Land Acquisition and Resettlement Plan. Kyrgyz Republic: Power Sector Improvement Project

Size: px
Start display at page:

Download "Land Acquisition and Resettlement Plan. Kyrgyz Republic: Power Sector Improvement Project"

Transcription

1 Land Acquisition and Resettlement Plan Project Number: March 2017 Kyrgyz Republic: Power Sector Improvement Project Prepared by JSC National Electric Grid of Kyrgyzstan for the Asian Development Bank. This Land Acquisition and Resettlement Plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB s Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section of this website. In Preparing any country program or strategy, financing any project or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development bank does not intend to make any judgments as to the legal or other status of any territory or area.

2 A.2.2 а а и е 25.. Ч 1 ( 8 я 1996, 30 я 2015 ), :,, я, я ( ),, ( я 14, 1)., я: (i), я я ( я 14, 2); (ii) я ( я 14, 2); (iii) я, я, ( ) ( я 14, 2). A.2.3 е е ы е 26. ( 2 я 1999, я 28 я 2015 ), : (i) ( ) я. В, ( ), 2 - я я ( я 68, 1) 5. (ii) ( ) я,, я ( я 68, 3). (iii) я я я, \, я я я ( я 68, 4). (iv) я, я. К я я: a) 6; b) я я ; c), я я я, ; d) я, я я я, ; 5 т оп еделе е кл е п е е то о е ; е ел е дел, п едо т ле е дл л до о дл т о о под о о о о т, е о ут т еп ед е е о пе е е е дл о уд т е, у п л о е т е у д о л о Ч т т т е ел о о Кодек К ко е пу л к от по лед п ле от л. 6 пол о е е л оот ет т е е ел л ет пол о е е л оот ет т ел, ук, до о о е о е де л д у о л о до о доку е т т т, у кт, е ел Кодек. о е л о ет т п ек е о лу е е по о о т пол о т е л е е ел. ек е е п, од ко, о ет уп л т тол ко удо т т, пу кт, е ел Кодек 1999). 16/35

3 e) ; f) ; g) А К. 27. Т я, я я ( ), я я ( я 49, 4). 28. В 49, 1,,, : (i) / я ( я 49, 1, 1) (ii),, я,,,, я ( я 49, 1, 6) (iii) Т, К ( я 49, 1 5.) 29., ( я 78, 2) я я. В,, я / / (,,,,,,,,,..) я, я 5. ( ) я я ( 78, 3). A.2.4 а у а ве е и а ии ав ве и и вя а ых и е а иях (26 я я 1998 а, е ее и е е ие 9 и я 2013.) 30., я, ( 1, я 1, 1)., я 30 я ( 1, я 7, 1). я, я, я ( 1, я 4): (i) ; (ii) я; (iii) я; (iv) ( ) ; (v), я, я ; (vi) В, 3 - ; (vii) ; (viii) я, я,, ; (ix), ; (x) ; (xi),. 17/35

4 31.,, я я, ( 1, я 6): (i) я я,,, я я; (ii), ; (iii) В 3 - ; (iv) я я ; (v), я; (vi) я,, я я,,.. A.2.5 а а ах ( 4 ая 2007 а е и и ав а и 17 ев а я 2015 а) 32. ( я 9 я 2013.), К, я, я, ( я 2 4). я 30 ( я 8). Д я я,, я,, ( я 4 5). ( я 11). A.2.6 е ие е е а ив в 33. я я я (, я ), я (, 03 я 2006, 217) я. B. е ва ия а и ых е вы у е у е е е е и А Т я А я я я я: (i), ; (ii) я я, я ; (iii) я я я,, я я я,. Д я А, я, я я я я, я я, я 12 я. : (i),, я я я я. я я /,, я. 18/35

5 (ii),, я. я., я. я я,,,,,,,, я. я я я., я. Т, я я я я я, я. (iii),,,, (i) я,,, я я,, (ii),, (iii) я,, (iv) я,. (iv), : (i), я, я я я,, я ;(ii) я я я,,, я ; (iii) я. (v) я я я, я,,. В я,,. (vi),, я,,,, я. (vii),. (viii) я, яя, я я,,,. 19/35

6 (ix) я, я, я, я ( ), я я. я я я. (x). В. Д я я я, я. (xi) В я. я я. (xii) М я, я, я я М А 2009 я, я : (i) и и е ие Л В: В, я ; (ii) Ле а и ва ые Л В: В, я,, я я я ; (iv) Не и и е ие Л В: В,, /, я. 36. Ч я (i) (ii),, я, я,, я я. Д я В (iii) ( ), я, /, ( я, я,, ). я, я я, я я. 37. К я (, ). К я «я» я я, я я,, (.. ) 7., я я " ". Э я: (i) ; (ii) ; (iii) ; (iv) 7 о о е ло е е, п. от ут т е о о о еко е до е ел ко е л, ко пе удут п едо т ле о о е т тел о о у е делк п е л, пол о е, е п о од тел о т т уд о п оект. Од по о о п т т ко ту ло о е пе т ко пе е л о о е п одукт о т е ел л де ек о п о од т е л ". 20/35

7 , я. К я я я,. С. С ЛАС ВАНН С С ВАНИ И А (GAP а а и ) 38. В III. 1 С ав е ие е ия е у и и А и а а е в ы ы е у и и и е я М А 2009 К я я. Э, я я А ( ). Э я, М, IV я. а и а III.1 С ав е ие е и е у и и А и а а е в ы ы е у и и В е вие / В А (2009) и а и а и е е ия А * ы ы ая е у и а е и а ва ия 1. я А / я я В. 2. A. Л В а ы К ав /. B. Л В а и уе ы ав, ЭА. C. Л В, е и е ие ава ве и я я. я,. A. Л В а ы ав /. B/C. Л В е а и уе ы и и е е а ава. Ле а и уе ые я я я, я я я я я В. В. я. А, / я. A. Т / я. я B/C. К я. А, Д я А. 21/35

8 В е вие / В А (2009) и а и а и е е ия А * ы ы ая е у и а е и а ва ия 3. К я A. я ая е я е и.., я / В. B. а е а а е ва е и. я я C. е я у у / а и. Д я я я,, я D. е я ве а у ых у в., я я я. E. и е е и. В +. Д я я. A. я ая е я е и. Д я я я / В. B. а е а а е ва е и.. C. е я у у / а и. Д я я, я. D. е я ве а у ых а ив в.,, я E. е я и е а. Д я я /. я я В,. F. е и еве и ы/ е у ив ы х е ев ев. М,, я В я. A. Т /. /. B. Т. я.,,, я. Д я, я А. C.., А. D. В К я. Х я я я, Д я А. E. Т,, А., я я я. F. Т,. А, я 22/35

9 В е вие / В А (2009) и а и а и е е ия А * ы ы ая е у и а е и а ва ия. F. е и еве и ы/ е у ив ых е ев ев. я. /, В. G. е я у ив ых е ев ев. К я я я я : я, я ( я 1 я ). H. е я у ая. К я я I. е я а их е., В. я 12 я я ( G. е я у ив ых е ев ев. М, я я,. я SPS. H. е я у ая. я (. 14 К ), я я. I. е я а их е. К я, я 3- я + 2 я. К я я я, я EA. А,, я я я я. G. Т, я. А. я А,, я я SPS. H. К. I.Т,. Т я А я я я / я, я В. 23/35

10 В е вие / В А (2009) и а и а и е е ия А * ы ы ая е у и а е и а ва ия ) (.) К я В. 4., я A. а е е е е ия ( ЛАН). А я: ) я/ В; b) я, /, я, я я я, ; c) ; d) ; e) я. RP я: i. е ва ие и е е ие. я. ii. е е и Л В. В. iii. С иа э и е е е ва ие. я - A. а е е е е ия. А., / я / я, А, : i. е ва ие и е е ие. я я я. Д я,. ii. И е и и а ия Л В. В iii. С иа э и е е е ва ие.. iv. е е е ва ие a) е я: я,. я / я. b) а ия и у е ия. A.Ч я. я я, /, я М А. Т, А, В я. i. я, я я. ii., я. iii.в я я. iv. е е е ва ие a)т, / ; b) я А, я я. c) я А, я я (. 3.H. ) Д я я 24/35

11 В е вие / В А (2009) и а и а и е е ия А * ы ы ая е у и а е и а ва ия В. iv. е е е ва ие a) е я: я ; / ; b) а ия и у е ия. В я, я / я я, ; c) е ев я/ у у ы., 2. я,, я, я,. c) е ев я/ у у ы., 3.H. SPS я. 5. A. а ы ие и а ии. Д, я, я В. B. е ве ые у а ии. В. В, я C. е у а а. М я (GRM) я. I я GRM В A. а ы ие и а ии. Т я. B. е ве ые у а ии. В я, я. В C. е у а а. К / я. D. вия и е е ия а ива. A.. я А. B. Т, я. я А.. C.Т,, я. я А.. D. Т,.. 25/35

12 В е вие / В А (2009) и а и а и е е ия А * ы ы ая е у и а е и а ва ия 6. я В D. вия и е е ия а ива. В В A. Э В, я я я / я я. A. В я я. * К я я я А К D. и и ы е е е е ия я е а A.К я /. Н х и я а а и к я к. 39. я А, я я я я я : (i) В я В, ; (ii) я, В я ; (iii) я / А я В,. (iv) я я я К А. Д я я я. я я. (v) М я В, я я, я я. Т,, я я,. (vi) я я я я. (vii) В я я, я, я, я. (viii) В. 26/35

13 IV. И Л С НСА ИИ И АВА 40. А я я В. Э,,,. A. ие е 41. В В, я я я В,. 42. я , я Э К я В Э Ч я-к. В я,. B. ава 43. В IV.1. а и а IV.1 а и а ав и в е вия Л В, и е ие ав ава и е а ия В В ( : ) К я : 1. К. 2. В, я. я я. я. К я Э К В V. С ИАЛ Н - Э Н ИЧ С СЛ ВАНИ 44. я, я я В Ч, К. Т я я 8 : А,, К, М,,, Ч -А. 6 ( я) 1 ( ), 105 (AA) 331. я 870, Ч я я я я я. Ч я я 10%, я. 81,600 я я, 21,9% я я. 27/35

14 46. К я А я V.1. а и а V.1 а ая ха а е и и а А ы ых а а в # а а е и На ва ие A ы ых А а в И а Чу Чы - в а 1 К, , Д я, я я, я я, 8 я , 9 Т, К , я 11, М я, К, Д,% М А я я. я я я : АА - 52,4% я, Ч АА - 20%, Ч -К АА - 54,2%. 20,2%. В 8 Х В я я. Х В я я я я, В, я я я. 48. Д я А А я 15-20%. 8 Х В я я. В К «я К»: 28/35

15 (i) я я - я, я я, ; (ii) я я - я, я я, я 2631 К. 49. В,,. 80%-100% я. 50. Э я я : а и а V.2 Э и е и ав а е е ия. На ва ие АA/ а И а Чу Чы - в а На и а - в % - в % - в % - в % 1 К , , , , ,7 55 0,4 20 0, , , , , ,2 4 Д , , Т , ,2 6 К 13 0, , Д 94 1, , , ,1 В е VI. АНИ АСС НИ АЛ A. е а е ия а 51. М я (М ) я В., В, я, А. я М я ( 6). 52. М я 3 я, : (i) М (А ). я ( ). я М (МК ), я, В. МК, я я я, я А 8 К я 2015 «я я я,». 29/35

16 , В я. 14. (ii) ( Э К). 14, я я К Э К МК А, В. К я Э К 14. (iii). 14, я. B. е е а е и 53. М (МК ) я я я, Э К А А, я А В. МК 5. В - -,, я, я - я. я я 3 я я я. 54. я МК я я я: (i) А я Э К; (ii) Д я, ; (iii) я, В А, я Э К. С. у ы а е ия а ( ) 55. Д я,, я, я я ( ).,, / я. 56. : (i) М - А - А - я - В. (ii) 30/35

17 Э К я М я. я я я. 57. я я, я я я я. Э я: - ; - я ; -.,, Э К. VII. НС Л А ИИ, ЧАС И И АС И А. е ве ые у а ии 58. Д я А А, Э К я Т, В В Э Ч я-к. Д я я Т VII.1. а и а VII.1 е ве ые у а ии, ВЛЭ Чу ая- е и, а 2017 А / Ч, Ч -К, М я Д К. Т, Ч , Ч я, К я., К, Ч я, К я Э К я : (i) я, я, ; (ii) В,, я ; (iii) В,,, ; (iv) М я, М я. 59. В я : В : К я? : 20 я В : К? : А я. Ч ВЭ ( Э К). 31/35

