Much more than Rules need to be in place by 2014

Similar documents
Policy and regulatory framework: what are the next challenges to tackle?

On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation. Mark Copley 27/05/14

European Developments

The Agency s Work Programme Outline for 2016

An Introduction to Network Codes & The Links Between Codes

ENTSO-E working to fulfill the 3 rd Package

Forum Energia Regulation of energy markets Klaus Gerdes Lisbon, October 19th 2006

ENTSOG update and view on Germany

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010

TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM

All Baltic CCR TSOs amended proposal for the fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July

The latest update of power market in Latvia

GAS INTERCONNECTION POLAND LITHUANIA (GIPL) STATUS AND POTENTIAL IMPACT ON THE BALTIC STATES MARKET

DRIVING REGIONAL COOPERATION FORWARD: FROM PROJECT TO POLICY AND BACK BOELL STIFTUNG 26 APRIL 2016, BRUSSELS

Electricity Market Development in the Energy Community. Janez Kopač, Energy Community Secretariat 1 st SEERC Power Conference Portorož, 7 June 2016

European Network of Transmission System Operators for Electricity (ENTSO-E) GCRP - November 2009

Electricity Market Integration 2.0 in Central and South East Europe Potential benefits: markets and institutions

CGM and Energy Data Architecture a TSO Perspective

REGIONAL COOPERATION AND GOVERNANCE IN THE ELECTRICITY SECTOR

Day Ahead Fallback proposal Explanatory note

REGIONAL GAS MARKET COORDINATION GROUP. Progress report No. 2 December 2015 February 2017

An Energy Community for the Future Key Findings of the Report of the High Level Reflection Group. Barbora Jaksova, Energy Community Secretariat

Capacity building in the IAEA Action Plan on Nuclear Safety

Network Code on Operational Security. User s Group System Operations 06/11/2013

Work to establish standard ENTSOE STAKEHOLDER COMMITTEE 1

ANNUAL WORK PROGRAMME 2018 VERSION FOR PUBLIC CONSULTATION

The Agency s Work Programme Outline for 2017

European Network Codes: RfG GB Grid Code Application Options

XBID Launch Information Package Published February 2018

New Concept for Article 36 Networking and Management of the List

entso-e vision the energy Union ahead! entso-e 24 JUne 2015 reliable, sustainable, CoMPetitive Vision

ENTSOG s Response to ACER s Document for the Consultation Template foreseen by Article 26(5) of the TAR NC

Network Codes, Governance and Regulatory issues for the Transition towards up to 100% RES

ENTSO-E WORK PROGRAMME

Memorandum of Understanding

Description of the issue Comments Responsible Timing State of Play end Nov. 16. Dec 2016, Implementation beginning of point

CEF ehealth DSI 2018 Technical Boot Camp State of Play

The Energy Community Perspective

Stakeholder consultation process and online consultation platform

20 December All TSOs of the Capacity Calculation Region Hansa, taking into account the following: Page 1 of 7

Business Requirements Specification for the. Nomination and Matching Procedures. In Gas Transmission Systems (NOM BRS)

CORESO A CENTRALIZED REGIONAL SECURITY COORDINATION INITIATIVE. Leading coordination for enhanced reliability of supply

Cross-Border participation in the GB Capacity Market. Elaine O Connell 15 th January 2015

SME License Order Working Group Update - Webinar #3 Call in number:

The new Electricity Market Design a smart regulation for smart distribution networks?

e-sens Nordic & Baltic Area Meeting Stockholm April 23rd 2013

TSC Long Term Vision and Integrated Capacity Management ALEXANDER WIRTH, SWISSGRID AG TSC OPERATIONAL MANAGER

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)

Introduction to the ENTSOG Common Data Exchange Solutions

SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline

Terms of Reference (ToR) for ICAT support to MRV in the Energy Sector in Kenya

13543/17 PhL/at 1 DG G 3 B

BEST PRACTICE GUIDE ON THE USE OF THE ELECTRONIC COMMON TECHNICAL DOCUMENT

All-island European Stakeholder Forum. 22 September 2016 Dublin

EU Energy Policy & CH

INSPIRE status report

Discussion on measuring electricity security of supply and potential indicators of Smart Grids

EDISON S COMMENTS ON ERGEG PUBLIC CONSULTATION ON PILOT FRAMEWORK GUIDELINES ON ELECTRICITY GRID CONNECTION

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009

The Africa-EU Energy Partnership (AEEP) The Role of Civil Society and the Private Sector. 12 February, Brussels. Hein Winnubst

