- 1 - GradePlane for Windows
|
|
- Patricia Bond
- 5 years ago
- Views:
Transcription
1 GradePlane for Windows GradePlane is designed for Land Levelers and farmers and provides an easy way to design and output cut/fill maps for grading land to specified slopes. It uses the common, plane method of field design and expects you to enter surveyed Elevation or Rod Readings into a spreadsheet type Grid. Once data is surveyed and entered, GradePlane calculates the field best fit slopes and creates a field design automatically based on the best fit. It does this on the fly as you are entering field data. As soon as you have field data entered, your best fit design is done. Of course, you can fine tune the design any way you want, changing row and column slopes, importing and exporting yardage, create sections and break lines, and engineer smooth transitions at breaks. The standard version allows fields to be designed in up to seven Sectors and can engineer smooth transitions at sector breaks in either the column or row direction. With the standard version you can also monitor the progress of your work as you cut the field and check the design to insure your field will balance. The standard version also includes 3 D graphs of your field data and designs which makes field layout easier to visualize. While GradePlane is easy to use, it is assumed you know how to use a personal computer and Windows software, and you know about Land Grading and designing fields for irrigation. All calculations in GradePlane are estimates based on survey data that you provide. If your survey is incorrect to begin with, then all results and designs estimate will also be incorrect. Also, recognize that GradePlane makes yardage calculations based on the assumption that you grade the field as you specified in your design. If you don t cut the field to the specified slopes or if you don t properly setup or calibrate your landgrading equipment then your results may not be those listed on your Cutsheet. GradePlane makes the design calculation process easier and faster, but you are the ultimate field designer. Make sure the designed output is what you would normally expect to see and if not, check your data to make sure all is correctly entered. And, of course, a Cutsheet is only a small part of the process. It takes a skilled land grader to turn the design into a graded field. You need keep a close eye as grading progresses to insure you are grading the field as you designed it and your assumptions are valid
2 Column Slope 100 Feet Field Survey GradePlane requires data to be surveyed on a square grid. The field doesn t have to be exactly square, but the survey must be based on regularly spaced grid intervals, rather than randomly surveyed data points. The standard is 100 feet between stations (which is the default), Field Edge 100 Feet A B C D 1 Row Slope 2 3 but you are free to specify other grid intervals if you prefer. In all cases, the first grid line of your survey should begin about one-half the grid interval from the edge of the field. You then lay out your survey grid by drawing perpendicular lines spaced at the grid interval in both the Row and Column directions. In GradePlane Columns are Up and Down on the page and represented by Letters and Rows are Left to Right on the page and represented by numbers Feet A Reading at Center of Station 100 Feet When surveying, you record either rod readings or elevations at each grid intersection. This reading becomes the representative elevation of the entire 100 feet square station, so make sure the location is really representative of the entire section, if not, move location slightly before recording the reading. 100 Feet 50 Feet - 2 -
3 GradePlane allows you designate any grid location as a partial station (versions 1.50 and above) For fields that are not a perfect rectangle partial stations allow you to better estimate cut and fill yardage. You may designate a partial station to be 5 % to 150 % of a normal sized station. Gradeplane will adjust field areas and yardages accordingly. For example, if your regular grid size is 100 feet by 100 feet, designating a partial station size as 50% would reduce the area used from 10,000 square feet to 5,000 square feet. You designate a partial station by highlighting, one or more stations using the mouse, then Right-Click the mouse on the highlighted cells and choose set partial station. Enter the partial station value. You can also access the partial station option for the Design Main Menu section. Partial stations will be marked with a small red triangle in the upper right hand corner of the spreadsheet to indicate the station grid size is not 100%. Click on [-Reset-] to return the cell to 100% You can design fields using feet, acres and Cubic Yards, or meters, hectares and cubic meters. Default Design Values The default values for GradePlane are: Data Type: Elevations Units: Feet/Yards/Acres Grid Size: 100 feet by 100 feet Cut/Fill Ratio: 1.25 You may change any of the above values by selecting: Options, Preferences from the Main Menu. The values you enter become the new default values until you again change any of the values. These values will be stored with any Field data saved. Slopes In GradePlane, increasing slopes (rise) are positive numbers and falling slopes (fall) are negative numbers referenced to the upper left hand corner of the spreadsheet (Cell A1). Rows are left to right and identified with numbers Columns are top to bottom and identified with letters. + Rise, - Fall
4 If you specify a 0.10 Row slope, then slopes along the rows increase in slope 0.10 feet per 100 feet, left to right, from Column A to M. If you specify a Column slope, slope down the columns decrease in slope 0.10 feet per 100 feet, top to bottom, from Row 1 to Row 10. On the printed Cutsheet, map arrows will print showing the direction of fall. Do note that slopes are specified per 100 feet (or % slope) regardless of the grid size. If your grid size is not 100 feet then your slopes will be adjusted accordingly when display on the spreadsheets. For example, with 50 a ft grid size, a specified 0.10 Row slope would be 0.05 per 50 feet (the grid size). Although most land graders talk in terms of Row slope and Cross slopes, in reality, the field plane also slopes in one direction at a particular slope and angle from a specified reference point.. This value is the normally referred to as the compound slope. Even though you enter row and column slopes, GradePlane also calculates the compound slope for use in setting up single slope lasers. To use compound slope you, normally, set your laser to the specified compound slope value, point the laser in the direction of the larger slope, then rotate (or turn) the specified angle in the direction of the smaller slope and set the compound slope value. However, follow your laser manufacturer s guidelines for setting compound slope
5 Elevations and Rod Readings Standard field surveying methods normally use some type of transit or optical level along with a survey rod. A survey rod usually denotes zero at the bottom and increases in tenths of foot up to seven or eight feet tall. Using a survey rod results in rod readings that are inversely proportional to field elevations. (The lower the rod reading, the higher the elevation.) These rod readings can be converted to elevations. GradePlane accepts either Rod Readings or Elevations and converts between the two types of data using a real or arbitrary bench mark or instrument height. Recognize that increasing readings along a row or column indicate a fall when using rod readings, and a rise when using elevations. However, GradePlane always indicates slopes the same: negative numbers indicate a fall from left to right on the grid (or top to bottom) and positive numbers indicate a rise. Normally you should always survey in and use Elevations, unless you either already have a field surveyed in Rod Readings or you have a preference for Rod Readings. You must specify the correct data type BEFORE entering survey readings into Gradeplane. If you do specify the field data to be in Elevations, but you really entered the data in Rod Readings (or vice versa) then simply specify the data correctly under the Preferences menu AFTER entering all the data. If you somehow get half the data in rod readings and half in elevations you will have to start over. Elevation Data Input Directly into GradePlane from a Laser Receiver. If your Laser receiver control unit/box can output standard computer RS232 serial data, you may be able to directly read your survey data into the GradePlane spreadsheet grid from a Laser - 5 -
