Best Practices Guide. EMC VMAX3 Family. Best Practices Guide for AC Power Connections REVISION 2.0. August, 2015

Similar documents
EMC VMAX Best Practices Guide for AC Power Connections

EMC SYMMETRIX VMAX 10K

Cisco CRS 16-Slot Chassis Power Systems

POWERMAX FAMILY. Appliance-based packaging. PowerMax 2000 and Specifications. Specification Sheet. PowerMax Arrays

DELL EMC VMAX3 FAMILY

EMC SYMMETRIX VMAX 40K SYSTEM

EMC SYMMETRIX VMAX 40K STORAGE SYSTEM

VMAX ALL FLASH FAMILY

VMAX ALL FLASH FAMILY

Installation and Operation Guide P/N Rev 04

Power Vault in EMC Symmetrix DMX-3 and Symmetrix DMX-4 Systems

Metered Rack PDU Rack PDU, Metered, Zero U, 20A, 120V, (24) NEMA 5-20R

Metered Rack PDU Rack PDU, Metered, Zero U, 10A, 230V, (16) C13

QuickSpecs. HP Intelligent Power Distribution Unit (ipdu) Overview

Metered Rack PDU Rack PDU, Metered, Zero U, 5.7kW,208V,(36)C13& (6)C19; 10' Cord

ECS APPLIANCES. Specification Sheet

Installation Guide SMT 2200/3000 VA Input/Output Hardwire Kit

Metered Rack PDU Rack PDU, Metered, Zero U,12.5kW,208V,(30)C13, (6)C19; 10' Cord

QuickSpecs. HP Intelligent Power Distribution Unit (ipdu) Overview

APC Next Generation Rack ATS

EATON Transformer Module

M5 and M10 Routers Power Supply and Power Cord Component Replacement Instructions

EMC Symmetrix VMAX Cloud Edition

Installation Note for the Cisco ME 3800X and ME 3600X Switch Power Supply and Fan Modules

DNS-2608 Enterprise JBOD Enclosure User Manual

QuickSpecs. HP Remote Monitoring Power Distribution Units. Overview

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

High Power over Ethernet Midspans PD Port Model PD Port Model

Summit Virtual Chassis Design and Installation Guide

Installation Notes for the Catalyst 3750-X and 3560-X Switch Power Supply Modules

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual.

The HP BladeSystem p-class 1U power enclosure: hot-plug, redundant power for a server blade enclosure

Modular, scalable, high-efficiency power protection for data centers

Dell MD1280 Storage Enclosure Getting Started Guide

SANnet II Family Safety, Regulatory, and Compliance Manual

Installation Instructions for Eaton Surge Protective Device XXCFXXX10-DIN and XXCFXXX10-DIN2

Here is Your Customized Document

Increasing Data Center Efficiency by Using Improved High Density Power Distribution

IS Series Manual. 19 Pro Series Rack Mount (RK) Faceplate. 17 Consumer Series (C) Faceplate Available in Black (B) and Silver (S) colours

QuickSpecs. HP Basic Power Distribution Units (bpdu) Overview

Cisco CRS Carrier Routing System Multishelf System Description

E-Series Site Preparation Guide

QuickSpecs. HPE Modular Power Distribution Units (Zero-U/1U Modular PDUs) Overview

hp uninterruptible power system r12000 xr models installation instructions

Metro-Optical Transport Access Nodes

SCALABLE, FAULT TOLERANT, INDUSTRIAL PROTECTION

Installing Cisco RP-Series PDUs

DMX512-A 2.10 HUB. User Guide

QuickSpecs. HP Intelligent Power Distribution Unit (ipdu) Overview

Owner s Manual. Isolate. Restore. Inspire! Power Conditioners Audio / Video Power Isolation Units Rack Mount / Consumer Series

IBM UPS5000 HV Uninterruptible Power Supply for IBM System x Product Guide

Liebert MPX Rack Power Distribution Unit (PDU) Guide Specifications 1.0 GENERAL 1.1 SUMMARY

User Manual Back-UPS BE650MC

Zonit μats TM Users Guide μats1-lv Version 1.2

Retired. Full Rack Vertical PDU Model (Ideal for 36U to 47U racks)

Symmetra PX 48kW. Scalable from 16 to 48kW. Make the most of your energy TM. Modular, Scalable, High-Efficiency Power Protection for Data Centers

