Page. Proposed Metrics The ISO proposes to monitor the following metrics. An update on the performance of these metrics will be provided at the June Board meeting, at which time revisions may be proposed. Uninstructed Deviations Significant increases in the mean and/or variance in aggregate uninstructed deviations by Generating Units may suggest that a strong incentive to follow Schedules and instructions as would be provided by UDP should not be further delayed. This metric is calculated by comparing the Expected Energy based on Final Hour Ahead Schedules, as adjusted by ISO Dispatch Instructions, to the metered Energy for each Settlement Interval. One issue is that all corrections to Expected Energy are not completed until several weeks after the Trade Day, although 95% of corrections are completed within 96 hours. Since these corrections generally reduce the volume of estimated uninstructed deviations, there is an increased risk that an erroneous conclusion that the magnitude or variance of uninstructed deviations has increased exists for calculations that are made shortly after the relevant Trade Days. The longer the calculation is delayed, the better the data quality, but the longer before any ISO action that depends on such a metric is taken. 6 As noted above, the ISO has determined that accuracy takes precedence over timeliness with respect to the calculation of metrics, and Preliminary Settlement Statement data will be used. The proposed margin for uninstructed deviations is the greater of an increase of 50% or 200 MW in average uninstructed deviations (e.g., an increase from 100 to 200 MW would not be a trigger, but 50 MW to 250 MW would be a trigger.) Reliability Any significant decline in average CPS 2 performance demands attention. While uninstructed deviations may play a role, other factors can have a significant effect, including limited ramping capability in the Imbalance Energy Market, deficiencies in the supply or performance of Regulation, or other factors such as the magnitude and volatility of interchange ramps and deviations between forward scheduled load and actual load. Recognizing that the Imbalance Energy Market is a key tool in balancing the system, however, a metric based on significant change in CPS2 performance is proposed. The propose margin is the smaller of a drop to below 90% in CPS2 performance, or a decrease of 4 percentage points in CPS performance (e.g., a decrease from 94% to 90% or 92% to 89% would be a trigger, but not a decrease of 93% to 90%.) Impact of Deviations on Reliability One way to better recognize the relationship between uninstructed deviations is to explicitly consider the contribution that uninstructed deviations make to CPS2 violations. A CPS2 violation occurs whenever the ISO s average ACE across a ten-minute interval exceeds a specified threshold ( L10 referred to as Lsub10 ), which is MW in A second issue is that the magnitude and/or variance of uninstructed deviations may increase as the load level, and the associated number of Generating Units and the total expected Generation, increases. It may be useful to consider uninstructed deviations normalized by load level to eliminate the effect of increasing loads on the level on uninstructed deviations. However, such a metric may erroneously imply that so long as uninstructed deviations do not increase relative to load level that no action is required, when in fact any significant increase in the absolute magnitude or variance of uninstructed deviations is the more relevant consideration. A metric based on normalized deviations would require additional time to make sure that the variables are properly specified and that the hypotheses are well constructed. No such metric is proposed at this time. 7 CPS2 is measured monthly by considering the number of 10-minute intervals in which the average Area Control Error (ACE) is within a bandwidth defined by L10. The ISO s L10 is determined annually based on the targeted frequency bound for each Control Area in the WECC, and the Frequency Bias Setting for the ISO, which is a measure of the MW associated with a given 6

