1 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005

2 1.0 Description of the Generation Facility Q0047 ( Interconnection Customer ) Project is located approximately 11 miles northeast of Idaho Falls Idaho. The project consists of twelve 575 volt, 1.5 MW wind turbine generators, connected to a 14.4 kv distribution system ( Project ). Each generator is connected to the distribution circuit via a kv transformer. A single, 3-phase, 69 / 14.4 kv, 15/20/25 MVA transformer is used to step up the voltage of the project to 69 kv. A 3.6 mile, 4/0 ACSR "Penguin" 69 kv conductor transmission line will connect the project to the PacifiCorp ( Transmission Provider ) 31.4 mile, Sugar Mill/Goshen Rigby 69 kv line. The Point of Interconnection will be located about 3 miles south of the Ucon substation tap and three miles north of the Sandcreek substation tap. Interconnection Customer will own the 3.6 mile, 69 kv line to the Point of Interconnection. 2.0 Scope of Study The study was conducted to discover any voltage or other transmission impacts from the integration of this Project to Transmission Provider's transmission system in the Goshen/Rigby area as a small generation interconnection project. In addition, any existing outage limitations were studied. The study investigated transmission system impacts under two different loading conditions: Peak summer load conditions and spring load conditions. Both the existing transmission system and the proposed system with the Interconnection Customer s Generation Project added were studied. Transmission Provider determined that stability studies were not required due to the size of the project. This study addresses the proposed 19.5 MW output of the planned wind project per the customers interconnect request. Additionally, although this study considered deliverability of the power in the local area, the Interconnection Customer, or its agent, must apply for transmission service according the Transmission Provider s tariff in order to deliver energy from the project. Another deliverability study, and potential modifications to the transmission system, may be required at that time. 3.0 Type of Interconnection Service This section is not applicable to the interconnect request or the study. 4.0 Interconnection 4.1 Modifications and Additions to Facilities at Transmission Provider s Interconnection Location A facility will be built at the point of interconnection of the new 69kV line to the wind power project with the existing Transmission Provider s 69 kv line. The point of interconnection will consist of 3 three phase motor operated 69kV pole mounted disconnect switches, one switch in each of the three lines connected at that location. The Q0047 Page 2 4/28/2006

3 motor operators will be controlled remotely by the Transmission Provider s dispatcher via SCADA through a remote terminal unit (RTU) at that location. A single phase line to ground potential device will be connected at the point of interconnection and the secondary of the potential device will be connected to an analog point on the RTU. A communication link will be needed between the RTU and Transmission Provider s Salt Lake City control center. There is an existing communication system between Salt Lake City and Transmission Provider s major facilities in southeastern Idaho. For this project communication will be needed between the RTU and one of these existing facilities. 4.2 Additions Needed at the Interconnection Customer s Project Substation At the wind power project collector substation the 69kV line will be terminated into current transformers and potential transformer for interchange metering and a 69kV circuit breaker. The following one line diagram on the next page shows the interconnection. Q0047 Page 3 4/28/2006

4 Transmission Provider will design and build a panel with protective relays to detect faults on the 69kV system and to monitor the voltage and frequency at this location. If a line fault is detected the 69kV circuit breaker would be tripped. If the voltage or frequency of the system is outside of the normal range of operation a signal will be provided to trip the 14.4kV feeder breakers. Q0047 Page 4 4/28/2006

5 An RTU will be installed at the collector substation to monitor the following quantities: Status of the following: 69kV circuit breaker 14.4kV main transformer circuit breaker 14.4kV feeder circuit breakers Capacitor bank switch for each capacitor increment (if shunt capacitor banks are needed for voltage support) Trouble alarms from the 69kV line protection package Analog signals from the following: MWatts delivered at 69kV MVar delivered at 69kV Voltage at 69kV MWatts of each of the 14.4 kv feeders MVar of each of the 14.4 kv feeders MVar of shunt capacitor bank (if shunt capacitor bank is needed) Wind speed indicator at the site Energy pulse signals from the following: KWH delivered to the 69kV line KWH at each of the 14.4 kv feeders Telemetering equipment will be needed to send data to Transmission Provider s energy control center. Transmission Provider will need the ability to remotely access the fault data records that will be produced by the line protection relays. These records will be accessed via a dialup modem. A communication link will be needed from the collector substation to an existing Transmission Provider communication site. This communication link will carry signals for the RTU, telemetering transmitter, and the dialup modem for accessing relay fault records. 4.3 Power Flow Study The system configurations were studied with all lines in service (N-0) to determine if any normal loading problems are encountered for peak or minimum load conditions Several N-1 conditions (single line out of service) were studied to determine if any system problems exist due to outages. These conditions were evaluated for peak summer load conditions and for light load conditions. The following outages were conducted to determine any deficiencies in system performance: Q0047 Page 5 4/28/2006

6 Goshen Rigby 161 kv Line Outage Goshen - Sugarmill 161 kv Line Outage Rigby Sugarmill 161 kv Line Outage Rigby Jefferson 161 kv Line Outage Goshen Jefferson 161 kv Line Outage Goshen Eagle Rock 161 kv line Outage Westside Sugarmill 161 kv line Outage The Interconnection Customer s Project was modeled to the representation as shown on the next page. Q0047 Page 6 4/28/2006

