Network Redesign at Bates College MTUG 2018

Similar documents
Specialist Level Certification JNCIS-ENT; 5 Days; Instructor-led

JNCIS Enterprise Routing and Switching Certification Boot Camp (JIR, JEX)

IMPLEMENTING A LAYER 2 ENTERPRISE INFRASTRUCTURE WITH VIRTUAL CHASSIS TECHNOLOGY

Choosing Switches and Routers for the Campus

IT Certification Exams Provider! Weofferfreeupdateserviceforoneyear! h ps://

Junos OS. 2nd edition FOR. Walter Goralski, Cathy Gadecki, and Michael Bushong. John Wiley & Sons, Inc. WILEY

LAN design. Chapter 1

References: tates-roles.html

Cisco EXAM Cisco ADVDESIGN. Buy Full Product.

Network Configuration Example

Junos Fusion Data Center

Network Configuration Example

Question: 3 Which LSA type describes the router ID of ASBR routers located in remote areas?

TestOut Routing and Switching Pro - English 6.0.x COURSE OUTLINE. Modified

Juniper Virtual Chassis Technology: A Short Tutorial

Troubleshooting and Maintaining Cisco IP Networks v2 ( )

Juniper Networks Certified Specialist Service Provider Routing and Switching Bootcamp, JIR, JSPX, JMF (JNCIS-SP BC)

SEVENMENTOR TRAINING PVT.LTD

Interconnecting Cisco Networking Devices Part 1 (ICND1) Course Overview

Module 5: Cisco Nexus 7000 Series Switch Administration, Management and Troubleshooting

Table of Contents. Cisco TCP/IP

CCNA Exploration Network Fundamentals

3COM 3M Certified Enterprise LAN Specialist Final v3.0. Download Full Version :

Configuring Virtual Port Channels

Lab 1-2Connecting to a Cisco Router or Switch via Console. Lab 1-6Basic Graphic Network Simulator v3 Configuration

CCNP SWITCH (22 Hours)

Evolved Campus Core: An EVPN Framework for Campus Networks. Vincent Celindro JNCIE #69 / CCIE #8630

Network Configuration Example

Case Study Parc de Vilgénis College

Application Notes for Foundry Networks FastIron Super X Switch with Avaya Communication Manager - Issue 1.0

Network Configuration Example

CAMPUS AND BRANCH RECAP. Ralph Wanders Consulting Systems Engineer

IBM Ethernet Switch J48E

CCNP (Routing & Switching and T.SHOOT)

Software Defined Networks and OpenFlow. Courtesy of: AT&T Tech Talks.

GuideTorrent. The best excellent exam certification guide torrent and dumps torrent provider

Choosing Routers for the Campus

Configuring Cisco Nexus 7000 Series Switches

Scope and Sequence: CCNA Exploration v4.0

Cisco CCNA (ICND1, ICND2) Bootcamp

Networking for Data Acquisition Systems. Fabrice Le Goff - 14/02/ ISOTDAQ

PASS4TEST. IT Certification Guaranteed, The Easy Way! We offer free update service for one year

Date Center Solutions. Stefano Alei Consulting SE EMEA Partners

Implementing Cisco IP Routing ( )

Configuring StackWise Virtual

PREREQUISITES TARGET AUDIENCE. Length Days: 5

JN0-210.juniper. Number: JN0-210 Passing Score: 800 Time Limit: 120 min.

Junos Reference Guide. JUNOsReference. 1 P a g e

Cisco Etherswitch Service Modules

Deploying Data Center Switching Solutions

Configuring Virtual Port Channels

Release Notes: J-Web Application Package Release 17.4A1 for EX4300 and EX4600 Switches

A Gigabit Ethernet core network or aggregation layer with high availability as well as scalability

IBM BladeCenter Layer 2-7 Gigabit Ethernet Switch Module (Withdrawn) Product Guide

EXAM - JN Service Provider Routing and Switching, Specialist (JNCIS-SP) Buy Full Product.

