Relief Well Ranging Strategy

Size: px
Start display at page:

Download "Relief Well Ranging Strategy"

Transcription

1 Relief Well Ranging Strategy L. Wm Bill Abel ABEL Engineering LLP Houston, Texas USA 1

2 Relief Well History Santa Barbara oil spill occurred in January 1969 in the Santa Barbara Channel in Southern California According to Dr. Preston Moore the first relief well ever was for this problem and the objective was to penetrate and produce the reservoir to blowdown the pressure and thus stop the flow, e.g., RELIEF WELL relieved the pressure in the reservoir. 2

3 Why do we drill relief wells? Answer: Because we have to! If there is another solution, it is taken because time is the driving factor in any well control event. SOLUTION MUST BE SOONER RATHER THAN LATER IN ALL CASES. 3

4 GOM Event 2007 Off-bottom Kill Objective 4

5 N. America HTHP Land 5

6 Lake Maracaibo crater circa

7 Swamp Barge Rig Marea after a few hours of exposure to fire 7

8 Dewi9 on TNE5 with RW in the background Big crocodiles! 8

9 How Does Ranging Fit Into the Project RELIEF WELL TEAM WELL PLANNING PROXMINITY LOGGING (Ranging Runs) FLOW ASSURANCE / HYDRAULIC MODELING Survey Mgt. INTERCEPTION / COMMUNICATION DIRECTIONAL DRILLING / MWD-LWD LWA Aug-10 9

10 Overlapping responsibilities Well Plan Project Engineering "Relief Well Team" Proximity Logging Hydraulic Simuation Interception Stragegy Directional Drilling 10

11 + Corporate Image Incident begins - OVER ALL OBJECTIVE STOP THE FLOW STABILIZE THE WELL Quality of Press Releases with pre-plan Image with a pre-plan Image sans pre-plan Flow stopped Time Savings Quality of Press Releases sans pre-plan??? Flow stopped Time + Quality of Press Releases - 11

12 IMPACT OF TIME Flow stopped Pre-Plan BCP Cost of Control Pre-Planned Project Curve POLLUTION / PRODUCTION LOST Normal Project Curve Flow stopped Time Savings Pollution stopped Pollution stopped Pollution saved Cost Savings Produciton Lost / Pollution Incident begins Time 12

13 OBJECTIVES Allow communication for a pump to kill operation Least risk per ALARP (as low as reasonably possible) Least time possible (time = exposure in blowout) 13

14 The real Objective Hit a VERY small target and make a communication: 14

15 Proximity Choices: WL (active) or MWD (passive) Why choose one over the other? Both have strength and weaknesses Active has greater range (in most cases) Passive uses tools that are already in the hole (MWD) no trip out to obtain data (provided you are within the detection range) LOGICAL ANSWER: Use both 15

16 Relief Well Plans are now part of the Emergency Response Plan ERP for high risk (pollution) 16

17 Angle Impact (Incident and EOUs size) 17

18 TVD MD Ple-10 Relief Well Trajectory Large KOP Incident ANG = 44.0 Angel Small End Bld EOUs X Target MD TD TD TVD X Deprt EOU Ple-10 RW , ,091.4 uated LWA Sept

19 Low Incident Angle Large EOUs 19

20 Ranging in small EOU 2m 2m Blowout Well Well Separation 10 12m ' vendor MWD Proximity Range Relief Well 8m 7m MWD Proximity Range 24m (diameter) Sum of Surface + RW + Blowout Well Uncertainty 28m (diameter) Change in azimuth MWD Proximity MWD Range Proximity MWD Proximity MWD Range Proximity Range Range MWD MWD Proximity Proximity Range Range 24m (diameter) 24m (diameter) 24m (diameter) 24m (diameter) 24m (diameter) 24m (diameter) Sweeping thru the ellipse to locate Blowout Well Casing 20

21 Large Incident AZ well AZ small EOUs 54m 36m 1590m MD 29.8 x 12m 57m m TVD 54m well AZ RW AZ m Active AZ m 54m 54m 1590m MD highside well AZ m Passive 36m 84 lowside 36m 29.8 x 14.8m m TVD 38m. OPEN HOLE POTENTIAL UNPLANNED COMMUNICATION LWA Sept

22 Small EOU but high Incident angle Passive 9-5/8" 43.5 lbs/ft Major Axis x 9-5/8" Casing Shoe 118 x 46m Active 35 deg Incident angle RW Gyro Major Axis x Intercept 37 x 24m 30.6m 19m EOU Combined Major Axis x 9-5/8" Casing Shoe 155 x 70m 43.6m Gryo Major Axis x Intercept 19.6 x 14.4m Passive 9-5/8" 43.5 lbs/ft 30.6m 19m Major Axis x 9-5/8" Casing Shoe x 19m EOU Combined Major Axis x 9-5/8" Casing Shoe 165 x 23.4m 43.6m LWA Sept-15 Active 35 deg Incident angle 22

23 Blowout well (Target) LWD/MWD Ranging Relief well LWD/MWD tool range Trace across the ellipse of uncertainty Ellipse of uncertainty Calculated well location Actual well location R 2 R 1 1 Investigated area Area left to investigate Detection point Well Planning Extends Range-of-Detection Intercept and communication point 23

24 Sweep thru the EOU holding angle mtvd 30.6m 19m 19.4m x 45.2m Maj x Vert 30.6m 19m 30.6m 19m 1205 mtvd mtvd 30.6m 19m x 52.2m 30.6m 19m 30.6m 19m 15.3m. 1267m TVD Major x Vertical x 59m 1267 mtvd 30.6m 19m 30.6m 19m 1282 mtvd 24

