1 Document Background In Order No. 802 (final order on CIP Physical Security), issued on November 20, 2014, FERC directed NERC to remove the term widespread from Reliability Standard CIP or, alternatively, to propose modifications to the Reliability Standard that address the Commission s concerns. FERC directed that NERC submit a responsive modification within six months from the effective date of this final rule. R1. Each Transmission Owner shall perform an initial risk assessment and subsequent risk assessments of its Transmission stations and Transmission substations (existing and planned to be in service within 24 months) that meet the criteria specified in Applicability Section The initial and subsequent risk assessments shall consist of a transmission analysis or transmission analyses designed to identify the Transmission station(s) and Transmission substation(s) that if rendered Removed the term widespread from Requirement R1 R1. Each Transmission Owner shall perform an initial risk assessment and subsequent risk assessments of its Transmission stations and Transmission substations (existing and planned to be in service within 24 months) that meet the criteria specified in Applicability Section The initial and subsequent risk assessments shall consist of a transmission analysis or transmission analyses designed to identify the Transmission station(s) and Transmission substation(s) that if rendered

2 inoperable or damaged could result in widespread instability, uncontrolled separation, or Cascading within an Interconnection. [VRF: High; Time-Horizon: Long-term Planning] 1.1. Subsequent risk assessments shall be performed: At least once every 30 calendar months for a Transmission Owner that has identified in its previous risk assessment (as verified according to Requirement R2) one or more Transmission stations or Transmission substations that if rendered inoperable or damaged could result in widespread instability, uncontrolled separation, or Cascading within an Interconnection; or At least once every 60 calendar months for a Transmission Owner that inoperable or damaged could result in instability, uncontrolled separation, or Cascading within an Interconnection. [VRF: High; Time-Horizon: Long-term Planning] 1.1. Subsequent risk assessments shall be performed: At least once every 30 calendar months for a Transmission Owner that has identified in its previous risk assessment (as verified according to Requirement R2) one or more Transmission stations or Transmission substations that if rendered inoperable or damaged could result in instability, uncontrolled separation, or Cascading within an Interconnection; or At least once every 60 calendar months for a Transmission Owner that has not identified in its previous risk assessment (as verified according to Document 2

3 has not identified in its previous risk assessment (as verified according to Requirement R2) any Transmission stations or Transmission substations that if rendered inoperable or damaged could result in widespread instability, uncontrolled separation, or Cascading within an Interconnection The Transmission Owner shall identify the primary control center that operationally controls each Transmission station or Transmission substation identified in the Requirement R1 risk assessment. Requirement R2) any Transmission stations or Transmission substations that if rendered inoperable or damaged could result in instability, uncontrolled separation, or Cascading within an Interconnection The Transmission Owner shall identify the primary control center that operationally controls each Transmission station or Transmission substation identified in the Requirement R1 risk assessment. R2. Each Transmission Owner shall have an unaffiliated third party verify the risk assessment performed under Requirement R1. The verification may occur concurrent with Retained from previous version R2. Each Transmission Owner shall have an unaffiliated third party verify the risk assessment performed under Requirement R1. The verification may occur concurrent with or Document 3

4 or after the risk assessment performed under Requirement R1. [VRF: Medium; Time-Horizon: Long-term Planning] 2.1. Each Transmission Owner shall select an unaffiliated verifying entity that is either: A registered Planning Coordinator, Transmission Planner, or Reliability Coordinator; or An entity that has transmission planning or analysis experience The unaffiliated third party verification shall verify the Transmission Owner s risk assessment performed under Requirement R1, which may include recommendations for the addition or deletion of a Transmission station(s) or Transmission substation(s). The Transmission Owner shall ensure the verification is completed within 90 after the risk assessment performed under Requirement R1. [VRF: Medium; Time-Horizon: Long-term Planning] 2.1. Each Transmission Owner shall select an unaffiliated verifying entity that is either: A registered Planning Coordinator, Transmission Planner, or Reliability Coordinator; or An entity that has transmission planning or analysis experience The unaffiliated third party verification shall verify the Transmission Owner s risk assessment performed under Requirement R1, which may include recommendations for the addition or deletion of a Transmission station(s) or Transmission substation(s). The Transmission Owner shall ensure the verification is completed within 90 Document 4

5 calendar days following the completion of the Requirement R1 risk assessment If the unaffiliated verifying entity recommends that the Transmission Owner add a Transmission station(s) or Transmission substation(s) to, or remove a Transmission station(s) or Transmission substation(s) from, its identification under Requirement R1, the Transmission Owner shall either, within 60 calendar days of completion of the verification, for each recommended addition or removal of a Transmission station or Transmission substation: Modify its identification under Requirement R1 consistent with the recommendation; or Document the technical basis for not modifying the identification in accordance with the recommendation. calendar days following the completion of the Requirement R1 risk assessment If the unaffiliated verifying entity recommends that the Transmission Owner add a Transmission station(s) or Transmission substation(s) to, or remove a Transmission station(s) or Transmission substation(s) from, its identification under Requirement R1, the Transmission Owner shall either, within 60 calendar days of completion of the verification, for each recommended addition or removal of a Transmission station or Transmission substation: Modify its identification under Requirement R1 consistent with the recommendation; or Document the technical basis for not modifying the identification in accordance with the recommendation. Document 5

