1 Power Systems with POWER8 Scale-out Technical Sales Skills V1 1. An ISV develops Linux based applications in their heterogeneous environment consisting of both IBM Power Systems and x86 servers. They are considering optimizing operations by offering developers a self-service user interface for automated provisioning of new Linux images. Which of the following tools will satisfy their requirement? A. VMControl B. PowerKVM C. IBM Cloud Manager with OpenStack D. IBM PowerVC Standard Edition Managing PowerKVM 2. Which feature is included with Quick to Order pre-defined configurations on the LC models? A. 64 GB of memory B. Software preload C. Two power supplies D. 3-Year, 9x5 Software Maintenance 3. A customer wants to make use of the Server Flash Caching function on their POWER8 machine. Which operating system supports this function? A. AIX 7.2 B. IBM i 7.2 C. Red Hat Enterprise v7.2 D. SUSE Enterprise v12 4. SPEC (Standard Performance Evaluation Corporation - spec.org) published a benchmark called specvirt_sc2013 designed to measure the amount of pre-defined virtual machines a server can run simultaneously. The following results were achieved, for a POWER S824 and a HP DL560 Gen8: Based on the results, IBM Power: A. was able to achieve almost two times more VMs per server than HP. B. was able to achieve almost two times more VMs per core than HP. C. was able to achieve two times more VMs per socket than HP. D. can pack 1.5 times more VMs per rack unit than HP.

2 5. How many PCIe Gen3 I/O Expansion Drawers can be attached to an S812LC server? A. Zero B. One with one fanout module C. One with two fanout modules D. Two with two fanout modules 6. A customer requires two IBM systems and two DS8870 storage units to be connected in a cross-coupled active - active configuration between two different sites. What is the technology that allows this type of configuration? A. HyperSwap B. Cluster Aware AIX C. IBM Spectrum Protect D. Shared Storage Pool 7. Which statement describes an advantage of the ability to use Shared Storage Pools (SSPs)? A. They reduce the total required storage in the organization by removing duplicate files. B. They reduce the overall storage administration efforts by allocating once and distributing as needed. C. They increase the overall read/write speed across the organization by mixing different storage technologies. D. They increase the total number of OS instances that can simultaneously write to the same file by duplicating the files. 8. A customer currently has VIO Server and non-vio Server partitions on a POWER8 system. What is the benefit of using SR-IOV adapters? A. They are dedicated to non-vio Server partitions. B. They eliminate the need for the VIO Servers. C. They can be used by VIO Server and non-vio Server partitions. D. They force the non-vio Server partitions to share resources through VIO Servers. 9. Which of the following Power Systems supports the highest density of Graphics Processing Units (GPUs) per rack? A. S824L B. S822L C. S822LC D. S812LC 10. With Scale-out servers, what is the maximum number of power distribution units (PDUs) that can be installed in a 7014-T42 rack without horizontal mounting? A. 0 B. 2 C. 4 D. 6

3 11. Which of the following features is natively supported with both PowerVM and PowerKVM? A. NPIV B. HMC Management C. Live Partition Mobility D. Memory Compression 12. A customer wants to install a POWER8 tower system at a remote site. The system will run Red Hat Linux. Which system satisfies the requirement? A. S814 B. S822L C. S812L D. S There is a dedicated memory controller in each of the CDIMMs. How can this capability increase the platform RAS? A. Multiple memory controllers allow for faster Live Partition Mobility operations, increasing the speed that a server VMs can be evacuated in case of failure B. By having multiple CDIMMs, a server has multiple integrated memory controllers, allowing for failure of a memory controller without impacting the server operations. C. Having a memory controller on the memory modules allow for CAPI enabled adapters to bypass the CPU and access data directly into memory forcing cache to write to disk when a failure is detected. D. Besides their standard functions, memory controllers also perform memory scrubbing to identify and correct single bit soft-errors on the memory modules and inform the Hypervisor of faulty memory modules. 14. When creating a partition that will be using Live Partition Mobility, which of the following is a valid configuration? A. All the storage, Ethernet and backup I/O must be virtualized with VIO Server. B. Both VIO Servers must be on the same Ethernet Subnet on a class "C" network. C. Each VIO Server needs a dedicated HMC assigned to it where the HMCs are set up in Dual Mode. D. The boot LUNS for each partition must be kept on different SANs and must be accessed by only one partition at any time. 15. A customer has two Power 570 servers that need to be replaced to accommodate company growth. The first server runs a transactional workload with high server usage during the day (8am-8pm) The second server runs analytic queries based on the transactional data during the night (10pm-6am). A technical sizing analysis determined that each server would require (18) POWER8 3.52GHz cores and 160GB RAM, considering the needed growth. What would be the most cost-efficient (Total Cost of Acquisition) way to satisfy the customer needs?

