midi LOGGER 900 SERVICE MANUAL GL900-UM-251 GL900-UM
|
|
- Stephanie Caldwell
- 5 years ago
- Views:
Transcription
1 midi LOGGER 900 GL900-UM-251 SERVICE MANUAL GL900-UM
2
3 HISTORY OF REVISIONS No. Date issued Description of revision Page Edition First Printing All 01 GL900-UM i
4 TO ENSURE SAFETY This Service Manual has been compiled for the purpose of facilitating repair and maintenance of the GL900 midi LOGGER by Graphtec service personnel and other persons who have undergone equivalent technical training. Maintenance or repair by unauthorized service personnel is to be strictly avoided. Because the GL900 contains numerous internal components with a high electric potential, such work by unauthorized service personnel could cause human injury or serious damage to the GL900 midi LOGGER. GL900-UM ii
5 CONTENTS 1. CONFIGURATION Model Configuration Accessories and Options UPGRADING THE FIRMWARE How to Upgrade the GL900 Flash ROM from the USB memory device DISASSEMBLY AND REASSEMBLY Notes on Disassembly and Reassembly Removing the Battery Cover Detaching the Terminal Cover Detaching the Terminal Board Disassembling the Front Case Assembly and the Rear Case Assembly Replacing the Main Board Replacing the Control panel board and the Key Pad Replacing the Tilt Foot Assembly Replacing the Front Case Assembly (with LCD) Replacing the Memory Control Board Replacing the AMP Board Replacing the Fan SETUP PROCEDURES Entering the System Setup Menu Performing Setup1 (Voltage Input) Performing Setup2 (Room Temperature Compensation) Necessary setup by the replaced board INSPECTION AND CHECK PROCEDURES Insulation Resistance Preparations for inspections Sampling setting Copy the condition settings file How to load the condition settings file to the GL900 from a USB memory device Voltage Measurement Accuracy Temperature Accuracy PARTS LISTS Recommended Parts List Parts Lists Outer Casing Front Case Parts Rear Case Parts Standard Accessories GL900-UM iii
6 7. Block Diagram Main Unit Power Block & Main Control Main Control Block AMP Block Details of the AMP...7-4
7 1. CONFIGURATION 1. CONFIGURATION 1.1 Model Configuration GL900: 8-channel model with color monitor 1.2 Accessories and Options Unit name Model name Description Logic Alarm Cable B-513 Same as GL450/500/800 DC Power Drive Cable B-514 Same as GL200/450/500/800 Battery Pack B-517 Same as GL200/450/500/800 Humidity Sensor B-530 Same as GL200/450/500/800/MT100 BNC to BNC Cable RIC m BNC to Banana Cable RIC m BNC to Alligator Clip Cable RIC m Thermocouple T type JBS M-T 5 m, 5 thermocouples/set Thermocouple K type JBS M-K 5 m, 5 thermocouples/set Thermocouple K type (Rod-shaped) RIC m Thermocouple K type (For static surface) RIC m Thermocouple K type (L-shaped, for static surface) RIC m GL900-UM
8 GL900-UM CONFIGURATION
9 2. UPGRADING THE FIRMWARE The version of your GL900 s firmware can be upgraded by rewriting the flash ROM on the pertinent circuit boards. You can upgrade the firmware by loading the update program to a USB memory device. 2.1 How to Upgrade the GL900 Flash ROM from the USB memory device Preparations for the upgrade Firmware :Mxxxa001.G90 Main Program file for GL900 :Mxxxa002.G90 Main Program file for GL900 :Mxxxa003.G90 Main Program file for GL900 (1) Connect the AC adapter for the GL900. (2) Turn on the GL900. (3) Copy the two main program files to a USB memory device from the computer. (Copy the two main program files to root directory of a USB memory. Do not copy them to any folder.) How to upgrade (1) Insert the USB memory device containing the main upgrade program into the GL900's USB port. GL900-UM
10 2. UPGRADING THE FIRMWARE (2) Turn on the GL900 to automatically execute the upgrade program. (3) Wait until the display shown below appears or until the beeper sound stops. Note: Don't turn off the GL900 until this process is finished. The following message will appear on the GL900 display in yellow characters when the upgrade is complete. Also the beeper will sound for 5 seconds. Please Turn Off the Power. I have locked up. (4) Turn off the power to the GL900 when the above message is displayed or when the beeper sound stops. (5) Delete the two main program files from a USB memory device. This is to avoid upgrading the firmware by mistake. GL900-UM
11 3. DISASSEMBLY AND REASSEMBLY 3.1 Notes on Disassembly and Reassembly 3. DISASSEMBLY AND REASSEMBLY During disassembly, disconnect the cables from the specified connectors as necessary. During reassembly, double-check to ensure that the proper cables have been correctly re-connected to the pertinent connectors. Some areas of the control panel unit possess a high electrical potential, so exercise caution to avoid an electrical shock. When handling the LCD shield and LCD protective plate, be careful not to leave fingerprints or other marks on them. 3.2 Removing the Battery Cover Detaching (1) Remove the battery cover from the main unit as shown in the picture below. Push here, and detach the battery cover from the main unit. slide the battery cover to the arrow direction to detach it. Battery cover Reattaching (1) Reattach the battery cover in the reverse order in which it was detached. GL900-UM
12 3. DISASSEMBLY AND REASSEMBLY 3.3 Detaching the Terminal Cover Detaching (1) Remove the two M2L6 self-tapping screws holding the terminal cover. (2) Pull up the terminal cover while pushing the area of four hooks. M2L6 self-tapping screw Terminal cover Hook Reattaching (1) Reattach the terminal cover in the reverse order in which it was detached. GL900-UM
13 3. DISASSEMBLY AND REASSEMBLY 3.4 Detaching the Terminal Board Detaching (1) Remove the two M2L6 self-tapping screws holding the terminal board. (2) Pull up the terminal board and detach it. M2L6 self-tapping screw Terminal board Reattaching (1) Reattach the terminal board in the reverse order in which it was detached. GL900-UM
14 3. DISASSEMBLY AND REASSEMBLY 3.5 Disassembling the Front Case Assembly and the Rear Case Assembly Disassembly (1) Remove the battery cover (See Section 3.2). (2) Remove the terminal cover (See Section 3.3). (3) Remove the terminal board (See Section 3.4). (4) Remove the four M2L8 self-tapping screws holding the rear case assembly from the front case assembly. (5) Detach the front case assembly from the rear case assembly. Front case assembly Rear case assembly M2L8 self-tapping screw Re-assembly (1) Re-assemble the front case assembly and rear case assembly in the reverse order in which they were disassembled. GL900-UM
15 3. DISASSEMBLY AND REASSEMBLY 3.6 Replacing the Main Board Disassembly (1) Remove the battery cover (See Section 3.2). (2) Remove the terminal cover (See Section 3.3). (3) Remove the terminal board (See Section 3.4). (4) Disassemble the front case assembly and the rear case assembly (See Section 3.5). (5) Disconnect the LCD flexible cable on the main board. Main board M2L6 self-tapping screw LCD flexible cable J4 (6) Disconnect the cable from J4 on the main board. (7) Remove the two M2L6 self-tapping screws holding the main board. (8) Remove the main board from the front case assembly. Main board Re-assembly (1) Re-assemble the Main board in the reverse order in which it was disassembled. GL900-UM