18 М я ( 7). B. а ы ие 60. Э я А я Э К. Э К я В я ( 8). VIII. АНИ А И НН И АЛИ А И 61. я А. Э Э К, К я. A.НЭС 62. Э К,,. ( ) Э К (i), А я А ; (ii) ; (iii) ; (iv) ; (v) я ; (vi) А я. 63. В Э К я я В, : (i) я я, ; (ii) ; (iii) я. B. я и 64. Д я А я я. я А я, я, (i) я ; (ii) ; (iii) (Д ) я я В ; (iv) ; (v) - ; (vi) А ; (vii) я. C. и ии 65. В я я А. К,, я, В, я. Т я я, я. я :, (М ), я 32/35

19 я, я, я А. D. е ие в в и и у и а а и а ии и еа и а ии ЛАНа 66. Т VIII.1 /, А. а и а VIII.1 ве ве в в е е ых у е е и / е ия ия ве ве ые 1 я, Э К, А 2 Д,, Э А я 3 Э К 4 я, я К А 5 Э К, я, К 6 А Э К, А 7 В Э К 8 А Э К 9 В Э К 10 Э К я я я я я В 11 я 12 М Э К 67. А я ( 9). IX. НСА ИИ И С Л НИ А. С ав и е а ии 68. Д я, я,. К я В, я. A.1 е я у ая 69. я я я я В. я К, я я / В я, я В я : 33/35

20 (i) я я я, я я. (ii) я я /. (iii) я я я. Д я я я (20 ), я я. A.2 а а ы Л В, вя а ые е а ие 71. В, я я: (i) Т В я. (ii). (iii), я я я, я, К. В, я, я ( 10). B. е а и и е а ии 72. Д. Д я я я 28 я я я В Э Ч я-к я 67, ( я я ) (Д я я ) А я. А я 69,1298 /$. я ( 11). 73. Т IБ.1 я В Э Ч я-к. Наи е ва ие а ы а а а/ а а и а IБ.1 ая у а е а Су а е а ии а е у ая, Су а е а ии а а х ы Л В, ая у а, 1 И а 15008,5 1526, ,5 2 Чу 7619,4 1526,0 9145,4 3 Чы - 882,0 1526,0 2408,0 4 в а 31400,3 7630, ,3 ая у а, 54910, , ,2 34/35

21 X. НИ ИН A. е вы е ии ( е ии) ЛАНа 74. Д я я я А А я, я А. Э К ( ) А А А. 75. я : (i) я я я я А ; (ii) В, А ; (iii) (iv) (v) ; В; я ; (vi) я А А я я. B. е ы и и у иа ых а и ых е 76., А я, Э К А. В я я Э К я я я. 35/35

22 ANNEX 1/ ИЛОЖЕНИЕ 1 Pictures of technique and equipment will be used during stringing work/ у к тех к о о удо, кото е удут пол о о е от по п от к ел 1. Truck will be used for transportation, loading and unloading. Г у о ш удет пол о для т по т о к, у к у к. Dimensions/Р е Width/Ш Length/Дл mm Tractor will work under line./т кто удет от т под л я. Dimensions/Р е Width/Ш Length/Дл mm /3

23 3. Pick-up will be out of the work area. Can be used only on the road. к п для от е оче о е т. Будет пол о тол ко до о х. Dimensions/Р е Width/Ш Length/Дл mm Excavator will work on work area and under line if it is need. Эк к то удет от т оче е те под л я, е л т е ует я. Dimensions/Р е Width/Ш Length/Дл mm /3

24 5. Tensioner for stringing work./ по о ле е для тя я к еля Dimensions/Р е Width/Ш Length/Дл mm Puller for stringing work./ по о ле е для тя я к еля Dimensions/Р е Width/Ш Length/Дл mm /3

25 ANNEX 2 Photo of LAR impacted areas on Chuiskaya-Kemin OHL 1. Kemin raion, Orlovka town administration 1.1. Towers T52-T56 of a high-voltage transmission line "Chuiskaya - Kemin" is located to the north-west of Orlovka town. For execution of the electrical and installation works, it is nоcоssarв to ОnsurО passagо oп tсо ClТОnt s transport ЛОtаООn toаоrs Т52 Т56. The total area required for the passage of the Customer transport is 5600 sq.m. (1120 x 5). On land plots where will be carried out electrical work planned sowing of barley and wheat Tower T84 is located to the south-east of the Orlovka town. For execution of the electrical and installation works, there must be total land area of 2620 sq.m, including working place 1600 sq.m (40x40) and access road 1020 sq.m (340 x 3). The land plot where the works will be conducted, sown by winter wheat and partially sainfoin. 1.3.Tower T118 is located to the north-west of the Orlovka town. For execution of the electrical and installation works, there must be total land area of 1645 sq.m, including working place 1600 sq.m (40x40) and access road 45 sq.m (15 x 3). The land plot where the works will be conducted, sown by winter wheat.

26 2. Kemin raion, Chym-Korgon AO, Chym-Korgon village 2.1.Tower T133 of a high-voltage transmission line "Chuiskaya - Kemin" is located in Samansur village, Kemin raion. For execution of the electrical and installation works, there must be total area 100 sq.m, (20 x 5). On land plot where will be carried out electrical work is planned sowing of corn. 3. Chuisky raion, Iskra AO, Kara-Dobo village 3.1.Tower T165 of a high-voltage transmission line "Chuiskaya - Kemin" is located to the west of Kara-Dobo village. For execution of the electrical and installation works, there must be total area 695 sq.m, including working place 125 sq. m (25 x 5) and access road 570 sq. m (190 x 3). On land plot where will be carried out electrical work is planned sowing of beet. 4. Chuisky raion, Chuisky AO, Chui village 4.1.Tower T180 of a high-voltage transmission line "Chuiskaya - Kemin" is located to the northwest of Sayilyk village, Chuiskiy raion. For execution of the electrical and installation works, there must be total area 2575 sq.m, including working place 2500 sq. m (50 x 50) and access road 75 sq. m (25 x 3). On land plot where will be carried out electrical work is planned sowing of barley.

27 ИЛ НИ 2 Ф е, ав их в е вие, а ВЛЭ «Чу ая- е и» 1. е и и а, э ия а в а 1.1. Т52 Т56 Э «Ч я-к» -. Д я я Т52 Т56. я я я я (1120 5). я я я я Т84 -. я я я я , (40 40) (340 3)., я, я я Т я я я я , (40 40) 45. (15 3)., я, я я.

28 2. е и и а, Чы - и А/. Чы Т133 Э «Ч я-к», К. я я я я 100. (20 5), я, я. 3. Чу и а, И и и А/,. а а- ө ө 3.1. Т165 Э «Ч я-к» К -Дө ө, Ч. я я я я 695., (25 5) 570. (190 3)., я, я. 4. Чу и а, Чу и А/. Чу 4.1. Т180 Э «Ч я-к» -, Ч. я я я я 2575., (50 50) 75. (25 3)., я, я я я.

29 ANNEX 3 / ИЛ НИ 3 Cut-off date announcement (text in English and clipping from newspaper)/ яв е ие а ы и е е ия а я е е е ия е а и (вы е а и а е ы) JSC National Electric Grid of Kyrgyzstan Power Sector Improvement Project, RRP KGZ Chuiskaya-Kemin OHL Announcement of cut-off date for compensation entitlements JSC National Electric Grid of Kyrgyzstan (NEGK) is the Implementing Agency for the Power Sector Improvement Project (RRP KGZ ), (Project), where a number of persons are expected to be impacted by the Project. Brief description of works, OHL scheme and numbers of towers are indicated below. In this regard, NEGK announces that 14 March 2017 is the cut-off date for establishment of affected assets in the Project. Scheme of location of Chuiskaya-Kemin OHL where works related to stringing of fiber optic cables on existing towers of Chuiskaya-Kemin OHL will be conducted Tower Nos: 1, 9, 19, 36, 51, 64, 84, 99, 118,133, 150, 165, 180, 193, 203 and distance under line between towers Nos Clipping from newspaper in Russian

30

31 ANNEX 4/ И И 4 Decree on establishment of LAR Commission (with translation into English)/ ш я я

32

33

34

35

36

37 K Y R GY Z R E PUBL IC K E MIN DIST R IC T ST AT E ADMINIST R AT ION OR DE R March 16, 2016 No. 50 K Оmin c. On thо ОstablishmОnt oп commission Пor thо prоparation anн implоmоntation oп thо LanН Acquisition anн RОsОttlОmОnt plan within thо "PowОr SОctor ImprovОmОnt" projоct ПunНОН bв A DB In thо ОxОcution oп thо lоttоr oп thо AuthoriгОН RОprОsОntativО oппicо oп thо GovОrnmОnt oп K вrрвг RОpublic in Chui rорion НatОН No. TC on thо quоrв oп J SC "National ElОctrical GriН oп K вrрвгstan" anн thоir rоcommоnнations. 1. To Оstablish a commission with composition accorнinр to thо AppОnНix No Commission is to timоlв support J SC "National ElОctrical GriН oп K вrрвгstan" in thо prоparation anн implоmоntation oп thо LanН Acquisition anн RОsОttlОmОnt plan on thо tоrritorв oп thо rорion, incluнinр: proviнinр nоcоssarв inпormation, orрaniгinр consultations with aппоctон partiоs anн local population, solvinр othоr quоstions rоlatон to prоparation anн implоmоntation oп thо aпorоmоntionон Plan. 3. Control oп thо implоmоntation oп this orноr is to bо ОntrustОН to Пirst НОputв hоaн oп Нistrict statо aнministration N. SharshОnaliОv. HОaН /siрnaturо/ T. SunataОv SОnt to: thо ПilО, commission mоmbоrs ApprovОН bв: N. SharshОnaliОv /siрnaturо/ SiРnОН bв: A. AbНrakhmanova /siрnaturо/ J. K onurbaоva /siрnaturо/ MaНО bв: J. JОnishbОkova

38 AppОnНix to thо orноr oп K Оmin Нistrict statо aнministration No. 50 НatОН March 16, 2016 Composition oп commission Пor thо prоparation anн implоmоntation oп thо LanН Acquisition anн RОsОttlОmОnt plan within thо "PowОr SОctor ImprovОmОnt" projоct ПunНОН bв ADB 1. N. SharshОnaliОv Пirst НОputв hоaн oп K Оmin Нistrict statо aнministration, chairman oп commission 2. J anвbоkov B.R. rоprоsоntativо oп J SC NEGK, НОputв chairman oп commission 3. HОaНs oп aвil okmotu s in whosо borноrs work sitоs anн accоss arоas to thо ovоrhоaн transmission linоs towоrs arо locatон 4. MursaНairov K.M. chiоп oп AНministration oп aрricultural НОvОlopmОnt 5. AbНвrahmanov R.A chiоп oп AНministration oп lanн planninр anн rорistration oп rоal ОstatО 6. SoltobОkov T.E. chiоп oп AНministration oп citв planninр anн architоcturо 7. HОaН oп rоlоvant sоrvicо oп ПorОst manaроmоnt on thо rорion tоrritorв (iп nоcоssarв) ChiОП oп StaПП /siрnaturо/ A. AbНrahmanov

39 K вrрвг R Оpublic Chui R ОРion CHUI DIST R ICT ST AT E ADMINIST R AT ION No. 467/1-3 AuthoriгОН RОprОsОntativО oппicо oп thо GovОrnmОnt oп K вrрвг RОpublic in Chui rорion oп K вrрвг RОpublic To вour lоttоr No. TC НatОН March 2, 2016 Chui Нistrict statо aнministration hоrоbв sоnнs вou a copв oп thо orноr НatОН March 15, 2016 with rопоrоncо No. 46-p On commission Пor thо prоparation anн implоmоntation oп thо LanН Acquisition anн RОsОttlОmОnt plan within thо "PowОr SОctor ImprovОmОnt" projоct ПunНОН bв ADB, crоatон on thо basis oп quоrв oп J SC National ElОctrical GriН oп K вrрвгstan. First DОputв hоaн oп Chui Нistrict statо aнministration /siрnaturо/ Sh. AbвkaОv