7 Interconnection Schwendiman Wind Customer Project Area facilities Map Project Area Facilities Map 3-75 MVA Rigby 161 kv 69 kv 4.2 miles Ririe Southfork Ucon 2.1 miles 6.7 miles 1.3 miles 1.0 mile 3.0 miles Sugarmill 40 MVA 138 kv 69 kv Sandcreek 1.6 miles 3.2 miles 3.6 miles 3.0 miles Windfarm.95 mile Ammon 14.9 miles 75 MVA 69 kv Area Planning Wind.cdr 01204/05 Goshen 161 kv Q0047 Page 7 4/28/2006

8 The study assumed that the normal system open points for the 69 kv transmission system between Goshen, Rigby and Sugarmill would be maintained. This means that the new Wind Project would be served by a 12.6 mile radial feed from the Rigby substation. Heavy summer peak load conditions were modeled using the Transmission Provider B2003WSCC base case, with the Idaho area loads modified to reflect the 2004 heavy summer conditions. Spring load conditions were modeled by scaling the summer loads to 50%. The Wind Project was modeled as one large machine with various levels of VAR compensation, reflecting the range of reactive capabilities the GE machines are capable of. The equivalent model of the turbine involves modeling the generator as a fixed MW and MVAR device. Since Transmission Provider s interconnection requirements stipulate that the Interconnection Customer generation will maintain a power factor of +/- 95%, that range was assumed for these studies. The GE machines are capable of maintaining this power factor, so no additional capacitors were included in the model Existing System (Pre-Interconnection Customer Generation) No N-0 problems were identified under either Heavy or Light loading conditions. Area of lowest voltage during heavy load conditions was at Ucon sub (.971 pu). Areas of Highest voltage during light loading conditions were at the Rigby and Goshen 69 kv buses (1.041 pu). One N-1 problem was identified for the existing system. Since the Goshen - Rigby - Sugarmill 69 kv system is operated as three radial line taps, a line fault to the system on any one segment of line will cause an outage to all customers on that line segment. Manual switching will restore power to the out of service customers by utilizing the other two sources. Looping the three sources together has not been considered, due to the fact that the system does not have sectionalizing circuit breakers. With a paralleled system, any line fault to the combined, (much longer) looped transmission system would cause an outage to many more customers on the system. It would also take much longer to restore service, because of the need to patrol all three line segments to find the problem Post-Interconnection Customer Generation N-0 Heavy Summer conditions: Assuming a generation output of 19.5 MW, and a maximum power factor of 85% lagging (the maximum capability of the GE machine), no thermal or capacity limits were reached on any transmission line or substation transformer. Assuming summer peak loading conditions, the voltage at the Wind Project 69 kv bus, with no MW or MV generation was estimated to be.981 pu. Assuming a power factor Q0047 Page 8 4/28/2006

9 of +/- 95%, the voltage range of the Wind Project 69 kv bus moved from.992 pu to pu. This means that there is the potential of a 4.5% voltage change to the Wind Project bus from maximum generation to no generation. The study shows Ucon, the closest Transmission Provider s load, has a maximum voltage change of 2.8%. N-0 Light Summer conditions: Assuming a generation output of 19.5 MW, and a maximum power factor of 85% lagging (the maximum capability of the GE machine), no thermal or capacity limits were reached on any transmission line or substation transformer. Assuming summer light loading conditions, the voltage at the Wind Project 69 kv bus, with no MW or MV generation was estimated to be pu. At generation levels of 19.5 MW and assuming a power factor of +/- 95%, the voltage range of the Wind Project 69 kv bus moved from pu to pu. This means that there is the potential of a 4.0% voltage change to the Wind Project bus from maximum generation to no generation. The study shows Ucon, the closest Transmission Provider s load, has a maximum voltage change of 2.8% N-1 Heavy Summer conditions: As was mentioned above, since this Wind Project will be run on radial 69 kv transmission line, a line outage will drop the generation. A group of studies were also run by transferring the Wind Project to the 11.4 mile Sugarmill Sandcreek 69 kv source. Assuming a generation output of 19.5 MW, and a maximum power factor of 85% lagging (the maximum capability of the GE machine), no thermal or capacity limits were reached on any transmission line or substation transformer from this source. Assuming summer peak loading conditions, the voltage at the Wind Project 69 kv bus, with no MW or MV generation was estimated to be.981 pu. At generation levels of 19.5 MW and assuming a power factor of +/- 95%, the voltage range of the Wind Project 69 kv bus moved from.987 pu to pu. This means that there is the potential of a 5.3% voltage change to the Wind Project bus from maximum generation to no generation. The study shows Sandcreek, the closest Transmission Provider load, has a maximum voltage change of 1.9%. N-1 Light Summer conditions: Since this Wind Project will be run on radial 69 kv transmission line, a line outage will drop the generation. A group of studies were also run by transferring the Wind Project to the 11.4 mile Sugarmill Sandcreek 69 kv source. Assuming a generation output of 19.5 MW, and a maximum power factor of 85% lagging (the maximum capability of the GE machine), no thermal or capacity limits were reached on any transmission line or substation transformer. Assuming summer light loading conditions, the voltage at the Wind Project 69 kv bus, with no MW or MV generation was estimated to be pu. At generation levels of 19.5 MW and assuming a power factor of +/- 95%, the voltage range of the Wind Project 69 kv bus moved from pu to pu. This means that there is the potential of a 4.0% voltage change to the Wind Project bus from maximum Q0047 Page 9 4/28/2006

