BEMIP implementation WG. Interconnectors Market development

Similar documents
KURZEME RING PROJECT. Antons Kutjuns AS AUGSTSPRIEGUMA TIKLS Head of International Development Projects Division

THE GAS INTERCONNECTION POLAND LITHUANIA (GIPL)

The latest update of power market in Latvia

REGIONAL GAS MARKET COORDINATION GROUP. Progress report No. 2 December 2015 February 2017

On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation. Mark Copley 27/05/14

European Coordinator

All Baltic CCR TSOs amended proposal for the fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July

Elia Grid International Your expert in power system solutions

Next Generation Scada Architectures

COUNCIL OF THE EUROPEAN UNION. Brussels, 26 January /10 ENER 22

Forum Energia Regulation of energy markets Klaus Gerdes Lisbon, October 19th 2006

ENTSO-E working to fulfill the 3 rd Package

TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM

Power & Utilities EU funding during Daina Belicka EY Advisory Leader - EU Institutions

GAS INTERCONNECTION POLAND LITHUANIA (GIPL) STATUS AND POTENTIAL IMPACT ON THE BALTIC STATES MARKET

Regulating and pricing network access

Cross-Border participation in the GB Capacity Market. Elaine O Connell 15 th January 2015

XBID Launch Information Package Published February 2018

Day Ahead Fallback proposal Explanatory note

Market Coupling en regions: results and perspectives

MODULAR HUB AND SPOKE 17 NOVEMBER 2017

An Introduction to Network Codes & The Links Between Codes

XBID Project Preparing for Go-live in June 2018 Jean Verseille Co-chair of XBID Intraday Steering Committee

Electricity Market Development in the Energy Community. Janez Kopač, Energy Community Secretariat 1 st SEERC Power Conference Portorož, 7 June 2016

ITC HOLDINGS, CORP. Edison Electric Institute 9

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010

From: Laura Manz, Vice President of Market & Infrastructure Development

European Developments

Grid Interconnection of Renewable Generation

Gas Sector Development in Ukraine. Focus on selection of GTS partner and unbundling. Milan Sedláček, eustream, a.s.

The strategic plan of HEDNO for the Non- Interconnected Islands Investments Smart Islands Innovation

High Level Group on Interconnections for South-West Europe. Progress Report (March - December 2015)

Oslo Data Center Location at Hønefoss, Norway A part of the Oslo region. Oslo Data Center Location DMS 60o12.1 N

The GCC Interconnection Grid

Explanatory document concerning the Nordic TSOs proposal for establishment of fallback procedures in accordance with Article 44 of the Commission

In the section from valve site No 13 to the place of the end of works Lithuanian-Polish border (~37 km)

Arkona Offshore Wind Project

Discussion on measuring electricity security of supply and potential indicators of Smart Grids

Response to Draft Guidelines of Good Practice on Electricity Grid Connection and Access (E08-ENM-09-03)

List of actions selected for receiving financial assistance under the second CEF Energy Call for Proposals 2018

An Energy Community for the Future Key Findings of the Report of the High Level Reflection Group. Barbora Jaksova, Energy Community Secretariat

International cooperation on power interconnection: Mongolian Regulatory perspective

Green Bond presentation

Pan-Arab Interconnection and Development of Arab Power Markets

Mocuba The First Utility Scale PV Project in Mozambique

Electricity Market Reform

The Agency s Work Programme Outline for 2016

Network Codes, Governance and Regulatory issues for the Transition towards up to 100% RES

Smart Grid data sharing platform Estfeed

A Framework to Approach Shared Use of Mining Related Infrastructure: ICT

Pierre Sebellin. Systems Technical Officer International Electrotechnical Commission

October 2017 INVESTING FOR THE FUTURE. NIE Networks summary business plans

European regime for interconnection

Power Trade in Greater Mekong Sub-region

North Central Europe ANNA HYVÖNEN, EVP, NORTH CENTRAL EUROPE 1 DECEMBER, 2015, CAPITAL MARKETS DAY 2015

Introduction to transmission network characteristics - technical features. Slobodan Markovic Danka Todorovic EKC Tirana,

CGM and Energy Data Architecture a TSO Perspective

EDISON S COMMENTS ON ERGEG PUBLIC CONSULTATION ON PILOT FRAMEWORK GUIDELINES ON ELECTRICITY GRID CONNECTION

21 st BSHC Meeting Agenda item C September 2016 BSBD-WG Report Klaipeda, Lithuania

The Regional Electricity Market Platform

GDF SUEZ Infrastructures Business Line. Yves Colliou

Estonian research infrastructure policy. Toivo Räim Vilnius,

Update on the Gulf Cooperation Council (GCC) Electricity Grid System Interconnection

Explanatory document concerning the Nordic TSOs proposal for establishment of fallback procedures in accordance with Article 44 of the Commission

