DESIGN CRITERIA MEMORANDUM

Size: px
Start display at page:

Download "DESIGN CRITERIA MEMORANDUM"

Transcription

1 State Route 49 Realignment Study DESIGN CRITERIA MEMORANDUM ATTACHMENT G

2

3 SR 49 Realignment Study STATE ROUTE 49 El Dorado to Coloma El Dorado County, CA DESIGN CRITERIA MEMORANDUM Introduction The El Dorado County Transportation Commission (EDCTC) has initiated the State Route 49 (SR 49) Realignment Study, which is a feasibility study for the realignment of SR 49 from its intersection with Pleasant Valley Road in the town of El Dorado to the intersection of SR 49 with Lotus Road in the town of Coloma. The SR 49 Realignment Study will explore alternative alignments of SR 49 between Coloma and El Dorado that will improve traffic operations on the state and regional transportation system. Alignments that are examined will eliminate the existing alignment of SR 49 through Marshall Gold Discovery State Historic Park and the at-grade intersection of SR 49 and Highway 50. The purpose of this Design Criteria Memorandum is to present a range of design criteria that will be utilized by TY Lin International when analyzing alternative alignments. The proposed design criteria will be used to estimate costs for right-of-way acquisition, construction, and environmental mitigation for up to three alternatives. design criteria will also help determine the feasibility and constructability of alternative alignments. Design criteria were collected from the following four sources: 1. El Dorado County Highway Design Manual and Std. Plans(Local Agency Standards) 2. El Dorado County Drainage Manual (Local Agency Standards) 3. Caltrans Design Information Bulletin (DIB) 79-03; (design guidance for resurfacing, restoration, and rehabilitation (3R) type projects) 4. Caltrans Highway Design Manual This document shall be updated on an as-needed basis. Latest update dated December 18,

4 DESIGN CRITERIA Table 1: Functional Classification State Route 49 (SR 49) Designation Classification Terrain Conventional Hwy Rural/Urban (1) Rolling Table 2: Design Designation SR 49 (existing from Caltrans SR 49 TCR, September 2000 ) Segment 2 Segment 3 Segment 4 ADT (2010) ADT (2030)* DHV* Truck % (T) 6% 6% 10% Directional Split (D) 55% 55% 64% LOS E F E Concept LOS E F E * ADT values for the year 2030 are projected based on given annual % traffic growth values contained in the TCR. DHV calculated using 0.15*ADT. Table 3: General Roadway Design Criteria Caltrans HDM Basic Design Criteria Design Speed (mph) Index HDM Table Table SR 49 (Rural) SR 49 (Urban) Design Vehicle Index Index SR 49 WB40/CA LEGAL CA LEGAL CA LEGAL CA LEGAL Minimum Sight Distances Stopping (ft) HDM Table Table SR 49 (Rural) HDM SR 49 (Urban) HDM Passing (ft) HDM Table Table SR 49 (Rural) N/A SR 49 (Urban) N/A Decision (ft) HDM Table Table SR 49 (Rural) N/A SR 49 (Urban) N/A

5 Caltrans HDM Geometric Design Criteria Typical Cross Section Minimum Lane Width (ft) Index Index Index SR 49 (Rural) SR 49 (Urban) Minimum Shoulder Width (ft) Index Index Table SR 49, ADT < or 4, ADT < SR 49, 251 < ADT < SR 49, 1001 < ADT < , ADT > 400 SR 49, ADT > Minimum Structural Section (AC/AB) SR 49 HDM Ch. 610 HDM Ch. 610 HDM Ch. 610 TBD (2) Minimum R/W Width (ft) Index Index SR 49 (Rural) (3)(4) (3)(4) SR 49 (Urban) (3)(4) 130 Normal Cross Slope (%) Index (2)(b) Index 301.2(2)(a) SR min / 3 max 2 2 (5) Side (Cut & Fill) Slopes Index Index SR 49 2H:1V 2H:1V (CUT); 4H:1V (FILL) 2H:1V (CUT); 4H:1V (FILL) 1.5H:1V (CUT); 2H:1V (FILL) (6) Minimum Bike Lane Width (ft) Topic (1)( c) Index (1)( c) SR 49 (Rural), w/o curb & gutter HDM (7) SR 49 (Urban), w/ curb & gutter HDM (7) Minimum Sidewalk Width (ft) Std. Plan RS Index SR (8) Curb and Gutter Type Std. Plan RS Index not recommended for speeds > 45mph not recommended for speeds > 45mph Type 2 (for V < 45 mph) (8) SR 49 Type 2 Choker Width/Shoulder Backing (ft) HDM Figure Figure SR 49 N/A Horizontal and Vertical Alignment - 3 -

