PRO-1250D CT MID DIN rail three phase four wire energy meter.

Similar documents
PRO1250D CT MID DIN rail three phase four wire energy meter. User manual Version 1.5

PRO1 V21.xxx series MID DIN rail single phase two wire energy meter

PRO1250D CT M-bus MID DIN rail three phase four wire energy meter. User manual Version 1.11

PRO1250D CT MODBUS MID Three phase four wire energy meter.

PRO-75 SERIES. User manual

PRO2DM DIN rail single phase two wire energy meter

LXEM145 SERIES Lanx Australis single Phase KWh Meter 45Amp. User manual

DRT-301 A/D. User manual. Three phase four wire DIN rail energy meter. (Seven modules) 1.1 Safety instruction. 1.2 Foreword. 1.3 Performance criteria

XTM1250SA DIN rail three phase four wire LCD display energy meter

SDM120 SERIES. SDM120 series User Manual. Single phase two wire DIN rail energy meter (One module)

1.2 Foreword. 1.7 Basic errors. 1.8 Description. 1.9 Dimensions Installation Operating

PRO1-S PRO1-2T PRO1-Mb PRO1-Mod. PRO1 Series MID Single phase energy meter. User manual. Product version: Inepro B.V. All rights reserved

PRO1-S PRO1-2T PRO1-Mb PRO1-Mod. PRO1 Series MID Single phase energy meter. User manual. Version: Inepro B.V. All rights reserved

METERSUK. SmartLink D Y N A M i T E. 3 MOD CT Series. User Manual KEY FEATURES INDEX 3. TECHNICAL DESCRIPTION.

OB735 Smart Energy Meter

CEM-C30 INSTRUCTION MANUAL (M017B A)

Smart Energy Meters Noark Electric Europe s.r.o.

Smart Grid Tie Microinverter User Manual

Smart Energy Meter. Benefits and Main Features. User Manual Revision English OB (100)A

Model P4017 Single Channel USB Oscilloscope. Quick Start Guide

HITACHI. EH-150 series PLC EH-RTD8 Resistance Temperature Detective input module Instruction manual. Safety precautions

Operating instructions AS-i SmartLine module AC3200 AC /00 06/2016

SINAMICS G130. Terminal Module 150 (TM150) Operating Instructions 03/2013 SINAMICS

H Series PLC. ! : Indicates Compulsion. EH-150 Analog input module EH-AXH8M Instruction manual. Safety precautions DANGER CAUTION COMPULSION

Operating instructions. Speed monitor D / / 2014

Line reactors SINAMICS. SINAMICS G120P Line reactors. Safety information 1. General. Mechanical installation 3. Electrical installation 4

Line reactors SINAMICS. SINAMICS G130 Line reactors. Safety information 1. General. Mechanical installation 3. Electrical installation

22-60VDC Grid Tie Microinverter User Manual

Operating instructions. Standstill monitor A / / 2011

SITOP power supply. Selectivity modules. Overview. Safety notes. Description, device design, dimension drawing. Mounting/removal 3

Operating instructions. Switching amplifier DN0210 DN / / 2015

CEM-C6 INSTRUCTION MANUAL (M187B B)

IO-DI8-TO8, IO-DI8-TO8-L I/O Expansion Modules 8 Inputs, 8 Outputs

CEM M-RS485 INSTRUCTION MANUAL (M014B A)

Part No. Z , IA Jul OPERATION MANUAL. High Voltage Digitalmeter A

MID PRELIMINARY DATA SHEET. RI-D Series. Single Phase Multifunction Energy Meter (MID Certified) MID

DIGITAL INPUT/OUTPUT RELAY INTERFACE BMS-IFDD01E

dv/dt filter compact plus Voltage Peak Limiter SINAMICS SINAMICS G120P dv/dt filter compact plus Voltage Peak Limiter Safety information 1 General 2

V E1B Snap-in I/O Module

Operating Manual -ENGLISH- Page 1 KWG-ISO

IO-DI8-TO8 I/O Expansion Module 8 Inputs, 8 Outputs

SMS 3xxx/SMS 4xxx Safety switch with separate actuator

OPERATING INSTRUCTIONS 7 SERIES STATIC GENERATORS

V E1B Snap-in I/O Module

Installation and Operation Back-UPS BR1000G-IN / BR1500G-IN

TOUCH SCREEN CONTROLLER for Air Conditioning Control System

Analog Monitor Installation Manual

Part No. Z , IA Mar OPERATION MANUAL. High Voltage Digitalmeter A

PV Rapid Shutdown device

SINAMICS G130. Voltage Sensing Module 10 (VSM10) Operating instructions 03/2011 SINAMICS

Siemens Industrial s

SINAMICS G130. Voltage Sensing Module 10 (VSM10) Operating Instructions 05/2010 SINAMICS

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

Emerson Network Power provides customers with technical support. Users may contact the nearest Emerson local sales office or service center.