6 2.4. Each Transmission Owner shall implement procedures, such as the use of non-disclosure agreements, for protecting sensitive or confidential information made available to the unaffiliated third party verifier and to protect or exempt sensitive or confidential information developed pursuant to this Reliability Standard from public disclosure Each Transmission Owner shall implement procedures, such as the use of nondisclosure agreements, for protecting sensitive or confidential information made available to the unaffiliated third party verifier and to protect or exempt sensitive or confidential information developed pursuant to this Reliability Standard from public disclosure. R3. For a primary control center(s) identified by the Transmission Owner according to Requirement R1, Part 1.2 that a) operationally controls an identified Transmission station or Transmission substation verified according to Requirement R2, and b) is not under the operational control of the Transmission Owner: the Transmission Owner shall, within seven calendar days following completion of Requirement R2, notify the Transmission Operator that has operational control of the Retained from previous version R3. For a primary control center(s) identified by the Transmission Owner according to Requirement R1, Part 1.2 that a) operationally controls an identified Transmission station or Transmission substation verified according to Requirement R2, and b) is not under the operational control of the Transmission Owner: the Transmission Owner shall, within seven calendar days following completion of Requirement R2, notify the Transmission Operator that has operational control of the Document 6

7 primary control center of such identification and the date of completion of Requirement R2. [VRF: Lower; Time-Horizon: Long-term Planning] 3.1. If a Transmission station or Transmission substation previously identified under Requirement R1 and verified according to Requirement R2 is removed from the identification during a subsequent risk assessment performed according to Requirement R1 or a verification according to Requirement R2, then the Transmission Owner shall, within seven calendar days following the verification or the subsequent risk assessment, notify the Transmission Operator that has operational control of the primary control center of the removal. primary control center of such identification and the date of completion of Requirement R2. [VRF: Lower; Time-Horizon: Long-term Planning] 3.1. If a Transmission station or Transmission substation previously identified under Requirement R1 and verified according to Requirement R2 is removed from the identification during a subsequent risk assessment performed according to Requirement R1 or a verification according to Requirement R2, then the Transmission Owner shall, within seven calendar days following the verification or the subsequent risk assessment, notify the Transmission Operator that has operational control of the primary control center of the removal. Retained from previous version Document 7

8 R4. Each Transmission Owner that identified a Transmission station, Transmission substation, or a primary control center in Requirement R1 and verified according to Requirement R2, and each Transmission Operator notified by a Transmission Owner according to Requirement R3, shall conduct an evaluation of the potential threats and vulnerabilities of a physical attack to each of their respective Transmission station(s), Transmission substation(s), and primary control center(s) identified in Requirement R1 and verified according to Requirement R2. The evaluation shall consider the following: [VRF: Medium; Time-Horizon: Operations Planning, Long-term Planning] 4.1. Unique characteristics of the identified and verified Transmission station(s), Transmission substation(s), and primary control center(s); 4.2. Prior history of attack on similar facilities taking into account the frequency, Retained from previous version R4. Each Transmission Owner that identified a Transmission station, Transmission substation, or a primary control center in Requirement R1 and verified according to Requirement R2, and each Transmission Operator notified by a Transmission Owner according to Requirement R3, shall conduct an evaluation of the potential threats and vulnerabilities of a physical attack to each of their respective Transmission station(s), Transmission substation(s), and primary control center(s) identified in Requirement R1 and verified according to Requirement R2. The evaluation shall consider the following: [VRF: Medium; Time-Horizon: Operations Planning, Long-term Planning] 4.1. Unique characteristics of the identified and verified Transmission station(s), Transmission substation(s), and primary control center(s); 4.2. Prior history of attack on similar facilities taking into account the frequency, Document 8

