SIMATIC HMI. Configuring Graphics Displays. Product Brief. Edition 12/01. Table of Contents. Introduction. Commissioning Operating Units

Similar documents
Siemens Drives & PLCs

SIMATIC PC. Panel PC Industrial Lite Without Operating System. Preface, Table of Contents

Aotewell SIMATIC S7-PDIAG for S7-300 and S Configuring Process Diagnostic Getting St

SIMATIC PC. Panel PC 577 Installation Using the Docu & Drivers CD 10/2005. Preface, Table of Contents. Introduction 1.

SIMATIC PC. Panel PC 677 and PC 877 Installation Using the Docu & Drivers CD 04/2005. Preface, Table of Contents. Introduction 1.

First Steps with S7-PDIAG and ProAgent

SIMATIC HMI. Configuration Support for Migrators Migration to Windowsbased. Preface, Contents. Converting ProTool Projects 1.

SIMATIC PC. Panel PC 870 V2: PC 870 V2 Installation Using the Docu & Drivers CD 06/2004. Preface, Table of Contents. Introduction 1.

SIMATIC HMI. Software RemoteOperate V2. Preface. Overview 1. Range of functions of the RemoteOperate software. Hardware and software requirements

Creating the program. TIA Portal. SIMATIC Creating the program. Loading the block library 1. Deleting program block Main [OB1]

SIMATIC HMI. ProAgent/PC and ProAgent/MP. Printout of the Online Help. Release 12/01 A5E

SIMATIC. Process Control System PCS 7 OS Process Control (V8.1) Preface 1. Additional documentation 2. Functions of the PCS 7 OS in process mode 3

Siemens Distributor SIMATIC. WinAC MP for MP370 V3.1. Preface, Contents. Product Overview. Transferring WinAC MP to the Multi Panel

SIMATIC Easy Motion Control. Getting Started Edition 02/2003. First Steps in Commissioning

SIMATIC HMI. WinCC V7.4 SP1 SIMATIC HMI WinCC V7.4 Getting Started. Welcome 1. Icons 2. Creating a project. Configure communication

SIMATIC. S7/HMI SIMATIC Automation Tool V3.1 SP1 product information. SIMATIC Automation Tool features 1. Known problems. Product Information

SIMATIC. Process Control System PCS 7 OS Process Control (V8.1) Security information 1. Preface 2. Additional documentation 3

Team engineering via Inter Project. Engineering. TIA Portal. Team engineering via Inter Project Engineering. Basics of "Inter Project Engineering"

Preface 1. Main Management System 2. Contact Information 3 SIPLUS CMS. SIPLUS CMS4000 X-Tools - User Manual Main Management System.

SIMATIC HMI. WinCC V7.0 SP1 Setting up a Message System. WinCC Alarm Logging 1. Message System in WinCC 2. Principles of the Message System

Readme SiVArc V14 SP1 Update 6

SIMATIC. Communications processor CP 340 first commissioning steps. Getting Started 04/2005 A5E

Preface 1. Device Management System 2. Contact Information 3. User Manual Device Management System. English. Release

DANGER indicates that death or severe personal injury will result if proper precautions are not taken.

SIMATIC. Process Control System PCS 7 Operator Station. Preface, Contents. The PCS 7 OS 1 Introduction to PCS 7 OS Configuration

Preface 1. Master Data System 2. Contact Information 3. User Manual Master Data System. English. Release English

MindSphere. Visual Explorer. Introduction. User roles for "Visual Explorer" Connecting "Visual Explorer" to MindSphere data. Creating Visualizations

SIMATIC. Process Control PCS 7 V7.0 PCS 7 OS Process Control. Preface, Contents. Additional Documentation 1 Functions of the PCS 7 OS in Process Mode

Preface 1. X-Tools Client 2. Contact Information 3. User Manual X-Tools Client. English. Release English. Release / 25

SIMATIC. Process Control System PCS 7 Advanced Process Functions Operator Manual. Preface. Security information 1. Overview 2. Material management 3

Preface Master Data System Contact Information SIPLUS CMS

Preface 1. Device Management System 2. Contact Information 3. User Manual Device Management System. English. Release

Preface 1. Storage System 2. Contact Information 3 SIPLUS CMS. SIPLUS CMS X-Tools - User Manual Storage System. English.

Deckblatt. APL Operator Guide SIMATIC PCS 7. Application description June Applikationen & Tools. Answers for industry.