6 Caltrans HDM Maximum Superelevation (%) Index HDM Table Table SR 49 (Rural) SR 49 (Urban) Min Horizontal Curve Radius (ft) Index HDM Table Table SR 49 (Rural) SR 49 (Urban) Profile Grade (%) (min/max) Index HDM Table Table SR 49 (Rural) HDM 0.3 / / / 5 (9) SR 49 (Urban) HDM 0.3 / / / 7 (9) Maximum Grade Break w/o Curve (%) Index Index SR 49 HDM Minimum Vertical Curve Length (ft) Index Index SR 49 (Rural) HDM 10*V 10*V 10*V SR 49 (Urban) HDM 10*V 10*V 10*V SR 49, A < 2% or V < 40 mph HDM Clearances Clear Recovery Zone (ft) Minimum Horizontal Clearance (ft) 309.1(2) Index 309.1(2) SR 49 N/A (10) 309.1(3)( c) 4 or Std. shoulder width Index 309.1(3)( c) 4 or Std. shoulder width 4 or Std. shoulder width SR 49 N/A Minimum Vertical Clearance (ft) Index SR 49 N/A Intersection Criteria Minimum Curb Return/Turning Radius (ft) Intersection/Corner Sight Distance (ft) 404.3(3) Index 404.3(3) SR 49 N/A HDM Table 405.1A Table 405.1A SR 49 (Rural) N/A SR 49 (Urban)

7 Drainage Cross Drainage Storm Frequency (Culverts) Caltrans HDM 821.3(2) Index 821.3(2) SR 49 N/A 100 yr 100 yr 100 yr Caltrans HDM Roadway Drainage Storm Frequency (Spread) EDDM Index HDM Table Table SR 49 (Rural) 10 yr 25 yr 25 yr 25 yr SR 49 (Urban) 10 yr 10 yr 10 yr 10 yr *Local agency standards taken from El Dorado County Highway Design Manual ( and the County of El Dorado Drainage Manual (EDDM) ( **Caltrans DIB gives design guidance and standards for Roadway Rehabilitation (3R) Projects. Design Criteria not fully covered by DIB will default to the Caltrans Highway Design Manual (HDM) criteria for new construction, unless noted otherwise. Notes: (1) The project area is mostly rural. However, there are sections of urban classification including the areas within the city limits of Placerville, El Dorado, and Diamond Springs. (2) Structural section (AC/AB) will be determined from HDM Ch. 610 using projected traffic volumes for proposed alignments and assumed minimum R-values (3) DIB does not specify a minimum R/W width. The 82 shown here is meant to convey the width of R/W required to construct the minimum widths of the cross section components that are specified by DIB 79-03, which sum to the full R/W width. 82 = 24 (2-12 lanes) + 16 (2-8 shldrs) + 6 (2-3 chokers) + 36 (2-18 catch to hinge). The 40 shown here is meant to convey the width of R/W under several constraints; therefore, limited to edge of shoulder to edge of shoulder. 40 = 24 (2-12 lanes) + 16 (2-8 shldrs). (4) Recommended 130 minimum width will be used when feasible. (5) Normal Cross Slope for all widening and overlays will use % range; all new construction will use 2% Normal Cross Slope. (6) Flatter side slopes (e.g. 3H:1V Cut and 4H:1V Fill) will be used when feasible. (7) Bike lanes to be included as part of the required paved shoulder. (8) Use of sidewalk and or curb and gutter is not anticipated except in select locations where pedestrian access improvements are necessary or in urban areas. Where signs or utility poles are located within sidewalk, a minimum 4 clear width shall be provided (per ADA). (9) Profile grades not exceeding 7% may be used in areas where terrain is considered mountainous

8 (10) Planting Guidelines: Large trees should be planted at least 30 from the ETW where the posted speed limit is 35 mph or greater with no curb or barrier present, per HDM 902.3(4)(a)

Page 2D-12 Revised the following language in the last sentence on the page from; as shown in Figure 2D-3. To; as shown in Chapter 2H, Figure 2H-35.

Page 2D-12 Revised the following language in the last sentence on the page from; as shown in Figure 2D-3. To; as shown in Chapter 2H, Figure 2H-35. IMPERIAL ROAD DESIGN MANUAL REVISIONS January, 2015 CHAPTER 2A Page 2A-1 Revised the following language at the end of the paragraph under PRELIMINARY ENGINEERING AUTHORIZATION from; Funding Allocation/Verification/Submittal

More information

INPUT DATA PROCEDURES

INPUT DATA PROCEDURES 79 SECTION 7 INPUT DATA PROCEDURES This section describes the forms and message boxes used to enter input data for an RSRAP optimization problem. These forms and message boxes implement Steps 1 through

More information

Request for FTE Design Exceptions & Variations Checklist

Request for FTE Design Exceptions & Variations Checklist District: Project Name: Project Section BMP: EMP: Exemption BMP: EMP: Request for FTE Design Exceptions & Variations Checklist FPID: New Construction RRR Requested Control Element(s): Design Speed* Horizontal

More information

CASE 1 TWO LANE TO FOUR LANE DIVIDED TRANSITION GEO-610-C NOT TO SCALE GEOMETRIC DESIGN GUIDE FOR MATCH LINE LINE MATCH. 2 (0.6m) shoulder transition

CASE 1 TWO LANE TO FOUR LANE DIVIDED TRANSITION GEO-610-C NOT TO SCALE GEOMETRIC DESIGN GUIDE FOR MATCH LINE LINE MATCH. 2 (0.6m) shoulder transition CASE 1 2 (0.6m) Joint Line See sheet #5 for description of variables 4 (1.2m) Transition taper is tangent to Edge of Pavement curve at this point. 1:25 Paved shoulder transition 16 (4.m) Median width 16

More information

A parabolic curve that is applied to make a smooth and safe transition between two grades on a roadway or a highway.

