1 PoP ROOM: INSIDE AND OUTSIDE PLANT RULES & REGULATIONS Version 14 November 19, 2014 Digital Realty
2 Table of Contents INTRODUCTION... 3 ACCESS TO THE POP ROOMS, ISP & OSP... 3 PoP- MoP Forms... 3 Who must submit a PoP- MoP?... 4 Scheduled Access... 5 Carrier Emergency Access... 5 After Hours Access... 5 SECURITY... 6 RULES FOR POP ROOMS... 6 PROHIBITED PRACTICES IN POP ROOMS... 7 RULES FOR CABLE INSTALLATIONS WITHIN POP ROOMS... 8 PROHIBITED PRACTICES REGARDING ISP & OSP... 9 ELECTRICAL DISTRIBUTION... 9 NEW CONDUIT INSTALLATIONS...10 PRE-ACTIVATION CHECK...10 CABINET AND RELAY RACK INSTALLATIONS...10 LABELING STANDARD...12 DELIVERY OF EQUIPMENT...13 EXHIBIT A: Datacenter Customer PoP-MoP...14 EXHIBIT B: Carrier PoP- MoP...18 Pop Room: Inside and Outside Plant Rules and Regulations Page 2
3 INTRODUCTION Digital Realty s Point of Presence (PoP) Rooms, Inside Plant (ISP) and Outside Plant (OSP) are classified as Mission Critical due to the central role they play in connecting Customers to Carriers and the outside world. All work performed in the PoP Rooms, ISP & OSP must be done in accordance with these Rules & Regulations. These requirements will contribute to providing a safe environment and facilitate the timely, secure and uninterrupted delivery of telecommunications services. It will allow for 24 X 7 X 365 access. ACCESS TO THE POP ROOMS, ISP & OSP 1. Only Customers or Carriers with pathway(s) or premises granted to them in a lease, PoP Room Rider or Carrier Access Contract/Carrier Service Agreement can request access to the PoP Rooms, ISP or OSP. 2. Customers and Carriers must request access to the PoP Rooms, ISP and OSP on behalf of their Vendors and Contractors. 3. Vendors and Contractors cannot request access directly. PoP- MoP Forms 1. There are two PoP-MoP forms: a. Customer PoP-MoP See Exhibit A Datacenter Customer PoP-MoP b. Carrier PoP-MoP See Exhibit B Carrier PoP-MoP 2. Establishes which entity Customer or Carrier--is requiring access to the PoP Room, ISP or OSP. 3. Requires that a Carrier requesting real time access due to an emergency must provide brief description of the emergency wiith name(s) of datacenter Customer(s) affected. 4. Requires full contact information for the senior person from the Customer or the Carrier coordinating and/or requiring access to the PoP, ISP or OSP. 5. Requires the names of everyone from the Customers or the Carrier requiring access to the PoP, ISP or OSP. 6. Requires full contact information for the senior person from the Vendor or Contractor requiring access to the PoP, ISP or OSP. 7. Requires the names of everyone from the Vendor or Contractor requiring access to the PoP, ISP or OSP. Pop Room: Inside and Outside Plant Rules and Regulations Page 3
4 8. Establishes where the work will be performed. a. PoP Room i. Customer or Carrier licensed pathway and/or premise: a) Rack, ¼ rack, quad cabinet or RU(s) ii. Common Area a) Vertical & horizontal ladder rack and fiber guide b) ISP & OSP iii. Customer pathway a) Ducts and conduits b) Innerduct or Maxcell sleeve. iv. Common area a) Man holes vaults, hand holes, junction and pull boxes, cab, etc. 9. Requires the date(s) and time(s) that access is required. Who must submit a PoP- MoP? 1. Customers and Carriers requesting access to the PoPs, ISP and/or OSP 2. Datacenter Customers submit Customer PoP-MoP a. For Customer s employees requesting access to the PoP Rooms or ISP b. On behalf of their Vendors or Contractors c. Customer s employees who are merely visiting and not working in the PoP Room or ISP only need to complete page 1 of the Customer-PoP-MoP 3. Carriers submit Carrier PoP-MoP a. Carrier employees requesting access to the PoP Rooms, ISP or OSP b. On behalf of their Vendors or Contractors 4. Remote Hands do not need to submit a PoP-MoP when performing cross-connects Pop Room: Inside and Outside Plant Rules and Regulations Page 4
5 Scheduled Access 1. The appropriate PoP-MoP must be fully completed and submitted by the Customer or Carrier 48 hours in advance of the requested access via a. Customer Portal, or b. to 2. The PoP-MoP must be approved by Building Management before access is granted. 3. An approved PoP- MoP is required for access to the PoP Room, ISP & OSP even if there will only be a visit and no work will be performed. Carrier Emergency Access 1. The Carrier PoP-MoP must be fully completed and submitted by the Carrier a. Via to Customer Portal, b. Via Customer to Customerservice@digitalrealty.com, c. Via hard copy to Building Management in business hours, or d. Via hard copy to Security after hours 2. A description of the emergency including any impact on other Customers is required. 3. The PoP-MoP must be approved by Building Management before access is granted. After Hours Access 1. The correct PoP-MoP must be fully completed and submitted by the Customer or Carrier a. Via to Customerservice@digitalrealtytrust.com, b. Via Customer Portal, or c. Via hard copy to Security 2. The PoP-MoP must be approved by Building Management before access is granted. Pop Room: Inside and Outside Plant Rules and Regulations Page 5