7 If uninstructed deviations are in the same direction as the ISO s ACE in a 10-minute interval, then the uninstructed deviations contribute to or exacerbate the CPS2 violation, while if the uninstructed deviations are of the opposite sign, then the uninstructed deviations mitigate ACE. 8 If the aggregate uninstructed deviations contribute to ACE by an amount in excess of L10, then such a condition, while not definitive, suggests that uninstructed deviations may have had a significant impact on the ISO s ability to maintain system balance. The ISO proposes to initially establish a benchmark for the number or percentage of intervals with CPS2 violations in which the average volume of contributing uninstructed deviations exceeds the ISO s L10. The proposed margin is a 50 percent increase in the proportion of CPS2 intervals in which contributing uninstructed deviations exceed the ISO s L10. For example, if uninstructed deviations exceed the ISO s L10 in 10 percent of CPS2 intervals in the benchmark period and 16 percent in the current period, then the threshold criterion is triggered (16 percent represents a 60 percent increase over 10 percent). Regulation Requirement Another proposed metric is changes in the volume of Regulation requirement. As Imbalance Energy Performance declines, the ISO will be required to increase reliance on Regulation. As a point of reference, Regulation procurement has decreased for January through March 2005, as compared to the same period a year earlier, but has not declined to the extent of the Phase 1B business objective. 9 The proposed margin is an increase in Regulation requirement of 5 percent. For example, if the average hourly Regulation requirement increases from 750 MW in the benchmark period to 780 MW in the current period, representing a 4 percent increase, then the threshold criterion is not triggered. Management Must Reserve Discretion If the threshold criteria for two or more of the selected metrics are triggered in one of the bi-weekly reports, then the presumption is that the ISO should file for an immediate effective date for UDP. However, Management will have the discretion to consider additional factors in determining whether the ISO should instead take some other action. Conversely, the presumption is that if two or more of the threshold criteria are not triggered, then the ISO will not file to make UDP effective until all issues are resolved. Here again, Management will consider other factors in determining whether Board authority should be requested to file a tariff amendment to make UDP immediately effective, either as designed, or reflecting modification of the Tolerance Band or an exemption for brief excursions outside the Tolerance Band. 10 PUBLIC COMMENTS AT APRIL 25 BOARD MEETING The public comments provided during the Board s meeting on April 25 are worth considering. One commenter suggested that the ISO might not need UDP because the ISO has the necessary tools to address uninstructed deviations, which include FERC s Market Behavior Rules, the ISO s new authority to impose penalties under Amendment 55, and the ISO s No Pay provisions. While each of these tools is important, none provides a reasonable substitute for UDP. Action under the first tool, FERC Market Behavior Rules, would only be taken if the change in frequency. The NERC standard and the ISO s corporate goal require that the ISO s ACE be within the L10 during 90% of the 10-minute intervals over a calendar month. 8 For example, if the ACE averages positive 200 MW across a ten-minute interval, and uninstructed deviations average a positive 100 MW across the ten-minute interval, then those deviations contribute to ACE, while if the uninstructed deviations average 50 MW, then they mitigate ACE. 9 Regulation requirement decreased between 3 and 9 percent between December 2004 and March 2005 as compared to the prior year. 10 To be clear, no authority is proposed to be delegated to Management to file a tariff amendment without further Board approval unless two or more of the criteria are triggered. 7

8 ISO, or FERC on its own initiative, identified an egregious event or a pattern of behavior that consistently violates one or more of the Market Behavior Rules. This is no substitute for UDP, which monitors performance of every resource subject to UDP in every Settlement Interval. The second tool, the ISO s authority under the Enforcement Protocol accepted by FERC in Amendment 55, does not provide the ISO any penalty authority FERC has reserved all authority to impose penalties under the EP. More importantly, the only instructions subject to review as violations of an ISO operating order under the EP are those that are communicated by means other than the ISO s Automated Dispatch System (ADS). 11 In sharp contrast, the only instructions that are subject to UDP are those that are communicated by ADS. The ISO s EP and UDP are not substitutes, but complements with no overlap. Finally, the ISO s No Pay provisions described in Section of the ISO Tariff simply eliminate capacity payments for Ancillary Services that are unavailable, such as when a supplier scheduled to provide Operating Reserve fails to perform or is incapable of performing in accordance with its bid. In contrast, UDP applies much more broadly to resources dispatched by the ISO in the Imbalance Energy Market to assure that the ISO receives the aggregate Imbalance Energy response required to reliably and economically operate the ISO Control Area. Other comments provided during the public comment section of the April 25 Board meeting are addressed in the table below: Stakeholder Comment ISO Response The milestones identified as prerequisites for UDP implementation have not been achieved. ISO verbal Dispatch Instructions are not accurately recorded on a consistent basis resulting in erroneous UDP UDP fails to properly include accurate ramp rates. The specific milestones that were established in the January Board memo have been met Stakeholders believe other issues, which require additional system changes, must be resolved before UDP is implemented. These issues are addressed below. ISO endeavors to record all verbal instructions no UDP is applied for verbal instructions, unless those instructions specifically confirm an ADS instruction. Suppliers have the opportunity to specify up to nine ramp rate segments, and to update ramp rates or specify other changes in availability in real time ISO will seek to understand this concern, but is not aware of any conflict with the accuracy of the ramp rates it applies in UDP In its February 20, 2004 order accepting the ISO s proposed Rule of Conduct regarding operating orders on Amendment 55, FERC specifically acknowledged the limitation proposed by the ISO in response to stakeholder comments, stating that this market rule applies to operating orders that are directly communicated to Scheduling Coordinators by means other than the ISO's automated dispatch system." 106 FERC paragraph 61,179, at P The ISO will provide an exemption from UDP in the case of outages, as explained in Section 7 of the UDP technical documentation available at 8

