1 DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models Problem Statement With the proliferation of distributed energy resources (DER), Transmission Planners must adapt models and modeling practices to account for and differentiate end use loads and the offset in net demand by these resources. In the past, and at lower penetrations of DER integrating into the distribution system, net load reduction has been used. This assumes the same load composition for these different demand levels; however, it is well understood and expected that net load reduction is actually a result of the same or greater demand with an offset due to some level of distributed energy resources. However, these practices are not sustainable moving forward as the distribution system continues to integrate more DER. The NERC Distributed Energy Resources Task Force (DERTF) is developing a report 1 that will provide definitions for DER including different types of DER such as distributed generation (DG), behind the meter generation (BTMG), demand-side management (DSM), and others. These definitions will be used as the prevailing definition of DER; however, for the purposes of modeling DER and the guidance provided herein, a simplified set of definitions are used. The recommended modeling practices differentiate between types of generating resources by the location of their interconnection to the distribution system. For the purposes of dynamic load modeling specified in this guidance, the following definitions are used: Utility-Scale Distributed Energy Resources (U-DER): distributed energy resources directly connected to the distribution bus 2 or connected to the distribution bus through a dedicated, nonload serving feeder. These resources are specifically three-phase interconnections, and can range in capacity, for example, from 0.5 to 20 MW although facility ratings can differ. Retail-Scale Distributed Energy Resources (R-DER): distributed energy resources that offset customer load. These DER include residential 3, commercial, and industrial customers. Typically, the residential units are single-phase while the commercial and industrial units can be single- or threephase facilities. 1 The DERTF Final Report will be completed by end of year 2016 and available here. 2 The distribution bus is connected to a transmission voltage bus via the transmission-distribution transformer. Resources not directly connected to this bus do not meet the criteria for this definition. 3 This also applies to community distributed energy resources that do not serve any load directly but are interconnected directly to a distribution load serving feeder.

2 Discussion of Modeling Practices This section includes a description of modeling practices in both the powerflow and dynamics base case and how utility-scale distributed energy resources (U-DER) and retail-scale distributed energy resources (R- DER) can be represented to effectively capture their performance. Simple Powerflow Modeling Aggregated loads are commonly modeled in the powerflow base cases at the high side of the distribution transformer, with no representation of the transmission-distribution transformer that steps the voltage down to feeder levels (Figure 1). This is generally done to simplify modeling for studying the impacts on Bulk-Power System (BPS) performance. Figure 1: Powerflow Representation of Aggregated Loads Modeled Distribution Transformer One form of modeling loads is to represent each transmission-distribution transformer as a point of connectivity and represent that in the powerflow base case. In this situation, the distribution transformer is modeled explicitly, capturing the electrical impedance as well as any under-load tap changing (ULTC) impacts the transformer may have in steady-state pre- and post-contingency operating conditions. This is particularly important for voltage stability analysis where the transformer impedance and ULTC operation can impact longer term dynamics. Figure 2 shows an example of this representation. Figure 2: Transmission-Distribution Transformer Representation Modeling Guidance: DER in Dynamic Load Models 2

3 Composite Load Model Representation in Stability Programs The most detailed representation of end-use load for dynamic simulations and transient stability assessment available in commercial software platforms is the Composite Load Model (CLM). This model is used in this guidance document to explain how U-DER and R-DER can be incorporated into the model and modeling practices. The CLM includes different types of induction motor models, electronic load, and static load. It also includes representation of the transmission-distribution transformer, shunt compensation at the distribution level, and a distribution feeder equivalent impedance. Lastly, protective tripping can be modeled for each machine as well as the ULTC action. The CLM in the form shown in Figure 3 does not allow for representation of U-DER or R-DER. This is the current implementation of the CLM model structure in at least four major commercial software platforms in North America. The model is not well suited for breaking out U-DER or R-DER and separating the amount of net load reduction (U-DER and R-DER) versus gross load modeled as various forms of induction motors and other types of load. Figure 3: Composite Load Model DER in the Composite Load Model One option is to include all DER directly into the dynamic load model, as shown in Figure 4. This capability is included in a modified version of the CLM presently in one commercial software platform 4. In this case, the DER model represents an aggregate of all U-DER and R-DER on the distribution feeder and is located at the load-bus end of the feeder. This is a simplification to represent some average impedance to all the loads (and DER) on the feeder. While this may be a reasonable modeling assumption at low penetration levels, the U-DER and R-DER must therefore be represented by a uniform control strategy ( DER model). In this case, the powerflow base cases load records must have fields to account for the amount of DER. Increasing DER will result in net load reduction; however, the gross load will be broken out in the dynamic 4 cmpldw in GE PSLF TM. Modeling Guidance: DER in Dynamic Load Models 3