6 SECURITY 1. All persons accessing the PoP Rooms, ISP & OSP must be in possession of a valid Customer or visitor badge. 2. All Carriers, Vendors and Contractors requesting access to the PoP Rooms, ISP & OSP must show a Government issued ID to Security to obtain a visitors badge. 3. All Carriers Vendors and Contractors accessing the PoP Rooms, ISP & OSP must be escorted by Building Management or Security. 4. Building Management or Security escort will remain with the Customer, Carrier Vendor or Contractor for the duration of a visit or while work is being performed. 5. All persons entering a PoP Room will register their Customer or visitor badge at the card reader before entering. 6. Any person not complying with Security requirements will be denied access to, or ejected from the PoP Rooms, ISP & OSP. RULES FOR POP ROOMS 1. Customers are only authorized to work in the area(s) identified in an approved PoP- MoP. 2. Work must be performed in a professional manner; it must comply with industry standards and the standards set forth in the PoP Room, ISP & OSP Rules & Regulations. a. Building Management reserves the right to have the work removed or replaced in the event that it does not meet these standards. 3. Extreme care should be used at all time when working in a PoP Room. 4. Customers must remove any trash before they leave the PoP Room. 5. Customers are obliged to keep their space neat and clean. 6. At completion of the work and prior to activation (see Pre-Activation Check), the Customer must notify Building Management, so that the work can be inspected and verified against these Rules & Regulations and the approved PoP-MoP. 7. All incidents must be reported to Building Management immediately. Pop Room: Inside and Outside Plant Rules and Regulations Page 6
7 8. All incidents after hours must be reported to Security immediately. 9. Building Management will audit Customer equipment on a continual basis and shall notify Customers if corrections are required. PROHIBITED PRACTICES IN POP ROOMS 1. Working in areas (Customer/common area) not identified in the approved PoP-MoP. 2. Splicing outside of a Customer s or Carriers licensed area (cabinet, relay rack or ¼ relay racks). 3. Leaving slack loops anywhere but in a location approved in writing by Building Management 4. Deploying splice cans 5. Mounting anything on walls without specific written permission from Building Management or called out in a POP Rider, Carrier Access Contract or Carrier Service Agreement. 6. Tampering with the access control system, HVAC settings, airflow, cameras, fire alarms, smoke detectors and signage. 7. Tailgating: a. i.e. following someone into the PoP Room without registering a visitor s or Customer s badge. b. Opening the POP door to allow a person into the space without using biometric access device 8. Propping POP room door open for any reason. 9. Eating, drinking or smoking. 10. Taking photographs or video. 11. Using a PoP Room to store anything. a. Building Management or Security will dispose of any such articles. 12. Leaving any articles behind after hours. a. Building Management or Security will dispose of any such articles. Pop Room: Inside and Outside Plant Rules and Regulations Page 7
8 RULES FOR CABLE INSTALLATIONS WITHIN POP ROOMS 1. Signal Cable: Defined as any cable transmitting a signal over fiber, copper or coax. These cables must be installed on the bottom tier of ladder rack in the POP rooms. 2. All Signal cables must be plenum rated when entering from a Customer s suite or space. 3. All horizontal cabling will be attached to horizontal ladder rack, and all vertical cabling will be attached to a vertical ladder rack or cable management system. a. Inner-duct is not required in the POP rooms. b. If innerduct is required this will be ran on the bottom tier of ladder rack. c. All cabling and innerduct must waterfall over the side of the ladder rack and not through the rungs of the ladder. This must also not block or obstruct any equipment, device, outlet or cable management systems within the cabling footprint. d. All cabling must be fastened to vertical & horizontal ladder rack with #12 stitching/lace wax cord. Velcro may be used if installer cannot stitch/lace. e. Tie-Wraps are not allowed as a permanent fastening solution. Tie-wraps can only serve as a temporary solution during installation or build. 4. All fiber cross-connects, jumpers and patch cables must be run in POP room provided ADC FiberGuide System, where installed. These must not be run in innerduct and or on any ladder racking. 5. Any copper or coax cross-connects, jumpers and patch cables must run on the signal ladder rack. These must not be run in innerduct and must follow same rules cabling rules. a. Waterfall cables over the sides or ladder racks and not through rungs. b. Lace/stitch cables to ladder rack. c. Label as described below. 6. Building Management will audit Cable Installations & equipment installs on a continual basis and shall notify Customers or Carriers if any corrections are required. Pop Room: Inside and Outside Plant Rules and Regulations Page 8