9 geographic proximity, and severity of past physical security related events; and 4.3. Intelligence or threat warnings received from sources such as law enforcement, the Electric Reliability Organization (ERO), the Electricity Sector Information Sharing and Analysis Center (ES-ISAC), U.S. federal and/or Canadian governmental agencies, or their successors. geographic proximity, and severity of past physical security related events; and 4.3. Intelligence or threat warnings received from sources such as law enforcement, the Electric Reliability Organization (ERO), the Electricity Sector Information Sharing and Analysis Center (ES-ISAC), U.S. federal and/or Canadian governmental agencies, or their successors. R5. Each Transmission Owner that identified a Transmission station, Transmission substation, or primary control center in Requirement R1 and verified according to Requirement R2, and each Transmission Operator notified by a Transmission Owner according to Requirement R3, shall develop and implement a documented physical security plan(s) that covers their respective Transmission station(s), Transmission substation(s), and Retained from previous version R5. Each Transmission Owner that identified a Transmission station, Transmission substation, or primary control center in Requirement R1 and verified according to Requirement R2, and each Transmission Operator notified by a Transmission Owner according to Requirement R3, shall develop and implement a documented physical security plan(s) that covers their respective Transmission station(s), Transmission substation(s), and primary Document 9

10 primary control center(s). The physical security plan(s) shall be developed within 120 calendar days following the completion of Requirement R2 and executed according to the timeline specified in the physical security plan(s). The physical security plan(s) shall include the following attributes: [VRF: High; Time-Horizon: Long-term Planning] 5.1. Resiliency or security measures designed collectively to deter, detect, delay, assess, communicate, and respond to potential physical threats and vulnerabilities identified during the evaluation conducted in Requirement R Law enforcement contact and coordination information A timeline for executing the physical security enhancements and modifications specified in the physical security plan. control center(s). The physical security plan(s) shall be developed within 120 calendar days following the completion of Requirement R2 and executed according to the timeline specified in the physical security plan(s). The physical security plan(s) shall include the following attributes: [VRF: High; Time-Horizon: Long-term Planning] 5.1. Resiliency or security measures designed collectively to deter, detect, delay, assess, communicate, and respond to potential physical threats and vulnerabilities identified during the evaluation conducted in Requirement R Law enforcement contact and coordination information A timeline for executing the physical security enhancements and modifications specified in the physical security plan. Document 10

11 5.4. Provisions to evaluate evolving physical threats, and their corresponding security measures, to the Transmission station(s), Transmission substation(s), or primary control center(s) Provisions to evaluate evolving physical threats, and their corresponding security measures, to the Transmission station(s), Transmission substation(s), or primary control center(s). R6. Each Transmission Owner that identified a Transmission station, Transmission substation, or primary control center in Requirement R1 and verified according to Requirement R2, and each Transmission Operator notified by a Transmission Owner according to Requirement R3, shall have an unaffiliated third party review the evaluation performed under Requirement R4 and the security plan(s) developed under Requirement R5. The review may occur concurrently with or after completion of the evaluation performed under Requirement R4 and the security plan development under Requirement R5. [VRF: Medium; Time-Horizon: Long-term Planning] Retained from previous version R6. Each Transmission Owner that identified a Transmission station, Transmission substation, or primary control center in Requirement R1 and verified according to Requirement R2, and each Transmission Operator notified by a Transmission Owner according to Requirement R3, shall have an unaffiliated third party review the evaluation performed under Requirement R4 and the security plan(s) developed under Requirement R5. The review may occur concurrently with or after completion of the evaluation performed under Requirement R4 and the security plan development under Requirement R5. [VRF: Medium; Time-Horizon: Long-term Planning] Document 11

12 6.1. Each Transmission Owner and Transmission Operator shall select an unaffiliated third party reviewer from the following: An entity or organization with electric industry physical security experience and whose review staff has at least one member who holds either a Certified Protection Professional (CPP) or Physical Security Professional (PSP) certification. An entity or organization approved by the ERO. A governmental agency with physical security expertise. An entity or organization with demonstrated law enforcement, government, or military physical security expertise Each Transmission Owner and Transmission Operator shall select an unaffiliated third party reviewer from the following: An entity or organization with electric industry physical security experience and whose review staff has at least one member who holds either a Certified Protection Professional (CPP) or Physical Security Professional (PSP) certification. An entity or organization approved by the ERO. A governmental agency with physical security expertise. An entity or organization with demonstrated law enforcement, government, or military physical security expertise. Document 12

13 6.2. The Transmission Owner or Transmission Operator, respectively, shall ensure that the unaffiliated third party review is completed within 90 calendar days of completing the security plan(s) developed in Requirement R5. The unaffiliated third party review may, but is not required to, include recommended changes to the evaluation performed under Requirement R4 or the security plan(s) developed under Requirement R If the unaffiliated third party reviewer recommends changes to the evaluation performed under Requirement R4 or security plan(s) developed under Requirement R5, the Transmission Owner or Transmission Operator shall, within 60 calendar days of the completion of the unaffiliated third party review, for each recommendation: 6.2. The Transmission Owner or Transmission Operator, respectively, shall ensure that the unaffiliated third party review is completed within 90 calendar days of completing the security plan(s) developed in Requirement R5. The unaffiliated third party review may, but is not required to, include recommended changes to the evaluation performed under Requirement R4 or the security plan(s) developed under Requirement R If the unaffiliated third party reviewer recommends changes to the evaluation performed under Requirement R4 or security plan(s) developed under Requirement R5, the Transmission Owner or Transmission Operator shall, within 60 calendar days of the completion of the unaffiliated third party review, for each recommendation: Document 13