4 simulations such that a more accurate amount of induction motor load and other loads will be represented as well as a closer representation of DER transient performance. Again, the latest versions of several commercial software platforms used in North America presently have this feature of separate fields in the powerflow load records for specifying active and reactive power associated with aggregated DER for each load modeled in the powerflow. Figure 4: Inclusion of DER in the Composite Load Model U-DER and R-DER in the Composite Load Model Another option is to include U-DER and R-DER in the dynamic load model, as shown in Figure 5. In this case, the U-DER and R-DER are separated into different aggregate models with R-DER represented at the load bus of the feeder model and U-DER represented at the distribution substation. The benefits of this approach include: Effects of locationality of U-DER and R-DER: The equivalent feeder impedance results in several percent (e.g., typically around 5%) voltage drop between the low-side bus and load bus. During transient conditions, that voltage difference may cause some DER to trip offline while others may ride through. Control strategies: Interconnection requirements for U-DER may differ from R-DER. Larger-scale installations (U-DER) may have more complex controls such as low voltage ride through, voltage control, and other plant level controls. On the other hand, small-scale (R-DER) likely have simpler control features (e.g., present installations likely adhere to the original IEEE 1547 requirements, which were essentially constant power factor control with no ride through capability). Modeling Guidance: DER in Dynamic Load Models 4

5 The drawbacks of this approach are: Complicated Data Entry: The powerflow base case would need to include the U-DER and R-DER separately or a fractional differentiation would have to be accounted for in the dynamic load model. This would result in complications in data management and for running sensitivity studies. Dynamic Load Model Complexity: In addition to the complexity introduced in the powerflow solution, the composite load model records would also become increasingly complicated by multiple types of U-DER and R-DER. Figure 5: Inclusion of U-DER and R-DER in the Composite Load Model Recommended Modeling Practice for U-DER and R-DER in the Dynamic Load Models The NERC LMTF has discussed and explored options for effectively accounting for U-DER and R-DER in the dynamic simulations as well as how to account for these resources in the powerflow base case as well. Both are interlinked with one another so there is no realistic way to separate the dynamics and powerflow cases and how these resources are modeled. It is recommended that Transmission Planners and Planning Coordinators, in conjunction with the Distribution Providers, identify U-DER and R-DER thresholds for which these resources must be explicitly modeled in the powerflow and dynamics cases as distinct resources. The TPs and PCs should clearly differentiate in the model the resources that are U-DER and the resources that are distributed R-DER. This will clearly differentiate how these resources are modeled in the dynamic simulations as well as in the powerflow base case for contingency analysis and sensitivity analysis. The thresholds, for example, should be based on an individual resource s impact on the system as well as an aggregate impact. Modeling Guidance: DER in Dynamic Load Models 5

6 Gross aggregate nameplate rating of an individual U-DER facility directly connected to the distribution bus or interconnected to the distribution bus through a dedicated, non-load serving feeder; and Gross aggregate nameplate rating of all connected R-DER resources that offset customer load including residential, commercial, and industrial customers. Table 1 shows an example set of requirements for modeling U-DER and R-DER, with thresholds determined based on engineering judgment applicable to the TP or PC electrical characteristics and processes. U-DER Modeling: Any individual U-DER facility rated 5 MVA or higher should be modeled explicitly in the powerflow case at the low-side of the transmission-distribution transformer. A dynamics record, such as PV1 6 model, is required to account for the transient behavior 7 of this plant. R-DER Modeling: If the gross aggregate nameplate rating of R-DER exceeds this threshold, these distributed resource should be accounted for in dynamic simulations as part of the dynamic load model. While this may not require any explicit representation in the powerflow base case, the amount of R-DER should be accounted for in the load record and/or integrated into the dynamic model. Table 1: Example of U-DER and R-DER Requirements Criteria Description Threshold U-DER Modeling R-DER Modeling Gross aggregate nameplate rating of an individual U-DER facility directly connected to the distribution bus or interconnected to the distribution bus through a dedicated, non-load serving feeder Gross aggregate nameplate rating of all connected R-DER resources that offset customer load including residential, commercial, and industrial customers MVA MVA Figure 6 shows the conventional powerflow representation of the load in a powerflow base case and the recommended representation that explicitly models U-DER above a given size threshold. Note that each U- DER above the threshold would be modeled explicitly via its own step-up transformer, as applicable, to the low-side bus. The load is also connected to the low-side bus. 5 This is intentionally left blank as a template or placeholder for applying this in a particular TP or PC footprint. 6 The PV1 is a generic dynamic model for a photovoltaic inverter system. 7 Depending on complexity of the actual U-DER, for inverter coupled U-DER, more sophisticated models such as the second generation generic renewable energy system models may also be used (i.e. regc_a, reec_b and repc_a). Other U-DER (e.g. combined heat and power using conventional gas and steam-turbine generators) can also be modeled using standard models available in commercial software platforms. Modeling Guidance: DER in Dynamic Load Models 6