9 RULES FOR ISP & OSP 1. Customers and Carriers are only authorized to work in the pathways and common areas identified in an approved PoP- MoP. 2. Work must be performed in a professional manner, it must comply with industry standards and the standards set forth in the PoP Room, ISP & OSP Rules & Regulations. a. Building Management reserves the right to have the work removed or replaced in the event that it does not meet these standards. 3. Customers and Carriers must take the utmost care not to damage other Customers AND Carriers facilities in common areas. 4. Building Management will audit Customer ISP & OSP on a continual basis and shall notify Customers if any corrections are required. PROHIBITED PRACTICES REGARDING ISP & OSP 1. Splice cases in man holes, hand holes and vaults. 2. Slack loops in man holes, hand holes and vaults. 3. Slack loops or splice cases in Property Campus entrance vaults 4. Cables blocking or impeding ducts or conduit points of entry 5. Installing cables in ducts or inner-ducts in higher ducts when there are available ducts or inner-ducts lower down in the duct bank stack. 6. Building Management reserves the right to have the work removed or replaced in the event that it does not meet these standards. ELECTRICAL DISTRIBUTION 1. Building Management will manage all electrical distribution requirements. 2. A PoP Room Rider, Carrier Access Contract or Carrier Service Agreement will need to be fully executed before any electrical circuit activation. Pop Room: Inside and Outside Plant Rules and Regulations Page 9
10 3. Customers must adhere to the existing power cabling standard. a. DC cabling cloth covered with red positive and black or gray for negative, and sized accordingly. b. Grounding-RHH/RHW or THHN, Type green. 4. Building Management will control all electrical breaker positions. 5. Distribution panels will remain locked at all times. 6. Coordination of breaker operation must be requested by Datacenter Customer or Carrier Customer and approved by Building Management prior to activation. 7. All AC and DC power cabling to cabinets and relay racks will be installed by an approved electrician and approved by Building Management. 8. Customers are responsible for connection or plug in of all power for equipment in the space. 9. Building Management will audit Electrical Distribution on a continual basis and shall notify Customers if any corrections are required. NEW CONDUIT INSTALLATIONS Building Management will manage all new conduit installations. PRE-ACTIVATION CHECK At the critical period between the time the Customer s cabling or installation is completed but before equipment is activated, the cabling or installation is to be checked by Building Management prior to the equipment activation (powered, energized or turned up). CABINET AND RELAY RACK INSTALLATIONS 1. Building Management will manage all cabinet and rack Installations. a. Building Management reserves the right to make an exception to this rule. 2. A Quad is defined as ¼ of an EIA-D compliant rack10 or 11 Rus. Pop Room: Inside and Outside Plant Rules and Regulations Page 10
11 Pop Room: Inside and Outside Plant Rules and Regulations Page 11
12 LABELING STANDARD 1. All signal cables and x-connects in the common area will be labelled. 2. Telecommunications labels will be black characters on orange. 3. Equipment a. Carrier Customers must identify their equipment in racks and cabinets with a label displaying their name. 4. Signal Cable a. Permanent labels are required for identification of Carrier Customer cable ownership. i. See approved materials below. b. Labels should be present every 10 feet. i. See approved materials below. 5. Cables between racks/cabinets/interconnection areas. a. Labels should be present at the beginning and end points of the cable. b. Labels should be present every 10 feet. c. Write on labels are allowed for the identification of circuits. d. Labels should include Customer name(s) or Suite #, cabinet/ rack number. i. See approved materials below. 5. ISP & OSP a. Permanent labels are required for identification of Carrier Customer cable ownership in maintenance holes and hand holes. i. See approved materials below. 6. Power Cables a. All power cabling will be labeled according to industry standards and completed by the Customer and/or their Contractor/Vendor. Pop Room: Inside and Outside Plant Rules and Regulations Page 12
13 7. Building Management will audit Customer labeling on a continual basis and shall notify Customers if any corrections are required. DELIVERY OF EQUIPMENT 1. Deliveries must go directly from the loading dock to the PoP Room for installation. 2. No staging area is provided. 3. Customers are required to ensure that delivery and moving companies provide the appropriate insurance certificates to Building Management before the delivery arrives. Pop Room: Inside and Outside Plant Rules and Regulations Page 13
14 EXHIBIT A: DATACENTER CUSTOMER POP-MOP Pop Room: Inside and Outside Plant Rules and Regulations Page 14
15 Pop Room: Inside and Outside Plant Rules and Regulations Page 15
16 Pop Room: Inside and Outside Plant Rules and Regulations Page 16
17 Pop Room: Inside and Outside Plant Rules and Regulations Page 17
18 EXHIBIT B: CARRIER POP- MOP Pop Room: Inside and Outside Plant Rules and Regulations Page 18
19 Pop Room: Inside and Outside Plant Rules and Regulations Page 19