4 A. (2) new Power S824 with 20 cores and 192GB RAM each. B. (1) new Power S824 with 36 cores and 384GB, virtualized with capped LPARs. C. (1) new Power 770 with 36 active cores and 384GB active, virtualized with capped LPARs. D. (1) new Power S824 with 24 cores and 384GB and DLPAR CPU resources among LPARs. 16. What is the maximum number of partitions that can be moved concurrently using Live Partition Mobility (LPM) with the HMC 7042-CR8? A. 8 B. 16 C. 64 D. 128

5 Answer Key 1. C 2. C 3. A 4. B 5. A 6. A 7. B 8. C 9. C 10. C 11. C 12. A 13. D 14. A 15. D 16. B

IBM EXAM QUESTIONS & ANSWERS

IBM EXAM QUESTIONS & ANSWERS IBM 000-106 EXAM QUESTIONS & ANSWERS Number: 000-106 Passing Score: 800 Time Limit: 120 min File Version: 38.8 http://www.gratisexam.com/ IBM 000-106 EXAM QUESTIONS & ANSWERS Exam Name: Power Systems with

More information

C Number: C Passing Score: 800 Time Limit: 120 min File Version: 5.0. IBM C Questions & Answers

C Number: C Passing Score: 800 Time Limit: 120 min File Version: 5.0. IBM C Questions & Answers C4040-251 Number: C4040-251 Passing Score: 800 Time Limit: 120 min File Version: 5.0 http://www.gratisexam.com/ IBM C4040-251 Questions & Answers Power Systems with POWER8 Scale-out Technical Sales Skills

More information

Vendor: IBM. Exam Code: C Exam Name: Power Systems with POWER8 Scale-out Technical Sales Skills V1. Version: Demo

Vendor: IBM. Exam Code: C Exam Name: Power Systems with POWER8 Scale-out Technical Sales Skills V1. Version: Demo Vendor: IBM Exam Code: C9010-251 Exam Name: Power Systems with POWER8 Scale-out Technical Sales Skills V1 Version: Demo QUESTION 1 What is a characteristic of virtualizing workloads? A. Processors are

More information

PASS4TEST. IT Certification Guaranteed, The Easy Way! We offer free update service for one year

PASS4TEST. IT Certification Guaranteed, The Easy Way!   We offer free update service for one year PASS4TEST \ http://www.pass4test.com We offer free update service for one year Exam : 000-122 Title : Power Systems with POWER7 Common Sales Skills -v2 Vendor : IBM Version : DEMO 1 / 4 Get Latest & Valid

More information

Pass4Sure.C _83,Q&A

Pass4Sure.C _83,Q&A Pass4Sure.C4040-251_83,Q&A Number: C4040-251 Passing Score: 800 Time Limit: 120 min File Version: 16.02 http://www.gratisexam.com/ These are the most accurate study questions. Just focus on these and sit

More information

IBM Power Systems Update. David Spurway IBM Power Systems Product Manager STG, UK and Ireland

IBM Power Systems Update. David Spurway IBM Power Systems Product Manager STG, UK and Ireland IBM Power Systems Update David Spurway IBM Power Systems Product Manager STG, UK and Ireland Would you like to go fast? Go faster - win your race Doing More LESS With Power 8 POWER8 is the fastest around

More information

BMC Capacity Optimization Extended Edition AIX Enhancements

BMC Capacity Optimization Extended Edition AIX Enhancements BMC Capacity Optimization Extended Edition 9.5.1 AIX Enhancements Support for AIX Active Memory Expansion (AME) mode Metrics displayed in BCO AIX PowerVM view for CPU and Memory Allocation Frame name,

More information

Exam Questions C

Exam Questions C Exam Questions C9010-250 Power Systems with POWER8 Sales Skills V1 1. A credit card company is going to implement a new application for which security is a major requirement. The company has been quoted

More information

Executive Summary. At a high level there are several options if you have Power Nodes:

Executive Summary. At a high level there are several options if you have Power Nodes: Executive Summary The IBM PureFlex System brought new levels of integration and quick time to deploy advantages that were enjoyed by many customers. A central piece of the integration was the Flexible

More information

Exam Name: Assessment: Power Systems with POWER7 Common Sales Skills -v2

Exam Name: Assessment: Power Systems with POWER7 Common Sales Skills -v2 Vendor: IBM Exam Code: A4040-122 Exam Name: Assessment: Power Systems with POWER7 Common Sales Skills -v2 Version: Demo Topic 1, Volume A Question No : 1 - (Topic 1) A customer needs 2 Power Systems servers,

More information

IBM p5 and pseries Enterprise Technical Support AIX 5L V5.3. Download Full Version :

IBM p5 and pseries Enterprise Technical Support AIX 5L V5.3. Download Full Version : IBM 000-180 p5 and pseries Enterprise Technical Support AIX 5L V5.3 Download Full Version : https://killexams.com/pass4sure/exam-detail/000-180 A. The LPAR Configuration backup is corrupt B. The LPAR Configuration

More information

IBM SYSTEM POWER7. PowerVM. Jan Kristian Nielsen Erik Rex IBM Corporation

IBM SYSTEM POWER7. PowerVM. Jan Kristian Nielsen Erik Rex IBM Corporation IBM SYSTEM POWER7 PowerVM Jan Kristian Nielsen jankn@dk.ibm.com - +45 28803310 Erik Rex Rex@dk.ibm.com - +45 28803326 PowerVM: Virtualization Without Limits Reduces IT infrastructure costs Improves service

More information

IBM Virtualization Technical Support for AIX and Linux - v2.