Continuous Function Chart Getting. Started SIMATIC. Process Control System PCS 7 Continuous Function Chart Getting Started.

SIMATIC HMI. WinCC flexible 2004 Micro. Preface. Introduction to WinCC flexible Micro 1. WinCC flexible Engineering System.

SIMATIC. STEP 7 PLUS TIA Portal Teamcenter Gateway. Introduction to TIA Portal Teamcenter Gateway 1. System requirements 2

RF-MANAGER simulator SIMATIC. RFID-Systems RF-MANAGER simulator. Simulating projects. Compact Operating Instructions 06/2010 A5E

MindSphere. Fleet Manager. Introduction to "Fleet Manager" 1. User interface for "Fleet Manager" 2. User rights in "Fleet Manager" 3.

PD PA AP How To Configure Maxum II TimeServer Access

Getting Started - Startdrive. Startdrive SINAMICS. Introduction 1. Connecting the drive unit to the PC. Creating a project 3

SIMATIC. Component based Automation - WinLC PN Addendum to WinAC Basis V3.0. Foreword. Introduction to CBA and WinAC PN 2. Routing with WinLC PN 3

Class documentation. COMOSKDictionary COMOS. Platform Class documentation COMOSKDictionary. Trademarks. General. KDictionary. Programming Manual

SIMATIC. Function modules FM 351 First Steps in Commissioning. Purpose of the Getting Started. Requirements 2

Optional package printer driver V1.4

Siemens Spares SIMATIC. CFC for M7 Continuous Function Chart A B. Preface, Contents. CFC for SIMATIC M7. Handling Blocks.

SIMATIC. Process Control System PCS 7 PCS 7 system documentation - Readme V8.0 SP2 (Update 1) Options for Accessing Documentation 1

SIMATIC. SIMATIC Logon V User management and electronic signatures 1. Hardware and Software Requirements 2. Scope of delivery 3.

SIMATIC HMI. WinCC V7.4 WinCC/Options for Process Control. Overview of process control system options 1. OS Project Editor 2.

SITOP UPS1600 under STEP 7 V13. SITOP UPS1600 under STEP 7 V13. Introduction. Safety notes. Description. Assigning the IP address

SIMATIC. Process Control System PCS 7 VT Readme V8.2 (online) Security information 1. Overview 2. Notes on Installation 3. Notes on usage 4.

Operator Station (V8.0) SIMATIC. Process Control System PCS 7 Operator Station (V8.0) Preface 1. The PCS 7 Operator Station

SIMATIC. Process Control System PCS 7 Trend Micro OfficeScan (V8.0; V8.0 SP1) Configuration. Using virus scanners 1.

SIMATIC. Automation system BRAUMAT/SISTARClassic V5.3 Block library basic. Preface, Content. Blocks in SIS_USR. Appendix. Manual

Key Panels Library SIMATIC HMI. Key Panels Library. Preface 1. Installation of Key Panels Library. Working with the Key Panels Library

SIMATIC. Working with STEP 7. Introduction to STEP 1. The SIMATIC Manager 2. Programming with Symbols. Creating a Program in 4

SIMATIC. Process control system PCS 7 Operator Station (V9.0 SP1) Security information 1. Preface 2

SIMATIC. WinCC Readme Runtime Professional. Validity 1. Improvements in Update 2 2. Improvements in Update 1 3

S7-300 Programmable Controller

SITOP UPS1600 under STEP 7 V5. SITOP UPS1600 under STEP 7 V5. Introduction. Safety notes. Description 3. Assigning the IP address

SIMATIC IPC Wizard for. Widescreen devices with multitouch SIMATIC. Industrial PC SIMATIC IPC Wizard for. Preface.

Preface 1. Main Management System 2. Contact Information 3. User Manual Main Management System. English. Release

SIMOTION. SIMOTION SCOUT Task Trace. Preface 1. Overview 2. Configuring 3. Working with the SIMOTION Task Profiler. Function Manual 05/2009

SIMATIC. Process Control System PCS 7 V7.0 SP1 Security Information Note: Setting up antivirus software. Preface. Using virus scanners 2

COMOS. Lifecycle 3D Integration Operation. Publisher 1. COMOS PDMS Integration 2. Material management 3. COMOS 3D viewing 4.