14 Modify its evaluation or security plan(s) consistent with the recommendation; or Document the reason(s) for not modifying the evaluation or security plan(s) consistent with the recommendation Each Transmission Owner and Transmission Operator shall implement procedures, such as the use of nondisclosure agreements, for protecting sensitive or confidential information made available to the unaffiliated third party reviewer and to protect or exempt sensitive or confidential information developed pursuant to this Reliability Standard from public disclosure. Modify its evaluation or security plan(s) consistent with the recommendation; or Document the reason(s) for not modifying the evaluation or security plan(s) consistent with the recommendation Each Transmission Owner and Transmission Operator shall implement procedures, such as the use of nondisclosure agreements, for protecting sensitive or confidential information made available to the unaffiliated third party reviewer and to protect or exempt sensitive or confidential information developed pursuant to this Reliability Standard from public disclosure. Document 14

Physical Security Reliability Standard Implementation

Physical Security Reliability Standard Implementation Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,

More information

CIP Physical Security What to Expect

CIP Physical Security What to Expect CIP-014-2 Physical Security What to Expect March 28, 2017 Kevin Perry Director, Critical Infrastructure Protection Jeff Rooker Lead Compliance Engineer 1 Purpose To identify and protect Transmission stations

More information

CIP-014. JEA Compliance Approach. FRCC Fall Compliance Workshop Presenter Daniel Mishra

CIP-014. JEA Compliance Approach. FRCC Fall Compliance Workshop Presenter Daniel Mishra CIP-014 JEA Compliance Approach FRCC Fall Compliance Workshop Presenter Daniel Mishra Acronyms & Terminologies DHS Department of Homeland Security JEA It s not an acronym JSO Jacksonville Sheriff's Office

More information

151 FERC 61,066 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING. (Issued April 23, 2015)

151 FERC 61,066 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING. (Issued April 23, 2015) 151 FERC 61,066 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION COMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION COMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Physical Security Reliability : Standard : Docket No. RD14-15-000 COMMENTS OF THE PENNSYLVANIA PUBLIC UTILITY COMMISSION I. INTRODUCTION On

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

CIP Cyber Security Personnel & Training

CIP Cyber Security Personnel & Training A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-5.1 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the BES from individuals

More information

Grid Security & NERC

Grid Security & NERC Grid Security & NERC Janet Sena, Senior Vice President, Policy and External Affairs Southern States Energy Board 2017 Associate Members Winter Meeting February 27, 2017 Recent NERC History Energy Policy

More information

CIP Cyber Security Systems Security Management

CIP Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security System Security Management 2. Number: CIP-007-5 3. Purpose: To manage system security by specifying select technical, operational, and procedural requirements in

More information

Standard CIP Cyber Security Incident Reporting and Response Planning

Standard CIP Cyber Security Incident Reporting and Response Planning A. Introduction 1. Title: Cyber Security Incident Reporting and Response Planning 2. Number: CIP-008-4 3. Purpose: Standard CIP-008-4 ensures the identification, classification, response, and reporting

More information

Live Webinar: Best Practices in Substation Security November 17, 2014

Live Webinar: Best Practices in Substation Security November 17, 2014 Live Webinar: Best Practices in Substation Security November 17, 2014 1 Agenda & Panelists Welcome & Introduction - Allan Wick, CFE, CPP, PSP, PCI, CBCP Enterprise Security Manager-CSO Tri-State Generation

More information

Violation Risk Factor and Violation Severity Level Justification Project Modifications to CIP-008 Cyber Security Incident Reporting

Violation Risk Factor and Violation Severity Level Justification Project Modifications to CIP-008 Cyber Security Incident Reporting Violation Risk Factor and Justification Project 2018-02 Modifications to CIP-008 Cyber Security Incident Reporting This document provides the standard drafting team s (SDT s) justification for assignment

More information

CIP Cyber Security Configuration Management and Vulnerability Assessments

CIP Cyber Security Configuration Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard CIP 005 4a Cyber Security Electronic Security Perimeter(s)

Standard CIP 005 4a Cyber Security Electronic Security Perimeter(s) A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-4a 3. Purpose: Standard CIP-005-4a requires the identification and protection of the Electronic Security Perimeter(s)

More information

October 2, CIP-014 Report Physical Security Protection for High Impact Control Centers Docket No. RM15-14-

October 2, CIP-014 Report Physical Security Protection for High Impact Control Centers Docket No. RM15-14- October 2, 2017 Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 Re: CIP-014 Report Physical Security Protection for High Impact Control Centers

More information

A. Introduction 1. Title: 2. Number: 3. Purpose: 4. Applicability: 4.1. Functional Entities: Balancing Authority Distribution Provider

A. Introduction 1. Title: 2. Number: 3. Purpose: 4. Applicability: 4.1. Functional Entities: Balancing Authority Distribution Provider The Background, VRF/VSLs, and Guidelines and Technical Basis Sections have been removed for this informal posting. The Project 2016-02 is seeking comments around the concept of the Requirement/Measure

More information

This draft standard is being posted for an initial comment and ballot. The draft includes modifications to meet the directives of FERC Order No. 791.

