Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations

Size: px
Start display at page:

Download "Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations"

Transcription

1 Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations Michael. Duff City of College Station Payal Gupta, Dharmendra Prajapati, and Alex Langseth Schweitzer Engineering Laboratories, Inc City of College Station and SEL

2 Provides electric power to residential and commercial customers Is composed of City of College Station (COCS) College Station Utilities (CSU) ~20 miles of transmission lines ~458 miles of distribution lines 7 substations OpenStreetMap contributors

3 Traditional 13.2 kv Distribution Substation 138 Electromechanical kv ring bus relays Two No bus 138 differential kv / 13.8 kv power protection transformers Two No breaker buses electrically failure backup connected via normally No automatic source open tie breaker transfer Four feeders per bus Challenge coordinating supplied from main breaker for simultaneous fault conditions

4 13.2 kv Distribution Substation for Special Protection and Control Scheme (SPCS)

5 Information Flow Diagram

6 Communications Link Supervision for High-Speed Data Bits Transmit eceive TB1 TB2... TB8 B1 B2... B TB1 TB2... TB8 B1 B2... B8 Transmit eceive IEDs OK = 1 OK = 0 Status Description Communications channel good Communications channel bad Inverse (NOT) of OK is used to create digital alarm bit to alert operations of communications failure

7 Communications Link Supervision for High-Speed Data Bits IED-B IED-COM B-IED Logic Processors COM = 1 COM = 0 Status Description Communications channel good Communications channel bad Communications link supervision in logic processors only allows received data bits of good quality to be considered in algorithms

8 Different Schemes Implemented Fast bus tripping scheme for significantly reduced bus fault-clearing time Breaker failure protection scheme for shorter breaker failure clearing time Double-circuit feeder trip scheme for faster clearing of simultaneous faults without causing substation outage, and stall reclose logic for system availability Automatic source transfer scheme (ASTS) for higher power system availability

9 SCPS Six Major Design Criteria Dependability Security Selectivity esilience Speed Cost

10 Fast Bus Tripping Scheme Limitation of traditional bus protection philosophy Bus fault is cleared with time-delayed transformer backup protection Typical fault-clearing time is between 0.6 and 1.0 seconds Solution Bus differential protection is fast and secure, but has added cost Fast bus tripping scheme is fast and cost-effective

11 Fast Bus Tripping Scheme Fault on Bus 1

12 Fast Bus Tripping Scheme Fault on F1 Feeder Circuit

13 Limitation of traditional breaker failure protection philosophy Fault is cleared with upstream inverse-time overcurrent protection Long fault-clearing times lead to equipment damage or reduced equipment lifespan Solution Breaker Failure Protection Scheme Dedicated, fast breaker failure protection scheme using existing IEDs and communications backbone Low implementation cost with minimal wiring

14 B-BF T1 Breaker Failure Protection Scheme Fault on Bus 1 Breaker Fails Bus 1 M1 TB-BF TIE F1 F2 F3 F4 B-BF B-BF B-BF B-BF B-BF Logic Processor T1

15 Limitation of traditional system Simultaneous faults may cause coordination issues Main breaker 51 element may misoperate IED overcurrent pickup and time-dial settings must be adjusted (resulting in slower tripping) Solution Double Circuit Feeder Trip Scheme and Stall eclose Logic Double-circuit feeder trip scheme with low implementation cost Fast 51 element setting and improved service reliability

16 Double Circuit Feeder Trip Simultaneous Fault M1 M2 Bus 1 TIE Bus 2 F1 F2 F3 F4 F5 F6 F7 F8 TB-PU B-PU TB-PU B-PU B-PU B-PU B-PU B-PU B-PU B-PU Logic Processor T1 B-PU Logic Processor T2

17 Stall eclose Logic M1 M2 Bus 1 TIE Bus 2 F1 F2 F3 F4 F5 F6 F7 F8 TB-S B-S Logic Processor T1 Logic Processor T2

18 ASTS Limitation of traditional system Less power system availability with more disruption Long restoration times Solution ASTS that automatically switches from primary source to alternate source Short restoration times to improve power system availability

19 11 22 T1 T2 ASTS Transformer Fault TB-FAULT M1 Bus 1 TB-52A Bus 2 TIE TB-52A B-CLOSE M2 F1 F2 F3 F4 F5 F6 F7 F8 TB-52A TB-NO FAULT SCADA ASTS ENABLE Logic Processor T1 Logic Processor T2

20 Other Schemes Multiple SPCSs run in parallel and coordinate with each other as complete, integrated solution Other control logic is implemented to improve system availability and dependability Hot-line mode IED health alarm

21 Questions?

Utility Implements Communications-Assisted Special Protection and Control Schemes for Distribution Substations