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

WORKSHOP WITH STAKEHOLDERS ON THE CONNECTION NETWORK CODES NATIONAL IMPLEMENTATION GUIDANCE DOCUMENTS

National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010

Auction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code

WHERE THE DIGITAL TRANSFORMATION OF THE EUROPEAN ELECTRICITY SYSTEM STARTS:

RPS Work Item: Beta Testing of Message Standard

Elia Grid International Your expert in power system solutions

The Regional Electricity Market Platform

European Open Science Cloud Implementation roadmap: translating the vision into practice. September 2018

Third public workshop of the Amsterdam Group and CODECS European Framework for C-ITS Deployment

EIM s comments on Best practices and challenges of cross border infrastructure management

The future role of DSOs in the context of the Clean Energy for All Europeans package

INAB Mandatory and Guidance Documents Policy and Index

MISO PJM Joint and Common Market Cross Border Transmission Planning

BDT Activities on Spectrum Management István Bozsóki Head of Division BDT/IEE/SBD

Gas Sector Development in Ukraine. Focus on selection of GTS partner and unbundling. Milan Sedláček, eustream, a.s.

Explanatory document concerning the Nordic TSOs proposal for establishment of fallback procedures in accordance with Article 44 of the Commission

High Level Group on Interconnections for South-West Europe. Progress Report (March - December 2015)

Mastering the future of Air Traffic Management A conference on the European ATM Master Plan

Valérie Andrianavaly European Commission DG INFSO-A3

Auction Calendar 2016/2017 for Capacity Allocation Mechanism Network Code

Status of the ecall initiative

VdTÜV Statement on the Communication from the EU Commission A Digital Single Market Strategy for Europe

13174/15 AT/tl 1 DGE 2B

SOFTWARE MAINTENANCE PROGRAM for exo Platform

Compliance Enforcement Initiative

ENTSO-E Requirements for Generators Network Code: GB Stakeholder s Key Issues. Feedback to JESG Garth Graham (SSE) 16 August

Contacts. CEDEC Marc Malbrancke, Coordinator CEDEC WG Network Code

EU Harmonisation of Maintenance Publications at Interconnection Points 13/11/2015

Annual Policy Initiatives Roadmap Process Straw Proposal

Directive on security of network and information systems (NIS): State of Play

XBID Project Preparing for Go-live in June 2018 Jean Verseille Co-chair of XBID Intraday Steering Committee

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679)

IPv6 Task Force - Phase II. Welcome

The Potential of ICT for Creative Learning & Innovative Teaching

ENTSOG s template for non-binding demand indications by network users for incremental capacity

ENISA s Position on the NIS Directive

Transport Security Standards

Transcription:

Much more than Rules need to be in place by 2014 Alberto Pototschnig Director CEER 2012 Annual Conference Energy TITRE Infrastructure and Energy Efficiency Brussels, 25 January 2012

A strong momentum The internal market should be completed by 2014 so as to allow gas and electricity to flow freely. European Council - 4 February 2011 - Conclusions on Energy (paragraph 4)

a clear target.the completion of the Internal Energy Market in 2014 should deliver tangible benefits to European consumers Shared Vision: Target Model Common Rules (FG & NC) Implementation.It would be difficult to claim that the Internal Energy Market has been completed if the Target Model/Rules had not been implemented

Where do we stand?.electricity Shared Vision: Target Model Common Rules (FG & NC) Implementation.Gas Shared Vision: Target Model Common Rules (FG & NC) Implementation

Electricity Target Model Internal Electricity Market Capacity Calculation Long-Term Capacity Allocation Day-Ahead Capacity Allocation Intraday Capacity Allocation Balancing Markets Adequate Network Development (EU TYNDP and EIP) TSO/ISO/ITO Unbundling Strengthened powers and independence for NRAs Higher coordination requirements (ACER & ENTSO-E)

3 Mar Recent activities: Electricity Sector Mar Apr May Jun Jul Aug Sep Oct PUBLIC CONSULT. 2 May FG on Grid Connections Opinion on ENTSO-E Statutes, List of Members and Rules of Procedure T.C. 5 Apr 5 May 20 Jul FG on Capacity Allocation and Congestion Management in Electricity PUBLIC 11 Apr CONSULT. 10 Jun 29 Jul FG on System Operations PUBLIC 15 Jul 15 Sep CONSULT. FG on Balancing SCOPING 2011 2012 Nov Dec Jan Feb Mar 2 Dec Opinion on ENTSO-E 2012 Work Programme 2 Dec

CC, DA, ID Forward Op. Security Electricity: FG and NC planning Op. Plann/Sched. LFC, Reserves 2011 2012 2013 2014 2015 FG/NC on Grid Connection FG NC EV COMITOLOGY FG/NC on Capacity Allocation and Congestion Management NC EV COMITOLOGY FG NC EV COMITOLOGY FG/NC on System Operation NC EV COMITOLOGY FG NC EV COMITOLOGY NC EV COMITOLOGY FG/NC on Balancing FG NC EV COMITOLOGY FG/NC on Third Party Access WS FG NC EV COMITOLOGY ACER ENTSO-E EP - EC EV = Evaluation on NC