16 3. DISASSEMBLY AND REASSEMBLY 3.7 Replacing the Control panel board and the Key Pad Disassembly (1) Remove the battery cover (See Section 3.2). (2) Remove the terminal cover (See Section 3.3). (3) Remove the terminal board (See Section 3.4). (4) Disassemble the front case assembly and the rear case assembly (See Section 3.5). (5) Remove the main board (See Section 3.6). (6) Remove the tow M2L6 self-tapping screws holding the LCD bracket. (7) Remove the four M2L6 self-tapping screws holding the control panel and the key pad. (8) Detach the control panel board and the key pad from the front case assembly. Key pad Control panel board Re-assembly M2L6 self-tapping screw LCD bracket Front case assembly (1) Re-assemble the control panel board and the key pad in the reverse order in which they were disassembled. GL900-UM
17 3. DISASSEMBLY AND REASSEMBLY 3.8 Replacing the Tilt Foot Assembly Disassembly (1) Remove the battery cover (See Section 3.2). (2) Remove the terminal cover (See Section 3.3). (3) Remove the terminal board (See Section 3.4). (4) Disassemble the front case assembly and the rear case assembly (See Section 3.5). (5) Remove the main board (See Section 3.6). (6) Detach the tilt foot from the front case assembly. Front case assembly Tilt foot assembly Re-assembly (1) Re-assemble the tilt foot in the reverse order in which it was disassembled. How to install the tilt foot to the front case assembly Tilt foot Insert the tilt foot from the center side. Pull the corner of the front case assembly gently and then insert the right side of the tilt foot to the front case assembly. GL900-UM
18 3. DISASSEMBLY AND REASSEMBLY 3.9 Replacing the Front Case Assembly (with LCD) Disassembly The LCD is assembled to the front case to protect from any dust in between the LCD and the front case. (1) Remove the battery cover (See Section 3.2). (2) Remove the terminal cover (See Section 3.3). (3) Remove the terminal board (See Section 3.4). (4) Disassemble the front case assembly and the rear case assembly (See Section 3.5). (5) Remove the main board (See Section 3.6). (6) Remove the control panel board and the key pad (See Section 3.7). (7) Remove the tilt foot (See Section 3.8). (8) Remove the flexible cable from the LCD. (9) Replace the front case assembly (with LCD). Front case assembly (with LCD) Re-assembly LCD flexible cable (1) Re-assemble the front case assembly (with LCD) in the reverse order in which it was disassembled. GL900-UM
19 3. DISASSEMBLY AND REASSEMBLY 3.10 Replacing the Memory Control Board Disassembly (1) Remove the battery cover (See Section 3.2). (2) Remove the terminal cover (See Section 3.3). (3) Remove the terminal board (See Section 3.4). (4) Disassemble the front case assembly and the rear case assembly (See Section 3.5). (5) Remove the main board (See Section 3.6). (6) Disconnect the cables for fans. (7) Remove the four M2L6 self-tapping screws holding the memory control board. (8) Detach the memory control board from the AMP board. Fan cable Memory control board M2L6 self-tapping screw Rear case assembly AMP board Re-assembly (1) Re-assemble the memory control board in the reverse order in which it was disassembled. GL900-UM
20 3. DISASSEMBLY AND REASSEMBLY 3.11 Replacing the AMP Board Disassembly (1) Remove the battery cover (See Section 3.2). (2) Remove the terminal cover (See Section 3.3). (3) Remove the terminal board (See Section 3.4). (4) Disassemble the front case assembly and the rear case assembly (See Section 3.5). (5) Remove the memory control board (See Section 3.10). (6) Remove the six M2L6 self-tappimg screws holding the AMP board. (7) Detach the AMP board from the rear case assembly. AMP board Rear case assembly M2L6 self-tapping screw (8) Separate the AMP board as shown in the following picture. AMP2 board AMP1 board Shield Sheet Spacer ASB-2007 M2L3 binding head screw Re-assembly (1) Re-assemble the AMP board in the reverse order in which it was disassembled. GL900-UM
21 3. DISASSEMBLY AND REASSEMBLY 3.12 Replacing the Fan Disassembly (1) Remove the battery cover (See Section 3.2). (2) Remove the terminal cover (See Section 3.3). (3) Remove the terminal board (See Section 3.4). (4) Disassemble the front case assembly and the rear case assembly (See Section 3.5). (5) Remove the memory control board (See Section 3.10). (6) Remove the two M2L6 self-tapping screws holding the fan bracket. (7) Detach the fan from the rear case assembly. Fan bracket Fan Rear case assembly M2L6 self-tapping screw Re-assembly (1) Re-assemble the fan in the reverse order in which it was disassembled. GL900-UM
22 4. SETUP PROCEDURES 4. SETUP PROCEDURES 4.1 Entering the System Setup Menu (1) Press the [MENU] key until the OTHR menu shown below appears. (2) Press the [LEFT DOUBLE ARROW Direction] key 10 times in order to display the Setup menu shown below. (3) Move the cursor to the Mode position using the [Direction] keys. (4) Press the [ENTER] key to display the menu from which you can execute the various Setup operations. Setup mode Setup1 (Basic) Setup2 (Room temp.) (5) Select the Setup mode using the [Direction] keys, and then press the [ENTER] key. GL900-UM
23 4. SETUP PROCEDURES (6) Move the cursor to the Execute Setup position as shown below. (7) Press the [ENTER] key to start the selected Setup operation. GL900-UM
24 4. SETUP PROCEDURES 4.2 Performing Setup1 (Voltage Input) This procedure is required when any part of the AMP board is replaced. Preparation Have a voltage generator on hand that can output voltage up to 500 VDC (four-digit output). Mutually connect the ground terminals of the voltage generator and the GL900. Wiring connection Voltage generator V Connect both ends to GND FG Input cable GND Connect to CH1 to CH8 AC adapter Setup procedure (1) As shown in the figure above, connect the output of the voltage generator to the GL900 s CH1 to CH8 input terminals. (2) Leave the GL900 turned on for at least 30 minutes. And leave the GL900 turned on for at least 10 minutes after wiring. GL900-UM
25 4. SETUP PROCEDURES (3) After entering the System Setup mode, open the Setup menu as shown below. Specify the AMP Setup conditions as shown below. Mode :Setup1 (Basic) CH :ALL (4) Move the cursor to the Execute Setup position as shown below. GL900-UM
26 4. SETUP PROCEDURES (5) Press the [ENTER] key to start the Setup1 (Basic) operation. Message (6) The GND : [START] message is displayed at the location shown above. (7) Input 0.000mV to the input terminals of channel 1 to channel 8. (8) Press the [START] key and then wait until the "20 mv : [START]" message appears. Specify the voltage generator's output voltage setting to correspond to one of the displayed voltage ranges in the following table, and then input that voltage to the GL900. Message Input Voltage GND mv 20 mv mv 50 mv mv 100 mv mv 200 mv mv 500 mv mv 1 V V 2 V V 5 V V 10 V V 20 V V 50 V V 100 V V 200 V V 500 V V (9) Repeat step (8) by sequentially setting the Measure parameter to 50 mv, 100 mv, 200 mv, 500 mv, 1 V, 2 V, 5 V, 10 V, 20 V, 50V, 100V, 200V and 500 V, and then inputting the corresponding voltage. GL900-UM
