How Big Data Analytics Helps Hotels Improve Maintenance and Comfort, and Save Energy

Similar documents
Driving Proactive Facility Operations with Automated HVAC Diagnostics

Saving Energy and Reducing Costs Through Better Use of Building Automation Systems

BAS Chillers 8/15/2016. Achieving Energy Savings with BAS and Data Analytics Guanjing Lin Lawrence Berkeley National Laboratory August 10, 2016

ComEd Retro-Commissioning and Monitoring-Based Commissioning

CenterPoint Energy Retro-Commissioning Program Application

Achieving Operational Excellence

DUKE UNIVERSITY DESIGN & CONSTRUCTION STANDARDS

Experiences Commercializing FDD in the Northwest. Danny Miller, President Transformative Wave

The challenge is that BAS are often very complex with 1000s of data points to review. EMS Optimization Software

Why Should We Care? Building Intelligent Solutions 2

Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II

Setting New Standards for Ultra High Performance HVAC

Leveraging Building Automation Systems to support ongoing commissioning

Energy Action Plan 2015

DATA CENTER AIR HANDLING COOLING SOLUTIONS

Building Tune-Up Program Application

MM Ne C F tworking Br orum 2017 eak trca.on.ca/mmc

CLICK TO EDIT MASTER TITLE STYLE. AdvanTEC Solutions CHILLER PLANT HEALTH MANAGER

Committed to Energy Efficiency

Critical Facilities Existing Building Commissioning (EBCx)

O&M Roadie or Rockstar?

Setting New Standards for Ultra High Performance HVAC

Modernizing Control Systems for Campuses

James Donahue Control Consultants, Inc.

Economizer Fault Detection and Diagnostics (FDD) for Built-Up Air Handlers Draft Report

Daikin Blueprint: Five New Strategies to Reduce Operational Expenses for Air-cooled Chillers

Transformative Wave Technologies Kent, Washington

SECTION GRAPHICS

Prediction of Chilled Water Plant Failures and System Optimization Using Multivariate Modeling Techniques

Continuous Commissioning at Sandia National Laboratories

Retro-Commissioning Report

Optimizing Laboratory Controls through Fault Detection and Diagnostics Software. Laura Dyas, PE, LEED AP O+M, CEM Bryce Buchanan, PE, CCP, CEM

Commercial Retro-Commissioning Program Manual for 2016 SECTION 1

Verasys Enterprise Configuration and User Guide

Best Practices in Existing Building Commissioning

The Basics of HVAC Operation and the Role of Automation. Mr. Jay Zaino GxP Automation, LLC

E e n rgy g y St S ud u y y Pr P og o r g ams December 2011

Doing More with Less: Maintaining, Operating, and Improving your BMS. Bernard Keister, V PE Senior Engineer Guttmann & Blaevoet Consulting Engineers

Comprehensive Energy Management & Utility Master Plan

where we are, where we could be, how we can get there. 12/14/2011

2013 Building Energy Efficiency Standards Non-Residential HVAC Alterations

Simplifying Device and System Integration Specifications for Building Automation Systems

Optimizing the Existing Building Cx Process:

Commercial Controls. Advanced control for saving time and money

Utility Incentives for RTU FDD in California. Mel Johnson Southern California Edison

August 2017 Welcome Design Topic Product Focus

Campus Continuous Improvement with Controls. Bill Broadhurst, PE, CEM, LEED AP Campus Energy Manager

DCIM and how it helps deliver the InteropNet. Paul Goodison CEO, Cormant Inc CORMANT

Building Management Systems (BMS) Back to Basics. Presented By: Andrew Smith Leader Building Technologies A.G. Coombs Advisory

Advanced Rooftop Controller

Designing Ultra-Efficient Building Cooling Systems

Developing an Action Plan: Building Energy Metering and Beyond

Control systems. Efficient room control

Nonresidential HVAC Stakeholder Meeting #3

Pathfinder AWV air-cooled screw chillers

May Hands-on Guidance. Measurable Results. SUPPLIER EFFICIENCY PROGRAM

HVAC Energy Management System

Energy Performance Tracking: Tools and Best Practices

How to Get the Most out of Your Rooftop AC

A New Paradigm for Retrocommissioning: Moving Building Science to Green Collar Trades