20 Pop Room: Inside and Outside Plant Rules and Regulations Page 20
21 Pop Room: Inside and Outside Plant Rules and Regulations Page 21
22 Pop Room: Inside and Outside Plant Rules and Regulations Page 22
23 Pop Room: Inside and Outside Plant Rules and Regulations Page 23
Data Centers and Mission Critical Facilities Access and Physical Security Procedures
Planning & Facilities Data Centers and Mission Critical Facilities Access and Physical Security Procedures Attachment B (Referenced in UW Information Technology Data Centers and Mission Critical Facilities
More informationCenteris Data Centers - Security Procedure. Revision Date: 2/28/2018 Effective Date: 2/28/2018. Site Information
Section 01 Document Information Creation Date: 12/1/2016 Centeris Data Centers - Security Procedure Revision Date: 2/28/2018 Effective Date: 2/28/2018 Section 02 Site Information Site Information Document
More informationSECTION COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING
SECTION 27 13 23 COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete
More informationTarleton State University. Specifications
Tarleton State University Campus Communication Infrastructure Specifications Cabling Standards Summary This document identifies Tarleton State University communication infrastructure standards. The communication
More informationAT&T Switched Ethernet Service SM
Site Preparation Guide AT&T Switched Ethernet Service SM December 2016 2016 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo, Mobilizing Your World and DIRECTV are registered trademarks
More informationFACILITY USER GUIDE. Colocation in Key Info s Agoura Court Data Center
FACILITY USER GUIDE Colocation in Key Info s Agoura Court Data Center Page 1 of 11 Key Info Facilities User Guide v2.4 Table of Contents Welcome... 3 GETTING STARTED... 4 Colocation Access... 4 Proof of
More informationAT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)
AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT) Site Preparation Guide 2015 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T
More informationAT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)
AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT) Site Preparation Guide This guide is designed to assist local on-site contacts to understand what you will need to
More information17. Microwave Collocation 17.1 General
Original Page 1 17.1 General 17.1.1 General A. Unless otherwise specified herein, general regulations contained in Sections 1 through 4 and Sections 14 and 15 apply in addition to the regulations contained
More informationOffice of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO
Cabling Standards Office of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO 1. Purpose CABLING STANDARDS This technical note
More informationData Center Access Policies and Procedures
Data Center Access Policies and Procedures Version 2.0 Tuesday, April 6, 2010 1 Table of Contents UITS Data Center Access Policies and Procedures!3 Introduction!3. Overview!3 Data Center Access!3 Data
More informationPhysical and Environmental Security Standards
Physical and Environmental Security Standards Table of Contents 1. SECURE AREAS... 2 1.1 PHYSICAL SECURITY PERIMETER... 2 1.2 PHYSICAL ENTRY CONTROLS... 3 1.3 SECURING OFFICES, ROOMS AND FACILITIES...
More informationTimico Data Centres: Access Policy
Timico Data Centres: Access Policy Timico Ltd 2012 Page: 1 of 6 1 Contents 1 Contents... 2 2 Version control... 2 3 Overview... 3 4 Introduction... 3 5 Rules of conduct... 3 6 Access request procedure...
More informationCCBC is equipped with 3 computer rooms, one at each main campus location:
Policy: Computer Room Procedures Policy: Draft 12/14/2009 1.0 Purpose The purpose of this document is to establish procedures for the Community College of Baltimore County (CCBC) Information Technology
More informationComputer Network Design Guide Existing Systems 1 / 6
COMPUTER NETWORK DESIGN GUIDELINE FOR EXISTING SYSTEMS DOCUMENT NUMBER: 16765 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 11-27-06 - First Issued NOTES: The attached guideline should
More informationSECTION 15 KEY AND ACCESS CONTROLS
15.1 Definitions A. The definitions in this section shall apply to all sections of the part unless otherwise noted. B. Definitions: Access Badge / Card a credential used to gain entry to an area having
More informationUITS Data Center Access Policies and Procedures
UITS Data Center Access Policies and Procedures Revision 5: 2/15/2017 2/15/17 Page 1 Author: Len Sousa, UConn/UITS Contents... 1 UITS Data Center Access Policies and Procedures... 1 1. Introduction...
More informationData Center Colocation Service Level Agreement
Data Center Colocation Service Level Agreement Contents Terminology... 2 Service Description... 2 Power... 2 Conditioned Space... 3 Fire Suppression... 3 Service Reporting... 3 Hardware Replacement...
More informationSabey Data Center Properties CONSOLIDATED WORK RULES
Sabey Data Center Properties CONSOLIDATED WORK RULES Contents Overview... 2 Building Security... 2 General... 2 Access Badge Display... 2 Security Rounds... 2 Access to Secure Spaces... 2 Emergency Exits...
