16Hi HARDWARE INSTALLATION GUIDE

Similar documents
Arcserve UDP 8100 and UDP 8200

HARDWARE INSTALLATION GUIDE. Arcserve UDP 8100 and UDP 8200 Appliance Hardware Installation Guide

Lightspeed Advanced Reporting Bottle Rocket Hardware Installation Guide

LVN5200A-R2, rev. 1, Hardware Installation Guide

HP UPS R/T3000 ERM. Overview. Precautions. Installation Instructions

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

LifeSize ClearSea Installation Guide August 2012

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

HP R/T2200 UPS. Overview. Precautions. Installation Instructions. The HP UPS R/T2200 features power protection for loads up to 2200 VA/1600 W.

350 East Plumeria Drive San Jose, CA USA February

System Storage EXP3000 Rack Installation Instructions

G5 PDU Installation Guide

350 East Plumeria Drive San Jose, CA USA May

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options

Installing the Cisco MDS 9020 Fabric Switch

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual.

CHASSIS INSTALLATION GUIDE

Serial ATA Hot Swap Drive Cage Upgrade Kit for: Intel Server Chassis SC5200 Intel Server Chassis SC5250-E

ReadyNAS OS 6 Rack-Mount Hardware Manual

Dual-Feed 80A Auto Low Voltage Disconnect Panel - 80LVD02

IBM. Rack Installation Instructions

VelaSync HIGH-SPEED TIME SERVER. Quick Reference Guide

4-Post and Universal Telco Frame (UTF) Rack Mount Kit Installation Instructions

JanusRAID SA-6692J Hardware User Manual

SCv360 Expansion Enclosure

2U Server. User Manual

Rack Installation Instructions

Titan Media Cart. Installation and Operation Manual

Unified Office Gateway UMG Quick Installation Guide. Version: 1.0

Rack Installation Instructions

1 Getting Started Installing & Configuring

PIX 515/515E. PIX 515/515E Product Overview CHAPTER

Before you begin. Installation and Setup Instructions for E-Series 60-Drive Trays. Unpack & Prepare. Install Hardware. Connect Hardware.

Table of Contents. 1. Introduction Package Contents Function Installation Web Interface... 4

Dell Networking S4810 Open Networking (ON) Getting Started Guide

Before you begin. Unpack & Prepare. Install Hardware. Connect Drive Shelves. Apply Power. Connect Data Hosts. Connect Ethernet Cables

apple Service Source Xserve RAID 17 March Apple Computer, Inc. All rights reserved.

User s Guide. Mobile Rack Device Mounting Kit for Echo Express III-R and xmac Pro Server. Quick Start Guide Video Available Online!

Installation and Maintenance

apple Service Source Xserve RAID Xserve RAID and Xserve RAID (SFP) Updated: 25 May Apple Computer, Inc. All rights reserved.

Installing the Server into a Rack

Junos WebApp Secure 5.0 Hardware Guide

Rack Installation Instructions

100 - SERIES NETWORK SWITCHES QUICK START GUIDE

Rack Installation Instructions

Microsoft Azure StorSimple Appliance 8600 Hardware Installation Guide

Heat Containment System (HCS)

TRC-190 User s Manual

FVT/FVR20D2I1C4E INSTALLATION AND OPERATION MANUAL

Power Supply and Fan Module Installation

1. Unpacking the System

SMAVIA Enterprise Storage JBOD Commissioning

Installation Job Aid for Ethernet Routing Switch 5900 Series

Switched XPDU. 15A Model. User & Installation Manual Xtreme Power Conversion Corporation. All rights reserved.

