5 ROP Institutional Issues
|
|
- Martin Lewis
- 5 years ago
- Views:
Transcription
1 5 ROP Institutional Issues Throughout the ROP process, the Forum and Task Force attendees raised numerous institutional issues and proposed various remedies. Many of the identified issues fell outside of the purview of the region. While this type of feedback did not neatly fit into the ROP, it was important to capture. Participants believed that to be appropriately addressed many of these suggestions and recommendations needed to be raised at a level higher than the PennDOT District or the region either by PennDOT Central Office or the state government. This section identifies and discusses those institutional concerns that were identified as most critical in the opinion of ROP participants. Table 3 lists some of the issues that were raised in several different ROPs, and the issues are cross referenced to ROPs that listed them. Table 3: ROP Institutional Issues Common Institutional Issues ROP Region Northwest District 2-0 North Central Northeastern Region 5 DVRPC/District 6-0 South Central Southern Alleghenies Southwestern Expedite 511 Elevating Operations Dedicated Operations Funding Increased Staffing Increased Training Coordination Between Agencies Maintenance Use of Wireless Field Equipment - Issue Raised As noted, the above table is not comprehensive, but represents the most common issues throughout the state. A full list of each region s institutional issues is below. Northwest IM Training participate in Pennsylvania Emergency Management Agency (PEMA) Quarterly Incident Management Trainings RWIS Maintenance CASTNET Deployment Flat screen traveler information devices District 2-0 Technology Sharing o Investigate North Central Broadband services November
2 o Utilize Transit Data Improved Incident Management o Conduct Joint Training NIMS/ICS o Utilize Smart Work Zones in Construction areas to improve traveler safety o Investigate Photogrammetry for PSP o PennDOT Coordination with the Knowledge Center Support 511 Statewide Implementation Operations Management o Investigate alternative TMC/RTMC Concepts. o Support the Statewide Interoperable 800 MHz Radio System. o Identify dedicated funding for ITS Maintenance. o Address Staffing Needs in Concurrence with TSOP-20. o Establish a Standard Training Program for Operations Staffing in the District 2-0 TMC. North Central Funding and Programming o Establish Dedicated Funding for Operations o Incorporate Operations in the Project Planning Process Management and Staffing o Elevate Operations within PennDOT o Increase Operations Staffing Guidance and Support o Expedite 511 Statewide Deployment o Utilize Statewide Telecommunications Plan o Maintain and Utilize Roadway Weather Information o Develop Electronic Detour Routing System (EDRS) Northeastern In development Region 5 Elevate Operations within PennDOT o In Districts with considerable operations-related duties, the creation of an ADE of Operations o Elevation of a District ITS Coordinator to a full time position o Create a full-time regional or statewide signals manager position to coordinate and advance traffic signal needs Establish Dedicated Funding for Operations o Work with the TF&RC to create dedicated funding for operations o Seek dedicated funding for a signal program Strengthen a Work Force for Operations November
3 o Establishment of a mentoring program for operations o Expand information sharing among District Operations and ITS staff o Consider succession planning and knowledge transfer practices o Consider recruiting new types of staff with IT backgrounds and knowledge of software, hardware and communication platforms o Increase supplemental technical training for operations staff o Work with Pennsylvania universities and institutions to better support the education and training of ITS and operations professionals Permit the use of Wireless Communication Systems o Change Office of Administration regulations to permit PennDOT to use wireless communication systems o Seek opportunities for piggy-backing on communication infrastructure of other state agencies, such as PEMA DVRPC/District 6-0 Increased Capacity for Information Sharing o Building Information Sharing Protocols o Intaking and Integrating Statewide Data o Including Early Action Components to ITS Deployment Projects Improved Incident Clearance o Promote Quick Clearance Laws o Investigate and Promote Rapid Clearance Legislation o Conduct Table-Top Exercises o Conduct Joint Training NIMS/ICS 511 System Deployment Recommendations o Include Multi-Modal Trip Planning Component in 511 Website Deployment o Include Information from Adjoining States Operations Management o Conduct Operations and ITS Reviews on All New PennDOT Projects o Utilize ITS Devices in Work Zones o Create Statewide ITS Asset Management Plan o Convert to Statewide Interoperable Radio System o Design Signals for Dual Operation o Establish MOUs with Municipalities for Operations of Signals During Incidents o Lobby for the Creation of a Dedicated Funding for Operations in the Transportation Budget Enhanced Coordination With Pennsylvania Turnpike o Data and video sharing through a fiber connection with PennDOT o DMS Sharing o Coordination of Parallel Routes o Establishing Task Forces Through DVRPC November