10 generation to no generation. The study shows Sandcreek, the closest Transmission Provider load, has a maximum voltage change of 1.3%. 4.4 Transmission Modifications Existing Breaker Modifications Short-Circuit A fault analysis was performed using the computer software Aspen GE 1.5 MW wind turbines connected through the 14.4kV collector system was added to the latest Aspen One-liner Base Case. The 14.4kV collector system was modeled using the information supplied by the developer which included a kV 15/20/25MVA transformer with an impedance of 8.0% on 15MVA base. Classical faults were simulated at several key locations. These faults were simulated to determine if the existing breakers had sufficient interrupting capacity. The following table lists the in fault duty on buses in the vicinity of the new generation facility. Interconnection Customer Generation Addition Substation Bus 3 phase fault Single line to ground fault Ammon 69kV 4170 A 3135 A Goshen 69kV 8736 A 10,586 A Rigby 69kV 10,361 A 12,506 A Ririe 69kV 2390 A 1825 A Sand Creek 69kV 3900 A 4215 A The study showed that no equipment will need to be replaced due to increased fault duty caused by the addition of the generation facility Protection Requirements The protection relay settings at Goshen Substation Circuit Breaker 78, Sugar Mill Substation Circuit Breaker 81, and Rigby Substation Circuit Breaker 72 will need to be reviewed to determine if the current protection provided is adequate with the addition of the tap line to the new wind power project. This review will be completed in the design phase of the project to determine any required relay settings changes at these locations Communication Requirements At the point of interconnection a pole mounted RTU including MAS remote radio and antenna will be installed to interface with the existing MAS master at the Mennan Butte site, and a RTU installed at the Customers switchyard. A microwave tower using T1 fractional wireless equipment is proposed for the Q0047 Page 10 4/28/2006

11 Customer s switchyard to carry the RTU, meter phone line, and telemetry signals to Transmission Provider s dispatch centers Revenue Metering Bi-directional revenue metering will be installed at the wind plant end of the 69 kv line. See one-line diagram on Page 4 of 12. The metering will use CTs that will be capable of accurately measuring the wide range of bi-directional power flows from max generation to no generation. The meter readings will be adjusted for losses back to the Point of Interconnection. 5.0 Voltage Fluctuations for Capacitor Switching This study assumed that any VAR needs would be supplied by the GE machines. As a result, no remote capacitor switching studies were included. 6.0 Transient Stability Studies No transient stability studies were required for this study and none were investigated due to the size of the project. 7.0 Conclusions: Based on the results of this study, the following recommendations are noted: During light loading conditions the Wind Project 69 kv bus could see voltage fluctuations that will exceed the Transmission Provider allowable voltage fluctuation maximum of 3.0%, if the Wind Project were to trip off at maximum generation levels. However, no Transmission Provider load bus would experience a violation of this flicker guideline, so no remediation is necessary. There were conditions discovered during light loading that could drive the Wind Project 69 kv bus to voltage levels as high as pu, depending of the settings of their generators. It would be prudent for the Customer to consider tight voltage control settings to hold down the voltage. No Transmission Provider busses exceeded voltage levels of 1.05 pu. During a line outage of the Rigby - Sandcreek 69 kv line, all loads and generation will be lost. It is feasible by manual switching to temporarily transfer loads and generation to the Sugarmill Sandcreek 69 kv line. The wind plant must be designed to deliver power to the point of interconnection within the range of +/-95% power factor, with voltage control. The short circuit analysis did not find any existing breakers in the area that would require upgrading due to the additional short circuit duty caused by the wind plant. The configuration at the Point of Interconnection will include a pole-mounted three-way motor-operated switch and RTU, for remote operation. The 69 kv radial interconnecting line from the wind plant must include a 69 kv breaker at the wind plant end of the line. Transmission Provider will design and procure a relay Q0047 Page 11 4/28/2006

12 panel to be installed at the wind plant end of the line, to detect faults on the 69 kv system. Transmission Provider will design, procure and install an RTU at the wind plant to collect data which will be delivered to Transmission Provider s control center, via SCADA. The Customer will be required to deliver the data, listed in III.B to the RTU. At the point of interconnection a pole mounted RTU including MAS remote radio and antenna will be installed. A microwave tower using T1 fractional wireless equipment will be installed at the customer s collector station to communicate with Transmission Provider s control centers. Bi-directional revenue metering will be installed at the wind plant substation using 69 kv instruments. The meter will be adjusted for line losses back to the Point of Interconnection with Transmission Provider. Q0047 Page 12 4/28/2006

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer ) Revised Generation Interconnection Impact Study Report For Queue Position 31 ( Interconnection Customer ) September 22, 2004 1 Generation Interconnection System Impact Study Report I. Revision of Original

More information

Generation Interconnection Impact Study Report. For. Interconnection Customer Q0022

Generation Interconnection Impact Study Report. For. Interconnection Customer Q0022 Generation Interconnection Impact Study Report For Interconnection Customer Q0022 Prepared by: PacifiCorp Date: 10/29/2003 Generation Interconnection System Impact Study Report Interconnection Customer

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project #169 Generation Interconnection Feasibility Study Report 7/2/2014 Regional Electric Transmission Planning TABLE OF CONTENTS Executive Summary... 3 Generator and Interconnection Data... 5 Study