27 4. SETUP PROCEDURES (10) When you have finished the Setup operation for 500 V, the "EEPROM : [ENTER]" message appears. Press the [ENTER] key to begin writing the new Setup data to the EEPROM. Message (11) After the setup parameters have been registered to the EEPROM, the display closes and returns to normal mode. (12) Turn off the GL900. This completes the voltage amp setup. GL900-UM
28 4. SETUP PROCEDURES 4.3 Performing Setup2 (Room Temperature Compensation) Preparation As shown below, use (T: ø0.65 mm) temperature compensation leads to connect the input terminals to the 0 C reference temperature device (Zero controller). Wiring connection Connect the GND terminals. Input 0 V for the output side or short the + and - terminals 0 C reference temperature device (Zero Controller) (K) output side (K) input side (T) compensation lead (T) output side (T) input side Connect (T) compensation lead to the CH1 to CH8 input terminals. AC adapter CAUTION Connect each compensation copper lead to a single terminal as shown in the above diagram (parallel wiring is not permitted). (1) As shown in the figure above, connect the inputs of the zero controller to the GL900 s input terminals. (2) Leave the GL900 turned on for at least 30 minutes. And leave the GL900 turned on for at least 10 minutes after wiring. GL900-UM
29 4. SETUP PROCEDURES (3) After entering the System Setup mode, open the Setup menu as shown below. Specify the AMP Setup conditions as shown below. Mode :Setup2 (Room temp.) CH :ALL (4) Move the cursor to the Execute Setup position as shown below. GL900-UM
30 4. SETUP PROCEDURES (5) Press the [ENTER] key to start the Setup2 (Room temp.) operation. Message (6) The rtemp : [START] message is displayed at the location shown above. (7) Press the [START] key and then wait until the "EEPROM : [ENTER]" message appears. Message (8) Press the [ENTER] key to begin writing the new Setup data to the EEPROM. (9) After the setup parameters have been registered to the EEPROM, the display closes and returns to normal mode. (10) Turn off the GL900. This completes the Room temp. setup. GL900-UM
31 4. SETUP PROCEDURES 4.4 Necessary setup by the replaced board Replaced board Necessary setup Mian Board Not necessary. Memory control board Setup 2 AMP 1 board Setup 1 and Setup 2 AMP 2 board Setup 1 and Setup 2 Terminal board Setup 2 Control panel board Not necessary. GL900-UM
32 5. INSPECTION AND CHECK PROCEDURES 5. INSPECTION AND CHECK PROCEDURES 5.1 Insulation Resistance Use a megohm meter (an insulation resistance gauge) to check that the insulation resistance between the following terminals is equal to or higher than the rated value. Measuring Terminals Rated value Remark Ch1 (-) to GND (FG) Megohm meter with an 1 channel Ch2 (-) to GND (FG) output capacity of channel Ch3 (-) to GND (FG) VDC, insulation resistance 3 channel Ch4 (-) to GND (FG) 4 channel is 50 M ohm or more. Ch5 (-) to GND (FG) 5 channel Ch6 (-) to GND (FG) 6 channel Ch7 (-) to GND (FG) 7 channel Ch8 (-) to GND (FG) 8 channel Wiring connection CH1(-) CH2(-) CH3(-) CH4(-) CH5(-) CH6(-) CH7(-) CH8(-) 500 V megohm meter GL900-UM
33 5. INSPECTION AND CHECK PROCEDURES 5.2 Preparations for inspections Sampling setting (1) Set the Sampling setting of the GL900 to at least 1 sec or longer Copy the condition settings file Condition settings files :GL9CondV.CND Condition settings for measurement accuracy :GL9CondT.CND Condition settings for T range accuracy :GL9CondK.CND Condition settings for K range accuracy (1) Copy the condition settings file to a USB memory device from the computer How to load the condition settings file to the GL900 from a USB memory device (1) Connect the USB memory device to the GL900. GL900-UM
34 5. INSPECTION AND CHECK PROCEDURES (2) Press the [FILE] key to display the menu below. (3) Move the cursor to the Load position using the [Direction] keys. (4) Press the [ENTER] key to display the menu below. (5) Move the cursor to the File Name position using the [Direction] keys. GL900-UM
35 5. INSPECTION AND CHECK PROCEDURES (6) Press the [ENTER] key to display the menu shown below. (7) Move the cursor to the USB device position using the [Direction] keys. (8) Press the [ENTER] key to display the menu shown below. (9) Specify the condition settings file to execute the various inspection operations. GL900-UM
36 5. INSPECTION AND CHECK PROCEDURES (10) Move the cursor to the OK position using the [Direction] keys. (11) Press the [ENTER] key to load the condition settings file. GL900-UM
37 5. INSPECTION AND CHECK PROCEDURES 5.2 Voltage Measurement Accuracy Supply the reference voltage or frequency determined for each measurement range, and then check the voltage accuracy. Preparation Have a voltage generator on hand that can output voltage up to 500 VDC (using four-digit output). Mutually connect the ground terminals of the voltage generator and the GL900 prior to initiating measurement. Set the Sampling setting of the GL900 to at least 1 sec or longer. Wiring connection Same wiring connection as Setup1. (See Setup1 procedure) Setting procedure (1) Load the condition settings file "GL9CondV.CND" from the USB memory device. Measurement procedure (1) Press the [MENU] key to display the menu shown below. (2) Move the cursor to the Range position of All channels. (3) Press the [ENTER] key to display the menu shown below, and then select the reference voltage range. GL900-UM
38 5. INSPECTION AND CHECK PROCEDURES (4) Input the reference voltage for each range according to the table below, and then check that the level of measurement is within the rating. Voltage precision ratings Range Input voltage Factory Rating (±0.2%) Product Rating (±0.25%) 20 mv mv mv to mv mv to mv 50 mv mv mv to mv mv to mv 100 mv mv mv to mv mv to mv 200 mv mv mv to mv mv to mv 500 mv mv mv to mv mv to mv 1 V V V to V V to V 2 V V V to V V to V 5 V V V to V V to V 10 V V V to V V to V 20 V V V to V V to V 50 V V V to V V to V 100 V V V to V V to V 200 V V V to V V to V 500 V V V to V V to V (5) Press the [DISPLAY] key until the menu shown below appears. (6) Press the [START/STOP] key when the input voltage stabilizes. (7) Wait until the "Int RAM Replaying" message is displayed, and then display the values as shown below. Message GL900-UM
39 5. INSPECTION AND CHECK PROCEDURES (8) Press the [Menu] key to display the menu shown below. (9) Move the cursor to the function and select the Average. (10) Move the cursor to the Execute, and then press the ENTER key. GL900-UM