25 Example Strategy for Ranging 0 (RT) 500 KOP 642m 1 0 /10m AZ RW Phase 8-¼ Phase Blowout Vertical section Blowout Well NOTE: Hold trajectory is maintained until casing is detected with proximity logs. MWD Ranging at 50m separation Detection, mapping of relative position SEE NOTE MWD Bit Sub Anticollision Hold AZ Inc 81 0 Line up to parallel AZ Nudge away if needed to avoid unplanned collision Match AZ and 4 to 7 m separation Check shots Check shots End far side of EOU AZ Inc /8" 9-5/8" Case well after lined up to hit Line up to intercept attack angle Drill out with slim BHA and hit well to communicate PUMP TO KILL WELL CONTROLLED 25

26 ABEL Generalized Ranging Strategy Aim at a point where the EOU is manageable (not all that big if possible) Use near-bit inc. and MWD as anticollision and ranging Drill to that point where calcs say detection should have happened If no go Log the hole with WL and or EMS run or continuous MWD to increase detection range 26

27 USE DEMMING MODEL Assess risks v. benefits Evaluate Available Resources Determine Possible Actions Identify Actions Identify personnel roles Determine desired activities Request resources` Emergency Event Identify Real Problems Get It Done Hazards to people/environment? Damage to property Incident Response Needs Timeframe No Improve future response capabilities Monitor Results Problem Solved? Yes Stop work & record activities Use ICS systems Ensure safety of personnel Communicate Actions Clearly 27

28 END OF PRESENTAION HTHP Land N. America

Well Placement and Ranging Services. Charles Duck

Well Placement and Ranging Services. Charles Duck Well Placement and Ranging Services Charles Duck The RADAR services encompass: SAGD (well twinning) applications Well Intercept (well kill) applications Well Avoidance applications Gravity MWD (provide

More information

September 23 rd 2010 ISCWSA Meeting Florence

September 23 rd 2010 ISCWSA Meeting Florence Could the minimum curvature wellbore reconstruction lead to unrealistic wellbore positioning? A directional step by step approach enables to address this issue Introduction Problem Positioning In SPE paper

More information

Well Advisor Project. Ken Gibson, Drilling Technology Manager

Well Advisor Project. Ken Gibson, Drilling Technology Manager Well Advisor Project Ken Gibson, Drilling Technology Manager BP Well Advisor Project Build capability to integrate real-time data with predictive tools, processes and expertise to enable the most informed

More information

Next Generation Directional MWD Tool Requirements for Improving Safety and Accuracy

Next Generation Directional MWD Tool Requirements for Improving Safety and Accuracy Next Generation Directional MWD Tool Requirements for Improving Safety and Accuracy Discussion and Proposal for a JIP Market/Technology Feasibility Study Keith Lynch Conoco Phillips (sponsor) 281-293-3746

More information

Making the Most of Borehole Surveying

Making the Most of Borehole Surveying Making the Most of Borehole Surveying Prof Angus Jamieson University of the Highlands and Islands Video presentation available at www.uhi.ac.uk/surveying-summary This Presentation Covers... 1. Why survey

More information

Next Generation Directional MWD Tool Requirements for Improving Safety and Accuracy

Next Generation Directional MWD Tool Requirements for Improving Safety and Accuracy Next Generation Directional MWD Tool Requirements for Improving Safety and Accuracy DEA-164 Discussion and Proposal for a JIP Market/Technology Feasibility Study Son Pham ConocoPhillips (Sponsor) +1 281

More information

The New Generation of Rotary Systems May be Closer Than You Think Frank J. Schuh, Pat Herbert, John Harrell, The Validus International Company, LLC

The New Generation of Rotary Systems May be Closer Than You Think Frank J. Schuh, Pat Herbert, John Harrell, The Validus International Company, LLC 1 AADE-03-NTCE-02 The New Generation of Rotary Systems May be Closer Than You Think Frank J. Schuh, Pat Herbert, John Harrell, The Validus International Company, LLC Copyright 2003 AADE Technical Conference

More information

AADE-17-NTCE-022. Achieving Efficient Well Spacing Using Advanced MWD Correction Techniques

AADE-17-NTCE-022. Achieving Efficient Well Spacing Using Advanced MWD Correction Techniques AADE-17-NTCE-022 Achieving Efficient Well Spacing Using Advanced MWD Correction Techniques Christopher R. Chia and David E.M. Ross, Scientific Drilling International Copyright 2017, AADE This paper was

More information

PETROPHYSICAL DATA AND OPEN HOLE LOGGING BASICS COPYRIGHT. MWD and LWD Acquisition (Measurement and Logging While Drilling)

PETROPHYSICAL DATA AND OPEN HOLE LOGGING BASICS COPYRIGHT. MWD and LWD Acquisition (Measurement and Logging While Drilling) LEARNING OBJECTIVES PETROPHYSICAL DATA AND OPEN HOLE LOGGING BASICS MWD and LWD Acquisition By the end of this lesson, you will be able to: Understand the concept of Measurements While Drilling (MWD) and

More information

THE NEW METHOD OF DIRECTIONAL DRILLING BY NON-ROTATING ADJUSTABLE STABILIZER

THE NEW METHOD OF DIRECTIONAL DRILLING BY NON-ROTATING ADJUSTABLE STABILIZER THE NEW METHOD OF DIRECTIONAL DRILLING BY NON-ROTATING ADJUSTABLE STABILIZER Eisa Novieri, E.novieri@siau.ac.ir, Department of Petroleum Engineering, Islamic Azad University Susangerd Branch, Susangerd,