6 Control Box connected to a Laptop computer serial port. Check with your equipment manufacturer for the proper serial cable to connect between the control box and your laptop. Connect your Laptop serial port to the Laser Mast control box with a serial cable as specified by the control box manufacturer. Start GradePlane and Select Survey with Laser Mast from the Options Menu. You'll then see the Laser Mast Panel appear. It shows several buttons and a read out display for the elevation values: Next, click on the Setup Button to setup the serial port parameters. You will see the following Dialog: - 6 -
7 From the serial port setup, select your control box type/manufacturer, which will establish default values for your equipment. If your serial port parameters are different than the default values, then change them according to your equipment requirements. The two boxes near the bottom of the above dialog box labeled ADD TO and MULTIPLY BY allow you to adjust the raw numbers coming in from the Control Box. You can add a constant value to each reading, or multiply each reading by a constant value. These will normally be adjusted based on the type of control box you use, however change these values if you want. Click OK to close the setup screen. Since GradePlane only accepts elevation readings less than 1000, in some case you must use these correction factors. For example, if your control box outputs in hundredths, e.g You should MULTIPLY BY 0.01 to convert the value to Next, click on the Start button which turns on the Port and starts collecting data from your survey mast. You should see the latest reading from your control box in the Laser box: Now you can start collecting data. Drive to the proper grid station and press the RETURN key on your keyboard to enter the Mast Elevation data into the spreadsheet. Each time you press RETURN, the mast data will be entered and your cursor will advance to the next cell. The auto advance button will automatically advance left to right (LR) to start. But, by clicking on the button, you can change the auto advance direction to right to left (RL), up to down (UD), or down to - 7 -
8 Up (DU) Each time you click on the button it will toggle to the next value. So, if you get out of sync, just keep pressing the button until you get to the direction you want. GradePlane is set up to make surveying in any direction fairly easy using the Mast. Once you get started surveying, when you get to the end of a row or column press either the + key or the * key on the numeric keypad and the cursor will advance to a new row or column and the auto advance direction will reverse allowing you to survey back the other direction. You can also reverse directions by pressing the New Row or New Col buttons if you want. It is usually easier to use the keyboard. When you're done surveying with the Laser, press the STOP button to turn off the serial port and un-select "Survey with Laser Mast" from the options menu. Laser Survey Adjustment - Surveying using a Laser with Slope In some situations, a field may have such large slope changes from one side to other that you may want to survey using a laser containing slope to obtain all survey readings with one laser setup. GradePlane can correct data surveyed this way and convert to the actual elevations. In order to do this, you will need to specify the laser slopes and a reference station for the Laser location. Gradeplane will then add or subtract the appropriate slope values from the measured values depending on the location within the field. This will be a one time conversion to modify the raw data. After loading or importing your raw uncorrected field survey data, Select Laser Survey Adjustment from the Options Menu. This brings up a dialog box where you enter the Row and Column slopes and the Laser Reference Station. The Laser Reference station is simply the station location that will have 0 adjustment. After entering these values, click OK. All the survey data values will be corrected and the design will recalculate. You should then save the field data under a different name. If you happen to make an error when entering slopes, the only way to recover is to again select the Laser Survey Adjustment and enter the opposite values to un-correct the data. For example, if you entered a row slope of.10 and it was incorrect. Select the item again and enter -.10 as the slope. This returns the values to the way they were. Another option is to re-load the raw uncorrected data and start over. Volume Calculations The overall objective with land grading is to grade a particular field to a designed plane with the specified field row and cross slopes. The design plane is then compared to the existing field survey and either cut or fill values are specified for each grid location depending on whether the station is above or below the desired design plane. Dirt is moved from cut stations to fill stations - 8 -
9 to create the designed plane. You also normally want the cut yardage to equal the fill yardage so that the field is balanced. That is, you don t want to be short or long on dirt when you re done. GradePlane uses the specified grid interval and the amount of cut or fill at each station to determine the overall cut volume and fill volume. Gradeplane uses the summation method, where it is assumed that each grid section is flat, and the surveyed elevation is the elevation of the entire grid section. This assumption may not be true, so it is important that the elevation surveyed be representative of the entire grid elevation. For stations 100 feet by 100 feet, a one tenth cut or fill across the station represents about 37 cubic yards of earth moved. (100 x 100 x 0.10) / 27 cubic feet. Usually, you want to have dirt balance across the entire field. When a field is balanced, you have exactly the right amount of dirt moved. Due to soil shrinkage you need more cut volume than fill volume. In order to balance yardage you need to know and enter the ratio of a field s cut to fill. Total yards cut, divided by Total yards filled is the Cut to Fill ratio. The Cut to Fill ratio you enter is only an estimate of the actual field cut to fill ratio. Cut to fill ratios will always vary depending on the type of soil, moisture content, depth of cuts, and farming history. Normally cut to fill ratios are between 1.2 and 1.5 but they vary. If you grade in one area, you can normally determine a good starting point based on past experience. However, if your cut to fill ratio is incorrect, your yardage calculations may not be accurate and your field may not balance. It is the land grader s responsibility to ensure that the cut to fill ratio is correct, and if not, make adjustments in setup during grading. The grader must tally the cuts and fills as work progresses and adjust elevation up or down to insure balance. Using the specified slopes, GradePlane adjusts the design plane elevation up or down to achieve the desired cut to fill ratio. Raising the plane reduces cut volume and increases the fill volume. Lowering the plane increases cuts and decreases fills. GradePlane defaults to a 1.25 Cut/Fill ratio which means you cut 125% of the required fill volume. You can adjust the ratio, to any value, and you should use a ratio appropriate for the type of soil you are grading. Data Entry GradePlane defaults to elevations as the data type. You can change this value to Rod Readings from the Options, Preferences Menu. GradePlane remembers any settings you change in the Preferences menu and saves them as defaults. Leave the data type set to elevations unless you know you have a survey in Rod Readings, or you prefer rod readings (and know how to get them) when conducting a survey. To begin a new field design, first specify the data type (rod readings or elevations) and field border distances (if not ½ the grid size), then begin entering your survey readings. If you specify the data type as Rod Readings, but enter elevations, everything will be backwards and calculations will be incorrect. Readings may be up to GradePlane remembers the previous value entered so a previous reading value can be repeated simply be pressing the Enter Key. As you enter data and press the enter key, you automatically advance to the next cell (from Left to Right.) You can change this to advance from right to left if you prefer. You change the direction by clicking on the Auto L/R button just above the upper right hand corner of the Survey date entry spreadsheet. At the end of each data line, pressing the * or the + key will advance to the next row and return you to column 1 in the spreadsheet