Follow the procedure below for unpacking the carton in which the device is shipped. DW-GTW-AC-E1060 Four anti-slide bumpers for desktop installation

Oracle <Insert Picture Here>

TRC-190 User s Manual

Installing the Cisco SFS 3504 Server Switch

User Manual. Per Port Monitoring Models

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

Power Supply Installation

ReadyNAS Rack-Mount Storage Systems

Dell Networking S4100-ON Series. Set-Up Guide

D-Link Switch User Manual. Table of Contents

Dell MD1280 Storage Enclosure Getting Started Guide

System Storage DS3950 Quick Start Guide

64 Bays SAS to SAS/SATA JBOD Subsystem. User Manual. Revision 1.0

Dell Networking C9010 Getting Started Guide

Assembling the Rack-Mounted MAP/100P

Eaton Heat Containment System (HCS) Installation Guide

Installation and Getting Started Guide. HP ProCurve 600/610 External Power Supplies. PoE. Power over Ethernet Devices

Dell SC460 Expansion Enclosure Getting Started Guide

HP EVA4400 M6412 drive enclosure

Dell SC5020 and SC5020F Storage Systems Getting Started Guide

INSTRUCTION MANUAL RA 59 RACK ADAPTER. 1) This manual is valid for the following Model and associated serial numbers: MODEL SERIAL NO. REV. NO.

Installation Job Aid for Ethernet Routing Switch 3600 Series

actilib Library 2U Quick Start Guide

HPE Intelligent Power Distribution Unit Installation Instructions

Removal and Installation8

Table of Contents Quick Install Guide page Introduction Safety Rack System Precautions ESD Precautions...

Installation Job Aid for Avaya Virtual Services Platform 8400

Installation and Configuration Guide

Vertiv Local Rack Access 18.5" LED LCD Console

Installation Note for the Cisco ME 3800X and ME 3600X Switch Power Supply and Fan Modules

PRISMA VelaSync HIGH-SPEED TIME SERVER. Getting Started Guide

easyraid Q24P2-U4R4 Hardware Manual

Juniper Secure Analytics Quick Start Guide

ProLiant ML350 Tower-to-Rack Conversion Guide. First Edition (September 2000) Part Number Compaq Computer Corporation

SCv3000 and SCv3020 Storage System. Owner s Manual

Installing the IPS 4345 and IPS 4360

Flat Panel Static Wall Mount MSP-SS (GSM-210)

Model 2380 Rack-Mount Kit

Installation Job Aid for VSP 4450GTX-HT- PWR+

Polycom VMC 1000 Version 2.0 Getting Started Guide

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

S5048F-ON. Set-up Guide

Dell SC7020 Storage Controller Getting Started Guide

300 - SERIES NETWORK SWITCHES QUICK START GUIDE

Installing the IPS 4260

Transcription:

16Hi HRDWRE INSTLLTION GUIDE

Table of Contents Section 1 Ratings....................................................................... 3 Section 2 Site Preparation................................................................ 3 Section 3 Unpacking the 4 Post Rack Installation ssemblies................................... 4 Section 4 4 Post Rack Installation with Standard Rails......................................... 5 Section 4B 4 Post Rack Installation with Quick Mount Rails (square hole rack only).................. 6 Section 5 Installing the ppliance in the 4 Post Rack.......................................... 7 Section 6 Unpacking the 2 Post Rack Installation Hardware.................................... 8 Section 7 2 Post Rack Installation.......................................................... 9 Section 8 Installing the ppliance in the 2 Post Rack.......................................... 10 Section 9 Rear Panel Connections......................................................... 11 Section 1o Front Panel Operation........................................................... 13 NetSpective Web Filter 16Hi Hardware Installation Guide Page 2

1. Ratings C input voltage: 100 240V~ Input frequency range: 50/60 Hz Rated input current: 6.1 2.6 (x2) 2. Site Preparation Setup location, rack and appliance precautions Elevated Operating mbient Temperature If installed in a closed or multi unit rack assembly, the operating ambient temperature of the rack environment may be greater than room ambient temperature. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (Tma) specified by the manufacturer. lways keep the rack s front door and all panels and components on the appliances closed when not servicing to maintain proper cooling. Reduced ir Flow Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised. Leave enough clearance, approximately 25 inches in the front, and 30 inches in the back of the rack to enable you to access appliance components and allow for sufficient air flow. Mechanical Loading Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading. LL RCKS MUST BE MOUNTED SECURELY. Ensure that all leveling jacks or stabilizers are properly attached to the rack. If installing multiple appliances in a rack, make sure the overall loading for each branch circuit does not exceed the rated capacity. Do not slide more than one appliance out from the rack at a time. Extending more than one appliance at a time may result in the rack becoming unstable. Install your appliance in the lower part of the rack because of its weight and also for ease in accessing appliance components. Circuit Overloading Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring. ppropriate consideration of equipment nameplate ratings should be used when addressing this concern. Reliable Earthing Reliable earthing of rack mounted equipment should be maintained. Particular attention should be given to supply connections other than direct connections to the branch circuit (e.g. use of power strips). Install near appropriate C outlets, and Ethernet hubs or individual jacks. Be sure to install an C Power Disconnect for the entire rack assembly. The Power Disconnect must be clearly marked. Ground the rack assembly properly to avoid electrical shock. NetSpective Web Filter 16Hi Hardware Installation Guide Page 3