4 o Forming a Joint Operations Committee o Sign Deployment to I-476 o Conduit Deployment on Northeast Extension to Quakertown o Creating a Joint Incident Management Plan o Invite PTC to play a larger role in future ROP updates and activities o Address Staffing Needs in Concurrence with TSOP-20 o Create Assistant District Executive of Operations and Move District ITS o Coordinator to a Full Time Position o Create a Regional Signals Manager Position o Establish a Standard Training Program for Operations Staffing South Central Obtain CMAQ Funding for Traffic Signal Upgrade Projects Expand COSTARs Program and Available Vendors Cooperative Sourcing to Achieve Reductions in Spending Expedite 511 Statewide Deployment Evaluate the Reliability and Usefulness of Travel Time Information Develop a Statewide Truckers Map Develop Statewide Intermodal/Truck Terminal Planning Requirements Incorporate Operations in the Project Planning Process Southern Alleghenies Elevate Operations within PennDOT Ensure that Funding and Processes are in Place to Adequately Maintain Existing Equipment and Devices Develop Standard Incident Management Policies and Procedures Improve Communications Among Various Transportation-Related Systems Eliminate (Reduce) Restrictions on Use of Wireless Equipment Reconsider the Regional TMC Concept Southwestern Elevate operations within PennDOT o In Districts with considerable operations-related duties, the creation of an ADE of Operations o Elevation of a District ITS Coordinator to a full time position o Creation a full-time regional or statewide signals manager position to coordinate and advance traffic signal needs o Complements to district traffic units for operations support Establish dedicated funding for operations o Work with the TF&RC to create dedicated funding for operations o Seek dedicated funding for a signal program November
5 Strengthen a work force for operations o Establishment of a mentoring program for operations, o Expand information sharing among District Operations and ITS staff, o Consider succession planning and knowledge transfer practices, o Consider recruiting new types of staff with IT backgrounds and knowledge of software, hardware and communication platforms, o Increase supplemental technical training for operations staff, and o Work with Pennsylvania universities and institutions to better support the education and training of ITS and operations professionals. Permit the use of wireless communication systems o Work with Office of Administration to change policy on using wireless communication systems o Seek opportunities for piggy-backing on communication infrastructure of other state agencies, such as PEMA November
NORTHWEST PA REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 1-0
MINUTES OF MEETING (FINAL) PROJECT: PURPOSE OF MEETING: LOCATION: PENNDOT Agreement E00229 Open-end Agreement for ITS, Traffic and Highway Safety Engineering Services Work Order 015- District 1-0 Regional
More informationDISTRICT 6-0 REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0
MINUTES OF MEETING (FINAL) PROJECT: PURPOSE OF MEETING: LOCATION: PENNDOT Agreement E00229 Open-end Agreement for ITS, Traffic and Highway Safety Engineering Services Work Order 016 - District 6-0 Regional
More informationSouth Central ROP Projects
Pennsylvania Department of Transportation ROP Overview and Summary South Central ROP Projects November 2007 77 INCIDENT MANAGEMENT (IM) Draft Version 1 July 2007-40 - IM 1: SOUTH CENTRAL PA ITS DEPLOYMENT
More informationSouth Central Pennsylvania Regional Operations Plan Candidate Project Listing (DRAFT)
South Central Pennsylvania Regional Operations Plan Candidate Project Listing (DRAFT) APPLICABILITY South Central PA ITS Deployment Plan Update Lebanon County ITS deployment Lancaster County ITS deployment
More informationRegional Operations Traffic Signals Task Force Meeting #1 February 13, 2007
South Central Pennsylvania Regional Operations Traffic Signals Task Force Meeting #1 PennDOT Executive Goal # 6 Effectively and efficiently operate the transportation system Agenda Introductions Purpose
More informationPennDOT Planning Services and Implementation Regional Operations Plan for the Southern Alleghenies Region. Task Force #1.