More information

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281

Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 Generator Interconnection Impact Study Report Pamlico County, NC 200 MW Wind Farm Queue #281 June 6, 2012, Inc. PURPOSE The purpose of this impact study is to assess the impacts of a wind farm interconnection

More information

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project 76 Generation Interconnection Feasibility Study Report December 21, 2007 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Network Resource Interconnection

More information

March 4, Mona Substation Line position & assoc relaying, communications & metering

March 4, Mona Substation Line position & assoc relaying, communications & metering 700 N.E. Multnomah, Suite 550 Portland, OR 97232 March 4, 2004 Merrill Brimhall PacifiCorp Merchant 201 South Main, Suite 2200 Salt Lake City, Utah 84111 Dear Mr. Brimhall: PacifiCorp Transmission Systems

More information

Feasibility Study on Load Flow and Short Circuit Project

Feasibility Study on Load Flow and Short Circuit Project Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November

More information

Local Area Studies Update - PACW Kevin Putnam

Local Area Studies Update - PACW Kevin Putnam Transmission Planning Attachment K Q5 Public Input Meeting Local Area Studies Update - PACW Kevin Putnam March 23, 2017 Hermiston-Pendleton-Enterprise Study Finding Report Jerry Vang PAGE 3 Hermiston-Pendleton

More information

Small Generator Interconnection Tier 4 Facilities Study Report. Completed for. ( Interconnection Customer ) A Qualifying Facility Q0662

Small Generator Interconnection Tier 4 Facilities Study Report. Completed for. ( Interconnection Customer ) A Qualifying Facility Q0662 Small Generator Interconnection Tier 4 Facilities Study Report Completed for ( Interconnection Customer ) A Qualifying Facility Q0662 Proposed Interconnection Klamath Falls-Fishhole 69 kv line at approximately

More information

Smart Distribution Technology

Smart Distribution Technology Smart Distribution Technology Presentation Agenda Alabama Power Company, A Southern Company Distribution Automation Supervisory Control And Data Acquisition (SCADA) Multiple Address System (MAS) communications

More information

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Generator Interconnection Request 377 40 MW Wind Generating Facility Renfrew, NS Mar. 6, 2012 Control Centre Operations Nova Scotia Power Inc.

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

More information

POWER SYSTEM SECURITY CONCEPTS

POWER SYSTEM SECURITY CONCEPTS POWER SYSTEM SECURITY CONCEPTS 1.1 INTRODUCTION The Power System needs to be operationally secure, i.e. with minimal probability of blackout and equipment damage. An important component of power system

More information

SCADA Training - T&D Automation

SCADA Training - T&D Automation SCADA Training - T&D Automation Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq This course covers all the

More information

AUTOMATION OF POWER DISTRIBUTION USING SCADA

AUTOMATION OF POWER DISTRIBUTION USING SCADA 1 2 ABSTRACT In every substation certain measurements, supervision, control, operation and protection functions are necessary. Traditionally these functions were performed manually by system operator from

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT INTERCONNECTION FACILITIES STUDY REPORT NORTHEAST WYOMING 250MW GENERATOR Prepared on Behalf of the Transmission Provider: Basin Electric Power Cooperative Transmission Black Hills Power Transmission December

More information

This webinar brought to you by the Relion product family

This webinar brought to you by the Relion product family This webinar brought to you by the Relion product family Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays are smarter, more flexible and more adaptable. Easy

More information

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10,

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10, Sacramento Municipal Utility District SMUD May 10, 2010 1 SMUD Facts and Figures 900 Sq. Miles Service Area 585,500 Customers 1.4 million Area Population 10 Bulk Substations 473 Miles of Transmission Lines

More information

Collector System Design Considerations for Wind Farms. Sean Carr Ernst Camm S&C Electric Co.

Collector System Design Considerations for Wind Farms. Sean Carr Ernst Camm S&C Electric Co. Collector System Design Considerations for Wind Farms Sean Carr Ernst Camm S&C Electric Co. 1 Overview Challenges in wind farm collector systems Design considerations for collector systems Summary The

More information

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9 PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6

More information

Concept of Automation in Management of Electric Power Systems Richard Joseph, Nerey Mvungi

Concept of Automation in Management of Electric Power Systems Richard Joseph, Nerey Mvungi Concept of Automation in Management of Electric Power Systems Richard Joseph, Nerey Mvungi Abstract An electric power system includes a generating, a transmission, a distribution, and consumers subsystems.

More information

PacifiCorp Transmission Technical Workshop

PacifiCorp Transmission Technical Workshop PacifiCorp Transmission Technical Workshop RFP Attachment 20 February 22, 2012 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated Resource Plan Attachment 20 Point of Receipt

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

1 Description of Methodology for Volt / Var Optimization

1 Description of Methodology for Volt / Var Optimization Methodology for Volt / Var Optimization on a Substation Basis May 13th, 2011 Version 1.7 1 Methodology for Volt / Var Optimization (VVO) on a Substation Basis This use case discusses how the utility will

More information

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

SOUTH TEXAS ELECTRIC COOPERATIVE, INC. SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection

More information

2009 SPP TransCanada Pipeline Study Report

2009 SPP TransCanada Pipeline Study Report 2009 SPP TransCanada Pipeline Study Report SPP Engineering Department, Planning Section PUBLISHED: 7/9/2009 LATEST REVISION: 7/9/2009 Copyright 2009 by Southwest Power Pool, Inc. All rights reserved. Table

More information

ELG4125: System Protection

ELG4125: System Protection ELG4125: System Protection System Protection Any power system is prone to 'faults', (also called short-circuits), which occur mostly as a result of insulation failure and sometimes due to external causes.