Utility Implements Communications-Assisted Special Protection and Control Schemes for Distribution Substations Utility Implements Communications-Assisted Special Protection and Control Schemes for Distribution Substations Michael. Duff, City of College Station Payal Gupta, Dharmendra Prajapati, and Alex Langseth,

More information

High-Reliability Fault-Clearing System solution. Application Guide. Outdoor Distribution (15.5 kv through 38 kv) S&C ELECTRIC COMPANY

High-Reliability Fault-Clearing System solution. Application Guide. Outdoor Distribution (15.5 kv through 38 kv) S&C ELECTRIC COMPANY S&C Remote Supervisory V ista Outdoor Distribution (15.5 kv through 38 kv) Electric utility customers are increasingly concerned about the frequency and duration of outages they are experiencing, and are

More information

Identify and understand the operation of common bus. After this presentation you will be able to: Identify common bus arrangements

Identify and understand the operation of common bus. After this presentation you will be able to: Identify common bus arrangements Introduction to Bus Protection By Matt Horvath, P.E. November 6, 2018 Electrical Buses Physical and Electrical Junction A bus is a critical element of a power system, as it is the point of convergence

More information

Protection, Monitoring, and Control System for Distribution Substations ALARM HISTORY SYSTEM COMM. On-Line Documentation TRANSFORMER 12 MW

Protection, Monitoring, and Control System for Distribution Substations ALARM HISTORY SYSTEM COMM. On-Line Documentation TRANSFORMER 12 MW SEL Distribution Substation Protection and Automation System Protection, Monitoring, and Control System for Distribution Substations Data Sheet SYSTEM ONE-LINE RELAY TARGETS ALARM HISTORY SYSTEM COMM.

More information

PG&E 500 kv Protection Standard Design and Development

PG&E 500 kv Protection Standard Design and Development PG&E 500 kv Protection Standard Design and Development Davis Erwin, Rafael Pineda, and Monica Anderson Pacific Gas and Electric Company Eric Udren Quanta Technology, LLC Jordan Bell and Neal Jones Schweitzer

More information

Multifunction Relays and Protection Logic Processors in Distribution Substation Applications

Multifunction Relays and Protection Logic Processors in Distribution Substation Applications Multifunction s and Protection Logic Processors in Distribution Substation Applications David Sánchez Escobedo, Eliseo Alcázar Ramírez, Oscar A. Márquez Villanueva, and Héctor J. Altuve Ferrer Schweitzer

More information

IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS

IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS Armando Guzmán Schweitzer Engineering Laboratories, Inc. Pullman, WA 99163 A reliable power system maintains frequency and voltage

More information

BREAKER FAILURE PROTECTION

BREAKER FAILURE PROTECTION 0 th Annual HANDS-ON RELAY SCHOOL March 11-15, 201 REAKER FAILURE PROTECTION brent.c@relayapplication.com OUTLINE Protection System Failures and reaker Failures Protection versus Relaying Relay Schemes

More information

Advanced Protection and Control for a Power System Serving Industrial Customers

Advanced Protection and Control for a Power System Serving Industrial Customers Advanced Protection and Control for a Power System Serving Industrial Customers Marco F. Jorge Iberdrola Energía Monterrey David Sánchez, Héctor J. Altuve, and Jorge L. Soto Schweitzer Engineering Laboratories,

More information

SEL-487B. A Powerful Solution for Busbar Differential Protection. Bus Differential and Breaker Failure Relay

SEL-487B. A Powerful Solution for Busbar Differential Protection. Bus Differential and Breaker Failure Relay Bus Differential and Breaker Failure Relay A Powerful Solution for Busbar Differential Protection Features and Benefits Select the for the differential protection of busbar systems with up to 18 terminals.

More information

Upgrading From a Successful Emergency Control System to a Complete WAMPAC System for Georgian State Energy System

Upgrading From a Successful Emergency Control System to a Complete WAMPAC System for Georgian State Energy System Upgrading From a Successful Emergency Control System to a Complete WAMPAC System for Georgian State Energy System Dave Dolezilek International Technical Director Schweitzer Engineering Laboratories SEL

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination GSU Phase Overcurrent (51T), GSU Ground Overcurrent (51TG), and Breaker Failure (50BF) Protection System Protection and Control Subcommittee

More information

Bus Differential and Breaker Failure Relay. Advanced bus protection with built-in breaker failure detection

Bus Differential and Breaker Failure Relay. Advanced bus protection with built-in breaker failure detection SEL-487B Bus Differential and Breaker Failure Relay Advanced bus protection with built-in breaker failure detection Protect busbars with up to 21 terminals using high-speed, low-impedance bus differential

More information

Bus Differential and Breaker Failure Relay. Advanced bus protection with built-in breaker failure detection

Bus Differential and Breaker Failure Relay. Advanced bus protection with built-in breaker failure detection SEL-487B Bus Differential and Breaker Failure Relay Advanced bus protection with built-in breaker failure detection Protect busbars with up to 21 terminals using high-speed, low-impedance bus differential