7 Figure 6: Representing Utility-Scale DER (U-DER) in the Powerflow Base Case Once represented in the powerflow model in this manner, the data for the composite load model should be modified to account for explicit representation of the U-DER and transmission-distribution transformer. Figure 7 shows the composite load model where the distribution transformer impedance is not represented in the dynamic record, it is modeled explicitly in the powerflow to accommodate one or more U-DER. The transformer impedance is not represented in the CLM (impedance set to zero in the dynamic load model); therefore, any LTC modeling would have to be done outside the CLM such as using the ltc1 model available 8. The motor load and distribution equivalent feeder impedance is modeled as part of the CLM, and the R- DER are represented at the load bus based on the input in the powerflow load record while the load is fully accounted for rather than any net load reduction. Figure 7: Dynamic Load Model Representation with U-DER Represented in the Powerflow Base Case 8 Software vendors are exploring the concept of applying an area-, zone-, or owner-based LTC model that could be applied to all applicable transformers to address LTC modeling. Modeling Guidance: DER in Dynamic Load Models 7

8 To capture the R-DER in the powerflow solution, the load records must have the capability 9 to input the R- DER quantity in the powerflow. Figure 8 shows an example of the R-DER included in the powerflow load records. The red box shows the R-DER specified, for example 80 MW and 20 Mvar of actual load with 40 MW and 0 Mvar of R-DER at Bus 2. The blue box shows the net load equal to the actual load less the R-DER quantity specified for MW and Mvar, defined as: NNNNNN MMMM = MMMM llllllll DDDDDDDD MMMM RR DDDDDD NNNNNN MMMMMMMM = MMMMMMMM llllllll DDDDDDDD MMMMMMMM RR DDDDDD Figure 8: Capturing R-DER in the Powerflow Load Records (Source: PowerWorld) The R-DER captured by these quantities in the powerflow would be based on the threshold values as specified in Table 1 for R-DER Modeling. 9 Some software platforms have already adopted this approach; the NERC LMTF recommends all software platforms adopt the same approach to unify this modeling practice and enable flexibility for capturing DER as part of the load records. Modeling Guidance: DER in Dynamic Load Models 8

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2 SMUD Model Data Requirements & Reporting Procedures MOD-032-1 VERSION 1.2 NOVEMBER 10, 2015 1 TABLE OF CONTENTS INTRODUCTION... 2 1.1 Purpose... 2 1.2 Audience... 3 1.3 Process Overview... 3 Figure 1-1:

More information

Using WECC Composite Load Model and PowerWorld Time Step Simulation Tool. Eleanor Ewry

Using WECC Composite Load Model and PowerWorld Time Step Simulation Tool. Eleanor Ewry Using WECC Composite Load Model and PowerWorld Time Step Simulation Tool Eleanor Ewry Engineer October 21, 2014 Overview Introduction to Composite Load Model Introduction to Time Step Simulation (TSS)

More information

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company

Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company Requirements for Data for Power System Modeling and Analysis (MOD-032-1) Arizona Public Service Company December 29, 2016 APS Requirements for Data for Power System Modeling and Analysis Table of Contents

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

Dynamic Load Models in PowerWorld Simulator

Dynamic Load Models in PowerWorld Simulator Dynamic Load Models in PowerWorld Simulator Jamie Weber (weber@powerworld.com) Director of Software Development 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements

More information

DER Data Collection Guideline. Rich Hydzik, DER Subgroup Lead ERSWG Meeting November 6, 2017

DER Data Collection Guideline. Rich Hydzik, DER Subgroup Lead ERSWG Meeting November 6, 2017 DER Data Collection Guideline Rich Hydzik, DER Subgroup Lead ERSWG Meeting November 6, 2017 Since the August 3, 2017, Meeting Data Collection Guideline has been through two rounds of comment from DER Subgroup