More information

Substation SCADA Monitoring

Substation SCADA Monitoring Substation SCADA Monitoring Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Substations are a critical component

More information

Power System Network Simulator (PSNsim)

Power System Network Simulator (PSNsim) The PSNsim is hardware simulator that simulates all parts of power system from generation to utilization. The PSNsim is a scaled down model of the real power system that provides an experimental environment

More information

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016

More information

Interconnection of Navajo-Gallup Water Supply Project Electrical Transmission Facilities. Non-Tariff System Impact Study

Interconnection of Navajo-Gallup Water Supply Project Electrical Transmission Facilities. Non-Tariff System Impact Study Interconnection of Navajo-Gallup Water Supply Project Electrical Transmission Facilities Non-Tariff System Impact Study March 204 Prepared by: Utility System Efficiencies, Inc (USE) Under Contract with:

More information

Generation, Transmission, and End User Facilities

Generation, Transmission, and End User Facilities Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3

More information

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study XXXX Bear Creek Hydro Generation Project Interconnection Facilities Study Report No. SPA 2005-33 August 2005 System Planning (Lower Mainland & Vancouver Island) British Columbia Transmission Corporation

More information

RFP Attachment 13. January 2010

RFP Attachment 13. January 2010 PacifiCorp Transmission Technical Workshop RFP Attachment 13 January 2010 Presented by PacifiCorp Transmission PacifiCorp Transmission Update Integrated t dresource Plan Attachment 13 Point of Receipt

More information

STCP 04-3 Issue 005 Real Time Data Provision

STCP 04-3 Issue 005 Real Time Data Provision STCP 04-3 Issue 005 Real Time Data Provision STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

Small Generator Interconnection System Impact Study Report. Completed for Q0373

Small Generator Interconnection System Impact Study Report. Completed for Q0373 Small Generator Interconnection Completed for Q0373 Proposed Interconnection To the Existing Q0006 500kV substation on the 13.8kV side of the bus July 7, 2011 TABLE OF CONTENTS 1.0 DESCRIPTION OF THE GENERATING

More information

Awareness of the Situation

Awareness of the Situation 17/11/21 Situational Awareness UPDEA - Workshop Awareness of the Situation 25,623 Alarms in 8 ours 53 Alarms / min (average) 8% Are consequential Things 1 to keep in mind during a disturbance - Analog

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor

More information

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC September 21, 2018 Penelec Transmission Zone Need Number: PN-2018-001 Consider upgrading transmission line equipment (switches, conductor, splices,

More information

Supplemental Information

Supplemental Information Retirement of NPCC Directory# 3 Supplemental Information On April 1, 2015, NPCC Directory# 3 was retired upon the effective date of PRC-005-2 Protection System Maintenance which is subject to a 12 year

More information

XXXXX XXXX Wind Generation Project

XXXXX XXXX Wind Generation Project A subsidiary of Pinnacle West Capital Corporation XXXXX XXXX Wind Generation Project XXXX XXXXX XXXXXXX Co., Inc. Interconnection System Impact Study Final Report Prepared By Arizona Public Service Company

More information

Real-time Power System Operation. Energy Management Systems. Introduction

Real-time Power System Operation. Energy Management Systems. Introduction 1 Real-time Power System Operation Energy Management Systems Introduction The time frame for Power Systems Operation varies from a few seconds to a week. To assist with the operation of the system, modern

More information

ITC Facility Connection Requirements for Generation, Transmission and End-User Facilities Connected to the ITC Holdings Transmission Systems

ITC Facility Connection Requirements for Generation, Transmission and End-User Facilities Connected to the ITC Holdings Transmission Systems ITC Facility Connection Requirements for Generation, Transmission and End-User Facilities Connected to the ITC Holdings Transmission Systems Category: Planning Type: Policy Eff. Date/Rev. # 06/19/2017

More information

ISO New England Data Modeling Requirements

ISO New England Data Modeling Requirements A U G U S T 1 5, 2 0 1 6 B O S T O N, M A ISO New England Data Modeling Requirements Renew Northeast Meeting Al McBride D I R E C T O R, T R A N S M I S S I O N S T R A T E G Y & S E R V I C E S Agenda

More information

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5 Central Hudson Gas & Electric Corporation (CHG&E) Interconnection Protection Requirements for Distributed Generators of Greater than 300 kva Connected in Parallel with the CHG&E Electrical Delivery System

More information

Shabnam Rukhsar Electrical Engineering Department, Anjuman College of Engineering and Technology.India

Shabnam Rukhsar Electrical Engineering Department, Anjuman College of Engineering and Technology.India SCADA in Transmission Line Shabnam Rukhsar Electrical Engineering Department, Anjuman College of Engineering and Technology.India ABSTRACT: Transmission line equivalent circuit parameters are often 25%

More information

Memorandum. This memorandum requires Committee action.