40 C hui Нistrict statо aнministration OR DE R НatОН No. 46-p C hui v. On commission Пor thо prоparation anн implоmоntation oп thо LanН Acquisition anн RОsОttlОmОnt plan within thо "PowОr SОctor ImprovОmОnt" projоct ПunНОН bв ADB In orноr to support thо implоmоntation oп PowОr SОctor ImprovОmОnt projоct in accorнancо with an aрrооmоnt bоtwооn thо GovОrnmОnt oп K вrрвг RОpublic anн Asian DОvОlopmОnt Bank, Пor thо prоparation anн implоmоntation oп thо LanН Acquisition anн RОsОttlОmОnt plan in accorнancо with thо Asian DОvОlopmОnt Bank rоquirоmоnts: 1. To Оstablish a commission Пor thо prоparation anн implоmоntation oп thо LanН Acquisition anн RОsОttlОmОnt plan accorнinр to thо AppОnНix No Commission is to timоlв support J SC "National ElОctrical GriН oп K вrрвгstan" in thо prоparation anн implоmоntation oп thо LanН Acquisition anн RОsОttlОmОnt plan on thо tоrritorв oп Chui rорion, incluнinр: proviнinр nоcоssarв inпormation orрaniгinр consultations with aппоctон partiоs anн local population solvinр othоr quоstions rоlatон to prоparation anн implоmоntation oп thо aпorоmоntionон Plan. 3. Control oп thо implоmоntation oп this orноr is to bо ОntrustОН to Пirst НОputв hоaн oп Chui Нistrict statо aнministration A. K oгhomambоtov. HОaН oп Chui Нistrict statо aнministration akim /stamp/ K. A nbasov Е

41 AppОnНix No. 1 to thо orноr oп Chui Нistrict statо aнministration НatОН March 15, 2016 with rоп No. 46-p Composition oп commission Пor thо prоparation anн implоmоntation oп thо LanН Acquisition anн RОsОttlОmОnt plan within thо "PowОr SОctor ImprovОmОnt" projоct ПunНОН bв ADB 1. AbвkaОv Sh. A. First НОputв hоaн oп Chui Нistrict statо aнministration chairman oп thо commission 2. J anвbоkov B.R. НОputв РОnОral НirОctor oп A DB НОputв chairman oп thо commission MОmbОrs oп commission: 3. AlвshpaОv Z.T. hоaн oп Shamshinskii a/a 4. MambОtbaОv J.T. hоaн oп Ak-BОshimskii a/a 5. Ibraimov M.A. hоaн oп Buraninskii a/a 6. DuishОnaliОv A.J. hоaн oп Iskrinskii a/a 7. Saburov T.S. hоaн oп Ibraimovskii a/a 8. SharshООv A.J. hоaн oп KОРОtinskii a/a 9. SвНвkov I.S. hоaн oп Onbir-ZhвlРinsii a/a 10. KoгholiОv K.B. hоaн oп Chuiskii a/a 11. SokООv T.S. НirОctor oп Chui Нistrict aнministration oп ArchitОcturО anн DОvОlopmОnt 12. Momunkulov M.A. DirОctor oп Tokmok-Chui tоrritorial aнministration oп lanн planninр anн rорistration oп rоal ОstatО 13. Akmatov A.S. ChiОП ArchitОctor oп Chui Нistrict 14. SoltonbОkov I.K. DirОctor oп Chui ПorОst manaроmоnt (iп nоcоssarв) ChiОП oп StaПП /stamp/ A. K oгhomambоtov

42 ANNE X 5/ Л 5 ConПirmations oп L ocal AuthoritiОs rоlatон to L AR impact arоa, DPs anн tвpо oп crops (with translation into E nрlish)/ яа а я, Л В а х я ая

43

44

45

46

47

48 KYRGYZ REPUBLIC CHUI REGION KEMIN DISTRICT MUNICIPALITY OF ORLOVKA TOWN /47 To E xоcutivо DirОctor oп J S C National E lоctric GriНs oп KвrРвгstan TвumОnbaОv A.R. ThО Maвor oп thо town oп Orlovka oп thо KОmin District conпirms that thо ownоrs - thо actual usоrs oп lanн plots arounн anн bоtwооn thо towоrs oп thо hiрh-voltaро powоr transmission linо (OHL) Chuiskaвa KОmin thо ПollowinР: 1. BОtwООn thо towоrs T53 - T54 is S alpaрarov HusОi Ilвaгovich 2. BОtwООn thо towоrs T54 - T55 is IskОnНОr AurstanbОkovich MurгaliвОv 3. BОtwООn thо towоrs T55 - T56 is IskОnНОr AurstanbОkovich MurгaliвОv 4. ArounН thо towоrs T84 (partiallв) is Pashinskiв Nikolai AlОksООvich 5. ArounН thо towоrs T84 (partiallв) is KolkobaОv KОrОг MОНiorвch 6. ArounН thо towоrs oп T118 is Polвakov DОnis PОtrovich. ThО lanн plots wоrо survовон toроthоr with thо spоcialist on lanн issuоs oп thо Orlovka maвor's oппicо TОmirkanov TN, valuator AbНвkaНвrovв K.Dгh. anн ОnРinООr AbНullah Gul. AccorНinР to thо rоsults oп thо survов, it was rоvоalон that НurinР thо pоrioн Пrom "1" March to "30" April 2017, barlов sowinр is plannон on thо lanн plots, in thо contours oп thо towоrs oп T53, 54, T84 is sown with wintоr whоat anн sainпoin, T118 with wintоr whоat. ThО inпormation nоcоssarв Пor calculation oп compоnsation Пor thо impact in thо pоrioн oп work on cablо strinрinр: 1. ThО total arоa nоcоssarв Пor thо passaро oп thо contractor's ОquipmОnt on thо sitо usон bв S alpaрarov H.I. is 2070 sq.m. (414 x 5) barlов. 2. ThО total arоa nоcоssarв Пor thо passaро oп thо contractor's ОquipmОnt on thо sitо usон bв MurгaliОv I.A. is 3530 sq.m. (706 x 5) whоat, 3. Total arоa rоquirон Пor ОlОctrical work anн passaро oп Contractor's tоchniquо in thо arоa usон bв Pashinskiв N.A. is 1820 sq.m., incluнinр accоss roaн 1020 sq. m. (340 x

49 3). AnН work spacо 800 sq. M. (20 x 40) whоat, 4. ThО total arоa nоонон to pоrпorm ОlОctrical work on thо arоa usон bв KolkobaОv K.M. is 800 sq.m. (40 x 20) sainпoin. 5. ThО total arоa nоонон to pоrпorm ОlОctrical work anн passaро oп thо contractor's ОquipmОnt in thо arоa usон bв Polвakov DP is 1645 sq. M., IncluНinР accоss roaн 45 sq. M (15 x 3) anн work spacо 1600 sq. M. (40 x 40) whоat. 6. ThО plannон вiоlн Пor 2017 oп barlов is 23 Нt/ha, whоat is 28 Нt/ha, sainпoin Нt/ha. 7. ThО plannон cost oп 1 kр oп thо whоat crop oп 2017 is 12 som / kр, thо, sainпoin is som / kр. Maвor oп Orlovka town /S iрnaturо/ Chancharov B.A. S pоcialist in lanн manaроmоnt /S iрnaturо/ TОmirkanov T.N. TОnant /S iрnaturо/ S aнiaрarov H. N. TОnant /S iрnaturо/ MurгaliОv I.A. OwnОr /S iрnaturо/ Pashinskiв N.A. OwnОr /S iрnaturо/ KolkobaОv K.M. T84 OwnОr /S iрnaturо/ Polвakov D.P.

50 K вrрвг R Оpublic Chui R ОРion K Оmin District Chвm-K orрon Aвil Okmotu No. 27 To E xоcutivо DirОctor J S C National E lоctrical GriН oп KвrРвгstan TвumОnbaОv A.R. Chвm-KorРon aiвl okmotu oп Chui R ОРion conпirms that ownоr actual usоr oп lanн plot arounн towоr T133 oп Chuiskaвa KОmin OHL is AralbaОv RвskulbОk S atвbalнiоvich. LanН plat was survовон toроthоr with aiвl okmotu lanн planninр spоcialist BaisОkООv A.A., valuator DolРov Y u.y u. anн ОnРinООr AbНullah Gul. BasОН on thо survов rоsults it was ПounН that arounн T165 towоr, lanн is not ПarmОН, НurinР thо pоrioн bоtwооn «1» March anн «30» April, sоонinр oп corn is plannон. InПormation nоcоssarв to calculatо compоnsation Пor impact НurinР thо cablо linо strinрinр works ОxОcution: 1. Total arоa nоcоssarв Пor carrвinр out ОlОctric installation works on thо lanн plot usон bв AralbaОv R вskulbоk S atвbalнiоvich is 100 m 2 (5 x 20). 2. PlannОН corn вiоlн Пor 2017 is И И И И И И И И И И И Нt/ha. 3. PlannОН cost oп 1 kр oп corn вiоlн Пor 2017 is И И И И И И И И И И И И soms/kр. /stamp/ HОaН oп Chвm-KorРon Aiвl okmotu /siрnaturо/ MakООv E.M. LanН PlanninР spоcialist /siрnaturо/ BaisОkООv A.A. OwnОr /siрnaturо/ AralbaОv R.S.

51 No. 12/02-09 K вrрвг R Оpublic Chui R ОРion Chui District Iskra Aiвl Aimak To E xоcutivо DirОctor J S C National E lоctrical GriН oп KвrРвгstan TвumОnbaОv A.R. Iskra aiвl okmotu conпirms oп Chui R ОРion conпirms that ownоr actual usоr oп lanн plot arounн towоr T165 oп Chuiskaвa KОmin OHL is rural communal inпrastructurо Ala-Too rоprоsоntон bв DirОctor TОimurov GamiН GamгaОvich. LanН plot was survовон toроthоr with aiвl okmotu lanн planninр spоcialist AbНвmomunov D.B., valuator DolРov Y u.y u. anн ОnРinООr AbНullah Gul. BasОН on thо survов rоsults it was ПounН that arounн T165 towоr, lanн is not ПarmОН, НurinР thо pоrioн bоtwооn «1» March anн «30» April, sоонinр oп bооt is plannон. InПormation nоcоssarв to calculatо compоnsation Пor impact НurinР thо cablо linо strinрinр works ОxОcution: 1. Total arоa nоcоssarв Пor carrвinр out ОlОctric installation works on thо lanн plot usон bв rural communal inпrastructurо Ala-Too is 695 m 2, incluнinр work sitо 125 m 2 (5 x 25) anн accоss routо 570 m 2 (190 x 3). 2. PlannОН bооt вiоlн Пor 2017 is 1000 Нt/ha. 3. PlannОН cost oп 1 kр oп bооt вiоlн Пor 2017 is 3.50 soms/kр. /stamp/ HОaН oп Iskra Aiвl okmotu /siрnaturо/ BoНbaОv R.B. LanН PlanninР spоcialist /siрnaturо/ AbНвmomunov D.B. OwnОr /siрnaturо/ TОimurov G.G.

52 K вrрвг R Оpublic Chui R ОРion Chui Aiвl Okmotu oп Chui Aiвl Aimak No. 160/04.2 To E xоcutivо DirОctor J S C National E lоctrical GriН oп KвrРвгstan TвumОnbaОv A.R. Chui aiвl okmotu oп Chui R ОРion conпirms that ownоr actual usоr oп lanн plot arounн towоr T180 oп Chuiskaвa KОmin OHL is AblaОv S almorbоk S avоkovich. LanН plat was survовон toроthоr with aiвl okmotu lanн planninр spоcialist UsubaliОva B.E., valuator DolРov Y u.y u. anн ОnРinООr AbНullah Gul. BasОН on thо survов rоsults it was ПounН that arounн T180 towоr, lanн is not ПarmОН, НurinР thо pоrioн bоtwооn «1» March anн «30» April, sоонinр oп barlов is plannон. InПormation nоcоssarв to calculatо compоnsation Пor impact НurinР thо cablо linо strinрinр works ОxОcution: 1. Total arоa nоcоssarв Пor carrвinр out ОlОctric installation works anн accоss oп vоhiclоs to thо lanн plot usон bв AblaОv S almorbоk S avоkovich is 2575 m 2 (5 x 20), incluнinр worksitо 2500 m 2 (50 x 50) anн accоss routо 75 m 2 (25 x 3). 2. PlannОН barlов вiоlн Пor 2017 is 450 Нt/ha. 3. PlannОН cost oп 1 kр oп barlов вiоlн Пor 2017 is 11 soms/kр. /stamp/ HОaН oп Chui Aiвl okmotu /siрnaturо/ KojonaliОv K. ChiОП LanН PlanninР spоcialist /siрnaturо/ UsubaliОva B. OwnОr /siрnaturо/ AblaОv S.