PennDOT Planning Services and Implementation Regional Operations Plan for the Southern Alleghenies Region Task Force #1 Meeting Notes Foundational Issues Traveler Information Incident Management Communication
More informationDAVID WOLFE TMC Operations & Incident Management Specialist
DAVID WOLFE TMC Operations & Incident Management Specialist Professional Background Education Temple University, B.A. - Communications Licenses/Certificates FEMA NIMS: ICS-100 ICS-200 ICS-300 ICS-400 IS-700
More informationTXDOT ITS STRATEGIC PLAN DEVELOPMENT
TXDOT ITS STRATEGIC PLAN DEVELOPMENT Agency Follow-up: Sherman-Denison Stakeholders June 26, 2013 9:00 a.m. TxDOT, 3904 US 75, Sherman, Texas Project Objectives Assist TxDOT in developing a statewide ITS
More information2
1 2 3 4 PennDOT has 11 engineering districts that provide engineering, maintenance, construction, traffic and related services for the state transportation system. PennDOT s Central Office provides administrative,
More informationIntelligent Transportation Systems (ITS)
Intelligent Transportation Systems (ITS) Systems Engineering (SE) Requirement Intelligent Transportation Systems (ITS) means electronics, communications, or information processing used singly or in combination
More informationPage 7. Page 8. (MDSS)) Pilot Phase. Page 9. Page 6. Vision. Mission. of Program. Optimizing the. complimentary. Page 1 of 9
Inte ligent Transportation Program Direcry of Active Projects In This Edition: Project background and expected benefits for the followingg projects: 511 Pennsylvania Page 2 Video Sharing Solution Page
More informationLAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY
LAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY L-DC REGIONAL ITS ARCHITECTURE AND STRATEGIC DEPLOYMENT PLAN EXECUTIVE SUMMARY The Lawrence-Douglas County Metropolitan Planning Organization (L- DC MPO) has
More informationJohnson City Regional ITS Architecture Update Review Workshop. March 12, 2015
Johnson City Regional ITS Architecture Update Review Workshop March 12, 2015 Introductions Workshop Overview Review of the Draft Regional ITS Architecture Document Discussion on Existing and Planned ITS
More informationI 95 CORRIDOR COALITION EXECUTIVE BOARD & STEERING COMMITTEE MEETING Chicago, Illinois September 25, 2015
I 95 CORRIDOR COALITION EXECUTIVE BOARD & STEERING COMMITTEE MEETING Chicago, Illinois September 25, 2015 Agenda ***Important Note: The meeting is in Chicago, Central Time (Eastern Time is noted in parenthesis
More informationMountain Corridor Incident Management Program
Mountain Corridor Incident Management Program Colorado Department of Transportation Background The I- Incident Management study was initiated in response to CDOT s I- MIS. The resulting program was the
More informationResponse to Wood Buffalo Wildfire KPMG Report. Alberta Municipal Affairs
Response to Wood Buffalo Wildfire KPMG Report Alberta Municipal Affairs Background To ensure continuous enhancement and improvement of Alberta s public safety system, the Alberta Emergency Management Agency
More informationArizona State Troopers Highway Patrol Division Sergeant John Paul Cartier
Arizona State Troopers Highway Patrol Division Sergeant John Paul Cartier Average Annual Number of Responders Struck and Killed Nationally 12 Law Enforcement Officers 5 Fire and Rescue Personnel 60 Towing
More informationRegional TSM&O Vision and ITS Architecture Update
Regional TSM&O Vision and ITS Architecture Update Progress Update Transportation Coordinating Committee April 5, 2019 Task List (2018 2020) 1. Develop a Regional TSM&O Vision 2. Document Current TSM&O
More informationRegional Operations Plan 2007 Southern Alleghenies Region ACKNOWLEDGMENTS
Final January 2008 ACKNOWLEDGMENTS This plan was made possible through the leadership of PennDOT s District 9-0, Bureau of Highway Safety and Traffic Engineering (BHSTE), and Center for Program Development
More informationNOVEMBER department of transportation CONNECTICUT DEPARTMENT OF TRANSPORTATION. Statewide Computerized Traffic Signal Systems Needs Assessment
department of transportation NOVEMBER 2015 CONNECTICUT DEPARTMENT OF TRANSPORTATION Statewide Computerized Traffic Signal Systems Needs Assessment EARLY DEPLOYMENT NEEDS ASSESSMENT-NOVEMBER 2015 The Connecticut
More informationA Pennsylvania Plan for Safe Work Zones PRESENTED BY: LARRY BANKERT, ASSOCIATE V.P., TOLL SERVICES MICHAEL BAKER INTERNATIONAL
A Pennsylvania Plan for Safe Work Zones PRESENTED BY: LARRY BANKERT, ASSOCIATE V.P., TOLL SERVICES MICHAEL BAKER INTERNATIONAL Introduction A Pennsylvania Plan for Safe Work Zones presents a framework
More informationExecutive Summary. City of Goodyear. Prepared for: Prepared by: November, 2008 Copyright 2008, Kimley-Horn and Associates, Inc.