Installation and Operation Back-UPS BR1000G-IN / BR1500G-IN

Dell Storage MD1400 and MD1420 Enclosures Getting Started Guide

Panduit Basic Rack PDU

Wireless Fixture Adapter (WFA100-SN) Installation Instructions

Eaton 9PX PowerPass Distribution Modules and Transformers 9PXTFMR5, 9PXPPDM2, 9PXTFMR11, and 9PXPPDM1 User's Guide

Models. Specifications

APMTM UPS 18kW - 90kW The Flexpower Technology for mission critical applications

Models HP Z VR Backpack G1 Dock

Rack Mount Power Supplies

Installation Manual for D1800 Series High Power PoE Midspan Power Supply

Dell EMC Unity Family Dell EMC Unity All Flash, Unity Hybrid, UnityVSA. Unity shut down and restart the system (power down and power up)

IBM 1U Switched and Monitored Power Distribution Units IBM System x at-a-glance guide

EMC VNXe. Adding input/output modules to a disk processor enclosure REV 03. July, 2015

RE-82 RACK MOUNT DIMMER OWNERS MANUAL. 8 X 2400Watts. Revision /29/2007

HPE Intelligent Power Distribution Unit Installation Instructions

User Guide. DMXSM-H18 Splitter. DMXSM-H81 Merger. Document Release Aug Revision B

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

BS 287 DUAL CHANNEL POWER SUPPLY. User Manual. January 2017 V1.0

Chameleon Labs Model CPS-501 Powered Chassis

QuickSpecs. HPE Basic Power Distribution Units (PDU) Overview

Customer Replacement Procedure

* * Agilent Power Distribution Unit (PDU) Installation Guide

LVDT Test Device. Product Manual (Revision B) Original Instructions. Testing and Calibration of LVDT Feedback Devices on PG Governors

Single Phase Systems-North American PC125/PC420 Series

EMC VNXe. Replacing a link control card in a 12-slot disk-array enclosure REV 02. July, 2015

DELL EMC VPLEX FAMILY

Datasheet. 10G Rack-Mountable UniFi Application Server. Model: UAS-XG. Dual 3.5" Hard Drive Bays. Dual 10G Ethernet Ports

Configurable Output Distribution. 120V / 208V / 240V 60Hz. User Manual English

Instruction Manual. Rack PDU XP Series. geistglobal.com

Broadband Automatic Disconnect Switch. User Manual

Installation and Operation

Installation and Getting Started Guide. HP ProCurve 600/610 External Power Supplies. PoE. Power over Ethernet Devices

Customer Replacement Procedure

Symmetra PX. Symmetra PX 48kW Scalable from 16kW to 48kW. Modular, Scalable, High-Efficiency Power Protection for Data Centers

Power distribution solutions for the ProLiant DL580 G2 server

Cisco Redundant Power System 2300

Powering HP BladeSystem c7000 Enclosures

QuickSpecs. HPE Intelligent Power Distribution Unit (PDU) Overview

AVR Manual. Isolate. Restore. Inspire! Audio / Video Power Isolation Units with Automatic Voltage Regulation. 19 Pro Series Rack Mount (RM) Faceplate

IBM. User's Guide and Installation and Service Guide. Supplement to the RS/6000 Enterprise Servers S70 and S7A:

Power Supply and Fan Module Installation

CS-10H0A413H3 (Master) Key Features. CL-10H0A413H3 (Link)

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE

READ FIRST. Symmetra LX. Start-Up Guide. For use with Symmetra LX UPS Models: Symmetra LX. Rack-mount UPS. Symmetra LX Rack-mount Extended Run

Transcription:

Best Practices Guide EMC VMAX3 Family Best Practices Guide for AC Power Connections REVISION 2.0 August, 2015 Best practices overview for AC power connections... 3 Selecting the proper AC power connection procedure...4 Procedure A: Working with customer's electrician onsite... 5 Procedure B: Verify and connect...11 Procedure C: Obtain customer verification...12 Labeling the PDUs...13 AC power specifications... 15

Best Practices Guide 2 Best Practices Guide

Best Practices Guide for AC Power Connections Best practices overview for AC power connections To assure fault tolerant power, external AC power must be supplied from independent, customer-supplied, power distribution units (PDUs) as shown in Figure 1 on page 3. NOTICE For systems operating from three phase AC power, two independent and isolated AC power sources are recommended for the two individual power zones in each rack of the VMAX3 system. This provides for the highest level of redundancy and system availability. If independent AC power is not available, there is a higher risk of data unavailability should a power failure occur, including individual phase loss occurring in both power zones. NOTICE Before connecting external AC power to EMC bays, verify that the bays have been placed in their final position as explained in the installation guide. Figure 1 Two independent customer-supplied PDUs Power feed 1 Power feed 2 breakers on ( ) breakers - Numbers 27 28 29 30 Customer s PDU 1... breakers on ( ) breakers - Numbers Customer s PDU 2 8 9 10 11... Best practices overview for AC power connections 3