40 5. INSPECTION AND CHECK PROCEDURES (11) The average of the value will be displayed as shown below. Confirm that this value is within the above ratings after data has been captured. Confirm that this value is within the above ratings after data has been captured. (12) Repeat steps (1) to (11), and then confirm that each value is within the above ratings. GL900-UM
41 5. INSPECTION AND CHECK PROCEDURES 5.3 Temperature Accuracy Preparation Use (T) and (K) temperature compensation leads to connect a 0 C reference temperature device (zero controller) to the GL900 input terminals. Set the Sampling setting of the GL900 to at least 1 sec or longer. Wiring connection Same wiring connection as Setup2. (See Setup2 procedure) Setting procedure (1) Load the condition settings file GL9CondT.CND for T type temperature from the USB memory device. Or (1) Load the condition settings file GL9CondK.CND for K type temperature from the USB memory device. Measurement procedure (temperature accuracy) (1) Short the input reference voltage signal for the 0 C reference temperature device (zero controller) according to the table below, then check that the level of measurement is within the rating. Input voltage precision ratings (Type T) Temperature Input voltage Factory Rating Product Rating 0 C mv -2.0 C to +2.0 C -2.5 C to +2.5 C Input voltage precision ratings (Type K) Temperature Input voltage Factory Rating Product Rating 0 C mv -2.5 C to +2.5 C -3.0 C to +3.0 C (2) Press the [DISPLAY] key until the menu shown below appears. (3) Press the [START/STOP] key to measure the temperature. GL900-UM
42 5. INSPECTION AND CHECK PROCEDURES (4) Wait until the "Int RAM Replaying" message is displayed, and then display the values as shown below. Message (5) Press the [Menu] key to display the menu shown below. (6) Move the cursor to the function and select the Average. GL900-UM
43 5. INSPECTION AND CHECK PROCEDURES (9) Move the cursor to the Execute, and then press the ENTER key. (10) The average of the value will be displayed as shown below. Confirm that this value is within the above ratings after data has been captured. Confirm that this value is within the above ratings after data has been captured. (11) Check that the level of measurement is within above rating. GL900-UM
44 GL900-UM INSPECTION AND CHECK PROCEDURES
45 6. PARTS LISTS 6. PARTS LISTS 6.1 Recommended Parts List No. Part No. Part Name Description Q'ty Remarks Main Board for GL Memory Control Board for GL AMP 1 Board for GL AMP 2 Board for GL Terminal Board for GL900 1 GL900-UM
46 6. PARTS LISTS 6.2 Parts Lists Outer Casing No. Part No. Part Name Description Q'ty Remarks Battery Cover Terminal Cover Terminal Board Rear Case Assy 1 Outer Casing GL900-UM
47 6. PARTS LISTS Front Case Parts No. Part No. Part Name Description Q'ty Remarks Main Board for GL Tilt Foot Assembly Front Case Assembly Key Pad Control Panel Board 1 Same as GL Bracket, LCD Flexible Cable, LCD RN A 1 Same as GL800 Front Case Parts Replaceable parts for the main board No. Part No. Part Name Description Q'ty Remarks USB Type A Connector, XM7A-0442 J7: USB Connector USB Type B Connector, XM7B-0442 J8: USB Connector LAN Connector, TM11R-5M2-88-LP J9: LAN Connector Backup Battery, ML2130-TT2 BAT1: Backup Battery 1 GL900-UM
48 6. PARTS LISTS Rear Case Parts No. Part No. Part Name Description Q'ty Remarks Rear Case Assembly Memory Control Board AMP Board 1 Assembly PCB AMP Board 2 Assembly PCB Shield Sheet Spacer, ASB-2007E Fan Assembly Bracket, Fan 2 Rear Case Parts Standard Accessories No. Part No. Part Name Description Q'ty Remarks GL900-CDM01M CD Manual, Software GL900-UM-851 Quick Start Manual 1 English GL900-UM-801 Quick Start Manual 1 Japanese AC Adapter, JP KSAH T1M2, JP 1 Japanese AC Adapter, UL KSAH T1M2, UL 1 UL AC Adapter, CEE KSAH T1M2, CEE 1 CEE AC Adapter, BS KSAH T1M2, BS 1 BS AC Adapter, CCC KSAH T1M2, CCC 1 CCC GL900-UM
49 7. BLOCK DIAGRAM 7. Block Diagram 7.1 Main Unit Power Block & Main Control 1. 2 Main Unit Power Block & Main Control Block (No.1) Secondary circuit Primary circuit AC IN AC Adapter KSAH T1M2 NOTE ISOLATION ISOLATION Primary circuit Secondary circuit Signal input circuit Connector to Connector J12 POWER SW SW1 To mini DC FAN 1 J208 To mini DC FAN 2 J211 To Humidity Sensor J203 J206 J2 J5 J4 J8 J7 AMP-2 Board (RN *) J6 J9 J4 Main Control Board (RN *) J10 J204 Mmory Control Board (RN *) J205 J1 J202 J402 J203 J403 J3 J207 J3 J502 J503 J702 J703 BL LCD J5 J301 J209 To Battery 1 J210 To Battery 2 AMP-1 Board (RN *) J101 J201 J301 J517 J518 J519 LCD KEY Board (RN *) J401 J901 J501 J520 J525 J521 TERMINAL Board (RN *) J601 J522 J701 J523 J801 J524 GL900-UM
50 7. BLOCK DIAGRAM 7.2 Main Control Block Main Control Block (No.2) BAT1 Battery of clock USB (to FLASH MEMORY) J7 USB (to PC) J6 Main Control Board (RN *) LAN J8 J10 Logic&Alarm&Pulse&Ext-Trig J204 J202 Memory Control Board (RN *) J203 Humidity Sensor GL900-UM
51 7. BLOCK DIAGRAM 7.3 AMP Block AMP Block(No.1) 1ch 8ch J509 J501 J515 J BNC BNC Signal Input circuit Terminal Board (RN *) J517 J518 J519 J520 J521 J522 J523 J524 J101 J201 J301 J401 J501 J601 J701 J801 Signal Input circuit Signal Input circuit Signal Input circuit Signal Input circuit Signal Input circuit Signal Input circuit Signal Input circuit Signal Input circuit Secondary circuit Amp Board (RN *) J2 J1 J3 J206 J205 J207 To Main Control (RN *) J10 J204 Secondary circuit Memory Control Board (RN *) GL900-UM
52 7. BLOCK DIAGRAM 7.3 Details of the AMP Detailes of AMP Block Signal Input circuit Terminal Board (RN *) Signal Input BNC + - Temperature Sensor AMP Board (RN *) RELAY Attenuator Selector AMP Selector Filter AMP A/D Isolating i Coupler ADuM1301BRWZ Photo Coupler TLP181-BL DC±5V DC/DC AIC1660CS Secondary circuit Secondary circuit Memory Control Board (RN *) Main Control Board (RN *) FPGA CPU DC/DC DCP010505BP-U AMP A/D DC+24V AC Adaptor GL900-UM
midi LOGGER 820 GL820-UM-251
midi LOGGER 820 GL820-UM-251 SERVICE MANUAL GL820-UM-251-02-9370 HISTORY OF REVISIONS No. Date issued Description of revision Page Edition 1 10.02.18 First Printing All 01 2 10.04.06 The size of screws
More informationmidi LOGGER 220 GL220-UM-251
midi LOGGER 220 GL220-UM-251 SERVICE MANUAL GL220-UM-251-03-9370 HISTORY OF REVISIONS No. Date issued Description of revision Page Edition 1 10.03.29 First Printing All 01 2 10.04.16 The size of screws
More informationmidi LOGGER 200 SERVICE MANUAL GL200-UM-251 GL200-UM
midi LOGGER 200 GL200-UM-251 SERVICE MANUAL GL200-UM-251-03-9370 HISTORY OF REVISIONS No. Date issued Description of revision Page Edition 1 06.02.14 First Printing All 01 2 06.03.29 Information for the
More informationmidi LOGGER GL240 Quick Start Guide GL240-UM-852
midi LOGGER GL240 Quick Start Guide 604249022 GL240-UM-852 Thank you for choosing Graphtec midi LOGGER GL240. The Quick Start Guide is to assist with the basic operations. Please refer to the USER'S MANUAL
More informationAfter unpacking, check the GL820's Exterior to make sure that there are crack or other damage before use.