Goodyear Intelligent Transportation Systems Strategic Plan Executive Summary Prepared for: City of Goodyear Prepared by: 191376000 Copyright 2008, Kimley-Horn and Associates, Inc. I. INTRODUCTION The City
More informationFIRE REDUCTION STRATEGY. Fire & Emergency Services Authority GOVERNMENT OF SAMOA April 2017
FIRE REDUCTION STRATEGY Fire & Emergency Services Authority GOVERNMENT OF SAMOA April 2017 FIRE REDUCTION STRATEGY Fire & Emergency Services Authority GOVERNMENT OF SAMOA April 2017 2 1. Introduction The
More informationCITY OF MONTEBELLO SYSTEMS MANAGER
CITY OF MONTEBELLO 109A DEFINITION Under general administrative direction of the City Administrator, provides advanced professional support to departments with very complex computer systems, programs and
More informationNCTCOG MTP Policy Bundle Application for TXDOT
MTP Policy Application Acknowledgement I hereby certify that all information provided and contained herein is complete, accurate, and true. I am authorized to provide information on behalf of my agency.
More informationPUBLIC WORKS ORGANIZATIONAL CHART
PUBLIC WORKS ORGANIZATIONAL CHART C-108 Actual 2012-13 Adopted Year-End Estimated 2014-15 2015-16 PROGRAM EXPENSES/REVENUES Salaries & Benefits $ 1,725,030 $ 1,855,980 $ 1,676,130 $ 1,956,510 $ 1,979,470
More informationMid-Atlantic Traffic Incident Management Training Facility Feasibility Study
TIM TRAINING FACILITY Mid-Atlantic Traffic Incident Management Training Facility Feasibility Study 2017 Transportation Engineering & Safety Conference December 8, 2017 Troy D. Truax, AICP Michael Baker
More informationBENEFITS of MEMBERSHIP FOR YOUR INSTITUTION
PROFILE The Fiduciary and Investment Risk Management Association, Inc. (FIRMA ) is the leading provider of fiduciary and investment risk management education and networking to the fiduciary and investment
More informationPennsylvania Safety Transportation and Research Track (PennSTART) April 10, 2018
Pennsylvania Safety Transportation and Research Track April 10, 2018 1 Purpose and Need Evaluate the need and demand for a PA-based, Mid-Atlantic TIM Training Facility Centrally located facility offering:
More informationDISTRICT 2-0 REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 2-0
MINUTES OF MEETING (FINAL) PROJECT: PURPOSE OF MEETING: LOCATION: PENNDOT Agreement E00229 Open-end Agreement for ITS, Traffic and Highway Safety Engineering Services Work Order 018- District 2-0 Regional
More informationPOSITION DESCRIPTION
POSITION DESCRIPTION Engagement Manager Unit/Branch, Directorate: Location: Outreach & Engagement, Information Assurance and Cyber Security Directorate Auckland Salary range: H $77,711 - $116,567 Purpose
More informationChattanooga Regional ITS Architecture Update Project Overview. January 7, 2014
Chattanooga Regional ITS Architecture Update Project Overview January 7, 2014 Project Overview Update of the 2010 Chattanooga Regional ITS Architecture and Deployment Plan Provides a long range plan for
More informationProject Summary. Feb. 2014
Project Summary Feb. 2014 2 Cooperative Transportation Systems Pooled Fund Study Overview Program to support the development and deployment of Cooperative Transportation Systems Applications Goals To facilitate
More informationRural Health Care Pilot Program. Program Update October 8, 2009
Rural Health Care Pilot Program Program Update October 8, 2009 1 Background September 2006 Pilot Program Order (FCC 06-144) Announces and seeks applications for Pilot Program. Participants eligible to
More informationHazard Management Cayman Islands
Hazard Management Cayman Islands Strategic Plan 2012 2016 Executive Summary HMCI strategic plan outlines the agency s outlook in the next five years and illustrates the main strategies as goals that will
More information2 ESF 2 Communications
2 ESF 2 Communications THIS PAGE LEFT BLANK INTENTIONALLY Table of Contents 1 Introduction... 1 1.1 Purpose and Scope... 1 1.2 Relationship to Other ESF Annexes... 1 1.3 Policies and Agreements... 1 2
More informationCedar Rapids ITS Deployment Project
Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders
More informationNORTH CAROLINA NC MRITE. Nominating Category: Enterprise IT Management Initiatives
NORTH CAROLINA MANAGING RISK IN THE INFORMATION TECHNOLOGY ENTERPRISE NC MRITE Nominating Category: Nominator: Ann V. Garrett Chief Security and Risk Officer State of North Carolina Office of Information
More informationConnecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1
Connecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1 Presentation Overview What is BTOP? Making BTOP work for our state What
More informationBusiness Continuity and Disaster Recovery. Pennsylvania Emergency Management Agency (PEMA) Satellite Warning System/Rapid Notification Network
Business Continuity and Disaster Recovery Pennsylvania Emergency Management Agency (PEMA) Satellite Warning System/Rapid Notification Network Executive Summary Too often emergency management communication
More informationAPTS05 Transit Security Private Bus Operators and AMTRAK
APTS05 Transit Security Private Bus Operators and AMTRAK Transit AMTRAK Operations Private Commuter Bus Operators Private Long- Distance Bus Operators Systems transit emergency data status NYPD 911 Communications
More informationRegional Operations Plan 2007 Southwestern Region ACKNOWLEDGMENTS
ACKNOWLEDGMENTS Major contributions from the following PennDOT groups; Districts 10-0, 11-0, and 12-0, Bureau of Highway Safety and Traffic Engineering, Center for Program Development and Management, as
More informationFusing Data Across the State of Florida to Support ATIS Services
Session 5A: Center-to to-center Fusing Data Across the State of Florida to Support ATIS Services Steven W. Dellenback,, Ph.D., PMP Southwest Research Institute San Antonio, Texas Objectives FDOT Objectives:
More informationIT SECURITY OFFICER. Department: Information Technology. Pay Range: Professional 18
Pierce County Classification Description IT SECURITY OFFICER Department: Information Technology Job Class #: 634900 Pay Range: Professional 18 FLSA: Exempt Represented: No Classification descriptions are
More informationTelecommunications Report City of Richmond
November 11, 1996 Telecommunications Report City of Richmond The City of Richmond's Telecommunications Task Force 1 has been charged with (1) reviewing the City's telecommunications infrastructure, available
More informationMeeting attendees are now required to go through security screenings upon entering the building. Please allow for extra time.
TO WHOM IT MAY CONCERN: NOTICE OF RE-SCHEDULED BOARD MEETINGS This is notice that the re-scheduled meetings of the Board of Directors of the New Jersey Transit Corporation, NJ Transit Rail Operations,
More informationFIBER OPTIC RESOURCE SHARING IN VIRGINIA
FIBER OPTIC RESOURCE SHARING IN VIRGINIA Commonwealth Transportation Board Innovation & Technology Subcommittee Dean Gustafson, P.E., PTOE February 20, 2018 Why Fiber? Enormous bandwidth available to support
More informationNetwork, Policy & Privacy Considerations for Connected Autonomous Vehicle Initiatives
Network, Policy & Privacy Considerations for Connected Autonomous Vehicle Initiatives Wednesday, April 25, 2018 11:30 am - 12:00 pm (EDT) Presented by Lindsay Miller & Matthew Diaz Ice Miller LLP 250 West
More information2014 NASCIO Recognition Award Nomination
2014 NASCIO Recognition Award Nomination TITLE: Network Communication Partnerships for Public Safety and Economic Opportunity CATEGORY: Cross Boundary Collaboration and Partnerships CONTACT: Shannon Barnes
More informationATMS08 Traffic Incident Management System TRANSCOM (1 of 3)
ATMS08 Traffic Incident System (1 of 3) AMTRAK MTA Police / Municipal/County EOCs Municipal/County Public Safety NYS Police incident status resource request incident resource deployment status road network
More informationHampton Roads Regional Broadband Strategy Briefing to Virginia Beach City Council Aug 15, Dave Hansen City Manager
Hampton Roads Regional Broadband Strategy Briefing to Virginia Beach City Council Aug 15, 2017 Dave Hansen City Manager Connectivity Following the Hampton Roads Transportation Advisory Committee decision
More informationDATE: April 8, 2013 REPORT NO. CD TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ]
DATE: April 8, 2013 REPORT NO. CD2013-040 TO: FROM: Chair and Members Committee of the Whole Community Services Gregory Dworak, General Manager Community Services 1.0 TYPE OF REPORT CONSENT ITEM [ ] ITEM
More informationMobile Communications for Transit
Mobile Communications for Transit Barry Einsig Chair APTA Wireless Communications Subcommittee Chair Joint Council on Transit Wireless Communications and Market Director Harris Corporation, Washington,
More informationCyber Security Strategy
