A 130 Year- Old Story

Similar documents
ARCHICAD 22 and STAR(T) Edition Feature Comparison Chart

ARCHICAD 21 and START Edition Feature Comparison Chart 21 SE 2018 SE Complex, Multi-story Elements + + +

3D Scanning Technology in the Transportation Infrastructure: Case Studies from Around the Globe

NEW PERSPECTIVE SEPTEMBER 2017

Integrated Projects. Madonna di Pietranico Pompeii insula V1 V I S UA L COMPUTING L A B I ST I - C N R

With FARO PointSense for Revit. Jörg Braunes Platform Owner Software Chris Palmer Sales Engineer 1

technical notes trimble realworks software

Realworks Software. A Powerful 3D Laser Scanning Office Software Suite

Semi-Automatic Techniques for Generating BIM Façade Models of Historic Buildings

RealWorks Software. A Powerful 3D Laser Scanning Office Software Suite

Trimble Realworks Software

Trimble Indoor Mobile Mapping Solution

Using Laser Scanning technology and software. Chris Palmer Sales Engineer 28 th April

Trimble 3D Laser Scanning TRANSFORMING THE WAY THE WORLD WORKS

Surveyor s. Time Machine. The. Product Review Triumph-LS software. Polaris Shows the Way Leveraging workflow

The application of a SMARTTECH 3D scanner for the production of additional parts / industry: motorcycle accessories

MODELING CITY HALL S FAÇADE USING LASER SCANNING TECHNOLOGY

BEFORE YOU BUY: SEVEN CRITICAL QUESTIONS TO ASK ABOUT LASER SCANNERS. Robert Gardiner

JANUARY 2017 WATER S END. Mobile Mapping. Station to Station. Decided Guidance Indoor application. Implementing BIM. A fixed boundary R E YEARS

The Trimble 3D Scanning Solution: Designed by Surveyors for Surveyors

2017 AGC ACE Awards. Category 4: Best Building Project - Specialty Contractor (Under $2 Million) Contractor: Sturgeon Electric Company, Inc.

TIMMS : FAST, ACCURATE & COST-EFFECTIVE INDOOR MAPPING

Updated to reflect current working practices and software application. Version 2.0 January 2016

GEOMETRY IMPORT HACKS. (Tips & Tricks)

Reality Capture. Customer Case

APPLICATION OF 3D TERRESTRIAL LASER SCANNING IN THE PROCESS OF UPDATE OR CORRECTION OF ERRORS IN THE CADASTRAL MAP

Intelligent photogrammetry. Agisoft

Trimble RealWorks. What s new in version 9.0

Innovative Integrations Boost Designing with BIM

ARCHICAD Template Upgrade

Leica High-Definition Surveying Systems. Leica HDS3000. The Industry Standard for High-Definition Surveying

The Leica HDS Family. The Right Tool for the Job HDS3000 HDS2500 HDS4500. Cyclone & CloudWorx. Press the QuickScan button to define the field-of-view.

IMAGINE DESIGN SHARE

King County Housing Authority Delivers Multimedia Online Help with MadCap Doc-To-Help

How To Reduce the IT Budget and Still Keep the Lights On

Smart Manufacturing in the Food & Beverage Industry

ArchiCAD 11 manual Chapter 1

SUCCESS STORY HÄAGEN-DAZS JAPAN HÄAGEN-DAZS JAPAN DRAMATICALLY IMPROVES USER EXPERIENCE AND PRODUCTIVITY WITH NVIDIA GRID

USE THE 3D LASER SCANNING FOR DOCUMENTATION THE RIGA CATHEDRAL IN LATVIA

At Hewlett Packard Enterprise, an HR Transformation

Point clouds in BIM. IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS

Displayed with permission The American Surveyor April/May Copyright 2009 Cheves Media

Streamline your office to field processes. Peter Madsen

[make]shift: Information Exchange and Collaborative Design Workflows

nora rubber fl oorings LIBRARY ELEMENT FOR ARCHICAD 17+

GIS in security planning of sport events

CUSTOMER SUCCESS STORY GRIMME GRIMME IMPROVES WORKFLOWS AND REDUCES COSTS BY MORE THAN 40% WITH NVIDIA VIRTUAL GPU

BIM for infrastructure make easy with Laser Scanner. 17 October Beng Chieh Quah Head of Marketing Asia Pacific

Improving Your Deliverables with Revit Structure and SDS/2 Connect Doug Evans Vice President Sales, Design Steve Vasquez Vice

Innovation. lidarnews.com. volume 3 issue 5. Points clouds and terrain models support rail project. Structured light scanning for human head modeling

Extract from NCTech Application Notes & Case Studies Download the complete booklet from nctechimaging.com/technotes

Private Cloud Project Leads to Lower Server Footprint and US$595,000 Savings

COMPLEX 3D BIM OCT/NOV PORTABLE NUKE INSPECTIONS Might a backpack and ultra-portable LIDAR technology make the world a safer place?