PRESSURE LOAD TORQUE POSITION ROTARY ANGLE TILT ACCELERATION VIBRATION RATE SIGNAL CONDITIONER DATALOGGER midi LOGGER GL820 Quick Start Guide GL820-UM-851 Thank you for choose the midi LOGGER GL820. This
More informationmidi LOGGER GL240 Quick Start Guide GL240-UM-850
midi LOGGER GL240 Quick Start Guide 604249020 GL240-UM-850 Thank you for choose the midi LOGGER GL240. This Quick Start Guide describes the basic operations. Please refer to the manual (PDF) in the CD-ROM
More informationmidi LOGGER GL840 Quick Start Guide GL840-UM-850
midi LOGGER GL840 Quick Start Guide 604849020 GL840-UM-850 Thank you for choose the midi LOGGER GL840. This Quick Start Guide describes the basic operations. Please refer to the manual (PDF) in the CD-ROM
More informationWARNING: Do not use the thermometer/data logger before you read the users manual and the following instructions.
55 This unit passes the following tests EN 61326-1:2006 (CISPR11,IEC/EN 61000-3-2:2006, IEC/EN 61000-3-3: 1995+A1 :2001+A2:2005 IEC/EN 61000-4-2/-3/-5/-6/-11) WARNING: Do not use the thermometer/data logger
More informationmidi LOGGER HV GL2000 Quick Start Guide GL2000-UM-851
midi LOGGER HV GL2000 Quick Start Guide 604929220 GL2000-UM-851 Thank you for choose the midi LOGGER HV GL2000. This Quick Start Guide describes the basic operations. Please refer to the manual (PDF) in
More informationFIELD REPLACEABLE UNIT DOCUMENTATION. Satellite TM. A20 Series GENERAL INFORMATION. Tools Required for Proper Disassembly and Reassembly:
GENERAL INFORMATION Tools Required for Proper Disassembly and Reassembly: 1. Phillips Screwdriver (Size 0&1) 2. 4mm Flat head Screwdriver 3. Case Separator 4. ESD Wrist Strap 5. ESD mats 6. Tweezers Before
More informationHandy type 10-channel logger midi LOGGER GL200A Sales Manual GRAPHTEC
Handy type 10-channel logger midi LOGGER GL200A Sales Manual GRAPHTEC The midi LOGGER GL200 has evolved 10 channels compact data logger No only for temperature but also for voltage fluctuation measurement
More informationFIELD REPLACEABLE UNIT DOCUMENTATION
Satellite TM 1700 Series GENERAL INFORMATION Tools Required for Proper Disassembly and Reassembly: 1. Phillips Screwdriver (Size 1) 2. Flat head screwdriver (5mm) 3. Hex driver (5mm) 4. Case Separator
More informationHITACHI. EH-150 series PLC EH-RTD8 Resistance Temperature Detective input module Instruction manual. Safety precautions
HITACHI EH-150 series PLC Resistance Temperature Detective input module Instruction manual Thank you for purchasing a Hitachi Programmable Logic Controller. To operate it safely, please read this instruction
More informationH Series PLC. ! : Indicates Compulsion. EH-150 Analog input module EH-AXH8M Instruction manual. Safety precautions DANGER CAUTION COMPULSION
H Series PLC EH-150 Analog input module EH-AXH8M Instruction manual Thank you for purchasing a Hitachi Programmable Logic Controller. To operate it safely, please read this instruction manual and all the
More informationSP-100. Service Manual Aug. 02
SP-100 Service 2004. Aug. 02 1. Caution for maintenance and Service. Please take care below points when you do Service and Maintenance. (1) Service and Maintenance should be done under safety condition.
More informationRhino Buffer Module PSM24-BFM600S. Operating Instructions
Rhino Buffer Module PSM24-BFM600S Operating Instructions RHINO BUFFER MODULE PSM24-BFM600S Description The PSM24-BFM600S Buffer Module will hold the output voltage of a 24 VDC power supply after brownouts
More informationWEASEL N/B MAINTENANCE
2. System Assembly & Disassembly 2.1 System View 2.1.1 Front View ❶ Microphone Connector ❷ Audio Input Connector ❸ Audio Output Connector ❹ Top Cover Latch ❹ ❶ ❸ ❷ 2.1.2 Left-Side View ❶ VGA Port ❷ S-Video
More information99 Washington Street Melrose, MA Phone Toll Free Visit us at
99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.testequipmentdepot.com Table of Contents 1. General Safety Requirements... 1 2. Safety Terms and Symbols...
More informationGL820 midi Logger. Wide Sample Interval Selections Sample intervals can be programmed to be one of sixteen values ranging from 10 ms to one hour.
GL820 midi Logger Built-in 5.7" TFT LCD Color Display Stand-alone or PCconnected operation 20 Analog Channels Standard, Expandable to 200 Input-to-output and channel-to-channel Isolation USB and Ethernet
More informationRS Stock No Instruction Manual RS Input Data Logging Thermometer
RS Stock No. 730-0458 Instruction Manual RS-1384 4 Input Data Logging Thermometer EN FR IT DE ES TABLE OF CONTENTS / EN TITLE TABLE OF CONTENTS PAGE 1. INTRODUCTION FEATURE... 1 2. SPECIFICATIONS... 2
More information3700 SERIES USER MANUAL
SAFETY GUIDE This manual contains the precautions necessary to ensure your personal safety as well as for protection for the products and the connected equipment. These precautions are highlighted with
More informationLe Disassembly. Required Tools Disassembly Instructions Reassembly Instructions
Le Div@ Disassembly Required Tools Disassembly Instructions Reassembly Instructions Required Tools All Le Div@ maintenance procedures can be performed using the following tools: Tweezers Small flat-head
More informationHAKKO FG-101 Calibration Instructions Revision
HAKKO FG-101 Calibration Instructions Revision 2013-10 Tools Required: Room Temperature Thermometer Yokogawa CA-71 Portable Calibrator or equivalent Yokogawa 2786 Decade Resistance Box or equivalent Fluke
More informationMini Digital Multimeter
User's Guide Mini Digital Multimeter Model MN15 99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.testequipmentdepot.com Back to the Extech MN15/MN16 Series
More informationGL200A midi Logger. Wide Sample Interval Selections Sample intervals can be programmed to be one of sixteen values ranging from 100 ms to one hour.
GL200A midi Logger Built-in 3.5" TFT LCD Color Display Stand-alone or PCconnected operation 10 Analog Channels Input-to-output & channel-to-channel Isolation USB PC Interface With its color monitor and
More informationData Platform GL7000
Data Platform GL7000 Datasheet GL7000 Modular Data Platform Measurement ranges: ±20 mv... ±100 V, thermocouples, Pt100, JPt100, Pt1000, humidity, strain gauge, vibration sensors Measurement channels: up
More informationEltek TU GenII AQ110A comprehensive portable air quality monitor transmitter
Eltek TU1082 - GenII AQ110A comprehensive portable air quality monitor transmitter AQ110A (serial number 32655 onward) is part of the Eltek GenII family of transmitters and can be used alongside any other
More informationCRAGG RAILCHARGER Instruction Manual for 10DTC-12V 20DTC-12V 30DTC-24V 40DTC-12V 60DTC-12V
CRAGG RAILCHARGER for 10DTC-12V 20DTC-12V 30DTC-24V 40DTC-12V 60DTC-12V Contents 1 Warnings, Cautions, and Notes... 1 2 Description... 2 3 Features... 2 3.1 STANDARD FEATURES... 2 3.2 CHARGER REGULATION...