More information

WECC Load Modeling Task Force Updates

WECC Load Modeling Task Force Updates WECC Load Modeling Task Force Updates Irina Green California ISO, WECC LMTF Chair NERC Load Modeling Task Force Meeting November 1, 2017 Composite Load Model with Distributed Generation Composite Load

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

Demonstration Test Bed for Advanced Control Systems

Demonstration Test Bed for Advanced Control Systems Demonstration Test Bed for Advanced Control Systems Christopher R Clarke Senior Engineer SCE Advanced Technology June 22, 2016 1 Advanced Distribution Control Systems Introduction of customer adoption

More information

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 June 6, 2012, Inc. PURPOSE The purpose of this impact study is to assess the impacts of a wind farm interconnection

More information

Proposed Improvements for NERC MOD Standards July 10, 2012

Proposed Improvements for NERC MOD Standards July 10, 2012 Agenda Item 3.6 Planning Committee Meeting September 18-19, 2012 Proposed Improvements for NERC MOD Standards July 10, 2012 Background This paper outlines proposed improvements for NERC Reliability Standards

More information

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Small Generator Interconnection System Impact Study Report. Completed For Q0047 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection

More information

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission... CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document September, 2010 Table of Contents TABLE OF CONTENts Disclaimer... 3 Executive Summary... 4 Introduction...

More information

Caroline Marzinzik. CMPLDW Support in PowerWorld Simulator ext. 12

Caroline Marzinzik. CMPLDW Support in PowerWorld Simulator ext. 12 CMPLDW Support in PowerWorld Simulator Caroline Marzinzik caroline@powerworld.com 217 398 2340 ext. 12 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com

More information

ISO New England Data Modeling Requirements

ISO New England Data Modeling Requirements A U G U S T 1 5, 2 0 1 6 B O S T O N, M A ISO New England Data Modeling Requirements Renew Northeast Meeting Al McBride D I R E C T O R, T R A N S M I S S I O N S T R A T E G Y & S E R V I C E S Agenda

More information

Grid Interconnection of Renewable Generation

Grid Interconnection of Renewable Generation Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

Hosting Capacity Webinar. Summary of April 28, 2017 Stakeholder Engagement Group Meeting

Hosting Capacity Webinar. Summary of April 28, 2017 Stakeholder Engagement Group Meeting Hosting Capacity Webinar Summary of April 28, 2017 Stakeholder Engagement Group Meeting April 28, 2017 Agenda Introductions Agenda Overview Background Hosting Capacity Implementation Roadmap Stage 2 Hosting

More information

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Revised: July 12, 2013 Introduction The following information includes requests for clarification

More information

PRC Coordination of Protection Systems for Performance During Faults

PRC Coordination of Protection Systems for Performance During Faults PRC-027-1 Coordination of Protection Systems for Performance During Faults A. Introduction 1. Title: Coordination of Protection Systems for Performance During Faults 2. Number: PRC-027-1 3. Purpose: To

More information

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure 1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the

More information

Supplemental Information

Supplemental Information Retirement of NPCC Directory# 3 Supplemental Information On April 1, 2015, NPCC Directory# 3 was retired upon the effective date of PRC-005-2 Protection System Maintenance which is subject to a 12 year

More information

CIP Cyber Security Critical Cyber Asset Identification. Rationale and Implementation Reference Document

CIP Cyber Security Critical Cyber Asset Identification. Rationale and Implementation Reference Document CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document NERC Cyber Security Standards Drafting Team for Order 706 December 2010 This document provides

More information

Consideration of Issues and Directives Project Modeling Data (MOD B) October 7, 2013

Consideration of Issues and Directives Project Modeling Data (MOD B) October 7, 2013 Project 2010-03 Modeling Data (MOD B) October 7, 2013 Para 290. Project 2010-03 - Modeling Data The Commission directs public utilities, working through NERC, to modify the reliability standards MOD- 010

More information

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9 PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6

More information

USE CASE 14 CONTROLLED ISLANDING

USE CASE 14 CONTROLLED ISLANDING I USE CASE 14 CONTROLLED ISLANDING Use Case Title Centralized application separates grid into islands to prevent blackout Use Case Summary Controlled islanding is a method that can significantly improve

More information

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Generator Interconnection Request 377 40 MW Wind Generating Facility Renfrew, NS Mar. 6, 2012 Control Centre Operations Nova Scotia Power Inc.