53 ANNEX 6/ ИЛ НИ 6 Decisions on Establishment of Grievance Redress Mechanism (with translation into English)/ е е ия у а в е и еха и а а е ия а

54

55

56 Joint Stock Company «National Electric Grid of Kyrgyzstan» Order No. 154 To ensure the successful implementation of the project "Power Sector Improvement, funded by the ADB, being guided by the Law of the Kyrgyz Republic "On the order of consideration of complaints" dated with amendments in 2008 and 2013, and the standard instruction on records management, approved by the resolution of Government of KR dated July 23, 2012 for No. 517, in citizens handling (proposals, applications, complaints), HEREBY ORDER: To OO Head Bektorgoeva E.J., to provide a job: 1. In the immediate registration of received applications and complaints in the journal; 2. Immediately transfer the received complaints and applications to the management personnel for consideration; 3. Promptly transfer to the responsible head of department and service, whose competence includes the consideration of received complaints in accordance with the head resolution, as well as send a copy of the complaint to the Asian Development Bank; 4. To ensure control over terms of consideration of complaints and responses to the applicant (within 14 days); 5. Timely direct response to the applicant's address and ADB, that should be recorded in the journal; 6. Control over the execution entrust to Borodin A.V. - First Deputy General Director. General Director /signature/ M.A.Aitkulov

57 ANNEX 7/ ИЛ НИ 7 MКtОrТКls oп PuЛlТМ МoЧsultКtТoЧs атtстч tсо proуомt PoаОr sомtor IЦproЯОЦОЧt (Chuiskaya-KeminOHL) / а е иа ы е ве ых у а и в а ах е а «а ви ие е а э е е и и» (ВЛЭ «Чу ая- е и ) The minute of Public МoЧsultКtТoЧs атtстч tсо proуомt PoаОr sомtor IЦproЯОЦОЧt (Chuiskaya-Kemin OHL) Tokmok town 23 March 2017 Representatives of OJSC "NEGK": L.Kamalova - specialist of the Department of external relations of "NEGK" Т.Kurmanaliev- specialist of the Department of Capital Construction, ChuPVES Representatives of Ak-Ay Elektrik: S. Asanalieva - Resettlement Specialist K. Abdykadyrov - Evaluator Representatives of LAR Commissions: B.Usubalieva Specialist on land issues of Chui Local Authority (aiylokmoty) D.Abdymomunov - Specialist on land issues of IskraLocal Authority (aiylokmoty) М. Momunkulov Head of Local registration office B.Mukambetov specialist of the Department on agrarian development of the Chui district administration DP: S.Ablaev LAR affected person Thetotalnumberofparticipants - 9people (List of participants is attached). Subject: Inform about the Resettlement Plan (Information disclosure) Resettlement Specialist (S.Asanalieva) informed the participants about the project "Development of the Energy Sector" and the Plan of resettlement in the framework of this project: goal, implementation term, project impact, compensation issues, grievance mechanism (Form of Grievance registration book is attached). Photos of machinery and equipment that will be used during the work are presented.alsonotedthattodefineaveragecropyieldfor compensations LAR commission of this district was engaged. Evaluator (K.Abdykadyrov) provided information on the approach of determining the cost of

58 damage, the size of the affected area, composed of DPs expenditure associated with the payment. Sumofcompensationisdefinedbasedoninformationof District administration/members of LAR commission on crop yield. Question: When will you start civil work? Questions from participants and answers Answer: Starting date of civil work is planned for 20 April Question: When and who will pay compensation? Answer: According to ADB policy compensation should be paid before starting of civil work. And it will be implemented by specialists of ChuPVES (NEGK). Protocol led by /signature/ S.Asanalieva

59 List of participants of public consultations Photo from Public consultations in Tokmok town

60 The minute of Public МoЧsultКtТoЧs атtстч tсо proуомt PoаОr sомtor IЦproЯОЦОЧt (Chuiskaya-Kemin OHL) Orlovka town 23 March 2017 Representatives of OJSC "NEGK": L.Kamalova - specialist of the Department of external relations of "NEGK" Т.Kurmanaliev- specialist of the Department of Capital Construction, ChuPVES Representatives of Ak-Ay Elektrik: S. Asanalieva - Resettlement Specialist K. Abdykadyrov - Evaluator Representatives of LAR Commissions: B.Chancharov Mayor of Orlovka town Т.Temirkanov - Specialist on land issues of Orlovka town E.Makeev Head of ChymKorgonLocal Authority A.Baisekeev - Specialist on land issues of ChymKorgonLocal Authority Thetotalnumberofparticipants - 15people (List of participants is attached). Subject: Inform about the Resettlement Plan (Information disclosure) Resettlement Specialist (S.Asanalieva) informed the participants about the project "Development of the Energy Sector" and the Plan of resettlement in the framework of this project: goal, implementation term, project impact, compensation issues, grievance mechanism(form of Grievance registration book is attached). Photos of machinery and equipment that will be used during the work are presented. Evaluator (K.Abdykadyrov) provided detailed information on the approach of determining the cost of damage, the size of the affected area, composed of DPs expenditure associated with the payment. No Questions have been received. Protocol led by /signature/ S.Asanalieva

61 List of participants of public consultations

62 Photo from Public Consultations in Orlovka town

63 Grievance Registration Logbook Project: Power Sector Improvement Project RRP KGZ Grievance Location AyilAimak Local Point of Contact A Inquiry, clarification, suggestion, request B Complaint regarding alleged breach of the SPS 2009 or Public Communication Policy 2011 C Allegation of fraud or corruption IR Involuntary Resettlement ENV Environment GRIEVANCE REGISTRATION LOG BOOK Grieva nceno Date Name Address, telephone Type (A, B,C) & nature of Grievance (SOC or ENV) Location of impact (village name, Local Authority GrievanceSummary DP ssтрчкturо

64 A, я,, у а е и а ии аяв е и е : а ви ие е а э е е и и RRPKGZ е а и аяв е ия а ы ы а а Л ИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИИ (Ф.И.. ) B я М (2009) я я (2011) C В В С НАЛ ИС А ИИ А ВЛ НИ аяв е ие а а Ф.И.. А е, е е и (A, B,C) и и а аяв е и я (В и и С) е ах е ие в ия ия ( а ва ие е а/а ы а а а) а е е а ие аяв е и я и и а, ав е в е вие е а

65 ANNEX 8/ ИЛ И 8 PAMPHLET RESETTLEMENT PLAN INFORMATION JSC NATIONAL ELECTRIC GRID OF KYRGYZSTAN Power Sector Improvement Project RRP KGZ (Chuiskaya-Kemin OHL) A. Introduction 1. The JSC National Electric Grid of Kyrgyzstan (NEGK) is planning to string of optical ground wires (OPGW) on existing transmission lines in Chuy Oblast. The estimated length of OPGW is 552 km. The Project is financed by the Asian Development Bank (ADB), NEGK is the Executing Agency (EA). The Project commencement date is and completion date is According to the requirements of the ADB resettlement policy, NEGK has prepared the Resettlement Plan for Chuiskaya-Kemin OHL (RP) for detailing Project impacts, compensation entitlements and compensation mechanisms and procedures. 2. This Information Pamphlet summarizes the main points of the RP. Its objective is to disclose and summarize for the benefit of APs impacts of the project. This project will link seven major substations and the control centers via optical fiber. This will reduce technical losses through avoidance of overloading; enable faster detection and restoration of faults. Also it improves overall efficiency and reliability of the system. OPGW will be pulled over existing transmission towers on existing lines, which are located mostly on agricultural land or barren land. Photos of transport and equipment for stringing work will be presented during public consultations. This activity requires work space and access, and lead to temporary crop damage around/along the existing towers. Since the works will be conducted on/along the existing transmission towers, the impact shall be limited to the temporary damage to crops and no land acquisition is expected. 3. According to ADB policy, NEGK will disclose information about RP on public consultations. This pamphlet in Kyrgyz and Russian shall be shared with DPs. B. Impacts Summary 4. Based on the RP impacts, there are 8 DPs on Chuiskaya-Kemin OHL in Kemin and Chui districts. On this line Project has impact on 5 types of crops as wheat, barley, sainfoin, corn and beet. C. Resettlement Policy and Principles 5. The impacts caused by stringing of wires will be compensated based on the laws of Kyrgyz Republic and the requirements of the ADB Safeguards Statement Policy (2009). All DPs will receive a

66 relevant compensation for crop losses. The compensation program under the RP is based on the following principles: IЧvoХuЧtКrв rоsоttхоцочt Тs to ЛО КvoТНОН or Кt ХОКst ЦТЧТЦТгОН. IП ТЦpКМts КrО uчкvoтdable appropriate compensation will be provided DPs should be fully informed and consulted on LAR compensation options and implementation. ӨoЦpОЧsКtТoЧ атхх ЛО МКrrТОН out атtс ОquКХ МoЧsТНОrКtТoЧ oп аoцоч КЧН ЦОЧ. D. Compensation Eligibility and Entitlements DPs lost Мrops НurТЧР аorф oч tсо strтчртчр oп OPGА атtстч tсо ProУОМt PoаОr sомtor ТЦprovОЦОЧt are entitled to compensation. Entitlement Matrix Impact type Eligible DPs Entitlements Notes Crops All DPs (actual users of land: owners or tenants) Compensation for: 1. One season harvest based on data from National Statistics Committee of the Kyrgyz Republic and market analysis. 2. DPs costs related to compensation issues. Determined by evaluator. The sum of compensation depends on the size of land plot and type of the crop. Compensation should be paid in accordance with the contract between NEGK and DP Compensation eligibility is limited by setting of cut-off date March 14, DPs have the right to get compensation for type of crop defined before this date. E. Compensation rates Compensation includes the following: 1. Market value of crop losses defined by the average crop yield and price based on market analysis and data from National Statistic Committee of Kyrgyz Republic. 2. DPs costs related to compensation issues as transport costs, costs for copy of documents and average lost profit calculated on the basis of data from National Statistic Committee of Kyrgyz Republic. F. Complaints and Grievance Redress Mechanism A grievance mechanism is available to allow DP to appeal any disagreeable decision related compensation. The Grievance Redress Group (GRG) is established at each local authority level

67 КММorНТЧР to TurЧФОв МoЧtrКМtor s orноr НКtОН JuХв 29, 2016, RОП.No.LNGK 73/15И102К. The grievance resolution process is detailed below. Local level. GRG at local level consists of Representatives of Local Authority (LA), Complainant and Turnkey contractor. The grievances will be first lodged at the LA level. The complainant will report his/her case to the Local Point of Contact (LPC), who is officially appointed to process DP s quоrтоs and complaints. GRG at local level consider and take a decision in 14 working days. Central level. If within 14 working days the grievance is still not resolved at local level, the МoЦpХКТЧКЧt атхх ПurtСОr rктsо tсо ТssuО to NEGK s GrТОvКЧМО RОНrОss ӨoЦЦТssТoЧ (GRC) in Bishkek. GRC of NEGK will take a decision in 14 working days. Information about LPC in local authorities is provided below in the next section. G. Contact Information For any information and advice, please feel free to approach the following contacts on Monday- Friday, 8:00-17: Local Point of Contacts: # Local Authority 1 Chui 2 Iskra 3 Chym- Korgon Name of LPC Position Contact tel. Burmagul Usubalieva Daniyar Abdymomunov Land surveyor Agronomistland surveyor Anarbek Baisekeev Land surveyor Orlovka Tilek Temirkanov Land surveyor Hayrullah Bash, Contractor of NEGK, Frunze 410/2, Bishkek Tel: hayrullah.bas@ak-ay.com, ali.acikbas@ak-ay.com 3. General Unit of NEGK, Jibek Jolu, 326, Bishkek Tel: Fax: nesk@elcat.kg

68 И Ф А И ЛА А «А И АЛ А ЭЛ ИЧ А А А» «а», (ВЛЭ Ч ая - ) A. В 1. ( Э ) - ( ) ( ), Э ( ) , Э Э - ( ),,. 2. Э.,, ( ). Э. Э,..,.,,. Э, /. /,,. 3., Э. Э.. а я 4., Э ,,,,. В. а ы 5. У,, (2009).. :

69 .,.... а а а а 6.,,,. а а а я В ы Л В а а а У ( : ) : 1.,. 2.,... Э ,.,.. а а 8. : 1. ы ая ая,. 2. а ы Л В, я а ы а,,,.. а а а 9.,. ( )

70 LNGK 73/15_102a... ( ),.. З ( ), , ( ) Э. Э а ы а ы 10.,,,, 8:00 17: ( ): # 1 А ы ы а а Л У а ы ы З З З , Э,..,., 410/2 : Э :hayrullah.bas@ak-ay.com, ali.acikbas@ak-ay.com 3. Э,..,. 326 : : Э :nesk@elcat.kg

71 ЛА ЧА ААЛ А «А Л ЭЛ А А» АА «Э а а ы», (Ч - а а а ы ы) A. ө 1. ( УЭ ) ү - ( ) үү ү. ү ү үү ү 552 ү. ү ү үү ( ), УЭ ( ) ү үү УЭ,, - ү ү - ү ү ( ). 2.. ү үү ( ) ү ү.. ү үү ү ү, үү ү. үү ү ү. ү ү ү ү ү ү. ү ү ң үү ү ү ү ү ү. үү ү, ү / ү ү ү. ү /, ү ү. 3. УЭ үү ң ң үү ү... аа ая ,,, ү ү ү ү 5 ү ү.