Preface 1. Product Characteristics 3 SIPLUS CMS4000 ION SIMATIC TDC T001 Manual Software Installation 4

SIMATIC. Process Control System PCS 7 SFC Visualization (V9.0 SP2) Security information 1. What's new in SFV? 2. SFC Visualization (SFV) 3

Industrial Controls. SIMOCODE pro SIMOCODE pro PCS 7 Library. Preface. Security information. Product specific security. information.

General Information 1. Connection 2. User Interface 3 ATC5300. Menus 4. Automatic Transfer Controller. Remote Control Software Manual A5E

MindSphere. Fleet Manager. Introduction to "Fleet Manager" 1. User interface for "Fleet Manager" 2. User rights in "Fleet Manager" 3

S7-300 Getting Started - Commissioning a CPU 31xC: Closed-loop control

Siemens Automation Products

SIMATIC. WinCC Readme Runtime Professional. Validity 1. Improvements in Update 7 2. Improvements in Update 6 3. Improvements in Update 5 4

SIMATIC Automation License Manager Manual 02/2008 A5E

Validity 1. Improvements in STEP 7 2. Improvements in WinCC 3 SIMATIC. Readme. Readme

PROFIsafe SITRANS. Pressure transmitter SITRANS P, DS III PROFIsafe series. Product Information 7MF4*34 04/2008 A5E

SFC Visualization (V8.0 SP1) SIMATIC. Process Control System PCS 7 SFC Visualization (V8.0 SP1) What's new in SFV? 1. SFC Visualization (SFV)

COMOS. Platform Class documentation RevisionMaster_dll. Class: RevisionInfo 1. Class: RevisionMaster 2. Programming Manual

SIMOTION. Motion Control Task Trace. Preface 1. Overview 2. Configuring 3. Working with the SIMOTION Task Profiler 4.

SIMATIC. Component Based Automation SIMATIC imap STEP 7 AddOn Creating PROFINET components. Preface. Creating PROFINET components in STEP 7

English. SIMATIC Sensors. RFID-Systems RF600. Getting Started. Edition 11/2005; J31069-D0172-U001-A1-7618

First Steps in Commissioning CPU. 31xC: Positioning with digital output SIMATIC

SIMATIC. Communications processor CP First Steps in Commissioning. Getting Started 09/2008 A5E

SENTRON powermanager. Low-Voltage Power Distribution and Electrical Installation Technology Software SENTRON powermanager.

SIMATIC. Process Control System PCS 7 PCS 7 Documentation (V8.1) Options for Accessing Documentation 1. Documentation for the Planning Phase 2

SIMATIC. Process Control System PCS 7 Configuration McAfee Endpoint Security Security information 1. Preface 2.

Siemens Spares. Preface 1. Scope of Delivery 2 SIPLUS CMS4000. Product Characteristics 3 ION PROFIBUS DP SPY T001 Installation and Maintenance 4

Siemens Spares COMOS. Operations Inspection. Introduction 1. Working with the "Inspection" plugin 2. Working with the "Inspection diagram" plugin 3

Setting up securityglobal FW Rulesets SIMATIC NET. Industrial Ethernet Security Setting up security. Preface. Firewall in standard mode

SIMATIC HMI. WinCC V6 Basic Documentation. Foreword 0. SIMATIC WinCC 1. Working with Projects 2. Working with Tags 3. Creating Process Screens 4

SIMATIC. SIMATIC Energy Manager V1.0 App for ios and Android. Preface. SIMATIC Energy Manager app. Establish connection to SIMATIC Energy Manager PRO

Performance data abgn SCALANCE W770/W730 SIMATIC NET. Industrial Wireless LAN Performance data abgn SCALANCE W770/W730.

DANGER indicates that death or severe personal injury will result if proper precautions are not taken.

SIMATIC. Process Control System PCS 7 Product Brief on Software Updates from V5.1/V5.2 to PCS 7 V7.0 SP1. Preface 1

SIMATIC. SIMATIC Logon V1.6. Security information 1. Conditions for secure operation of SIMATIC Logon 2. User management and electronic signatures 3

Performance data abgn PCIe Minicard MPCIE-R1-ABGN-U3 SIMATIC NET

Portable & Direct COMOS. Operations Portable & Direct. Trademarks 1. Introduction. Portable 3. "Direct" plugin 4. User interface reference

Sample project Filling Station SIMATIC. STEP 7 Professional / WinCC Advanced V11 for Sample project Filling Station. Overview of the Getting.