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1 Reliability Standard Audit Worksheet 1 CIP-002-5.1 Cyber Security BES Cyber System Categorization This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR

More information

Joint Transmission Planning Base Case Preparation Process

Joint Transmission Planning Base Case Preparation Process California Independent System Operator & Southern California Edison Joint Transmission Planning Base Case Preparation Process NERC Reliability Standard MOD-032-1 Version 1.2 August 31, 2017 INTENTIONALLY

More information

Feasibility Study on Load Flow and Short Circuit Project

Feasibility Study on Load Flow and Short Circuit Project Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November

More information

Interconnection Application

Interconnection Application Interconnection Application Member interested in applying for the interconnection of a distributed energy resource to the Utility s distribution system through the Fast Track or Study Processes are to

More information

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW The Customer Generator applicant ("Applicant") hereby makes application to the T &

More information

LORAIN-MEDINA RURAL ELECTRIC COOPERATIVE, INC. NORTH CENTRAL ELECTRIC COOPERATIVE, INC.

LORAIN-MEDINA RURAL ELECTRIC COOPERATIVE, INC. NORTH CENTRAL ELECTRIC COOPERATIVE, INC. Page 1 LORAIN-MEDINA RURAL ELECTRIC COOPERATIVE, INC. NORTH CENTRAL ELECTRIC COOPERATIVE, INC. RULES AND REGULATIONS FOR DISTRIBUTED RESOURCES (DR) OBJECTIVES To provide for the safety of consumers, Cooperative

More information

SMALL GENERATOR INTERCONNECTION REQUEST. (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST. (Application Form) Attachment 2 Transmission Provider: SMALL GENERATOR INTERCONNECTION REQUEST Designated Contact Person: Address: Telephone Number: (Application Form) An Interconnection Request is considered complete when

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection

More information

Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014

Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014 Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014 2014 Electric Power Research Institute, Inc. All rights reserved. Meet the Challenge An Integrated Grid 2 Interconnected

More information

Alberta Reliability Standard Cyber Security Incident Reporting and Response Planning CIP-008-AB-5

Alberta Reliability Standard Cyber Security Incident Reporting and Response Planning CIP-008-AB-5 A. Introduction Consultation Draft April 5, 2016 1. Title: 2. Number: 3. Purpose: To mitigate the risk to the reliable operation of the bulk electric system as the result of a cyber security incident by

More information

Unofficial Comment Form Project Disturbance Monitoring

Unofficial Comment Form Project Disturbance Monitoring Unofficial Comment Form Project 2007-11 Disturbance Monitoring Please DO NOT use this form for submitting comments. Please use the electronic form to submit comments on the Standard Authorization Request

More information

Power System Studies. The Power of Trust. The Future of Energy.

Power System Studies. The Power of Trust. The Future of Energy. The Power of Trust. The Future of Energy. POWER SYSTEM ANALYSIS Consulting studies to investigate system events and optimize power system performance In todays competitive and rapidly changing operating

More information

For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form)

For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form) Electrical Company: PacifiCorp For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form) Designated Contact Person: Robin Moore Address

More information

I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff)

I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff) I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff) * MISO will add the underlined text provided by the Owners Committee to Section 34.2 of the Tariff with

More information

Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013

Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013 Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time November 12, 2013 Rationale Background Interconnection wide powerflow and dynamics cases are currently

More information

Chapter 2 State Estimation and Visualization

Chapter 2 State Estimation and Visualization Chapter 2 State Estimation and Visualization One obvious application of GPS-synchronized measurements is the dynamic monitoring of the operating conditions of the system or the dynamic state estimation

More information

BESNet User Manual. Exception Request Preparation for Registered Entities. June 29, 2014 Version 1-2

BESNet User Manual. Exception Request Preparation for Registered Entities. June 29, 2014 Version 1-2 Table of Contents BESNet User Manual Exception Request Preparation for Registered Entities June 29, 2014 Version 1-2 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com

More information

* Standards Coordinating Committee 21. Sept 2, 2010 by Tom Basso

* Standards Coordinating Committee 21. Sept 2, 2010 by Tom Basso IEEE SCC21* Status 1547 TM Interconnection and P2030 TM Smart Grid Interoperability Series of Standards * Standards Coordinating Committee 21 presented at the Electric Vehicle Infrastructure t Working

More information

Minnesota DER Interconnection Process Kristi Robinson, P.E.