More information

High Accuracy Wellbore Surveys Multi-Station Analysis (MSA)

High Accuracy Wellbore Surveys Multi-Station Analysis (MSA) 1 High Accuracy Wellbore Surveys Multi-Station Analysis (MSA) Magnetic MWD measurement Uncertainty Conventional MWD Tools report their own orientation: Inclination, Azimuth, and Toolface. These reported

More information

Pad Drilling Using Magnetic MWD

Pad Drilling Using Magnetic MWD Pad Drilling Using Magnetic MWD Managing Magnetic Interference from nearby casing Neil Bergstrom, P.E. Wellbore Geodetic Specialist Devon Energy ISCWSA SPE Wellbore Positioning i Tech Section Denver 3

More information

This paper was prepared for presentation at the Unconventional Resources Technology Conference held in San Antonio, Texas, USA, 1-3 August 2016.

This paper was prepared for presentation at the Unconventional Resources Technology Conference held in San Antonio, Texas, USA, 1-3 August 2016. URTeC: 2458828 Web-based Technologies for Real-time Directional Survey Quality Improvement Jarrod S. DeVerse*, Surcon Ltd., Denver, CO, United States; Stefan Maus, Magnetic Variation Services LLC, Westminster,

More information

TL LONGBOW v

TL LONGBOW v http://www.trantlogistics.com eric@trantlogistics.com for licensing and technical support nate@trantlogistics.com for sales and pricing USER'S MANUAL Directional Driller, Proximity, Planner Edition January

More information

AADE-05-NTCE-67. A Gravity-Based Measurement-While-Drilling Technique Determines Borehole Azimuth From Toolface and Inclination Measurements

AADE-05-NTCE-67. A Gravity-Based Measurement-While-Drilling Technique Determines Borehole Azimuth From Toolface and Inclination Measurements AADE-05-NTCE-67 A Gravity-Based Measurement-While-Drilling Technique Determines Borehole Azimuth From Toolface and Inclination Measurements Herbert Illfelder, Ken Hamlin, Graham McElhinney - PathFinder

More information

Directional Drilling Optimization by Non-Rotating Stabilizer

Directional Drilling Optimization by Non-Rotating Stabilizer Directional Drilling Optimization by Non-Rotating Stabilizer Eisa Noveiri, Adel Taheri Nia Abstract The Non-Rotating Adjustable Stabilizer / Directional Solution (NAS/DS) is the imitation of a mechanical

More information

A Dynamic Support System For Wellbore Positioning Quality Control While Drilling

A Dynamic Support System For Wellbore Positioning Quality Control While Drilling A Dynamic Support System For Wellbore Positioning Quality Control While Drilling Dr. Cyrille Mathis, Director & CSO, ThinkTank Maths (Edinburgh) IOGP Geomatics / Statoil Industry Day 2017 26 th April 2017

More information

Drillstring Magnetic Interference

Drillstring Magnetic Interference Drillstring Magnetic Interference ISCWSA MWD Error Model Terms Harry Wilson ISCWSA 38, New Orleans, 3 October 2013 MWD Magnetic Azimuth Dominant error sources: Uncertainty associated with nominal declination

More information

Addressing Vulnerabilities By Integrating Your Incident Response Plans. Brian Coates Enaxis Consulting

Addressing Vulnerabilities By Integrating Your Incident Response Plans. Brian Coates Enaxis Consulting Addressing Vulnerabilities By Integrating Your Incident Response Plans Brian Coates Enaxis Consulting Contents Enaxis Introduction Presenter Bio: Brian Coates Incident Response / Incident Management in

More information

Improving Directional Survey Accuracy through Real-Time Operating Centers Shawn DeVerse, Surcon Ltd Stefan Maus, Magnetic Variation Services LLC

Improving Directional Survey Accuracy through Real-Time Operating Centers Shawn DeVerse, Surcon Ltd Stefan Maus, Magnetic Variation Services LLC All final manuscripts will be sent through an XML markup process that will alter the LAYOUT. This will NOT alter the content in any way. IADC/SPE-SPE-180652-MS-MS Improving Directional Survey Accuracy

More information

REDEFINING PUMP DOWN PERFORATING

REDEFINING PUMP DOWN PERFORATING REDEFINING PUMP DOWN PERFORATING 2018-NAPS-37 Authors: Sharif Aboelnaga, Pedro Hernandez, Carlos Eduardo Guedes, Fernando Garcia-Osuna, Schlumberger, Nick Snoke, FHE USA LLC AGENDA REDEFINING PUMP DOWN

More information

Integration of Business Continuity, Emergency Preparedness, and Emergency Response

Integration of Business Continuity, Emergency Preparedness, and Emergency Response Integration of Business Continuity, Emergency Preparedness, and Emergency Response Continuity Insights Conference 2014 Julia Halsne Manager of Business Continuity East Bay Municipal Utility District Contents

More information

PRESENTATION TITLE. Uncertainty - an introductory discussion Robert Wylie. Industry Steering Committee on Wellbore Survey Accuracy

PRESENTATION TITLE. Uncertainty - an introductory discussion Robert Wylie. Industry Steering Committee on Wellbore Survey Accuracy 1 PRESENTATION TITLE Tool Wellbore Face Positioning Efficiency, Technical Virtual SectionSurveys, and Positional Uncertainty - an introductory discussion Speaker Information President xndrilling, Inc.

More information

A Logging, Perforating, Pipe Recovery & Pressure Control Service Company.