COMOS. Operations Inspection. Introduction 1. Working with the "Inspection" plugin 2. Working with the "Inspection diagram" plugin 3

Basic principles 1. Configuring function diagrams based on IEC 2. Administration 3 COMOS. Automation Logical. Operating Manual 04/2015 A5E AD

Transcription:

SIMATIC HMI Configuring Graphics Displays Table of Contents Introduction Commissioning Operating Units Product Brief Basic Steps for a Configuration Extend Configuration with Simple Elements Edition 12/01 A5E00148106

Safety Guidelines This manual contains notices which you should observe to ensure your own personal safety, as well as to protect the product and connected equipment. These notices are marked as follows according to the level of danger: Danger indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. Warning indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. Caution used with the safety alert symbol indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. Caution used without safety alert symbol indicates a potentially hazardous situation which, if not avoided, may result in property damage. Attention indicates that unwanted events or status can occur if the relevant information is not observed. Note draws your attention to particularly important information on the product, handling the product, or to a particular part of the documentation. Qualified Personnel Equipment may be commissioned and operated only by qualified personnel. Qualified personnel within the meaning of the safety notices in this manual are persons who are authorized to commission, ground and identify equipment, systems and circuits in accordance with safety engeneering standards.

Correct Usage Note the following: Warning The equipment may be used only for the applications stipulated in the catalog and in the technical description and only in conjunction with other equipment and components recommended or approved by Siemens. Startup must not take place until it is established that the machine, which is to accommodate this component, is in conformity with the guideline 98/37 ECC. Faultless and safe operation of the product presupposes proper transportation, proper storage, erection and installation as well as careful operation and maintenance. Trademarks The registered trademarks of the Siemens AG can be found in the preface. The remaining trademarks in this publication may be trademarks, whose use by third parties for their own purposes could violate the rights of the owner. Impressum Editor and Publisher: A&D PT1 D1 Copyright Siemens AG 2001 All rights reserved The transmission and reproduction of this documentation and the exploitation and communication of its contents are not allowed, unless expressly granted. Violators are liable for damages. All rights reserved, especially in the case of the granting of a patent or registration by GM. Siemens AG Bereich Automation & Drives Geschäftsgebiet SIMATIC HMI Postfach 4848, D-90327 Nuernberg Siemens Aktiengesellschaft Exclusion of liability We have checked the content of this publication for compliance with the described hard and software. However, discrepancies cannot be excluded, with the result that we assume no guarantee for total compliance. The information in this publication is checked regularly, and any necessary corrections are included in the following editions. We would be grateful for any suggestions for improvement. Siemens AG 2001 Technical data subject to change. Order number A5E00148106

Configuring Graphics Displays Contents Contents Page Introduction... 3 Commissioning Operating Units... 7 Basic Steps for a Configuration... 9 Extend Configuration with Simple Elements... 21 SIMATIC is a registered trademark of Siemens AG. The other designations in this document may be trademarks which, when used by others for their own purposes, may constitute a violation of the owners rights. Siemens AG 1

2 Siemens AG

Configuring Graphics Displays Introduction Introduction Projects whose processes should be visualized are created using the ProTool configuration software on a configuration computer (PC or PU) under Windows for the following operating units: Text Displays (e.g. TD 17) Operator Panels with text-based displays (e.g. OP 3, OP 7, OP 17) Operator Panels with graphics displays (e.g. OP 27, OP 37) Touch Panels (e.g. TP 27, TP 37) Windows-based systems Panels (TP 170A, TP 170B, OP 170B, TP 270, OP 270) Multi Panels (MP 270, MP 270B, MP 370) OP 37/Pro Panel PCs (Panel PC 670, Panel PC 870, Panel PC IL, FI 25, FI 45) PCs C7 units (e.g. C7-621/623/624/626/633/634) The configuration software is available in three release levels: ProTool/Pro to configure the entire unit family ProTool to configure text displays, text and graphic operator panels and the Windows-based units ProTool/Lite to configure text displays, text-based operator panels and the Windows-based unit TP 170A The procedures and descriptions in this product brief should provide initial help with regard to configuring units with graphics displays. The range of units with graphics displays includes both touch panels and operating units. PLC-specific details for creating the associated program are not provided. Siemens AG 3