Cyber Security Strategy Committee for Home Affairs Introduction Cyber security describes the technology, processes and safeguards that are used to protect our networks, computers, programs and data from
More informationSUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17
Page 1 of Report TR-01-17 SUBJECT: PRESTO operating agreement renewal update TO: FROM: Committee of the Whole Transit Department Report Number: TR-01-17 Wards Affected: All File Numbers: 465-12, 770-11
More informationWORLD TELECOMMUNICATION STANDARDIZATION ASSEMBLY Hammamet, 25 October 3 November 2016
I n t e r n a t i o n a l T e l e c o m m u n i c a t i o n U n i o n ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU WORLD TELECOMMUNICATION STANDARDIZATION ASSEMBLY Hammamet, 25 October 3 November
More informationASSEMBLY, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED FEBRUARY 4, 2016
ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED FEBRUARY, 0 Sponsored by: Assemblywoman VALERIE VAINIERI HUTTLE District (Bergen) Assemblyman DANIEL R. BENSON District (Mercer and Middlesex)
More informationAway from Isolation: Caltrans Arterial Management
Away from Isolation: Caltrans Arterial Management David Man CALTRANS TRAFFIC OPERATIONS NOV 19, 2015 1 Agenda Introduction Basic Facts Past Present Future 2070s and Cabinets 2 Basic Facts 5,000 State traffic
More informationAZTech Capability Maturity Model
AZTech Capability Maturity Model Faisal Saleem ITS Branch Manager & MCDOT SMARTDrive Program Manager Maricopa County Department of Transportation National Operations Center of Excellence August 9, 2017
More informationDISTRICT 2-0 REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 2-0
MINUTES OF MEETING (FINAL) PROJECT: PENNDOT Agreement E00229 Open-end Agreement for ITS, Traffic and Highway Safety Engineering Services Work Order 018- District 2-0 Regional Operations Plan (ROP) PURPOSE
More informationPublic Safety Communications Evolution
Public Safety Communications Evolution November 2011 CURRENT TRANSITION DESIRED EVOLUTION Indefinite Time Frame Long Term Land Mobile Radio Networks Mission Critical Voice Mission Critical Data Public
More informationCyber Security Program
Cyber Security Program Cyber Security Program Goals and Objectives Goals Provide comprehensive Security Education and Awareness to the University community Build trust with the University community by
More informationVirginia Department of Transportation Hampton Roads Bridge-Tunnel Action Plan Implementing the Independent Review Panel Recommendations
Virginia Department of Transportation Hampton Roads Bridge-Tunnel Action Plan Implementing the Independent Review Panel Recommendations Initial Panel Charge August 2009 To review existing policies and
More informationSAN JOSÉ FIRE DEPARTMENT. Strategic Planning
SAN JOSÉ FIRE DEPARTMENT Strategic Planning San Jose Neighborhoods Commission October 8, 2014 [ link to www.wgbackfence.net/nc/sjfd_promo.mp4 ] SJFD Prevention & Response Services Fire Suppression Aircraft
More informationFive-Year Strategic Plan
Five-Year Strategic Plan 2016 2020 Contents A Message from the ERIS Board... 3 Introduction and Background... 4 Five-Year Plan Goal Areas... 7 Goal Area 1: State Environmental Agency Research Needs and
More informationForward. 1. Purpose. Page 1 of 5 Revision Date
Memorandum of Understanding between the Tippecanoe County Chapter of the American Red Cross and Tippecanoe County Amateur Radio Emergency Service (ARES) July 24, 2009 Forward The American Radio Relay League,
More informationKansas City s Metropolitan Emergency Information System (MEIS)
Information- Sharing Interagency Cooperation Resources Management Law Enforcement Fire Emergency Medical Services Public Health Private Sector Kansas City s Metropolitan Emergency Information System (MEIS)
More informationSpecial Action Plan on Countermeasures to Cyber-terrorism of Critical Infrastructure (Provisional Translation)
Special Action Plan on Countermeasures to Cyber-terrorism of Critical Infrastructure (Provisional Translation) December 15, 2000 1. Goals of the Special Action Plan The goal of this action plan is to protect
More informationDIXIE REGIONAL ITS ARCHITECTURE EXECUTIVE SUMMARY
DIXIE REGIONAL ITS ARCHITECTURE EXECUTIVE SUMMARY SUBMITTED TO: and the Dixie Regional ITS Stakeholders Draft Report August 14, 2006 SUBMITTED BY: DRAFT FINAL REPORT Table of Contents 1.0 INTRODUCTION...