10 Field Design GradePlane will automatically calculate and display a best fit design based on the surveyed data. When you enter or import your field data, the field design is created for you automatically using the calculated best fit slopes for the field. GradePlane calculates a least-squares best fit of the field using an average of the row and column elevation profiles. The best fit will conform to the natural trend of the field slopes and be very close to the optimal design for moving minimum yardage. However, the best fit slopes are calculated values based on the average of each of the row and column slopes. Clicking on the Use Best Fit Slopes check box, sets the best fit slopes as the design slopes. You still may need to adjust slopes up or down slightly to obtain the slopes that will minimize the cut yardage. Gradeplane includes an option to automatically Minimize yards by incrementing the best fit slopes up and down slightly until values are found that minimizes the cut yardage. You can also make slight adjustments up or down in your row or column slopes manually by clicking on the small up or down arrows next the slope entry boxes. If you press the Minimize Yards button GradePlane will try to minimize the best fit yardage by adjusting the slopes and then will set your design slopes to these calculated value. It then automatically unchecks the checkbox. Clicking it again will repeat the process. Although this is a convenient feature, it also takes extra processing time, therefore you are required to select it manually. Also, even though GradePlane attempts to minimize yardage, in some cases you still might be able to get a slightly lower yardage by adjusting the slopes up or down manually. Usually, you ll want to normalize the best fits slopes to standard values, for example, change.087 to 0.10, but other than that, choosing the best fit design is the design for minimum construction. Of course, change the slope values to anything you want. Experiment, and see how your adjustments change the total yardage. The overall design is based on the original survey, the specified row and column slopes and the Cut/Fill ratio. Changing any of these values affects the total yardage calculation. You can also specify to Import or Export yardage from the field. If you need to obtain yardage to build a road or crown, you specify the amount as a design parameter. Likewise, if you have additional yardage you need to waste in a field, GradePlane can handle that also. Positive numbers designate import, and negative numbers indicate export. Gradeplane considers import or export yardage when calculating the overall cut/fill ratio. You also can affect the field design by specifying the final elevation at a particular location. For example, if you know you want the elevation at station E5 to be 44.50, you can force the elevation to be that value. GradePlane will then use your specified Row and Column slopes to force the design to have an elevation of at station E5. However, this will cause the Cut/Fill to move away from the specified 1.25 to whatever is necessary to make the design work. You can
11 specify Row and Column slopes, and, either the Cut/Fill Ratio or the final elevation at a particular station, but not both. To specify a final elevation value, select the final elevation tab to view the final elevation spreadsheet. Use your cursor or mouse to go to a station and type in the final elevation you want. GradePlane recalculates the design to force the station to that elevation. The cut/fill ratio will be adjusted to whatever is necessary to achieve the design. Defining Multiple Sectors In some cases you may find a particular field that has two or more well defined natural slope areas or sections as is the case in the field shown here. If you recognize this, and your final design criteria is not overly rigid, you can save a considerable amount in construction costs by specifying sectors in your field with different design parameters conforming closely to the natural shape of the field. GradePlane not only allows you define multiple sectors, but also engineers the field so that at the hinge or breaklines, the field sections blend smoothly without abrupt elevation changes, and yardages balance across the entire field. Few other landgrading design programs can accomplish this. GradePlane can divide a field into multiple rectangular sectors (up to seven) and specify design parameters into each section separately. You can accomplish the same thing by dividing a large field into pieces and entering readings as separate fields. However, using sectors has the advantage of allowing you design the two sectors together and allow smooth transitions at the break lines. Each section can have its own Row and Column slopes, cut/fill ratio, and import/export yardage. Initially each section of the field will be a separate design plane and there could be significant differences in elevation at the break lines. By selecting Blend in either the Row or Column Direction, GradePlane will engineer the field planes so there is a smooth transition at the break points. However, you can only blend in one direction at a time. For example, if you select blend in the Column direction, slopes will blend at break lines along the Rows. The Row slopes must be the same across both sectors for the blend to work. If you blend in the Column direction, GradePlane uses the Row slope in sector number 1 for the Row slope for all sectors. This works the same if you select Blend in the Column direction
12 To define a sector, you first highlight the section of the field using your mouse. In the Survey screen move the mouse cursor to the upper left corner of the sector you want to define, hold down the left mouse button and drag across the stations until you reach the lower right hand corner of the sector. Release the left mouse button and the sector will remain highlighted. Now, click the right mouse button which will bring up a Pop-Up menu. Select the Menu Item Set Sector Slope You should see the following dialog box. Enter your desired values. You can either click on the Use Best Fit Slopes button to accept the best fit slopes. Or, you can enter any slopes you want in the appropriate boxes. You can change any of these slopes later, so at this point you can enter anything you want. Click OK, when done. If you change your mind click cancel. Repeat the above process to define additional sectors
13 You can also View Sector Info from the Pop-Up menu instead of setting the slopes. This item provides information about the sector defined, but doesn t allow to you enter slopes. If you just want to check different sectors, then use this option. Here is the same field from above, the graphs show both a single plane design and a two sector design. By conforming the design to the natural field contour with two sectors instead of using one plane, the total yardage moved is lowered considerably. Single Plane -10,067 yds 2 Sectors - 3,256 yds If you want to delete sectors you can select Delete All Sectors from the design menu. Or while in the Survey spreadsheet, right click your mouse in the Sector you want to delete and select Delete Sector. You must delete sectors in the reverse order that you created them. That is, you must delete sector 2, before you delete sector 1. Printing After completing your field design you will want to print your designs. GradePlane has several different printing options where you can specify the printout desired. You can print the old survey readings, a working map or Cutsheet, or a full map that lists old readings, new designed readings and the cuts and fills. You can print more than one map by selecting the respective box in the print menu. The print menu also allows you to print a page header with your business name, plus you can add a field name and customer name. The page header entered will become the default and will print on future maps until you change it. You can also print any of the 3-D graphs. You print these from the 3-D view tab on the main screen. Select the 3-D view you want printed, and click on the Print Graph button. Convert Data Type This option allows you to convert data from Rod Readings to Elevations or Vice Versa. You must enter a bench mark or Instrument Height Value which will be used to convert the data. This can be the actual instrument height or some arbitrary number. GradePlane simply subtracts all survey readings from the specified number. For example, if you have a 4.3 Rod Reading and specify 10 for the benchmark, the Elevation becomes or 5.7. If you entered data incorrectly and the data is really elevations and not rod readings (or vice versa) then simply specify the data correctly under the Preferences menu. Don t use convert data type