Introduction Configuring Graphics Displays The figure below illustrates an example configuration of a touch panel using ProTool: The figure below illustrates an example configuration of an operating unit using ProTool: 4 Siemens AG

Configuring Graphics Displays Introduction Notes on using the quick reference manual Further information Texts or inputs required for the configuration which can be selected from items provided appear in Courier typeface. Menus, menu options, dialogs or texts in dialog boxes which can be selected appear in italics. Further help and information is available in the following: Online help User's Guide ProTool - Configuring Graphics Displays User's Guide - Communications Elements of a configuration The following elements are those available for the configuration which are explained in the example configurations provided in this quick reference manual: Creating screens Screens enable processes to be visualized. Screens show the user the current status of a process in the form of numeric values, bars or trend curves and enable operational intervention by adjusting values, pressing function keys (OP) or configured buttons (TP). Linking screens The screens involved in a configuration can be linked to each other. Setting and resetting bits in the PLC Bits in the PLC can be influenced by means of function keys (OP) or correspondingly configured buttons (TP). This enables active intervention in the running of a process. PLC process value input/output Process values can be displayed and modified directly by using input and output fields. The entries can be assigned limit values and protected by a password. Output is possible in a number of display formats, such as decimal or binary. Siemens AG 5

Introduction Configuring Graphics Displays Displaying PLC process values in graphical form Bars represent a PLC value in the form of a rectangular area. A bar is suited, for example, for representing fill levels. Integrating graphics Graphic fields can be used to provide users with a visual representation of a system. Integrating texts Input/output fields and function keys can be labeled with text for the user. Display messages Messages indicate events and statuses in the process. ProTool distinguishes between event messages and alarm messages. Event messages relate to the status of a machine or process. Alarm messages indicate operating faults concerning a machine or process and must be acknowledged. 6 Siemens AG

Configuring Graphics Displays Commissioning Operating Units Commissioning Operating Units Hardware structure The figure below illustrates an example of one variant of a hardware structure: ProTool PC TP PLC OP A B Serial connection to download the configuration (configuration phase only) Connection between operating unit and PLC (configuration phase and online operation) Siemens AG 7

Commissioning Operating Units Configuring Graphics Displays Installing the software Installing ProTool on a PC Insert the installation CD in the CD-ROM drive; setup starts automatically after a few seconds Follow the instructions on the screen Using online help and context-sensitive help If problems arise during the configuration, or further information concerning specific points is required, proceed as follows: Using context menus Click on the question mark symbol Click on the elements for which information is required Context menus are available for the elements of a configuration. Context menus can be used to trigger actions which are related to the corresponding element. Proceed as follows to call in a context menu: Select an element Click the right mouse button 8 Siemens AG

Configuring Graphics Displays Basic Steps for a Configuration Basic Steps for a Configuration Start ProTool Double click on the ProTool icon on the desktop Define the new configuration In the case of new ProTool users, it is recommended to use standard configurations as a basis for individual configurations. Standard configurations are available for all graphics displays. They contain screens in which generally used functions are already configured. Select File New Select the operating unit to be configured Click on Continue Select PLC Set further parameters for the PLC under Parameters Example: Parameters when an S7 is connected Siemens AG 9

Basic Steps for a Configuration Configuring Graphics Displays Click on Continue Activate checkbox Use Standard Project Click on Continue Enter a name for the configuration in Project Click on Finish Define default settings Before carrying out the actual configuration, certain settings must be defined concerning the division of the screen on the operating unit. These settings are valid for the entire configuration. In addition, communication areas required for messages, for example, must be defined. Define division of the display These settings are related to the representation, size and position of message areas for event and alarm messages. The system setting contains the fixed window. The fixed window is an area in which each screen appears. Here, it is possible to label the system or position date/time fields, for example. When using a TP, buttons which should be available for all screens can be placed in the fixed window. Leave the fixed window in the pre-defined position at the top of the screen. Proceed as follows to ensure that alarm messages are always displayed in the message window and event messages in a message line: Select System Screen/Keys Under Alarm/Event Mess. select Window/Line Proceed as follows to define the position of the message line: Under Active select Message Area Press the mouse button and position the message line in the screen layout. Click on OK 10 Siemens AG

