Instructions for Operation of S&C Test Accessory Catalog Number TA-2669

Similar documents
Quick-Start Programming

Communications Card Operation

Vista SD Portable Remote Control Pendant

Installation and Operation

Source-Transfer Application Guide

Product Description. S&C IntelliNode Interface Module. Table of Contents. Instruction Sheet

Configuration. S&C Scada-Mate Switching System Outdoor Distribution (14.4 kv through 34.5 kv)

Primary Injection Test Procedure

Product Description. S&C 5800 Series Automatic Switch Control S&C ELECTRIC COMPANY TABLE OF CONTENTS

PS/IO Circuit Board Retrofit

IntelliLink Setup Software

Installation NOTICE. S&C IntelliCap Automatic Capacitor Control. Table of Contents. Instruction Sheet

Troubleshooting Instructions

Troubleshooting Guide

Docking Station Instructions

Altivar 61/71 Adjustable Speed Drives Heatsink Fan Kits VZ3V1212 and VZ3V1216

Wi-Fi and Security Administration

Specifications. S&C Micro-AT Source-Transfer Control. In Weatherproof Enclosure

Operation and Maintenance

Setup. S&C 5800 Series Automatic Switch Controls With IntelliTeam Automatic Restoration System. Table of Contents. Instruction Sheet

Troubleshooting. S&C IntelliCap Automatic Capacitor Control. Instruction Sheet Table of Contents

User s Guide. POWERVAR Single Phase Power Conditioners

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE

Setup Instructions. S&C Universal Interface Module. Table of Contents. Instruction Sheet

Installation, Field Programming, and Operation

Line reactors SINAMICS. SINAMICS G120P Line reactors. Safety information 1. General. Mechanical installation 3. Electrical installation 4

TDM-170 TIMER DISPLAY

Installation. Section Page Section Page NOTICE

Agilent Technologies E5385A 100-Pin Probe

DCM Digital Control Modules

Model 7705 Control Module

Model 8020-KHV. Kelvin Keithley Triaxial Connector Card. Description / October 2014 *P * 1

User s Guide. S&C IntelliTeam Designer. Table of Contents. Instruction Sheet

Operation. S&C IntelliRupter PulseCloser Fault Interrupter Outdoor Distribution (15.5 kv, 27 kv, and 38 kv) Table of Contents

Troubleshooting. S&C 5800 Series Automatic Switch Control. Table of Contents. Instruction Sheet

Table of Contents Section Page Section Page Introduction Safety Information Installation Diagrams Installation

Troubleshooting. S&C IntelliCap Plus Automatic Capacitor Control. Table of Contents. Instruction Sheet

Agilent Technologies E5346A 38-Pin Probe and E5351A 38-Pin Adapter Cable

EMMS-T A00 SIERS. Siemens integrated electrical racking system instruction manual. usa.siemens.com/mvswitchgear

Resolver to Digital Expansion Board

COOPER POWER SERIES. Input/Output (I/O) module installation instructions. Voltage Regulators MN225067EN

TDM-150 TIMER DISPLAY

BOP QUICK START GUIDE 100W, 200W, 400W. KEPCO An ISO 9001 Company. BIPOLAR OPERATIONAL POWER SUPPLY WARNINGS I INTRODUCTION II SAFETY.

Installation Instructions

OilCop Component Wiring Installation Manual

Model 8020-STC. Kelvin Standard Triaxial Connector Card. Description / October 2014 *P * 1

Model 2600B-PM V Protection Module with 1 A Clamp. Description / April 2015 *PPA * 1

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Troubleshooting. S&C IntelliCap 2000 Automatic Capacitor Control. Table of Contents. Instruction Sheet

Installation Instructions for Eaton Surge Protective Device XXCFXXX10-DIN and XXCFXXX10-DIN2

Type VR Electrically Operated Ground and Test Device

Configurable Output Distribution. 120V / 208V / 240V 60Hz. User Manual English

COOPER POWER SERIES. 600 A U-OP visible break connector system operation instructions. Deadbreak Apparatus Connectors MN650022EN

KBMG MULTI-SPEED BOARD

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.