14 Loading and Saving Field Data GradePlane uses standard windows menus for saving and loading field data files. When saving GradePlane files the.fld extension will be added to your field names. For example, myfield becomes myfield.fld. You can save the data whenever you want, plus you will be given the option to save data changed data before exiting. Import Data GradePlane can import data saved in from other data collectors. Select File, Import Data then select the appropriate file format. You can also Cut and Paste readings from any spreadsheet type application. For example, if someone provided you with field data entered into Excel, you load the file into Excel, then elect and copy the data from there and Paste the data into the GradePlane data entry screen. Keyboard Navigation The following key combinations allow better navigation when entering field survey data. Home Goto Current Row, Column A Ctrl Home Goto Cell A1 *, + Goto Row + 1, Column A End Goto Current Row, Last Column Delete Delete Cell Contents 3-D Graph GradePlane allows you to view and print 3 dimensional graphic views of your survey readings and designs. You view the graphs by selecting the 3D View tab. Graphs make it easier to visualize your field designs. For example, by looking at a graph of the survey readings you can better decide where you might divide a field into sectors. In the example below the surveyed field graph makes it easy to see a significant change in natural slope at
15 about Row 8. In this case, you might choose to design the field in two sectors instead of one plane. From the 3D view window you can choose to view either the Survey Readings or field Design by clicking on the button above the graph. You can also print the selected graph by clicking on the Print Graph button. The 3D graph view is rotated from the way the data entry spreadsheet looks in order give a better perspective of the field. You can rotate or Zoom in on the graph view using your mouse. To rotate the graph for a different view click and hold down your left mouse button while the cursor is over the graph. By dragging the mouse you can rotate the graph. Likewise, if you hold down the right mouse button and drag, the graph gets larger or smaller depending on the direction you drag. Check Cut/Fill Ratio The Cut/Fill ratio entered into GradePlane is only an estimate. If you estimate wrong, your field may not balance. That is, you may end up with left over dirt when the field is completed or not have enough dirt for all of the required fills. In either case, this causes added time or expense in re-grading or rework to fix the problem. You always want to end up with exactly the needed amount of cut and fill to make your earthwork balance. In order to do this, the land grader must continually check work progress to figure out whether the field is "going long" or "going short" and make small grade adjustments to compensate. GradePlane provides tools to help you do this. On the printed Cutsheet, the cuts and fills for each row and column are listed. By adding up the cuts and fills for the portion of the field already completed, the grader can determine if the field is going long or short and then raise or lower setup elevation to compensate. GradePlane also does this automatically and tells you the estimated amount to raise or lower elevation. This is another feature no other design programs offer. The Check Cut/Fill Ratio option does this for you. In order to use this option, you first must select the Cutsheet Tab and be viewing the Cutsheet on your Computer Screen. You then use the mouse to Highlight the stations already graded. If you have completed a square area, you simply press the left mouse button and drag the cursor across the cells to select. If you don't have a square area completed, you add individual cells to the selection by holding down the Ctrl key, then pressing the left mouse button while the cursor is over the cell you want to add. After the cells are selected a button will show in the upper right hand corner of the spreadsheet. Click on this button to check the ratio, (You can also do this by pressing the right mouse button to bring up the pop-up menu, or select this option
16 from the Main Menu - Design item.) In any case, GradePlane calculates the actual cut/fill ratio of the stations already completed, and gives an estimate of how far you should raise or lower the elevation to adjust for the real Cut/Fill ratio. As example, if your field designed cut/fill ratio was 1.25 and after completing a third of the field you check the real Cut/Fill ratio find it is 1.50 your design is not cutting enough to balance. If you don't change your setup, the field will come up short. What you should do is lower the setup elevation by a few hundredths of foot to increase your cut/fill ratio. By continuing to check cut/fill and making adjustments the land grader can assure the grade is correct and the field balances. In the Cutsheet above we have highlighted an area that we have completed grading and clicked on the Check Cut/Fill Ratio button. The dialog box informs us that the actual cut/fill ratio for the graded area is In this case our estimated ratio was 2.00, so we need to lower the field elevation by.02 feet since we are actually cutting more than we first estimated and we need to do the same on the rest of the field. For this feature to work properly, you need to use it very soon after the field work begins. If you wait until the field is almost done, you might not have enough remaining work to make the cut adjustment and still smooth the field. Anytime the adjustment estimates are more than a tenth (.10) you probably have waited too long to make adjustments and will have to regrade portions of the entire field. What this option does is takes the stations you have completed and balanced, and calculates the actual cut to fill ratio. It then removes those stations from the field and recalculates the design using the actual cut to fill ratio. Finally it compares the elevation of the remaining stations to the original design elevations and estimates the amount you need to raise or lower the elevation. This feature is another tool, and won t replace land grading experience. You can do the same thing and create a new cutsheet by deleting all the stations completed from your survey and change the cut to fill ratio to the new estimate. Installation In you received GradePlane on a CD ROM, it should automatically start and give you an installation menu when you place the CD Rom in your computer. If it does not, to install GradePlane you simply run the program GPsetup.exe from the program disk provided or from the folder where you downloaded this file. If you know where the file is located on your hard
17 drive (CD Rom or floppy disk), Double click on the file name from Windows Explorer, or Run the file from the Start, Run option on the start Menu. Follow the prompts on the screen for installation. GradePlane will normally be installed in the c:\program files\gradeplane directory. You can only install GradePlane on one Computer. After installing it will only fully function for 30 days. To complete the installation process after installing GradePlane, you must obtain a final Release Code by or mail to permanently authorize the program on your Computer. To get your release code, first start GradePlane. From the Main Screen click the Help menu item. Then click on Install. You will see a box similar to the following: Copy the machine ID number. In the above example, the machine ID number is Send your Machine ID number by to support@gradeplane.com or to your dealer and request a final release code. You will then be sent a release code similar to A123 A123 A123 A123 Open the Help Menu and click on Install option to again see the above dialog box. Enter the release code in the second box above and click OK. GradePlane will then be completely install and won t expire. Record and save your release code. Once installed, the Install option will disappear. You are only authorized to use GradePlane on one Computer. Entering a New Release Code In some situations you may need to enter a new release code. For example, if your release code has expired, you will need to enter a new code to continuing using GradePlane. After you obtain the new code by , open the Help Menu and click on the About menu item. You should see the following:
18 Click on the New Code button which will bring up the Final Install dialog and allow you to enter the new release code. Click Ok. Questions/Support If you have questions or problems contact your dealer or contact us by at
19 Main Menu Select Tabs to display Cutsheet or Full Data Shows best fit values and average elevation Totals Cut/Fill yardage when using multiple sectors Click to change Auto Advance Direction. Enter desired row and column slopes and Cut to fill ratios Select this box to use best fit values in design Shows graph of Row and Column Profiles
20 Options Menu Items Specify Elevations or Rod Readings Enter grid interval Specify Feet/Acres or Meters/Hectares Auto calculates a new field design every time any data is changed. Turn this off with very large fields to speed data entry. Adjusts survey readings IF survey was made using a laser with slope added. This subtracts out the laser slope based on the location of the laser. Convert from Elevations to Rod Readings or vice versa. Enter a benchmark value, then all readings will be subtracted from this value to convert
21 Sector Slopes and Blending Sectors are outlined on on all screens If designed with multiple slopes these tabs show sector design values. Selecting blend, engineers smooth transitions at break lines
22 Pop Up Menu Items Highlight a section of the field using the left Mouse button then press the right mouse button to bring up the Pop Up Menu. Then select View or Set Sector Info. (Only in the Standard Cutsheet Version.) Pressing the Right mouse button brings up this Pop- Up menu used to set, view and delete sector slopes. (Not available in the lite Version
EXCEL BASICS: MICROSOFT OFFICE 2010
EXCEL BASICS: MICROSOFT OFFICE 2010 GETTING STARTED PAGE 02 Prerequisites What You Will Learn USING MICROSOFT EXCEL PAGE 03 Opening Microsoft Excel Microsoft Excel Features Keyboard Review Pointer Shapes
More informationEXCEL BASICS: MICROSOFT OFFICE 2007
EXCEL BASICS: MICROSOFT OFFICE 2007 GETTING STARTED PAGE 02 Prerequisites What You Will Learn USING MICROSOFT EXCEL PAGE 03 Opening Microsoft Excel Microsoft Excel Features Keyboard Review Pointer Shapes
More informationUSER MANUAL. > analyze. reduce. recover
USER MANUAL > analyze > reduce > recover Table of Contents COPY AUDIT... 1 OVERVIEW... 1 IMPORTANT NOTES FOR PRINT AUDIT 4 CUSTOMERS... 1 COMMUNICATOR TECHNICAL NOTES... 2 COPY AUDIT SOFTWARE... 2 INSTALLING
More informationLD20493 From AutoCAD Civil 3D to Storm and Sanitary Analysis - Pond Design Using Volume-Grading Tools
LD20493 From AutoCAD Civil 3D to Storm and Sanitary Analysis - Pond Design Using Volume-Grading Tools Kevin Larkin LSC Design, Inc. Learning Objectives Learn how to dynamically model stormwater ponds using
More informationTPC Desktop Series. Alignments Learning Guide 1/18
TPC Desktop Series Alignments Learning Guide 1/18 NOTICE The information in this document is subject to change without notice. TRAVERSE PC. Inc. assumes no responsibility for any errors that may appear
More informationUsing Microsoft Excel
Using Microsoft Excel Introduction This handout briefly outlines most of the basic uses and functions of Excel that we will be using in this course. Although Excel may be used for performing statistical
More informationv SMS 12.2 Tutorial Observation Prerequisites Requirements Time minutes
v. 12.2 SMS 12.2 Tutorial Observation Objectives This tutorial will give an overview of using the observation coverage in SMS. Observation points will be created to measure the numerical analysis with
More informationCHAPTER 1 COPYRIGHTED MATERIAL. Getting to Know AutoCAD. Opening a new drawing. Getting familiar with the AutoCAD and AutoCAD LT Graphics windows
CHAPTER 1 Getting to Know AutoCAD Opening a new drawing Getting familiar with the AutoCAD and AutoCAD LT Graphics windows Modifying the display Displaying and arranging toolbars COPYRIGHTED MATERIAL 2
More informationTechnique or Feature Where Introduced
Part 6: Keypad 4 Mirrored features Patterned features First extrusion Rounded corners In the earpiece part, you defined a radial pattern, one that created new instances of a feature at intervals around
More informationCopyright 2004, Mighty Computer Services
EZ-GRAPH DATABASE PROGRAM MANUAL Copyright 2004, Mighty Computer Services The Table of Contents is located at the end of this document. I. Purpose EZ-Graph Database makes it easy to draw and maintain basic
More informationHOUR 12. Adding a Chart
HOUR 12 Adding a Chart The highlights of this hour are as follows: Reasons for using a chart The chart elements The chart types How to create charts with the Chart Wizard How to work with charts How to
More informationGloucester County Library System EXCEL 2007
Gloucester County Library System EXCEL 2007 Introduction What is Excel? Microsoft E x c e l is an electronic s preadsheet program. I t is capable o f performing many diff e r e n t t y p e s o f c a l
More informationThe Fundamentals. Document Basics
3 The Fundamentals Opening a Program... 3 Similarities in All Programs... 3 It's On Now What?...4 Making things easier to see.. 4 Adjusting Text Size.....4 My Computer. 4 Control Panel... 5 Accessibility
More informationUsing Edusoft and Excel to Extract SLO Data for the BPSD Growth Target Calculator Spreadsheet by Granger Meador
Using Edusoft and Excel to Extract SLO Data for the BPSD Growth Target Calculator Spreadsheet by Granger Meador CREATING AND GIVING PRE-TEST: 1. Create separate assessment(s) in Edusoft for your pre-test
More informationMicrosoft Excel 2010 Basic
Microsoft Excel 2010 Basic Introduction to MS Excel 2010 Microsoft Excel 2010 is a spreadsheet software in the new Microsoft 2010 Office Suite. Excel allows you to store, manipulate and analyze data in
More informationObservation Coverage SURFACE WATER MODELING SYSTEM. 1 Introduction. 2 Opening the Data
SURFACE WATER MODELING SYSTEM Observation Coverage 1 Introduction An important part of any computer model is the verification of results. Surface water modeling is no exception. Before using a surface
More informationINTRODUCTION... 1 UNDERSTANDING CELLS... 2 CELL CONTENT... 4
Introduction to Microsoft Excel 2016 INTRODUCTION... 1 The Excel 2016 Environment... 1 Worksheet Views... 2 UNDERSTANDING CELLS... 2 Select a Cell Range... 3 CELL CONTENT... 4 Enter and Edit Data... 4
More informationGrading and Volumes CHAPTER INTRODUCTION OBJECTIVES
CHAPTER 10 Grading and Volumes INTRODUCTION AutoCAD Civil 3D uses surface breaklines, cogo points, contours, feature lines, and grading objects to create a surface design. There are numerous ways to grade
More informationGeometric Entities for Pilot3D. Copyright 2001 by New Wave Systems, Inc. All Rights Reserved
Geometric Entities for Pilot3D Copyright 2001 by New Wave Systems, Inc. All Rights Reserved Introduction on Geometric Entities for Pilot3D The best way to develop a good understanding of any Computer-Aided
More informationStickFont Editor v1.01 User Manual. Copyright 2012 NCPlot Software LLC
StickFont Editor v1.01 User Manual Copyright 2012 NCPlot Software LLC StickFont Editor Manual Table of Contents Welcome... 1 Registering StickFont Editor... 3 Getting Started... 5 Getting Started...
More informationTach Facts V3.0 Software
Tach Facts V3.0 Software Download runs from your Auto Meter Playback Tach with Tach-Facts Software. Instr. No. 2650-978 Tach Facts provides complete race analysis on your personal computer. Introduction
More informationv Observations SMS Tutorials Prerequisites Requirements Time Objectives
v. 13.0 SMS 13.0 Tutorial Objectives This tutorial will give an overview of using the observation coverage in SMS. Observation points will be created to measure the numerical analysis with measured field
More informationTangents. In this tutorial we are going to take a look at how tangents can affect an animation.
Tangents In this tutorial we are going to take a look at how tangents can affect an animation. One of the 12 Principles of Animation is called Slow In and Slow Out. This refers to the spacing of the in
More informationQuick Start Guide. ASR Automated Systems Research Inc. Toll free: Fax:
Quick Start Guide ASR Automated Systems Research Inc. Toll free: 1-800-818-2051 Phone: 604-539-0122 e-mail: support@asrsoft.com Fax: 604-539-1334 www.asrsoft.com Copyright 1991-2014 ASR Automated Systems
More informationEarthwork 3D for Dummies Doing a digitized dirt takeoff calculation the swift and easy way
Introduction Earthwork 3D for Dummies Doing a digitized dirt takeoff calculation the swift and easy way Getting to know you Earthwork has inherited its layout from its ancestors, Sitework 98 and Edge.