9 Stakeholder Comment Real time Dispatches of RMR units are not accurately reflected in RTMA dispatch Differences in understanding between Scheduling Coordinators and the ISO real-time operations staff regarding the interpretation of SLIC outage information results in faulty UDP calculations RTMA Dispatch Instructions cause significant wear and tear on Generating Units. ISO Response Under some circumstances the ISO issues verbal Dispatch Notices to RMR units that are not reflected in RTMA instructions. Expected Energy is corrected from such verbal instructions, and when such corrections are made, an exemption from UDP is provided. 13 ISO Management established no prerequisite to UDP implementation related to SLIC functionality. 14 The ISO is aware of questions raised when Scheduling Coordinators have made errors in entering information into SLIC about a change in availability. All known bugs or SLIC design issues that would limit the ability of a Scheduling Coordinator to properly report a change in availability have been resolved. However, the ISO will seek to verify that there are no additional outstanding issues, and that sufficient training is provided to Scheduling Coordinators to use SLIC. As noted elsewhere, the ISO will also continue to consider changes in the web client interface to make SLIC more user-friendly. Although no condition on UDP implementation was established in the January Board memo, the ISO continues to examine results of RTMA dispatch and to consider examples and questions provided by suppliers. 15 However, the ISO believes that RTMA is operating consistent with its design, and changes to RTMA are not proposed as a condition on UDP implementation. STAKEHOLDER PROCESS The purpose of the stakeholder process is to first verify that the ISO s proposed scope of review of UDP rules is reasonable, and to then develop an objective foundation on which to base a decision regarding what if any changes to UDP rules are necessary and appropriate. Toward this end, the ISO intends to better coordinate inquiries directed to different ISO system owners and understand implications across all systems as they relate to the ability to perform within the Tolerance Band. The ISO will also seek to confirm that stakeholder concerns are well understood, and will hold a meeting with stakeholders during the week of May 9 to identify issues and examples of problems with UDP, RTMA and SLIC. As noted, the ISO does not presently believe that any change in the design of either RTMA or SLIC is necessary for UDP to be just and reasonable. However, the ISO looks forward to engaging stakeholders on this subject to make sure that ISO decisions are based on a full and complete 13 Id, Section See the January 27, 2005 Board memo available at 15 The January 27, 2005 Board memo on UPD specifically recognized that the four milestones established by the ISO as prerequisites to UDP implementation did not address all stakeholder concerns, including those related to the frequency of changes in direction that ISO Dispatch Instructions required of Generating Units. 9

10 understanding of stakeholder concerns and any problems that might have their root cause in the design of either of these systems. The following milestones are proposed. Additional meetings and conference calls may be scheduled and other deliverables may be produced as required. Activity Date Stakeholder meeting to provide detailed specification of issues Week of May 9 Briefing to ISO Board on scope of issues and performance of metrics June 15 Provide draft report for stakeholder comment By June 29 One or more stakeholder meetings or conference calls July Board update July 28 One or more stakeholder meetings or conference calls August Final recommendation to Board September 13,