More information

Busbar protection REB 670

Busbar protection REB 670 Gunnar Stranne Busbar protection REB 670 Rio de Janeiro April 23-25, 2006 ABB Power Technologies AB 2 3 4 REB 500 is enabled for use with IEC61850 communication Benefits of REB 670 outstanding features

More information

Advanced Line Differential Protection, Automation, and Control System. Combine subcycle line protection with traveling-wave fault locating

Advanced Line Differential Protection, Automation, and Control System. Combine subcycle line protection with traveling-wave fault locating Advanced Line Differential Protection, Automation, and Control System Combine subcycle line protection with traveling-wave fault locating Subcycle differential and distance protection minimizes damage

More information

Bus Protection Application Challenges

Bus Protection Application Challenges Bus Protection Application Challenges KN Dinesh Babu - Megger JC Theron, Lubomir Sevov GE Grid Solutions 2017 Texas A&M Protective Relay Conference Content Introduction Application Challenges Increase

More information

Advanced Fuse-Saving Techniques. T. ROUSAN Ameren Illinois USA. J. JERMAKOWICZ S&C Electric Company USA

Advanced Fuse-Saving Techniques. T. ROUSAN Ameren Illinois USA. J. JERMAKOWICZ S&C Electric Company USA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Advanced Fuse-Saving Techniques T. ROUSAN Ameren Illinois USA J. JERMAKOWICZ S&C Electric

More information

A Current Based, Communication Assisted High Speed Protection System to Limit Arc Energy. Patrick Robinson Altelec Engineering

A Current Based, Communication Assisted High Speed Protection System to Limit Arc Energy. Patrick Robinson Altelec Engineering A Current Based, Communication Assisted High Speed Protection System to Limit Arc Energy Patrick Robinson Altelec Engineering Captured Arcing Fault Event Arc begins as phase A-C, 8ka peak, dies out then

More information

PPL EU Relay Standardization

PPL EU Relay Standardization PPL EU Relay Standardization John Sonnelitter Senior Engineer, Transmission Relay Engineering Richard Michael Jr. Support Engineer, Transmission Relay Engineering 9/18/2018 Background PPL EU is undergoing

More information

Blackstart Hardware-in-the-loop Relay Testing Platform

Blackstart Hardware-in-the-loop Relay Testing Platform 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Blackstart Hardware-in-the-loop Relay Testing Platform R. LIU R. SUN M. TANIA Washington

More information

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure Revised: July 12, 2013 Introduction The following information includes requests for clarification

More information

PRC 001 R6 & R7.3 TFO s Notification Requirement

PRC 001 R6 & R7.3 TFO s Notification Requirement PRC 001 R6 & R7.3 TFO s Notification Requirement Diagram Information: 4 Substation Buses: SB1 is Substation Bus 1, SB2 is Substation Bus 2, SB3 is Substation Bus 3, and SB4 is Substation Bus 4. Terminals:

More information

Lecture 6 Substation Automation Systems

Lecture 6 Substation Automation Systems Lecture 6 Substation Automation Systems 1 Course map 2 Contents of the Lecture Part 1 Substation Automation Components & Architectures Substation Automation Functions Communication within the Substation

More information

Lightweight and flexible recloser control for single-phase applications

Lightweight and flexible recloser control for single-phase applications SEL-35S Kestrel Single-Phase ecloser Control Lightweight and flexible recloser control for single-phase applications Plug-and-work operation with popular single-phase reclosers simplifies new and retrofit

More information

Redundant Bus Protection Using High-Impedance Differential Relays. Josh LaBlanc

Redundant Bus Protection Using High-Impedance Differential Relays. Josh LaBlanc Redundant Bus Protection Using High-Impedance Differential Relays Josh LaBlanc Purpose Discuss the configuration of the bus under study, and touch on the needs for redundant protection on the bus. Briefly

More information

Auto-Changeover & Feeder Automation. Reclosers & Sectionalizers

Auto-Changeover & Feeder Automation. Reclosers & Sectionalizers Auto-Changeover & Feeder Automation Reclosers & Sectionalizers WHY AUTOMATE? COMPETITION SERVICE VALUE QUALITY RELIABILITY REGULATION RATES BASED ON RELIABITY & PERFORMANCE PENALTIES REGULATION SAIDI (System

More information

Configuration and Interoperability Guide for IEC for the SEL-751 Feeder Protection Relay. July 10, 2015

Configuration and Interoperability Guide for IEC for the SEL-751 Feeder Protection Relay. July 10, 2015 Configuration and Interoperability Guide for IEC 60870-5-103 for the SEL-751 Feeder Protection Relay July 10, 2015 Contents 1 Interoperability... 3 1.1 Physical Layer... 3 Electrical Interface... 3 Optical