More informationTarget Interface / Construction Compliance Inspection Checklist
TES A. Roads-Service, Lanes Common Items Trails and service roads provide adequate access to buildings for maintenance B. Testing Results-provided to the local government construction representative Data
More informationCommunications Room Policy
Information Security Policies Communications Room Policy Author : David Rowbotham Date : 01/07/2014 Version : 1.1 Status : Initial Release MAG Information Security IT Policies Page: 1 1 Table of contents
More informationData Centre Security. Presented by: M. Javed Wadood Managing Director (MEA)
Data Centre Security Presented by: M. Javed Wadood Managing Director (MEA) EPI history and global locations UK origin, 1987 Singapore office, 1999 9 EPI offices worldwide Global partner network spanning
More informationBROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS
BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS All noted standards apply to the current revisions applicable at the time of construction or intended construction. NO SUBSTITUTIONS
More informationData Cabling / Low Voltage Technology Specifications
P19-02- Forsyth County Schools Data Cabling / Low Voltage Technology Specifications 1. General requirements 1.1 On premise connectivity All building closets (IDF) aside from the main closet (MDF) shall
More informationPhysical and Environmental Security Policy Document Number: OIL-IS-POL-PES
Physical and Environmental Security Policy Document Number: OIL-IS-POL-PES Document Details Title Description Version 1.0 Author Classification Physical and Environmental Security Policy Physical and Environmental
More informationNZQA unit standard version 2 Page 1 of 5
Page 1 of 5 Title Demonstrate knowledge of installation practices and procedures for telecommunications network equipment Level 3 Credits 10 Purpose This unit standard covers the installation of basic
More informationOpen IX Data Center Technical Standards
Open IX Data Center Technical Standards Comments/Questions: dc group@open ix.org Last updated: November 1, 2013 Version: 1.0 Developed by: Open IX Data Center/MMR Standards Committee Gabe Cole RTE Group
More informationOpen Access. Definitions
Open-IX Data Center Technical Standards Version 2.0, January 1, 2018 Questions: dc-group@open-ix.org The purpose of the Open- IX Data Center Technical Standards document is to establish a recommended standard
More informationClassroom WiFi Network Infrastructure Plan
Seattle Archdiocese Office for Catholic Schools Design for Classroom WiFi Network Modernization Guidelines for IT Physical Infrastructure Design and Specifications This document provides guidelines to
More informationStandard CIP-006-4c Cyber Security Physical Security
A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-4c 3. Purpose: Standard CIP-006-4c is intended to ensure the implementation of a physical security
More informationSPECIFICATION STANDARD COPPER RISER AND INTRABUILDING CABLING
PART 1: GENERAL 1.01 SCOPE OF WORK A. The Designer and Contractor are responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the
More informationSECTION FARE COLLECTION SYSTEM
SECTION 17830 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for the Ticket Vending Machines (TVMs) and for the Clipper Network Card Interface Devices (CIDs) as a subsystem of the station
More informationCrisp Data Centre Standards 11 November 2008
Crisp Data Centre Standards 11 November 2008 This document outlines the standards that are enforced within the Crisp Data Centre, and as amended from time to time. Also specified are the responsibilities
More informationANSI/TIA/EIA-568-B Cabling Standard
83 Pair Numbers and Color Coding The conductors in a UTP cable are twisted in pairs and color coded so that each pair of wires can be easily identified and quickly terminated to the appropriate pin on
More informationUlster University Policy Cover Sheet
Ulster University Policy Cover Sheet Document Title DATA CENTRE ACCESS POLICY 3.2 Custodian Approving Committee Data Centre & Operations Manager ISD Committee Policy approved date 2017 09 08 Policy effective
More informationSPECTRUM ENTERPRISE. Colocation Services Addendum
LEGAL SPECTRUM ENTERPRISE Colocation Services Addendum This Colocation Services Addendum ( Colocation Addendum ) governs the Spectrum Enterprise Colocation Service ( Colocation Service ) and constitutes
More informationCenturyLink Data Center North American Facility User Guide
CenturyLink Data Center North American Facility User Guide page 1 of 18 NORTH AMERICAN FACILITY USER GUIDE Table of Contents 1.0 - Welcome... 3 1.1 - CenturyLink Data Center Facility Classifications...
More informationCopper Riser And Intrabuilding Cabling
Copper Riser And Intrabuilding Cabling PART 1: GENERAL The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable
More information6. Secured Collocation Open Physical Environment (SCOPE) 6.1 Description
6.1 Description Page 1 Unless otherwise specified herein, general regulations contained in Part A, Sections 1 through 4 and Part E, Sections 1 and 2 apply in addition to the regulations contained in this
More informationn+2 DATA CENTER CONTROL POLICY
This Data Center Control Policy (the Control Policy ) forms a part of the Master Services Agreement between n+2 LLC ( n+2 ) and Client (the Agreement ), in which this Control Policy is incorporated by
More informationMeter Enclosure and Equipment Standards
Meter Enclosure and Equipment Standards (a) (b) General Requirements: CITY OF OCALA UTILITY SERVICES METER ENCLOSURE AND EQUIPMENT STANDARDS: (1) To avoid the costs associated with having to replace unacceptable
More informationData Center Rules & Regulations
Data Center Rules & Regulations VERSION 7.1 AUGUST, 2013 TABLE OF CONTENTS SECTION 11102: TURN-KEY DATACENTER RULES & REGULATIONS... 3 THE PURPOSE OF THESE STANDARDS... 3 DEFINITION OF MISSION CRITICAL
More informationSECTION COMMUNICATIONS BACKBONE CABLING
(NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) PART 1 GENERAL 1.1 RELATED
More informationTechnical Planning for Moving Into a Colocation Data Center
Technical Planning for Moving Into a Colocation Data Center Jonathan Jew - J&M Consultants, Inc. Co-chair BICSI Data Center Subcommittee Secretary TIA TR-4 Telecommunications Cabling Systems Chair TIA
More informationv2.5 was updated May 10, v2.6 is an updated copy from March 1, 2017.