Lex Mundi Telecommunications Regulation Multi-Jurisdictional Survey

Seminar on African Electrical Interconnection. Module 1. The feasibility of Regional Electricity Cooperation and Integration

Montenegro s role in the electricity market integration of the South East Europe (SEE) Region

Role of the DSO in providing flexibility. Febeliec Workshop Demand Response 15/6/2015

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)

Nordic Imbalance Settlement

ENTSOG update and view on Germany

Nord Stream 2: Market Perspectives for the Long-Term Financing of the Project

Implementation of projects to increase energy efficiency in high-voltage power transmission systems

REPORT FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT

ELKO Group IT products and solutions distributor

An Overview on ehealth Co-operation in the Baltic States. Gediminas Cerniauskas Lithuania

UNDERGROUND HV SUBSTATION DESIGN

E.ON UK plc Group Consolidated Segmental Report. for the year ended 31 December 2011

Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace.

Danish Policy on Underground Cabling of HV lines. Anders H Kristensen Danish Energy Agency

April 2010 Power Systems division A brief introduction. ABB Group August 25, 2011 Slide 1

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1

Memorandum. This memorandum requires Committee action.

Interconnection and Transmission

Investment in offshore wind - utility s perspective Marek Dziewior

Planning for the Future

Policy drivers and regulatory framework to roll out the Smart Grid deployment. Dr. Manuel Sánchez European Commission, DG ENERGY

Connecting and Managing Offshore Wind Danish Embassy - 4 th December 2012

Generator Interconnection Process. Wholesale Transmission Overview

DSO for Republic of Ireland. Supplying every home in the country

Inspection and Certification for Individual Farms, Smallholder Group Certification S S R A N A S R S C I E N T I S T

Lex Mundi Telecommunications Regulation Multi-Jurisdictional Survey

PRELIMINARY OPERATING RESULTS AND FACTSHEET FOR 3 MONTHS OF 2016

Small Hydro Regulatory and Permitting Requirements California

Electricity Market Integration 2.0 in Central and South East Europe Potential benefits: markets and institutions

CORESO A CENTRALIZED REGIONAL SECURITY COORDINATION INITIATIVE. Leading coordination for enhanced reliability of supply

Denmarks Cable Policy

Regional Interconnectivity & Cross Border Trade Networks: An EAPP Update. Eng. David M. Mwangi Independent Energy Consultant Kenya

Wind Power Systems - Project Rödsand 2

Progress Report on the GCC Electricity Grid Interconnection in the Middle East

Transcription:

BEMIP implementation WG Interconnectors Market development

Estlink 2 The EstLink 2 project is supported by the EU: 100 M EUR Conditions set by Fingrid for construction of Estlink 2, autumn 2009: Estonia: the opening of 35% of the Estonian electrical energy wholesale market Nord Pool Spot: the creation of an Estlink price area Both these conditions to be met during the first quarter of 2010 at the latest Criteria for investment decisions by Fingrid, 19 of May 2010 Positive development in the open electricity market in Estonia Development of the Estlink price area : Reliability and transparency of the price area Energy quantities traded flexibly on the power exchange Estlink 1 capacity allocated in the right amounts on Nord Pool Spot Expansion of the Estlink price area to the Latvian and Lithuanian energy markets

Land part in Finland -DC overheadline about 14 km -about 70 % route between existing two 110 kv powerlines -Converter station and extension of AC substation in Anttila -Arrangements of 4 x existing AC overheadlines total 2 km Sea part between Finland and Estonia -length about 145 km -seacable Land part in Estonia -underground DC cable about 11,5 km -Converter station and extension of AC substation in Püssi -Reinforcement of 2 x AC overheadlines total 126 km

EstLink 2 preliminary project time schedule Q1-2 2008 Q3-4 2008 Q1-2 2009 Q3-4 2009 Q1-2 2010 Q3-4 2010 Q1-2 2011 Q3-4 2011 Q1-2 2012 Q3-4 2012 Q1-2 2013 Q3-4 2013 Q1-2 2014 Q3-4 2014 Q1-2 2015 Market criteria 1 Decision in principle, ER/FG Framework agreement Sea bed survey Environmental study in FIN Investment decision EIA of land part in EST Environmental study of sea part in EST Market criteria 2 Fishing study Cross border permit Water permit application in EST Water permit in FIN Commissioning Land access in EST Land access in FIN Supply contracts Cable laying Ask for tenders Cable and converter deliveries Burn-in time

Development of Latvia transmission network towards integrated Baltic electricity market Arnis Staltmanis Head of Inetrnational Project Department AS Augstsprieguma tīkls 4 June 2010

INTRODUCTION The main steps towards Latvia/Baltic Western part security of supply and market integration Reinforcement of transmission grid of Western part of Latvia : 1st stage - 330kV AC cable Riga CHP1 Imanta (2009 2012) 2nd stage - 330kV OHL Grobina Liepaja Ventspils (2009 2015) 3rd stage - 330kV s/st. Liepaja, Ventspils, Dundaga (2009 2015) 4th stage - 330kV OHL Ventspils Dundaga Tume Riga (2009 2015) Total costs estimated of 200MEUR and 43MEUR are granted by EU 04.06.2010 Development of Latvia transmission network towards integrated Baltic electricity market 2