A parabolic curve that is applied to make a smooth and safe transition between two grades on a roadway or a highway. A parabolic curve that is applied to make a smooth and safe transition between two grades on a roadway or a highway. VPC: Vertical Point of Curvature VPI: Vertical Point of Intersection VPT: Vertical Point

More information

Geometric Layout for Roadway Design with CAiCE Visual Roads

Geometric Layout for Roadway Design with CAiCE Visual Roads December 2-5, 2003 MGM Grand Hotel Las Vegas Geometric Layout for Roadway Design with CAiCE Visual Roads Mathews Mathai CV32-3 This course describes and demonstrates various tools for defining horizontal

More information

1.4.3 OPERATING SPEED CONSISTENCY

1.4.3 OPERATING SPEED CONSISTENCY Geometric Design Guide for Canadian oads 1.4.3 OPEATING SPEED CONSISTENCY The safety of a road is closely linked to variations in the speed of vehicles travelling on it. These variations are of two kinds:

More information

Interactive Highway Safety Design Model (IHSDM) Workshop Nevada DOT Las Vegas, NV February 13, 2014

Interactive Highway Safety Design Model (IHSDM) Workshop Nevada DOT Las Vegas, NV February 13, 2014 Interactive Highway Safety Design Model (IHSDM) Workshop Nevada DOT Las Vegas, NV February 13, 2014 Overview Hands-on Exercises: IHSDM Crash Prediction Module (CPM) The Crash Prediction Module estimates

More information

Overview September 7, 2017

Overview September 7, 2017 Overview September 7, 2017 Purpose The purpose of this presentation is to provide an overview of the changes to the required deliverables and workflow for developing plans and models for Illinois DOT projects

More information

AED Design Requirements: Superelevation Road Design

AED Design Requirements: Superelevation Road Design US Army Corps of Engineers Afghanistan Engineer District AED Design Requirements: Various Locations, Afghanistan MARCH 2009 TABLE OF CONTENTS AED DESIGN REQUIREMENTS FOR SUPERELEVATION ROAD DESIGN VARIOUS

More information

Horizontal Alignment

Horizontal Alignment AMRC 2012 MODULE 8 Horizontal Alignment CONTENTS Overview... 8-1 Objectives... 8-1 Procedures... 8-1 8.1 Design Considerations and Circular Curves... 8-3 8.2 Superelevation and Transitional Spiral... 8-5

More information

Sight Distance on Vertical Curves

Sight Distance on Vertical Curves Iowa Department of Transportation Office of Design Sight Distance on Vertical Curves 6D-5 Design Manual Chapter 6 Geometric Design Originally Issued: 01-04-0 Stopping sight distance is an important factor

More information

Components of Alignment. Horizontal Alignment. Vertical Alignment. Highway Design Project. Vertical Alignment. Vertical Alignment.

Components of Alignment. Horizontal Alignment. Vertical Alignment. Highway Design Project. Vertical Alignment. Vertical Alignment. 1/35 Components of Alignment Highway Design Project Horizontal Alignment Vertical Alignment Vertical Alignment Amir Samimi Civil Engineering Department Sharif University of Technology Cross-section /35

More information

2017 STP PROJECT APPLICATION (OREGON)

2017 STP PROJECT APPLICATION (OREGON) Project Title Section 1. Applicant Information Name of Lead Agency/ Organization Address Phone Number Name & Title of Contact Person Email Address Certified Local Public Agency (Yes/No) Section 2. Project

More information

Work Type Definition

Work Type Definition Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-6. I. Description Refer to

More information

AUTODESK AUTOCAD CIVIL 2009 AND AUTOCAD CIVIL 3D Rule-Based Road Design using AutoCAD Civil and AutoCAD Civil 3D

AUTODESK AUTOCAD CIVIL 2009 AND AUTOCAD CIVIL 3D Rule-Based Road Design using AutoCAD Civil and AutoCAD Civil 3D AUTODESK AUTOCAD CIVIL 2009 AND AUTOCAD CIVIL 3D 2009 Rule-Based Road Design using AutoCAD Civil and AutoCAD Civil 3D Contents Introduction... 3 Design Criteria Files... 3 Alignment Geometry... 4 Applying

More information

JCE 4600 Fundamentals of Traffic Engineering. Horizontal and Vertical Curves

JCE 4600 Fundamentals of Traffic Engineering. Horizontal and Vertical Curves JCE 4600 Fundamentals of Traffic Engineering Horizontal and Vertical Curves Agenda Horizontal Curves Vertical Curves Passing Sight Distance 1 Roadway Design Motivations Vehicle performance Acceleration

More information

NCHRP Project Median Cross-Section Design for Rural Divided Highways

NCHRP Project Median Cross-Section Design for Rural Divided Highways NCHRP Project 22-21 Median Cross-Section Design for Rural Divided Highways Acknowledgements NCHRP Projects Officer, Ray Derr Project Team Midwest Research Institute PI Jerry Graham Pennsylvania Transportation

More information

Mobile Mapping Solutions for Ohio s Integrated Transportation Network. Brian Foster, CP

Mobile Mapping Solutions for Ohio s Integrated Transportation Network. Brian Foster, CP Mobile Mapping Solutions for Ohio s Integrated Transportation Network Brian Foster, CP About Woolpert Established in 1911 Over 600 Professionals 25 Offices $12,000,000 invested in new technology in last

More information

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016 TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

APPENDIX D. Traffic Impact Analysis

APPENDIX D. Traffic Impact Analysis APPENDIX D Traffic Impact Analysis TRAFFIC IMPACT ANALYSIS CALEXICO SOLAR FARM I County of Imperial, California July 8, 2011 LLG Ref. 3-11-2034 Prepared by: Cara Leone Transportation Planner II Under the

More information

Calipatria Solar Farm TIA

Calipatria Solar Farm TIA Calipatria Solar Farm TIA Prepared for: 7SM 8ME, LLC 71SM 8ME, LLC c/o 8minutenergy Renewables LLC Prepared by: Fehr & Peers March 25, 211 IE1-37 TABLE OF CONTENTS Executive Summary... i Project Trip Estimates...