11 Current Period: December 1, 2004 through January 25, 2005 Benchmark Period: December 1, 2003 through January 25, 2004 Metric (1) (2) (3) (4) Uninstructed Deviations CPS2 Violations Regulation Requirement Contribution of Uninstructed Deviations to CPS2 Violations Is Threshold Exceeded? No No No No Benchmark Values Mean % % Variance % NA NA Margin Absolute 100 4% NA NA Relative 50% 90% 5% 50% Threshold Values Mean Threshold % % Variance % NA NA Current Values Mean % % Variance % NA 0% Increase (Decrease) over Threshold Mean NA NA NA NA Variance NA NA NA NA Does current value significantly exceed threshold? Mean No NA NA NA Variance NA NA NA NA Summary Statistics APPENDIX 1 SUMMARY UDP IMPLEMENTATION METRICS REPORTED APRIL 28, 2005 t-value/f-value for current> threshold Mean (t-value) NA NA NA NA Variance (F-value) NA NA NA NA (5) p-value Mean NA NA NA NA Variance NA NA NA NA Notes: (1) Uninstructed Deviations in aggregate MW per 10-minute interval averaged over the period. (2) CPS2 performance measures as % of Intervals each day in the period - threshold is the higher CPS2 percentagegreater of 4% below the benchmark value or 90%. (3) Regulation requirement in MW per hour (4) % of Intervals with CPS violation where contributing uninstructed deviations exceeded the ISO's L 10. (5) P-Value is the probability that the threshold criteria have not been exeeded. 11

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately in congestion management procedures.

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix M... 2 Dynamic Scheduling Protocol (DSP)... 2 1. DYNAMIC SCHEDULES OF IMPORTS TO THE CAISO BALANCING AUTHORITY AREA... 2 1.2 Contractual Relationships... 2 1.3 Communications,

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

Physical Security Reliability Standard Implementation

Physical Security Reliability Standard Implementation Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,

More information

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision

More information

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan Quarter 3, (Q3) Generation Deliverability Assessment Study Plan Background and Purpose of Study Phases I & II Generation and Import Deliverability Studies were completed that established the deliverability

More information

EXHIBIT A: PROJECT SCOPE AND SCHEDULE The Project consists of the activities and delivery dates identified in this Exhibit A, implemented in accordance with the Agreement. The Parties have included a schedule

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 978 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE MP 1.1 Objective

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE

More information

Energy Storage and Distributed Energy Resources (ESDER) Stakeholder Initiative. Revised Scope and Schedule

Energy Storage and Distributed Energy Resources (ESDER) Stakeholder Initiative. Revised Scope and Schedule Energy Storage and Distributed Energy Resources (ESDER) Stakeholder Initiative Revised Scope and Schedule June 25, 2015 Table of Contents 1 Introduction... 3 2 Background... 3 3 Stakeholder process...

More information

PRC Coordination of Protection Systems for Performance During Faults

PRC Coordination of Protection Systems for Performance During Faults PRC-027-1 Coordination of Protection Systems for Performance During Faults A. Introduction 1. Title: Coordination of Protection Systems for Performance During Faults 2. Number: PRC-027-1 3. Purpose: To

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 17. Transmission Ownership Rights (TORs)... 2 17.1 TRTC Instructions... 2 17.1.1 Responsibility to Create TRTC Instructions... 2 17.1.2 TOR Scheduling Coordinator Responsibilities...

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

February 18, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

February 18, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation February 18, 2015 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Resource Adequacy Pre-Market Simulation Training Workshop

Resource Adequacy Pre-Market Simulation Training Workshop Resource Adequacy Pre-Market Simulation Training Workshop Focusing on the following initiatives: Reliability Services Initiative (RSI) Capacity Procurement Mechanism (CPM) Replacement October 21, 2015

More information

Project Retirement of Reliability Standard Requirements

Project Retirement of Reliability Standard Requirements Project 2013-02 Retirement of Reliability Standard Requirements Unofficial Comment Form for Paragraph 81 (P81) Project Retirement of Reliability Standard Requirements This form is provided in a Word format

More information

Entergy Arkansas, Inc. Transition Plan Technical Conference #1

Entergy Arkansas, Inc. Transition Plan Technical Conference #1 Entergy Arkansas, Inc. Transition Plan Technical Conference #1 May 5, 2010 1 Why Technical Conferences? Complex subject matter Venue for stakeholders to develop an awareness and understanding of the issues

More information

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting Contingency Reserve Sharing; Ancillary Services Market Presented to the JCM Joint Stakeholder Meeting 1 Agenda Products and Nature of Current Services Contingency Reserve Sharing Group (CRSG) Agreement

More information

ERO Enterprise Strategic Planning Redesign

ERO Enterprise Strategic Planning Redesign ERO Enterprise Strategic Planning Redesign Mark Lauby, Senior Vice President and Chief Reliability Officer Member Representatives Committee Meeting February 10, 2016 Strategic Planning Redesign Current