More informationDOING MORE WITH WORD: MICROSOFT OFFICE 2010
DOING MORE WITH WORD: MICROSOFT OFFICE 2010 GETTING STARTED PAGE 02 Prerequisites What You Will Learn USING MICROSOFT WORD PAGE 03 Viewing Toolbars Adding and Removing Buttons MORE TASKS IN MICROSOFT WORD
More informationMicrosoft Office Excel
Microsoft Office 2007 - Excel Help Click on the Microsoft Office Excel Help button in the top right corner. Type the desired word in the search box and then press the Enter key. Choose the desired topic
More informationSURFACE WATER MODELING SYSTEM. 2. Change to the Data Files Folder and open the file poway1.xyz.
SURFACE WATER MODELING SYSTEM Mesh Editing This tutorial lesson teaches manual finite element mesh generation techniques that can be performed using SMS. It gives a brief introduction to tools in SMS that
More informationCHAPTER 1 GETTING STARTED
GETTING STARTED WITH EXCEL CHAPTER 1 GETTING STARTED Microsoft Excel is an all-purpose spreadsheet application with many functions. We will be using Excel 97. This guide is not a general Excel manual,
More informationPLAY VIDEO. Fences can be any shape from a simple rectangle to a multisided polygon, even a circle.
Chapter Eight Groups PLAY VIDEO INTRODUCTION There will be times when you need to perform the same operation on several elements. Although this can be done by repeating the operation for each individual
More informationUsing Microsoft Word. Working With Objects
Using Microsoft Word Many Word documents will require elements that were created in programs other than Word, such as the picture to the right. Nontext elements in a document are referred to as Objects
More informationQuick Reference Card
with the FieldLevel II Automated Levelling System Quick Reference Card f g h i j e Run screen layout d c l m n o p q r k s Item Description Item Description c d e Cut / Fill map The difference between
More informationGeoWeb Portal. User Manual
GeoWeb Portal User Manual Purpose The GeoWeb Portal (GWP) is a map viewing and publishing site. It is designed to allow people to build their own maps and review the data that is attached to the elements
More informationSelective Space Structures Manual
Selective Space Structures Manual February 2017 CONTENTS 1 Contents 1 Overview and Concept 4 1.1 General Concept........................... 4 1.2 Modules................................ 6 2 The 3S Generator
More informationMicrosoft Excel 2010 Handout
Microsoft Excel 2010 Handout Excel is an electronic spreadsheet program you can use to enter and organize data, and perform a wide variety of number crunching tasks. Excel helps you organize and track
More informationHAPPY HOLIDAYS PHOTO BORDER
HAPPY HOLIDAYS PHOTO BORDER In this Photoshop tutorial, we ll learn how to create a simple and fun Happy Holidays winter photo border! Photoshop ships with some great snowflake shapes that we can use in
More informationSUM - This says to add together cells F28 through F35. Notice that it will show your result is
COUNTA - The COUNTA function will examine a set of cells and tell you how many cells are not empty. In this example, Excel analyzed 19 cells and found that only 18 were not empty. COUNTBLANK - The COUNTBLANK
More informationLESSON 2 MODELING BASICS
LESSON 2 MODELING BASICS In this lesson we ll start to model a multi-story office building from scratch. We ll construct the base grid, create the two towers and place slabs between the stories. Also we
More informationExcel Basics: Working with Spreadsheets
Excel Basics: Working with Spreadsheets E 890 / 1 Unravel the Mysteries of Cells, Rows, Ranges, Formulas and More Spreadsheets are all about numbers: they help us keep track of figures and make calculations.
More informationHow to use Excel Spreadsheets for Graphing
How to use Excel Spreadsheets for Graphing 1. Click on the Excel Program on the Desktop 2. You will notice that a screen similar to the above screen comes up. A spreadsheet is divided into Columns (A,
More informationPiping Design. Site Map Preface Getting Started Basic Tasks Advanced Tasks Customizing Workbench Description Index
Piping Design Site Map Preface Getting Started Basic Tasks Advanced Tasks Customizing Workbench Description Index Dassault Systèmes 1994-2001. All rights reserved. Site Map Piping Design member member
More informationCross Sections, Profiles, and Rating Curves. Viewing Results From The River System Schematic. Viewing Data Contained in an HEC-DSS File
C H A P T E R 9 Viewing Results After the model has finished the steady or unsteady flow computations the user can begin to view the output. Output is available in a graphical and tabular format. The current
More informationIntroduction to Microsoft Office PowerPoint 2010
Introduction to Microsoft Office PowerPoint 2010 TABLE OF CONTENTS Open PowerPoint 2010... 1 About the Editing Screen... 1 Create a Title Slide... 6 Save Your Presentation... 6 Create a New Slide... 7
More informationRev. C 11/09/2010 Downers Grove Public Library Page 1 of 41
Table of Contents Objectives... 3 Introduction... 3 Excel Ribbon Components... 3 Office Button... 4 Quick Access Toolbar... 5 Excel Worksheet Components... 8 Navigating Through a Worksheet... 8 Making
More informationExcel Basics Rice Digital Media Commons Guide Written for Microsoft Excel 2010 Windows Edition by Eric Miller
Excel Basics Rice Digital Media Commons Guide Written for Microsoft Excel 2010 Windows Edition by Eric Miller Table of Contents Introduction!... 1 Part 1: Entering Data!... 2 1.a: Typing!... 2 1.b: Editing
More informationBasic Modeling 1 Tekla Structures 12.0 Basic Training September 19, 2006
Tekla Structures 12.0 Basic Training September 19, 2006 Copyright 2006 Tekla Corporation Contents Contents 3 1 5 1.1 Start Tekla Structures 6 1.2 Create a New Model BasicModel1 7 1.3 Create Grids 10 1.4
More informationEXCEL BASICS: PROJECTS
EXCEL BASICS: PROJECTS In this class, you will be practicing with three basic Excel worksheets to learn a variety of foundational skills necessary for more advanced projects. This class covers: Three Project
More informationUser Manual. Gateway 6.2: Map Math
User Manual Gateway 6.2: Map Math TerraCutta Pro User Release Version 2.0 2014 Precision Cropping Technologies Pty Ltd. No part of this publication may be reproduced, transmitted, transcribed, stored in
More informationInstructions for Using the Databases
Appendix D Instructions for Using the Databases Two sets of databases have been created for you if you choose to use the Documenting Our Work forms. One set is in Access and one set is in Excel. They are
More informationDOING MORE WITH WORD: MICROSOFT OFFICE 2013
DOING MORE WITH WORD: MICROSOFT OFFICE 2013 GETTING STARTED PAGE 02 Prerequisites What You Will Learn USING MICROSOFT WORD PAGE 03 Viewing Toolbars Adding and Removing Buttons MORE TASKS IN MICROSOFT WORD
More informationGY301 Geomorphology Lab 5 Topographic Map: Final GIS Map Construction
GY301 Geomorphology Lab 5 Topographic Map: Final GIS Map Construction Introduction This document describes how to take the data collected with the total station for the campus topographic map project and
More informationWEEK NO. 12 MICROSOFT EXCEL 2007
WEEK NO. 12 MICROSOFT EXCEL 2007 LESSONS OVERVIEW: GOODBYE CALCULATORS, HELLO SPREADSHEET! 1. The Excel Environment 2. Starting A Workbook 3. Modifying Columns, Rows, & Cells 4. Working with Worksheets
More informationUsing Microsoft Excel
Using Microsoft Excel Excel contains numerous tools that are intended to meet a wide range of requirements. Some of the more specialised tools are useful to people in certain situations while others have
More informationStep 1: Create A New Photoshop Document
Snowflakes Photo Border In this Photoshop tutorial, we ll learn how to create a simple snowflakes photo border, which can be a fun finishing touch for photos of family and friends during the holidays,
More informationStatus Bar: Right click on the Status Bar to add or remove features.