Minnesota DER Interconnection Process Kristi Robinson, P.E. Minnesota DER Interconnection Process Kristi Robinson, P.E. 6841 Power Lane SW Alexandria, Minnesota Tel 320.762.1697 Fax 320.762.1479 www.star-energy.com eee@star-energy.com Spring 2017: Petition made

More information

PG&E Transmission Interconnection Handbook

PG&E Transmission Interconnection Handbook Table of Contents TABLE OF CONTENTS... 1 UPDATE HISTORY... UP-1 INTRODUCTION... IN-1 I-1. PURPOSE... IN-1 I-2. INTRODUCTORY DEFINITIONS... IN-1 I-3. HANDBOOK APPLICABILITY... IN-2 I-3.1. New Load, New

More information

Project Consideration of Commission Directives in Order No. 693

Project Consideration of Commission Directives in Order No. 693 Project 2009-02 Consideration of Commission Directives in Order Order P 905-906 Further, consistent with the NOPR, the Commission directs the ERO to modify IRO-002-1 to require a minimum set of tools that

More information

Order No Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request. September, 2015

Order No Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request. September, 2015 Order No. 754 Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request System Protection and Control Subcommittee (SPCS) and System Modeling and Analysis Subcommittee

More information

THE INTERCONNECTION HANDBOOK

THE INTERCONNECTION HANDBOOK THE INTERCONNECTION HANDBOOK Southern California Edison Company Rev. 8 This document is controlled by the originating SCE T&D organization. When downloaded and printed, this document becomes UNCONTROLLED,

More information

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: _Cleco Power LLC Designated Contact Person: Cindy Guillot Address: P.O Box 70, (2180 St. Landry Hwy) St. Landry, LA 71367

More information

Karl Iliev, San Diego Gas & Electric Company

Karl Iliev, San Diego Gas & Electric Company INTEGRATING DER THROUGH DISTRIBUTION SYNCROPHASORS Karl Iliev, San Diego Gas & Electric Company 2002 San Diego Gas and Electric Co. and Southern California Gas Company. All copyright and trademark rights

More information

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons

More information

Software Technologies

Software Technologies The Power of Trust. The Future of Energy. MAINTAINING GRID SECURITY Analysis tools for off-line and on-line Dynamic Security Assessment 02 Maintaining grid security is a fundamental requirement for power

More information

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System Real Time Digital Simulator Testing of an On Line Integrated Stability Control System R.P. Wierckx, M. Kawasaki, N. Saito, K. Anzai, S.C. Verma Abstract The paper describes the testing of an on line integrated

More information

Modeling of RAS and Relays in Power Flow Contingency Analysis. Jamie Weber

Modeling of RAS and Relays in Power Flow Contingency Analysis. Jamie Weber Modeling of RAS and Relays in Power Flow Contingency Analysis Jamie Weber weber@powerworld.com 217 384 6330 ext. 13 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

Measurement Based Dynamic Load Modeling in Power Systems

Measurement Based Dynamic Load Modeling in Power Systems Measurement Based Dynamic Load Modeling in Power Systems Alireza Rouhani 1 Bilgehan Donmez 2 Ali Abur Northeastern University 1 Currently with Dominion Power (Received his PhD in Spring 2017) 2 Cuurently

More information

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010

NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010 Transmission Relay Loadability FERC Order 733 Project 2010-1313 NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010 Project Overview 2 Standards Involved PRC-023-2 Transmission

More information

Chapter 2 Communication for Control in Heterogeneous Power Supply

Chapter 2 Communication for Control in Heterogeneous Power Supply Chapter 2 Communication for Control in Heterogeneous Power Supply The need to modernize the power grid infrastructure, and governments commitment for a cleaner environment, is driving the move towards

More information

ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018

ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018 ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018 Purpose The purpose of this Practice Guide is provide a reference to be used

More information

Bulk Electric System Definition Changes and Reporting

Bulk Electric System Definition Changes and Reporting Bulk Electric System Definition Changes and Reporting June 12, 2014 Greg Sorenson, PE Senior Compliance Engineer gsorenson.re@spp.org 501.688.1713 Overview BES Definition Change BES Definition Reference

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking Regarding Policies, Procedures and Rules for the California Solar Initiative, the Self-Generation Incentive

More information

Hosting Capacity for Distributed Energy Resources on Distribution Feeders A Case Study

Hosting Capacity for Distributed Energy Resources on Distribution Feeders A Case Study CIGRE US National Committee 2017 Grid of the Future Symposium Hosting Capacity for Distributed Energy Resources on Distribution Feeders A Case Study Huijuan Li EPRI Cleveland, OH October 23, 2017 Hosting

More information

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of

More information

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer ) Revised Generation Interconnection Impact Study Report For Queue Position 31 ( Interconnection Customer ) September 22, 2004 1 Generation Interconnection System Impact Study Report I. Revision of Original