More information

Bus Bar Protection Applications Seminar

Bus Bar Protection Applications Seminar Bus Bar Protection Applications Seminar April 3, 2006 College Station TX ZONE 1 23 24 ZONE 2 1 2 11 12 13 22 ZONE 1 ZONE 2 23 24 1 2 3 21 22 Presentation Outline Introduction to Bus Bar Protection Bus

More information

EE 868: Digital Techniques for Power System Protection. Laboratory Assignment #2 (Feb. 8 (12pm)) Overcurrent Relay Coordination

EE 868: Digital Techniques for Power System Protection. Laboratory Assignment #2 (Feb. 8 (12pm)) Overcurrent Relay Coordination EE 868: Digital Techniques for Power System Protection 1 Objective Laboratory Assignment #2 (Feb. 8 (12pm)) Overcurrent Relay Coordination Rama Gokaraju Department of Electrical & Computer Engineering

More information

Bus Differential and Breaker Failure Relay. Advanced bus protection with built-in breaker failure detection

Bus Differential and Breaker Failure Relay. Advanced bus protection with built-in breaker failure detection SEL-487B Bus Differential and Breaker Failure Relay Advanced bus protection with built-in breaker failure detection Protect busbars with up to 21 terminals using high-speed, low-impedance bus differential

More information

ELG4125: System Protection

ELG4125: System Protection ELG4125: System Protection System Protection Any power system is prone to 'faults', (also called short-circuits), which occur mostly as a result of insulation failure and sometimes due to external causes.

More information

2012 Grid of the Future Symposium. Demonstration of Pulsecloser Applications and Benefits in Ameren s Distribution Automation Program

2012 Grid of the Future Symposium. Demonstration of Pulsecloser Applications and Benefits in Ameren s Distribution Automation Program 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2012 Grid of the Future Symposium Demonstration of Pulsecloser Applications and Benefits in Ameren s Distribution Automation

More information

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9 PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6

More information

PRC Coordination of Protection Systems for Performance During Faults

PRC Coordination of Protection Systems for Performance During Faults PRC-027-1 Coordination of Protection Systems for Performance During Faults A. Introduction 1. Title: Coordination of Protection Systems for Performance During Faults 2. Number: PRC-027-1 3. Purpose: To

More information

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Small Generator Interconnection System Impact Study Report. Completed For Q0047 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection

More information

DTRV-EP. COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS. Application field

DTRV-EP. COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS. Application field DTRV-EP COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS Application field The DTRV type of complex transformer protection is designed to protect 120 kv / medium voltage transformers,

More information

ASPEN Software - Introduction

ASPEN Software - Introduction ASPEN Software - Introduction ASPEN is a very user-friendly software package that is capable of doing load-flow and shortcircuit studies, as well as relay application and coordination. Its simple graphical

More information

FAULT DETECTION ISOLATION AND RESTORATION ON THE FEEDER (FDIR): PICK YOUR TECHNOLOGY

FAULT DETECTION ISOLATION AND RESTORATION ON THE FEEDER (FDIR): PICK YOUR TECHNOLOGY FAULT DETECTION ISOLATION AND RESTORATION ON THE FEEDER (FDIR): PICK YOUR TECHNOLOGY Fahrudin Mekic Ken Alloway Cleber Angelo Robert Goodin ABB Inc. USA ABB Inc. USA ABB Inc. USA ABB Inc. USA fahrudin.mekic@us.abb.com.ken.alloway@us.abb.com

More information

Power System Protection Training

Power System Protection Training Power System Protection Training Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Refresh your knowledge of

More information

SOLKOR-N (7SR18) Feeder Differential Protection. Make the ight choice! Choose EYROLLE Protection

SOLKOR-N (7SR18) Feeder Differential Protection. Make the ight choice! Choose EYROLLE Protection SOLKO-N (7S18) Feeder Differential Protection CLASSIFICATION OF UNIT TYPE POTECTION Summation Transformer, Circulating Current Protection B B 3 1 1 O O 3 1 1 SUMMATION TANSFOME SUMMATION TANSFOME O - Operating

More information

Power System Protection Laboratory Electric Power and Energy Engineering

Power System Protection Laboratory Electric Power and Energy Engineering Experiment no. 5 Overcurrent Protection of Transmission Line Power System Protection Laboratory Electric Power and Energy Engineering Dr. Jamal Thalji Eng. Saddam Ratrout Eng. Mageda El-Moubarak Content

More information

Lecture 5 Substation Automation Systems. Course map

Lecture 5 Substation Automation Systems. Course map Lecture 5 Substation Automation Systems 1 Course map 2 1 Contents of the Lecture Part 1 Substation Automation Components Substation Automation Functions Communication within the Substation (Intro) Part