Excel 2013 Quick Start Guide The Excel Window File Tab: Click to access actions like Print, Save As, etc. Also to set Excel options. Ribbon: Logically organizes actions onto Tabs, Groups, and Buttons to
More informationTOF-Watch SX Monitor
TOF-Watch SX Monitor User manual Version 1.2 Organon (Ireland) Ltd. Drynam Road Swords Co. Dublin Ireland Contents General information... 3 Getting started... 3 File Window... 7 File Menu... 10 File Open
More information1) Merge the cells that contain the title and center the title
Supplies: You will need a storage location to save your spreadsheet for use in Session 2. You will need the 2 handouts pertaining to Session 1 Instructions: Follow the directions below to create a budget
More informationWorking with Charts Stratum.Viewer 6
Working with Charts Stratum.Viewer 6 Getting Started Tasks Additional Information Access to Charts Introduction to Charts Overview of Chart Types Quick Start - Adding a Chart to a View Create a Chart with
More informationGetting Started with ShowcaseChapter1:
Chapter 1 Getting Started with ShowcaseChapter1: In this chapter, you learn the purpose of Autodesk Showcase, about its interface, and how to import geometry and adjust imported geometry. Objectives After
More informationEXCEL PRACTICE 5: SIMPLE FORMULAS
EXCEL PRACTICE 5: SIMPLE FORMULAS SKILLS REVIEWED: Simple formulas Printing with and without formulas Footers Widening a column Putting labels and data in Bold. PART 1 - DIRECTIONS 1. Open a new spreadsheet
More informationXnView 1.9. a ZOOMERS guide. Introduction...2 Browser Mode... 5 Image View Mode...15 Printing Image Editing...28 Configuration...
XnView 1.9 a ZOOMERS guide Introduction...2 Browser Mode... 5 Image View Mode...15 Printing... 22 Image Editing...28 Configuration... 36 Written by Chorlton Workshop for hsbp Introduction This is a guide
More informationAUTODESK FUSION 360 Designing a RC Car Body
AUTODESK FUSION 360 Designing a RC Car Body Abstract This project explores how to use the sculpting tools available in Autodesk Fusion 360 Ultimate to design the body of a RC car. John Helfen john.helfen@autodesk.com
More informationIntroduction to MS Word XP 2002: An Overview
Introduction to MS Word XP 2002: An Overview Sources Used: http://www.fgcu.edu/support/office2000/word/files.html Florida Gulf Coast University Technology Skills Orientation Word 2000 Tutorial The Computer
More informationPodium Plus Data Analysis Software. User Manual. SWIS10 Version
SWIS10 Version Issue 1.10 February 2005 Contents 1 Introduction 6 1.1 What is Podium Plus? 6 1.2 About This Manual 6 1.3 Typographical Conventions 7 1.4 Getting Technical Support 7 2 Getting Started 8
More informationDOING MORE WITH WORD: MICROSOFT OFFICE 2007
DOING MORE WITH WORD: MICROSOFT OFFICE 2007 GETTING STARTED PAGE 02 Prerequisites What You Will Learn USING MICROSOFT WORD PAGE 03 Viewing Toolbars Adding and Removing Buttons MORE TASKS IN MICROSOFT WORD
More informationGetting Started. Custom Reports Software
Getting Started Custom Reports Software Custom Reports software Custom reporting The Custom Reports software lets you transfer quantitative results from Data Analysis into the Custom Reports spreadsheet
More informationNCMail: Microsoft Outlook User s Guide
NCMail: Microsoft Outlook 2007 Email User s Guide Revision 1.1 3/9/2009 This document covers how to use Microsoft Outlook 2007 for accessing your email with the NCMail Exchange email system. The syntax
More informationMn/DOT MnCMAT Crash Analysis Application Help
Mn/DOT MnCMAT Crash Analysis Application Contents Login... 5 User Login Dialog... 5 Login... 5 Request Access Dialog... 5 Forgotten Password Dialog... 6 Create/Open Project... 7 Create/Open Project Dialog...