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Control unit SG-EFS 104/2W. EN Operating instructions. Innovative by tradition. Version SG-EFS 104/2W 24 V=/~

PanelView Plus/VersaView CE Terminals and Display Modules

D6030S - D6030D INSTRUCTION MANUAL. D SIL 3 Switch/Proximity Detector Repeater Relay Output. Models D6030S, D6030D

V E2B Snap-in I/O Module

DM-918 OPERATIONS MANUAL AUTORANGING MULTIMETER

CEM M-ETH INSTRUCTION MANUAL (M060B A)

Smart Grid Tie Microinverter User Manual

PHOENIX CONTACT - 12/2007

DANGER DANGER: is used in this manual to warn of high voltages capable of causing shock, burns, or death.

CG800H SERIES USER MANUAL ZIGBEE WIRELESS SCENE CONTROL PANEL VERSION JANUARY, Disclaimers and Copyright

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

Polymer Electric. Operating Instructions. Control Unit SG-EFS 1X4 ZK2/1 8k2. Version 3

PI-EX-ME-2NAM/COC-120VAC

Control unit SG-EFS 104/4L. EN Operating instructions. Innovative by tradition. Version SG-EFS 104/4L AC/DC 24 V

PI-EX-ME-2NAM/COC-24VDC

ekorrps MULTIFUNCTIONAL PROTECTION UNIT CONFIGURATION AND GENERAL CHARACTERISTICS LIB

Vision OPLC V TR6/V350-J-TR6

RCD Fused Connection Unit Model: RCD10WPV. RCD Double Sockets Models: RCD05WAV, RCD06WPV, RCD07MAV, RCD08MPV. Installation & Operating Instructions

SIMADYN D Digital Control System. Fiber-Optic Rack Coupling CS12. User Manual. Edition DK No

IO-DI8-RO8, IO-DI8-RO8-L I/O Expansion Modules 8 Inputs, 8 Outputs

Symmetra PX 160. Maintenance Bypass Enclosure. Installation 05/

SAVE THESE INSTRUCTIONS

Model 8020-STC. Kelvin Standard Triaxial Connector Card. Description / October 2014 *P * 1

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE

BS 287 DUAL CHANNEL POWER SUPPLY. User Manual. January 2017 V1.0

SAVE THESE INSTRUCTIONS

SINAMICS. SINAMICS G120P dv/dt filter plus Voltage Peak Limiter. Safety information 1. General. Mechanical installation. Electrical installation 4

Touch-controller_IM_03943A_1_Co_EN.indd 오후 3:06:00

Part No. Z , IA Nov OPERATION MANUAL. High Voltage Digitalmeter A

User Manual V1.0 SDM230-DR. Single-Phase Two Module DIN rail Meters

High Speed Remote I/O Module

AcquiSuite Ally 12 & 48 Advanced Multi-Circuit Meter

CMSA-100 Manual. Cinema Media Server Automation

User safety and equipment protection guidelines

ILUMEN PID SOLUTION INDOOR OUTDOOR ILUMEN PIDBOX MINI INSTALLATION MANUAL. Ilumen PIDbox mini Version 1.5

Surge Protective Devices. STV100K Series. Instruction Manual

F1000 User's Manual. (Version: V1.01)

MDM 011-Z1 Regen Resistor

Surge Protective Devices. STV100K Series. Instruction Manual

V E2B Snap-in I/O Module

Your Global Flow Control Partner. Series 50 Valve Status Monitor Operation and Maintenance Manual

Switched Mode Power Supply Operating manual PAP800

Energy meters Single phase electrical energy meters WM1-6 / WM1M6

Models beginning with 2M, 2L or 2X. Product Description. Technical Specifications. Installation Instructions. Series 2000 Multiple Meter Units (MMUs)

EX-RC1 Remote I/O Adapter

Transcription:

PRO-1250D CT MID DIN rail three phase four wire energy meter. 1.1 Safety instructions 1.2 Foreword 1.3 MID certificate 1.4 Performance criteria 1.5 Specifications 1.6 Basic errors 1.7 Description 1.8 Dimensions 1.9 Installation 1.10 Operation 1.11 CT ratio setting 1.12 Troubleshooting 1.13 Technical support User manual Version 1.0 2011-1 - User manual 0028

1.1 Safety instructions Information for Your Own Safety This manual does not contain all of the safety measures for operation of this equipment (module, device) because special operating conditions, local code requirements or local regulations may necessitate further measures. However, it does contain information which must be adhered to for your own personal safety and to avoid damage to the equipment. This information is highlighted by a warning triangle with an exclamation mark or a lightning bolt depending on the severity of the warning. Warning Means that failure to observe the instruction can result in death, serious injury or considerable material damage. Caution Means hazard of electric shock and failure to take the necessary safety precautions will result in death, serious injury or considerable material damage. Qualified personnel Installation and operation of the equipment described in this manual may only be performed by qualified personnel. Only people that have proper knowledge about the local standards regarding electrical installations and are allowed to work on these installations according to the local regulations are considered qualified personnel in this manual. Use for the intended purpose The equipment (device, module) may only be used for the application cases specified in the catalog and the user manual and only in connection with devices and components recommended and approved by Inepro Metering B.V. Proper handling The prerequisites for perfect, reliable operation of the product are proper transport, storage, installation and connection, as well as proper operation and maintenance. When operating electrical equipment, certain parts of this equipment carry dangerous voltages. Improper handling can therefore result in serious injury or material damage. Only use isolated tools suitable for the voltages the meter is used for. Do not connect while circuit is live (hot). Place the meter only in dry surroundings. Do not mount the meter in an explosive area or exposed to dust, mildew and/or insects. Make sure the used wires are suitable for the maximum current of this meter. Make sure the AC wires are connected correctly before activating the current/voltage to the meter. Do not touch the meter s connection clamps directly with your bare hands, with metal, blank wire or any other conducting material as that will cause an electric shock and possibly cause injury. Make sure the protection cover is placed after installation. Installation, maintenance and repair should only be done by qualified personnel. Never break the seals to open the front cover as this might influence the 2011-2 - User manual 0028

functionality or accuracy of the meter, and will void all warranty. Do not drop, or allow physical impact to the meter as there are high precision components inside that may break and render the meter measurement inaccurate. Exclusion of liability We have checked the contents of this publication and every effort has been made to ensure that the descriptions are as accurate as possible. However, deviations from the description cannot be completely ruled out, so that no liability can be accepted for any errors or omissions in the information given. The data in this manual is checked regularly and the necessary corrections will be included in subsequent editions. If you have any suggestions, please let us know. Subject to technical modifications without notice. Copyright Copyright Inepro Metering March 2011 All rights Reserved. It is prohibited to pass on or copy this document or to use or disclose its contents without our express permission. Any duplication is a violation of the law and subject to criminal and civil penalties. All rights reserved, particularly for pending or approved patent awards or registered trademarks. 1.2 Foreword Registered trademarks DMMetering is a registered trademark of Inepro Metering member of the Inepro Group. Other names appearing in this manual may be trademarks of third parties and are property of their respectful owners. Thank you for purchasing the DMMetering PRO-1250D CT MID approved DIN rail three phase energy meter. The DMMetering PRO-1250D CT MID approved energy meter is the most advanced type electronic kwh meter available at the market. With the DMMetering product range we have introduced a large scale of energy meters on the market suitable for 110V AC to 400V AC (50 or 60Hz). Besides the normal energy meters we also developed our own pre-paid meters with chip card, chip card re-loaders and a complete PC management control system. For more information on other products please contact our sales department at sales@ineprometering.com or info@inepro.com.hk. Although we produce the DMMetering PRO-1250D CT MID approved meter according to the requirements of EN 50470-3 and our quality inspection is very accurate there might always be a possibility that your product shows a defect or failure for which we do apologize. Under normal conditions your product should give you years of trouble free operation. In case there is a problem with the energy meter you should contact your dealer immediately. All energy meters are sealed with a special seal. Once this seal is broken there is no possibility to claim any warranty. Therefore NEVER open an energy meter or break the seal of the energy meter. The warranty time is 3 years, after production, and only valid for construction faults. 2011-3 - User manual 0028