More information

Substation to substation (ss2ss) GOOSE exchange for critical relay operations

Substation to substation (ss2ss) GOOSE exchange for critical relay operations CIGRÉ Canada 21, rue d Artois, F-75008 PARIS (CIGRE-130) Conference on Power Systems http : //www.cigre.org Vancouver, October 17-19, 2010 Substation to substation (ss2ss) GOOSE exchange for critical relay

More information

International Journal of Engineering Trends and Technology (IJETT) Volume 26 Number 2- August 2015

International Journal of Engineering Trends and Technology (IJETT) Volume 26 Number 2- August 2015 Microprocessor-Based Protective Applications in Nigeria Power System Protections J.O. Aibangbee #1, S.O. Onohaebi *2. # Department of Electrical &Computer Engineering, Bells University of Technology, Ota,

More information

IntelliTeam II Automatic Restoration System

IntelliTeam II Automatic Restoration System No system is too complex to automate with... IntelliTeam II Automatic Restoration System Introduced in 1997, the IntelliTeam Automatic Restoration System was the first product of its kind. Using peer-to-peer

More information

SEL Time-Domain Link (TiDL ) Technology

SEL Time-Domain Link (TiDL ) Technology SEL Time-Domain Link (TiDL ) Technology The simple, fast, and secure digital secondary system solution Increase safety by removing high-energy cables from areas where personnel typically work. Reduce the

More information

Protection, Automation, and Bay Control System. Advanced feeder protection and complete substation bay control in one economical system

Protection, Automation, and Bay Control System. Advanced feeder protection and complete substation bay control in one economical system SEL-451 Protection, Automation, and Bay Control System Advanced feeder protection and complete substation bay control in one economical system Customize distribution protection using multiple instantaneous,

More information

ADVANCED. Protection Co-ordination. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

ADVANCED. Protection Co-ordination. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E ADVANCED Protection Co-ordination H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Distribution Networks are designed to serve loads in a

More information

A low-cost, economical solution for distribution feeder protection

A low-cost, economical solution for distribution feeder protection SEL-351A Protection System A low-cost, economical solution for distribution feeder protection Achieve sensitive and secure fault detection using comprehensive protection functions. Track breaker status

More information

////// SUBSTATIONS. Control command and local Scada

////// SUBSTATIONS. Control command and local Scada ////// SUBSTATIONS Control command and local GENERAL INFORMATION The solution provided by Sécheron for local control and monitoring of traction substations is a significant step in supporting operations

More information

If You Cannot Test It, You Cannot Use It IEC GOOSE System Designed With Testing in Mind

If You Cannot Test It, You Cannot Use It IEC GOOSE System Designed With Testing in Mind If You Cannot Test It, You Cannot Use It IEC 61850 GOOSE System Designed With Testing in Mind Don Burkart, Consolidated Edison of New York William Edwards, Anne Atalay, and Stephen Snuggs, Schweitzer Engineering

More information

To: Honorable Public Utilities Board Submitted by: From: Diosdado Hernandez, P. E. Approved by:

To: Honorable Public Utilities Board Submitted by: From: Diosdado Hernandez, P. E. Approved by: AGENDA ITEM NO.: 4.F.1 ADMINISTRATIVE REPORT NO.: 2018-50 To: Honorable Public Utilities Board Submitted by: /S/ Andre Basler AGM Engineering and Operations From: Diosdado Hernandez, P. E. Approved by:

More information

Exercise 2. Single Bus Scheme EXERCISE OBJECTIVE DISCUSSION OUTLINE. The single bus scheme DISCUSSION

Exercise 2. Single Bus Scheme EXERCISE OBJECTIVE DISCUSSION OUTLINE. The single bus scheme DISCUSSION Exercise 2 Single Bus Scheme EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with electric power substations using the single bus scheme with bus section circuit breakers.

More information

WHAT IS A BUS? FUNDAMENTALS OF BUS PROTECTION. Kevin Wright Senior Protection Engineer Sacramento Municipal Utility District

WHAT IS A BUS? FUNDAMENTALS OF BUS PROTECTION. Kevin Wright Senior Protection Engineer Sacramento Municipal Utility District WHAT IS A BUS? FUNDAMENTALS OF BUS PROTECTION Kevin Wright Senior Protection Engineer Sacramento Municipal Utility District 5 WHAT IS A BUS? All connections are at the same voltage. WHAT IS A BUS? All

More information

Flexible High-Speed Load Shedding Using a Crosspoint Switch

Flexible High-Speed Load Shedding Using a Crosspoint Switch Flexible High-Speed Load Shedding Using a Crosspoint Switch Will Allen and Tony Lee Schweitzer Engineering Laboratories, Inc. Published in Wide-Area Protection and Control Systems: A Collection of Technical

More information

Protection, Automation, and Control System. Combine subcycle line protection with complete substation bay control

Protection, Automation, and Control System. Combine subcycle line protection with complete substation bay control Protection, Automation, and Control System Combine subcycle line protection with complete substation bay control Subcycle distance protection minimizes damage and expensive repairs on transmission lines.