IBM Virtualization Technical Support for AIX and Linux - v2. IBM 000-109 Virtualization Technical Support for AIX and Linux - v2 http://killexams.com/exam-detail/000-109 QUESTION: 170 A Power Systems server has two HMCs connected to its Flexible Service Processor

More information

IBM POWER7 Systems Express Blades Quick Reference Guide April 2012

IBM POWER7 Systems Express Blades Quick Reference Guide April 2012 IBM Systems IBM POWER7 Systems Blades Quick Reference Guide. PS700 PS701 PS702 PS703 PS70 # of processor sockets 1 1 2 2 3.0 GHz (-core) 3.0 GHz (-core) 3.0 GHz (-core) 2. GHz (-core) 2. GHz (-core) 32

More information

IBM POWER7 Systems Express Blades Quick Reference Guide October 2012

IBM POWER7 Systems Express Blades Quick Reference Guide October 2012 IBM Systems IBM POWER7 Systems Blades Quick Reference Guide. PS700 PS701 PS702 PS703 # of processor sockets 1 1 2 2 3.0 GHz (-core) 3.0 GHz (-core) 3.0 GHz (-core) 2. GHz (-core) - GHz (cores/socket) -

More information

IBM Power Systems Technical Support for AIX and Linux. Download Full Version :

IBM Power Systems Technical Support for AIX and Linux. Download Full Version : IBM 000-330 Power Systems Technical Support for AIX and Linux Download Full Version : https://killexams.com/pass4sure/exam-detail/000-330 A. 520 2-core, 2 active B. 550 2-core, 2 active C. 570 8-core,

More information

C ibm. Number: C Passing Score: 800 Time Limit: 120 min.

C ibm. Number: C Passing Score: 800 Time Limit: 120 min. C9010-262 ibm Number: C9010-262 Passing Score: 800 Time Limit: 120 min Exam A QUESTION 1 A customer has purchased a POWER8 server and will deploy dual VIO servers to provide virtualized access to storage

More information

IBM System p5 550 and 550Q Express servers

IBM System p5 550 and 550Q Express servers The right solutions for consolidating multiple applications on a single system IBM System p5 550 and 550Q Express servers Highlights Up to 8-core scalability using Quad-Core Module technology Point, click

More information

IBM Power Systems. 14 February IBM Power Systems Facts and Features: Enterprise and Scale-out Systems with POWER8Ò Processor Technology

IBM Power Systems. 14 February IBM Power Systems Facts and Features: Enterprise and Scale-out Systems with POWER8Ò Processor Technology 14 February 2017 IBM Systems Facts and Features: Enterprise and Scale-out Systems with POWER8Ò Processor Technology 1 Table of contents Page no. Notes 3 Why Systems 4 IBM System S812LC, S822LC for Commercial

More information

Power Systems High Availability & Disaster Recovery

Power Systems High Availability & Disaster Recovery Power Systems High Availability & Disaster Recovery Solutions Comparison of various HA & DR solutions for Power Systems Authors: Carl Burnett, Joe Cropper, Ravi Shankar Table of Contents 1 Abstract...

More information

PowerVC: Essential for Power Systems in a Multi-Cloud World

PowerVC: Essential for Power Systems in a Multi-Cloud World PowerVC: Essential for Power Systems in a Multi-Cloud World Ian Robinson Virtualization Offering Manager idrobinson@us.ibm.com January 2018 2 Enterprises are rapidly adopting multi-cloud strategies Clients

More information

Experiences with VIOS support for IBM i

Experiences with VIOS support for IBM i Experiences with VIOS support for IBM i Pete Stephen, Power Systems / AIX Architect Sirius Computer Solutions Pete.Stephen@siriuscom.com Agenda VIO overview Virtualization Trends. PowerVM and how do I

More information

IBM i supports additional IBM POWER6 hardware

IBM i supports additional IBM POWER6 hardware , dated April 28, 2009 IBM i supports additional IBM POWER6 hardware Table of contents 1 At a glance 6 Product number 1 Overview 6 Ordering information 2 Key prerequisites 8 Prices 2 Planned availability

More information

IBM System p5 570 POWER5+ processor and memory features offer new options

IBM System p5 570 POWER5+ processor and memory features offer new options Hardware Announcement February 14, 2006 IBM System p5 570 POWER5+ processor and memory features offer new options Overview The System p5 570 offers new POWER5+ processor options with 64-bit 1.9 GHz and

More information

Power Systems with POWER7 and AIX Technical Sales

Power Systems with POWER7 and AIX Technical Sales Power Systems with POWER7 and AIX Technical Sales Number: 000-107 Passing Score: 800 Time Limit: 120 min File Version: 26.6 http://www.gratisexam.com/ IBM 000-107 EXAM QUESTIONS & ANSWERS Exam Name: Power

More information

p5 520 server Robust entry system designed for the on demand world Highlights

p5 520 server Robust entry system designed for the on demand world Highlights Robust entry system designed for the on demand world IBM p5 520 server _` p5 520 rack system with I/O drawer Highlights Innovative, powerful, affordable, open and adaptable UNIX and Linux environment system

More information

IBM Power Systems Facts and Features: Enterprise and Scale-out Systems with POWER8 Processor Technology. March 2016

IBM Power Systems Facts and Features: Enterprise and Scale-out Systems with POWER8 Processor Technology. March 2016 March 2016 IBM Systems Facts and Features: Enterprise and Scale-out Systems with POWER8 Processor Technology IBM Systems servers and IBM BladeCenter blade servers using IBM POWER7 and POWER7+ processors

More information

PowerVM simplification enhancements. PowerVM simplification enhancements. PowerVM infrastructure overview