1.3 MID certificate 2011-4 - User manual 0028

1.4 Performance criteria: Operating humidity 75% Storage humidity 95% Operating temperature -25 C - +55 C Storage temperature -30 C - +70 C International standard EN50470-3 Accuracy class 1 Protection against penetration of dust and water IP51 Insulating encased meter protective class Ⅱ 1.5 Specifications: Meter type PRO-1250D CT Nominal voltage (Un) 230/400V AC (3~) Operational voltage 0.7~1.3Un Insulation capabilities: - AC voltage withstand 2KV for 1 minute - Impulse voltage withstand 6KV 1.2µS waveform Basic current (Ib) 1.5A Maximum rated current (Imax) 6A Operational current range 0.4% Ib- Imax Peak current withstand 30Imax for 0.01s Operational frequency range 50Hz ±10% Internal power consumption 2W / 10VA per phase Test output flash rate (PULSE LED) 1600imp/kWh Pulse output rate (pins 8 & 9) 1600imp/kWh L1, L2 & L3 LED indicator Meter is connected to power Consumption indicator (RED LED) Flashing at load running Data save The data can be stored more than 20 years without power. 1.6 Basic errors: With balanced loads 0.05Ib Cosφ = 1 ±1.5% 0.1Ib Cosφ = 0.5L ±1.5% Cosφ = 0.8C ±1.5% 0.1Ib - Imax Cosφ = 1 ±1.0% 0.2Ib - Imax Cosφ = 0.5L ±1.0% Cosφ = 0.8C ±1.0% With single phase load 0.1Ib - Imax Cosφ = 1 ±2.0% 0.2Ib - Imax Cosφ = 0.5L ±2.0% 2011-5 - User manual 0028

1.7 Description A B C D Front panel Cover Base Security wire slot Material Front panel Cover Base PC inflammable plastic ABS inflammable plastic ABS inflammable plastic A B C D 1.8 Dimensions Height Width Depth Max diameter cable Weight 130 mm 126 mm 65 mm 11.5 mm 0.7 Kg (net) 1.9 Installation CAUTION Turn off and if possible lock all sources supplying the energy meter and the equipment that is connected to it before working on it. Always use a properly rated voltage sensing device to confirm that power is off. 2011-6 - User manual 0028

WARNING Installation should be performed by qualified personnel familiar with applicable codes and regulations. Use isolated tools to install the meter. Fuse or thermal cut-off should be fitted on the supply lines. The meter s casing is sealed, if not properly looked after, this seal could be broken, voiding the warranty and damaging the meter. - We recommend that the connecting wire which is used to connect meter to the outside circuit should be sized according to local codes and regulations for the maximum amount of current of the circuit breaker or other overcurrent protection device used in the circuit. - An external switch or a circuit-breaker should be installed on the supply wires, which will be used to disconnect the meter. It is recommended that this switch or circuit-breaker is placed near the meter because that is more convenient for the operator. The switch or circuit-breaker should comply with the specifications of the building s electrical design and all local regulations. - An external fuse or thermal cut-off which will be used as an overcurrent protection device for the meter must be installed on the supply side wire, and it is recommended that this protection device is near the meter since that is convenient for the operator. The overcurrent protection device should comply with the specifications of the building s electrical design and all local regulations. - This meter can be installed indoor, or outdoor enclosed in a meter box which is sufficiently protected, subject to local codes and regulations. - To prevent tampering, an enclosure with a lock or a similar device can be used. - The meter has to be installed against a fire resistant wall. - The meter has to be installed in a well ventilated and dry place. - The meter has to be installed in a protective box if the meter is exposed to dust or other contaminants. - The meter can be installed and used after being tested and can be sealed afterwards. - The meter can be installed on a 35mm DIN rail or onto a panel with screws. - The meter should be installed on a location where the meter can be read easily. - When the meter is installed in an area with frequent surges for example due to thunderstorms, welding machines, inverters etc, the meter should be protected with a Surge Protection Device. - After finishing installation, the meter can be sealed to prevent tampering. 2011-7 - User manual 0028