Memorandum. This memorandum requires Committee action. California Independent System Operator Corporation Memorandum To: ISO Operations Committee From: Dariush Shirmohammadi, Director of Regional Transmission - South Armando Perez, VP, Planning & Infrastructure

More information

LONG ISLAND POWER AUTHORITY INTERCONNECTION REQUIREMENTS FOR NEW DISTRIBUTED GENERATION GREATER THAN 300 KVA OPERATING IN PARALLEL WITH LIPA S RADIAL

LONG ISLAND POWER AUTHORITY INTERCONNECTION REQUIREMENTS FOR NEW DISTRIBUTED GENERATION GREATER THAN 300 KVA OPERATING IN PARALLEL WITH LIPA S RADIAL LONG ISLAND POWER AUTHORITY INTERCONNECTION REQUIREMENTS FOR NEW DISTRIBUTED GENERATION GREATER THAN 300 KVA OPERATING IN PARALLEL WITH LIPA S RADIAL DISTRIBUTION SYSTEM Revised and Issued March 2003 I.

More information

Glencoe Light and Power

Glencoe Light and Power Glencoe Light and Power REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS 1 Table of Contents Page I. INTRODUCTION...5 A. Authority... 5 B. Objectives...5 C. Interconnection

More information

Lecture 5 Substation Automation Systems. Course map

Lecture 5 Substation Automation Systems. Course map Lecture 5 Substation Automation Systems 1 Course map 2 1 Contents of the Lecture Part 1 Substation Automation Components Substation Automation Functions Communication within the Substation (Intro) Part

More information

Chapter 2 State Estimation and Visualization

Chapter 2 State Estimation and Visualization Chapter 2 State Estimation and Visualization One obvious application of GPS-synchronized measurements is the dynamic monitoring of the operating conditions of the system or the dynamic state estimation

More information

Facility Connection Requirements

Facility Connection Requirements SEMINOLE ELECTRIC COOPERATIVE, INC. Facility Connection Requirements BULK ELECTRIC SYSTEM FACILITIES Facility Connection Requirements Page 1 of 19 Table of Contents 1. GENERAL CONNECTION REQUIREMENTS...

More information

IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS

IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS Armando Guzmán Schweitzer Engineering Laboratories, Inc. Pullman, WA 99163 A reliable power system maintains frequency and voltage

More information

JEA. Facility Connection Requirements

JEA. Facility Connection Requirements JEA Facility Connection Requirements April 2008 January 14 th, 2006 1/22 JEA Facility Connection Requirements TABLE OF CONTENTS 1.0 Introduction and Scope 1.1 Generation Facilities 1.2 Transmission Facilities

More information

Sapphire Wind Farm 330/33kV Substation

Sapphire Wind Farm 330/33kV Substation Signature projects: Projects: Project Edison AusNet Sapphire Wind Farm 330/33kV Substation TransGrid Zinfra constructed 330/33kV substation and transmission line as part of the cut in works for the Sapphire

More information

PG&E Transmission Interconnection Handbook

PG&E Transmission Interconnection Handbook Table of Contents TABLE OF CONTENTS... 1 UPDATE HISTORY... UP-1 INTRODUCTION... IN-1 I-1. PURPOSE... IN-1 I-2. INTRODUCTORY DEFINITIONS... IN-1 I-3. HANDBOOK APPLICABILITY... IN-2 I-3.1. New Load, New

More information

ASPEN Software - Introduction

ASPEN Software - Introduction ASPEN Software - Introduction ASPEN is a very user-friendly software package that is capable of doing load-flow and shortcircuit studies, as well as relay application and coordination. Its simple graphical

More information

High-Reliability Fault-Clearing System solution. Application Guide. Outdoor Distribution (15.5 kv through 38 kv) S&C ELECTRIC COMPANY

High-Reliability Fault-Clearing System solution. Application Guide. Outdoor Distribution (15.5 kv through 38 kv) S&C ELECTRIC COMPANY S&C Remote Supervisory V ista Outdoor Distribution (15.5 kv through 38 kv) Electric utility customers are increasingly concerned about the frequency and duration of outages they are experiencing, and are

More information

LAB1 INTRODUCTION TO PSS/E EE461: POWER SYSTEMS COLORADO STATE UNIVERSITY

LAB1 INTRODUCTION TO PSS/E EE461: POWER SYSTEMS COLORADO STATE UNIVERSITY LAB1 INTRODUCTION TO PSS/E EE461: POWER SYSTEMS COLORADO STATE UNIVERSITY PURPOSE: The purpose of this lab is to introduce PSS/E. This lab will introduce the following aspects of PSS/E: Introduction to

More information

MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES

MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES 1. Introduction Real time monitoring and control is necessary to ensure public and employee safety and to protect the integrity

More information

DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models

DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models Problem Statement With the proliferation of distributed energy resources (DER), Transmission Planners must adapt

More information

THE INTERCONNECTION HANDBOOK

THE INTERCONNECTION HANDBOOK THE INTERCONNECTION HANDBOOK Southern California Edison Company Rev. 8 This document is controlled by the originating SCE T&D organization. When downloaded and printed, this document becomes UNCONTROLLED,

More information

Interconnection and Transmission

Interconnection and Transmission Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection

More information

SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM

SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM 1. Instructions By completing this request form, an Interconnection Customer may request a preapplication report from the NYISO regarding the

More information

LCRA Transmission Services Corporation. Facility Connection Requirements

LCRA Transmission Services Corporation. Facility Connection Requirements LCRA Transmission Services Corporation Facility Connection Requirements April 2017 Table of Contents 1.0 INTRODUCTION... 3 2.0 Facility Connection Requirements... 3 2.1 Summary of Basic Interconnection

More information

Attachment H: Small Generator (10 MW and Below) Technical Requirements and Standards