A Logging, Perforating, Pipe Recovery & Pressure Control Service Company. A Logging, Perforating, Pipe Recovery & Pressure Control Service Company. Jake Thon. 432.556.6458. jake.thon@rtxwireline.com Kevin Pettyjohn. 432.209.9584. kevin.pettyjohn@rtxwireline.com Braden Vaughan.

More information

Cisco IPICS Case Study: Cisco Safety and Security

Cisco IPICS Case Study: Cisco Safety and Security Cisco IPICS Case Study: Cisco Safety and Security Cisco manages day-to-day safety and security incidents using IPICS. EXECUTIVE SUMMARY SAFETY AND SECURITY, CISCO SYSTEMS Corporate safety, security and

More information

Expensive to drill wells when all goes to plan. Drilling problems add costs throughout the well s life.

Expensive to drill wells when all goes to plan. Drilling problems add costs throughout the well s life. Beau Rollins Map View Cross Section View Expensive to drill wells when all goes to plan. Surface Location Drilling problems add costs throughout the well s life. The best scenario for minimizing costs

More information

Directional Driller s

Directional Driller s Instructions for the Directional Driller s DIREC Program. For use with the HP 50g calculator Contents of this manual: Directional Driller s DIREC Program Diagram #1 Instruction sheet on the HP 50g Diagram

More information

Drilling Performance Services

Drilling Performance Services Drilling Performance Services Helping Our Customers Achieve Superior Results REVit DAMPED Oscillation REVit PROVEN REAL-TIME STICK SLIP MITIGATION *Torque and RPM are out of phase and cancel one another

More information

Summary. Introduction

Summary. Introduction Chris Davison*, Andrew Ratcliffe, Sergio Grion (CGGeritas), Rodney Johnston, Carlos Duque, Jeremy Neep, Musa Maharramov (BP). Summary Azimuthal velocity models for HTI (Horizontal Transverse Isotropy)

More information

Magnetic Referencing and Survey Accuracy for Horizontal Development in the Permian

Magnetic Referencing and Survey Accuracy for Horizontal Development in the Permian Slide 1 of 35 Magnetic Referencing and Survey Accuracy for Horizontal Development in the Permian Wellbore position uncertainty Global and local geomagnetic models Quality control and advanced corrections

More information

Drillingsoftware Casing Design User Manual

Drillingsoftware Casing Design User Manual Drillingsoftware Casing Design User Manual 1. Introduction Working Stress Design (WSD) loads are evaluated throughout the entire length of the casing from the Well Head to the Casing Shoe. True Vertical

More information

Pipeline engineer competency standards list: onshore sector

Pipeline engineer competency standards list: onshore sector Pipeline engineer competency standards list: onshore sector ID Competency area/competency Gen Des Cons Ops Level General engineering GE001 Engineering degree in a relevant discipline x Core GE002 Pipeline

More information

Learning's from Major Process Safety Incidents

Learning's from Major Process Safety Incidents Learning's from Major Process Safety Incidents Brian D. Rains Global PSM Practice Leader DuPont Sustainable Solutions 23 February 2012 Copyright 2010 DuPont. All rights reserved. The DuPont Oval Logo,

More information

MWD and Surveying Services

MWD and Surveying Services MWD and Surveying Services Offering More MWD options, with more reliability, for more optimized directional-drilling operations in any well environment From routine to extreme, we deliver. Drilling Evaluation

More information

Express Monitoring 2019

Express Monitoring 2019 Express Monitoring 2019 WHY CHOOSE PT EXPRESS MONITORING PT Express Monitoring provides a quick evaluation of the current signaling network protection level. This service helps to discover critical vulnerabilities

More information

LFI Learning from Incidents

LFI Learning from Incidents LFI Learning from Incidents 1 Current State Good systems with analysis exist Generally good culture of reporting Areas for Enhancement Not shared between organizations Safety culture could further encourage

More information

Cyber Security What we think and what we know?

Cyber Security What we think and what we know? Cyber Security What we think and what we know? Asbjørn Ueland Principal Engineer Petroleum Safety Authority The stories from the press The incident at Statoil Mongstad 2017 audit at all operators and ship

More information

A Hybrid Approach to Closed-loop Directional Drilling Control using Rotary Steerable Systems

A Hybrid Approach to Closed-loop Directional Drilling Control using Rotary Steerable Systems Proceedings of the 2012 IFAC Workshop on Automatic Control in Offshore Oil and Gas Production, Norwegian University of Science and Technology, Trondheim, Norway, May 31 - June 1, 2012 ThB1.4 A Hybrid Approach

More information

Healthcare HIPAA and Cybersecurity Update

Healthcare HIPAA and Cybersecurity Update Baker Tilly refers to Baker Tilly Virchow Krause, LLP, an independently owned and managed member of Baker Tilly International. Healthcare HIPAA and Cybersecurity Update Agenda > Introductions > Cybersecurity

More information

DISASTER PREPAREDNESS IN THE COUNTY: IMPROVEMENTS NEEDED

DISASTER PREPAREDNESS IN THE COUNTY: IMPROVEMENTS NEEDED 2006-2007 SANTA CLARA COUNTY CIVIL GRAND JURY REPORT Summary DISASTER PREPAREDNESS IN THE COUNTY: IMPROVEMENTS NEEDED Disaster events that have occurred in Santa Clara County (County) have heightened interest

More information

Publishing CitiSense Data: Privacy Concerns and Remedies

Publishing CitiSense Data: Privacy Concerns and Remedies Publishing CitiSense Data: Privacy Concerns and Remedies Kapil Gupta Advisor : Prof. Bill Griswold 1 Location Based Services Great utility of location based services data traffic control, mobility management,