Quantum, a Data Storage Solutions Leader, Delivers Responsive HTML5-Based Documentation Centers Using MadCap Flare

OPEN-PIT MINE SCANNING IN INDONESIA, HYDRONAV SERVICES OF SINGAPORE

3D Terrestrial Laser Scanner Innovative Applications for 3D Documentation

FARO As-Built for AutoCAD Software Versatile Reality to CAD Solutions

Effective Collaboration Techniques for the Architect and Consulting Engineer Using Copy/Monitor in Autodesk Revit

DEVELOPMENT OF OPERATIONAL MANUALS. Jason Whittaker. Goulburn Valley Water

123D Catch - Tutorial

Scan-to-BIM. NEWBIM ApS, Galina Slavova CEO, BIM Specialist

Delivering the value of BIM to Smart Mobile Devices

CLICK HERE TO KNOW MORE

PhotoScan. Fully automated professional photogrammetric kit

User Manual PointCab 2

The Most Comprehensive Solution for Indoor Mapping Applications

CAPTURING REALITY AT CENTRE BLOCK

Welcome to ARCHICAD 22

CASE STUDY VOLUNTEERING UX EXPERTISE TO INCREASE ONLINE DONATIONS BY 650% FOR THE HUNGARIAN RED CROSS

The All-in-One Solution for General Design, BIM and Mechanical

A new geodetic methodology for the accurate Documentation and Monitoring of inaccessible surfaces.

Why This Major Energy Company Surged Back to BlackBerry After Trying AirWatch

MAPSITE - INTERNET MAP SERVICE OF THE NATIONAL LAND SURVEY OF FINLAND GETS DRESSED IN MODERN TECHNOLOGY

Advanced Parcel Editing. Amy Andis Tim Hodson

Decommissioning Legacy Networks

product overview CRASH

Steven A. Schafer and Roy S. Rogers, IV Fenestra Technologies Corporation, Century Blvd. Ste. 230, Germantown, MD 20874

Seifferth GmbH: Faster Prototyping with 3D Scanners

DIGITALGLOBE ENHANCES PRODUCTIVITY

Trimble Business Center Software, v3.30

Interoperability with Structural Disciplines

News on The Use of Laser Scanning Technology. Continued on page 4

PhotoScan. Fully automated professional photogrammetric kit

Flash Decisions: Which Solution is Right for You?

Drones and Supercalculators : A New Field of Investigation in Photogrammetry.

Business Process Outsourcing

Revit Architecture Syllabus Total duration: 80 hours (Theory 40 Hours + Lab 40 Hours)

Data Center Management and Automation Strategic Briefing

Storage Tank Solutions TRANSFORMING THE WAY THE WORLD WORKS

aveva.com LASER FOCUSED How the use of laser scanning and 3D modelling is modernising shipyard operations WHITE PAPER September 2017

Typical Website Design & Development process

Indoor. Heritage Preservation CAD versus Cloud. inside. Applanix and CSIRO. Grows with LiDAR. Vol. 2 Issue 4 ABOVE & BEYOND. ipad & Tablet Ready!

Tutorial (Intermediate level): 3D Model Reconstruction of the building with Agisoft PhotoScan 1.0.0

Bring your BIM models to life.

Autodesk Revit Architecture. Design without compromise.

In addition, the purge functionality is also available for Generated Statements and Spot Bonus awards to cover the Compensation core functionality.

TITLE CLOUD BASED VIDEO ANIMATION RENDERING MANAGEMENT SYSTEM INVENTOR: Thomas Ryan Mikota, of Orem Utah

Embarking on the next stage of hosted desktop delivery for international events management company

What s new in SketchUp Pro?