Wall. No opening (Example: LA-030-W)

PowerLogic ION7300 Series

SAVE THESE INSTRUCTIONS

PowerLogic High Density Metering System 1-Meter Enclosure

3710 ACM 3750 PDC 3800 RTU. ISOCOM Communications Card Retrofit Instructions

Panduit Basic Rack PDU

Troubleshooting. S&C 6801M Automatic Switch Operators Reciprocating and Rotating Switch Operation. Table of Contents. Instruction Sheet 1045M-550

SAVE THESE INSTRUCTIONS

COOPER POWER SERIES. Form 4C microprocessor-based recloser control standard and automation power supply kit installation and operation instructions

powerbrite led Lighting Systems & Modules

Setpoint Isolators. Technical Manual. HA Issue Parker SSD Drives, a division of Parker Hannifin Ltd. WARRANTY

Installation Manual. 12 Volt Power Supplies. 18-Port. 9-Port RET18PT RET9PT

DIGITAL VOLTAGE INDICATOR

S Contents. Figure 1. Kyle Form 4C Analog Current Metering Accessory KME

Wa r n i n g-wa r n i n g-wa r n i n g

SIAC-PS 3G SIGNAL ISOLATOR WITH POWER SUPPLY (PART NO. 8890) INSTALLATION INSTRUCTIONS

Models beginning with 2M, 2L or 2X. Product Description. Technical Specifications. Installation Instructions. Series 2000 Multiple Meter Units (MMUs)

Agilent Technologies E5339A 38-Pin Low-Voltage Probe

CVU-200-KIT. 200 V Bias Tee Kit. Description. Parts list / October 2014 *P A* 1

Voltage Detector and Phasing Tester Operating Instructions 83280

SMVector Additional I/O Module Installation and Operation Manual

Pressurized Line Leak Controller Module. For Veeder-Root TLS-350/350R Systems

COOPER POWER SERIES. DC motor operator control installation and operation instructions. Padmounted Switchgear MN285018EN

ET 200S distributed I/O Digital electronic module 2DO AC V (6ES7132-4FB01-0AB0)

Instructions. TLA5Fxxx, TLA6Fxx, & TLA7Fxx PowerFlex Field Upgrade Kits for TLA5000, TLA600, and TLA700 Logic Analyzers

Model 2657A-LIM-3 LO Interconnect Module

Setup. Section Page Section Page NOTICE

SAVE THESE INSTRUCTIONS

HUBBCOM GSC3000/GSC4000 Flush-Mount Smart Controller Quick Installation Guide

XBDM. 1015LV, 1020LV, 1030LV, 1020HV Models USER & INSTALLATION MANUAL BYPASS DISTRIBUTION MODULE

OPERATING MANUAL FOR THE 30KV A.C. TEST SET P123. Bicotest High Voltage Products Ltd

Tornado F-5. Motor Backspin Detect Relay And Probe For F-5 Motor Controller

Manual No: Revision: F. Relay Output Modules. Installation Guide

FNet Repeater Installation & Operator s Instruction Manual

Remote Refrigeration Control

Multi Unit Enclosed Meter

Installation and Operation Guide for PD5200 and PD5300 Automatic Transfer Switch

Master Pulse Reference/ Isolated Pulse Follower Expansion Board

Operation. S&C 6800 Series Automatic Switch Controls with IntelliTeam SG Automatic Restoration System. Table of Contents. Instruction Sheet

SINAMICS G130. Terminal Module 150 (TM150) Operating Instructions 03/2013 SINAMICS

Installation Guide SMT 2200/3000 VA Input/Output Hardwire Kit

INSTRUCTION MANUAL DISTRIBUTION UNIT. Please read this manual thoroughly before use, and keep it handy for future reference.