More information

Upper vs. Lower Case BTMG. Resource Adequacy Subcommittee October 11, 2017

Upper vs. Lower Case BTMG. Resource Adequacy Subcommittee October 11, 2017 Upper vs. Lower Case BTMG Resource Adequacy Subcommittee October 11, 2017 Purpose & Key Takeaways Purpose: Address issue assigned to RASC by SC: Define lower case btmg and/or criteria such as MW threshold

More information

ELECTRIC POWER SYSTEM

ELECTRIC POWER SYSTEM FUNDAMENTAL CHANGES TO THE ELECTRIC POWER SYSTEM POST-2018 BY MARK SIIRA, ComRent International This article gives a glimpse of some significant changes that will occur in electric power system testing

More information

Standard Development Timeline

Standard Development Timeline CIP-002-6 Cyber Security BES Cyber System Categorization Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the

More information

Standard Development Timeline

Standard Development Timeline CIP-002-6 Cyber Security BES Cyber System Categorization Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the

More information

Generation, Transmission, and End User Facilities

Generation, Transmission, and End User Facilities Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3

More information

Facility Connection Requirements

Facility Connection Requirements SEMINOLE ELECTRIC COOPERATIVE, INC. Facility Connection Requirements BULK ELECTRIC SYSTEM FACILITIES Facility Connection Requirements Page 1 of 19 Table of Contents 1. GENERAL CONNECTION REQUIREMENTS...

More information

3. SCHEDULED ACTIONS Scheduling Using Different Bases: Time, Temperature, Pricing Signals...32

3. SCHEDULED ACTIONS Scheduling Using Different Bases: Time, Temperature, Pricing Signals...32 Specification for PV & Storage Inverter Interactions using IEC 61850 Object Models and Capabilities (Draft v14) Table of Contents 1. OVERVIEW...1 1.1 Background of EPRI's Photovoltaic & Storage Integration

More information

Introduction to Generation Availability Data System (GADS) Wind Reporting

Introduction to Generation Availability Data System (GADS) Wind Reporting Introduction to Generation Availability Data System (GADS) Wind Reporting Registration and Reporting Fundamentals Donna Pratt, Performance Analysis Manager-Data Analytics NERC Webinar April 26, 2017 Topics

More information

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project #169 Generation Interconnection Feasibility Study Report 7/2/2014 Regional Electric Transmission Planning TABLE OF CONTENTS Executive Summary... 3 Generator and Interconnection Data... 5 Study

More information

Attachment H: Small Generator (10 MW and Below) Technical Requirements and Standards

Attachment H: Small Generator (10 MW and Below) Technical Requirements and Standards Attachment H: Small Generator (10 MW and below) Technical Requirements and Standards Scope Attachment H: Small Generator (10 MW and Below) Technical Requirements and Standards The PJM Small Generator Interconnection

More information

Minnesota Hosting Capacity Analysis

Minnesota Hosting Capacity Analysis Minnesota Hosting Capacity Analysis MIPSYCON November 8, 2017 Chris Punt, P.E. Outline What is Hosting Capacity? Background DRIVE Results Visualization Accuracy Timeline Next Steps 2 What is Hosting Capacity?

More information

STCP 04-3 Issue 005 Real Time Data Provision

STCP 04-3 Issue 005 Real Time Data Provision STCP 04-3 Issue 005 Real Time Data Provision STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

Glencoe Light and Power

Glencoe Light and Power Glencoe Light and Power REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS 1 Table of Contents Page I. INTRODUCTION...5 A. Authority... 5 B. Objectives...5 C. Interconnection

More information

Standards. Howard Gugel, Director of Standards Board of Trustees Meeting May 5, 2016

Standards. Howard Gugel, Director of Standards Board of Trustees Meeting May 5, 2016 Standards Howard Gugel, Director of Standards Board of Trustees Meeting May 5, 2016 Real-time Monitoring and Analysis Reliability Benefits Ensure entities have capabilities for maintaining high quality

More information

LAB1 INTRODUCTION TO PSS/E EE461: POWER SYSTEMS COLORADO STATE UNIVERSITY

LAB1 INTRODUCTION TO PSS/E EE461: POWER SYSTEMS COLORADO STATE UNIVERSITY LAB1 INTRODUCTION TO PSS/E EE461: POWER SYSTEMS COLORADO STATE UNIVERSITY PURPOSE: The purpose of this lab is to introduce PSS/E. This lab will introduce the following aspects of PSS/E: Introduction to