3. Unpacking the 4 Post Rack Installation ssemblies Verify that the ship kit includes one of the following installation assemblies Installation ssembly Standard Rail ssemblies with Mounting Hardware Two power cords* set of 4 post rack mounting hardware** (Eight) M5 x 12 Phillips flat head screws (Eight) M5 x 12 cone washers (Ten) M5 cage nuts (Two) 10 32 x 3/4 Phillips pan head screws (used to secure the appliance in the rack) pair of 4 post rack sliding chassis rail rack assemblies that attach directly to the rack NOTE: Use the hardware supplied with your specific rack if different from the hardware supplied in this kit. * NOTE: Only two power cords will be included in your ship kit even if you receive multiple rail kits. ** NOTE: There may be additional mounting hardware included that will not be used with this installation assembly kit. Rack rail assembly, inside view djustable front rack rail assembly djustable rear rack rail assembly Rack rail assembly, outside view Installation ssembly B Quick Mount Rails (for use in 4 post racks with square holes only) Two power cords* Two 10 32 x 3/4 Phillips pan head screws** (Two) 10 32 x 3/4 Phillips pan head screws (used to secure the appliance in the rack) pair of adjustable quick mount rack rail assemblies (requires no additional mounting hardware or tools) Quick-mount rack rail assembly, inside view djustable front quick-mount rack rail assembly djustable rear quick-mount rack rail assembly Quick-mount rack rail assembly, outside view NetSpective Web Filter 16Hi Hardware Installation Guide Page 4

4. 4 Post Rack Installation with Standard Rails Locate the mounting hardware and rack rail assemblies shown below Step 1 Locate the two adjustable standard rack rail assemblies. Insert the tabs on the front section of the adjustable rack rail assembly through the openings in the rear sections of the assemblies. Check to make sure the adjustable rack rail assemblies are connected correctly, then slide the front section forward and the rear section back to keep them from coming apart. These assemblies adjust to accommodate different rack depths. Rack bracket tab NOTE: The installation procedures for Sections 6 below, and 6B, 4 Post Rack, and on page 9 are for use with the rails and hardware provided in your ship kit. If different style rails are being used, or if your rack requires different hardware, refer to the instructions provided with your rail s or rack s ship kit. Rack bracket tabs the adjustable rack rail assembly the adjustable rack rail assembly Step 2 Insert a cage nut into each of the square holes in the rack you will be using as shown (three in the front and two in the rear). They click into place. ttach the rack/rail assemblies to the rack using two M5 x 12 flat head screws and cone washersin the front and back. The convex side of the conewashers face toward the rack. djustable rack rail assemblies 4-post rack Empty hole Empty hole Make sure the rack/rail assemblies and screws are aligned in the rack not only in the front and back, but are level in height on the left and right sides for proper alignment for appliance installation. Empty hole NetSpective Web Filter 16Hi Hardware Installation Guide Page 5