More information

PE Exam Review - Surveying Demonstration Problem Solutions

PE Exam Review - Surveying Demonstration Problem Solutions PE Exam Review - Surveying Demonstration Problem Solutions I. Demonstration Problem Solutions... 1. Circular Curves Part A.... Circular Curves Part B... 9 3. Vertical Curves Part A... 18 4. Vertical Curves

More information

Traffic Impact Study for the Girard Winery Project

Traffic Impact Study for the Girard Winery Project October 16, 2014 Ms. Heather McCollister 1512 D Street Napa, CA 94559 Traffic Impact Study for the Girard Winery Project Dear Ms. McCollister; Whitlock & Weinberger Transportation, Inc. (W-Trans) has completed

More information

CONTRIBUTION TO THE INVESTIGATION OF STOPPING SIGHT DISTANCE IN THREE-DIMENSIONAL SPACE

CONTRIBUTION TO THE INVESTIGATION OF STOPPING SIGHT DISTANCE IN THREE-DIMENSIONAL SPACE National Technical University of Athens School of Civil Engineering Department of Transportation Planning and Engineering Doctoral Dissertation CONTRIBUTION TO THE INVESTIGATION OF STOPPING SIGHT DISTANCE

More information

The Transition Curves (Spiral Curves)

The Transition Curves (Spiral Curves) The Transition Curves (Spiral Curves) The transition curve (spiral) is a curve that has a varying radius. It is used on railroads and most modem highways. It has the following purposes: 1- Provide a gradual

More information

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana

Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana Traffic Impact Study for the TAVA Homes Project at 1584 East Santa Clara Avenue in the City of Santa Ana March 2011 Prepared for: URS Corporation 2020 E. First Street, Suite #400 Santa Ana, CA 92705 Tel:

More information

AUTOCAD CIVIL 2009 AND AUTOCAD CIVIL 3D Road Rehabilitation and Reconstruction with AutoCAD Civil and AutoCAD. Civil 3D

AUTOCAD CIVIL 2009 AND AUTOCAD CIVIL 3D Road Rehabilitation and Reconstruction with AutoCAD Civil and AutoCAD. Civil 3D AUTOCAD CIVIL 2009 AND AUTOCAD CIVIL 3D 2009 Road Rehabilitation and Reconstruction with AutoCAD Civil and AutoCAD Civil 3D 1 Contents Introduction... 3 Introduction to Corridor Targets... 3 Surface Targets...

More information

COMMISSION POLICY POLICY #9.16

COMMISSION POLICY POLICY #9.16 COMMISSION POLICY POLICY #9.16 SUBJECT: Public Right-of-Way Encroachments and Regulations for Mailboxes and Newspaper Delivery Boxes DATE ADOPTED PAGE (BCC MINUTES) February 19, 2008 Page 26 OBSOLETE VERSIONS

More information

STUDY REPORT #1 ADDENDUM

STUDY REPORT #1 ADDENDUM STUDY REPORT #1 ADDENDUM 1.0 PURPOSE OF ADDENDUM This document is an addendum to Study Report #1: Sub-System Planning Alternatives. The purpose of this addendum is to bridge the gap between the initial

More information

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician. PUBLIC WORKS ORGANIZATIONAL CHART Director of Public Works/City Engineer Secretary Word Processor Transit Services Manager Fleet Services Supervisor Streets and Facilities Supervisor Principal Principal

More information

Three-Dimensional Analysis of Sight Distance on Interchange Connectors

Three-Dimensional Analysis of Sight Distance on Interchange Connectors TRANSPOR'IAT/ON RESEARCH RECORD 1445 101 Three-Dimensional Analysis of Sight Distance on Interchange Connectors EDDIE SANCHEZ The design of interchange ramps and connectors, especially in large freeway-to-freeway

More information

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan Managing DC Work Zones: DDOT s Citywide Transportation Management Plan ARTBA National Work Zone Management Conference September 20, 2016 1 Outline Citywide Transportation Management Plan (TMP) Citywide

More information

Economic Crash Analysis Tool. Release Notes

Economic Crash Analysis Tool. Release Notes Release Notes August 2017 Release: 1. Project Information Worksheet: a. Update: Removed the design exception report option b. Enhancement: The first question has been expanded to provide better clarity

More information

8/8/2018 Council Approval Presentation. 8/14/2018 MOVEBR Infrastructure Enhancement and Traffic Mitigation Plan 1

8/8/2018 Council Approval Presentation. 8/14/2018 MOVEBR Infrastructure Enhancement and Traffic Mitigation Plan 1 8/8/2018 Council Approval Presentation 8/14/2018 MOVEBR Infrastructure Enhancement and Traffic Mitigation Plan 1 Speaker Panel Jamie Setze Executive Director, Capital Regional Planning Commission Stephen