More information

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public

More information

_ Dear Secretary Bose: The attached. Folsom, CA

_ Dear Secretary Bose: The attached. Folsom, CA California Independent System Operator June 29, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection

More information

Specific topics covered in this brief include:

Specific topics covered in this brief include: April 2008 Summary Welcome to the Fifteenth National Wind Coordinating Collaborative (NWCC) Transmission Update! Kevin Porter of Exeter Associates, Inc. led the April 28, 2008, Transmission Update conference

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE

More information

NERC-Led Technical Conferences

NERC-Led Technical Conferences NERC-Led Technical Conferences NERC s Headquarters Atlanta, GA Tuesday, January 21, 2014 Sheraton Phoenix Downtown Phoenix, AZ Thursday, January 23, 2014 Administrative Items NERC Antitrust Guidelines

More information

TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities

TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities A. Introduction 1. Title: Real-time Reliability Monitoring and Analysis Capabilities 2. Number: TOP-010-1(i) 3. Purpose: Establish requirements for Real-time monitoring and analysis capabilities to support

More information

Standard CIP-006-4c Cyber Security Physical Security

Standard CIP-006-4c Cyber Security Physical Security A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-4c 3. Purpose: Standard CIP-006-4c is intended to ensure the implementation of a physical security

More information

CIP Cyber Security Systems Security Management

CIP Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security System Security Management 2. Number: CIP-007-5 3. Purpose: To manage system security by specifying select technical, operational, and procedural requirements in

More information

Standard CIP-006-3c Cyber Security Physical Security

Standard CIP-006-3c Cyber Security Physical Security A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-3c 3. Purpose: Standard CIP-006-3 is intended to ensure the implementation of a physical security

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market and Infrastructure Development Date: January 30, 2019 Re: Decision on

More information

CIP Standards Development Overview

CIP Standards Development Overview CIP Standards Development Overview CSSDTO706 Meeting with FERC Technical Staff July 28, 2011 Objectives Historical Timeline CIP-002-4 CIP-005-4 CIP Version 5 2 Project 2008-06 Overview FERC Order 706 SDT

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission The following White Paper proposes a draft methodology for determining the incremental amount of transfer capability that would be the basis for the quantity of Merchant Transmission CRRs to be allocated

More information

Data Release & Accessibility

Data Release & Accessibility Draft Final Proposal Data Release & Accessibility Phase 1: Transmission Constraints January 6, 2010 Jan-08-2010: To correct for minor edits that were inadvertently omitted, this revised copy was posted.

More information

Unofficial Comment Form Project Operating Personnel Communications Protocols COM Operating Personnel Communications Protocols

Unofficial Comment Form Project Operating Personnel Communications Protocols COM Operating Personnel Communications Protocols Project 2007-02 Operating Personnel Communications Protocols COM-002-4 Operating Personnel Communications Protocols Please DO NOT use this form. Please use the electronic comment form to submit comments

More information

Load Conformance Limiter Enhancement

Load Conformance Limiter Enhancement TECHNICAL BULLETIN December 28, 2016 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 TECHNICAL BULLETIN Revision History Date Version Description Author December 28, 2016 1.0 Draft Proposal

More information

MARPA DOCUMENT MARPA Revision 1.1

MARPA DOCUMENT MARPA Revision 1.1 MARPA 1100 - Page 1 MARPA DOCUMENT MARPA 1100 Revision 1.1 STREAMLINE PROGRAM FOR PMA APPLICATIONS OF NON-SAFETY-SIGNIFICANT ARTICLES SUBMITTED BY EXPERIENCED APPLICANTS WITH A QUALIFYING PERFORMANCE RECORD

More information

Business Practice Manual Change Management Meeting

Business Practice Manual Change Management Meeting Business Practice Manual Change Management Meeting Name Chris Kirsten Date August 23, 2011 Web Address: https://www.webmeeting.att.com Meeting Number: 5114682337 Access code: 9842446 Teleconference Dial-in

More information

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

Proposed Clean and Redline for Version 2 Implementation Plan

Proposed Clean and Redline for Version 2 Implementation Plan Exhibit A Implementation Plans for CIP-002-2 through CIP-009-2 and CIP-002-3 and CIP-009-3 For Generator Owners and Generator Operators of U.S. Nuclear Power Plants Proposed Clean and Redline for Version