72 В. ө ү үү а а а ая а 5. З үү (2009). ү ү. ү : ү үү,, үү. Э, үү. ң үү. ү ү ү.. а я ү ү ү ү ү а а а «Э» үү ү ү ү. а ы а а ы аа ү ү а Э үү ү ү ( ү ү ү : ) : 1. У ү ү ү ү ү ү ү ү. УЭ ү үү ү ү ү ү ү. ү ү ү ү ү.. а я ы ө ө ү ү ү : 1. ыя ү ү ү а а а ы У ү ү үү ү.

73 2. ы а я а а а ы а ы ы а ы:, ү ү У. үү ү ү.. а а ы аа ы а ы ң ү ү 8:00 17:00 ү ү ү ң. 1. үү ( ): А ы # а а ы А ы а ы а а ы а а - ү ү ү. ( ) ү ң LNGK 73/15_102a ү ү.. үү ң. үү ң ү, ү ү. ү ң. ү ү ү үү. үү ң 14 ү ү. ң. Э 14 ү ү үү ң, УЭ ( ). 14 ү ү. - У ы а ы а а ы , УЭ,.,., 410/2 : hayrullah.bas@ak-ay.com, ali.acikbas@ak-ay.com 3. УЭ,., -., 326 : : nesk@elcat.kg

74 ANNEX 9 LARP Preparation and Implementation Shedule for Chuiskaya-Kemin OHL within the Power Sector Improvement Project (RRP KGZ ) # Activities February ( ) 2017 March ( ) April ( ) Responsibility 1 Scoping of LAR Impact Contractor/NEGK 2 LAR Action Plan Contractor/NEGK/ ADB 3 Census of DPs and Impact status Contractor/LAR comissions 4 Establishment of Grievance It was already established for all lines Contractor/NEGK Redress Mechanism 5 Valuation Contractor 6 Socio-Economic Survey Contractor 7 Pamphlet draft and approval Contractor/ NEGK/ADB 8 Information Disclosure and Public NEGK/ Consultations Contractor/ LAR comissions 9 First draft of LARP Contractor 10 LARP finalization Contractor 11 LARP approval NEGK/ADB 12 LARP implementation/ Compliance report 13 ADB no objection to start civil work NEGK ADB

75 ИЛ И 9 а а а а а а а а " а а " (RRP KGГ ) я ВЛЭ Ч ая- # я я 2017 ы Ф а ( ) а ( ) А ( ) 1 / Э З 2 З / Э / 3 4 У У / / Э / Э / 8 Э / / 9 З 10 З З 11 З Э / 12 З / 13 Э

76 ANNEX 10 DPs costs related to compensation issues (from Valuation report for Chuiskaya-Kemin OHL) 1. Transportation costs - the cost of the land user (APs), which are necessary for the implementation of trips: trip to the land plot for its identification and specification of the project impact area; trip to the land plot directly at the time of electrical and installation works; The cost of transport expenses in the amount of 10 soms per 1 km is determined based on an analysis of market information on the cost of gasoline, depreciation standards of vehicles and maintenance costs, as well as the analysis of market prices for transport services. Transportation costs for land users of Orlovka town, Chym-Korgon AO, Iskra AO and Chuy AO is determined at 200 som. 2. Lost profit as a business land users determined from the conditions of working time loss required for the implementation of activities related to the Project. According to the data of the National Statistical Committee of the Kyrgyz Republic the average monthly nominal wage per employee actually is 14, soms and soms per day (22 working days in a month). 3. Costs of copying documents identified in the amount of not more than 50 KGS, including copying passports APs, all sheets and title of certifying documents all at least 10 sheets. Table 5 presents the information to calculate the amount of lost profits and transportation costs of APs. Table 5 Name Amount 1 Transportation costs 200 som including Trip to the land plot for its identification and specification of the project impact area to 10 km 100 som Trip to the land plot directly at the time of electric installation works to 10 km 100 som 2 Lost profit 1'276 som including Trip to the land plot for its identification and specification of the project impact area 0.5 day 319 som Participation in public hearings 0.5 day 319 som Conclusion of the agreement for compensation 0.5 day 319 som Trip to the land plot directly at the time of electric installation works 0.5 day 319 som 3 Costs of copying documents 1 kit 50 som

77 ИЛ И 10 а а ы Л В, я а ы а а ( а я ВЛЭ Ч ая- ) 1. а ы а х ы я ( В), я я : я я я ; я М,,. я, Ч -К А/, А/ Ч А/ щ ая ы а я я я я. К я я я я я 14' (22 я я ). 3.За а ы а к и а и к 50, я В, я 10. В 5 я я В,. Т 5 Наи е ва ие Су а 1 Т, 200 я я 2 ( я), 1276 я 0,5 я 319 я 0,5 я 319 0,5 я 319 0,5 я К 1 50

78 ANNEX 11 The total amount of compensation for Chuiskay-Kemin OHL within the Power Sector Improvement Project (Annex 4 from Valuation report) of tower Name of AO / Raion Name Affected area of the land plot The amount of damage caused by loss of crops Transport expenses Copying documents Lost profit Total losses hectare som som som som som Orlovka town Nikolay Pashinsky administration / Kemin raion 0, , ,2 Kerez Kolkbaev Orlovka town 2 84 administration / 0, , ,0 Kemin raion Denis Polyakov Orlovka town administration / 0, , ,2 Kemin raion Chym-Korgon AO / Ryskulbek Kemin raion Aralbaev 0, , ,0 Iskra AO/ Chuy raion Gamid Teimurov, Ala-Too Agriculture Farm 0, , , Chuysky AO / Chuy Salmorbek Ablaev raion 0, , ,4 Husey Salpagarov Orlovka town administration / 0, , ,1 Kemin raion Orlovka town administration / Kemin raion Iskender MurгalТОv, Ak- BОkОt LLC 0, , ,8 Total: 54910, ,2

79 ИЛ И 11 ая у а е а ии у ы в ВЛЭ Чу ая- е и в а ах е а а ви ие е а э е е и и ( и е ие 4 е у е у) /... я щ ч щ я х К щ я В М я 1 84 / 0, , ,2 К - А М я / К - М я / К - Ч -К / К - / Ч - Ч / Ч - М я / К - М я / К - К К М 0, , ,0 я Д 0, , ,2 А 0, , ,0 КХ «А -Т» Т 0, , ,5 А 0, , ,4 Х я 0, , ,1 «А -» М А 0, , ,8 И : 54910, ,2

-. (Mr R. Bellin),.: MW224r

-. (Mr R. Bellin),.: MW224r 2018 FC 171/9 7? R А Ы Е а, 29 31 а 2018 а За а а а х х : -. (Mr R. Bellin), Д,.: +3906 6513 2392 Д QR- ; ФАО щ. С www.fao.org MW224r 2 FC 171/9 Е Е " х х". " х х",. А А, А АШ АЕ ЫЕ А Е А " х х". XIV Ф

More information

Prepared by the Joint Stock Company National Electric Grid of Kyrgyzstan for the Kyrgyz Republic and the Asian Development Bank.

Prepared by the Joint Stock Company National Electric Grid of Kyrgyzstan for the Kyrgyz Republic and the Asian Development Bank. Environmental Monitoring Report Bi-annual Report Covering the period of January June 2015 KGZ: Power Sector Improvement Project Project Number: 43456-023 ADB Loan/Grant Number: L2671/G0218-KGZ Prepared:

More information

Environmental Monitoring Report. Loan 2671 & Grant 0218-KGZ: Power Sector Improvement Project. Semiannual Report January June 2016

Environmental Monitoring Report. Loan 2671 & Grant 0218-KGZ: Power Sector Improvement Project. Semiannual Report January June 2016 Environmental Monitoring Report Semiannual Report January June 2016 Loan 2671 & Grant 0218-KGZ: Power Sector Improvement Project Prepared by OJSC National Electric Grid of Kyrgyzstan for the Kyrgyz Republic

More information

.. 2017. 21.03.01.07 «184»...,.. 13-04 081310953.. 2017 .. 2017. ё 13-04 21.03.01.07 : 184,. : 184,0 - -R98; : (,, - ); ; ; ; ё ; :,. 15,..... 2017. «184» 103, 16, 7.,,,,,.. : - 184 ; :, ;, ; ;., 3D. 4

More information

«, 68, 55, 23. (, -, ).,,.,,. (workcamps).,. :.. 2

«, 68, 55, 23. (, -, ).,,.,,. (workcamps).,. :.. 2 ,.. 2017. 49.03.03. -,......,..... 2017 «, 68, 55, 23. (, -, ).,,.,,. (workcamps).,. :.. 2 ......4 1..6 1. 1...6 1. 2...9 1.3...14 2...20 2.1.........20 3. 22 3.1...22 3.2...34 3.3,.41.....44..... 48 A

More information

NECTAR. ThТs work has bооn submтttоd to NECTAR, thо Northampton Electronic Collection of Theses and Research. Conference or Workshop Item

NECTAR. ThТs work has bооn submтttоd to NECTAR, thо Northampton Electronic Collection of Theses and Research. Conference or Workshop Item ThТs work has bооn submтttоd to NECTAR, thо Northampton Electronic Collection of Theses and Research. Conference or Workshop Item Title: ESIPP ац ја а а ца а а Creators: Troshanska, J., PrООcО, D., SвmОou,

More information

О Њ О О О О О Л К КОЛ Ј Л Ћ О КОЛ К 7/2018. О - 1

О Њ О О О О О Л К КОЛ Ј Л Ћ О КОЛ К 7/2018. О - 1 .. 51 05.09. 2017. О Њ О О О О О Л К КОЛ Ј Л Ћ О КОЛ К 7/2018. О - 1 , 2017/2018... 1950. 70 80. 1961. ђ.,. 1978/1979., К Д, 1979.. ђ ( ), ( ), ( ), ( ), ( ). И. ( ). 24. 1995.. 23. 1997.. Ђ Ђ.10, ђ,,

More information

Operating Manual version 1.2

Operating Manual version 1.2 VEHICLE TEMPERATURE AND HUMIDITY RECORDER Operating Manual version 1.2 Sp. z o.o. 41-250 Czeladź ul. Wojkowicka 21 tel. +48 32 763 77 77 fax. +48 32 763 75 94 www.mikster.pl mikster@mikster.pl Table of

More information

JOINT-STOCK COMPANY GIDROPRIVOD. RADIAL PISTON PUMPS OF VARIABLE DISPLACEMENT type 50 НРР

JOINT-STOCK COMPANY GIDROPRIVOD. RADIAL PISTON PUMPS OF VARIABLE DISPLACEMENT type 50 НРР JOINT-STOCK COMPANY GIDROPRIVOD RADIAL PISTON PUMPS OF VARIABLE DISPLACEMENT type 50 НРР Item purpose Radial piston pumps of variable displacement of the type 50НРР with adjustable delivery and constant

More information

Good Practice in Implementation of Grievance Redress Mechanism (GRM)

Good Practice in Implementation of Grievance Redress Mechanism (GRM) Good Practice in Implementation of Grievance Redress Mechanism (GRM) Ketevan Chomakhidze Environmental Specialist United Water Supply Company of Georgia (UWSCG) SUMMARY Legislation and institutional framework

More information

4WCE * 5 * : GEO. Air Products and Chemicals, Inc., 2009

4WCE * 5 * : GEO. Air Products and Chemicals, Inc., 2009 ХН Ч АН А 4WCE-600700* 5 9 2015. 1 93 : * : 600.700 600.730 1. 2 2. 2 3. 2 4. 3 5. 5 6. 7 7.,,, 8 8. 9 9., 10 10. 12 11., 13 12. 14 13. 16 14. 16 15. 17 16. 17 17., 18 18. 21 19., 24 20., 25 21., 26 22.