More information

Design Elements Horizontal Milos N. Mladenovic Assistant Professor Department of Built Environment

Design Elements Horizontal Milos N. Mladenovic Assistant Professor Department of Built Environment Design Elements Horizontal Milos N. Mladenovic Assistant Professor Department of Built Environment 01.03.2017 Outline Highway alignment Vehicle cornering forces Minimum radius Circular curve elements Transition

More information

Horizontal and Vertical Curve Design

Horizontal and Vertical Curve Design Horizontal and Vertical Curve Design CE 576 Highway Design and Traffic Safety Dr. Ahmed Abdel-Rahim Horizontal Alignment Horizontal curve is critical. Vehicle cornering capability is thus a key concern

More information

HDM Manager Version 3.0:

HDM Manager Version 3.0: Methods for Economic Evaluation of Highways Investments and Maintenance HDM Manager Version 3.0: User-friendly Shell Environment for the Highway Design and Maintenance Standards Model (HDM) June, 1995

More information

OPTIMIZING HIGHWAY PROFILES FOR INDIVIDUAL COST ITEMS

OPTIMIZING HIGHWAY PROFILES FOR INDIVIDUAL COST ITEMS Dabbour E. Optimizing Highway Profiles for Individual Cost Items UDC: 656.11.02 DOI: http://dx.doi.org/10.7708/ijtte.2013.3(4).07 OPTIMIZING HIGHWAY PROFILES FOR INDIVIDUAL COST ITEMS Essam Dabbour 1 1

More information

Quality Control Checklist & Tools for Reviewing 3D Engineered Models

Quality Control Checklist & Tools for Reviewing 3D Engineered Models Quality Control Checklist & Tools for Reviewing 3D Engineered Models Production Support Office CADD Vern Danforth Description: In this session we will discuss 3D engineered models. Brief FDOT CADD/Industry

More information

TECHNICAL BULLETIN Ministry of Transportation

TECHNICAL BULLETIN Ministry of Transportation TECHNICAL BULLETIN Ministry of Transportation ENGINEERING BRANCH TRAFFIC, ELECTRICAL, HWY SAFETY AND GEOMETRIC STANDARDS. SECTION BULLETIN NUMBER: TE-2005-04 Subject: Web Camera Design, Installation, and

More information

DELAWARE COUNTY SECONDARY ROAD DEPARTMENT POLICY AND PROCEDURE MEMORANDUM

DELAWARE COUNTY SECONDARY ROAD DEPARTMENT POLICY AND PROCEDURE MEMORANDUM DELAWARE COUNTY SECONDARY ROAD DEPARTMENT POLICY AND PROCEDURE MEMORANDUM PPM #17, 2003 SUBJECT: Mailbox Installation in County Rights of Way Problem: Highway and roadside safety is the primary reason

More information

Lesson 6: Traffic Analysis Module (TAM)

Lesson 6: Traffic Analysis Module (TAM) Go back to: Table of Contents Go to the next lesson Overview : Traffic Analysis Module (TAM) The Traffic Analysis Module (TAM) may be used to evaluate the operational effects of existing and projected

More information

Final Report. Interstate-680 Bus-on-Shoulder Feasibility Assessment. prepared for

Final Report. Interstate-680 Bus-on-Shoulder Feasibility Assessment. prepared for Final Report Interstate-680 Bus-on-Shoulder Feasibility Assessment prepared for Metropolitan Transportation Commission & Contra Costa Transportation Authority prepared by HDR in association with Fehr &

More information

Current Project - Project Markups Listing

Current Project - Project Markups Listing 120160290 File Name Markup Name Markup Text Markup Date Created by 10-FCP-120160290-005.pdf Round 1 AVL No mitiogation trees planted in the public road ROW. 10-FCPLTR-120160290-001.pdf Round 1 - AVL This

More information

Plateia. BIM-Ready Roadway Design Solution. by CGS Labs. Professional software solutions for Civil Engineering. (C) 2017 by CGS Labs

Plateia. BIM-Ready Roadway Design Solution. by CGS Labs. Professional software solutions for Civil Engineering. (C) 2017 by CGS Labs Plateia by CGS Labs BIM-Ready Roadway Design Solution Professional software solutions for Civil Engineering (C) 2017 by CGS Labs BIM Solution for Roadway Design & Reconstruction Plateia is a professional,

More information

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6 Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-04 County: King List of 17-04 Amendment Projects:

More information

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013 Girard Siding Environmental Assessment (EA) Public Meeting May 23, 2013 1 Agenda» Program Overview» Girard Siding Project EA» Auburn to Shipman Track Improvement Project» Public Involvement Opportunities

More information

Mountain Corridor Incident Management Program

Mountain Corridor Incident Management Program Mountain Corridor Incident Management Program Colorado Department of Transportation Background The I- Incident Management study was initiated in response to CDOT s I- MIS. The resulting program was the

More information

Provo-Orem Bus Rapid Transit

Provo-Orem Bus Rapid Transit Provo-Orem Bus Rapid Transit and Timpanogos Maintenance Facility Expansion Procurements Informational Meeting August 18, 2014 Agenda Topic Presenter Time Introduction of key project personnel Project history

More information

Prepared for: Rocklin. Prepared by:

Prepared for: Rocklin. Prepared by: APPENDIX L Sierra Gateway Apartments Transportation Impact Analysis Report Prepared for: Rocklin Sierra Apartments II, LLC Prepared by: SIERRA GATEWAY APARTMENTS TRANSPORTATION IMPACT ANALYSIS REPORT PREPARED

More information

2017 ANNUAL REPORT

2017 ANNUAL REPORT INFRASTRUCTURE UPGRADES ECONOMIC DEVELOPMENT PUBLIC SAFETY IMPROVED APPEARANCE 2017 ANNUAL REPORT www.stonemountaincid.com Stone Mountain Community Improvement District BOARD OF DIRECTORS Chairman Joe

More information

OPTIMAL 3D COORDINATION TO MAXIMIZE THE AVAILABLE STOPPING SIGHT DISTANCE IN TWO-LANE ROADS

OPTIMAL 3D COORDINATION TO MAXIMIZE THE AVAILABLE STOPPING SIGHT DISTANCE IN TWO-LANE ROADS 0 0 0 Moreno, Ana Tsui; Ferrer-Pérez, Vicente; Garcia, Alfredo; Romero, Mario Alfonso. (00). Optimal D Coordination to Mazimize the Available Stopping Sight Distance in Two-Lane Roads In: Proceedings of

More information

NCDOT Civil Geometry for GEOPAK Users

NCDOT Civil Geometry for GEOPAK Users 2018 NCDOT Civil Geometry for GEOPAK Users Oak Thammavong NCDOT Roadway Design Unit 7/31/2018 This page left intentionally blank Copyright 2018 NCDOT DO NOT DISTRIBUTE Printing for student use is permitted

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009 North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings December 9 & 10, 2009 1 Welcome & Introductions 2 3 What Are We Doing Here Tonight? Public Hearing for RTD North Metro Corridor

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

Appendix D. Transportation Study

Appendix D. Transportation Study Appendix D Transportation Study Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May 29 County of Mendocino Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May

More information

6.9 Intelligent Transportation Systems

6.9 Intelligent Transportation Systems 6.9 Intelligent Transportation Systems This chapter describes Intelligent Transportation Systems (). The chapter also describes the process that defines how agencies and systems are interconnected through

More information

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax: ENVIRONMENTAL QUESTIONNAIRE City of Twentynine Palms Community Development Department 6136 Adobe Road Twentynine Palms, CA 92277 (760) 367-6799 Fax (760) 367-5400 29palms.org : Please complete each statement

More information

Another Look at the Safety Effects of Horizontal Curvature on Rural Two-Lane Highways

Another Look at the Safety Effects of Horizontal Curvature on Rural Two-Lane Highways 1 2 Another Look at the Safety Effects of Horizontal Curvature on Rural Two-Lane Highways 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

More information

Ferrovia. BIM-Ready Railway Design Solution. by CGS Labs. Professional software solutions for Civil Engineering. (C) 2017 by CGS Labs

Ferrovia. BIM-Ready Railway Design Solution. by CGS Labs. Professional software solutions for Civil Engineering. (C) 2017 by CGS Labs Ferrovia by CGS Labs BIM-Ready Railway Design Solution Professional software solutions for Civil Engineering (C) 2017 by CGS Labs Solution for Railway Design & Rail track Analysis Ferrovia is a professional,

More information

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013

Girard Siding Environmental Assessment (EA) Public Meeting. May 23, 2013 Girard Siding Environmental Assessment (EA) Public Meeting May 23, 2013 1 Agenda» Program Overview» Girard Siding Project EA» Auburn to Shipman Track Improvement Project» Public Involvement Opportunities

More information

ORDINANCE NO. _ CITY OF LEOTI, KANSAS

ORDINANCE NO. _ CITY OF LEOTI, KANSAS ORDINANCE NO. _2018-06 CITY OF LEOTI, KANSAS AN ORDINANCE AMENDING SECTION 28-1 OF THE MUNICIPAL CODE OF THE CITY OF LEOTI REGULATING TRAFFIC WITHIN THE CORPORATE LIMITS OF THE CITY OF LEOTI, KANSAS; INCORPORATING

More information

Sight Distance on Horizontal Alignments with Continuous Lateral Obstructions

Sight Distance on Horizontal Alignments with Continuous Lateral Obstructions TRANSPORTATION RESEARCH RECORD 1500 31 Sight Distance on Horizontal Alignments with Continuous Lateral Obstructions YASSER HASSAN, SAID M. EASA, AND A. 0. ABD EL HALIM For safe and efficient highway operation,

More information

Annual FARS/GES System-Wide Training

Annual FARS/GES System-Wide Training Annual FARS/GES System-Wide Training Anaheim, California October 26th-30th 2009 SWT 2009 October 26th-30th 1 Session Summary To Complete this session you will need the following materials: 2010 FARS Coding

More information

Appendix C.6. Best Management Practices for Construction Activities

Appendix C.6. Best Management Practices for Construction Activities Appendix C.6 Best Management Practices for Construction Activities In accordance with Section F.2 of San Diego Regional Water Quality Control Board (RWQCB) Order 2001-01 (Permit), the City of La Mesa has

More information

Delivering 3D Engineered Model Data for Highway Construction

Delivering 3D Engineered Model Data for Highway Construction Delivering 3D Engineered Model Data for Highway Construction Objectives After completing this module, you will be able to: Describe how 3D engineered models are created in design Describe how contractors