Configuring Graphics Displays Basic Steps for a Configuration The figure below illustrates a possible configuration for the division of the display for a operating unit: Define communication area Communication areas must be defined in the PLC for special operating unit jobs. Communication areas are necessary, for example, to trigger and acknowledge messages. Operating unit and PLC both access the defined data areas in order to communicate with each other. Proceed as follows to define a communication area for alarm messages: Select System Area Pointers Under Type, select Alarm Messages Click on Add In PLC, select the PLC used in the system Define the other settings for alarm messages Click on OK Set up this data area in the PLC program too. In the case of connection to a SIMATIC S5, a communication area of the type Interface Area must always be set up for communication between the operating unit and PLC. The setup procedure is the same as for setting up a communication area for alarm messages described above. Siemens AG 11

Basic Steps for a Configuration Configuring Graphics Displays Assign functions In order to trigger certain operating unit functions, they must be assigned globally or locally. The following options are available for selection: Global assignment: A function with global assignment need only be configured once in ProTool. It can then be activated via the operating unit from all the screens in the configuration. Local assignment: A function with local assignment can only be activated via the operating unit from one specific screen in the configuration. Global function key assignment on the operating unit In order to assign a function globally on the operating unit, select a K key. A K key is always available, regardless of the screen selected. Select System Screen/Keys Click on the required function key Open the required folder in Select Object Double click on the function, thus assigning it to the function key If necessary, modify the function parameters Click on OK 12 Siemens AG

Configuring Graphics Displays Basic Steps for a Configuration Global button assignment on the TP In order to assign a function globally on the TP, position a button in the fixed window. The fixed window appears in every screen. Click on the button icon Move to the required position in the fixed window at the top edge of the screen, click and hold the mouse button pressed. Position the button using the mouse and release the mouse button. Select the tab control Functions Open the required folder in Select Object Double click on the function, thus assigning it to the button If necessary, modify the function parameters Click on OK The button can be allocated either a label text or icon. Proceed as follows to allocate a label to the button: Select the tab control General Under Display select String Under Labeling enter the label text for the button Click on OK Proceed as follows to allocate an icon to the button Select the tab control General Under Display select Graphic Click on the context menu symbol Select New from the context menu Double click on the object type Bitmap, the graphics program is started Siemens AG 13

Basic Steps for a Configuration Configuring Graphics Displays Create the graphic Terminate the graphics program Click on OK If a language change is defined in the configuration, ensure that the icon assigned is the same in all the languages. Local function key assignment on the operating unit Click on the required function key in the screen Select the tab control Functions Open the required folder in Select Object Double click on the function, thus assigning it to the function key If necessary, modify the function parameters Click on OK Select the tab control Icon Click on the context menu symbol Select New from the context menu Double click on the object type Bitmap, the graphics program is started Create the graphic Terminate the graphics program Click on OK If a language change is defined in the configuration, ensure that the icon assigned is the same in all the languages. 14 Siemens AG

Configuring Graphics Displays Basic Steps for a Configuration Local button assignment on the TP Click on the button icon Move to the required position in the screen, click and hold the mouse button Position the button using the mouse and release the mouse button Select the tab control Functions Open the required folder in Select Object Double click on the function, thus assigning it to the button If necessary, modify the function parameters Click on OK The button can be allocated either a label text or icon. Proceed as follows to allocate a label to the button: Select the tab control General Under Display, select String Under Labeling, enter the label text for the button Click on OK Proceed as follows to allocate an icon to the button Select the tab control General Under Display, select Graphic Click on the context menu symbol Select New from the context menu Double click on the object type Bitmap, the graphics program is started Create the graphic Terminate the graphics program Click on OK If a language change is defined in the configuration, ensure that the icon assigned is the same in all the languages. Siemens AG 15

Basic Steps for a Configuration Configuring Graphics Displays Creating the start screen for the configuration The start screen is the first screen displayed with regard to a configuration. Add new screen to a configuration Proceed as follows: Double click on Screens in the project window A new screen is added and opened. Identify new screen as start screen Proceed as follows: Click on the screen entry on the right-hand side of the project window using the right mouse button Select Properties in the context menu Activate checkbox Start Screen Click on OK 16 Siemens AG

