Twin Core Data Center Munich
T-Systems Data Center Munich Sister Site, Back Up Location/Twin Core DC ALL (Allach) 1st Route: 13km DWDM System 2nd Route: 27km DC EIP (Euro Industrie Park) Point to Point Distance > 10km Cluster installation Backup implementation Disaster Recovery concepts Data Mirroring operation 2 separate distribution paths/2 separate providers/each building separately supplied Redundant installation of fiber optical backbone between buildings including network core devices T-Systems / Twin Core Data Center 2
T-Systems Data Center Munich Twin Core Site Plan DC ALL DWDM1 10 km DC EIP DWDM2 T-Systems / Twin Core Data Center 3
Twin Core Data Center Munich - EIP (Euroindustrie Park) T-Systems / Twin Core Data Center 4
Twin Core Data Center Munich - EIP Data, Facts, Information 20,350m² fenced-in area 15,525m² building surface 9,638m² gross IT space 20 fire areas -> cellular conception (extendable) 5,133KW high-availability power-/air conditioning (n+1; extendable) 2,500 server components 1,090 network chassis 3,200 storage components Net Providers 2 providers with different feeding Each provider with own redundant connection xx Certifications ISO 9001: 2008 ISO/IEC 27001: 2005 ISO/IEC 20000-1: 2011 T-Systems / Twin Core Data Center 5
Twin Core Data Center Munich - EIP The infrastructure consequently meets the high requirements of a security real estate Stand alone building No direct surrounding building on property border Unsuspicious setting in office- and industrial district Euroindustriepark Central and convenient location (highway A9/city center) Complete concrete and steel construction Groundwater 14m beneath the building Building 1.3m above canalization level Specially sealed roof; 300 leakage detectors Technical park (infrastructure) in another location Central sanitary- and employee recreation facilities Area-wide grounding net and lightning protection 2.9m (height) surrounding security fence with perimeter surveillance Steel barrier against unwanted access Road blocker to ensure single entrance for cars Surveillance by outdoor dome cameras Car registration and pass port control T-Systems / Twin Core Data Center 6
Twin Core Data Center Munich - EIP The consequent implementation of regulations has highest priority Metal detector Single entry control access system 24 x 7 x 365 security Access only with code cards CCTV surveillance in the building Motion detector, infrared sensors, light sensors Observation with 2 independent fire detection system Early smoke detection system (VESDA) Fire protection walls and doors F90 Argon fire extinguishing system Direct connection to fire department 60cm raised floor level Raised floor: ultimate load 3t/m² Point load 500kg Emergency planning and manuals; professional facility management 24h on-call-duty T-Systems / Twin Core Data Center 7
Twin Core Data Center Munich - EIP Ensuring an uninterruptable power supply is most significant 5 feed-ins of local utility company Separate MVMD (10,000V level) 10 transformers Separate LVMD (low voltage main distribution) on 400V level Altering current with 230V or rotating current with 400V Redundant emergency power supply Diesel stock for 72h full load Redundant continuous power supply (static UPS), static with more than 1,200 accumulators Grounding according to telecommunication norms Separate A-/B-/C-bus bar system for the supply of the critical equipment and the non-critical installations Separate bus bar system available in each IT room Separate PDU s per A- und B-client distribution, additional C-distribution T-Systems / Twin Core Data Center 8
Twin Core Data Center Munich - EIP Higher performing computers require an extensive supply of chilled IT rooms Redundant water chillers with automatic switching Free cooling Central building control systems for a complete surveillance of all technical equipment Redundant air cooling circulation units Supply of chilled air in raised floor Air temperature 24 C ± 4 C Air humidity 45% ± 10% Central air moistening outside the IT rooms Redundant pump systems Central supply- and outlet air units 2-level air filtering (abrasive particles and particulate matter) Complete air exchange in 2h T-Systems / Twin Core Data Center 9