Changes in v2.6: v2.5 was updated May 10, 2016. v2.6 is an updated copy from March 1, 2017. Modifications to 4. Horizontal Pathways section with feedback incorporated from UofA Facilities and Operations
More informationAT&T Virtual Private Network Service (VPN) and AT&T VPN Express
AT&T Virtual Private Network Service (VPN) and AT&T VPN Express Site preparation guide This guide is designed to assist local on-site contacts to understand what you will need to accomplish in preparation
More informationTechnical Planning for Moving Into a Colocation Data Center
Technical Planning for Moving Into a Colocation Data Center Jonathan Jew J&M Consultants, Inc. Co-chair BICSI Data Center Subcommittee Secretary TIA TR-4 Telecommunications Cabling Systems Chair TIA TR-4.6
More informationStandard CIP-006-3c Cyber Security Physical Security
A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-3c 3. Purpose: Standard CIP-006-3 is intended to ensure the implementation of a physical security
More informationCERTIFICATION PLUS SM
CERTIFICATION PLUS SM SYSTEM WARRANTY PROGRAM Panduit Warranty Guide PROGRAM OUTLINE TABLE OF CONTENTS: MATERIALS PAGE # Program Outline 2 Table of Contents Warranty Information 3 Introduction & Installation
More informationAT&T Virtual Private Network Service (VPN) and AT&T VPN Express
AT&T Virtual Private Network Service (VPN) and AT&T VPN Express Site Preparation Guide 2017 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo, Mobilizing Your World and DIRECTV are registered
More informationHIPAA Security. 3 Security Standards: Physical Safeguards. Security Topics
HIPAA Security SERIES Security Topics 1. Security 101 for Covered Entities 2. Security Standards - Administrative Safeguards 3. Security Standards - Physical Safeguards 4. Security Standards - Technical
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO/IEC 18010 First edition 2002-05 Information technology Pathways and spaces for customer premises cabling ISO/IEC 2002 All rights reserved. Unless otherwise specified, no part
More informationData Center Design and the ANSI/TIA-942 Standard
Data Center Design and the BICSI Regional Meeting Ellicott, MD Rick Foster RCDD,TLT Communications Infrastructure Group July 27, 2006 What is ANSI/TIA-942? Published by TIA in April 2005 Telecommunications
More informationThe six major components of a structured wiring system are:
OBJECTIVES 1. Describe various ANSI/TIA/EIA standards for commercial buildings and residential settings. 2. Discuss the specific Technical Systems Bulletins that can affect telecommunications installations.
More informationSFTI & COLOCATION US US LIQUIDITY CENTER OPERATING POLICIES & PROCEDURES. June Version 12 STATUS. NYSE Group, Inc.
SFTI & COLOCATION US US LIQUIDITY CENTER OPERATING POLICIES & PROCEDURES June 2016 STATUS Version 12 NYSE Group, Inc. 2016 Page 1 About This Document The following documents should be read in conjunction
More informationNZQA unit standard version 3 Page 1 of 5. Demonstrate knowledge for telecommunications premises network cablers
Page 1 of 5 Title Demonstrate knowledge for telecommunications premises network cablers Level 2 Credits 2 Purpose This unit standard is for people installing and maintaining telecommunications cables on
More informationGovernment of Prince Edward Island Structured Cabling Standards August 24, 2009
Government of Prince Edward Island Structured Cabling Standards August 24, 2009 Emerging technologies dictate that it is no longer allowable to simply integrate various manufacturers components into a
More informationDATA CENTER COLOCATION BUILD VS. BUY
DATA CENTER COLOCATION BUILD VS. BUY Comparing the total cost of ownership of building your own data center vs. buying third-party colocation services Executive Summary As businesses grow, the need for
More informationSecurity Integrator. Solutions. Your One Source for Physical Security, Network & Electrical. Solutions
Your One Source for Physical Security, Network & Electrical Solutions Security Integrator Solutions WESCO best-in-class supply chain solutions The latest technology from all industry-leading manufacturers
More informationFIBER OPTIC HARDWARE STEVE PAULOV
C H A P T E R 7 FIBER OPTIC HARDWARE STEVE PAULOV The main purpose for hardware is to protect and organize splice and termination points. Hardware can be divided into two categories; indoor and outdoor.
More informationAIMS CUSTOMER HAND BOOK THANK YOU FOR CHOOSING AIMS AS YOUR PREFERRED SERVICE PROVIDER.
AIMS CUSTOMER HAND BOOK THANK YOU FOR CHOOSING AIMS AS YOUR PREFERRED SERVICE PROVIDER. It is our pleasure to provide you with the fullest of Informations to enable you to obtain the best from our services.