This draft standard is being posted for an initial comment and ballot. The draft includes modifications to meet the directives of FERC Order No. 791. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Implementation Plan for Version 5 CIP Cyber Security Standards

Implementation Plan for Version 5 CIP Cyber Security Standards Implementation Plan for Version 5 CIP Cyber Security Standards April 10September 17, 2012 Note: On September 17, 2012, NERC was alerted that some references in the Initial Performance of Certain Periodic

More information

1. Post for 45-day comment period and pre-ballot review. 7/26/ Conduct initial ballot. 8/30/2010

1. Post for 45-day comment period and pre-ballot review. 7/26/ Conduct initial ballot. 8/30/2010 Standard CIP 011 1 Cyber Security Protection Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes

More information

Consideration of Issues and Directives Federal Energy Regulatory Commission Order No. 791 June 2, 2014

Consideration of Issues and Directives Federal Energy Regulatory Commission Order No. 791 June 2, 2014 Federal Energy Regulatory Commission Order No. 791 June 2, 2014 67 and 76 67. For the reasons discussed below, the Commission concludes that the identify, assess, and correct language, as currently proposed

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

CIP Cyber Security Configuration Change Management and Vulnerability AssessmentsManagement

CIP Cyber Security Configuration Change Management and Vulnerability AssessmentsManagement The Background, VRF/VSLs, and Guidelines and Technical Basis Sections have been removed for this informal posting. The Project 2016-02 is seeking comments around the concept of the Requirement/Measure

More information

June 4, 2014 VIA ELECTRONIC FILING. Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2

June 4, 2014 VIA ELECTRONIC FILING. Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2 June 4, 2014 VIA ELECTRONIC FILING Veronique Dubois Régie de l'énergie Tour de la Bourse 800, Place Victoria Bureau 255 Montréal, Québec H4Z 1A2 Re: North American Electric Reliability Corporation Dear

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-2 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

CIP Cyber Security Security Management Controls. Standard Development Timeline

CIP Cyber Security Security Management Controls. Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

CIP Cyber Security Personnel & Training

CIP Cyber Security Personnel & Training A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-6 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the Bulk Electric

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-2 3 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Critical Cyber Asset Identification Security Management Controls

Critical Cyber Asset Identification Security Management Controls Implementation Plan Purpose On January 18, 2008, FERC (or Commission ) issued Order. 706 that approved Version 1 of the Critical Infrastructure Protection Reliability Standards, CIP-002-1 through CIP-009-1.

More information

Grid Security & NERC. Council of State Governments. Janet Sena, Senior Vice President, Policy and External Affairs September 22, 2016

Grid Security & NERC. Council of State Governments. Janet Sena, Senior Vice President, Policy and External Affairs September 22, 2016 Grid Security & NERC Council of State Governments The Future of American Electricity Policy Academy Janet Sena, Senior Vice President, Policy and External Affairs September 22, 2016 1965 Northeast blackout

More information

Standard CIP Cyber Security Security Management Controls

Standard CIP Cyber Security Security Management Controls A. Introduction 1. Title: Cyber Security Security Management Controls 2. Number: CIP-003-4 3. Purpose: Standard CIP-003-4 requires that Responsible Entities have minimum security management controls in

More information

Project Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives

Project Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives Project 2014-02 - Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives Violation Risk Factor and Justifications The tables

More information

Standard CIP Cyber Security Electronic Security Perimeter(s)

Standard CIP Cyber Security Electronic Security Perimeter(s) A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-2 3. Purpose: Standard CIP-005-2 requires the identification and protection of the Electronic Security Perimeter(s)

More information

CIP Cyber Security Incident Reporting and Response Planning

CIP Cyber Security Incident Reporting and Response Planning Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard CIP 007 4a Cyber Security Systems Security Management

Standard CIP 007 4a Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-4a 3. Purpose: Standard CIP-007-4 requires Responsible Entities to define methods, processes, and procedures for

More information

Standard Development Timeline

Standard Development Timeline CIP-008-6 Incident Reporting and Response Planning Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP 010 1 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

A. Introduction. Page 1 of 22

A. Introduction. Page 1 of 22 The Background, VRF/VSLs, and Guidelines and Technical Basis Sections have been removed for this informal posting. The Project 2016-02 is seeking comments around the concept of the Requirement/Measure