More informationExpanding the Basic GL7000 Configuration
Test Equipment Depot - 800.517.8431-99 Washington Street Melrose, MA 02176 - TestEquipmentDepot.com Expanding the Basic GL7000 Configuration The GL7000 is a modular system that allows you to add analog
More informationMini Digital Multimeter
User Manual Mini Digital Multimeter Model MN15A Additional User Manual Translations available at www.extech.com Introduction Congratulations on your purchase of the Extech MN15A MultiMeter. The MN15A offers
More informationDruck DPI 620 advanced modular calibrator
GE Sensing & Inspection Technologies A1.1 DPI 620: Channel 1 (CH1) Druck DPI 620 advanced modular calibrator safety and quick reference guide - K0454 Measure (M) / Source (S) / Power (P) a ±30 V (M) b
More informationUser's Guide. MiniTec TM Series Model MN25 MultiMeter
User's Guide MiniTec TM Series Model MN25 MultiMeter Warranty EXTECH INSTRUMENTS CORPORATION warrants this instrument to be free of defects in parts and workmanship for one year from date of shipment (a
More informationMini Digital Multimeter
User's Guide Mini Digital Multimeter Model MN15 Introduction Congratulations on your purchase of the Extech MN15 MultiMeter. The MN15 offers AC/DC Voltage, AC/DC Current, Resistance, Diode, and Continuity
More informationModel (DRS-54V) Ver. 2.0 August. Dongah Rectifier System Operating Manual
2011 Model (DRS-54V) Ver. 2.0 August DRS-54V Dongah Rectifier System AC 240V 1Phase 3WIRE Input -54VDC Output 55A per Shelf 18.5Amps per Module DONGAHELECOMM.LTD _ Proprietary This document contains proprietary
More informationR1M-GH BEFORE USE... POINTS OF CAUTION INSTRUCTION MANUAL PC RECORDER MODEL. (thermocouple or DC input, 16 points)
INSTRUCTION MANUAL PC RECORDER (thermocouple or DC input, points) MODEL RM-GH BEFORE USE... Thank you for choosing M-System. Before use, please check contents of the package you received as outlined below.
More informationIDEAL INDUSTRIES INC. TECHNICAL MANUAL MODEL:
IDEAL INDUSTRIES INC. TECHNICAL MANUAL MODEL: 61-795 The Service Information provides the following: Precautions and safety information Specifications Performance test procedure Calibration and calibration
More informationR1M-GH BEFORE USE... POINTS OF CAUTION INSTRUCTION MANUAL PC RECORDER MODEL. (thermocouple or DC input, 16 points)
INSTRUCTION MANUAL PC RECORDER (thermocouple or DC input, points) MODEL BEFORE USE... Thank you for choosing M-System. Before use, please check contents of the package you received as outlined below. If
More informationGL900 USER S MANUAL MANUAL NO. GL900-UM-151
GL900 USER S MANUAL MANUAL NO. GL900-UM-151 Introduction Introduction Thank you for purchasing the GL900 midi LOGGER. Please read this manual thoroughly before attempting to use your new product to ensure
More informationDelta T Dew Heater for CDK
Delta T Dew Heater for CDK Delta T Dew Heater for CDK12.5 (125902) Your CDK 12.5 Delta T Dew Heater includes the following: QTY 1 Delta T control box w/ mounting bracket attached 1 2.5Amp AC adapter 2
More informationRhino Redundancy Module PSM24-REM360S. Operating Instructions
Rhino Redundancy Module PSM4-REM360S Operating Instructions RHINO REDUNDANCY MODULE PSM4-REM360S Description With this module and two power supplies of the PSM series (78, 90, 56, 80 and 360 watt models),
More informationW Warning To avoid electrical shock, remove test leads and any input signals from the Model 707 Loop Calibrator before opening the case.
Model 707 Loop Calibrator W Warning To avoid electrical shock, remove test leads and any input signals from the Model 707 Loop Calibrator before opening the case. WCaution The Model 707 Loop Calibrator
More informationSTYLITIS-POWER OPERATOR S GUIDE
STYLITIS-POWER OPERATOR S GUIDE Copyright 2008-2016, SYMMETRON Electronic Applications. Second edition in English. April 2016. No part of this publication may be reproduced, stored in retrieval system,
More information4 10/100/1000T Mini-GBIC with 4 IEEE 802.3at High Power PoE Industrial Wide Temperature Switch. User Manual SISTP LRT
4 10/100/1000T + 2 1000 Mini-GBIC with 4 IEEE 802.3at High Power PoE Industrial Wide Temperature Switch User Manual V1.0 September-2013 FCC Warning This Equipment has been tested and found to comply with
More informationDIGITAL MULTIMETER 4 1/2 digits, True RMS Model : DM-9027T
DIGITAL MULTIMETER 4 1/2 digits, True RMS Model : DM-9027T Caution Symbol Caution : * Risk of electric shock! Caution : * Do not apply the overload voltage, current to the input terminal! * Remove test
More informationMini Digital Multimeter Model MN15. User's Guide
Mini Digital Multimeter Model MN15 User's Guide Introduction Congratulations on your purchase of the Extech MN15 MultiMeter. The MN15 offers AC/DC Voltage, AC/DC Current, Resistance, Diode, and Continuity
More informationS-14 S-14. Compact Digital Multimeter. Compact Digital Multimeter
S-14 Compact Digital Multimeter S-14 Compact Digital Multimeter SAFETY INFORMATION The following safety information must be observed to insure maximum personal safety during the operation at this meter
More informationGL980 USER S MANUAL MANUAL NO.GL980-UM-151
GL980 USER S MANUAL MANUAL NO.GL980-UM-151 To Ensure Safe and Correct Use To Ensure Safe and Correct Use To ensure safe and correct use of this device, read this manual thoroughly before use. After having
More informationOPERATING INSTRUCTION
OPERATING INSTRUCTION AUTORANGING MULTIMETER MAX Ω F C 10A MAX every 15 min. COM V SAFETY INFORMATION The following safety information must be observed to insure maximum personal safety during the operation
More informationActive UTP Transceiver Hub with Integral Isolated Camera Power
Active UTP Transceiver Hub with Integral Isolated Installation Guide HubWayEX16SP - UL Listed sixteen (16) Channel Active UTP Transceiver Hub with Integral Isolated Rev. 011810 More than just power. TM
More informationEPS 06 in rear housing type A1
Field Installation and / or Replacement of RACO Electronic Position Sensor Board EPS 02 & EPS 06 - Electronic Limit Switches - Analog Output Position Signal - Very Accurate - Easy To Use - Robust - Dependable
More informationGL220 midi Logger. Wide Sample Interval Selections Sample intervals can be programmed to be one of sixteen values ranging from 10 ms to one hour.
GL220 midi Logger Built-in 4.3" WQVGA TFT LCD Color Display Stand-alone or PCconnected operation 10 Analog Channels Input-to-output & channel-to-channel Isolation USB PC Interface With its color monitor
More informationTable of Contents. 3.1 Front/Rear Panel and User Interface Front Panel Rear Panel User Interface...