Configuring Graphics Displays Basic Steps for a Configuration Add descriptive text to start screen Proceed as follows: Click on the icon for static text Click on the required position in the screen Enter the text Start Screen Enable switch to download mode Before a generated configuration can be downloaded from a PC to an operating unit, the operating unit must be set to Download mode. In order to access Download mode simply and quickly, assign the function Mode globally to a configured button (TP) or a function key (operating unit). Assign function Mode globally Select a K key on the operating unit or generate a button on the TP in the fixed window. Open the folder Toggle and select the function Mode. Proceed as described in Section Assign functions on Page 12. At this point, define the following settings: Click on Mode (Key): Under Mode (Key): enter the parameter 2 Click on Mode (Field): Click on the context menu symbol Click on New in the context menu Do not alter the tag type predefined in Type Under PLC select <No PLC> Under Name enter the Mode Click on OK twice Siemens AG 17

Basic Steps for a Configuration Configuring Graphics Displays The tag can be used to display the current operating mode on the operating unit. Creation of this tag is necessary for the function described. During the course of further configuration, no reference is made as to the use of the tag. 18 Siemens AG

Configuring Graphics Displays Basic Steps for a Configuration Activate configuration on operating unit Compile operation-capable configuration Proceed as follows: Click on the icon for compiling Follow the instructions on the screen Download and test operation-capable configuration to operating unit The configuration must be downloaded to the operating unit for testing. Downloading is carried out via a direct serial connection between the PC and operating unit. Proceed as follows: Select File Settings Download to set Serial Set other downloading settings under Edit Click on OK twice In order to download the configuration, the operating unit must be in Download mode. The procedure with which to activate Download mode depends on the configuration status of the operating unit: An operating unit which has not received a configuration switches to Download mode automatically. An operating unit which contains a configuration can be switched to Download mode directly after switching on the power supply by pressing the key combination ESC and CURSOR UP. This key combination deletes the existing configuration. Siemens AG 19

Basic Steps for a Configuration Configuring Graphics Displays A TP which already contains a configuration displays a power-on screen immediately after switching on the power supply. This screen contains the button SERIAL DOWNLOAD. The TP can be switched to Download mode by pressing this button. The existing configuration is thus deleted. If a button (TP) or function key (operating unit) has already been assigned for switching the unit to Download mode, as described in Section Enable switch to download mode on Page 17, simply press that button/key. When the message Ready for transfer appears on the operating unit, proceed as follows: Click on the download icon After downloading has been completed successfully, the operating unit is rebooted with the downloaded configuration. It can then be tested. 20 Siemens AG

Configuring Graphics Displays Extend Configuration with Simple Elements Extend Configuration with Simple Elements A condition for the procedures described in this section is that the following configuration steps, defined in the Section Basic Steps for a Configuration have been carried out: Define the new configuration (Page 9) Define default settings (Page 10) Creating the start screen for the configuration (Page 16) Enable switch to download mode (Page 17) Integrate graphic in start screen Proceed as follows if a graphic or company logo should appear in the start screen of the configuration: Click the graphics icon Click on the required position in the screen and draw out the field to the desired size When integrating graphics, ensure that the field which has been drawn out has the same border ratio as the graphic created. If this is not so, the graphic is represented distorted. The following options are available: Call graphic file Create graphic using a graphics program Proceed as follows to call in a graphic file: Click on Create from file Enter the path and file name of the graphic file Click on OK Siemens AG 21

Extend Configuration with Simple Elements Configuring Graphics Displays Proceed as follows to create a graphic using a graphics programs: Click on New Double click on the object type Bitmap, the graphics program is started Create the graphic Terminate the graphics program The configuration can be tested at this point. The procedure is described in Section Activate configuration on operating unit on Page 19. Add second screen to configuration and configure changing screens At this point, the configuration only contains the start screen. If other screens are to be added, the user must be able to switch between the screens. This example illustrates how a second screen is linked to the start screen. A configured button (TP) or function key (operating unit) should be available in every screen to enable toggling between the screens. Add second screen to configuration Proceed as follows: Double click on Screens in the project window A new screen is added and opened. Add descriptive text to second screen Proceed as follows: Click on the icon for static text Click on the required position in the screen Enter text Second Screen 22 Siemens AG

Configuring Graphics Displays Extend Configuration with Simple Elements Configure switching to second screen Proceed as follows to enable changing from the start screen to the second screen using the operating unit: Create a button (TP) or click on a function key (OP) in the start screen Open the folder Screens in Select Object Double click on Select Screen Select the name of the second screen under Screen Name Configure change to start screen Proceed as follows to enable changing from the second screen to the start screen using the operating unit: Create a button (TP) or click on a function key (OP) in the second screen Open the folder Screens in Select Object Double click on Select Screen Select the name of the start screen in Screen Name The configuration can be tested at this point. The procedure is described in Section Activate configuration on operating unit on Page 19. Siemens AG 23