More information

Project Posting 8 Frequently Asked Questions Guide

Project Posting 8 Frequently Asked Questions Guide Project 2007-02 Posting 8 Frequently Asked Questions Guide General Questions 1. What were the inputs that drove the development of posting 8 of Project 2007-02? The NERC Board of Trustees November 7 th,

More information

Geomagnetic Disturbances

Geomagnetic Disturbances Geomagnetic Disturbances Managing Risk to the North American Power Grid Mark Olson, Reliability Standards Developer Worcester Polytechnic Institute Energy Symposium September 25, 2013 About NERC The North

More information

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM A. Valenti* I Bel ** S. Lee *EDF **EPRI E2I ConEdison France USA USA arnaud.valenti@edf.fr

More information

Facility Connection Requirements. LST-FAC-001-PRO-Facility_Connection_Requirements

Facility Connection Requirements. LST-FAC-001-PRO-Facility_Connection_Requirements Facility Connection Requirements LST-FAC-001-PRO-Facility_Connection_Requirements Document Control Document Owner: Name: Mathew Gomes Title: Director of Development & System Planning Change History: The

More information

Power System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017

Power System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017 Power System Resilience & Reliability Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017 NERC, Reliability, & Resilience NERC has addressed reliability

More information

requirements in a NERC or Regional Reliability Standard.

requirements in a NERC or Regional Reliability Standard. CIP 002 5.1 Cyber Security BES Cyber System Categorization A. Introduction 1. Title: Cyber Security BES Cyber System Categorization 2. Number: CIP 002 5.1 3. Purpose: To identify and categorize BES Cyber

More information

STCP22-1 Issue 003 Production of Models for GB System Planning

STCP22-1 Issue 003 Production of Models for GB System Planning STCP22-1 Issue 003 Production of Models for GB System Planning STC Procedure Document Authorisation Company Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission

More information

Applying branch circuit breakers and supplementary protectors in North America

Applying branch circuit breakers and supplementary protectors in North America Supersedes June 2017 FAZ-NA-L FAZ-NA FAZ Applying branch circuit breakers and supplementary protectors in North America Introduction Eaton offers three types of miniature circuit breakers for use in North

More information

Purpose. ERO Enterprise-Endorsed Implementation Guidance

Purpose. ERO Enterprise-Endorsed Implementation Guidance Lesson Learned CIP Version 5 Transition Program CIP-002-5.1 Requirement R1: Impact Rating of Generation Resource Shared BES Cyber Systems Version: January 29, 2015 Authorized by the Standards Committee

More information

Feeder Hosting Capacity and Impacts of Distribution Connected Generation. NGN Tutorial. Prepared for GOTF October 22, 2017

Feeder Hosting Capacity and Impacts of Distribution Connected Generation. NGN Tutorial. Prepared for GOTF October 22, 2017 Feeder Hosting Capacity and Impacts of Distribution Connected Generation NGN Tutorial Matthew Rylander, PhD Technical Leader Power System Studies Electric Power Research Institute mrylander@epri.com Prepared

More information

ENTSO-E connection network codes Implementation guidance documents. Joint DSO response paper

ENTSO-E connection network codes Implementation guidance documents. Joint DSO response paper ENTSO-E connection network codes Implementation guidance documents Joint DSO response paper August 2016 Dépôt légal: D/2016/12.105/45 Questionnaire Rate-of-change- of- frequency withstand capability (RoCoF)

More information

Utility Representative Frank Doherty, Con Ed Vendor Representative David Cohen, CEO Infotility, Inc.

Utility Representative Frank Doherty, Con Ed Vendor Representative David Cohen, CEO Infotility, Inc. Efficient Building Systems Utility Communications Internet Renewables PV Consumer Portal & Building EMS Advanced Distribution Dynamic Metering Control Operations Interface Systems Control Plug-In Hybrids

More information

Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA

Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA GE Energy Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA Mahesh Morjaria Manager, Wind Plant Systems Platform Adopted for Wind Power Management class http://www.icaen.uiowa.edu/ edu/~ie_155/

More information

Power System Network Simulator (PSNsim)

Power System Network Simulator (PSNsim) The PSNsim is hardware simulator that simulates all parts of power system from generation to utilization. The PSNsim is a scaled down model of the real power system that provides an experimental environment

More information

XXXXX XXXX Wind Generation Project

XXXXX XXXX Wind Generation Project A subsidiary of Pinnacle West Capital Corporation XXXXX XXXX Wind Generation Project XXXX XXXXX XXXXXXX Co., Inc. Interconnection System Impact Study Final Report Prepared By Arizona Public Service Company

More information