General Warranty OWON warrants that the product will be free from defects in materials and workmanship for a period of 2 years (1 year for accessories) from the date of purchase of the product by the original
More informationAvailable for low voltage and high current High slew rate with 100A/μs
Low voltage input and high slew rate electronic load Available for low voltage and high current High slew rate with 100A/μs Low voltage input and high slew rate electronic load Kenwood TMI Corporation
More informationPanasonic. DVD/DVC Camera Seminar VDR-D100/200/300 and PV-GS29/39
Panasonic DVD/DVC Camera Seminar VDR-D100/200/300 and PV-GS29/39 Features (VDR-D100~300) DVD Multi DVD-RAM/R/-RW DSC Feature (Disc & SD Card) One Touch Navigation & Joystick Built in Video Light (D105&D200
More informationTSP-BCM48, TSP-BCM48A. Operating Instruction Manual. Page 1 of 13
Battery Controller Module TSP-BCM24, TSP-BCM24A TSP-BCM48, TSP-BCM48A Operating Instruction Manual http://www.tracopower.com Page 1 of 13 Dimensions drawings: TSP-BCM24 & TSP-BCM48 Weight: 0.816lb Gewicht:
More informationDIGITAL INPUT/OUTPUT RELAY INTERFACE BMS-IFDD01E
INSTALLATION MANUAL DIGITAL INPUT/OUTPUT RELAY INTERFACE BMS-IFDD01E Thank you very much for purchasing this TOSHIBA Digital Input/Output Relay Interface. Please read this manual carefully beforehand for
More information4CH Real Time DVR. User Guide INFORMATION MAY CHANGE WITHOUT NOTICE. Digital Video Recorder
User Guide INFORMATION MAY CHANGE WITHOUT NOTICE. Table of Contents Caution... 4 Package Contents... 4 Introduction... 5 1. Product Overview...5 2. Front Panel...5 3. Rear Panel...6 4. IR Remote Controller
More informationUser's Guide Video Borescope Model BR200
User's Guide Video Borescope Model BR200 Introduction Congratulations on your purchase of this Extech BR200 Video Borescope. This instrument was designed for use as a remote inspection device. It can be
More informationIntroduction. Chapter 2
The Vantage PRO unit (Figure 2-1) combines a digital and graphing multimeter, lab scope and ignition scope with a powerful diagnostic database. Figure 2-1 Vantage PRO This diagnostic database gives you
More informationSatellite Pro TM Series GENERAL INFORMATION. Disassembly and Reassembly:
GENERAL INFORMATION Disassembly and Reassembly: 1. Phillips Screwdriver (Size 0&1) 2. Flat head Screwdriver 3. Case Separator 4. ESD Wrist Strap 5. ESD mats 6. Tweezers Before attempting any of the following
More information4.1 General. 4 Replacement Procedures
4.1 General This chapter explains how to disassemble the computer and replace Field Replaceable Units (FRUs). It may not be necessary to remove all the FRUs in order to replace one. The chart below is
More informationGL2000 USER S MANUAL
GL2000 USER S MANUAL MANUAL NO.GL2000-UM-151 To Ensure Safe and Correct Use To Ensure Safe and Correct Use To ensure safe and correct use of this device, read this manual thoroughly before use. After
More informationPlasma Panel Replacement Guide DU-42PX12X
Plasma Panel Replacement Guide DU-42PX12X Panel Replacement: At this point, the panel has been determined to be defective and replacement is necessary. Upon receiving the replacement panel, it must be
More informationPLCMTR Commercial Grade Camera System
Please read instructions carefully before installation and use. Installation should be performed by a professional installer. To ensure your safety, the driver should not watch videos or operate features
More informationSECURITEST USER S MANUAL TABLE OF CONTENTS SAFETY PRECAUTIONS SAFETY INFORMATION... 2 WARNINGS... 28
SECURITEST USER S MANUAL TABLE OF CONTENTS SAFETY PRECAUTIONS...... 1 1. SAFETY INFORMATION...... 2 WARNINGS...... 2 SAFETY INFORMATION..... 3 BATTERY PRECAUTIONS...... 5 2. INTRODUCTION...... 7 FEATURES......
More informationRS Stock No Instruction Manual RS Input Data Logging Thermometer
RS Stock No. 730-0458 Instruction Manual RS-1384 4 Input Data Logging Thermometer EN FR IT DE ES TABLE OF CONTENTS / EN TITLE TABLE OF CONTENTS PAGE 1. INTRODUCTION FEATURE... 1 2. SPECIFICATIONS... 2
More informationMYRIAD QLC 4-CHANNEL MONITOR/CONTROLLER INSTRUCTION MANUAL
MYRIAD QLC 4-CHANNEL MONITOR/CONTROLLER INSTRUCTION MANUAL VISIT OUR WEBSITE SIGMACONTROLS.COM MYR QLC MANUAL 013114 2 TABLE OF CONTENTS INTRODUCTION 3 Ordering Information Specifications Features WIRING
More informationExpansion Module HZS 541-1S
Expansion Module HZS 541-1S 12.10.2015 Page 1 System Description The external HZS 541-1S expansion module provides users of biomass heating systems with additional 230 V AC relay outputs, analog inputs
More informationInstallation Manual. 65 Interactive LED/LCD. Model: HILF65101 (64.56 )
Installation Manual 65 (64.56 ) Model: HILF65101 65 Interactive LED/LCD QUICK SETUP GUIDE For further information, see the user manual. Please contact directly if you have questions on the use of the touch
More informationUser's Guide. 800 Amp Clamp Meters. EX710 AC Clamp meter EX720 True RMS AC Clamp meter EX730 AC/DC True RMS Clamp meter
User's Guide 800 Amp Clamp Meters EX710 AC Clamp meter EX720 True RMS AC Clamp meter EX730 AC/DC True RMS Clamp meter Introduction Congratulations on your purchase of the EX710, EX720, or EX730 Clamp DMM.
More informationOPERATING PROCEDURES for the UPS-S2 Universal Power Supply Series 2
OPERATING PROCEDURES for the Universal Power Supply Series 2 Vanguard Instruments Co., Inc. 1520 S. Hellman Ave. Ontario, California 91761 TEL: 909-923-9390 November 2013 FAX: 909-923-9391 REV. 2 SAFETY
More informationGuangdong Be-tech Security Systems Limited. Elevator Control Manual Instruction. Version 2013 Page1 total 22
Elevator Control Manual Instruction Version 2013 Page1 total 22 Content Guangdong Be-tech Security Systems Limited 1. Unit Dimensions... 3 1.1. Card reader board... 3 1.2. Relay board... 3 1.3. Relay box
More informationCM-220 True RMS AC CLAMP METER INSTRUCTION MANUAL
CM-220 True RMS AC CLAMP METER INSTRUCTION MANUAL Safety International Safety Symbols This symbol, adjacent to another symbol or terminal, indicates the user must refer to the manual for further information.