DCS-E 1kW Series, DLM-E 3kW & 4kW Power Supplies

Operating and Diagnostic Instructions for IntelliTeam SG Automatic Restoration System

Operating instructions AS-i SmartLine module AC3200 AC /00 06/2016

Transcription:

S&C Micro-AT Source-Transfer Controls Instructions for Operation of S&C Test Accessory Catalog Number TA-2669 This publication contains instructions for operation of the S&C Test Accessory Catalog Number TA-2669 in conjunction with S&C Micro-AT Source-Transfer Controls. For instructions for opera tion of this device in conjunction with S&C Type AT-2, AT-3, or AT-12 Source-Transfer Controls, refer to S&C Instruction Sheet 514-605. Table of Contents Section Page Section Page Introduction... 2 Qualified Persons............................. 4 Read this Instruction Sheet...................... 4 Retain this Instruction Sheet.... 4 Proper Application............................. 4 Warranty... 4 Safety Information Understanding Safety-Alert Messages... 5 Following Safety Instructions..................... 5 Replacement Instructions and Labels.... 5 Metal-Enclosed Switchgear Application... 6 Pad-Mounted Gear Application... 8 Vista Underground Distribution Switchgear Application.... 10 June 30, 2008 S&C Electric Company Instruction Sheet 515-510

Introduction This publication provides instructions for the use of S&C Test Accessory Catalog Number TA-2669. TA-2669 permits preliminary checkout of the source-transfer operation of Micro-AT Source-Transfer Controls in S&C Metal-Enclosed Switchgear and Source- Transfer Pad-Mounted Gear, using an external single-phase 120-volt ac source. TA-2669 also permits preliminary checkout of the Micro-AT Source-Transfer Controls and Vista motor operator controls in S&C Source-Transfer Vista Underground Distribution Switchgear, as well as S&C Metal-Enclosed Switchgear and Source-Transfer Pad-Mounted Gear. By performing such a preliminary checkout, full service can be expedited once high voltage is available to the gear. Refer to S&C Instruction Sheet 515-500 for instructions on field programming and operation of the Micro-AT Source-Transfer Control. The S&C Test Accessory, further, is required in metal-enclosed switchgear applications and Vista Underground Distribution Switchgear applications in which the Micro- AT Source-Transfer Control is furnished with optional test panel feature (Catalog Number Suffix -Y5 ), if the sourcetransfer control is to be tested with the switchgear de-energized. In these applications, the test accessory provides control power for the switch operators during testing. Refer to S&C Instruction Sheet 515-505 for instructions on the use of the test panel feature. The S&C Test Accessory consists of a module with integral connecting plug for attachment to the sourcetransfer control input receptacle, a terminal board for connection of the 120-volt ac source, and internal fuse for protection of the source-transfer control input circuits. See Figure 1. 2 S&C Instruction Sheet 515-510

Introduction Figure 1. Test accessory connection diagram. S&C Instruction Sheet 515-510 3

Introduction Qualified Persons Ç WARNING The equipment covered by this publication must be in stalled, operated, and maintained by qualified persons who are knowledgeable in the installation, operation, and maintenance of electric power distribution equip ment along with the associated hazards. A qualified per son is one who is trained and competent in: The skills and techniques necessary to distinguish exposed live parts from nonlive parts of electrical equipment. The skills and techniques necessary to determine the proper approach distances corresponding to the voltages to which the qualified person will be exposed. The proper use of the special precautionary tech niques, personal protective equipment, insulating and shielding materials, and insulated tools for working on or near exposed energized parts of electrical equipment. These instructions are intended only for such qualified persons. They are not intended to be a substitute for ad equate training and experience in safety procedures for this type of equipment. Read this Instruction Sheet Retain this Instruction Sheet Proper Application Thoroughly and carefully read this instruction sheet before operating your Micro-AT Source-Transfer Control. Familiarize yourself with Understanding Safety Alert Messages, Following Safety Instructions, and Replace ment Instructions and Labels. This instruction sheet is a permanent part of your Micro-AT Source-Transfer Control. Designate a location where you can easily retrieve and refer to this publication. Ç CAUTION The equipment in this publication must be selected for a specific application. The application must be within the ratings furnished for the equipment. The latest release of this instruction sheet is available online at www.sandc.com. Select: Support - Product Support Documents. Documents are posted in PDF format. Warranty The warranty and/or obligations described in S&C s standard conditions of sale, as set forth in Price Sheet 150, plus any special warranty provisions, as set forth in the applicable product-line specification bulletin, are exclusive. The remedies provided in the former for breach of these warranties shall constitute immediate purchaser s or end user s exclusive remedy and a fulfillment of all seller s liability. In no event shall seller s liability to immediate purchaser or end user exceed the price of the specific product which gives rise to immediate purchaser s or end user s claim. All other warranties whether express or implied or arising by operation of law, course of dealing, usage of trade or otherwise, are excluded. The only warranties are those stated in Price Sheet 150, and THERE ARE NO EXPRESS OR IMPLIED WARRANTIES OF MERCHANT- ABILITY OR FITNESS FOR A PARTICULAR PURPOSE. ANY EXPRESS WARRANTY OR OTHER OBLIGATION PROVIDED IN PRICE SHEET 150 IS GRANTED ONLY TO THE IMMEDIATE PURCHASER AND END USER, AS DEFINED THEREIN. OTHER THAN AN END USER, NO REMOTE PURCHASER MAY RELY ON ANY AFFIRMATION OF FACT OR PROMISE THAT RELATES TO THE GOODS DESCRIBED HEREIN, ANY DESCRIPTION THAT RELATES TO THE GOODS, OR ANY REMEDIAL PROMISE INCLUDED IN PRICE SHEET 150. 4 S&C Instruction Sheet 515-510