More information

Introduction to Business continuity Planning

Introduction to Business continuity Planning Week - 06 Introduction to Business continuity Planning 1 Introduction The purpose of this lecture is to give an overview of what is Business Continuity Planning and provide some guidance and resources

More information

ECRC~SIMEC. Andy Erjavec Operations Support. November 2011 Slide 1

ECRC~SIMEC. Andy Erjavec Operations Support. November 2011 Slide 1 ECRC~SIMEC Andy Erjavec Operations Support November 2011 Slide 1 Presentation Contents ECRC~SIMEC Overview ECRC~SIMEC Services for Clients ECRC~SIMEC Spill Responses November 2011 Slide 2 Business Model

More information

Mitigating the Risks Associated With the Acquisition of Formation Evaluation Data

Mitigating the Risks Associated With the Acquisition of Formation Evaluation Data AADE-07-NTCE-27 Mitigating the Risks Associated With the Acquisition of Formation Evaluation Data Robert S. Kuchinski, Weatherford International; Robert J. Stayton, Weatherford International Copyright

More information

Why do we need Visualization? By Tracy J. Stark STARK Research

Why do we need Visualization? By Tracy J. Stark STARK Research Why do we need Visualization? By Tracy J. Stark STARK Research tstark3@attglobal.net How do you convince a non believer, in a short article with only a few static figures, the need for visualization? Within

More information

By Tracy J. Stark 1. Search and Discovery Article #40133 (2004) Introduction

By Tracy J. Stark 1. Search and Discovery Article #40133 (2004) Introduction GC Value in Visualization* By Tracy J. Stark 1 Search and Discovery Article #40133 (2004) *Adapted from the Geophysical Corner column in AAPG Explorer, June, 2004, entitled Why Do We Need to Have Visualization?

More information

Th SRS3 07 A Global-scale AVO-based Pre-stack QC Workflow - An Ultra-dense Dataset in Tunisia

Th SRS3 07 A Global-scale AVO-based Pre-stack QC Workflow - An Ultra-dense Dataset in Tunisia Th SRS3 07 A Global-scale AVO-based Pre-stack QC Workflow - An Ultra-dense Dataset in Tunisia A. Rivet* (CGG), V. Souvannavong (CGG), C. Lacombe (CGG), T. Coleou (CGG) & D. Marin (CGG) SUMMARY Throughout

More information

Port Facility Cyber Security

Port Facility Cyber Security International Port Security Program Port Facility Cyber Security Cyber Risk in the Marine Transportation System MAR'01 1 Objectives IDENTIFY motivations behind a cyber attack. IDENTIFY various types of

More information

Railroad Infrastructure Security

Railroad Infrastructure Security TRB Annual Meeting January 14, 2002 Session 107 - Railroad Security William C. Thompson william.thompson@jacobs.com 402-697-5011 Thanks to: Bob Ulrich Dr. William Harris Byron Ratcliff Frank Thigpen John

More information

Organize into a deployable resource that can be called up in an emergency Train GIS professionals to perform emergency response mapping Enhance the

Organize into a deployable resource that can be called up in an emergency Train GIS professionals to perform emergency response mapping Enhance the www.texasegrt.org Organize into a deployable resource that can be called up in an emergency Train GIS professionals to perform emergency response mapping Enhance the mapping capabilities of emergency responders

More information

CYBER RISK AND SHIPS :PRACTICAL ISSUES FOLLOWING BIMCO GUIDELINE

CYBER RISK AND SHIPS :PRACTICAL ISSUES FOLLOWING BIMCO GUIDELINE CYBER RISK AND SHIPS :PRACTICAL ISSUES FOLLOWING BIMCO GUIDELINE Yohan Le Gonidec, head of Shipowner support department, TECNITAS (subsidiary BUREAU VERITAS) 1 AGENDA 2 Introduction 1- Cyber incidents

More information

Any observations not included in this report were discussed with your staff at the informal exit conference and may be subject to follow-up.

Any observations not included in this report were discussed with your staff at the informal exit conference and may be subject to follow-up. Larry Mandel Vice Chancellor and Chief Audit Officer Audit and Advisory Services 401 Golden Shore, 4th Floor Long Beach, CA 90802-4210 562-951-4430 562-951-4955 (Fax) lmandel@calstate.edu June 5, 2018

More information

GRID PATTERN EFFECTS ON AERODYNAMIC CHARACTERISTICS OF GRID FINS

GRID PATTERN EFFECTS ON AERODYNAMIC CHARACTERISTICS OF GRID FINS 24 TH INTERNATIONAL CONGRESS OF THE AERONAUTICAL SCIENCES GRID PATTERN EFFECTS ON AERODYNAMIC CHARACTERISTICS OF GRID FINS Fumiya Hiroshima, Kaoru Tatsumi* *Mitsubishi Electric Corporation, Kamakura Works,

More information

DIRECTIONAL WELL TRAJECTORY DESIGN: THE THEORITICAL DEVELOPMENT OF AZIMUTH BENDS AND TURNS IN COMPLEX WELL TRAJECTORY DESIGNS

DIRECTIONAL WELL TRAJECTORY DESIGN: THE THEORITICAL DEVELOPMENT OF AZIMUTH BENDS AND TURNS IN COMPLEX WELL TRAJECTORY DESIGNS Nigerian Journal of Technology NIJOTECH) ol. 35, No. 4, October 2016, pp. 831 840 Copyright Faculty of Engineering, University of Nigeria, Nsukka, Print ISSN: 0331-8443, Electronic ISSN: 2467-8821 www.nijotech.com