More informationPlease take serious note of the following warnings:
TPDIN-SC48-20 MPPT Solar Controller with Passive PoE Switch Wireless Base Stations and Client Devices Surveillance Cameras Remote Control Remote Lighting Off Grid Electronics Congratulations! on your purchase
More informationUser Guide. TP3016M Series Switching Mode DC Power Supply
User Guide TP3016M Series Switching Mode DC Power Supply 1 Introduction I. Quick Start 1.1 Front Panel Description 1.2 Pre-Checking 1.3 Quick Start 1.4 Output Checking II. Specifications 2.1 Major Specification
More informationRemoval and Installation8
8 Screw Types 8-4 Top Cover Assembly 8-5 Left Hand Cover 8-6 Right Hand Cover 8-10 Front Panel Assembly 8-14 Left Rear Cover 8-15 Right Rear Cover 8-16 Extension Cover (60" Model only) 8-17 Media Lever
More informationInstallation & Replacement
Installation & Replacement Follow the individual procedures to perform the notebook s installation and replacement of various major components. Z70N Series Notebook is a fusion of flexibility, style and
More informationE2460GS Oscilloscope Upgrade Kit
Installation Instructions for E2460GS Oscilloscope Upgrade Kit Agilent 1670G-Series Logic Analyzers This kit upgrades either the Agilent Technologies 1670G, Agilent 1671G, Agilent 1672G, or the Agilent
More informationFIELD REPLACEABLE UNIT DOCUMENTATION. Satellite Pro TM Series GENERAL INFORMATION. Tools Required for Proper Disassembly and Reassembly:
GENERAL INFORMATION Tools Required for Proper Disassembly and Reassembly: 1. Phillips Screwdriver (Size 0&1) 2. Flat head Screwdriver 3. Security Torx (Size 7) 4. Case Separator 5. ESD Wrist Strap 6. ESD
More information2 Table of Contents 1. TABLE OF CONTENTS. 1. Table of Contents Introduction Wiring Diagram Terminals Review...
TPR-6 Temperature Protection Relay Instruction Manual Ver. June 1 st 2010 2 Table of Contents 1. TABLE OF CONTENTS 1. Table of Contents... 2 2. Introduction... 3 3. Wiring Diagram... 5 4. Terminals Review...
More informationManual Control Unit GFC 32
Manual Control Unit 1400004_EN/05.2017 Index 1. Main features 3 2. Technical features 3 3. Installation guidelines 4 4. Preliminary checks 5 5. Electrical connections 5 6. Settings 6 7. Remote control
More informationUser's Guide. Video Borescope. Models BR200 and BR250
User's Guide Video Borescope Models BR200 and BR250 Introduction Congratulations on your purchase of this Extech BR200 (17mm camera head) or BR250 (9mm camera head) Video Borescope. This instrument was
More informationAfter unpacking, confirm that there are no problems (scratches and dirt) on the exterior before use.
DATA PLATFORM GL7000 Quick Start Guide GL7000-UM-852 Thank you very much for buying the DATA PLATFORM GL7000. This quick manual provides easy to understand instructions for the basic operations. For detailed
More informationSingle Kernel Grain Moisture Tester PQ-520. (type PQ ) Operating Instructions
Single Kernel Grain Moisture Tester PQ-520 (type PQ-5205-1) Operating Instructions Single Kernel Grain Moisture Tester Safety Precautions Not following the safety precautions could cause an accident resulting
More information1. Safety Precautions (Read these precautions before use.)
R P5102S/N/N1 HMI Installation Guide Thank you for purchasing FATEK HMI. Before installing or operating the unit, please read this installation guide carefully to ensure correct use. 1. Safety Precautions
More informationChapter 4 Replacement Procedures
Chapter 4 Replacement Procedures 4 4-ii Satellite P30 Series Maintenance Manual Chapter 4 Contents 4.1 General... 4-1 4.2 Battery... 4-7 4.3 PC Card... 4-8 4.4 HDD... 4-10 4.5 Optical Drive Module... 4-12
More informationPSR-SCP- 24DC/URM4/4X1/2X2/B PSR-SPP- 24DC/URM4/4X1/2X2/B
Safety Relay as a Contact Extension Block INTERFACE Data Sheet PHOENIX CONTACT - 05/2006 Description The PSR-...- 24DC/URM4/4X1/2X2/B safety relay can be used as a contact extension block in safety circuits
More informationHP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions
HP UPS R/T3000 G2 Installation Instructions Overview The HP UPS R/T3000 G2 features a 2U rack-mount with convertible tower design and offers power protection for loads up to a maximum of 3300 VA/3000 W
More informationUser s Guide. 600A True RMS AC/DC Clamp Meter. Model 38389
User s Guide 600A True RMS AC/DC Clamp Meter Model 38389 Safety International Safety Symbols This symbol, adjacent to another symbol or terminal, indicates the user must refer to the manual for further
More informationAnalog Voltage Combination Module
Analog Voltage Combination Module T1F-8AD4DA-2 8-channel analog voltage input 4-channel analog voltage output The combination 8-in and 4-out voltage module uses a T1K-8B or T1K-8B-1 base, which is purchased
More informationINSTALLATION MANUAL For authorized service personnel only.
AIR CONDITIONER SIMPLE REMOTE CONTROLLER (WIRED TYPE) UTY-RSNUM INSTALLATION MANUAL For authorized service personnel only. English Français Español Contents. SAFETY PRECAUTIONS...2 2. ACCESSORIES...2 3.
More informationDigital Keypad Introduction
K2 Digital Keypad Introduction The K02 uses the latest microprocessor technology to operate door strikes and security systems that require a momentary (timed) or latching dry contact closure. All programming
More information3 Channel Datalogging Thermometer
USER MANUAL 3 Channel Datalogging Thermometer Model SD200 Introduction Congratulations on your purchase of the Extech SD200 3-Channel Temperature Datalogger. This meter displays and stores temperature
More informationPower Supply and Fan Module Installation
3 CHAPTER This chapter describes how to remove and install a new or replacement power supply or fan module in a Catalyst 3750-E or Catalyst 3560-E switch. See these sections: Installation Overview, page
More information1/32-DIN TEMPERATURE CONTROLLER INSTALLATION, WIRING AND OPERATION MANUAL FORM 3882
1/32-DIN TEMPERATURE CONTROLLER INSTALLATION, WIRING AND OPERATION MANUAL FORM 3882 This manual is intended for use in support of installation, commissioning and configuration of the 1/32-DIN Temperature
More informationMOSS-DVR-810 Mobile Digital SD Recorder User Manual
MOSS-DVR-810 Mobile Digital SD Recorder User Manual Before installing and using, be sure to read this Manual for best performance. ATTENTION This product is to be used within the vehicle interior. In order
More informationGL450 USER S MANUAL MANUAL NO. GL450-UM-151
GL450 USER S MANUAL MANUAL NO. GL450-UM-151 Introduction Introduction Thank you for purchasing the GL450 midi LOGGER. Please read this manual thoroughly before attempting to use your new product to ensure
More informationCDD Carbon Dioxide Transmitter
Introduction The OSA CO2 transmitter uses Infrared Technology to monitor CO2 levels within a range of 0 2000 ppm and outputs a linear 4-20 ma or 0-5/0-10 Vdc signal. The enclosure is designed to operate
More informationPTC/PT100 board 2.0 Option
PTC/PT100 board 2.0 Option Instruction Manual - English PTC/PT100 board 2.0 Option Instruction Manual - English Document number: 01-3873-01 Edition: r1 Date of release: 2006-10-30 Copyright Emotron AB
More informationDX4085 Z-Meter Tester
DX4085 Z-Meter Tester AC Resistance ( ACR ) Measurement Figure-of-Merit ( Z ) Measurement Time Constant ( t ) Measurement dtmax estimations (for single-stage TECs) External TEC Clips USB Interface for
More information