More information

LiDAR AT PennDOT Michael Loose, C.P. BOPD Photogrammetry and Surveys

LiDAR AT PennDOT Michael Loose, C.P. BOPD Photogrammetry and Surveys LiDAR AT PennDOT Michael Loose, C.P. BOPD Photogrammetry and Surveys 2 I. What is LiDAR? II. Benefits of LiDAR III. PennDOT Case Studies IV. Best Practices/Lessons Learned V. Questions 3 4 LiDAR for Engineering

More information

Known Errors in the 2012 OMUTCD 7/21/17 Update

Known Errors in the 2012 OMUTCD 7/21/17 Update Known Errors in the 2012 OMUTCD 7/21/17 Update (Updates are shown in red. New items are shown with a new date.) ODOT intends to correct these errors via a future revision to the Manual. This list is provided

More information

Digital Terrain Model V 6.5

Digital Terrain Model V 6.5 TCP MDT Digital Terrain Model V 6.5 Professional Version Introduction The Professional Version is designed to assist users in all the phases of carrying out a Surveying or Civil Engineering project. Its

More information

That CAD Girl. J ennifer dib ona. Carlson 2008 Creating Roadway Templates. Website:

That CAD Girl. J ennifer dib ona. Carlson 2008 Creating Roadway Templates. Website: That CAD Girl J ennifer dib ona Website: www.thatcadgirl.com Email: thatcadgirl@aol.com Phone: (919) 417-8351 Fax: (919) 573-0351 Carlson 2008 Creating Roadway Templates Defining roadway templates can

More information

Roadway Alignments and Profiles

Roadway Alignments and Profiles NOTES Module 15 Roadway Alignments and Profiles In this module, you learn how to create horizontal alignments, surface profiles, layout (design) profiles, and profile views in AutoCAD Civil 3D. This module

More information

Clearance in Order to Provide Stopping Sight Distances

Clearance in Order to Provide Stopping Sight Distances Journal of Transportation Technologies, 2017, 7, 221-239 http://www.scirp.org/journal/jtts ISSN Online: 2160-0481 ISSN Print: 2160-0473 Suitability of the Euler s Spiral for Roadside Clearance in Order

More information

PUBLIC WORKS ORGANIZATIONAL CHART

PUBLIC WORKS ORGANIZATIONAL CHART PUBLIC WORKS ORGANIZATIONAL CHART C-108 Actual 2012-13 Adopted Year-End Estimated 2014-15 2015-16 PROGRAM EXPENSES/REVENUES Salaries & Benefits $ 1,725,030 $ 1,855,980 $ 1,676,130 $ 1,956,510 $ 1,979,470

More information

GEOMETRIC DESIGN OF A HIGHWAY USING MXROAD

GEOMETRIC DESIGN OF A HIGHWAY USING MXROAD International J. of Engg. Research and Indu. Appls. (IJERIA) ISSN 0974-1518, Vol. 10, No. II (December 2017), pp. 25-34 GEOMETRIC DESIGN OF A HIGHWAY USING MXROAD MOHD. KHAJA NAZIMUDDIN 1, MIR IQBAL FAHEEM

More information

Combined Ranking Method for Screening Collision Monitoring Locations along Alberta Highways

Combined Ranking Method for Screening Collision Monitoring Locations along Alberta Highways Combined Ranking Method for Screening Collision Monitoring Locations along Alberta Highways Robert Duckworth, P. Eng., PTOE, Infrastructure Management System Specialist, Planning Branch, Alberta Transportation

More information

HW3 due today Feedback form online Midterms distributed HW4 available tomorrow No class Wednesday CEE 320

HW3 due today Feedback form online Midterms distributed HW4 available tomorrow No class Wednesday CEE 320 Course Logistics HW3 due today Feedback form online Midterms distributed HW4 available tomorrow No class Wednesday Midterm, 11/5 Geometric Design Anne Goodchild Introduction http://www.youtube.com/watch?v=u_jf_x

More information

Downtown Boise Multimodal Center

Downtown Boise Multimodal Center Treasure Valley High Capacity Transit Study Downtown Boise Multimodal Center Environmental Assessment June 2009 Prepared by the Federal Transit Administration and Valley Regional Transit. U.S. Department

More information

Bentley Civil Workshop

Bentley Civil Workshop Bentley Civil Workshop 2015 IBUG Spring Conference Templates 202 Team Leader: Chuck Lawson, PE Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341 This page left intentionally blank. Table

More information

Land Information Ontario

Land Information Ontario Land Information Ontario Logical/Physical Data Dictionary For MNRF Road Segment (MNRRDSEG) and MNRF Road Network (MNRRDNET) Revision Date: February 10, 2016 Model Diagram Page 2 of 11 Data Dictionary Entity

More information

Trimble s RoadLink Utility Tutorials

Trimble s RoadLink Utility Tutorials Trimble s RoadLink utility is an interface between third-party road definitions and Trimble survey devices. It lets you import or key in road definitions, view them graphically, edit them if required,

More information

PREFIX DESIGNATION FEDERAL PROJECTS

PREFIX DESIGNATION FEDERAL PROJECTS AC ADVANCE CONSTRUCTION (USED VARIES VARIES WITH REGULAR PREFIXES) AERO AERONAUTICS VARIES VARIES BR REHABILITATION BRASS BRASS GIRDER SOFTWARE 100.00% 0.00% BR-INV INNOVATIVE BRIDGE RESEARCH & 100.00%