More information

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer ) Revised Generation Interconnection Impact Study Report For Queue Position 31 ( Interconnection Customer ) September 22, 2004 1 Generation Interconnection System Impact Study Report I. Revision of Original

More information

Smart Distribution Technology

Smart Distribution Technology Smart Distribution Technology Presentation Agenda Alabama Power Company, A Southern Company Distribution Automation Supervisory Control And Data Acquisition (SCADA) Multiple Address System (MAS) communications

More information

1 Description of Methodology for Volt / Var Optimization

1 Description of Methodology for Volt / Var Optimization Methodology for Volt / Var Optimization on a Substation Basis May 13th, 2011 Version 1.7 1 Methodology for Volt / Var Optimization (VVO) on a Substation Basis This use case discusses how the utility will

More information

This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB

This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB This webinar brought to you by the Relion product family Advanced protection and control IEDs from ABB Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays are smarter,

More information

DISTRIBUTION FEEDER FAULT ANALYSIS TILLAMOOK PEOPLE S UTILITY DISTRICT

DISTRIBUTION FEEDER FAULT ANALYSIS TILLAMOOK PEOPLE S UTILITY DISTRICT DISTRIBUTION FEEDER FAULT ANALYSIS TILLAMOOK PEOPLE S UTILITY DISTRICT SCADA TO DG SITES DIGESTER MW AND MVAR INSTANTANEOUS READINGS FROM SEL 751 RELAY TRASK SUBSTATION LOADING DO NOT WANT TO FEED INTO

More information

FAST BUS PROTECTION USING IEC Cassandra Ha Goff

FAST BUS PROTECTION USING IEC Cassandra Ha Goff FAST BUS PROTECTION USING IEC 61850 By Cassandra Ha Goff Approved: Ahmed H. Eltom Professor of Electrical Engineering (Chair) Stephen D. Craven Adjunct Professor of Electrical Engineering (Committee Member)

More information

Improving Fault Response with Real-time Fault Location Analysis through Combined Outage and Advanced Distribution Management

Improving Fault Response with Real-time Fault Location Analysis through Combined Outage and Advanced Distribution Management Improving Fault Response with Real-time Fault Location Analysis through Combined Outage and Advanced Distribution Management David Lyons Georgia Power Brad Williams Oracle Kevin Costin - Oracle Southern

More information

SEL Protection and Communications Capabilities Integral to Power System Upgrade at Alberta s Dynamic Northlands Park

SEL Protection and Communications Capabilities Integral to Power System Upgrade at Alberta s Dynamic Northlands Park CASE STUDY Northlands Park Edmonton, Alberta, Canada SEL Protection and Communications Capabilities Integral to Power System Upgrade at Alberta s Dynamic Northlands Park A hub of sports, gaming, business,

More information

Iowa State University

Iowa State University Iowa State University Cyber Security Smart Grid Testbed Senior Design, Final Report Dec 13-11 Derek Reiser Jared Pixley Rick Sutton Faculty Advisor: Professor Manimaran Govindarasu 1 Table of Contents

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

Landsnet-Icegrid. Requirements for protection and control systems. Principles for the Icelandic power transmission network.

Landsnet-Icegrid. Requirements for protection and control systems. Principles for the Icelandic power transmission network. Landsnet-Icegrid Requirements for protection and control systems. Principles for the Icelandic power transmission network. Introduction.... 4 System requirements... 6 Validity:... 6 Requirements for protection:...

More information

Jehanpour Ranjkesh, Integrator Partner Seminar 2012 Station level product news Automation Controller COM600

Jehanpour Ranjkesh, Integrator Partner Seminar 2012 Station level product news Automation Controller COM600 Jehanpour Ranjkesh, Integrator Partner Seminar 2012 Station level product news Automation Controller COM600 Contents COM600 Product Overview Business Overview Product News Overview June 12-14, 2012 Slide

More information

Generation Interconnection Impact Study Report. For. Interconnection Customer Q0022

Generation Interconnection Impact Study Report. For. Interconnection Customer Q0022 Generation Interconnection Impact Study Report For Interconnection Customer Q0022 Prepared by: PacifiCorp Date: 10/29/2003 Generation Interconnection System Impact Study Report Interconnection Customer

More information

Advanced Protection and Control Technologies for T&D Grid Modernization

Advanced Protection and Control Technologies for T&D Grid Modernization Advanced Protection and Control Technologies for T&D Grid Modernization i-pcgrid Workshop San Francisco, CA March 31, 2016 Jeff Shiles, Principal Manager Protection & Automation Engineering Southern California

More information

Advanced distribution feeder solution with integrated protection, monitoring, and control