Using Loop Tuning for ASC Devices

The Future. Today. YZ MAGNETIC BEARING CENTRIFUGAL CHILLER

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net

Automated fault detection for persistent energy savings in commercial buildings Dr Josh Wall Research Project Leader March 2013

OCCUPANCY TRACKING: Your Secret Source of Savings

SMART VENTILATION MANAGEMENT: CHANGING THE WAY WE THINK ABOUT VENTILATION

Maintaining Efficiency using Your Building Controls and Automation

MSYS 4480 AC Systems Winter 2015

Belimo Energy Valve Solving Low Delta T Leveraging IoT.

BuildingSherlock: Fault Management Framework for HVAC Systems in Commercial Buildings

Carrier Hong Kong Limited. Carrier Comfort Network. - optimizes the performance of HVAC Systems & is the premier solution for Building Control

Enterprise Building Control System: What Now? November 7, 2017

Trailblazer AGZ-E air-cooled scroll chillers

Trane Controls. Smart Solutions for Smart Buildings

DCIM Solutions to improve planning and reduce operational cost across IT & Facilities

BUILDING AUTOMATION YORKLAND

BCPro System Product Bulletin

What s on the Horizon for HVAC in Title ? Mark Hydeman, PE, Principal Taylor Engineering, LLC

Future of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power

Title of Presentation Goes Here. Presenter Name Title, Company

Ecolibrium. Cloud control. Keeping data centres cool. OCTOBER 2018 VOLUME 17.9 RRP $14.95 PRINT POST APPROVAL NUMBER PP352532/00001

All Rights Reserved - 1

Fault Detection and Diagnostic Software

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona

INCENTIVES FOR ADVANCED RTU CONTROLS PILOT WITH THE CATALYST. May 2 nd 2017

Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio until the Webcast begins

Lab and Central Plant Controller

Data Centers. Powerful Solutions That Put You in Control. Energy Management Solutions. Where your energy dollars are used. 1

Advanced RTU Campaign Taking Action Toward Efficient RTUs Michael Deru February 25, 2014

ASHRAE elearning Course Catalog

Fault Detection and Diagnostics: Automated, Ongoing Commissioning Functionality for Large and Small HVAC Systems

75F Smart VAV with Reheat

Retro-Commissioning of Data Centers

CGAM air-cooled scroll chiller. Highly efficient, yet extremely quiet

Improving Situational Awareness for Utilities Operators and Energy Managers

Trane Engineering News Chiller Plant Case Study: Variable-Primary Flow Series Chillers with Free Cooling

Handling Economic Uncertainty While moving forward to a Smarter Planet

Better Building Controls Through Simulation

Supplement to PM WSC/WDC-1 MicroTech II for Centrifugal Compressor Water Chillers

Data Acquisition Methods: Lessons Learned from Deployment of Cloud HVAC Analytics at UCSB

Transcription:

How Big Data Analytics Helps Hotels Improve Maintenance and Comfort, and Save Energy

Critical facility management drivers are impacting all industries Sustainability Big Data/Cloud Open Building Systems Aging facilities Risk management Outsourcing

Cost Probability Revenue We asked customers about their needs The feedback was very clear: Reduce Costs Mitigate Risks Improve Asset Value Cost of Facility Operations Utility Costs Negative Event Maintenance Costs Time Impact Severity Time

Daily challenges Guest comfort Complex building systems Data overload Budget limitations Actionable information is required, not just lots of building data

What do we hear from Hotels? We re looking for. Energy and cost savings Prioritized maintenance ROI Justified Decision Making Utility Incentives

Data Transfer Web level Cloud level Hardware level Systems Integration Analytics Example of findings Simultaneous heating and cooling Suboptimal economizer controls Opportunity for higher/lower loop setpoints Opportunity for static pressure reset Leaking valves, broken dampers Manual overrides Poor occupancy scheduling Excessive zone temperature setpoints Excess reheating Trends in chiller efficiency Short cycling Custom analytics