Best Practices Guide Selecting the proper AC power connection procedure EMC Customer Engineer must select the proper AC power connection procedure Table 1 on page 4 summarizes possible scenarios at the installation site when you are about to connect external AC power to the EMC array. Select the procedure that applies to your situation. Table 1 Procedure options for AC power connection If the scenario is... The customer s electrician is available at the installation site. Access to customer-supplied, labeled, power cables (beneath raised floor or overhead). (And the customer s electrician is NOT available at the installation site.) Customer-supplied PDU source cables are already plugged into the EMC PDU and you have no access to the customer-supplied, labeled, power cables (beneath raised floor or overhead). (And the customer s electrician is NOT available at the installation site.) then use this procedure: A a, See: Procedure A: Working with customer's electrician onsite on page 5 B, See: Procedure B: Verify and connect on page 11 C, See: Procedure C: Obtain customer verification on page 12 a. Procedure A assures fault tolerant power in the EMC array. 4 Best Practices Guide

Best Practices Guide for AC Power Connections Procedure A: Working with customer's electrician onsite Use this procedure if the customer s electrician is available at the installation site. This procedure requires three basic tasks that alternate between the customer's electrician, the EMC CE and back to the customer's electrician. Procedure A-1: Customer's electrician on page 6 Procedure A-2: EMC Customer Engineer on page 7 Procedure A-3: Customer's electrician on page 10 Procedure A: Working with customer's electrician onsite 5

TYPE PM89 CLASS 25 01 TYPE PM89 CLASS 25 01 TYPE PM89 CLASS 25 01 TYPE PM89 CLASS 25 01 Best Practices Guide Procedure A-1: Customer's electrician NOTICE This task is performed by the customer's electrician. Procedure 1. Verify that the customer-supplied AC source voltage output on each PDU is within the AC power specification shown in AC power specifications on page 15. Measure the voltage output of each power cable as shown in Figure 2 on page 6. 2. Turn OFF all the relevant circuit breakers in customer-supplied PDU 1 and customersupplied PDU 2. 3. Verify that the customer-supplied power cables connected to PDU 1 and PDU 2 have no power as shown in Figure 3 on page 6. Figure 2 breakers ON AC power within specification Power feed 1 Power feed 2 Customer s PDU 1 breakers on ( ) PDU 1 CB 28 breakers - Numbers 27 28 29 30... breakers on ( ) PDU 2 CB 9 breakers - Numbers 8 9 10 11... Customer s PDU 2 Labels on customer power lines 0 Voltmeter 100 V 240 300 0 Voltmeter 100 V 240 300 Figure 3 breakers OFF No AC power breaker off (0) PDU 1 CB 28 Labels on customer power lines Customer s PDU 1 breakers - Numbers 27 28 29 30... 0 Voltmeter 100 V 240 300 breaker off (0) PDU 2 CB 9 breakers - Numbers 0 8 9 10 11... Customer s PDU 2 Voltmeter 100 V 240 300 6 Best Practices Guide

Best Practices Guide for AC Power Connections Procedure A-2: EMC Customer Engineer NOTICE This task is performed by the EMC Customer Engineer. Procedure 1. Confirm that the customer-supplied power cables are labeled and that each label contains the relevant customer-supplied PDU and circuit breaker numbers. If power cables are not equipped with labels, alert the customer. 2. Compare the numbers on the customer-supplied power cables for each EMC bay to verify that power zone A and power zone B are powered by a different customersupplied PDU. 3. If power extension cables are required, connect them to power zone A and power zone B in each bay. For single-phase, connect customer-supplied PDU power cables to the EMC bay by connecting to the bay's AC input cables for power zone A and power zone B as shown in Figure 4 on page 7. For three-phase, connect customer-supplied PDU power cables to the EMC bay by connecting to the bay's AC input cables for power zone A and power zone B as shown in Figure 5 on page 8. Figure 4 Connecting AC power, single-phase Rear view System bay Zone B PDU (Left) Zone A PDU (Right) EMC-supplied power cable and connector from the PDU Cable connectors are shown as they exit the bottom rear of the bay. EMC-supplied power cable and connector from the PDU Zone B AC input cable B 15 ft. extension cord options P1 P2 P3 P2 and P3 used depending on configuration P1 P2 P3 Zone A AC input cable A 15 ft. extension cord options Mating connector or customer-supplied cable Mating connector or customer-supplied cable Customer s PDU 1 Customer s PDU 2 Procedure A-2: EMC Customer Engineer 7