- Connection of the wires should be done in accordance with the underneath connection diagram. 1.10 Operation 1 and 2 CT for Phase A 3 and 4 CT for Phase B 5 and 6 CT for Phase C 18/16/14/12 Phase A / B / C and Neutral IN 8 and 9 Pulse output contact Consumption indication There is a red LED which displays the consumption measured by the PRO-1250D CT. When power is consumed, the LED will flash. The faster the LED flashes, the more power is consumed. For this meter, the LED will flash 1600 times per kwh. Please note that the meter is not suitable for reverse energy. Reading the meter The PRO-1250D CT has a 7 digit LCD which had a variable decimal count, it can be either 5+2, 6+1 or 7+0 depending on the CT ratio set-up. This register cannot be reset to zero. Pulse output The PRO-1250D CT energy meter is equipped with a pulse output which is optically isolated from the inside circuit. It generates pulses in proportion to the measured consumption for purpose of remote reading or accuracy testing. The pulse output is a polarity dependant, open-collector transistor output requiring an external voltage source for correct operation. For this external voltage source, the voltage (Ui) should be lower than 27V DC, and the maximum switching current (Iimax) is 27mA. To connect the impulse output, connect 5-27V DC to connector 9 (collector c), and the signal wire (S) to connector 8 (emitter e). The meter pulses 1600 times per kwh. 2011-8 - User manual 0028

1.11 CT ratio setting How to set the CT ratio of the CT meter Please set the CT Ratio after installation otherwise the CT Meter will count the second energy consumption by default ratio (5:5). NOTE: For security reasons, it is only possible to change the CT ratio in the first 30s after the meter has been turned on, after that pressing the PRG button does nothing. Furthermore, because of MID regulations it is only possible to change the CT ratio once, after the CT ratio has been set-up it is locked and can only be reset by the manufacturer. Procedures of setting or changing the CT ratio of the CT meter: 1. Wire the meter correctly according to section 1.9. 2. The meter will start when the power is turned on, and the LCD displays 88888.8.8. 3. Press the PRG button after the meter has started, then you can set the CT Ratio. The LCD displays - 4. Press the SEL button to choose the ratio, there are 27 you can choose from: 5/5 100/5 250/5 600/5 1200/5 2500/5 6000/5 50/5 125/5 300/5 750/5 1250/5 3000/5 7500/5 60/5 150/5 400/5 800/5 1500/5 4000/5 75/5 200/5 500/5 1000/5 2000/5 5000/5 5. After choosing one CT Ratio, press the PRG button to confirm and the ratio setting is complete. The LCD will display -END. 6. The meter will go back to the normal display if there is no press on the PRG button in 30s, and the LCD will show the energy consumption and CT ratio consecutively. 1.12 Troubleshooting CAUTION During repair and maintenance, do not touch the meter connecting clamps directly with your bare hands, with metal, blank wire or other conducting material as that will cause an electric shock and possibly cause injury. Turn off and if possible lock all sources supplying the energy meter and the equipment that is connected to it before opening the protection cover and working on it. WARNING Maintenance or repair should only be performed by qualified personnel familiar with applicable codes and regulations. Use insulated tools to maintain or repair the meter. Make sure the protection cover is in place after maintenance or repair. 2011-9 - User manual 0028

Problem Check Solution The power supply indicator (L1, L2 & L3 LED) are off. Is there power connected to the meter? Check the fuses and surge protection. The consumption LED is not flashing (PULSE LED). The register doesn t count. No pulse output. Pulse output rate wrong. Are L1, L2, L3 and N connected correctly? Maybe there is a fault inside the meter. Is there any load connected to the meter? Is the load on the line very low? Maybe there is a fault inside the meter. Is there almost no load on the meter? Maybe there is a fault inside the meter. Is DC power connected to the meter? Is the pulse output connected correctly? Maybe there is a fault inside the meter. Maybe there is a fault inside the meter. Make sure the wires are connected properly and tighten the screws if possible. There should be 230V AC between the N and one of the L connections and 400V AC between the L connections when power is supplied to the meter. Please contact technical support for a meter replacement. Only if there is a load on the meter this LED will flash. If the load is very low, the time between 2 flashes is very long. This can be mistaken for a broken meter. As a test, an electric water boiler (~1600W) should make it blink once every second. Please contact technical support for a meter replacement. Check if the consumption led is blinking (see above). 16 flashes of the LED equals 0.1kWh and should be clearly visible on the display. Please contact technical support for a meter replacement. Check the external voltage source (Ui) is 5-27V DC. Check correct connection: connect 5-27V DC to connection 6 (anode), and the signal wire (S) to connection 5(cathode). Please contact technical support for a meter replacement. Please contact technical support for a meter replacement. 2011-10 - User manual 0028

1.13 Technical support For questions about one of our products please contact: - The Inepro Metering dealer in your region - Your local Inepro Metering distributor - Email: support@ineprometering.com www.ineprometering.com 2011-11 - User manual 0028