Attachment H: Small Generator (10 MW and Below) Technical Requirements and Standards Attachment H: Small Generator (10 MW and below) Technical Requirements and Standards Scope Attachment H: Small Generator (10 MW and Below) Technical Requirements and Standards The PJM Small Generator Interconnection

More information

Karl Iliev, San Diego Gas & Electric Company

Karl Iliev, San Diego Gas & Electric Company INTEGRATING DER THROUGH DISTRIBUTION SYNCROPHASORS Karl Iliev, San Diego Gas & Electric Company 2002 San Diego Gas and Electric Co. and Southern California Gas Company. All copyright and trademark rights

More information

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Revised: July 12, 2013 Introduction The following information includes requests for clarification

More information

Evolution of Control for the Power Grid

Evolution of Control for the Power Grid Evolution of Control for the Power Grid Anjan Bose Washington State University Pullman, WA, USA PaiFest In Honor of Prof. M. A. Pai Urbana-Champaign, IL October 15, 2015 The Past (before 1960s) Hard

More information

Medium Voltage Metal-Enclosed Thyristor-Switched Harmonic Filter Banks

Medium Voltage Metal-Enclosed Thyristor-Switched Harmonic Filter Banks 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Medium Voltage Metal-Enclosed Thyristor-Switched Harmonic Filter Banks General NEPSI's activar, Medium

More information

ASPEN Software - Introduction

ASPEN Software - Introduction ASPEN Software - Introduction ASPEN is a very user-friendly software package that is capable of doing load-flow and shortcircuit studies, as well as relay application and coordination. Its simple graphical

More information

BULK POWER SYSTEM FACILITY AND END USER INTERCONNECTION REQUIREMENTS TO THE LIPA TRANSMISSION SYSTEM

BULK POWER SYSTEM FACILITY AND END USER INTERCONNECTION REQUIREMENTS TO THE LIPA TRANSMISSION SYSTEM BULK POWER SYSTEM FACILITY AND END USER INTERCONNECTION REQUIREMENTS TO THE LIPA TRANSMISSION SYSTEM April 13, 2007 LIPA Facility Connection Requirements TABLE OF CONTENT I. INTRODUCTION...1 II. REFERENCE

More information

TRANSMISSION FACILITIES INTERCONNECTION REQUIREMENTS

TRANSMISSION FACILITIES INTERCONNECTION REQUIREMENTS TRANSMISSION FACILITIES INTERCONNECTION REQUIREMENTS Corresponds to NERC Standard FAC-001-1 Developed By CPP Engineering Department May 1, 2015 Prepared by: Raymond O Neill, P.E. Version 3 INDEX CPP Transmission

More information

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control ENERGY CONTROL CENTERS To generated, Transmission and Distribution system, Number of customers and Total investment. Installed capacity in India exceeds 206 GW with annual energy generated energy exceeding

More information

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System

Real Time Digital Simulator Testing of an On Line Integrated Stability Control System Real Time Digital Simulator Testing of an On Line Integrated Stability Control System R.P. Wierckx, M. Kawasaki, N. Saito, K. Anzai, S.C. Verma Abstract The paper describes the testing of an on line integrated

More information

Lecture 6 Substation Automation Systems

Lecture 6 Substation Automation Systems Lecture 6 Substation Automation Systems 1 Course map 2 Contents of the Lecture Part 1 Substation Automation Components & Architectures Substation Automation Functions Communication within the Substation

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form)

For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form) Electrical Company: PacifiCorp For the State of Washington SMALL GENERATOR INTERCONNECTION REQUEST (Tier 1 [Non-Net Meter], Tier 2, Tier 3) (Application Form) Designated Contact Person: Robin Moore Address

More information

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2

SMUD Model Data Requirements & Reporting Procedures MOD VERSION 1.2 SMUD Model Data Requirements & Reporting Procedures MOD-032-1 VERSION 1.2 NOVEMBER 10, 2015 1 TABLE OF CONTENTS INTRODUCTION... 2 1.1 Purpose... 2 1.2 Audience... 3 1.3 Process Overview... 3 Figure 1-1:

More information

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements

More information

MONTANA-DAKOTA UTILITIES REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS

MONTANA-DAKOTA UTILITIES REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS MONTANA-DAKOTA UTILITIES REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS Table of Contents I. Introduction... 5 A. Authority... 5 B. Objectives... 5 C. Interconnection

More information

2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning

2018 General Rate Case. Transmission & Distribution (T&D) Volume 3 R System Planning Application No.: Exhibit No.: Witnesses: A.1-0- SCE-0, Vol. 0 R E. Takayesu A (U -E) 01 General Rate Case Transmission & Distribution (T&D) Volume R System Planning Before the nd Errata Public Utilities

More information

G. Larry Clark Principal Engineer Power Delivery Alabama Power Company, A Southern Company

G. Larry Clark Principal Engineer Power Delivery Alabama Power Company, A Southern Company 2014 IEEE PES T&D Conference & Exposition Chicago, IL April 15, 2014 Panel Session: Technologies for Advanced Volt/VAR Control Implementation Volt/VAR Control as Part of an Integrated Distribution Management

More information

LCRA Transmission Services Corporation. Facility Connection Requirements

LCRA Transmission Services Corporation. Facility Connection Requirements LCRA Transmission Services Corporation Facility Connection Requirements May 2018 Table of Contents 1.0 INTRODUCTION... 3 2.0 Facility Connection Requirements... 3 2.1 Summary of Basic Interconnection Requirements...