Best Practices Guide Figure 5 Connecting AC power, three-phase Rear view System bay Zone Zone B PDU B PDU (Left) (Left) Zone Zone A PDU A PDU (Right) (Right) EMC-supplied power cable and connector from the PDU Cable connectors are shown as they exit the bottom rear of the bay. EMC-supplied power cable and connector from the PDU Zone B AC input cable B Zone A AC input cable A 15 ft. extension cord options 15 ft. extension cord options Mating connector or customer-supplied cable Mating connector or customer-supplied cable Customer s PDU 1 Customer s PDU 2 8 Best Practices Guide

Best Practices Guide for AC Power Connections NOTICE Do not connect EMC bay power zone A and power zone B to the same customersupplied PDU. The customer will lose power redundancy and risk Data Unavailability (DU) if the PDU fails or is turned off during a maintenance procedure. Figure 6 Power zone connections Important: Refer to instruction manual Important: Refer to instruction manual Customer s Power Source 1 Customer s Power Source 1 SYSTEM (Rear View) Zone B Zone A Breakers (CBs) SYSTEM (Rear View) Zone B Zone A Breakers (CBs) Customer s Power Source 2 Customer s Power Source 1 Customer s Power Source 2 Customer s Power Source 1 Breakers (CBs) SYSTEM (Rear View) Zone B Zone A Breakers (CBs) Breakers (CBs) SYSTEM (Rear View) Zone B Zone A Breakers (CBs) 046-001-749_01 Procedure A-2: EMC Customer Engineer 9

Best Practices Guide Procedure A-3: Customer's electrician NOTICE This task is performed by the customer's electrician. Procedure 1. Working with the EMC Customer Engineer, turn ON all the relevant circuit breakers in customer-supplied PDU 2. Verify that only power supply and/or SPS LEDs in power zone A are ON or flashing green in every bay in the array. Note If all power supply and/or SPS LEDs in a bay are ON or flashing green, the bay is incorrectly wired because the AC power to both EMC power zones is supplied by a single PDU, that is, customer-supplied PDU 2. Wiring must be corrected before moving on to the next step. 2. Turn OFF the relevant circuit breakers in customer-supplied PDU 2. Verify that the power supply and/or SPS LEDs that turned green in the previous step changed from green to OFF and/or flashing yellow. The yellow SPS lights flash for a maximum of 5 minutes. Note Note that power supplies connected to an SPS continue to have green lights ON while the SPS yellow light continues to flash indicating the SPS is providing on-battery power. 3. Repeat step 1 and step 2 for power zone B and customer-supplied PDU 1. 4. Turn ON all the relevant circuit breakers in customer-supplied PDU 1 and customersupplied PDU 2. 5. Label the PDUs as described in Labeling the PDUs on page 13. 10 Best Practices Guide

Best Practices Guide for AC Power Connections Procedure B: Verify and connect Perform this procedure if the two conditions listed below are true: Access to customer-supplied, labeled, power cables (beneath raised floor or overhead). The customer's electrician is not available at the installation site. This procedure requires the EMC Customer Engineer to verify that the customer's electrician has complied with power specifications. Once verified, the EMC Customer Engineer makes the required power connections overhead or under the floor. Procedure 1. Have the customer verify that their electrician has complied with power specifications for voltage levels and redundancy. If the customer cannot verify this, provide them a copy of Procedure A: Working with customer's electrician onsite on page 5. Inform the customer that their array may prematurely shut down in the event of a site power issue. 2. Access the labeled, power cables (beneath raised floor or overhead) to verify that the customer-supplied power cables are properly labeled as shown in Figure 3 on page 6 and described in step 1 of Procedure A-2: EMC Customer Engineer on page 7. 3. Compare the numbers on the customer-supplied power cables for each EMC bay to verify that power zone A and power zone B are powered by a different customersupplied PDU. 4. If power extension cables are required, connect them to power zone A and power zone B in each bay. 5. Connect the customer-supplied power cables to EMC power zones as described in step 3 of Procedure A-2: EMC Customer Engineer on page 7 and shown in Figure 4 on page 7 or Figure 5 on page 8. 6. Record the customer-supplied PDU information as described in step 1 of Procedure A-2: EMC Customer Engineer on page 7. 7. Label the PDUs as described in Labeling the PDUs on page 13. Procedure B: Verify and connect 11