More informationInformation Services IT Security Policies L. Network Management
Information Services IT Security Policies L. Network Management Version 1.1 Last updated: 11th August 2010 Approved by Directorate: 2nd July 2009 Review date: 1st August 2011 Primary owner of security
More informationStandard CIP Cyber Security Physical Security
A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-3 3. Purpose: Standard CIP-006-3 is intended to ensure the implementation of a physical security program
More informationAIMS HOUSE RULES AND REGULATIONS
AIMS HOUSE RULES AND REGULATIONS The security of the equipment and information in our data centres is of critical importance to the daily function of our customers operations. The following House Rules
More informationANSI/TIA/EIA-568-B Cabling Standard NOTE
95 ANSI/TIA/EIA-569-A Though the ANSI/TIA/EIA-568-B Standard describes the subsystems of a structured cabling system, the TIA has published a more thorough document called ANSI/TIA/EIA-569-A Commercial
More informationCommunications. UNM IT/Telecommunications Guide Specification Communications
The material below covers specific information we definitely want to be included in the contract documents and may not be a completed specification section. This material is to be highlighted in your preliminary
More informationLos Angeles Community College District Design Standards
LACCD Facilities Design Standards - Structural Cabling and Telecommunications Room Facilities Ver Approved: DTC February 0, 0 LACCD has developed the following Districtwide standard for IT infrastructure
More informationA - Campus Emergency Phone System
University of New Hampshire University of New Hampshire Scholars' Repository Division 27 Communication Chapter 5 Technical Construction and Renovation Standards 2-26-2016 270742 - A - Campus Emergency
More informationNZQA registered unit standard version 2 Page 1 of 7. Demonstrate basic knowledge of electronic security data protocols and cabling
Page 1 of 7 Title Demonstrate basic knowledge of electronic security data protocols and cabling Level 3 Credits 15 Purpose This unit standard is for electronic security installers engaged in the installation
More informationTECHKNOW, INC. Kiosk Order Confirmation System INSTALLATION MANUAL. Revision Date: July 11, 2012 Part # Version 3.2
document Page 1 of 18 TECHKNOW, INC Kiosk Order Confirmation System INSTALLATION MANUAL Revision Date: July 11, 2012 Part # Version 3.2 Techknow, Inc. 393 Mayfield Road Duncan, SC 29334 www.gotechknow.com
More informationCYBER SECURITY POLICY REVISION: 12
1. General 1.1. Purpose 1.1.1. To manage and control the risk to the reliable operation of the Bulk Electric System (BES) located within the service territory footprint of Emera Maine (hereafter referred
More informationMayhew Technology Solutions
Mayhew Technology Solutions Business Overview MTS offers design, engineering, and installation services for fiber optic, telecommunications, ISP, OSP, physical security, low voltage, and audio-visual systems.
More informationf) Telecommunications Equipment Rooms
SECTION 270000 - COMMUNICATIONS PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification
More informationNetwork Construction Guide Specification Telecommunications Infrastructure Standards V 2.6
Network Construction Guide Specification Telecommunications Infrastructure Standards 11-16-2018 V 2.6 Springfield Public Schools R12 Prepared by: Approved by: Released by: Springfield Public Schools R12
More informationYour One Source for Federal Solutions
Your One Source for Federal Solutions GSA Contract Vehicles Dedicated Federal and Technical Teams Local Presence, International Network About WESCO The WESCO Federal Advantage Government Team Commitment
More informationPANGEN SYSTEM WARRANTY. Warranty Guide
PANGEN SYSTEM WARRANTY Warranty Guide C2-10270 PANGEN SYSTEMWARRANTY GUIDE PROGRAM OUTLINE TABLE OF CONTENTS: MATERIALS PAGE # Program Outline 2 Table of Contents Warranty Information 3 Introduction &
More informationCabling a Data Center to TIA-942 Standard
Cabling a Data Center to TIA-942 Standard BICSI 2006 Winter Conference Wednesday, January 25 th 2006 at 9:15 am Gary J. Bernstein, RCDD HellermannTyton Corporation Agenda Overview of TIA-942 Data Center
More informationRFP Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service
RFP 2017 845 Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service Version 1 Contents Project objectives... 1 Background... 1 Scope... 1 Timeframe and Cost... 4 Stakeholders, roles and responsibilities...
More informationSPECIAL INSTRUCTIONS FOR CAPACITORS COMPACT GENERATORS
SPECIAL INSTRUCTIONS FOR CAPACITORS COMPACT GENERATORS (WITH CAPACITOR CHARGER BOARD A3517-02) The process depends on Generator and System configuration. This document applies to installation of Capacitors
More informationSPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120
DESIGN GUIDELINES PRESTO INSTALLATION & CONNECTIVITY PAGE 1 of 4 ELECTRICAL CONNECTIVITY AND WIRING Communications Conduits Conduits designated for Presto equipment data wiring shall be clearly identified
More informationRack Solutions RS-2. Free Standing Racks & Cabinets Wall Mount Racks, Cabinets, & Brackets Shelving Cable Management Accessories RS-5 RS-10 RS-12
Rack Solutions Rack Solutions Rack Solutions Contents: RS-2 RS-5 RS-10 RS-12 RS-14 Free Standing Racks & Cabinets Wall Mount Racks, Cabinets, & Brackets Shelving Cable Management Accessories As a logical
More informationSecurity Integrator. Solutions. Your One Source for Physical Security, Network & Electrical. Solutions
Your One Source for Physical Security, Network & Electrical Solutions Security Integrator Solutions WESCO CSC best-in-class supply chain solutions The latest technology from all industry-leading manufacturers
More informationChapter 1 Introduction to Outside Plant
Chapter 1 Introduction to Outside Plant Chapter 1 offers an overview of outside plant (OSP) fundamentals. An introduction to standardization and valuable resources for the OSP designer are also included
More informationpeace of mind kit FAQ s Q: Is AccuPay bonded?