More informationNC Project Learning Tree Guidelines
NC Project Learning Tree Guidelines PREFACE Project Learning Tree (PLT) is an environmental education program for educators and youth leaders working with students from pre-kindergarten through grade 12.
More informationNational Policy and Guiding Principles
National Policy and Guiding Principles National Policy, Principles, and Organization This section describes the national policy that shapes the National Strategy to Secure Cyberspace and the basic framework
More informationStanislaus County Fire Warden. Authority Business Plan
Stanislaus County Fire Authority ---------------------------- Business Plan 2017-2018 The (Fire Authority) is a Joint Powers Agreement established in November 2005 by the fire agencies in Stanislaus County
More informationTransit Bus Safety and Security Program
Program Overview What is the Transit Bus Safety and Security Program? Founded on guidelines that were developed with input from the transit industry and national safety, security and emergency preparedness
More informationTSA/FTA Security and Emergency Management Action Items for Transit Agencies
TSA/FTA Security and Emergency Management Action Items for Transit Agencies AACTION ITEM LIST Management and Accountability 1. Establish Written System Security Programs and Emergency Management Plans:
More informationSALARY $ $72.54 Hourly $3, $5, Biweekly $8, $12, Monthly $103, $150, Annually
SALARY $49.72 - $72.54 Hourly $3,977.88 - $5,803.27 Biweekly $8,618.75 - $12,573.75 Monthly $103,425.00 - $150,885.00 Annually ISSUE DATE: 03/21/18 THE POSITION DIRECTOR OF CYBER SECURITY OPEN TO THE PUBLIC
More informationA Trusted Information Network for the National Responder Community
A Trusted Information Network for the National Responder Community Public Safety User Briefing Network Concept and Legislative Approach Proprietary 2004 - All Rights Reserved Purpose of Briefing: Inform
More informationSection 1 Metrics: Community Adoption
FY07 NIMS Compliance Metrics: Local/Tribal Section 1 Metrics: Community Adoption Compliance Requirement: Adopt NIMS at the community level for all government departments and agencies; as well as promote
More informationConnected & Automated Vehicle Activities
MDOT State Highway Administration Connected & Automated Vehicle Activities National Rural ITS Conference October 2018 MDOT s CAV Working Group MDOT s CAV Working Group Open discussions on CAV with TBUs,
More informationPennsylvania Safety Transportation and Research Track (PennSTART)
Pennsylvania Safety Transportation and Research Track (PennSTART) IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 1 Purpose and Need 2014 PA Transportation Advisory Committee TIM Study
More informationTrack 1 // Collaboration & Partnerships
Track 1 // Collaboration & Partnerships 1.1 Designate Single Point of Contact to serve as an consistent entry point for companies seeking to deploy in San Francisco. There is often a lack of trust and
More informationPresentation by Chris Kirkcaldy Director, DAS March 2018
Presentation by Chris Kirkcaldy Director, DAS March 2018 The United Nations Office at Nairobi was established with effect from 1 January 1996 as a successor to the United Nations Common Services Unit at
More informationThe Benefits of Regional Collaboration in Managing Network Transportation Operations
The Benefits of Regional Collaboration in Managing Network Transportation Operations PIARC Technical Committee 1.4 Prepared by: Wayne Berman Office of Transportation Management Federal Highway Administration
More informationBefore the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C
Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matters of Video Device Competition Implementation of Section 304 of the Telecommunications Act of 1996 Commercial Availability
More information3 ITS Standards Deployment and Testing Strategies
3 ITS Standards Deployment and Testing Strategies In chapter 2, this report reviewed some of the ITS deployments shaping the application of ITS Standards in New York State. These projects, and others,
More informationSTATEWIDE CENTERLINE INITIATIVE EDITED: MAY 17, 2013