Welcome to ARCHICAD 22

Transcription:

A 130 Year- Old Story The Architectural Survey of the Hungarian State Opera CÉH Inc. of Budapest, Hungary was tasked with the enormous task of measuring and modeling the Hungarian State Opera House. The combination of building surveying with geodetic methods and architectural 3D modeling, with the help of point cloud technology, made it possible to develop a detailed 3D model of this elaborate building while it remained in use. The final model is being used for the ongoing renovation process and will be used later for the management of the historic building as well. CÉH Inc. Type: Cultural Year of the survey: 2016 Size: 58.000 ft 2 /25.000 m 2 Software used: GRAPHISOFT ARCHICAD, Trimble RealWorks, Faro Scene Cover Image: Auditorium white render

360 view of the Auditorium Hungarian State Opera Hungarian State Opera House A 130-year-old story The decision to build the Hungarian Opera House was made in 1873. Following a public tender, the jury selected the design submitted by famed Hungarian architect, Miklós Ybl (1814-1891). Construction of the neo-classical building began in 1875 and, despite minor delays, was completed nine years later. The opening night to which Emperor and King Franz Joseph was also invited was held on September 27, 1884. Miklós Ybl s neo-renaissance palace has remained virtually unchanged in the 130+ years since, and continues to attract admirers of opera and ballet alike with its repertoire and worldclass acoustics. Each year, thousands of tourists visit the building to take in one of Budapest s most impressive 19th century national monuments.

Building survey and its challenges Surveying Process Video by CÉH s assignment was to complete a survey of the Hungarian State Opera House and its other buildings (shop, sales center, offsite storage, rehearsal hall, warehouses, offices and workshops) and, based on the point cloud data, to develop an architectural model of the current state of the buildings. The collected data was processed using Trimble RealWorks 10.0 and Faro Scene 5.5. It is important to note, that obtaining the data took considerably less time than to process it. Even though data processing took place essentially in tandem with the survey, the building s complicated structure and spaces, as well as the complexity of the project made processing a lengthy task. The tandem surveying and processing workflow caused additional difficulties. Every newly-received point cloud detail had to be perfectly fit into the developing model based on the previous point cloud material. There was no time to update the already submitted materials. Given the fact that the survey was done while the Opera House was in use, it was impossible to survey whole building blocks in their entirety. There were inaccessible rooms and the warehouses had to be vacated. This meant many rounds of surveying until a certain building block could be finished. The result was a slower survey and registration process that also required significant administrative work.

The assembled point cloud merged together with the ARCHICAD 19 model Although there were many spheres and checkerboards on hand, the Opera s workers would accidentally move these tools, which prevented the surveyors from later aligning the point clouds. As time passed, however, the two crews got used to each other, and everyone s work proceeded more smoothly. Managing the files was greatly helped by using GRAPHISOFT BIMcloud, which provided access to the file from practically anywhere in the world, at good speeds. Gábor Horváth, lead architect, CÉH Certain spaces in the building (like the props warehouse) were always changing, or else the surfaces of these spaces were too complex for the measuring instruments (e.g. the rigging system covered by a steel mesh, black surfaces backstage), which hampered the process of obtaining exact measurements. The most difficult and time-consuming part of the job was surveying the vaulted, sometimes zig-zag spaces, which constitute the auxiliary and mechanical areas of the building on the lower levels. The elevations, too, presented the surveyors with similar vaulted structures the legacy of the original 19th century architect, Miklós Ybl.

The props and other equipment often obscured key surfaces, such as walls and floors. In these cases, survey results can be the base of only a very rough 3D model. Photos and videos would prove very useful in documenting the details of the spaces not accessible by the scanner. The raw measurement data was imported to Faro Scene 5.5 for pre-processing and Trimble RealWorks 10.0 for finalizing the measurements, which took considerable time; the exported point cloud files were also very large. Both types of data are very hardware-intensive. Point cloud detail of the main Auditorium and the attic space above it The same detail modeled in ARCHICAD 19

Managing the point cloud library The point cloud shown in Trimble RealWorks File size is a significant factor in terms of data management. Since an enormous amount of point clouds was produced and the pointcount was as high as 40 million points per room, it was impossible to connect them as they were. First, the point-count had to be reduced using Trimble RealWorks. After this process, a digit could be cut off; the team ended up connecting smaller point clouds of 3-4 million points. Blocks of 20-30 million points were then assembled and saved from these reduced point clouds with the maximum density of 1 point per sq cm. This size is still dense enough and contains enough detail for the modeling work done in ARCHICAD. After the registered and reassembled point cloud file was exported in E57 format, readable by the design software, the team of architects could begin their work. ARCHICAD 19 was a significant asset in the modeling process. Managing the files was greatly helped by using GRAPHISOFT BIMcloud, which provided access to the file from practically anywhere, at acceptable speeds. This was no small achievement, since the full project file exceeded 50 Gb.