More information

Faculty of Science and Technology MASTER S THESIS. Open access

Faculty of Science and Technology MASTER S THESIS. Open access Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Petroleum Engineering/ Drilling and Well Technology Spring semester, 2013. Open access Writer: Wasal Ahmed Abbasi.. (Writer)

More information

Chapter 1. Chapter 2. Chapter 3

Chapter 1. Chapter 2. Chapter 3 Contents Preface ix Chapter 1 Terrorism 1 Terrorism in General 2 Definition of Terrorism 3 Why Choose Terrorism 4 Goals of Terrorists 5 Selection of Targets and Timing of Attacks 6 Perpetrators 7 Weapons

More information

Florida State University

Florida State University Florida State University Disaster Recovery & Business Continuity Planning Overview October 24, 2017 1 Key Readiness Questions Has your department identified the business functions and infrastructure that

More information

Effective Leadership, Role of Workers & Labor Organizations

Effective Leadership, Role of Workers & Labor Organizations Effective Leadership, Role of Workers & Labor Organizations International Regulators Offshore Safety Conference December 6, 2007 safety@usw.org 412.562.2581 Why is the USW involved in health & safety?

More information

Emergency Management & Disaster Planning

Emergency Management & Disaster Planning Emergency Management & Disaster Planning What we re going to talk about What is Emergency Management and Disaster Planning? What are the key elements of an EM Plan? Where does the University Architect

More information

securivy INFORMATION SYSTEMS MANAGEMENT ILLINOIS INSTITUTE OF TECHNOLOGY A New Model for Business Contingency Operations Ray Trygstad

securivy INFORMATION SYSTEMS MANAGEMENT ILLINOIS INSTITUTE OF TECHNOLOGY A New Model for Business Contingency Operations Ray Trygstad information technology & management INFORMATION SYSTEMS securivy t MANAGEMENT ILLINOIS INSTITUTE OF TECHNOLOGY A New Model for Business Contingency Operations Ray Trygstad 2008 Ray Trygstad Director of

More information

Study of real-time LWD data visual interpretation and geo-steering technology

Study of real-time LWD data visual interpretation and geo-steering technology DOI 10.1007/s12182-013-0298-x 477 Study of real-time LWD data visual interpretation and geo-steering technology Shao Cairui 1, Zhang Fuming 1, Chen Guoxing 1, Ji Jiaqi 2, Hou Qinggong 3, Tang Jianhong

More information

Methodology for Dynamic Characterization of Fragmenting Warheads

Methodology for Dynamic Characterization of Fragmenting Warheads Methodology for Dynamic Characterization of Fragmenting Warheads Jason Angel - U.S. Army Research Laboratory April 22, 2008 Guns & Missiles symposium New Orleans, LA OUTLINE BOTTOM LINE UP FRONT 1 - PROPOSED

More information

Integrating Cyber Security and Safety Systems Engineering Disciplines with a common Code of Practice

Integrating Cyber Security and Safety Systems Engineering Disciplines with a common Code of Practice Integrating Cyber Security and Safety Systems Engineering Disciplines with a common Code of Practice Dr Richard Piggin 16 November 2017 - Atkins Limited 1 Introduction Background Motivation Safety Engineering

More information

WITSML Direct from Rig User Guide. Revision 2 of DOCU268 Revised January 28, 2014

WITSML Direct from Rig User Guide. Revision 2 of DOCU268 Revised January 28, 2014 WITSML Direct from Rig User Guide Revision 2 of DOCU268 Revised January 28, 2014 This document contains proprietary information and is not intended for public distribution. Pason Systems and all other

More information

Borehole Seismic Services Data processing, imaging and dedicated expertise

Borehole Seismic Services Data processing, imaging and dedicated expertise Borehole Seismic Services Data processing, imaging and dedicated expertise To reduce risk and optimize recovery, you need a clear picture of the reservoir. OptaSense Borehole Seismic Services help you

More information

Disaster Recovery and Business Continuity Planning (Mile2)

Disaster Recovery and Business Continuity Planning (Mile2) Disaster Recovery and Business Continuity Planning (Mile2) Course Number: DRBCP Length: 4 Day(s) Certification Exam This course will help you prepare for the following exams: ABCP: Associate Business Continuity

More information

IADC HSE Case Guidelines Reference: Number-Title

IADC HSE Case Guidelines Reference: Number-Title PART 1 - HSE CASE INTRODUCTION X X X X X 1.1 INTRODUCTION TO THESE GUIDELINES 1.2 EXTERNAL STAKEHOLDERS HSE CASE EXPECTATIONS X 1.2.1 Senior Management Demonstration 1.2.2 HSE Case Scope and Arrangements

More information

NuStar Logistics, L.P.