Technology is Great, but it s not enough: Cloud Based Fault Detection & Diagnosis Remote Monitoring & Analysis Reporting & Maintenance Software Services

Ensuring FDD fulfills its promise Must work, accurately! Actionable information about cost, comfort, maintenance Identify root cause and suggest corrective action Identify opportunities for optimization and capital projects Scalable delivery

Which hotels can really take advantage? Scale: more data = more opportunity Large conditioned spaces: ballrooms, convention space, More equipment monitored by Building Automation System the better Engineering responsible for many sites

Web-based software enabling proactive building operations

Contact info: Alex Grace Director of Business Development Agrace@kgsbuildings.com 978-502-0658

For example, rules are only one approach

Hierarchical, rule-based FDD is another approach Logic + rules with many variables = = root cause + corrective action i.e. the FDD should connect the dots for you. Credit: Pacific Northwest National Laboratory, Outdoor Air Economizer Diagnostician

Ultimately, FDD must deliver actionable information Failed pilot-positioner on a pre-heat valve FDD identified & calculated cost impact ~$900 per day Marked as high priority on dashboards and via email Valve was fixed within 2 weeks (parts, shutdown, contractors) Demonstrated savings from the repair visible immediately Without FDD, who would have noticed? When?

Realizing ongoing energy & cost savings Fault detection in a research laboratory ventilation system $286k annual savings PROJECT AT A GLANCE Location Massachusetts Facility Research lab (450,000 sq. ft.) Monitored Systems Central and zone ventilation system Setup Cost $23,190 Maintenance Cost (annual) $35,407 Projected Annual Savings At least $286,000 CUSTOMER BENEFITS Assurance that system maintenance achieves the desired objectives Investment protection to secure and track investments over the long term A digital history of building performance An information front-end to consolidate building data and make it accessible to all vendors Based on Building Analytics findings, the following work has been performed: 84 VAV boxes were re-commissioned. 52 VAV box reheat valves were replaced. 12 VAV box actuators were replaced. An air handler chilled water valve was rebuilt. Multiple controls adjustments were made.

Modular Software Architecture with new features built continuously:

Cost ($) Provide Persistence: Platform for Ongoing Cx Services Case study: Heating coil recovery sequences and simultaneous heating & cooling on AHU s: $198,000 of avoidable waste on one air handler over 4 months Leaking reheat valves on 86 VAV s: $86,000 in savings Repaired reheat valves Repair AHU

Data-Driven EBCx Spend less time finding problems and more time identifying solutions Complete library of Diagnostics to perform root cause analysis Prioritize time on site with diagnostic results.

Diagnostics Details Explore results through plain text and informative graphics

Remove the pain of trend analysis: Instant online access to graph and apply equations to 1000 s of trends

Analysis Builder

Analysis Builder

Analysis Builder

Case Study: Clockworks in a 450K sqft laboratory Clockworks access to all stakeholders Facilities managers Repair and Maintenance managers Controls and HVAC technicians Commissioning agent Controls provider Identified >$286k/yr in opportunities Leaking reheat valves Simultaneous heating and cooling Suboptimal economizer operation Heat recovery loop controls

Cost ($) Case Study Clockworks driven work orders issued to address: Heating Coil Recovery Sequences AHU s: $137,000 of avoidable waste on one air handler over 4 months Leaking Reheat Valves on 86 VAV s: $86,000 in savings Simultaneous Heating & Cooling in AHU: $61,000 in savings Repaired reheat valves Repair AHU

Document Storage and Organization Building Upload manuals, plans, logs, schedules, sequences of operation, photos, or other documents and tag them to specific equipment.

Equipment Profiles Easily access information and documents online while in the field. Chiller1 Building Building Chiller1 Building Chiller1 Documents Data Links QR Codes Chiller1 Building

Kiosk Utility Tracking

Performance Dashboard normalized utility comparisons

Utility Programs Currently Engaged with: 1) National Grid 25 building pilot 2) NSTAR submitting data driven EEM s under MOU 3) Comed MBCx program 4) SDG&E Emerging Technologies Program pilot Biggest Drivers: Greater savings from ongoing MBCx delivery Persistence