Twin Core Data Center Munich - EIP OVERVIEW Power Distribution 1a 1c 3a 3b 1b UVA Zone 1 Zone 3a Zone 3b Zone 3c 3c Zone 11 2b 2c 2a Zone 6a Zone 6b Zone 9a Zone 9b Zone 9c ClientSuite ClientCage Zone 7a Zone 7b Zone 10 Zone 2b Netzwerk 1 Zone 5 Zone 8a Zone 8b Zone 8c Zone 8d Netzwerk 2 Zone 12 Zone 2a TELCO 1 Zone 4 COLO TELCO 2 T-Systems / Twin Core Data Center 10
Twin Core Data Center Munich - Allach T-Systems / Twin Core Data Center 18.03.2014 11
Twin Core Data Center Munich - Allach Data, Facts, Information 12,000m² building surface 6,000m² gross IT space divided into 2 buildings (DC036, DC046) distance between the buildings 800m high-availability power-/ air conditioning (n+1) infrastructure Net Providers 2 providers with different feeding Each provider with own redundant connection xx Certifications ISO 9001: 2008 ISO/IEC 27001: 2005 ISO/IEC 20000-1: 2011 T-Systems / Twin Core Data Center 12
Twin Core Data Center Munich - Allach The infrastructure consequently meets the high requirements of a security real estate Located in a high security site environment Concept of separated DC areas on Allach campus Location within secured work areas (NATO) Concept of separated small DC areas (200-250m²) Separated Customer areas, access only with code cards Former bunker from 2nd world war, rebuilt to a data Center (DC 036) 4m thick walls and ceiling (DC 036) Fragmented in several fire compartments ( sheds ) Situated in ground floor of office building (DC 046) Area-wide grounding net and lightning protection high-grade aggression protection Video surveillance system security fence Triple Access Control (Area, Datacenter, DC areas), Onion Principle Car registration and pass port control T-Systems / Twin Core Data Center 13
Twin Core Data Center Munich - Allach The consequent implementation of regulations has highest priority Single entry control access system 24 x 7 x 365 security Access only with code cards CCTV surveillance in the building No fresh air, only recirculation air in DC Fire alarm detection system directly connected to fire department onsite 2 separate high sensitivity smoke detection systems directly connected to fire department onsite (DC 036) CO2 fire extinguishing system (DC 046) Water and moisture detection system 60 80cm raised floor level Raised floor: ultimate load 2-3t/m² Point Load 500kg Emergency planning and manuals; professional facility management Company security service T-Systems / Twin Core Data Center 14
Twin Core Data Center Munich - Allach Ensuring an uninterruptable power supply is most significant 2 feed-ins of local utility company separate MVMD (medium voltage main distribution on 10,000V level) transformers á 10,000V separate LVMD (low voltage main distribution on 400V level) redundant emergency power system (EPS) Diesel stock for multiple days full load operation redundant continuous power supply (dynamic UPS), static with more than 2,000 accumulators Grounding according to telecommunication norms separate A-/B-power supply systems for the supply of the IT-Equipment Separate cable available in each IT room Separate PDU s per A- and B-client distribution T-Systems / Twin Core Data Center 18.03.2014 15
Twin Core Data Center Munich - Allach Higher performing computers require an extensive supply of chilled IT rooms Air cooling & Liquid cooled Racks (LCR) Multiple Redundancy in cooling: redundant cold water systems and chillers with automatic switching underground water reservoir/municipal water supply (DC 036/DC 046) Only recirculating Air (no fresh air inlet!) Supply of chilled air in raised floor air temperature 24 C ± 4 C air moisture 45% ± 10% Central air moistening outside the IT rooms Central building control systems for a complete surveillance of all technical equipment Redundant pump systems Central supply- and outlet air units 2-level air filtering (abrasive particles and particulate matter) T-Systems / Twin Core Data Center 18.03.2014 16
Twin Core Data Center Munich - ALLACH OVERVIEW Power Distribution EZ8 / 5 OG EZ7 / 5/2.OG EZ6 / 9K EZ5 / 10K EZ2 / 11K 5 4 3 2 1 EZ1 6 7 8 9 10 Sheds EZ3 / 13K 11 EZ4 / 14K 12 13u 13o 14u 14o T-Systems / Twin Core Data Center 17
Thank you for your attention!