Best Practices Guide Procedure C: Obtain customer verification Perform this procedure if the three conditions listed below are true: The customer-supplied PDU source cables are already plugged into the EMC PDU. You have no access to the area below the raised floor. The customer's electrician is not available at the installation site. Procedure 1. Have the customer verify that their electrician has complied with power specifications for voltage levels and redundancy. If the customer cannot verify this, provide them a copy of Procedure A: Working with customer's electrician onsite on page 5. Inform the customer that their array may prematurely shut down in the event of a site power issue. 2. Record the customer-supplied PDU information (AC source voltage) as described in step 1 of Procedure A-1: Customer's electrician on page 6 and label the PDUs as described in Labeling the PDUs on page 13. 12 Best Practices Guide

Best Practices Guide for AC Power Connections Labeling the PDUs Before you begin Before applying labels to the PDUs, one of the following procedures must have been completed: Procedure A: Working with customer's electrician onsite on page 5 Procedure B: Verify and connect on page 11 Procedure C: Obtain customer verification on page 12 If necessary, see Selecting the proper AC power connection procedure on page 4 to select the correct procedure. Table 2 Label part numbers and location For... Use PN Description Location All bays PN 046-001-750 LABEL: CUSTOMER 1P 3P PDU INFO WRITEABLE OPEN ME FIRST, KIT, PN 106-887-149 Procedure 1. For each bay, locate and complete the PDU label. Note For three-phase power, enter data only in the P1 column. 2. Place the label on the top surface of the PDU enclosure for side A and B. Figure 7 PDU label, single-phase and three-phase Customer PDU Information Power Zone B P1 P2 P3 Power Zone A P1 P2 P3 PDU Panel CB(s) PDU Panel CB(s) Labeling the PDUs 13

Best Practices Guide Figure 8 Label placement Customer PDU Information Zone B PDU label Zone A PDU label Rear View 14 Best Practices Guide

Best Practices Guide for AC Power Connections AC power specifications Single-phase AC power Table 3 Single-phase AC power specifications Specification North American 3-wire connection (2 L & 1 G) a International and Australian 3- wire connection (1 L & 1 N & 1 G) a Input voltage 200 240 VAC ± 10% L- L nom 220 240 VAC ± 10% L- N nom Frequency 50 60 Hz 50 60 Hz breakers 30 A 32 A Power zones Two Two Power requirements at customer site (min) Three 30 A, single-phase drops per zone. Two power zones require 6 drops, each drop rated for 30 A. PDU A and PDU B require three separate single-phase 30 A drops for each PDU. Note a L = line or phase, N= neutral, G= ground Three-phase AC power Table 4 Three-phase AC power specifications Specification North American 4-wire connection (3 L & 1 G) a International 5-wire connection (3 L & 1 N & 1 G) a Input voltage b 200 240 VAC ± 10% L- L nom 220 240 VAC ± 10% L- N nom Frequency 50 60 Hz 50 60 Hz breakers 50 A 32 A Power zones Two Two Power requirements at customer site (min) Two 50 A, three-phase drops per bay. PDU A and PDU B require one separate three-phase Delta 50 A drops for each PDU. Two 32A, three-phase drops per bay. Note a L = line or phase, N= neutral, G= ground Note b An imbalance of AC input currents may exist on the three-phase power source feeding the VMAX3 array, depending on the configuration. The customer's electrician must be alerted to this possible condition to balance the phase-by-phase loading conditions within the customer's data center. AC power specifications 15

Best Practices Guide Copyright 2014-2015 EMC Corporation. All rights reserved. Published in USA. Published August, 2015 EMC believes the information in this publication is accurate as of its publication date. The information is subject to change without notice. The information in this publication is provided as is. EMC Corporation makes no representations or warranties of any kind with respect to the information in this publication, and specifically disclaims implied warranties of merchantability or fitness for a particular purpose. Use, copying, and distribution of any EMC software described in this publication requires an applicable software license. EMC², EMC, and the EMC logo are registered trademarks or trademarks of EMC Corporation in the United States and other countries. All other trademarks used herein are the property of their respective owners. For the most up-to-date regulatory document for your product line, go to EMC Online Support (https://support.emc.com). 16 Best Practices Guide