Extend Configuration with Simple Elements Configuring Graphics Displays Integrating a standard configuration in a customized configuration The use of the standard configuration as a basis for customized configurations was recommended in Section Define the new configuration on Page 9. In order to access the standard configuration, a screen in the customized configuration must be linked to the basic standard configuration screen. The basic screen is linked to other screens in the standard configuration as a starting point. In this example, the second screen of the customized configuration is to be linked to the basic screen of the standard configuration. Configure changing screens to the basic screen of the standard configuration Proceed as follows: Create a button (TP) or click on a function key (OP) in the second screen Open the folder Screens in Select Object Double click on Select Screen Select Z_SYSTEM_MEN in Screen Name The configuration can be tested at this point. The procedure is described in Section Activate configuration on operating unit on Page 19. 24 Siemens AG

Configuring Graphics Displays Extend Configuration with Simple Elements PLC process value input/output This example illustrates how a PLC process value is entered in an operating unit input field and output via an output field and a bar graph. Inserting an input field Proceed as follows: Click on the Input/Output Field symbol Click on the required position in the screen and draw out the field to the desired size Select Field Type Input Generate a new tag Proceed as follows: Click on the context menu symbol Click on New in the context menu Define tag parameters Click on OK twice Siemens AG 25

Extend Configuration with Simple Elements Configuring Graphics Displays Example: Tag for S7 connection A B Formatting for display in the configuration Address in the PLC Each tag has a symbolic name and defined data type. The value of the tag changes during execution of the PLC program. Tags with links to the PLC are referred to as global tags, those without as local tags. ProTool has the following tag types, but they are not all necessarily available in each PLC: STRING tags BOOLEAN tags Numeric tags Array tags The acquisition cycle of a tag determines the time interval at which they are updated by a value from the PLC. 26 Siemens AG

Configuring Graphics Displays Extend Configuration with Simple Elements The address defines the memory location of a global tag in the PLC. It is therefore dependent on the PLC implemented. Set up a data area for the tag, used in this example, in the PLC. Using the operating unit input field it is possible to enter a process value in the PLC. The use of a tag should be taken into consideration when defining tag types. If the value selected for the acquisition cycle is too low, it affects communication between the PLC and operating unit. The following steps of this example describe the configuration of an output field and bar display used to output the process values entered. Inserting a bar display Proceed as follows: Click on the bar icon Click on the required position in the screen and draw out the field to the desired size Select the newly created tag in Tag Click on OK Siemens AG 27

Extend Configuration with Simple Elements Configuring Graphics Displays Insert an output field Proceed as follows: Click on the Input/Output Field symbol Click on the required position in the screen and draw out the field to the desired size Select Field Type Output Select the newly created tag in Tag Click on OK The configuration can be tested at this point. The procedure is described in Section Activate configuration on operating unit on Page 19. Setting and resetting bits in the PLC Proceed as follows to enable influencing bits in the PLC using the operating unit: Create a button (TP) or click on a function key (OP) in the start screen Open the folder Edit Bits in Select Object Double click on Set/Reset Bit Click on the context menu symbol Click on New in the context menu Define tag parameters Click on OK twice The configuration can be tested at this point. The procedure is described in Section Activate configuration on operating unit on Page 19. 28 Siemens AG

Configuring Graphics Displays Extend Configuration with Simple Elements Display messages In order to issue information concerning current process faults in the form of messages, a communication area was configured for alarm messages in Section Define communication area on Page 11. Proceed as follows to configure alarm message texts for output: Click on Messages in the project window Double click on Alarm Messages on the right-hand side of the project window Enter the alarm message text for Alarm Message 1 in line 0001 Enter the alarm message text for Alarm Message 2 in line 0002 Enter the alarm message text for Alarm Message 3 in line 0003 The status line, at the bottom right of the screen, indicates the respective address linking the alarm message to the PLC. This information is PLCspecific. In order to display the configured alarm messages on the operating unit, the corresponding bits must be set in the PLC using the PLC program. The configuration can be tested at this point. The procedure is described in Section Activate configuration on operating unit on Page 19. Siemens AG 29

30 Siemens AG

Siemens AG 31

32 Siemens AG