peace of mind kit At AccuPay, we take the trust you have placed in us very seriously. We understand that you depend on us to produce accurate payrolls as well as accurate tax returns and payments. With
More informationSCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS
1.0 PROJECT ADMINISTRATION SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS Project Administration services shall consist of project management and other support services for
More informationCRM Control Panel and Weather Detection System CRM3 for DC actuators (part # 40821J) CRM4 for AC actuators (part # 40822K)
CRM Control Panel and Weather Detection System CRM3 for DC actuators (part # 40821J) CRM4 for AC actuators (part # 40822K) CRM Applications CRM includes a control relay box and a power supply; additional
More informationPage 1 of 15. Applicability. Compatibility EACMS PACS. Version 5. Version 3 PCA EAP. ERC NO ERC Low Impact BES. ERC Medium Impact BES
002 5 R1. Each Responsible Entity shall implement a process that considers each of the following assets for purposes of parts 1.1 through 1.3: i. Control Centers and backup Control Centers; ii. Transmission
More informationThe Common Controls Framework BY ADOBE
The Controls Framework BY ADOBE The following table contains the baseline security subset of control activities (derived from the Controls Framework by Adobe) that apply to Adobe s enterprise offerings.
More informationWire Communications Design jfm 07. An Inside Look at Outside Plant
An Inside Look at Outside Plant BICSI Region Meeting 2007 Agenda What is CO-OSP? A close look at the 758-A standard Available Resources What is CO-OSP? Customer Owned Outside Plant Telecommunications infrastructure
More informationI. PURPOSE III. PROCEDURE
A.R. Number: 2.11 Effective Date: 2/1/2009 Page: 1 of 5 I. PURPOSE This policy outlines the procedures that third party organizations must follow when connecting to the City of Richmond (COR) networks
More informationEUROPEAN LIQUIDITY CENTRE COLOCATION OPERATING POLICIES
EUROPEAN LIQUIDITY CENTRE COLOCATION OPERATING POLICIES Version 5.3 December 2017 ICE Data Services Limited PREFACE REFERENCES A reference in this document to: Authorised Trading Platform means a trading
More information2.3 SCOPE OF WORK MATRIX TO BE INCLUDED IN DISTRICT PROJECTS
NOCCCD Cabling Infrastructure Standards - Page 1 2.3 SCOPE OF WORK MATRI TO BE INCLUDED IN DISTRICT PROJECTS For each project, a Scope of Work Matrix is to be created by the construction manager and updated
More informationICS Entrance Management Sign Installation Guide. Version 1.0
ICS Entrance Management Sign Installation Guide Version 1.0 Thank you for purchasing your new ICS Entrance Management System (EMS) from Innovative Control Systems, Inc. Installation Overview This document
More informationINTERIM COMMUNICATIONS INFRASTRUCTURE PLANNING GUIDELINES
INTERIM COMMUNICATIONS INFRASTRUCTURE PLANNING GUIDELINES University of California, Riverside Computing and Communications April XX, 2001 R1V6 TABLE OF CONTENTS Introduction and Background...3 Outside
More informationSPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station
SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet Reference: ZD23 Version: 1.1 Issue date: 15 May 2014 Contents 1 Scope... 3 2 Deer Park Terminal
More informationInstallation Instructions
50ES, 50EZ, 50GL, 50GS, 50GX, 50JS, 50JX, 50JZ, 50SD, 50SZ, 50VL, 50VT, 50XP, 50XZ 601A, 602A, 602B, 604A, 604B, 604D, 607C, 701A, 702A, 702B, 704A, 704B, 704D, 707C PA1P, PA2P, PA3P, PH1P, PH2P, PH3P
More informationAtras Network Communications
Atras Network Communications Guide to Information and Communications Technology (ICT) Standards developed and published by the Telecommunications Industry Association (TIA) The Telecommunications Industry
More informationANNEX. Organizational and technical measures
ANNEX Organizational and technical measures The Data Processor has implemented the measures as described in this exhibit insofar as the respective measure contributes or is capable of contributing directly
More informationAUTHORITY FOR ELECTRICITY REGULATION
SULTANATE OF OMAN AUTHORITY FOR ELECTRICITY REGULATION SCADA AND DCS CYBER SECURITY STANDARD FIRST EDITION AUGUST 2015 i Contents 1. Introduction... 1 2. Definitions... 1 3. Baseline Mandatory Requirements...
More informationStandard: Data Center Security
Standard: Data Center Security Page 1 Executive Summary The university data centers provide for the reliable operation of SJSU s computing systems, computing infrastructure, and communication systems.
More information