More information

Standard CIP Cyber Security Systems Security Management

Standard CIP Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-4 3. Purpose: Standard CIP-007-4 requires Responsible Entities to define methods, processes, and procedures for securing

More information

Standard CIP 005 2a Cyber Security Electronic Security Perimeter(s)

Standard CIP 005 2a Cyber Security Electronic Security Perimeter(s) A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-2a 3. Purpose: Standard CIP-005-2 requires the identification and protection of the Electronic Security Perimeter(s)

More information

CIP Cyber Security Security Management Controls. A. Introduction

CIP Cyber Security Security Management Controls. A. Introduction CIP-003-7 - Cyber Security Security Management Controls A. Introduction 1. Title: Cyber Security Security Management Controls 2. Number: CIP-003-7 3. Purpose: To specify consistent and sustainable security

More information

Summary of FERC Order No. 791

Summary of FERC Order No. 791 Summary of FERC Order No. 791 On November 22, 2013, the Federal Energy Regulatory Commission ( FERC or Commission ) issued Order No. 791 adopting a rule that approved Version 5 of the Critical Infrastructure

More information

NB Appendix CIP NB-0 - Cyber Security Personnel & Training

NB Appendix CIP NB-0 - Cyber Security Personnel & Training This appendix establishes modifications to the FERC approved NERC standard CIP-004-5.1 for its specific application in New Brunswick. This appendix must be read with CIP-004-5.1 to determine a full understanding

More information

Consideration of Issues and Directives Federal Energy Regulatory Commission Order No. 791 January 23, 2015

Consideration of Issues and Directives Federal Energy Regulatory Commission Order No. 791 January 23, 2015 Federal Energy Regulatory Commission Order No. 791 January 23, 2015 67 and 76 67. For the reasons discussed below, the Commission concludes that the identify, assess, and correct language, as currently

More information

CIP Cyber Security Recovery Plans for BES Cyber Systems

CIP Cyber Security Recovery Plans for BES Cyber Systems A. Introduction 1. Title: Cyber Security Recovery Plans for BES Cyber Systems 2. Number: CIP-009-5 3. Purpose: To recover reliability functions performed by BES Cyber Systems by specifying recovery plan

More information

1. SAR posted for comment on January 15, Standard Drafting Team appointed on January 29, 2014

1. SAR posted for comment on January 15, Standard Drafting Team appointed on January 29, 2014 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

CIP Cyber Security Recovery Plans for BES Cyber Systems

CIP Cyber Security Recovery Plans for BES Cyber Systems A. Introduction 1. Title: Cyber Security Recovery Plans for BES Cyber Systems 2. Number: CIP-009-6 3. Purpose: To recover reliability functions performed by BES Cyber Systems by specifying recovery plan

More information

OPUC Workshop March 13, 2015 Cyber Security Electric Utilities. Portland General Electric Co. Travis Anderson Scott Smith

OPUC Workshop March 13, 2015 Cyber Security Electric Utilities. Portland General Electric Co. Travis Anderson Scott Smith OPUC Workshop March 13, 2015 Cyber Security Electric Utilities Portland General Electric Co. Travis Anderson Scott Smith 1 CIP Version 5 PGE Implementation Understanding the Regulations PGE Attended WECC

More information

Cyber Threats? How to Stop?

Cyber Threats? How to Stop? Cyber Threats? How to Stop? North American Grid Security Standards Jessica Bian, Director of Performance Analysis North American Electric Reliability Corporation AORC CIGRE Technical Meeting, September

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

CYBER SECURITY POLICY REVISION: 12

CYBER SECURITY POLICY REVISION: 12 1. General 1.1. Purpose 1.1.1. To manage and control the risk to the reliable operation of the Bulk Electric System (BES) located within the service territory footprint of Emera Maine (hereafter referred

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

Standard CIP-006-4c Cyber Security Physical Security

Standard CIP-006-4c Cyber Security Physical Security A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-4c 3. Purpose: Standard CIP-006-4c is intended to ensure the implementation of a physical security

More information

A. Introduction. B. Requirements and Measures

A. Introduction. B. Requirements and Measures A. Introduction 1. Title: Communications 2. Number: COM-001-3 3. Purpose: To establish Communication capabilities necessary to maintain reliability. 4. Applicability: 4.1. Functional Entities: 4.1.1. Transmission

More information

EEI Fall 2008 Legal Conference Boston, Massachusetts Stephen M. Spina November 1,

EEI Fall 2008 Legal Conference Boston, Massachusetts Stephen M. Spina November 1, EEI Fall 2008 Legal Conference Boston, Massachusetts Stephen M. Spina November 1, 2008 www.morganlewis.com Overview Reliability Standards Enforcement Framework Critical Infrastructure Protection (CIP)