Cisco ME 6524 Ethernet Switch

Pass-Through Technology

CCNA. Course Catalog

Cisco CCIE Data Center Written Exam v2.0. Version Demo

CISCO QUAD Cisco CCENT/CCNA/CCDA/CCNA Security (QUAD)

Configuring Gigabit Ethernet Interfaces (J-Web Procedure)

CCNA Routing & Switching

OmniSwitch Edge Solution. OS6400 Gigabit Ethernet Switch - Overview. Bob Purvis February, AC or DC power source options

CCNA Routing and Switching Course Overview

Cisco CCNP ROUTE: Implementing Cisco IP Routing (ROUTE) 2.0. Upcoming Dates. Course Description. Course Outline

1 Training Description H3C Certification Training Building Networks for Small- and Medium-Sized Businesses (v6.0)...

Configuring Virtual Port Channels

CCNA 2014 Performance Based Lab. Course Outline. CCNA 2014 Performance Based Lab Sep 2018

IP & DCN Planning for Microwave Networks

UPGRADING INTERNET SERVICE PROVIDER USING MULTI-PROTOCOL LABEL SWITCHING AND VIRTUAL PRIVATE NETWORK

Networking Update. August 2017

Ethernet Switch Product Feature Comparison

Release Notes: J-Web Application Package Release 15.1A4 for Juniper Networks EX Series Ethernet Switches

CCNP R&S. Plan, implement, secure, maintain, and troubleshoot converged enterprise networks. Prepare for Cisco CCNP Routing & Switching certification

Interconnecting Cisco Networking Devices: Accelerated

Cloud Data Center Architecture Guide

SAE-PE QSFP-NMS

ASIT-33018PFM. 18-Port Full Gigabit Managed PoE Switch (ASIT-33018PFM) 18-Port Full Gigabit Managed PoE Switch.

Ethernet Fabrics- the logical step to Software Defined Networking (SDN) Frank Koelmel, Brocade

CCNA 3 (v v6.0) Chapter 3 Exam Answers % Full

Course Syllabus. NTM 2415 Cisco TCP/IP Routing Protocols & Router Configuration Cisco Networking Academy Cisco Semesters 1 & 2 Online Spring 2015

Traffic Load Balancing in EVPN/VXLAN Networks. Tech Note

SWITCH Implementing Cisco IP Switched Networks

MILLENNIUM PROJECT PROPOSAL

TestOut Network Pro - English 5.0.x COURSE OUTLINE. Modified

JN0-346 juniper

CISCO SYSTEM ADMINISTRATION (41)

QUESTION: 1 When limit-learning is configured on a port and the limit is reached the following traffic still flows to the port.

Chapter 2. Communicating Over The Network. CCNA1-1 Chapter 2

Overview. Switch Features CHAPTER

Top-Down Network Design

Gigabit Managed Ethernet Switch

PassTorrent. Pass your actual test with our latest and valid practice torrent at once

Copyright Link Technologies, Inc.

Q&As Implementing Cisco IP Switched Networks (SWITCH v2.0)

Implementing Cisco IP Routing (ROUTE)

New CCNP Passport. 2,895 saving 1,890 from individual courses. CCNP v6 Routing and Switching Courses

Industrial 48G+4x10G SFP+ Ports Gigabit Layer 3 Routing Server

Exam: Title : Routing & Switching Exam (RSS) Ver :

H3C S5130S-LI Gigabit Access & 10G Uplink Switch Series

Transcription:

Network Redesign at Bates College MTUG 2018

If the network is supposed to be up all of the time, then how do you maintain and upgrade it?

Bates College A private, highly selective, residential college devoted to undergraduate study in the liberal arts 5,526 applicants, 498 enrolled, including 43 from Maine in Freshman class 1,780 students, Maine is the 3rd most represented state 88% graduation rate 95% of first year students return for sophomore year 47% of students receive aid 100% of student need met

Bates College Campus

Network Topology - Before Collapsed backbone Layer 2 switching Core distribution layer based on Juniper Virtual Chassis Virtual Chassis made up of 5 ex4500 series switches across campus

Network Topology - After Distributed backbone Layer 3 routing Core aggregation layer based on Juniper qfx5100 series switches across campus

Why Change? ex4500 nearing end of life Increase network core speed from 10Gb Redundant uplinks to avoid single points of failure Easier upgrades to core software than on Virtual Chassis