Safety Information Understanding Safety-Alert Messages There are several types of safety-alert messages which may appear throughout this instruction sheet as well as on labels affixed to the gear. Familiarize yourself with these types of messages and the importance of the vari ous signal words, as explained below. Ç DANGER DANGER identifies the most serious and immediate hazards which will likely result in serious personal injury or death if instructions, including recommended precautions, are not followed. Ç WARNING WARNING identifies hazards or unsafe practices which can result in serious personal injury or death if instructions, including recommended precautions, are not followed. Ç CAUTION CAUTION identifies hazards or unsafe practices which can result in minor personal injury or product or property damage if instructions, including recommended precautions, are not followed. NOTICE NOTICE identifies important procedures or requirements that, if not followed, can result in product or property damage if instructions are not followed. Following Safety Instructions If you do not understand any portion of this instruction sheet and need assistance, contact your nearest S&C Sales Office or S&C Authorized Distributor, or call S&C Headquarters at (773) 338-1000, Monday through Friday between 8:30 AM and 5:00 PM Central Standard Time. (In Canada, call S&C Electric Canada Ltd. at (416) 249-9171, Monday through Friday between 8:00 AM and 5:00 PM Eastern Standard Time.) Thoroughly and carefully read this instruction sheet before operating your Micro-AT Source-Transfer Control. NOTICE Replacement Instructions and Labels If you need additional copies of this instruction sheet, contact your nearest S&C Sales Office, S&C Authorized Distributor, S&C Headquarters, or S&C Electric Canada Ltd. It is important that any missing, damaged, or faded labels on the equipment be replaced immediately. Replacement labels are available by contacting your near est S&C Sales Office, S&C Authorized Distributor, S&C Headquarters, or S&C Electric Canada Ltd. S&C Instruction Sheet 515-510 5