PowerVM simplification enhancements. PowerVM simplification enhancements. PowerVM infrastructure overview PowerVM simplification enhancements PowerVM infrastructure overview IBM PowerVM is the virtualization solution that enables workload consolidation for AIX, IBM i, and Linux environments on IBM Power Systems

More information

Live Partition Mobility Update

Live Partition Mobility Update Power Systems ATS Live Partition Mobility Update Ron Barker Power Advanced Technical Sales Support Dallas, TX Agenda Why you should be planning for partition mobility What are your options? Which is best

More information

Power your planet. Optimizing the Enterprise Data Center POWER7 Powers a Smarter Infrastructure

Power your planet. Optimizing the Enterprise Data Center POWER7 Powers a Smarter Infrastructure Power your planet. Optimizing the Enterprise Data Center POWER7 Powers a Smarter Infrastructure Enoch Lau Field Technical Sales Specialist, Power Systems Systems & Technology Group Power your planet. Smarter

More information

Virtualization Technical Support for AIX and Linux - v2

Virtualization Technical Support for AIX and Linux - v2 IBM 000-109 Virtualization Technical Support for AIX and Linux - v2 Version: 5.0 Topic 1, Volume A QUESTION NO: 1 An administrator is attempting to configure a new deployment of 56 POWER7 Blades across

More information

IBM System p5 510 and 510Q Express Servers

IBM System p5 510 and 510Q Express Servers More value, easier to use, and more performance for the on demand world IBM System p5 510 and 510Q Express Servers System p5 510 or 510Q Express rack-mount servers Highlights Up to 4-core scalability with

More information

... Oracle Database 11g and 12c on IBM Power E870 and E880. Tips and considerations

... Oracle Database 11g and 12c on IBM Power E870 and E880. Tips and considerations Oracle Database 11g and 12c on IBM Power E870 and E880 Tips and considerations........ Ravisankar Shanmugam Moshe Reder, Wayne Martin IBM Oracle International Competency Center November 2014 Copyright

More information

IBM POWER9 Server Update

IBM POWER9 Server Update IBM POWER9 Server Update Luc Cloutier Advisory I/T Specialist, Power Server luc@ca.ibm.com Charts by: Simon Porstendorfer Principal Offering Manager Cognitive Systems Dylan Boday, Ph.D. Offering Manager,

More information

Power Systems for Your Business

Power Systems for Your Business Hotel Mulia Jakarta Power Systems for Your Business Septia Sukariningrum Power Systems Technical Sales Specialist IBM Indonesia The datacenter is changing Server sprawl resulting in lack of space Datacenter

More information

Virtualization Benefits IBM Corporation

Virtualization Benefits IBM Corporation Virtualization Benefits 1 Virtualization Benefits CPU Utilization 100 90 80 70 60 50 40 30 20 10 0 8:00 10:00 12:00 2:00 4:00 Time Purchased Peak Average Increase Utilization Non-virtualized servers often

More information

Evaluation Report: HP StoreFabric SN1000E 16Gb Fibre Channel HBA

Evaluation Report: HP StoreFabric SN1000E 16Gb Fibre Channel HBA Evaluation Report: HP StoreFabric SN1000E 16Gb Fibre Channel HBA Evaluation report prepared under contract with HP Executive Summary The computing industry is experiencing an increasing demand for storage

More information

IBM POWER7 Systems Express Blades Quick Reference Guide November 2011

IBM POWER7 Systems Express Blades Quick Reference Guide November 2011 IBM POWER7 Systems Blades Quick Reference Guide. PS700 PS701 PS702 PS703 PS70 # of processor sockets 1 1 2 2 3.0 GHz (-core) 3.0 GHz (-core) 3.0 GHz (-core) 2. GHz (-core) disk bays / GB/TB storage - GB

More information

The Power of PowerVM Power Systems Virtualization. Eyal Rubinstein

The Power of PowerVM Power Systems Virtualization. Eyal Rubinstein The Power of PowerVM Power Systems Virtualization Eyal Rubinstein deyal@il.ibm.com The Power Equation: Power = i + p System i i515 i525 i550 i570 i595 IBM BladeCenter BladeCenter JS12/22/23 Express BladeCenter

More information

System i and System p. Creating a virtual computing environment

System i and System p. Creating a virtual computing environment System i and System p Creating a virtual computing environment System i and System p Creating a virtual computing environment Note Before using this information and the product it supports, read the information

More information

Looking ahead with IBM i. 10+ year roadmap

Looking ahead with IBM i. 10+ year roadmap Looking ahead with IBM i 10+ year roadmap 1 Enterprises Trust IBM Power 80 of Fortune 100 have IBM Power Systems The top 10 banking firms have IBM Power Systems 9 of top 10 insurance companies have IBM

More information

IBM Testpapers Now with Questions & Answers

IBM Testpapers Now with Questions & Answers IBM Testpapers 000-783 Now with Questions & Answers Number: 000-783 Passing Score: 660 Time Limit: 90 min File Version: 24.6 http://www.gratisexam.com/ Pass IBM 000-783 Now with Questions & Answers Exam

More information

C IBM. Virtualization Technical Support for AIX and Linux V2

C IBM. Virtualization Technical Support for AIX and Linux V2 C4040-109 Dumps C4040-109 Braindumps C4040-109 Real Questions C4040-109 Practice Test C4040-109 dumps free IBM C4040-109 Virtualization Technical Support for AIX and Linux V2 http://killexams.com/pass4sure/exam-detail/c4040-109