More information

Standard Development Timeline

Standard Development Timeline CIP-003-67(i) - Cyber Security Security Management Controls Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when

More information

Standard CIP Cyber Security Electronic Security Perimeter(s)

Standard CIP Cyber Security Electronic Security Perimeter(s) A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-1 3. Purpose: Standard CIP-005 requires the identification and protection of the Electronic Security Perimeter(s)

More information

CIP Cyber Security Security Management Controls

CIP Cyber Security Security Management Controls A. Introduction 1. Title: Cyber Security Security Management Controls 2. Number: CIP-003-6 3. Purpose: To specify consistent and sustainable security management controls that establish responsibility and

More information

Standard CIP 004 3a Cyber Security Personnel and Training

Standard CIP 004 3a Cyber Security Personnel and Training A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-3a 3. Purpose: Standard CIP-004-3 requires that personnel having authorized cyber or authorized unescorted physical access

More information

CIP Cyber Security Recovery Plans for BES Cyber Systems

CIP Cyber Security Recovery Plans for BES Cyber Systems Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard CIP 007 3a Cyber Security Systems Security Management

Standard CIP 007 3a Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-3a 3. Purpose: Standard CIP-007-3 requires Responsible Entities to define methods, processes, and procedures for

More information

LADWP Critical Infrastructure Protection

LADWP Critical Infrastructure Protection d ---- w. ^ - ** : _ mwm FEB 0 2 2016 B... gi r.* *«r 3br»t*> it-i > \ S fr-% LU Threat and Vulnerability Assessments Water and Power Facilities / * LADWP Critical Infrastructure Protection Control

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1 DRAFT Cyber Security Communications between Control Centers Technical Rationale and Justification for Reliability Standard CIP-012-1 March May 2018 NERC Report Title Report Date I Table of Contents Preface...

More information

Standard TOP Transmission Operations

Standard TOP Transmission Operations A. Introduction 1. Title: Transmission Operations 2. Number: TOP-001-34 3. Purpose: To prevent instability, uncontrolled separation, or Cascading outages that adversely impact the reliability of the Interconnection

More information

Chapter X Security Performance Metrics

Chapter X Security Performance Metrics DRAFT February 19, 15 BES Security s Working Group Page 1 of 7 Chapter X Security Performance s 1 3 3 3 3 0 Background The State of Reliability 1 report noted that the NERC PAS was collaborating with the

More information

Violation Risk Factor and Violation Severity Level Justifications Project Modifications to CIP Standards

Violation Risk Factor and Violation Severity Level Justifications Project Modifications to CIP Standards Violation Risk Factor and Violation Severity Level Justifications Project 2016-02 Modifications to CIP Standards This document provides the standard drafting team s (SDT s) justification for assignment

More information

Additional 45-Day Comment Period and Ballot November Final Ballot is Conducted January Board of Trustees (Board) Adoption February 2015

Additional 45-Day Comment Period and Ballot November Final Ballot is Conducted January Board of Trustees (Board) Adoption February 2015 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities

TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities A. Introduction 1. Title: Real-time Reliability Monitoring and Analysis Capabilities 2. Number: TOP-010-1(i) 3. Purpose: Establish requirements for Real-time monitoring and analysis capabilities to support

More information

Standard COM Communication and Coordination

Standard COM Communication and Coordination A. Introduction 1. Title: Communication and Coordination 2. Number: COM-002-3 3. Purpose: To ensure Emergency communications between operating personnel are effective. 4. Applicability 4.1. Reliability

More information

Additional 45-Day Comment Period September Final Ballot is Conducted October/November Board of Trustees (Board) Adoption November 2014

Additional 45-Day Comment Period September Final Ballot is Conducted October/November Board of Trustees (Board) Adoption November 2014 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1 Reliability Standard Audit Worksheet 1 CIP-002-5.1 Cyber Security BES Cyber System Categorization This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR

More information

Page 1 of 15. Applicability. Compatibility EACMS PACS. Version 5. Version 3 PCA EAP. ERC NO ERC Low Impact BES. ERC Medium Impact BES

Page 1 of 15. Applicability. Compatibility EACMS PACS. Version 5. Version 3 PCA EAP. ERC NO ERC Low Impact BES. ERC Medium Impact BES 002 5 R1. Each Responsible Entity shall implement a process that considers each of the following assets for purposes of parts 1.1 through 1.3: i. Control Centers and backup Control Centers; ii. Transmission

More information

Standard CIP Cyber Security Systems Security Management

Standard CIP Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-1 3. Purpose: Standard CIP-007 requires Responsible Entities to define methods, processes, and procedures for securing

More information

Implementation Plan. Project CIP Version 5 Revisions. January 23, 2015

Implementation Plan. Project CIP Version 5 Revisions. January 23, 2015 Implementation Plan Project 2014-02 CIP Version 5 Revisions January 23, 2015 This Implementation Plan for the Reliability Standards developed as part of Project 2014-02 CIP Version 5 Revisions replaces