Metal-Enclosed Switchgear Application Step 1 Ground the switchgear enclosure, if it has not yet been permanently grounded. Then install a jumper from the GND terminal on the test accessory to the enclosure. Step 2 Place the manual/automatic operation selector switch in MANUAL. Step 3 Remove the input plug from the input receptacle and immediately transfer it to the shorting receptacle. Refer to the instruction sheet furnished with the switchgear. Ç CAUTION Failure to immediately place the input plug on the shorting receptacle may result in damage to the voltage sensors and voltage limiters that will render the auto matictransfer scheme inoperative. This procedure short-circuits and isolates the secondaries of the voltage sensors, if furnished, and isolates the volt age transformers. Plug the test accessory into the input receptacle. Step 4 If the metal-enclosed switchgear is furnished with optional overcurrent lockout feature and the S&C Current Sensors have not been installed on the high-voltage entrance conductors: Locate, in each entrance bay, the four leads (typically taped to the left-hand side wall of the bay) which are to be subsequently attached to the output terminals of the S&C Current Sensors. Connect these leads to the ground bus. This prevents the induction of voltage from the control source, which could inadver-tently activate the overcurrent-lockout circuit. Step 5 Make up the 120-volt ac test-circuit connections shown in Figure 1 on page 3. The grounded side of the voltage source must be connected to the test accessory terminal marked GND. Otherwise, secondary fuses for components such as switch operators will be in the grounded rather than the ungrounded side of the 120-volt ac source. Step 6 For metal-enclosed switchgear furnished with three-phase voltage sensing: Turn off unbalance detect and set voltage sensing to 2-WIRE. (a) Press the CONFIGURE menu key. (b) Press the NEXT item key (or the LAST item key) repeatedly until unbalance detect is displayed. Then press the CHANGE key. (c) Press each digit of the access code number, then press the ENTER key. (d) Press the or key to change the response to OFF. Then press the ENTER key. (e) Press the NEXT item key (or the LAST item key) repeatedly until voltage sensing is displayed. If the displayed setting is 4-WIRE, then press the CHANGE key. (f) Press the ENTER key. Step 7 Refer to S&C Instruction Sheet 515-500 for instructions on field programming and operation of the Micro-AT Source-Transfer Control, and proceed with the field adjustment and programming and operational testing as discussed therein. 6 S&C Instruction Sheet 515-510

Metal-Enclosed Switchgear Application Step 8 For metal-enclosed switchgear furnished with three-phase voltage sensing: Turn on unbalance detect and set voltage sensing to 4-WIRE. (a) Press the CONFIGURE menu key. (b) Press the NEXT item key (or the LAST item key) repeatedly until unbalance detect is displayed. Then press the CHANGE key. (c) Press each digit of the access code number, then press the ENTER key. (d) Press the or key to change the response to ON. Then press the ENTER key. (e) Press the NEXT item key (or the LAST item key) repeatedly until voltage sensing is displayed. If the displayed setting is 2-WIRE, then press the CHANGE key. (f) Press the ENTER key. Step 9 When testing is completed, de-energize the external 120-volt ac source and remove the connections from the ter minal strip of the test accessory. Unplug the test acces sory from the input receptacle of the source-transfer control. Then remove the input plug from the shorting receptacle and transfer it to the input receptacle. If the leads for the S&C Current Sensors were connected to the ground bus of each entrance bay in Step 4, disconnect them from the ground bus. S&C Instruction Sheet 515-510 7

Pad-Mounted Gear Application Step 1 Ground the switchgear enclosure, if it has not yet been permanently grounded. Then install a jumper from the GND terminal on the test accessory to the enclosure. Step 2 Place the manual/automatic operation selector switch in MANUAL. Step 3 Remove the bolted cover labeled Input Plug and Voltage Limiters to gain access to the input plug and shorting receptacle. Refer to the instruction sheet furnished with the pad-mounted gear. Step 4 Remove the input plug from the input receptacle and immediately transfer it to the shorting receptacle. Ç CAUTION Failure to immediately place the input plug on the shorting receptacle may result in damage to the voltage sensors and voltage limiters that will render the auto matictransfer scheme inoperative. This procedure short-circuits and isolates the secondaries of the voltage sensors and also isolates the current sen sors utilized with the optional overcurrent lockout fea ture, if furnished. Plug the test accessory into the input receptacle. Step 5 Make up the 120-volt ac test-circuit connections shown in Figure 1 on page 3. The grounded side of the voltage source must be connected to the test accessory terminal marked GND. Otherwise, the source-transfer control will not function. Step 6 Turn off unbalance detect and set voltage sensing to 2-WIRE. (a) Press the CONFIGURE menu key. (b) Press the NEXT item key (or the LAST item key) repeatedly until unbalance detect is displayed. Then press the CHANGE key. (c) Press each digit of the access code number, then press the ENTER key. (d) Press the or key to change the response to OFF. Then press the ENTER key. (e) Press the NEXT item key (or the LAST item key) repeatedly until voltage sensing is displayed. If the displayed setting is 4-WIRE, then press the CHANGE key. (f) Press the ENTER key. Step 7 Refer to S&C Instruction Sheet 515-500 for instructions on field programming and operation of the Micro-AT Source-Transfer Control, and proceed with the field adjustment and programming and operational testing as discussed therein. Bear in mind that when the test accessory is used, the control power available will be less than that available during normal three-phase operation. As a result, the time required for the motors to charge the stored-energy opera tors will be greater than normal and, further, it may take as long as two minutes after the stored-energy operators are charged for the solenoid-tripping capacitors to become fully charged. Therefore, wait at least two min utes after the stored-energy operators are charged before initiating a transfer operation. 8 S&C Instruction Sheet 515-510