More information

IBM EXAM QUESTIONS & ANSWERS

IBM EXAM QUESTIONS & ANSWERS IBM 000-105 EXAM QUESTIONS & ANSWERS Number: 000-105 Passing Score: 650 Time Limit: 60 min File Version: 65.5 http://www.gratisexam.com/ IBM 000-105 EXAM QUESTIONS & ANSWERS Exam Name: Power Systems with

More information

KillTest *KIJGT 3WCNKV[ $GVVGT 5GTXKEG Q&A NZZV ]]] QORRZKYZ IUS =K ULLKX LXKK [VJGZK YKX\OIK LUX UTK _KGX

KillTest *KIJGT 3WCNKV[ $GVVGT 5GTXKEG Q&A NZZV ]]] QORRZKYZ IUS =K ULLKX LXKK [VJGZK YKX\OIK LUX UTK _KGX KillTest Q&A Exam : 000-108 Title : Enterprise Technical Support for AIX and Linux -v2 Version : Demo 1 / 7 1.Which power reduction technology requires a software component in order to be activated? A.

More information

A Mainframe Guy Discovers Blades..as in zenterprise Blade Extension

A Mainframe Guy Discovers Blades..as in zenterprise Blade Extension SHARE in Anaheim March 2011 A Mainframe Guy Discovers Blades..as in zenterprise Blade Extension Session ID: zzs18 Glenn Anderson, IBM Training 2011 IBM Corporation 1 2 3 1999 History of Blades.. Data center

More information

IBM Db2 Analytics Accelerator Version 7.1

IBM Db2 Analytics Accelerator Version 7.1 IBM Db2 Analytics Accelerator Version 7.1 Delivering new flexible, integrated deployment options Overview Ute Baumbach (bmb@de.ibm.com) 1 IBM Z Analytics Keep your data in place a different approach to

More information

iseries Tech Talk Linux on iseries Technical Update 2004

iseries Tech Talk Linux on iseries Technical Update 2004 iseries Tech Talk Linux on iseries Technical Update 2004 Erwin Earley IBM Rochester Linux Center of Competency rchlinux@us.ibm.com Agenda Enhancements to the Linux experience introduced with i5 New i5/os

More information

IBM PowerVM. Virtualization without limits. Highlights. IBM Systems and Technology Data Sheet

IBM PowerVM. Virtualization without limits. Highlights. IBM Systems and Technology Data Sheet IBM PowerVM Virtualization without limits Highlights Deliver services with superior economics by consolidating virtualized workloads Deliver services faster by automating deployment of virtual machines

More information

IBM Emulex 16Gb Fibre Channel HBA Evaluation

IBM Emulex 16Gb Fibre Channel HBA Evaluation IBM Emulex 16Gb Fibre Channel HBA Evaluation Evaluation report prepared under contract with Emulex Executive Summary The computing industry is experiencing an increasing demand for storage performance

More information

IBM Spectrum Scale on Power Linux tuning paper

IBM Spectrum Scale on Power Linux tuning paper IBM Spectrum Scale on Power Linux tuning paper Current Version Number: 7.1 Date: 09/11/2016 Authors: Sven Oehme Todd Tosseth Daniel De Souza Casali Scott Fadden 1 Table of Contents 1 Introduction... 3

More information

EonStor DS - iscsi Series High-Availability Solutions Delivering Excellent Storage Performance

EonStor DS - iscsi Series High-Availability Solutions Delivering Excellent Storage Performance EonStor DS EonStor DS - iscsi Series High-Availability Solutions Delivering Excellent Storage Performance Reliability and Availability Local and remote replication functionality enables quick data recovery

More information

Power Systems Firmware Management - What You Need to Know

Power Systems Firmware Management - What You Need to Know Power Systems Firmware Management - What You Need to Know Tracy Smith Executive IT Specialist (ATS) IBM Power Systems - Rochester, MN Tues. June 2, 2015 Technical University/Symposia materials may not

More information

New IBM POWER6 processors for the Power 570 enable you to get more processing power with fewer processors

New IBM POWER6 processors for the Power 570 enable you to get more processing power with fewer processors , dated October 7, 2008 New IBM POWER6 processors for the Power 570 enable you to get more processing power with fewer processors Table of contents 1 Key prerequisites 10 Services 1 Planned availability

More information

Benefits of Offloading I/O Processing to the Adapter

Benefits of Offloading I/O Processing to the Adapter Benefits of Offloading I/O Processing to the Adapter FCoE and iscsi Protocol Offload Delivers Enterpriseclass Performance, Reliability, and Scalability Hewlett Packard Enterprise (HPE) and Cavium have

More information

Vendor: IBM. Exam Code: C Exam Name: Enterprise Technical Support for AIX and Linux -v2. Version: Demo

Vendor: IBM. Exam Code: C Exam Name: Enterprise Technical Support for AIX and Linux -v2. Version: Demo Vendor: IBM Exam Code: C4040-108 Exam Name: Enterprise Technical Support for AIX and Linux -v2 Version: Demo QUESTION 1 Which power reduction technology requires a software component in order to be activated?