NuStar Logistics, L.P. Pipeline Emergencies 1 NuStar Logistics, L.P. Pipeline Emergencies 101 Awareness Level Training Copyright, 2011, National Association of State Fire Marshals. All rights reserved. CHAPTER 3 Pipeline Operations

More information

Drilling & Completion Summary - Ascending

Drilling & Completion Summary - Ascending API/UWI 42-383-37797-0000 Property Sub 927369-010 Field Name SPRABERRY (TREND AREA) Spud TD 8/15/2012 8/24/2012 Ground Elevation (ft) Original KB Elevation (ft) 2,625.00 2,640.00 PBTD (All) (ftkb) Original

More information

Software Release Notes

Software Release Notes Software Release Notes Version 3.07.04.00 January 2019 A. Software Description KellyDown is a well-planning and survey monitoring application designed specifically for use by well-planners and/or directional

More information

L 5 Seismic Method. Courtesy of ExxonMobil. Mitchum et al., 1977b

L 5 Seismic Method. Courtesy of ExxonMobil. Mitchum et al., 1977b Courtesy of ExxonMobil L 5 Seismic Method AAPG 1977 reprinted with permission of the AAPG whose permission is required for further use. Mitchum et al., 1977b Basic Exploration Workflow Identify Opportunities

More information

Appendix A: Risk Assessment for Divisions of DEM

Appendix A: Risk Assessment for Divisions of DEM Appendix A: Risk Assessment for Divisions of DEM Division Essential Services Vulnerability Needs for Maintaining/Restoring Services Administrative Adjudication Agriculture Air Resources Coastal Resources

More information

Emergency Support Function (ESF) #14b: UTILITIES: Potable Water. ESF Activation Contact: Cornell Facilities Customer Service (607)

Emergency Support Function (ESF) #14b: UTILITIES: Potable Water. ESF Activation Contact: Cornell Facilities Customer Service (607) Emergency Support Function (ESF) #14b: UTILITIES: Potable Water ESF Activation Contact: Cornell Facilities Customer Service (607)255-5322 Primary Department I. Purpose: Cornell IPP: Utilities and Energy

More information

3D MULTIDISCIPLINARY INTEGRATED GEOMECHANICAL FRACTURE SIMULATOR & COMPLETION OPTIMIZATION TOOL

3D MULTIDISCIPLINARY INTEGRATED GEOMECHANICAL FRACTURE SIMULATOR & COMPLETION OPTIMIZATION TOOL PETROPHYSICS RESERVOIR GEOMECHANICS COMPLETIONS DRILLING PRODUCTION SERVICE 3D MULTIDISCIPLINARY INTEGRATED GEOMECHANICAL FRACTURE SIMULATOR & COMPLETION OPTIMIZATION TOOL INTEGRATED GEOMECHANICAL FRACTURE

More information

FFC Workshop case study. Alan Archer CMIOSH, Asset Lifecycle Engineer

FFC Workshop case study. Alan Archer CMIOSH, Asset Lifecycle Engineer FFC Workshop case study Alan Archer CMIOSH, Asset Lifecycle Engineer Breakout session 1 Referring to the Operating Code for the Management of Fluid Filled Cables, in the event of a possible pollution incident

More information

Lessons learnt from past incidents

Lessons learnt from past incidents Lessons learnt from past incidents Captain P.R. Choudhury Director, Quality, Assurance, Health, Safety, Security & Environment Eaglestar Shipmanagement Emerging risks Impact on operators Sustainability

More information

PETRONAS E&P Technical Data Quality Metrics Initiative Going Green with Data

PETRONAS E&P Technical Data Quality Metrics Initiative Going Green with Data PETRONAS E&P Technical Data Quality s Initiative Going Green with Data Hassan B Sabirin Regulatory Compliance & Technical Assurance, Technical Data Petroleum Management Unit (PMU) PETRONAS E&P Digital

More information

Technical Whitepaper. Unlock your Subsurface Data using Seismic Explorer for ArcGIS & the ArcGIS Platform

Technical Whitepaper. Unlock your Subsurface Data using Seismic Explorer for ArcGIS & the ArcGIS Platform Technical Whitepaper Unlock your Subsurface Data using Seismic Explorer for ArcGIS & the ArcGIS Platform 1 Business Problem The Petroleum industry and their vendors have for years been talking about the

More information

Cyber Security. Our part of the journey

Cyber Security. Our part of the journey Cyber Security Our part of the journey The Journey Evolved Built on the past Will be continued Not always perfect Small Steps moving forward The Privileged How to make enemies quickly Ask before acting

More information

Contents. SyndiCATe User Manual for MWD

Contents. SyndiCATe User Manual for MWD SyndiCATe User Manual for MWD Contents Login... 3 Select Job... 4 SyndiCATe Main Window for MWD... 5 Daily Report for MWD... 6 Default Daily Report form:... 6 Print Daily Report... 7 Personnel information...

More information

Appendix N AMF Testing

Appendix N AMF Testing Appendix N AMF Testing The Automatic Mode Function (AMF) is an optional feature of the subsea control system designed to automatically close the blind shear rams (BSRs) in the blowout preventer (BOP) stack

More information

46 CFR : SUBJECTS FOR DECK LICENSES

46 CFR : SUBJECTS FOR DECK LICENSES 46 CFR 10.910: SUBJECTS FOR DECK LICENSES Capatin Joe's Note: The following is an extract from 46 CFR, which shows you the Subjects that you will be tested on. The Subjects are distributed in the 5 Modules:

More information

Resiliency & Maritime Security Preparedness Planning

Resiliency & Maritime Security Preparedness Planning Resiliency & Maritime Security Preparedness Planning Wayne Young, Domestic Ports Division Office of Port and Facility Activities (CG-544) Pertains to: Systems, Infrastructure, Government, Business, Individuals

More information

Geometrical Optics. Theory. N = normal to surface. n r > n i. n i. n r. PHY 192 Geometrical Optics Spring

Geometrical Optics. Theory. N = normal to surface. n r > n i. n i. n r. PHY 192 Geometrical Optics Spring PHY 192 Geometrical Optics Spring 2017 1 Geometrical Optics The light source for this experiment is a low-power helium-neon laser with a wavelength of 632.8 nm. ever look directly at a laser beam nor permit

More information

Designing Secure Medical Devices

Designing Secure Medical Devices Rick Brooks Director of Systems, Software, and Electrical Engineering Designing Secure Medical Devices 1 Copyright 2018 Battelle Memorial Institute. Permission granted to INCOSE to publish and use. About

More information

Frontiers of Risk. Don t Be Afraid: Business Continuity Plan Development Only Hurts A Little!