PROJECT Nr.1, 1st. Stage - 330kV cable Riga CHP1 - Imanta closing the loop around Riga (2012) Main objective: Provision of reliable power supply in Riga region and connection for Kurzeme loop Key drives: 2004 2008: Riga CHP2 new unit 442MW 2008 - decision to start construction of 14km 330kV AC cable \ Planned the next unit 442MW (2016) Possible increase of power demand in the Riga area 04.06.2010 Development of Latvia transmission network towards integrated Baltic electricity market 3

Project Nr.1 04.06.2010 Development of Latvia transmission network towards integrated Baltic electricity market 4

Project Nr.1, 1st. Stage - 330kV cable Riga CHP1 Imanta Key points: Financing approved in accordance with investment plan, payback time 40years. 2008 Land reservation and agreement for substations` expansion and cable route 2009 January design tendering completed 2010-2012 construction 04.06.2010 Development of Latvia transmission network towards integrated Baltic electricity market 5

Project Nr.1 2nd and 3rd. Stages 330kV OHL Grobina - Liepaja Ventspils (2015) Main objective: To improve security of supply of Western region of Latvia To provide connection of new coal-biomass TPP and wind power in Western region Key drives: New Liepaja TPP the unit 400MW, planned - 2016 Development of wind power, expected approx. 1000MW Background for 4th. Stage 330kV OHL Ventspils Riga (Imanta) and project Nr.2 and 3 04.06.2010 Development of Latvia transmission network towards integrated Baltic electricity market 6

Projects 1-3 04.06.2010 Development of Latvia transmission network towards integrated Baltic electricity market 7

Project Nr.1.2 and 1.3 1.stage 330kV OHL Grobina - Liepaja Ventspils (2015) Key points 2009 June Western region development study completed, - Land reservation for the new 330kV substations (Liepāja, Ventspils), decision on the OHL route alternatives, starting of EIA 2009-2011 - Land compensation, transformation, design, planned mainly along the existing 110kV OHL 2011 2015 construction 04.06.2010 Development of Latvia transmission network towards integrated Baltic electricity market 8

BEMIP Baltic Energy Market Interconnection Plan 1

Strategic projects Lithuanian TSO Lithuanian Polish interconnection project LitPol Link Lithuanian Swedish interconnection project NordBalt Interconnection of Baltic power systems for synchronous operation with the ECN 2

Lithuanian Polish interconnection LitPol Link project 3

Progress Project progress Preparation of territorial planning documents for 400 kv transmission line Preparation of environmental impact assessment in Lithuania and Poland Technical feasibility study for back-to-back station, 400kV substation, extension of 330kV substation Investment realization and operation model of the interconnection Further work Environmental impact assessment in Lithuania and Poland Preparation of territorial planning documents for 400 kv transmission line Land ownership issues Preparation of the technical project for the line, substation, back-to-back station Permits and licensing issues Construction of interconnection 4

Lithuanian Swedish interconnection project NordBalt 5

Project progress Progress Preparation of territorial planning documents for interconnection on land Lithuanian and Swedish TSOs signed an agreement on implementation of investment EC granted financial EU assistance to the project EUR 131 million from EEPR program Baltic seabed survey works completed Selected VSC (Voltage Source Converter) technology for interconnection Preparation of the technical specifications for cable and converter stations Further work Preparation of territorial planning documents on land in Lithuania and Sweden Land ownership issues Tender for supply of cable and converter stations Preparation of technical project for interconnection Permits and licensing issues Construction of interconnection 6

BEMIP (Step 2. Q1 2010) Regulated tariffs have been removed for eligible customers Subsidized renewable energy can enter the market without losing subsidies Separation of TSO activities/roles Basic transparency rules (Nord Pool Spot rules) Congestion management method between Estonia-Latvia-Lithuania and a common position towards Russian and Belarus TSO s Common ITC treatment of the perimeter countries for Estonia, Latvia, Lithuania and Finland Removal of cross-border restrictions, such as license and tariff in three Baltic States Introduction by Nord Pool Spot of price area Estlink.

BEMIP (Step 3. 2011 2013) Baltic common day ahead market (based on Nord Pool Spot trading platform) Stepwise introduction of Intra-day market Market based congestion management, implicit auction between Baltic countries managed by NPS Estonia, Latvia, Lithuania and Finland have a common position and trading principles towards non EEA third countries Transparency according to the ERGEG's North European Electricity Regional Initiative Common reserves and balancing power market Harmonized imbalance settlement and imbalance pricing Common market monitoring and surveillance rules Development of financial markets (OTC)

THANK YOU!