More information

SAP HANA on IBM Power Systems - Raising the Bar. Dr. Antonio Palacin Dominik Paluch IBM TUM Last update:

SAP HANA on IBM Power Systems - Raising the Bar. Dr. Antonio Palacin Dominik Paluch IBM TUM Last update: SAP HANA on IBM Power Systems - Raising the Bar Dr. Antonio Palacin Dominik Paluch IBM TUM Last update: 2016-02-29 IBM and SAP Partnership - Qualified, Awarded, Proven Certified Global SAP Partner Global

More information

IBM Exam A Virtualization Technical Support for AIX and Linux Version: 6.0 [ Total Questions: 93 ]

IBM Exam A Virtualization Technical Support for AIX and Linux Version: 6.0 [ Total Questions: 93 ] s@lm@n IBM Exam A4040-101 Virtualization Technical Support for AIX and Linux Version: 6.0 [ Total Questions: 93 ] IBM A4040-101 : Practice Test Question No : 1 Which of the following IOS commands displays

More information

IBM p5 Virtualization Technical Support AIX 5L V5.3. Download Full Version :

IBM p5 Virtualization Technical Support AIX 5L V5.3. Download Full Version : IBM 000-062 p5 Virtualization Technical Support AIX 5L V5.3 Download Full Version : https://killexams.com/pass4sure/exam-detail/000-062 A. Virtual Ethernet B. Micro-Partitioning C. Virtual I/O Server D.

More information

IBM PureFlex Technical

IBM PureFlex Technical IBM PureFlex Technical Number: 000-783 Passing Score: 660 Time Limit: 90 min File Version: 1.0 http://www.gratisexam.com/ Exam A QUESTION 1 Which of the following virtualization products is required to

More information

System p. Partitioning with the Integrated Virtualization Manager

System p. Partitioning with the Integrated Virtualization Manager System p Partitioning with the Integrated Virtualization Manager System p Partitioning with the Integrated Virtualization Manager Note Before using this information and the product it supports, read the

More information

IBM PowerKVM available with the Linux only scale-out servers IBM Redbooks Solution Guide

IBM PowerKVM available with the Linux only scale-out servers IBM Redbooks Solution Guide IBM PowerKVM available with the Linux only scale-out servers IBM Redbooks Solution Guide The IBM POWER8 processors are built for big data and open innovation. Now, Linux administrators and users can maximize

More information

IBM PowerVC (Power Virtualization Center) Glen Corneau Washington Systems Center

IBM PowerVC (Power Virtualization Center) Glen Corneau Washington Systems Center IBM PowerVC (Power Virtualization Center) Glen Corneau Washington Systems Center 2018 IBM Corporation Agenda The Power Cloud Management Stack PowerVM NovaLink PowerVC Standard Edition IBM Cloud PowerVC

More information

Pick your own enablement

Pick your own enablement Pick your own enablement Business Partner version April 2016 Pick Your Own Enablement Number of participants and : The number of required voucher indicated is per session, not per participant. Skills from

More information

IBM Systems Director VMControl

IBM Systems Director VMControl IBM Systems Director VMControl Glen Corneau Copyright IBM Corporation 2011 Materials may not be reproduced in whole or in part without the prior written permission of IBM. 5.3 Agenda > VMControl V2.3.1

More information

Vendor: IBM. Exam Code: C Exam Name: Power Systems with POWER7 and AIX & Linux Sales Skills -v2. Version: Demo

Vendor: IBM. Exam Code: C Exam Name: Power Systems with POWER7 and AIX & Linux Sales Skills -v2. Version: Demo Vendor: IBM Exam Code: C4040-123 Exam Name: Power Systems with POWER7 and AIX & Linux Sales Skills -v2 Version: Demo QUESTION NO: 1 A 010 is questioning why a purchasing agent has ordered a POWER7+ 770

More information

Implementing Live Partition Mobility Lab Ted Sullivan In this lab you will implement the Live Partition Mobility feature Lab Intermediate

Implementing Live Partition Mobility Lab Ted Sullivan In this lab you will implement the Live Partition Mobility feature Lab Intermediate AIX Preparing for Live Partition Mobility Operations This session covers the configuration requirements for relocating logical partitions from one server to another using Live Partition Mobility. Checklists

More information

C IBM. Power Systems Enterprise Technical Support for AIX and Linux -v2

C IBM. Power Systems Enterprise Technical Support for AIX and Linux -v2 IBM C4040-108 Power Systems Enterprise Technical Support for AIX and Linux -v2 Download Full Version : https://killexams.com/pass4sure/exam-detail/c4040-108 A. Ishmc-f B. Ishmc-F C. Ishmc-V D. Ishmc-I

More information

Software Editions. Systems Software leadership for innovation. Mike Perry IT Specialist IBM Systems & Technology Group.