Frontiers of Risk. Don t Be Afraid: Business Continuity Plan Development Only Hurts A Little! Don t Be Afraid: Business Only Hurts A Little! Frontiers of Risk Community College Risk Management Consortium July 20-21, 2017 JILL MCEWEN - FOX VALLEY TECHNICAL COLLEGE JOE DESPLAINES DISTRICTS MUTUAL

More information

Chapter 2 - Getting Started

Chapter 2 - Getting Started Chapter 2 - Getting Started Entering Survey Data The heart of this program is the survey data and the ability for this program to compute the derived survey parameters. Start the XSection Horizontal Log

More information

Wellbore trajectory optimization for horizontal wells: the plan versus the reality

Wellbore trajectory optimization for horizontal wells: the plan versus the reality Research Wellbore trajectory optimization for horizontal wells: the plan versus the reality Mohamed Halafawi and Lazăr Avram Petroleum-Gas University of Ploiesti, Romania Correspondence: Drd. Ing. Mohamed

More information

Collision Avoidance Calculations - Current Common Practice

Collision Avoidance Calculations - Current Common Practice Industry Steering Committee on Wellbore Survey Accuracy Collision Avoidance Calculations - Current Common Practice Introduction Many Operating companies and Directional Drilling contractors have policies

More information

FY ICMA Benchmarking Results

FY ICMA Benchmarking Results FY 2010-11 ICMA Benchmarking Results DALLAS FIRE - RESCUE DEPARTMENT DALLAS POLICE DEPARTMENT Public Safety Committee Briefing ICMA Center for Performance Measurement History Center for Performance Measurement

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN BEREENA QUARRY

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN BEREENA QUARRY TEGRA AUSTRALIA 1 POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN BEREENA QUARRY This Plan remains the property of Tegra Australia, the return of it may be called upon at any time for changes and/or upgrades.

More information

Friction Factor Model and Interpretation of Real Time Data

Friction Factor Model and Interpretation of Real Time Data Friction Factor Model and Interpretation of Real Time Data Christine Frafjord Petroleum Geoscience and Engineering Submission date: May 2013 Supervisor: Pål Skalle, IPT Co-supervisor: S. Ahmad Mirhaj,

More information

CRISIS TEAM GUIDE TO RESPONSE IN US WATERS

CRISIS TEAM GUIDE TO RESPONSE IN US WATERS CRISIS TEAM GUIDE TO RESPONSE IN US WATERS 24-Hour Emergency Assistance +1 985 781 0804 2016 O Brien s 2016 www.obriensrm.com 24 HR: +1 985 781 0804 inquiry@wittobriens.com 1 TABLE OF CONTENTS INTRODUCTION...

More information

Florida Government Finance Officers Association. Staying Secure when Transforming to a Digital Government

Florida Government Finance Officers Association. Staying Secure when Transforming to a Digital Government Florida Government Finance Officers Association Staying Secure when Transforming to a Digital Government Agenda Plante Moran Introductions Technology Pressures and Challenges Facing Government Technology

More information

Any observations not included in this report were discussed with your staff at the informal exit conference and may be subject to follow-up.

Any observations not included in this report were discussed with your staff at the informal exit conference and may be subject to follow-up. Larry Mandel Vice Chancellor and Chief Audit Officer Audit and Advisory Services 401 Golden Shore, 4th Floor Long Beach, CA 90802-4210 562-951-4430 562-951-4955 (Fax) lmandel@calstate.edu October 10, 2018

More information

Definitions Importance of reporting hazards and incidents... 2

Definitions Importance of reporting hazards and incidents... 2 Work Health and Safety Table of Contents Definitions... 2 Importance of reporting hazards and incidents... 2 How to Report Hazards and Incidents Online... 3 STEP 1: Access the Hazard and Incident Reporting

More information

Everything you did not want to know about least squares and positional tolerance! (in one hour or less) Raymond J. Hintz, PLS, PhD University of Maine

Everything you did not want to know about least squares and positional tolerance! (in one hour or less) Raymond J. Hintz, PLS, PhD University of Maine Everything you did not want to know about least squares and positional tolerance! (in one hour or less) Raymond J. Hintz, PLS, PhD University of Maine Least squares is used in varying degrees in -Conventional

More information

Collections Exam Need to Know Criteria

Collections Exam Need to Know Criteria Equipment Operation & Evaluation Class 1 Class 2 Class 3 Class 4 Operate drives X X X X Operate electronic testing equipment X X X X Operate hand and power tools X X X X Operate heavy equipment X X X X

More information

Earthquake Early Warning Where we are and where we are going. Doug Given USGS National Earthquake Early Warning Coordinator

Earthquake Early Warning Where we are and where we are going. Doug Given USGS National Earthquake Early Warning Coordinator Earthquake Early Warning Where we are and where we are going Doug Given USGS National Earthquake Early Warning Coordinator USGS Earthquake Hazard Responsibilities USGS Mission: reduce losses due to geological

More information

Continuity of Operations During Disasters: Electronic Systems and Medical Records

Continuity of Operations During Disasters: Electronic Systems and Medical Records Idaho Health Care Association Continuity of Operations During Disasters: Electronic Systems and Medical Records Philip Niemer, MBA, MS, HEM Director Operational Continuity & Emergency Management Children

More information