Where do layers come from? Developed by International Organization for Standardization (ISO) in the 1970s Layer 3 Layer 2 Layer 1 Source: http://www.zeronetwork.co.in /2015/06/osi-model.html

Layer 0 - Bates campus 133 acres in Lewiston, Maine Some buildings were built before the college founding in 1855 Continuous renovation and new construction Buried conduit for data and phone cables connects all major buildings and most others Some with generator backup

Layer 1 - Fiber Network 62.5 micron multi-mode from 1990s: 220 meters, 1 Gigabit 50 micron multi-mode from 2000s: 300 meters, 1-10 Gigabit 9 micron single-mode from mid-2000s: 40,000 meters 1-10-40 Gigabit

Layer 2 - Ethernet Frame Created by DEC, Intel, and Xerox in 1970s Media Access Control MAC Address 48 bits - 6 bytes 00:00:00:00:00:00 ff:ff:ff:ff:ff:ff:ff Source: http://docwiki.cisco.com/wiki/ethernet_technologies

Layer 2 - Network Core Juniper Virtual Chassis ex4500 switches 280 College FCP4 line Lane FCP3 line Pettengill FCP0 master Dining FCP1 line Coram FCP2 backup

Juniper Junos switch / router OS based on NetBSD CLI via serial console or SSH GUI via web browser

Layer 3 - IP Packet Invented by Vint Cerf and Bob Kahn in the 1970s IP address (v4) 32 bits 134.181.139.37 dotted quad 0-255 Source:

Maintaining Reliability Regular software upgrades - PM Regular hardware upgrades - EOL, BYOD Control and Data Planes for online changes Juniper and Cisco options for fallback (confirm, rollback and reboot)

Multi-Chassis LAG Juniper MC-LAG Cisco Virtual PortChannel Cisco Multichassis Etherchannel Source: Juniper nce-143-mid-size-enterprise-campus-solution.pdf

Layer 2 - Spanning Tree Redundant links but not all are used Convergence Avoid spanning tree with VC, LAG, or L3

Options MC-LAG - SP focus, complicated, not on all hardware models RTG - still unused links, just rapid convergence L3 at buildings - diverse paths, easy to upgrade or replace a device

L3 issues Some devices still require L2 connectivity across campus EVPN / VXLAN Can t have L2 and L3 on the same interface Need a routing protocol IP addressing changes

L3 implementation Reconfigure the distribution and access switches in a building ex4200 - adds routing to previous switching role ex2200 - change VLANs and management configuration Add 2nd link for L2 network Update DHCP servers Update DNS servers Add OSPF routing protocol

Routing Protocols Static RIP OSPF BGP ibgp ebgp

OSPF history Open Shortest Path First Link-State Developed in 1991 by John Moy

OSPF handshake 3 way handshake ensures bi-directional connectivity

OSPF priority Designated router

OSPF route injection

OSPF metrics

OSPF guidelines

L3 at Building Switches No spanning tree convergence issue Diverse paths

L3 Implementation at Bates PM opportunities Minimize disruption to academic activities First Approach Do everything at one time Second Approach Parallel installation in a building to allow phases

Operational Issues DHCP Protocol handshake Helper / Relay MAC-IP binding L2 forwarding L3 routing ARP

Operational Issues Computers Macs Windows Linux Printers Audio-Visual equipment Security - cameras, etc. Building Automation equipment

Future Projects at Bates Multi-Rate switches for increased AP bandwidth Data Center Interconnect Juniper MC-LAG Juniper VXLAN

Vendor Partners: Juniper, Jason Rioux, Systems Engineer Bates College, Information and Library Services, Network and Infrastructure Services: Jim Bauer, Director Rob Spellman, Associate Director for Network Services Kevin Poland, Network Infrastructure Project Manager Ryan Odom, Network Infrastructure Project Manager Karen McArthur, System Administrator Bruce Hall, Network Administrator

Future MTUG Topics? Cable management (over time and at scale, documentation, labeling) Network Monitoring Network Management and Automation 802.1X Network Access Control Emerging standards for 2.5Gb and 5Gb on copper