Software Editions. Systems Software leadership for innovation. Mike Perry IT Specialist IBM Systems & Technology Group. Software Editions Systems Software leadership for innovation Mike Perry IT Specialist IBM Systems & Technology Group 1 Enterprise Edition Offerings AIX Systems Director VMControl (VMControl is a bundled

More information

Storage Protocol Offload for Virtualized Environments Session 301-F

Storage Protocol Offload for Virtualized Environments Session 301-F Storage Protocol Offload for Virtualized Environments Session 301-F Dennis Martin, President August 2016 1 Agenda About Demartek Offloads I/O Virtualization Concepts RDMA Concepts Overlay Networks and

More information

Live Partition Mobility

Live Partition Mobility Live Partition Mobility Jaqui Lynch lynchj@forsythe.com Presentation at: http://www.circle4.com/forsythe/lpm2014.pdf 1 1 Why Live Partition Mobility? LPM LIVE PARTITION MOBILITY Uses Server Consolidation

More information

IBM Power Facts and Features IBM Power Systems, IBM PureFlex and Power Blades

IBM Power Facts and Features IBM Power Systems, IBM PureFlex and Power Blades IBM Power Facts and Features IBM Power Systems, IBM PureFlex and Power Blades October 2012 IBM Power Systems servers and IBM BladeCenter blade servers using IBM POWER6 and POWER6+ processors are described

More information

Application and Partition Mobility

Application and Partition Mobility IBM System p Application and Mobility Francis COUGARD IBM Products and Solutions Support Center Montpellier Copyright IBM Corporation 2009 Index Application and Mobility Presentation Videocharger and DB2

More information

IBM p5 and pseries Technical Sales Support. Download Full Version :

IBM p5 and pseries Technical Sales Support. Download Full Version : IBM 000-238 p5 and pseries Technical Sales Support Download Full Version : https://killexams.com/pass4sure/exam-detail/000-238 QUESTION: 130 A customer is ordering a new p650 server to be placed into an

More information

Power 795. New High-end 24 to 256 Cores

Power 795. New High-end 24 to 256 Cores New Power 795 New High-end 24 to 256 Cores 8 8 TB memory TurboCore 3.7, 4.0 or 4.25 GHz 1,000 VMs* with PowerVM Capacity on Demand Enterprise RAS 24x7 Warranty PowerCare 1 * Statement of Direction System

More information

IBM Enterprise Technical Support for AIX and Linux -v2. Download Full Version :

IBM Enterprise Technical Support for AIX and Linux -v2. Download Full Version : IBM 000-108 Enterprise Technical Support for AIX and Linux -v2 Download Full Version : http://killexams.com/pass4sure/exam-detail/000-108 QUESTION: 117 An administrator is preparing fibre-channel attached

More information

Supported Linux distributions for POWER8 Linux on Power systems

Supported Linux distributions for POWER8 Linux on Power systems Supported Linux distributions for POWER8 Linux on Power systems Use this topic to find the Linux distributions optimized for POWER8 servers running Linux Note: The recommended Linux distribution for a

More information

PowerVM Single Root I/O Virtualization: Fundamentals, Configuration, and Advanced Topics

PowerVM Single Root I/O Virtualization: Fundamentals, Configuration, and Advanced Topics PowerVM Single Root I/O Virtualization: Fundamentals, Configuration, and Advanced Topics Allyn Walsh Consulting IT Specialist awalsh@us.ibm.com Many contributions from Chuck Graham STSM, Lead Architect

More information

SAN Storage Array Workbook September 11, 2012

SAN Storage Array Workbook September 11, 2012 Page 1 of 9 The following are questions to be asked regarding acquiring SAN Storage Arrays. Some of the questions need to be filled in for the specific environment where the storage system will be deployed

More information

PASS4TEST. IT Certification Guaranteed, The Easy Way! We offer free update service for one year

PASS4TEST. IT Certification Guaranteed, The Easy Way!   We offer free update service for one year PASS4TEST \ http://www.pass4test.com We offer free update service for one year Exam : C9010-022 Title : IBM AIX Administration V1 Vendor : IBM Version : DEMO Get Latest & Valid C9010-022 Exam's Question

More information

IBM POWER8 100 GigE Adapter Best Practices

IBM POWER8 100 GigE Adapter Best Practices Introduction IBM POWER8 100 GigE Adapter Best Practices With higher network speeds in new network adapters, achieving peak performance requires careful tuning of the adapters and workloads using them.

More information

Build your own Cloud on Christof Westhues

Build your own Cloud on Christof Westhues Build your own Cloud on Christof Westhues chwe@de.ibm.com IBM Big Data & Elastic Storage Tour Software Defined Infrastructure Roadshow December 2 4, 2014 New applications and IT are being built for Cloud

More information

POWER9 Announcement. Martin Bušek IBM Server Solution Sales Specialist

POWER9 Announcement. Martin Bušek IBM Server Solution Sales Specialist POWER9 Announcement Martin Bušek IBM Server Solution Sales Specialist Announce Performance Launch GA 2/13 2/27 3/19 3/20 POWER9 is here!!! The new POWER9 processor ~1TB/s 1 st chip with PCIe4 4GHZ 2x Core

More information

Purchasing Services (305) FAX (305) January 31, 2011

Purchasing Services (305) FAX (305) January 31, 2011 Purchasing Services (305) 348-2161 FAX (305) 348-3600 January 31, 2011 ITB 01-006 Purchase, Maintenance, and Installation of Four (4) IBM P750 Servers ADDENDUM #1 Re: Revised Calendar of Events and Exhibit

More information

White Paper. IBM PowerVM Virtualization Technology on IBM POWER7 Systems

White Paper. IBM PowerVM Virtualization Technology on IBM POWER7 Systems 89 Fifth Avenue, 7th Floor New York, NY 10003 www.theedison.com 212.367.7400 White Paper IBM PowerVM Virtualization Technology on IBM POWER7 Systems A Comparison of PowerVM and VMware vsphere 4.1 update

More information

IBM Power Systems. 12 March IBM Power Systems Facts and Features: Scale-out Systems with POWER9Ò Processor Technology