More information

R E N E W A B L E E N E R G Y D E V E L O P M E N T I N K A Z A K H S T A N MINISTRY OF ENERGY OF THE REPUBLIC OF KAZAKHSTAN

R E N E W A B L E E N E R G Y D E V E L O P M E N T I N K A Z A K H S T A N MINISTRY OF ENERGY OF THE REPUBLIC OF KAZAKHSTAN R E N E W A B L E E N E R G Y D E V E L O P M E N T I N K A Z A K H S T A N MINISTRY OF ENERGY OF THE REPUBLIC OF KAZAKHSTAN KAZAKHSTAN 18 2.7 $133.6 $7510.08 Mln. Mln. km 2 Bln. People 9 th biggest country

More information

TVT Television Technologies. TVT Television Technologies.: (812)

TVT Television Technologies. TVT Television Technologies.: (812) ROTON F Р ь а я 1 О а ROTON F Р в в ьз ва я... 1 1.... 4 1.1... 4 1.2... 4 2.... 4 2.1... 4 2.2... 5 2.3... 5 2.4... 5 3.... 6 3.1... 6 3.2 ROTON... 6 3.3 ROTON... 7 4.... 8 5.... 8 5.1... 8 5.2 LED...

More information

OFFER VALID FROM R. 15 COLORS TEXT DISPLAYS SERIES RGB12-K SERIES RGB16-K SERIES RGB20-K SERIES RGB25-K SERIES RGB30-K

OFFER VALID FROM R. 15 COLORS TEXT DISPLAYS SERIES RGB12-K SERIES RGB16-K SERIES RGB20-K SERIES RGB25-K SERIES RGB30-K OFFER VALID FROM 1.11.2016R. 15 COLORS TEXT DISPLAYS SERIES RGB12-K SERIES RGB16-K SERIES RGB20-K SERIES RGB25-K SERIES RGB30-K RGB Technology RGB Technology Ltd. is a Polish market-leading manufacturer

More information

KbdKaz 500 layout tables

KbdKaz 500 layout tables a ao a ao a o o o o o a a oo A o a a o a a oa ao oo A o a a o oa ao A a o a oa oa ao o a a a a o a A a a A ˆ a a A ˇ ao a a A a a A o Ao a a A Ao a o a a A ao a o a a A α a A a a a A o o a a A A a a A

More information

, «Ruby»..,

, «Ruby».., ,.. 2018 44.03.01 44.03.01.09 «Ruby»..,..... 2018 ... 3 1.... 5 1.1.... 5 1.2.,... 21 1.3. Ruby... 30 e 1... 34 2. - «Ruby»... 37 2.1. «Ruby»,... 37 2.2. «Ruby»... 50 2.3. «Ruby»... 63 2... 67... 68...

More information

uninsta un in sta 9 weights & italics 5 numeral variations Full Cyrillic alphabet

uninsta un in sta 9 weights & italics 5 numeral variations Full Cyrillic alphabet un in sta 9 weights & italics 5 numeral variations Full Cyrillic alphabet contemporary geometric web normal versitile universal adaptable neutral systematic consistant print humanist homogeneous unique

More information

OFFER VALID FROM R. TEXT DISPLAYS SERIES A SERIES D SERIES K SERIES M

OFFER VALID FROM R. TEXT DISPLAYS SERIES A SERIES D SERIES K SERIES M OFFER VALID FROM 01.01.2016R. TEXT DISPLAYS SERIES A SERIES D SERIES K SERIES M SERIES M RGB Technology RGB Technology Ltd. is a Polish market-leading manufacturer of displays in LED technology. The company

More information

Ы Ш Илт :. у /Ph.D/,Х И, у лт л д д л. лдул /Ph.D/, Х И, к л өтөл ө л

Ы Ш Илт :. у /Ph.D/,Х И, у лт л д д л. лдул /Ph.D/, Х И, к л өтөл ө л Ы Илт :. у. /Ph.D/ Х И у лт лул /Ph.D/ Х И к л Ш л өтөл ө л л I. У т л.. / / II. ул л 2.1. Д (E. Koc 2006). 1990..(Zieliñski Lewandowski 2012). II. ул л 2.2. Х 1989 Fornell1992). (ACSI) 1994 Fornell2000).

More information

Infusion Pump CODAN ARGUS 717 / 718 V - Release Notes. Firmware V

Infusion Pump CODAN ARGUS 717 / 718 V - Release Notes. Firmware V Infusion Pump CODAN ARGUS 717 / 718 V - Release Notes Firmware V5.06.20165 Version Firmware V.5.06.20165 Release Date 28-May-2014 Update Type Optional Recommended Required (Field Safety Notice 1/2014 and

More information

NON-PROFIT ORGANIZATION CHARITY FUND

NON-PROFIT ORGANIZATION CHARITY FUND NON-PROFIT ORGANIZATION CHARITY FUND ONLY RELIABLE STRATEGIC DEVELOPMENT and REAL INNOVATIONS are CAPABLE To DEVELOP ECONOMY of ALL COUNTRIES of the WORLD, to LEAD THEM TO PROSPERITY, And to MAKE the WORLD

More information

Module I. Unit 5. д е far ед е - near д м - next to. - е у ед е? railway station

Module I. Unit 5. д е far ед е - near д м - next to. - е у ед е? railway station Module I 1 Unit 5 А:What services does the hotel offer? Polite questions and answers. Adverbs of place В: Entertainment and leisure For beginners 0 А1 5.1. Гд? Where? - д? - Н д м. 1. Answer the following

More information

Grievance Committee Primer (Short Guidelines)

Grievance Committee Primer (Short Guidelines) Primer (Short Guidelines) 2014 March 2014 1. Purpose The Mechanism (GM), implemented by the Redress (GRC), will do the following: Provide feedback to company representatives and government officials so

More information

Project Features. Power Sector Improvement Project (RRP KGZ ) $ 44.8 million (62.7% grant % loan) ADF amount:

Project Features. Power Sector Improvement Project (RRP KGZ ) $ 44.8 million (62.7% grant % loan) ADF amount: Power Sector Improvement Project (RRP KGZ 43456-02) Project Concept Outline Project Features ADF amount: ADF Country allocation: ADF Regional allocation: PPTA Budget (TASF IV): Sector (subsectors): Themes:

More information

Port Moresby Power Grid Development Project.

Port Moresby Power Grid Development Project. Environmental Monitoring Report Semi-annual Report January 2017 Port Moresby Power Grid Development Project. Prepared by PNG Power Limited for the Asian Development Bank. This Semi-annual Environmental

More information

А. Љто нќша кђшка That s our cat

А. Љто нќша кђшка That s our cat Dialogues: A: That s our cat Б: That's a tree! Grammar: Frozen іто constructions Word order in Russian (Introduction) Spelling/Sounds: The Russian alphabet Диалђги Dialogues А. Љто нќша кђшка That s our

More information

UCA Chart Help. Primary difference. Secondary Difference. Tertiary difference. Quarternary difference or no difference

UCA Chart Help. Primary difference. Secondary Difference. Tertiary difference. Quarternary difference or no difference UCA Chart Help This set of charts shows the Unicode Collation Algorithm values for Unicode characters. The characters are arranged in the following groups: Null Completely ignoreable (primary, secondary

More information

MANAGEMENT LETTER. Implemented by. Prepared by: (igdem KAHVECi Treasury Controller

MANAGEMENT LETTER. Implemented by. Prepared by: (igdem KAHVECi Treasury Controller Public Disclosure Authorized REPUBLIC OF TURKEY PRIME MINISTRY Undersecretariat of Treasury MANAGEMENT LETTER Public Disclosure Authorized Public Disclosure Authorized On PUBLIC FINANCE MANAGEMENT REFORM

More information

VI... VIII

VI... VIII - 23 2017 2017 ... VI... VIII... 1 1... 2... 2 1.1... 2 1.1.1... 2 1.1.2... 9 1.1.3... 13 1.1.4... 25 1.1.5... 29 1.1.6... 34 1.1.7... 37 1.1.8... 42 1.2... 47 1.2.1... 47 1.2.2 -... 49 1.2.3... 50 1.2.4

More information

«А з» -..,,.,,,, ; ё ; ё.,,, (,, - ),,,,. : 1.,,,, -,,,,. ~ 5 ~

«А з» -..,,.,,,, ; ё ; ё.,,, (,, - ),,,,. : 1.,,,, -,,,,. ~ 5 ~ ,, III -,, «,», 29 2014 ҮҢ.14 3ү 38 III -,, (29 2014 ). :, 2җ14. 302. III -,, «,», 29 2җ14 «,»,..,,,,,,. :..,,..,, -.., -.., - III М я - я я з з 1 -., 371., -...,..,.,. : (,,,, ); - ;,,., - -,.,,,,,..,..,,.,,,

More information

ц э ц эр е э вс свэ эч эр э эвэ эч цэ е рээ рэмц э ч чс э э е е е э е ц е р э л в э э у эр це э в эр э е р э э э в э ес у ч р Б эш сэ э в р э ешшв р э

ц э ц эр е э вс свэ эч эр э эвэ эч цэ е рээ рэмц э ч чс э э е е е э е ц е р э л в э э у эр це э в эр э е р э э э в э ес у ч р Б эш сэ э в р э ешшв р э з Г Те З р х З л ш рре рре Р е Ьу е е с с ррд З р е с е Ье Р е с е Ье А в ё ё яэ Ё АМ ес е е с М е Амв ес ес с е ес В З ес с е р е Ьу с е Р е е е р ф р с е р е ес с е Ое д Г с с е с ц э ц эр е э вс свэ

More information

IRRIGATION SYSTEM ENHANCEMENT PROJECT IBRD LOAN 8267-AM IMPLEMENTED BY WATER SECTOR PROJECTS IMPLEMENTATION UNIT STATE INSTITUTION

IRRIGATION SYSTEM ENHANCEMENT PROJECT IBRD LOAN 8267-AM IMPLEMENTED BY WATER SECTOR PROJECTS IMPLEMENTATION UNIT STATE INSTITUTION Public Disclosure Authorized IRRIGATION SYSTEM ENHANCEMENT PROJECT IBRD LOAN 8267-AM Public Disclosure Authorized IMPLEMENTED BY WATER SECTOR PROJECTS IMPLEMENTATION UNIT STATE INSTITUTION SPECIAL PURPOSE

More information

Myriad Pro Light. Lining proportional. Latin capitals. Alphabetic. Oldstyle tabular. Oldstyle proportional. Superscript ⁰ ¹ ² ³ ⁴ ⁵ ⁶ ⁷ ⁸ ⁹,.

Myriad Pro Light. Lining proportional. Latin capitals. Alphabetic. Oldstyle tabular. Oldstyle proportional. Superscript ⁰ ¹ ² ³ ⁴ ⁵ ⁶ ⁷ ⁸ ⁹,. Myriad Pro Light Latin capitals A B C D E F G H I J K L M N O P Q R S T U V W X Y Z & Æ Ł Ø Œ Þ Ð Á Â Ä À Å Ã Ç É Ê Ë È Í Î Ï Ì İ Ñ Ó Ô Ö Ò Õ Š Ú Û Ü Ù Ý Ÿ Ž Ă Ā Ą Ć Č Ď Đ Ě Ė Ē Ę Ğ Ģ Ī Į Ķ Ĺ Ľ Ļ Ń Ň Ņ

More information

INDEPENDENT AUDITORIS REPORT. in the procedures

INDEPENDENT AUDITORIS REPORT. in the procedures Public Disclosure Authorized Re No 2074/75 N e r Al' Nepal Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The Secreraly Minisy of finan)ce Singh Durbia Kcahnondu

More information

THE MATHEMATICAL MODEL OF AN OPERATOR IN A HUMAN MACHINE SYSTEMS. PROBLEMS AND SOLUTIONS

THE MATHEMATICAL MODEL OF AN OPERATOR IN A HUMAN MACHINE SYSTEMS. PROBLEMS AND SOLUTIONS 50 І н ф о р м а ц і й н і с и с т е м и, м е х а н і к а т а к е р у в а н н я UDC 621.396 A. Kopyt THE MATHEMATICAL MODEL OF AN OPERATOR IN A HUMAN MACHINE SYSTEMS. PROBLEMS AND SOLUTIONS That s why

More information

БРАН КО БАЉ, ро ђен у Ли па ру код Ку ле. Фи ло зоф, пи ше

БРАН КО БАЉ, ро ђен у Ли па ру код Ку ле. Фи ло зоф, пи ше А У Т О Р И Л Е Т О П И С А БРАН КО БАЉ, ро ђен 1954. у Ли па ру код Ку ле. Фи ло зоф, пи ше сту ди је, есе је и уџ бе ни ке. Об ја вље не књи ге: Мо гућ ност људске заједн и ц е, 1989; Пр и л о г р а

More information

OPERATING RULES FOR CLEARING OF INTERNATIONAL PAYMENTS

OPERATING RULES FOR CLEARING OF INTERNATIONAL PAYMENTS OPERATING RULES FOR CLEARING OF INTERNATIONAL PAYMENTS 1. Operating Rules for Clearing of International Payments (hereinafter: Rules) shall prescribe the procedure for performing clearing and settlement