STATEWIDE CENTERLINE INITIATIVE EDITED: MAY 17, 2013 WHAT IS THE CENTERLINE INITIATIVE? The Centerline Initiative is a joint effort between the Minnesota Department of Transportation (MnDOT), Minnesota
More informationIntelligent Transportation Systems (ITS) for Critical Infrastructure Protection
Intelligent Transportation Systems (ITS) for Critical Infrastructure Protection Presented at the Transportation Research Board January 2002 Annual Meeting Washington DC, USA HAMED BENOUAR Executive Director
More informationUTC - Global Advisory Council
UTC - Global Advisory Council JRC Autumn Seminar 13 th September 2017 Utilities Technology Council Global Focus on Utility Information and Communications Technology Mission UTC is the source and resource
More informationSmart infrastructure: unleashing ICT and road synergies
Smart infrastructure: unleashing ICT and road synergies Fifth Meeting of the Working Group on the Asian Highway ESCAP 7 October 2013, Bangkok Tiziana Bonapace, Chief, ICT and Development section, IDD ESCAP
More informationREGISTRATION DIVISION
REGISTRATION DIVISION BACKGROUND INFORMATION ABOUT SEYCHELLES Seychelles is a group of 118 islands located 4 degrees south of the Equator. The Seychelles Archipelago is spread over and Exclusive Economic
More informationSTRATEGIC PLAN. USF Emergency Management
2016-2020 STRATEGIC PLAN USF Emergency Management This page intentionally left blank. Organization Overview The Department of Emergency Management (EM) is a USF System-wide function based out of the Tampa
More informationSecurity Director - VisionFund International
Security Director - VisionFund International Location: [Europe & the Middle East] [United Kingdom] Category: Security Job Type: Open-ended, Full-time *Preferred location: United Kingdom/Eastern Time Zone
More informationITS 5C Summit. Operationalizing Connected Vehicle Services
ITS 5C Summit Operationalizing Connected Vehicle Services 1 Connected Vehicle: the Enabling Technology From Highways to Cities. www.kapsch.net 2 CV Services Foundational services Travel Times, Traveler
More informationResolution: Advancing the National Preparedness for Cyber Security
Government Resolution No. 2444 of February 15, 2015 33 rd Government of Israel Benjamin Netanyahu Resolution: Advancing the National Preparedness for Cyber Security It is hereby resolved: Further to Government
More informationOF ELECTRICAL AND ELECTRONICS ENGINEERS POWER & ENERGY SOCIETY
MEMORANDUM OF UNDERSTANDING between the MINISTERIO DE ELECTRICIDAD Y ENERGIA RENOVABLE DEL ECUADOR and the INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS POWER & ENERGY SOCIETY This Memorandum of Understanding
More informationCity of Rancho Cucamonga Fiber Optic Master Plan
City of Rancho Cucamonga Fiber Optic Master Plan History January 2016: City Council authorized Magellan Advisors to perform a fiber optic feasibility study Spring 2016 to Spring 2017: Researched and evaluated:
More informationMitigation Framework Leadership Group (MitFLG) Charter DRAFT
Mitigation Framework Leadership Group (MitFLG) Charter DRAFT October 28, 2013 1.0 Authorities and Oversight The Mitigation Framework Leadership Group (MitFLG) is hereby established in support of and consistent
More informationAppendix 3 Disaster Recovery Plan
Appendix 3 Disaster Recovery Plan DRAFT March 5, 2007 Revision XX Qwest Government Services, Inc. 4250 North Fairfax Drive Arlington, VA 22203 A3-i RFP: TQC-JTB-05-0002 March 5, 2007 REVISION HISTORY Revision
More informationMetrobus 30s Line Enhancements
Customer Service, Operations and Safety Committee Action Item III-C February 14, 2008 Metrobus 30s Line Enhancements Washington Metropolitan Area Transportation Authority Board Action/Information Summary
More informationTEL2813/IS2820 Security Management
TEL2813/IS2820 Security Management Security Management Models And Practices Lecture 6 Jan 27, 2005 Introduction To create or maintain a secure environment 1. Design working security plan 2. Implement management
More informationPREPARED STATEMENT OF ERNEST R. FRAZIER, SR., ESQ. AMTRAK, CHIEF OF POLICE AND SECURITY DEPARTMENT
PREPARED STATEMENT OF ERNEST R. FRAZIER, SR., ESQ. AMTRAK, CHIEF OF POLICE AND SECURITY DEPARTMENT HOUSE TRANSPORTATION & INFRASTRUCTURE SUBCOMMITTEE ON RAILROADS Oversight Hearing on Railroad Security
More information