More information

APPENDIX B-2. TECHNICAL CONNECTION REQUIREMENTS for LOAD DELIVERY FACILITIES. and SMALL GENERATION FACILITIES

APPENDIX B-2. TECHNICAL CONNECTION REQUIREMENTS for LOAD DELIVERY FACILITIES. and SMALL GENERATION FACILITIES APPENDIX B-2 TECHNICAL CONNECTION REQUIREMENTS for LOAD DELIVERY FACILITIES and SMALL GENERATION FACILITIES Revision: 4.0 12/30/2011 Page 1 of 39 TABLE OF CONTENTS DEFINITIONS A. Scope 1. Ownership 2.

More information

USE CASE 14 CONTROLLED ISLANDING

USE CASE 14 CONTROLLED ISLANDING I USE CASE 14 CONTROLLED ISLANDING Use Case Title Centralized application separates grid into islands to prevent blackout Use Case Summary Controlled islanding is a method that can significantly improve

More information

AUTOMATION OF DISTRIBUTION KIOSKS TECHNICAL AND FINANCIAL EVALUATION - "TYPICAL CASE STUDY"

AUTOMATION OF DISTRIBUTION KIOSKS TECHNICAL AND FINANCIAL EVALUATION - TYPICAL CASE STUDY AUTOMATION OF DISTRIBUTION KIOSKS TECHNICAL AND FINANCIAL EVALUATION - "TYPICAL CASE STUDY" Mohamed Khaled El-Sayed Alexandria Electricity Distribution Company - AEDC Egypt khaled_mks@hotmail.com 1-INTRODUCTION

More information

Large Embedded Generators Register of Completed Projects

Large Embedded Generators Register of Completed Projects Large Embedded Generators Register of Completed Projects This document contains a description of the completed projects relating to the connection of Large Embedded Generators to the TasNetworks distribution

More information

Distributor Thoughts on Smart Grid

Distributor Thoughts on Smart Grid Distributor Thoughts on Smart Grid Sylvia Smith Budget & Rates Manager Tony Richman Meter Services Manager-Smart Grid 1 Agenda Introduction Smart Grid Program Strategy & Technical Aspects Financial Considerations

More information

ABB static var compensator stabilizes Namibian grid voltage

ABB static var compensator stabilizes Namibian grid voltage Power ABB static var compensator stabilizes Namibian grid voltage factor! Rolf Grünbaum, Mikael Halonen, Staffan Rudin The spectacular dune landscapes of Namibia are a key factor in the country s booming

More information

Medium Voltage Metal-Enclosed Power Capacitor Banks

Medium Voltage Metal-Enclosed Power Capacitor Banks 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Medium Voltage Metal-Enclosed Power Capacitor Banks General Northeast Power System s (NEPSI's) medium

More information

Washington City. September Capital Facilities Plan- Electrical

Washington City. September Capital Facilities Plan- Electrical Washington City Capital Facilities Plan- Electrical September 2007 Intermountain Consumer Professional Engineers, Inc. 1145 East South Union Avenue Midvale, Utah 84047 (801) 255-1111 TABLE OF CONTENTS

More information

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s) A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure

More information

TRIP OF CLARE SOUTH TOWNSVILLE SOUTH 132 KV TRANSMISSION LINE ON 24 JUNE 2015

TRIP OF CLARE SOUTH TOWNSVILLE SOUTH 132 KV TRANSMISSION LINE ON 24 JUNE 2015 TRIP OF CLARE SOUTH TOWNSVILLE SOUTH 132 KV TRANSMISSION LINE ON 24 JUNE 2015 AN AEMO POWER SYSTEM OPERATING INCIDENT REPORT FOR THE NATIONAL ELECTRICTY MARKET Published: October 2015 VERSION RELEASE HISTORY

More information

MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO

MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO 1 MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO 2 MISO Overview MISO is an independent, non-profit, memberbased organization committed to reliability. We serve as

More information

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of

More information

TSR A & B - FACILITIES STUDY REPORT

TSR A & B - FACILITIES STUDY REPORT TSR-11-0502A & B - FACILITIES STUDY REPORT Transmission Service Request No. TSR-11-0502A&B 2 x 25 MW Wind Energy Generating Facilities From POI on Gladstone Walsenburg 230 kv Line to Ojo Substation 345

More information

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW

Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW Level 2, 3 and 4 Interconnection Application for Certified, Inverter Based Generating Facilities Not Greater than 2MW The Customer Generator applicant ("Applicant") hereby makes application to the T &

More information

INTERCONNECTION STANDARDS FOR GENERATING FACILITIES (GF) CONNECTED TO THE FORT COLLINS DISTRIBUTION SYSTEM. July 2011 UPDATED STANDARDS

INTERCONNECTION STANDARDS FOR GENERATING FACILITIES (GF) CONNECTED TO THE FORT COLLINS DISTRIBUTION SYSTEM. July 2011 UPDATED STANDARDS INTERCONNECTION STANDARDS FOR GENERATING FACILITIES (GF) CONNECTED TO THE FORT COLLINS DISTRIBUTION SYSTEM July 2011 UPDATED STANDARDS Rev 9.0 July 2011 2 TABLE OF CONTENTS 1.0 SCOPE AND GENERAL REQUIREMENTS...5

More information