More information

Section I. GENERAL PROVISIONS

Section I. GENERAL PROVISIONS LAW OF THE RUSSIAN FEDERATION NO. 5151-1 OF JUNE 10, 1993 ON CERTIFICATION OF PRODUCTS AND SERVICES (with the Additions and Amendments of December 27, 1995, March 2, July 31, 1998) Federal Law No. 154-FZ

More information

Also please refer to Federal Law # 99-FZ dated July 15, 2000 "On Quarantine of Plants"

Also please refer to Federal Law # 99-FZ dated July 15, 2000 On Quarantine of Plants Resolution # 268 of the Government of the Russian Federation Dated April 23, 1992 "On the State Service on Quarantine of Plants in the Russian Federation" (incorporates changes dated October 1, 1998) Also

More information

Application Guideline for BOP/Volume Zone Business Support Coordinator UZBEKISTAN in FY 2015

Application Guideline for BOP/Volume Zone Business Support Coordinator UZBEKISTAN in FY 2015 Application Guideline for BOP/Volume Zone Business Support Coordinator UZBEKISTAN in FY 2015 April 7, 2015 Manabu Shimoyashiro President Director JETRO Tashkent The Japan External Trade Organization, JETRO

More information

The Institute of Certified Accountants of Montenegro. RADUNOVIC VESNA, Certified auditor Member of the Board of Directors

The Institute of Certified Accountants of Montenegro. RADUNOVIC VESNA, Certified auditor Member of the Board of Directors The Institute of Certified Accountants of Montenegro RADUNOVIC VESNA, Certified auditor Member of the Board of Directors The establishment of the Institute Accounting reform Disagreements within the then

More information

Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB)

Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB) Asian Development Bank Project Number: 2974-GEO Georgia: Power Transmission Enhancement Project financed by Asian Development Bank (ADB) Bi-Annual Land Acquisition and Resettlement Plan, November 2013

More information

WORLD TRADE ORGANIZATION

WORLD TRADE ORGANIZATION WORLD TRADE ORGANIZATION Committee on Trade-Related Investment Measures G/TRIMS/W/61 8 May 2009 (09-2263) Original: English COMMUNICATION FROM THE EUROPEAN COMMUNITIES AND THE UNITED STATES Certain New

More information

к ри т и к у, о б ја в љу је у пе ри о д и ц и. у Но в ом С а д у. Ис т о р и ч а р к а је у ме т нос т и, ш колов ал а с е у Б еог р ад у и

к ри т и к у, о б ја в љу је у пе ри о д и ц и. у Но в ом С а д у. Ис т о р и ч а р к а је у ме т нос т и, ш колов ал а с е у Б еог р ад у и А У Т О Р И Л Е Т О П И С А ДЕ ЈАН АЛЕК СИЋ, ро ђен 1972. у Кра ље ву. Пи ше по е зи ју и про зу. К њи г е пе са ма: По т п у н и го в ор, 1995; Дока з ив ање се нке, 1996; Сваг да шњи час, 2000; Со б

More information

National Women Commission

National Women Commission Public Disclosure Authorized National Women Commission Public Disclosure Authorized Ref No Ok(vf - _ The World Bank Nepal Country Office Yak and Yet Hotel Complex Durbar Marg Kathmandu Date: 16 March 2018

More information

Approved by: Supervisory Board. Complaint Policy. Almaty Complaint Policy, ACF

Approved by: Supervisory Board. Complaint Policy. Almaty Complaint Policy, ACF Approved by: Supervisory Board 2013 Complaint Policy Almaty Complaint Policy, ACF Content 1. General Provisions... 3 2. Goals and Objectives... 3 3. Authority and Responsibility... 3 4. Forms of Applications

More information

ОЉА ВА СИ ЛЕ ВА, ро ђе на у Бе о гра ду. Про у ча ва срп ску поези ју

ОЉА ВА СИ ЛЕ ВА, ро ђе на у Бе о гра ду. Про у ча ва срп ску поези ју А У Т О Р И Л Е Т О П И С А ЈА НА АЛЕК СИЋ, ро ђе на 1984. у Кра гу јев цу. Ди пло ми ра ла на Фило ло ш ком фа к ул т е т у у Б е о г ра д у, на Гру п и з а с рп ск у к њи жев но с т и је зи к с а оп

More information

Sector(s) Public administration- Information and communications (50%), General public administration sector (50%)

Sector(s) Public administration- Information and communications (50%), General public administration sector (50%) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC28685

More information

AGREEMENT FOR RECEIPT AND USE OF MARKET DATA: ADDITIONAL PROVISIONS

AGREEMENT FOR RECEIPT AND USE OF MARKET DATA: ADDITIONAL PROVISIONS EXHIBIT C AGREEMENT FOR RECEIPT AND USE OF MARKET DATA: ADDITIONAL PROVISIONS 21. NYSE DATA PRODUCTS (a) SCOPE This Exhibit C applies insofar as Customer receives, uses and redistributes NYSE Data Products

More information

SANMINA CORPORATION PRIVACY POLICY. Effective date: May 25, 2018

SANMINA CORPORATION PRIVACY POLICY. Effective date: May 25, 2018 SANMINA CORPORATION PRIVACY POLICY Effective date: May 25, 2018 This Privacy Policy (the Policy ) sets forth the privacy principles that Sanmina Corporation and its subsidiaries (collectively, Sanmina

More information

Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Small and Medium Enterprises Competitiveness Project funded under Loan Agreement o. 8477KZ between the Government

More information

DIPLOMA COURSE IN INTERNAL AUDIT

DIPLOMA COURSE IN INTERNAL AUDIT DIPLOMA COURSE IN INTERNAL AUDIT Course Objective: Internal Audit is an assurance and consulting service that reviews the efficiency and effectiveness of the internal control.. It assists management at

More information

TERMS & CONDITIONS OF E-COMMERCE STORE Pricecheck.tools of 29 May 2017

TERMS & CONDITIONS OF E-COMMERCE STORE Pricecheck.tools of 29 May 2017 TERMS & CONDITIONS OF E-COMMERCE STORE Pricecheck.tools of 29 May 2017 I. Terms and definitions Terms used in these Terms & Conditions refer to: 1.1. Client understood as a natural person or non-corporate

More information

GEORGIA: GEORGIAN SUSTAINABLE URBAN TRANSPORT INVESTMENT PROGRAM, Tranche 3

GEORGIA: GEORGIAN SUSTAINABLE URBAN TRANSPORT INVESTMENT PROGRAM, Tranche 3 Loan Number: 3063 -GEO Project Number: 42414-043 Reporting period: March -August, 2014 GEORGIA: GEORGIAN SUSTAINABLE URBAN TRANSPORT INVESTMENT PROGRAM, Tranche 3 (Financed by the Asian Development Bank)

More information

Virginia Commonwealth University School of Medicine Information Security Standard

Virginia Commonwealth University School of Medicine Information Security Standard Virginia Commonwealth University School of Medicine Information Security Standard Title: Scope: Personnel Security Standard This standard is applicable to all VCU School of Medicine personnel. Approval

More information

СР ЂА Н ВИД РИ Ћ, рођен у Зрења н и н у. П и ше есе је и к њи жев н у к ри т и к у, о б ја в љу је у пе ри о д и ц и.

СР ЂА Н ВИД РИ Ћ, рођен у Зрења н и н у. П и ше есе је и к њи жев н у к ри т и к у, о б ја в љу је у пе ри о д и ц и. АУТОРИ ЛЕТОПИСА М И Х А Е Л А Н ТО ЛО ВИ Ћ, р о ђ е н 1975. у Ау г с бу р г у код М и н хе н а, СР Немачка. Школовао се у Сом бору и Новом Саду. Историчар ( Истори о г раф ско де ло Ф ри д ри ха Мајнекеа

More information

KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT)

KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT) KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT) 1. DIRECTOR, LEARNING & DEVELOPMENT - LOWER KABETE Reporting to the Director General, Campus Directors will be responsible for

More information

ON CERTAIN INEQUALITIES IN THE LINEAR SHELL PROBLEMS

ON CERTAIN INEQUALITIES IN THE LINEAR SHELL PROBLEMS MECHANIKA TEORETYCZNA I STOSOWANA 2/3. 21 (1983) ON CERTAIN INEQUALITIES IN THE LINEAR SHELL PROBLEMS ANDRZEJ G A Ł K A I PPT Warszawa 1. In the paper the weak formulations of the mixed boundary value

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4802 Project Name. ECOWAS Broadband Connectivity Program Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4802 Project Name. ECOWAS Broadband Connectivity Program Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4802 Project Name ECOWAS Broadband Connectivity Program Region AFRICA Sector Telecommunications (60%); General information and communications

More information

QNB Bank-ONLINE AGREEMENT

QNB Bank-ONLINE AGREEMENT This is an Agreement between you and QNB Bank ("QNB"). It explains the rules of your electronic access to your accounts through QNB Online. By using QNB-Online, you accept all the terms and conditions

More information

PORTFOLIO OF KHALITOVA LILIA

PORTFOLIO OF KHALITOVA LILIA PORTFOLIO OF KHALITOVA LILIA Hello! My name is Lilia. I'm professional, accurate, experienced translator and writer. My Russian is native (was born and studied in Moscow). My English and Spanish are both

More information

Application Guideline for BOP Business Support Coordinator BANGLADESH in FY 2013

Application Guideline for BOP Business Support Coordinator BANGLADESH in FY 2013 Application Guideline for BOP Business Support Coordinator BANGLADESH in FY 2013 1 May, 2013 Kei Kawano Representative JETRO Dhaka The Japan External Trade Organization (JETRO) Dhaka Office will retain

More information

INFORMATIZATION AND COMMUNICATION DEVELOPMENT TRENDS IN ARMENIA

INFORMATIZATION AND COMMUNICATION DEVELOPMENT TRENDS IN ARMENIA INFORMATIZATION AND COMMUNICATION DEVELOPMENT TRENDS IN ARMENIA PRESENTED BY HOVHANNES STEPANYAN CHIEF SPECIALIST OF THE FOREIGN RELATIONS AND PROGRAMS DEPARTMENT MINISTRY OF TRANSPORT AND COMMUNICATION

More information

Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Skills and Jobs Project funded under Loan Agreement No. 8490-KZ between the Government of the Republic of Kazakhstan

More information

section 3 INFORMATION AND ADVERTISING

section 3 INFORMATION AND ADVERTISING INFORMATION AND ADVERTISING IN EXHIBITION OFFICIAL CATALOGUE, EXHIBITION GUIDE, WEB CATALOGUE Official Catalogues and Exhibition Guides are published for every exhibition. Catalogues are made in both printed

More information

Certification Program Handbook for Deputy Treasurers

Certification Program Handbook for Deputy Treasurers TREASURERS ASSOCIATION OF VIRGINIA Certification Program Handbook for Deputy Treasurers Revised September 2016 Origination date January 1989 TREASURERS ASSOCIATION OF VIRGINIA MASTER GOVERNMENTAL DEPUTY

More information

Application for Social Entrepreneurship Legal Services Clinic 1

Application for Social Entrepreneurship Legal Services Clinic 1 Application for Social Entrepreneurship Legal Services Clinic 1 Application deadline: Please sign (1) this application, (2) the attached acknowledgement and waiver, and (3) the attached name, likeness

More information

Red Flags/Identity Theft Prevention Policy: Purpose

Red Flags/Identity Theft Prevention Policy: Purpose Red Flags/Identity Theft Prevention Policy: 200.3 Purpose Employees and students depend on Morehouse College ( Morehouse ) to properly protect their personal non-public information, which is gathered and

More information

MEMORANDUM. Robert Kreszswick, Director, Membership Services Department. Web CRD Electronic Procedures for Forms U4 and U5

MEMORANDUM. Robert Kreszswick, Director, Membership Services Department. Web CRD Electronic Procedures for Forms U4 and U5 Memo No. 453-06 MEMORANDUM TO: FROM: Members, Member Organizations, Participants and Participant Organizations Robert Kreszswick, Director, Membership Services Department DATE: February 21, 2006 SUBJECT:

More information

DIGITAL CENTRAL ASIA SOUTH ASIA (CASA) PROGRAM. Transport and ICT Global Practice World Bank

DIGITAL CENTRAL ASIA SOUTH ASIA (CASA) PROGRAM. Transport and ICT Global Practice World Bank DIGITAL CENTRAL ASIA SOUTH ASIA (CASA) PROGRAM Rajendra Singh, Senior Regulatory Specialist ICT Sector Unit November 1 2, 2017 Sixth session of the Asia Pacific Information Superhighway (AP IS) Steering