More information

Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View. Minnesota Pavement Conference February 14, 2008

Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View. Minnesota Pavement Conference February 14, 2008 Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View Minnesota Pavement Conference February 14, 2008 1 The Situation 2 WSDOT policy, in essence, mandated use of BSTs

More information

Context Sensitive Case Study: Grand Avenue Bridge

Context Sensitive Case Study: Grand Avenue Bridge Context Sensitive Case Study: Grand Avenue Bridge MODERATOR: Craig Gaskill, TSH Engineering Joe Elsen, Colorado Department of Transportation - DOT Perspective / Client Brian Pettet, Pitkin County - Pitkin

More information

Community Advisory Committee. June 5, 2017

Community Advisory Committee. June 5, 2017 Community Advisory Committee June 5, 2017 1 Today s Topics Call to Order/Introductions Approval of Minutes Project Overview Traffic Signal Coordination 60% Plans Update Advanced Construction: Bassett Creek

More information

Project File Number: B. Geographic Location of Proposed Project or Program (check all that apply)

Project File Number: B. Geographic Location of Proposed Project or Program (check all that apply) COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION PROJECT INITIATION FORM Project File Number: Part I: Summary Information A. Proponent Information Municipality/Agency

More information

LIVABLE CENTERS INITIATIVE THE ATLANTA EXPERIENCE. Amy Goodwin Alabama Planning Association Conference May 2, 2013

LIVABLE CENTERS INITIATIVE THE ATLANTA EXPERIENCE. Amy Goodwin Alabama Planning Association Conference May 2, 2013 LIVABLE CENTERS INITIATIVE THE ATLANTA EXPERIENCE Amy Goodwin Alabama Planning Association Conference May 2, 2013 Atlanta Regional Commission ARC is a multi-disciplinary regional planning agency with wide-ranging

More information

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model The Congestion Management Process Federal Regulations state that all metropolitan planning organizations must carry

More information

Appendix A Existing Surface Utilities

Appendix A Existing Surface Utilities Appendix A Existing Surface Utilities PRELIMINARY INFRASTRUCTURE STUDY PROPOSED DUSEL SITE GILES COUNTY, VIRGINIA Prepared for: Kimballton Deep Underground Science and Engineering Laboratory Kimballton

More information

Los Angeles County Metropolitan Transportation Authority (Metro) Arterial Performance Measures Framework

Los Angeles County Metropolitan Transportation Authority (Metro) Arterial Performance Measures Framework Los Angeles County Metropolitan Transportation Authority (Metro) Arterial Performance Measures Framework Anita Vandervalk-Ostrander Iteris, Inc. Santa Ana, California, USA Steven Gota, Deputy Executive

More information

St. Helena Island 5-6 December,

St. Helena Island 5-6 December, 5-6 December, 2011 Beaufort County Multi-Jurisdictional Form-Based Code Workshop and Charrette Report 2011 Opticos Design, Inc. 154 Beaufort County Multi-Jurisdictional Form-Based Code Workshop and Charrette

More information

TRAFFIC IMPACT ANALYSIS. MIDWAY SOLAR FARM II County of Imperial, California January 11, 2011

TRAFFIC IMPACT ANALYSIS. MIDWAY SOLAR FARM II County of Imperial, California January 11, 2011 TRAFFIC IMPACT ANALYSIS MIDWAY SOLAR FARM II County of Imperial, California January 11, 2011 LLG Ref. 3-10-2013 Prepared by: Cara Leone Transportation Planner II Under the Supervision of: Chris Mendiara

More information

CTRE SYSTEMATIC IDENTIFICATION FINAL REPORT OF HIGH CRASH LOCATIONS

CTRE SYSTEMATIC IDENTIFICATION FINAL REPORT OF HIGH CRASH LOCATIONS SYSTEMATIC IDENTIFICATION OF HIGH CRASH LOCATIONS FINAL REPORT Sponsored by the Iowa Department of Transportation and the Iowa Highway Research Board Iowa DOT Project TR-442 CTRE Management Project 00-59

More information

Users Guide for Estimation

Users Guide for Estimation Users Guide for Estimation Estimation Version 3.00/3.01 October 2017 [Type here] Phone: (352) 381-4400 Fax: (352) 381-4444 info@infotechfl.com www.infotechfl.com AASHTOWare is a registered trademark and

More information

Civil 3D Introduction

Civil 3D Introduction Civil 3D Introduction Points Overview Points are data collected by surveyors which represent existing site conditions (elevations, boundaries, utilities, etc.). Each point is numbered (or named) and has

More information

ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS

ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1 STUDY

More information

5/17/2017. Steven Popke, PE Wisconsin DOT Bureau of Project Development Methods Development Unit

5/17/2017. Steven Popke, PE Wisconsin DOT Bureau of Project Development Methods Development Unit Steven Popke, PE Wisconsin DOT Bureau of Project Development Unit Wisconsin Department of Transportation since 2014 Assists with WisDOT spilot program for sharing design model data with construction contractors

More information

Screen3 View. Contents. Page 1

Screen3 View. Contents. Page 1 Screen3 View Contents Introduction What is EPA's SCREEN3 Model? What is the Screen3 View Interface? Toollbar Buttons Preliminary Considerations Source Inputs Screen3 Options Running SCREEN3 Model Graphic

More information