Advanced distribution feeder solution with integrated protection, monitoring, and control Protection System Advanced distribution feeder solution with integrated protection, monitoring, and control Achieve sensitive and secure fault detection using comprehensive protection functions. Keep track

More information

Simplifying Protection System Design for Distribution Substations

Simplifying Protection System Design for Distribution Substations Rich Hunt - GE Digital Energy, John Coursey, Stephen Hirsch - Orion New Zealand Limited Rich Hunt 903 Haddon Hall Drive Apex, NC 27502 (O) 919 367 7608 (F) 919 882 9962 richard.hunt@ge.com 1. Introduction

More information

Some previous important concepts

Some previous important concepts Almustansorya University College of Education Computer Science Department Communication and Computer Networks Class 4 (A/B) Lesson 6... Network Topology Abstract This lesson will mainly focus on the network

More information

An Application of a Protective Relaying Scheme using the UCA/MMS Standard GER-4007

An Application of a Protective Relaying Scheme using the UCA/MMS Standard GER-4007 An Application of a Protective elaying Scheme using the UCA/MMS Standard GE-4007 New Communications Protocols An Application Of A Protective elaying Scheme Using the UCA/MMS Standard 1 Gustavo Brunello,

More information

Logic Programming for the DPU2000R Feeder Protection Relay

Logic Programming for the DPU2000R Feeder Protection Relay ABB Application Note Substation Automation and Protection Division Logic Programming for the DPU2000R Feeder Protection Relay DPU2000R AN-51D-99 The DPU2000R has extensive logic processing capability that

More information

An Innovative Approach to Implementing SCADA into the Industrial Environment

An Innovative Approach to Implementing SCADA into the Industrial Environment Feature An Innovative Approach to Implementing SCADA into the Industrial Environment by Lynn Hamrick and David Charles ESCO Energy Services ESCO Energy Services Company recently implemented a Supervisory,

More information

IMP/ 001 / 014 Policy for the Protection of Distribution Networks

IMP/ 001 / 014 Policy for the Protection of Distribution Networks Version:- 1.1 Date of Issue:- July 2016 Page 1 of 39 IMP/ 001 / 014 Policy for the Protection of Distribution Networks 1. Purpose The purpose of this document is to detail the network protection philosophy

More information

ANALYSIS OF PROTECTIVE SYSTEM FOR HIGH VOLTAGE LINES USING PROTOCOL IEC 61850

ANALYSIS OF PROTECTIVE SYSTEM FOR HIGH VOLTAGE LINES USING PROTOCOL IEC 61850 Available Online at www.ijcsmc.com International Journal of Computer Science and Mobile Computing A Monthly Journal of Computer Science and Information Technology IJCSMC, Vol. 3, Issue. 5, May 2014, pg.1164

More information

Amsterdam 27 September 2017 David MacDonald

Amsterdam 27 September 2017 David MacDonald Operations & Maintenance facilitating condition based and predictive maintenance to support cost-efficient operation and maximum life-cycle of next generation IEC 61850 systems Amsterdam 27 September 2017

More information

Innovative Distribution Feeder Protection and Control Schemes Using New Capabilities of Microprocessor Relays

Innovative Distribution Feeder Protection and Control Schemes Using New Capabilities of Microprocessor Relays Innovative Distribution Feeder Protection and Control Schemes Using New Capabilities of Microprocessor Relays Mohammad Vaziri PG&E 1. Abstract Farshid Vahedian Brojeni PG&E Eugene Shulman GE Multilin Manish

More information

i-pcgrid Workshop 2014 PG&E Order No. 754 Analysis: Protection

i-pcgrid Workshop 2014 PG&E Order No. 754 Analysis: Protection i-pcgrid Workshop 2014 PG&E Order No. 754 Analysis: Protection 1 Process PG&E Order No. 754 Analysis Receive Bus List from Planning that Meet the Criteria in Table A Protection Computes Actual Clearing

More information

FCIs reduce fault-locating times and improve reliability metrics, especially the Customer Average Interruption Duration Index (CAIDI).

FCIs reduce fault-locating times and improve reliability metrics, especially the Customer Average Interruption Duration Index (CAIDI). 1 Intelligent electronic devices (IEDs) are the preferred choice for modernizing the grid. Communication among networks of robust IEDs designed for protection, control, and monitoring (PCM) of the power

More information

Loop Automation. Technical Manual for the ADVC Controller Range

Loop Automation. Technical Manual for the ADVC Controller Range Loop Automation Technical Manual for the ADVC Controller Range Contents List of Figures 5 List of Tables 7 Acronyms 7 Symbols 7 Introduction 8 About this Manual 8 ADVC Controller Firmware Version 9 WSOS