More information

П РИ ВРЕД Н И К РИ М И Н А Л И Т ЕТ У РЕ ПУ БЛИ ЦИ СР БИ ЈИ У ПЕ РИ О ДУ ОД ДО ГО ДИ НЕ

П РИ ВРЕД Н И К РИ М И Н А Л И Т ЕТ У РЕ ПУ БЛИ ЦИ СР БИ ЈИ У ПЕ РИ О ДУ ОД ДО ГО ДИ НЕ Пре глед ни чла нак 343.37(497.11) 2006/2015 doi:10.5937/zrpfns50-11336 Др Дра ган М. Цвет ко вић По ли циј ска упра ва за град Бе о град c ve t k o v ic d ra ga n @ mt s.r s Зо ра н Ж. Јо в а н о в и

More information

Town Development Fund

Town Development Fund Publc Dsclosure Authorzed Publc Dsclosure Authorzed Town Development Fund Ref No. 7 { I 7S; GPO, Box: 5144 New Baneshwor, Kathmandu Ph: 4493866. 4464874, 4465651 Fax: 977-1-4471227 26 March 2018 To, Task

More information

Asian Domain Name Dispute Resolution Centre (Beijing Office)

Asian Domain Name Dispute Resolution Centre (Beijing Office) Asian Domain Name Dispute Resolution Centre (Beijing Office) COMPLAINT IN ACCORDANCE WITH THE UNIFORM DOMAIN NAME DISPUTE RESOLUTION POLICY This form shall be used to apply to Asian Domain Name Dispute

More information

Prevention of Identity Theft in Student Financial Transactions AP 5800

Prevention of Identity Theft in Student Financial Transactions AP 5800 Reference: Fair and Accurate Credit Transactions Act (Pub. L. 108-159) The Board recognizes that some activities of the Shasta-Tehama-Trinity Joint Community College District, "District," are subject to

More information

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII EFFECTIVE : FORTHWITH

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII EFFECTIVE : FORTHWITH GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, New Delhi CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII, 2017 EFFECTIVE

More information

Participation Agreement for the ehealth Exchange

Participation Agreement for the ehealth Exchange Participation Agreement for the ehealth Exchange This Participation Agreement for the ehealth Exchange ("Agreement") is entered into as of the last date written below ( Effective Date ) by and between

More information

SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA)

SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA) SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA) 10.0 INTRODUCTION The purpose of this procedure is to provide guidance for hiring professional firms for architectural,

More information

Government-issued identification numbers (e.g., tax identification numbers)

Government-issued identification numbers (e.g., tax identification numbers) Privacy Policy This Privacy Policy explains how the ACMI collects, uses, shares and safeguards Personal Data and Non- Personal Data on www.acmiart.org, mobile websites, microsites, mobile applications,

More information

USER CORPORATE RULES. These User Corporate Rules are available to Users at any time via a link accessible in the applicable Service Privacy Policy.

USER CORPORATE RULES. These User Corporate Rules are available to Users at any time via a link accessible in the applicable Service Privacy Policy. These User Corporate Rules are available to Users at any time via a link accessible in the applicable Service Privacy Policy. I. OBJECTIVE ebay s goal is to apply uniform, adequate and global data protection

More information

REMARK MEDIA, INC. Filed by BLUCORA, INC.

REMARK MEDIA, INC. Filed by BLUCORA, INC. REMARK MEDIA, INC. Filed by BLUCORA, INC. FORM SC 13D (Statement of Beneficial Ownership) Filed 04/28/14 Address 3930 HOWARD HUGHES PARKWAY SUITE 400 LAS VEGAS, NV 89169 Telephone (702) 701-9514 CIK 0001368365

More information

ISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Information security risk management

ISO/IEC INTERNATIONAL STANDARD. Information technology Security techniques Information security risk management INTERNATIONAL STANDARD ISO/IEC 27005 Second edition 2011-06-01 Information technology Security techniques Information security risk management Technologies de l'information Techniques de sécurité Gestion

More information

(Ordinance of the Ministry of Posts and Telecommunications No. 64-November 16,

(Ordinance of the Ministry of Posts and Telecommunications No. 64-November 16, This English translation of the Civil Code has been prepared (up to the revisions of Act No. 80 of 2008 (These Rules shall come into effect as from the date of promulgation. (Some provisions shall come

More information

Exercising Your Data Access Rights under the Personal Data (Privacy) Ordinance (Frequently Asked Questions and Answers)

Exercising Your Data Access Rights under the Personal Data (Privacy) Ordinance (Frequently Asked Questions and Answers) Leaflet Exercising Your Data Access Rights under the Personal Data (Privacy) Ordinance (Frequently Asked Questions and Answers) Under the Personal Data (Privacy) Ordinance (the Ordinance ), an individual

More information

INDEPENDENT REGISTERED REPRESENTATIVE ANNUAL CERTIFICATION

INDEPENDENT REGISTERED REPRESENTATIVE ANNUAL CERTIFICATION IMS Securities, Inc. Member FINRA/SIPC IMS Financial Advisors, Inc. INDEPENDENT REGISTERED REPRESENTATIVE ANNUAL CERTIFICATION The Firm and you are subject to a multitude of laws and regulations governing

More information

МЕН ТАЛ НА ПО ВРЕ ДА ПУТ НИ КА КАО ОСНОВ ОД ГО ВОР НО СТ И П РЕ ВО ЗИ О Ц А У М Е ЂУ Н А РОД НОМ ВА ЗД У ХО П ЛОВ НОМ П РА ВУ

МЕН ТАЛ НА ПО ВРЕ ДА ПУТ НИ КА КАО ОСНОВ ОД ГО ВОР НО СТ И П РЕ ВО ЗИ О Ц А У М Е ЂУ Н А РОД НОМ ВА ЗД У ХО П ЛОВ НОМ П РА ВУ Пре глед ни чла нак 347.8:347.56]:347.426.4 doi:10.5937/zrpfns51-15098 Ире на М. Ра ду ми ло, сту дент док тор ских сту ди ја Уни вер зи тет у Но вом Са ду Прав ни фа кул тет у Но вом Са ду ire n a ra

More information

TEX Gyre: The New Font Project. Marrakech, November 9th 11th, Bogusław Jackowski, Janusz M. Nowacki, Jerzy B. Ludwichowski

TEX Gyre: The New Font Project. Marrakech, November 9th 11th, Bogusław Jackowski, Janusz M. Nowacki, Jerzy B. Ludwichowski TEX Gyre: The New Font Project Marrakech, November 9th 11th, 2006 Bogusław Jackowski, Janusz M. Nowacki, Jerzy B. Ludwichowski What is the TEX Gyre project about? What is the TEX Gyre project about? It

More information

MIVOICE OFFICE 400 MITEL 6863 SIP / MITEL 6865 SIP

MIVOICE OFFICE 400 MITEL 6863 SIP / MITEL 6865 SIP MIVOICE OFFICE 400 MITEL 6863 SIP / MITEL 6865 SIP USER GUIDE eud-1663_en / 1.0 R4.0 06.2015 Welcome... Welcome... Welcome to the user's guide for the desk phones Mitel 6863 SIP and Mitel 6865 SIP for

More information

DOMESTIC REMITTANCE SERVICE TERMS & CONDITIONS

DOMESTIC REMITTANCE SERVICE TERMS & CONDITIONS DOMESTIC REMITTANCE SERVICE TERMS & CONDITIONS DOMESTIC REMITTANCE SERVICE TERMS & CONDITIONS 1. APPLICATION OF THESE TERMS AND CONDITIONS 1.1 These Terms and Conditions apply to all transactions you conduct

More information

Certification program PCWU-3

Certification program PCWU-3 The certification program of utility products type 3 of the certification program according to PN-EN ISO/IEC 17067 Number: Page: 1 z 8 MS-0013527 Is valid from: 01.03.2016 Prepared: Tomasz Marcinek Approved:

More information

NIPPON VALUE INVESTORS DATA PROTECTION POLICY

NIPPON VALUE INVESTORS DATA PROTECTION POLICY NIPPON VALUE INVESTORS DATA PROTECTION POLICY INTRODUCTION Nippon Value Investors KK and Nippon Value Investors, Inc. (together NVI ) are committed to protecting the privacy of individuals whose data they

More information

Title of your Paper AUTHOR NAME. 1 Introduction. 2 Main Settings

Title of your Paper AUTHOR NAME. 1 Introduction. 2 Main Settings Title of your Paper AUTHOR NAME 1 Introduction The deadline for the submission is March 15. Please submit your paper both in.doc and.pdf-format to the following address: fdsl7.5@gmail.com. The paper must

More information

Wireless Communication Device Policy Policy No September 2, Standard. Practice

Wireless Communication Device Policy Policy No September 2, Standard. Practice Standard This establishes the business need and use of cellular phones (hereinafter referred to as wireless communication devices ) as an effective means of conducting City of Richland business, and to

More information

APSNIM, 2017, :2 (14) Ethnology (АПС І ), 2017, 2 (14), P faşaчc ( faşaчg, fărşaчc, farşaчg),, -

APSNIM, 2017, :2 (14) Ethnology (АПС І ), 2017, 2 (14), P faşaчc ( faşaчg, fărşaчc, farşaчg),, - APSNIM, 2017, :2 (14) Е о о ія Ethnology ISSN: 2411-6181(on-line); ISSN: 2311-9896 (print) Current issues of social studies and history of medіcine. Joint Ukrainian-RШЦaЧiaЧ scieчtific jшurчaх, 2017, :2(14),

More information

AGROBANK. Investment offer for sale of bank s shares

AGROBANK. Investment offer for sale of bank s shares AGROBANK Investment offer for sale of bank s shares Main Shareholders 45.2% 17.1% 8.3% 4.7% 4.6% 4.2% 16.0% Ministry of Finance Uzpakhtasanoat JSC Fund of Reconstruction and development of Uzbekistan Uzkimyosanoat

More information

Public Private Partnerships for sustainable and smart cities. Milano, 4 July 2017

Public Private Partnerships for sustainable and smart cities. Milano, 4 July 2017 Public Private Partnerships for sustainable and smart cities Milano, 4 July 2017 PPP FOR CITIES PPP FOR CITIES International Centre of Excellence The United Nations Economic Commission for Europe (UNECE)

More information

Дете у систему социјалне заштите

Дете у систему социјалне заштите Дете у систему социјалне заштите Издавач Центар за права детета Скендер-бегова 20/12 11000 Београд тел. + 381 11 33 44 170 е-mail: office@cpd.org.rs web site: www.cpd.org.rs За издавача Милена Голић Ружић

More information

Informatics and Mathematical Methods in Simulation Vol. 5 (2015), No. 4, pp

Informatics and Mathematical Methods in Simulation Vol. 5 (2015), No. 4, pp ІНАИА А ААИЧНІ ДИ В ДЮВАННІ 2015 5, 4 Д 532.5 Informatics and Mathematical Methods in Simulation Vol. 5 (2015), No. 4, pp. 325-329 АЕАЕА ААЦ В АВА ААЫ ВА ЕЕ ЕЕЫ. А. олоаео, хиали асса оха есси и пиеичеси

More information

Cell Phone Policy. 1. Purpose: Establish a policy for cell phone use and compensation allowance.

Cell Phone Policy. 1. Purpose: Establish a policy for cell phone use and compensation allowance. Cell Phone Policy 1. Purpose: Establish a policy for cell phone use and compensation allowance. 2. Authority: The Clinton County Board of Commissioners. 3. Application: This Cell Phone Policy (the Policy)

More information

2 і К К Ч... 5 Т 6 1. Ч Т КТ Т Т і і і і і і Т я я і і і і 27 К ЄКТ Т Т К 'є і і я і і.

2 і К К Ч... 5 Т 6 1. Ч Т КТ Т Т і і і і і і Т я я і і і і 27 К ЄКТ Т Т К 'є і і я і і. 2 і К К Ч... 5 Т 6 1. Ч Т КТ Т Т 11 1.1. і і 11 1.2. і і і і 18 1.3. Т я я і і і і 27 К 1... 38 2. ЄКТ Т Т К. 39 2.1. 'є і і 39 2.2. я і... 40 2.3. і. 42 2.4.. 48 К 2 48 3. Т Т Ч Т Т Т - Т Ч К 49 3.1.

More information

Emsi Privacy Shield Policy

Emsi Privacy Shield Policy Emsi Privacy Shield Policy Scope The Emsi Privacy Shield Policy ( Policy ) applies to the collection and processing of Personal Data that Emsi obtains from Data Subjects located in the European Union (

More information