Pad-Mounted Gear Application Step 8 Turn on unbalance detect and set voltage sensing to 4-WIRE. (a) Press the CONFIGURE menu key. (b) Press the NEXT item key (or the LAST item key) repeatedly until unbalance detect is displayed. Then press the CHANGE key. (c) Press each digit of the access code number, then press the ENTER key. (d) Press the or key to change the response to ON. The press the ENTER key. (e) Press the NEXT item key (or the LAST item key) repeatedly until voltage sensing is displayed. If the displayed setting is 2-WIRE, then press the CHANGE key. (f) Press the ENTER key. Step 9 When testing is completed, de-energize the external 120-volt ac source and remove the connections from the terminal strip of the test accessory. Unplug the test acces sory from the input receptacle of the source-transfer con trol. Then remove the input plug from the shorting receptacle and transfer it to the input receptacle. S&C Instruction Sheet 515-510 9

Vista Undergound Distribution Switchgear Application Step 1 Ground the low-voltage enclosure, if it has not yet been permanently grounded. Then install a jumper from the GND terminal on the test accessory to the enclosure. Step 2 Place the manual/automatic operation selector on the Micro-AT to MANUAL. Step 3 Remove the input plug from the input receptacle (located just to the lower left of the control rack). Step 4 Plug the test accessory into the input receptacle. Step 5 Make the 120-volt ac test-circuit connections shown in Figure 1 on page 3. If an isolation transformer is used, it must be rated for at least 1 kva to provide adequate power for operation. The grounded side of the voltage source must be connected to the test accessory terminal marked GND. Otherwise, the source-transfer control will not function. Then, energize the 120-volt ac source. Step 6 Turn off unbalance detect and set voltage sensing to 2-WIRE. (a) Press the CONFIGURE menu key. (b) Press the NEXT item key (or the LAST item key) repeatedly until unbalance detect is displayed. Then press the CHANGE key. (c) Press each digit of the access code number, then press the ENTER key. (d) Press the or key to change the response to OFF. Then press the ENTER key. (e) Press the NEXT item key (or the LAST item key) repeatedly until voltage sensing is displayed. If the displayed setting is 4-WIRE, then press the CHANGE key. (f) Press the ENTER key. Step 7 Refer to S&C Instruction Sheet 515-500 for instructions on the field programming and operation of the Micro-AT Source-Transfer Control, and proceed with the field adjustment and programming and operational testing as discussed therein. Refer to S&C Instruction Sheet 683-510 for instructions on testing the motor operators and controls. Bear in mind that when the test accessory is used, the control power available will be less than that available during normal three-phase operation. As a result, the time required for a motor operation may be greater than normal. 10 S&C Instruction Sheet 515-510

Vista Undergound Distribution Switchgear Application Step 8 Turn on unbalance detect and set voltage sensing to 4-WIRE. (a) Press the CONFIGURE menu key. (b) Press the NEXT item key (or the LAST item key) repeatedly until unbalance detect is displayed. Then press the CHANGE key. (c) Press each digit of the access code number, then press the ENTER key. (d) Press the or key to change the response to ON. Then press the ENTER key. (e) Press the NEXT item key (or the LAST item key) repeatedly until voltage sensing is displayed. If the displayed setting is 2-WIRE, then press the CHANGE key. (f) Press the ENTER key. Step 9 When testing is completed, de-energize the external 120-volt ac source and remove the connections from the terminal strip of the test accessory. Unplug the test acces sory from the input receptacle of the source-transfer con trol. Then return the input plug to the input receptacle. S&C Instruction Sheet 515-510 11

Printed in U.S.A.