More information

Stakeholder Comments Template. Energy Storage and Distributed Energy Resources (ESDER) Phase 4. Submitted by Organization Date Submitted

Stakeholder Comments Template. Energy Storage and Distributed Energy Resources (ESDER) Phase 4. Submitted by Organization Date Submitted Stakeholder Comments Template Energy Storage and Distributed Energy Resources (ESDER) Phase 4 Submitted by Organization Date Submitted Ted Ko ted.ko@stem.com 510-381-6159 Stem, Inc. 2/27/19 The Issue Paper

More information

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009 Midwest ISO Overview - ATC Customer Meeting February 26, 2009 Agenda Overview January 2009 Dashboard Module E RAR Timeline Questions 2 Overview January was characterized by seasonal cold temperatures,

More information

November 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP

November 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP !! November 9, 2016 VIA ELECTRONIC FILING Jim Crone Director, Energy Division Manitoba Innovation, Energy and Mines 1200-155 Carlton Street Winnipeg MB R3C 3H8 RE: Revisions to the Violation Risk Factors

More information

IATF Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB

IATF Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB IATF 16949 Transition Strategy Presenter: Mrs. Michelle Maxwell, IAOB IATF 16949 Transition Strategy IATF 16949 transition strategy was presented at the IATF global stakeholder conference in Rome, Italy

More information

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018)

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018) NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

More information

Comparison of MANE-VU SIP Template to EPA SIP Checklist. September 17, 2007

Comparison of MANE-VU SIP Template to EPA SIP Checklist. September 17, 2007 Comparison of MANE-VU SIP to EPA SIP Checklist 9/17/07: Draft 1 Comparison of MANE-VU SIP to EPA SIP Checklist September 17, 2007 Key to Color Codes action MANE-VU work product Class I states only (and

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

IATF Transition Strategy Presenter: Cherie Reiche, IAOB

IATF Transition Strategy Presenter: Cherie Reiche, IAOB IATF 16949 Transition Strategy Presenter: Cherie Reiche, IAOB IATF 16949 Transition Strategy IATF 16949 transition strategy was presented at the IATF global stakeholder conference in Rome, Italy in April

More information

Maryland Soybeans: Historical Basis and Price Information

Maryland Soybeans: Historical Basis and Price Information Maryland Soybeans: Historical Basis and Price Information Fact Sheet 496 James C. Hanson Extension Specialist, Department of Agricultural and Resource Economics, University of Maryland Kevin McNew Adjunct

More information

MOD Transmission Reliability Margin Implementation Document

MOD Transmission Reliability Margin Implementation Document Transmission Margin Implementation Document Transmission Margin Implementation Document For NERC Page 1 of 7 Transmission Margin Implementation Document 1.0 Purpose The California Independent System Operator

More information

Frequently Asked Questions Real-Time Revenue Sufficiency Guarantee

Frequently Asked Questions Real-Time Revenue Sufficiency Guarantee Frequently Asked Questions Revenue Sufficiency Guarantee What is Revenue Sufficiency Guarantee (RSG)? Midwest ISO has the responsibility to ensure that adequate capacity is available and committed to meet

More information

Policy. Business Resilience MB2010.P.119

Policy. Business Resilience MB2010.P.119 MB.P.119 Business Resilience Policy This policy been prepared by the Bi-Cameral Business Risk and Resilience Group and endorsed by the Management Boards of both Houses. It is effective from December to

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Emilee Plouff, Contract Negotiation and Regulatory Contracts Joanne Bradley, Queue Management March 6, 2018 Interconnection Process

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft The Project Charter Project Title: VDI Data Center Design and Build Project Sponsor: South Alberta Data Centers Inc. (SADC Inc.) Project Customer: The City of Calgary Project Manager: Moe Yousof Document

More information

CIP Cyber Security Personnel & Training

CIP Cyber Security Personnel & Training A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-5.1 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the BES from individuals

More information

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Stage 01: Modification Proposal Grid Code GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Purpose of Modification: This modification (3/4) will set out within the Grid Code the following

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

Published: December 15, 2016 Revised: December 15, 2016

Published: December 15, 2016 Revised: December 15, 2016 Market Participant Guide: SPP 2017 Congestion Hedging Published: December 15, 2016 Revised: December 15, 2016 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion

More information

Annual Policy Initiatives Roadmap Process Straw Proposal

Annual Policy Initiatives Roadmap Process Straw Proposal Annual Policy Initiatives Roadmap Process Straw Proposal July 18, 2017 Copyright 2017 Table of Contents 1 Introduction... 2 2 Proposal... 3 2.1 Policy Initiatives Catalog... 3 Stakeholder Comments... 4

More information

March 15, 2011 VIA ELECTRONIC FILING

March 15, 2011 VIA ELECTRONIC FILING California Independent System Operator Corporation VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20246 Re: California

More information

Published: December 15, 2017 Revised: December 15, 2017

Published: December 15, 2017 Revised: December 15, 2017 Market Participant Guide: SPP 2018 Congestion Hedging Published: December 15, 2017 Revised: December 15, 2017 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion

More information

CIP Cyber Security Configuration Management and Vulnerability Assessments

CIP Cyber Security Configuration Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call

More information

From: Laura Manz, Vice President of Market & Infrastructure Development

From: Laura Manz, Vice President of Market & Infrastructure Development California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-2 3 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

Standard EOP Disturbance Reporting

Standard EOP Disturbance Reporting A. Introduction 1. Title: Disturbance Reporting 2. Number: EOP-004-1 3. Purpose: Disturbances or unusual occurrences that jeopardize the operation of the Bulk Electric System, or result in system equipment

More information

Financial Planning Institute of Southern Africa SETTING THE STANDARD. Continuous Professional Development (Cpd) Policy

Financial Planning Institute of Southern Africa SETTING THE STANDARD. Continuous Professional Development (Cpd) Policy FPI FPI Financial Planning Institute of Southern Africa SETTING THE STANDARD Continuous Professional Development (Cpd) Policy Table of Contents Definitions 3-4 Introduction 4 Primary Responsibility 5 Mandatory

More information

Purpose. ERO Enterprise-Endorsed Implementation Guidance

Purpose. ERO Enterprise-Endorsed Implementation Guidance Lesson Learned CIP Version 5 Transition Program CIP-002-5.1 Requirement R1: Impact Rating of Generation Resource Shared BES Cyber Systems Version: January 29, 2015 Authorized by the Standards Committee

More information

Maryland Corn: Historical Basis and Price Information Fact Sheet 495

Maryland Corn: Historical Basis and Price Information Fact Sheet 495 Maryland Corn: Historical Basis and Price Information Fact Sheet 495 James C. Hanson, Extension Specialist Department of Agricultural and Resource Economics, University of Maryland Kevin McNew, Adjunct

More information

CIP Cyber Security Personnel & Training

CIP Cyber Security Personnel & Training A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-6 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the Bulk Electric

More information

primary Control Center, for the exchange of Real-time data with its Balancing

primary Control Center, for the exchange of Real-time data with its Balancing A. Introduction 1. Title: Reliability Coordination Monitoring and Analysis 2. Number: IRO-002-5 3. Purpose: To provide System Operators with the capabilities necessary to monitor and analyze data needed

More information

Data Miner 2 Release Notes Release 18.09

Data Miner 2 Release Notes Release 18.09 Data Miner 2 Release Notes Release 18.09 Release Date: September 24, 2018 New Features: 1. New feeds These feeds will be available from September 25, 2018 onwards Enhancements: Real Time Temperature Sets

More information

Mountain West Transmission Group. WECC MIC Update October 17, 2017

Mountain West Transmission Group. WECC MIC Update October 17, 2017 Mountain West Transmission Group WECC MIC Update October 17, 2017 Agenda Overview Mountain West Activities Mountain West Analyses Mountain West Next Steps 2 Mountain West Overview 3 What is the Mountain

More information

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service Improvement and Power District Original Sheet No. F-1 ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service 1.0 This Form of Service Agreement for Wholesale Network

More information

Oracle Managed Cloud Services for Software as a Service - Service Descriptions. February 2018

Oracle Managed Cloud Services for Software as a Service - Service Descriptions. February 2018 Oracle Managed Cloud Services for Software as a Service - Service Descriptions February 2018 Table of Contents Oracle Managed Cloud GxP Compliance for SaaS...3 Oracle Managed Cloud Helpdesk for SaaS...5

More information

This draft standard is being posted for an initial comment and ballot. The draft includes modifications to meet the directives of FERC Order No. 791.