More information

1. SAR posted for comment on January 15, Standard Drafting Team appointed on January 29, 2014

1. SAR posted for comment on January 15, Standard Drafting Team appointed on January 29, 2014 Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

requirements in a NERC or Regional Reliability Standard.

requirements in a NERC or Regional Reliability Standard. CIP 002 5.1 Cyber Security BES Cyber System Categorization A. Introduction 1. Title: Cyber Security BES Cyber System Categorization 2. Number: CIP 002 5.1 3. Purpose: To identify and categorize BES Cyber

More information

Standard Development Timeline

Standard Development Timeline CIP-002-6 Cyber Security BES Cyber System Categorization Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the

More information

Implementation Plan. Project CIP Version 5 Revisions 1. January 23, 2015

Implementation Plan. Project CIP Version 5 Revisions 1. January 23, 2015 Implementation Plan Project 2014-02 CIP Version 5 Revisions January 23, 2015 This Implementation Plan for the Reliability Standards developed as part of Project 2014 02 CIP Version 5 Revisions replaces

More information

Cyber Security Incident Report

Cyber Security Incident Report Cyber Security Incident Report Technical Rationale and Justification for Reliability Standard CIP-008-6 January 2019 NERC Report Title Report Date I Table of Contents Preface... iii Introduction... 1 New

More information

2015 Risk Element: Extreme Physical Events

2015 Risk Element: Extreme Physical Events 2015 Risk Element: Extreme Physical Events Industry Webinar October 15, 2015 Administrative Items NERC Antitrust Guidelines It is NERC s policy and practice to obey the antitrust laws fully and to avoid

More information

Cyber Security Reliability Standards CIP V5 Transition Guidance:

Cyber Security Reliability Standards CIP V5 Transition Guidance: Cyber Security Reliability Standards CIP V5 Transition Guidance: ERO Compliance and Enforcement Activities during the Transition to the CIP Version 5 Reliability Standards To: Regional Entities and Responsible

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Standard Development Timeline

Standard Development Timeline CIP 003 7 Cyber Security Security Management Controls Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard

More information

5. Effective Date: The first day of the first calendar quarter after applicable regulatory approval.

5. Effective Date: The first day of the first calendar quarter after applicable regulatory approval. Introduction 1. Title: IROL and SOL Mitigation in the ERCOT Region 2. Number: IRO-006-TRE-1 3. Purpose: To provide and execute transmission loading relief procedures that can be used to mitigate SOL or

More information

CIP Standards Development Overview

CIP Standards Development Overview CIP Standards Development Overview CSSDTO706 Meeting with FERC Technical Staff July 28, 2011 Objectives Historical Timeline CIP-002-4 CIP-005-4 CIP Version 5 2 Project 2008-06 Overview FERC Order 706 SDT

More information

Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements

Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements In accordance with the Federal Energy Regulatory Commission (FERC) order issued on January 24, 2003 (as modified

More information

CIP Cyber Security Electronic Security Perimeter(s)

CIP Cyber Security Electronic Security Perimeter(s) A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-5 3. Purpose: To manage electronic access to BES Cyber Systems by specifying a controlled Electronic Security

More information

Board of Trustees Compliance Committee

Board of Trustees Compliance Committee Board of Trustees Compliance Committee August 13, 2014 10:00 a.m. 11:00 a.m. Pacific The Westin Bayshore 1601 Bayshore Drive Vancouver, BC V6G 2V4 Reliability Assurance Initiative (RAI) Progress Report

More information

NERC Request for Data or Information: Protection System Misoperation Data Collection August 14, 2014

NERC Request for Data or Information: Protection System Misoperation Data Collection August 14, 2014 Request for Data or Information Protection System Misoperation Data Collection August 14, 2014 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com 1 of 15 Table of

More information

Standard CIP Cyber Security Physical Security

Standard CIP Cyber Security Physical Security A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-3 3. Purpose: Standard CIP-006-3 is intended to ensure the implementation of a physical security program

More information

Cyber Security Standards Drafting Team Update

Cyber Security Standards Drafting Team Update Cyber Security Standards Drafting Team Update Michael Assante, VP & Chief Security Officer North American Electric Reliability Corp. February 3, 2008 Overview About NERC Project Background Proposed Modifications

More information

Standard Development Timeline

Standard Development Timeline CIP-002-6 Cyber Security BES Cyber System Categorization Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the

More information

CIP Cyber Security Physical Security of BES Cyber Systems

CIP Cyber Security Physical Security of BES Cyber Systems A. Introduction 1. Title: Cyber Security Physical Security of BES Cyber Systems 2. Number: CIP-006-5 3. Purpose: To manage physical access to BES Cyber Systems by specifying a physical security plan in