4B. 4 Post Rack Installation with Quick Mount Rails (square hole rack only) Locate the quick mount rack rail assemblies shown below Step 1 Locate the two adjustable quick mount rack rail assemblies. Insert the tabs on the front section of the adjustable rack rail assembly through the openings in the rear sections of the assemblies. Check to make sure the adjustable rack rail assemblies are connected correctly, then slide the front section forward and the rear section back to keep them from coming apart. These assemblies adjust to accommodate different rack depths. Rack bracket tab the adjustable rack rail assembly Rack bracket tabs the adjustable rack rail assembly Step 2 Quick mount rail Installation in the square hole rack:. Insert the quick mount rail tabs on the front of the rack rail assembly through the selected set of square holes in the rack. djustable quick-mount rack rail assemblies C Empty hole NOTE: There is a threaded hole between the two quick mount tabs in the rail assembly. This hole will be used to secure the appliance in the rack later in this guide. B. Push the tabs into the holes in the rack until you hear the locking mechanism on the rail assembly click into place. The locking mechanism secures the rails to the rack. C. Slide the rail assembly to the back of the rack. D. In the rear, insert the quick mount rail tabs through the square holes level with the front installation. E. Push the tabs into the holes until you hear the rear locking mechanism click into place. Repeat these steps for the other side of the rack.* 4-post rack Quick-mount rail tabs (side view) B Quick-mount locking mechanism D Quick-mount rail tabs (angle view) Empty hole Quick-mount rail locking mechanism * NOTE: Make sure the quick mount rail assemblies are aligned in the rack not only in the front and back, but are level in height on the left and right sides for proper alignment for appliance installation. E NetSpective Web Filter 16Hi Hardware Installation Guide Page 6

5. Installing the ppliance in the 4 Post Rack lign the inner fixed chassis rails on the appliance with the fixed chassis rack rail assemblies previously installed in the rack. Carefully slide the appliance into the rack rails until you hear the locking tabs on the chassis rails click into place. Push the appliance all the way into the rack until it stops. Secure the unit in the rack by inserting and tightening two 10 32 x 3/4 Phillips pan head screws, one on each side. djustable rack rail assemblies (standard or quick-mount) Two 10-32 x 3/4 * Locking tab Fixed chassis rail NOTE: When removing the appliance from your rack, you will need to press down on the locking tab in order to release it from the rack. Carefully slide it out supporting the unit on both sides at all times. NetSpective Web Filter 16Hi Hardware Installation Guide Page 7

6. Unpacking the 2 Post Rack Installation Hardware Verify that the ship kit includes the following installation hardware Installation Hardware Two power cords* set of 2 post rack mounting hardware** (Eight) M5 x 12 Phillips flat head screws (Twenty two) M4 x 4 Phillips truss head screws Two pairs of 2 post rack mounting brackets 4 (Four) Fixed 2-post rack brackets (Two) 10 32 x 3/4 Phillips pan head screws (used to secure the appliance in the rack) NOTE: Use the hardware supplied with your specific rack if different from the hardware supplied in this kit. * NOTE: Only two power cords will be included in your ship kit even if you receive multiple rail kits. ** NOTE: There may be additional mounting hardware included that will not be used with this installation assembly kit. Inside front view Outside front view pair of 2 post rack mounting brackets with threaded holes 2 (Two) Fixed 2-post rack brackets with threaded holes Inside front view Outside front view pair of 2 post rack assemblies that attach directly to the rack 2 Post Rack rail assembly, inside view 2 Post Rack rail assembly, outside view NetSpective Web Filter 16Hi Hardware Installation Guide Page 8

7. 2 Post Rack Installation Unpack the appliance and locate the mounting hardware Step 1 Locate the two long and six short rack brackets that came in your ship kit.. Securely attach the set of short brackets with the threaded screw holes to the long bracket in the front as shown. Use two M4 truss head screws for each bracket. B. Loosely attach one set of the other short brackets to the long fixed bracket as shown using one M4 truss head screw on each bracket. The three holes on the flap will face toward the back for later attachment to the 2 post rack. C. Loosely attach the remaining set of short brackets to the long fixed bracket as shown using one M4 truss head screw on each bracket. The three holes on the flap will face toward the front for later attachment to the 2 post rack. B C NOTE: The installation procedures below for Section 9, 2 Post Rack are for use with the rails and hardware provided in your ship kit. If different style rails are being used, or if your rack requires different hardware, refer to the instructions provided with your rail s or rack s ship kit. B C NOTE: Once the assembled rails are attached to the rack, securely tighten the single screws on steps B and C. Step 2 ttach the assembled brackets to the 2 post rack.. Insert two M5 x 12 flat head screws through the short brackets into the 2 post rack (in the front and back of the rack as shown) and tighten. Make sure the brackets are aligned and level in height, not only in the front and back but also on the left and right sides. B. Tighten each of the single screws on the small fixed brackets (located on either side of the rack) to secure the brackets in the rack and ensure appliance stability. * B B NetSpective Web Filter 16Hi Hardware Installation Guide Page 9