More information

www. ElectricalPartManuals. com Protective Relays HIGHLIGHTS PROTECTIVE FUNCTIONS ixp-420 Transformer Protection Relay

www. ElectricalPartManuals. com Protective Relays HIGHLIGHTS PROTECTIVE FUNCTIONS ixp-420 Transformer Protection Relay Protective Relays Electrical Apparatus ixp-420 Transformer Protection Relay 165-420 Figure 1: Edison Idea Relay The ixp-420 is a member of Cooper Power Systems Edison Idea line of protective relays. The

More information

Comparing Protective-Relaying Commissioning and Test Philosophies and Methods

Comparing Protective-Relaying Commissioning and Test Philosophies and Methods Comparing Protective-Relaying Commissioning and Test Philosophies and Methods Abstract This paper will discuss the differences in types of testing philosophies, test set units and different automated testing

More information

Entergy Development and Deployment of IEC Protection and Control Including Process Bus

Entergy Development and Deployment of IEC Protection and Control Including Process Bus Entergy Development and Deployment of IEC 61850 Protection and Control Including Process Bus Chan Y. Wong Entergy Transmission Eric A. Udren and Solveig Ward Quanta Technology, LLC Presented at CIGRÉ Grid

More information

FP-5000 Series Multi-functional Microprocessor-based Feeder Protective Relay

FP-5000 Series Multi-functional Microprocessor-based Feeder Protective Relay FP-5000 Series Multi-functional Microprocessor-based Feeder Protective Relay The power of fusion. 1874 1886 1893 1899 1906 1908 1911 1934 1962 1963 1976 1983 1990 1999 There s a certain energy at Eaton.

More information

FP-5000 Feeder Protection

FP-5000 Feeder Protection Effective: April 2001 Page 1 New Information FP-00 Feeder Protection Contents Description Page FP-00 Description......... 2 Application Description...... 2 Features, Functions and Benefits..............

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

Protection relays.

Protection relays. Protection relays www.vamp.fi Vamp Ltd Vamp Ltd, with a strong experience of designing devices, is an independent supplier of relays and monitoring equipment. The company has an established reputation

More information

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10,

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10, Sacramento Municipal Utility District SMUD May 10, 2010 1 SMUD Facts and Figures 900 Sq. Miles Service Area 585,500 Customers 1.4 million Area Population 10 Bulk Substations 473 Miles of Transmission Lines

More information

DIGITAL RELAY OF PROTECTION AND AUTOMATION SERIES PC83 AND PC830

DIGITAL RELAY OF PROTECTION AND AUTOMATION SERIES PC83 AND PC830 DIGITAL RELAY OF PROTECTION AND AUTOMATION SERIES PC83 AND PC830 PC83 and PC830 series devices are designed to perform the relay protection functions and 6-154 kv networks automation, have different functionality

More information

ASPEN Software - Introduction

ASPEN Software - Introduction ASPEN Software - Introduction ASPEN is a very user-friendly software package that is capable of doing load-flow and shortcircuit studies, as well as relay application and coordination. Its simple graphical

More information

Redundant Bus Protection Using High-Impedance Differential Relays

Redundant Bus Protection Using High-Impedance Differential Relays Redundant Bus Protection Using High-Impedance Relays Josh LaBlanc, Schweitzer Engineering Laboratories, Inc. (formerly of Minnesota Power) Michael J. Thompson, Schweitzer Engineering Laboratories, Inc.

More information

This webinar brought to you by the Relion product family

This webinar brought to you by the Relion product family This webinar brought to you by the Relion product family Relion. Thinking beyond the box. Designed to seamlessly consolidate functions, Relion relays are smarter, more flexible and more adaptable. Easy

More information

Smart Grid Protection through Self-Healing

Smart Grid Protection through Self-Healing Smart Grid Protection through Self-Healing Chathurika Chandraratne, R.T. Naayagi, Thillainathan Logenthiran School of Electrical and Electronic Engineering Newcastle University (Singapore) Singapore 567739

More information

Catching Falling Conductors in Midair Detecting and Tripping Broken Distribution Circuit Conductors at Protection Speeds

Catching Falling Conductors in Midair Detecting and Tripping Broken Distribution Circuit Conductors at Protection Speeds Catching Falling Conductors in Midair Detecting and Tripping Broken Distribution Circuit Conductors at rotection Speeds Karl Iliev San Diego Gas & Electric Company Eric Udren Quanta Technology, LLC Copyright

More information

We will discuss two types of loss-of-potential (LOP) logic during this presentation:

We will discuss two types of loss-of-potential (LOP) logic during this presentation: 1 We will discuss two types of loss-of-potential (LOP) logic during this presentation: Traditional LOP, which uses traditional voltage and current elements to detect an LOP condition. Advanced LOP, which

More information

AUTOMATION OF POWER DISTRIBUTION USING SCADA

AUTOMATION OF POWER DISTRIBUTION USING SCADA 1 2 ABSTRACT In every substation certain measurements, supervision, control, operation and protection functions are necessary. Traditionally these functions were performed manually by system operator from

More information