The final ARCHICAD model in section view Model development Analysis of the building s 3D mass began with the help of an old 2D survey plan. This 2D material was refined and augmented by the point cloud. The main deviations from the available 2D plans were obvious from the beginning. The building s stories, with their many and varied levels, presented the most challenges. A renovation in 1984 introduced new, more modern structures (such as steel supports for the rigging system). The availability of these renovation plans helped in understanding the complex steel structures, since the surveying equipment was not capable of detecting certain narrow elements clearly and understandably. The same was true for the constantly moving parts of the building such as the steel stage structure - which remained in use during the survey.

Almost every geometry could be modeled with ARCHICAD. Very complex elements, like the statues, were created in other software and then imported into ARCHICAD as triangulated 3D surfaces (Meshes). The polygon-count of these elements is very high, so they were added to the model in the final stage. Statues of the façade shown in the ARCHICAD model The architects biggest constraint in this case was hardware capacity. Both the point cloud and the model file tended to be very large, which made file management more difficult. With smart tricks, library and layer management, a smaller file size could be achieved that made it possible to deal with the model more easily. An important issue was to purge embedded library elements, since they increase the file size, which may not be a problem with a smaller model, but in this case the original geometry was already a high-polygon one. Another important issue was to save redundant elements as Objects in order to reduce file size and to make the 2D navigation smoother. This way, one Object could be placed as many times as needed, instead of multiple Morphs or other elements. Of course, this didn t reduce polygon-count so 3D performance wasn t affected fundamentally, but it did affect file size and the 2D-handling of the file. This could be refined even more with simple 2D symbols defined for the Objects.

Rendered façade of the final ARCHICAD model With smart layer combinations for example, by making it possible to switch off the polygon-heavy decorative elements 3D-navigation and additional 3D modeling became more manageable. Finally, the many hours of work and effort paid off with the result: a building model that anyone can explore on their own device. This success required the surveying process to be planned and scheduled in detail, since the surveyors could not always access all parts of the building. Continuous and effective work on the surveying and modeling tasks required the dedicated, consistent cooperation between the staff of the Hungarian State Opera House and the CÉH team of engineers who are proud that their achievement serves to support the preservation and renovation of the building and of Hungarian culture.

BIMx Lab video The Hungarian State Opera s survey model shown in BIMx Lab Model: Presentation video made by GRAPHISOFT The Opera model in BIMx Lab Although the ARCHICAD model was smartly optimized to be easily manageable for all possible uses, the full final model still contains close to 27,5 million polygons and approximately 29,000 BIM elements. This BIM model size was hardly manageable with GRAPHISOFT s mobile product, BIMx. The recently published BIMx Lab, a technology preview version of BIMx, was optimized so that it can handle huge and detailed models with polygon-counts previously unimagineable. According to the BIMx development team, when using the new BIMx engine, the size limitation moves back to ARCHICAD; every model ARCHICAD can handle is easily navigable in BIMx Lab! Download the BIMx Lab app from the Apple App Store (technology preview). To experience its capabilities, the BIMx Lab model of the Hungarian State Opera House has been made available as well.

About CÉH Inc. CÉH Planning, Developing and Consulting Inc. as the leading engineering business of the CÉH Group is a key player in the Hungarian planning and development market. During over 25 years of operation, CÉH has amassed significant experience in the preparation, planning and construction of buildings and the project management services associated with implementation. CÉH employ a team of professionals covering all engineering activities associated with all development and design disciplines. CÉH has some 80 full-time employees as well as over 10 affiliates and 150-200 contracted partners to provide comprehensive services for its clients. They have carried out projects involving multiple engineering tasks in a large number of complex development projects at a national scale where they single-handedly delivered the full range of engineering services to their clients. Due to CÉH s personnel having several years of domestic as well as international experience, they are able to manage the entire BIM process. Their efforts are confirmed by the success of a portfolio consisting of more than 150.000 m2 in implemented BIM projects. CÉH Inc. s architects have been using ARCHICAD for more than 10 years. They currently have 26 seats and use BIMcloud as well. Three- seven architects worked on the case study project using ARCHICAD 19.