More informationMicrosoft Excel Level 2
Microsoft Excel Level 2 Table of Contents Chapter 1 Working with Excel Templates... 5 What is a Template?... 5 I. Opening a Template... 5 II. Using a Template... 5 III. Creating a Template... 6 Chapter
More informationPart II: Creating Visio Drawings
128 Part II: Creating Visio Drawings Figure 5-3: Use any of five alignment styles where appropriate. Figure 5-4: Vertical alignment places your text at the top, bottom, or middle of a text block. You could
More informationMicrosoft Excel 2007
Learning computers is Show ezy Microsoft Excel 2007 301 Excel screen, toolbars, views, sheets, and uses for Excel 2005-8 Steve Slisar 2005-8 COPYRIGHT: The copyright for this publication is owned by Steve
More informationThe Mathcad Workspace 7
For information on system requirements and how to install Mathcad on your computer, refer to Chapter 1, Welcome to Mathcad. When you start Mathcad, you ll see a window like that shown in Figure 2-1. By
More informationCIS
USER MANUAL Table of Contents Section Topic Page Welcome to Data Link Pro2 A 3 Quick Start 4 Shortcut Keys 5 Data Link Pro2 Main Window 6 Create a New Sin2 Survey 7 Load Survey 7 Adding a Site to an Existing
More informationCOPYRIGHTED MATERIAL. Making Excel More Efficient
Making Excel More Efficient If you find yourself spending a major part of your day working with Excel, you can make those chores go faster and so make your overall work life more productive by making Excel
More informationEXCEL + POWERPOINT. Analyzing, Visualizing, and Presenting Data-Rich Insights to Any Audience KNACK TRAINING
EXCEL + POWERPOINT Analyzing, Visualizing, and Presenting Data-Rich Insights to Any Audience KNACK TRAINING KEYBOARD SHORTCUTS NAVIGATION & SELECTION SHORTCUTS 3 EDITING SHORTCUTS 3 SUMMARIES PIVOT TABLES
More informationPowerPoint 2016 Building a Presentation
PowerPoint 2016 Building a Presentation What is PowerPoint? PowerPoint is presentation software that helps users quickly and efficiently create dynamic, professional-looking presentations through the use
More informationChapter 2 Surfer Tutorial
Chapter 2 Surfer Tutorial Overview This tutorial introduces you to some of Surfer s features and shows you the steps to take to produce maps. In addition, the tutorial will help previous Surfer users learn
More informationRemark Office OMR. Tutorials
Remark Office OMR Tutorial Overview Tutorials We want you to be immediately successful with your new software. To that end, we highly recommend that you walk through the tutorials provided here before
More informationKeynote 08 Basics Website:
Website: http://etc.usf.edu/te/ Keynote is Apple's presentation application. Keynote is installed as part of the iwork suite, which also includes the word processing program Pages and the spreadsheet program
More informationInteractive Powerpoint. Jessica Stenzel Hunter Singleton
Interactive Powerpoint Jessica Stenzel Hunter Singleton Table of Contents iii Table of Contents Table of Contents... iii Introduction... 1 Basics of Powerpoint... 3 How to Insert Shapes... 3 How to Insert
More informationBoA Tools Page 1 / 31
BoA Tools Page 1 / 31 Standard tools Overview 2 Work pane 3 3D-2D file Main palette 6 Layout Main Palette 9 Navigation tools 11 Workplane Palette 14 Cursor Palette 21 Numeric control 24 Selection by Criteria
More informationWMS 9.1 Tutorial Watershed Modeling DEM Delineation Learn how to delineate a watershed using the hydrologic modeling wizard
v. 9.1 WMS 9.1 Tutorial Learn how to delineate a watershed using the hydrologic modeling wizard Objectives Read a digital elevation model, compute flow directions, and delineate a watershed and sub-basins
More informationLab Assignment #1: Introduction to Creo ME 170
Lab Assignment #1: Introduction to Creo ME 170 Instructor: Mike Philpott (email: mphilpot@illinois.edu) Date Due: One week from Start Day of Lab (turn in deadline 11pm night before next lab) Make sure
More informationGeostatistics 2D GMS 7.0 TUTORIALS. 1 Introduction. 1.1 Contents
GMS 7.0 TUTORIALS 1 Introduction Two-dimensional geostatistics (interpolation) can be performed in GMS using the 2D Scatter Point module. The module is used to interpolate from sets of 2D scatter points
More informationNCMail: Microsoft Outlook User s Guide
NCMail: Microsoft Outlook 2003 Email User s Guide Revision 1.0 11/10/2007 This document covers how to use Microsoft Outlook 2003 for accessing your email with the NCMail Exchange email system. The syntax
More informationIntroduction to MS Office Somy Kuriakose Principal Scientist, FRAD, CMFRI
Introduction to MS Office Somy Kuriakose Principal Scientist, FRAD, CMFRI Email: somycmfri@gmail.com 29 Word, Excel and Power Point Microsoft Office is a productivity suite which integrates office tools
More informationTutorial For LamTopo
Tutorial For LamTopo Automatic Grid Generation for LaModel One of the nicest features introduced in LaModel 2.0 was the capability of building the seam and topographic grid automatically from AutoCAD files.
More informationTutorial 01 Quick Start Tutorial
Tutorial 01 Quick Start Tutorial Homogeneous single material slope No water pressure (dry) Circular slip surface search (Grid Search) Intro to multi scenario modeling Introduction Model This quick start
More informationSNOWFLAKES PHOTO BORDER - PHOTOSHOP CS6 / CC
Photo Effects: Snowflakes Photo Border (Photoshop CS6 / CC) SNOWFLAKES PHOTO BORDER - PHOTOSHOP CS6 / CC In this Photoshop tutorial, we ll learn how to create a simple and fun snowflakes photo border,
More informationMicrosoft PowerPoint 2016 Part 2: Notes, Links, & Graphics. Choosing a Design. Format Background
Microsoft PowerPoint 2016 Part 2: Notes, Links, & Graphics Choosing a Design Open PowerPoint. Click on Blank Presentation. Click on the Design tab. Click on the design tab of your choice. In part one we
More informationPremiere Pro Desktop Layout (NeaseTV 2015 Layout)
Premiere Pro 2015 1. Contextually Sensitive Windows - Must be on the correct window in order to do some tasks 2. Contextually Sensitive Menus 3. 1 zillion ways to do something. No 2 people will do everything
More informationMicroTally/WinTally Manual. Introduction
MicroTally/WinTally Manual Introduction Congratulations! You are in possession of one of the finest electronic tally boards made. The MicroTally is a hand held electronic tally counter. It is designed
More informationDesigned by Jason Wagner, Course Web Programmer, Office of e-learning NOTE ABOUT CELL REFERENCES IN THIS DOCUMENT... 1
Excel Essentials Designed by Jason Wagner, Course Web Programmer, Office of e-learning NOTE ABOUT CELL REFERENCES IN THIS DOCUMENT... 1 FREQUENTLY USED KEYBOARD SHORTCUTS... 1 FORMATTING CELLS WITH PRESET
More informationADOBE DREAMWEAVER CS4 BASICS
ADOBE DREAMWEAVER CS4 BASICS Dreamweaver CS4 2 This tutorial focuses on the basic steps involved in creating an attractive, functional website. In using this tutorial you will learn to design a site layout,
More informationTabular Building Template Manager (BTM)
Tabular Building Template Manager (BTM) User Guide IES Vi rtual Environment Copyright 2015 Integrated Environmental Solutions Limited. All rights reserved. No part of the manual is to be copied or reproduced
More informationControlling the Drawing Display
Controlling the Drawing Display In This Chapter 8 AutoCAD provides many ways to display views of your drawing. As you edit your drawing, you can control the drawing display and move quickly to different
More informationRev. B 12/16/2015 Downers Grove Public Library Page 1 of 40
Objectives... 3 Introduction... 3 Excel Ribbon Components... 3 File Tab... 4 Quick Access Toolbar... 5 Excel Worksheet Components... 8 Navigating Through a Worksheet... 9 Downloading Templates... 9 Using
More informationMAPLOGIC CORPORATION. GIS Software Solutions. Getting Started. With MapLogic Layout Manager
MAPLOGIC CORPORATION GIS Software Solutions Getting Started With MapLogic Layout Manager Getting Started with MapLogic Layout Manager 2011 MapLogic Corporation All Rights Reserved 330 West Canton Ave.,
More information1 Introduction to Using Excel Spreadsheets
Survey of Math: Excel Spreadsheet Guide (for Excel 2007) Page 1 of 6 1 Introduction to Using Excel Spreadsheets This section of the guide is based on the file (a faux grade sheet created for messing with)
More informationImportant Note - Please Read:
Important Note - Please Read: This tutorial requires version 6.01 or later of SAFE to run successfully. You can determine what version of SAFE you have by starting the program and then clicking the Help