8. Installing the ppliance in the 2 Post Rack lign the inner fixed chassis rails on the appliance with the fixed chassis rack rail assemblies previously installed in the rack. Carefully slide the appliance into the rack rails until you hear the locking tabs on the chassis rails click into place. Push the appliance all the way into the rack until it stops. Secure the unit in the rack by inserting and tightening two 10 32 x 3/4 Phillips pan head screws, one on each side. Two 10-32 x 3/4 * NOTE: When removing the appliance from your rack, you will need to press down on the locking tab in order to release it from the rack. Carefully slide it out supporting the unit on both sides at all times. NetSpective Web Filter 16Hi Hardware Installation Guide Page 10

9. Rear Panel Connections CUTION Slide rail/mounted equipment is not to be used as a shelf or a work space. B C D E F G H J L N P I K M O Q R S T Power Supply Module #1 K Power Good LED #2 B C Power Inlet #1 L Power Supply Lock #2 C Power Supply #2 M USB Port 1 (generation 2) D C Power Inlet #2 N USB Port 2 (generation 2) E COM Port O USB Port 3 (generation 3) F Remote Management Port P USB Port 4 (generation 3) G 1 GbE Quad Port NIC Card Q Network Interface Connection (NIC) #1 H Quick ssist ccelerator Card R Network Interface Connection (NIC) #2 I Power Good LED #1 S VG Port J Power Supply Lock #1 T 10G Ethernet Dual Port Fiber LC, PCIe 2.0 x8 NetSpective Web Filter 16Hi Hardware Installation Guide Page 11

9. Rear Panel Connections (continued) 1 3 2 2 2 Step 1: Step 2: Step 3: Connect the Ethernet cables. Connect any other required cables. Connect the power cords. Proceed to Section 10, Front Panel Operation on page 13. Power Supply Status LED There is a single bi color Power Good LED on each power supply module to indicate power supply status. The LED operation is defined in the table below. CUTION The power supply is hot swappable only when you have a server with redundant power supplies installed. If you only have one power supply installed, before removing or replacing the power supply, you must first take the server out of service, turn off all peripheral devices connected to the server, turn off the server by pressing the power button, and unplug the C power cord from the server or wall outlet. NOTE: The server offers redundant, hot swap capability. The connections to C mains should be made in a manner appropriate to local code and consistent with customer power distribution with or without redundant sources. Output ON and OK Power Supply Condition No C power to both power supplies C present / Only 5VSB on (PS off) C cord unplugged or C power lost; with a second power supply in parallel still with C input power Power supply warning events where the power supply continues to operate; high temp, high power, high current, slow fan Power supply critical event causing a shutdown; failure, OCP, OVP, fan fail LED State GREEN OFF MBER OFF 1Hz Blinking MBER MBER In normal operation the Power Good LED on Power Supply Module 1 and Module 2 will be SOLID GREEN. If the power is down, both LEDs will BLINK GREEN. NetSpective Web Filter 16Hi Hardware Installation Guide Page 12

10. Front Panel Operation 1 2 Power on the appliance 1. Remove the front bezel (if it is on the appliance) by pressing in on the left side of the bezel to release it from the appliance. 2. Press the power button located on the far right on the front side of the appliance. 3. Once the system has been powered on, replace the bezel. Blue LED Red LED NIC2 LED NIC1 LED HDD LED Power LED 3 I/O Power NetSpective Web Filter 16Hi Hardware Installation Guide Page 13

Corporate Office Grom Educational Services, Inc. 3280 Pointe Parkway, Suite 2500 Peachtree Corners, G 30092 Phone 678 459 1410 Fax 678 459 1411 Email netspectivewebfilter@gromedu.com www.gromedu.com Copyright Grom Educational Services 2018