IBM Power Systems. 12 March IBM Power Systems Facts and Features: Scale-out Systems with POWER9Ò Processor Technology 12 March 2018 IBM Power Systems Facts and Features: Scale-out Systems with POWER9Ò Processor Technology 1 Table of contents Page no. Notes 3 Why Power Systems 4 IBM Power System S914 5-10 IBM Power System

More information

HMC, vhmc, Live Partition Mobility

HMC, vhmc, Live Partition Mobility HMC, vhmc, Live Partition Mobility Luc Cloutier luc@ca.ibm.com Frédéric Marcil Frederic.marcil@r2i.ca Charts from : Linda Flanders, IBM USA SSE Delivery and Development Program Manager Gareth Coates, IBM

More information

Veritas InfoScale 7.0 Virtualization Guide - AIX

Veritas InfoScale 7.0 Virtualization Guide - AIX Veritas InfoScale 7.0 Virtualization Guide - AIX November 2015 Veritas InfoScale 7.0 Virtualization Guide The software described in this book is furnished under a license agreement and may be used only

More information

June IBM Power Academy. IBM PowerVM memory virtualization. Luca Comparini STG Lab Services Europe IBM FR. June,13 th Dubai

June IBM Power Academy. IBM PowerVM memory virtualization. Luca Comparini STG Lab Services Europe IBM FR. June,13 th Dubai June 2012 @Dubai IBM Power Academy IBM PowerVM memory virtualization Luca Comparini STG Lab Services Europe IBM FR June,13 th 2012 @IBM Dubai Agenda How paging works Active Memory Sharing Active Memory

More information

Copyright 2011, Oracle and/or its affiliates. All rights reserved.

Copyright 2011, Oracle and/or its affiliates. All rights reserved. The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material,

More information

Accelerating Microsoft SQL Server 2016 Performance With Dell EMC PowerEdge R740

Accelerating Microsoft SQL Server 2016 Performance With Dell EMC PowerEdge R740 Accelerating Microsoft SQL Server 2016 Performance With Dell EMC PowerEdge R740 A performance study of 14 th generation Dell EMC PowerEdge servers for Microsoft SQL Server Dell EMC Engineering September

More information

NexentaStor 5.x Reference Architecture

NexentaStor 5.x Reference Architecture NexentaStor 5.x Reference Architecture November 2018 Copyright 2018 Nexenta Systems, ALL RIGHTS RESERVED NexentaStor 5 Reference Architecture Table of Contents Table of Contents... 2 Preface... 3 Intended

More information

Maailman paras palvelinjärjestelmä. Tommi Salli Distinguished Engineer

Maailman paras palvelinjärjestelmä. Tommi Salli Distinguished Engineer Maailman paras palvelinjärjestelmä Tommi Salli Distinguished Engineer Cisco UCS Momentum $1.1B Annualized Run Rate 7,400 UCS Customers; 2,620 repeat customers with average 3.4 repeat buys 350 ATP Channel

More information

IBM System Storage DCS3700

IBM System Storage DCS3700 IBM System Storage DCS3700 Maximize performance, scalability and storage density at an affordable price Highlights Gain fast, highly dense storage capabilities at an affordable price Deliver simplified

More information

IBM ProtecTIER and Netbackup OpenStorage (OST)

IBM ProtecTIER and Netbackup OpenStorage (OST) IBM ProtecTIER and Netbackup OpenStorage (OST) Samuel Krikler Program Director, ProtecTIER Development SS B11 1 The pressures on backup administrators are growing More new data coming Backup takes longer

More information

IBM Power 520 and Power 550 support the AIX, IBM i, and Linux operating systems

IBM Power 520 and Power 550 support the AIX, IBM i, and Linux operating systems Announcement ZG08-0790, dated October 7, 2008 IBM Power 520 and Power 550 support the AIX, IBM i, and Linux operating systems Table of contents 2 Key prerequisites 30 Technical information 2 Planned availability

More information

... IBM Advanced Technical Skills IBM Oracle International Competency Center September 2013

... IBM Advanced Technical Skills IBM Oracle International Competency Center September 2013 Performance benefits of IBM Power Systems and IBM FlashSystem for JD Edwards EnterpriseOne IBM Power 780 server with AIX and IBM FlashSystem 820 flash storage improves batch performance in a client proof

More information

1.1 Library Firmware Requirements. Firmware SL150 SL500 SL3000 SL8500 Minimum 1.82 FRS 1485 FRS

1.1 Library Firmware Requirements. Firmware SL150 SL500 SL3000 SL8500 Minimum 1.82 FRS 1485 FRS StorageTek Tape Analytics Requirements Guide Release 2.0 E5230-02 July 204 This document lists the requirements for StorageTek Tape Analytics (STA), Release 2.0, as of this document's publication. Review

More information

IBM Power 740 Express server

IBM Power 740 Express server IBM Power 740 Express server High performance, reliable, expandable midsize database and consolidation server Highlights For small-to-midsize database servers Ideal for running today s computeintensive

More information

IBM SmartCloud Entry. Administrator Guide 2.3

IBM SmartCloud Entry. Administrator Guide 2.3 IBM SmartCloud Entry Administrator Guide 2.3 IBM SmartCloud Entry Administrator Guide 2.3 Note Before using this information and the product it supports, read the information in Notices on page 115. Second

More information