This draft standard is being posted for an initial comment and ballot. The draft includes modifications to meet the directives of FERC Order No. 791. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Uninstructed Deviation Penalty Charge Types 4470, and 4480

Uninstructed Deviation Penalty Charge Types 4470, and 4480 Description Uninstructed Deviation Penalty Charge Types 4470, and 4480 This section of the Dispute Submittal Guide describes the information pertinent to charges for Uninstructed Deviation Penalties, specifically

More information

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010 Transmission Relay Loadability FERC Order 733 Project 2010-1313 NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010 Project Overview 2 Standards Involved PRC-023-2 Transmission

More information

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support TOP/IRO Standards RC Users Group January 21, 2016 Vic Howell Manager, Operations Engineering Support Saad Malik Manager, Real-Time Operations Engineering New/Revised TOP & IRO Standards November 19, 2015,

More information

October 30, Secretary. above. that. attached. Folsom, CA. 250 Outcropping Way

October 30, Secretary. above. that. attached. Folsom, CA. 250 Outcropping Way California Independent System Operator October 30, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent

More information

Agreements & Queue Management

Agreements & Queue Management Agreements & Queue Management Resource Interconnection Fair February 24, 2016 Page 1 Interconnection Process Map You are here Page 2 Topics 1. Generator Interconnection Agreement (GIA) 2. Affected Systems

More information

The NYISO shall assign a Queue Position based upon the date and time of receipt of the

The NYISO shall assign a Queue Position based upon the date and time of receipt of the 30.4 Queue Position 30.4.1 General The NYISO shall assign a Queue Position based upon the date and time of receipt of the valid Interconnection Request; provided that, if the sole reason an Interconnection

More information

Market Participant User Guide ISO Reliability Requirements Application (IRR UI)

Market Participant User Guide ISO Reliability Requirements Application (IRR UI) Market Participant User Guide ISO Reliability Requirements Application (IRR UI) Version 1 Last Revised: November 21, 2011 ISO Public 1 of 84 Table of Contents 1. Introduction... 5 1.1 Resource Adequacy

More information

GDPR AMC SAAS AND HOSTED MODULES. UK version. AMC Consult A/S June 26, 2018 Version 1.10

GDPR AMC SAAS AND HOSTED MODULES. UK version. AMC Consult A/S June 26, 2018 Version 1.10 GDPR AMC SAAS AND HOSTED MODULES UK version AMC Consult A/S June 26, 2018 Version 1.10 INDEX 1 Signatures...3 2 General...4 3 Definitions...5 4 Scoping...6 4.1 In scope...6 5 Responsibilities of the data

More information

Maryland Corn: Historical Basis and Price Information Fact Sheet 495

Maryland Corn: Historical Basis and Price Information Fact Sheet 495 Maryland Corn: Historical Basis and Price Information Fact Sheet 495 Dale M. Johnson, Farm Management Specialist James C. Hanson, Professor and Chair Kevin McNew, Adjunct Professor, Founder and President

More information

December 21, 1998 BY ELECTRONIC MAIL AND HAND DELIVERY

December 21, 1998 BY ELECTRONIC MAIL AND HAND DELIVERY Alden Adkins Sr. V. P. and General Counsel BY ELECTRONIC MAIL AND HAND DELIVERY Katherine A. England Assistant Director Division of Market Regulation Securities and Exchange Commission 450 Fifth Street,

More information

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 January 30, 2015 Re: California

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

Standard CIP 004 3a Cyber Security Personnel and Training

Standard CIP 004 3a Cyber Security Personnel and Training A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-3a 3. Purpose: Standard CIP-004-3 requires that personnel having authorized cyber or authorized unescorted physical access

More information

NETWORK INTEGRATION TRANSMISSION SERVICE. Preamble

NETWORK INTEGRATION TRANSMISSION SERVICE. Preamble Seventh Revised Volume No. 5 (MT) Original Sheet No. 53 III. NETWORK INTEGRATION TRANSMISSION SERVICE Preamble The Transmission Provider will provide Network Integration Transmission Service pursuant to

More information

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1 OATT Attachment Q-1 First Revision of Page 1 ATTACHMENT Q-1 Dynamic Scheduling This attachment contains the eligibility requirements and the terms and conditions for the provision of dynamic scheduling

More information