Achieving the Internal Electricity Market by 2014 Formal Framework Guidelines / Network Codes process FG/NC on Electricity Grid Connection FG/NC Capacity Allocation and Congestion Management FG/NC on System Operation FG/NC on Electricity Balancing Voluntary Coordinated Implementation of the Target Model Agency Electricity Stakeholders Advisory Group (AESAG) Regional and Cross-Regional Roadmaps Capacity calculation Long-term capacity allocation Day-ahead capacity allocation Intra-day capacity allocation

The Electricity Regional Initiatives: New impetus to market integration (1).More project-oriented, with newly designated project lead regulators» Focus on the CACM target models implementation: 4 key priority projects.stronger Pan-European dimension, with the elaboration of ambitious but realistic cross-regional roadmaps as the main reference to the market integration process, complementing the FG/NC process» to identify key milestones and accountabilities» to ensure consistency & coherence

The Electricity Regional Initiatives: New impetus to market integration (2).Stronger Stakeholders involvement (AESAG and regional consultations) to keep the strong momentum and maintain confidence throughout the process.more adequate governance to support the implementation process» Involvement of MS when necessary» Close follow-up to identify any obstacles, delays or inconsistencies with the FG/NC (Public quarterly reports)» More efficient decision-making process (ACER s residual power for cross-border issues)

AESAG Terms of Reference (1).To elaborate, based on the existing implementation projects, a concrete, ambitious but realistic, roadmap for the implementation of:.single European Day-ahead price-based market coupling.european Intraday Capacity Management Module.single European platform for the allocation and nomination of long-term transmission rights.flow-based capacity allocation method in highly meshed networks.pilot projects for the integration of balancing markets

AESAG Terms of Reference (2).Implementation of the roadmap.support the implementation of concrete projects to pave the way to the internal energy market.ensure the consistency of these projects with the Framework Guidelines on Capacity Allocation and Congestion Management and the related Network Codes.discuss the main features of the projects from a European perspective with all the stakeholders and give guidance to these projects where relevant

Cross-regional roadmap on Long-Term Transmission Rights Progress to Date Move to a single set of auction rules Harmonised rules between CWE/CSE and within CEE Move to a single European allocation platform Following CWE, CSE, Switzerland and DE/DK1, SWE agrees to join CASC Challenges to Come Move to a single set of auction rules ACER and ENTSO-E TFs to be created to define and implement a single set of auction rules across Europe Move to a single European allocation platform Decision for NE, NE-Continent and Baltic expected during 2012 Move to FTRs? ACER recommendation expected by Q1 2012 ENTSO-E s analysis of the possible design and impact of FTRs in Q2 2012

Cross-regional roadmap on Day-Ahead Market Coupling Progress to Date ENTSO-E s and EuroPEX s strong commitment to implement a Pan-European Market Coupling solution Challenges to Come Translating this commitment into concrete and detailed implementation project for 2012 Selection by EuroPEX and validation by ENTSO-E of the starting point for the PCR algorithm Endorsement by NRAs of the starting point for the PCR algorithm Validation by ENTSO-E and Endorsement by NRAs of: The interim flexible NWE high-level governance arrangements The cost-sharing principles between NWE and non-nwe countries

Cross-regional roadmap on Intraday Progress to Date Challenges to Come ENTSO-E - EuroPEX agreement on detailed technical solution for border-by-border implementation in 2012 Border-by-border implementation of a common intraday solution, linking the Nordic, Central West, South West and FUI electricity regions in 2012 ENTSO-E s and EuroPEX s strong commitment to implement a Pan-European cross-border Intraday mechanism Design and implementation of pan-european intraday target model by 2014

Cross-regional roadmap on Capacity Calculation Challenges to Come Decision on the implementation path in the CEE region expected for Q1 2012 CWE flow-based market coupling foreseen for mid-2013 Strengthening coordination between CWE and CEE

The Integration of the Day-Ahead Market Project milestones NWE price coupling (CWE, NE, GB borders) Integration of SWE borders Integration of CEE borders Integration of remaining Baltic borders Integration of CSE borders Integration of remaining FUI borders Single European Price Coupling (EPC) Integration of SEE 2011 2012 2013 2014 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 * * * MIBEL, Hungary, Slovakia and Czech Republic are willing and committed to join EPC by end of 2012 ** SEM may provide for transitional arrangements which are defined in section 1.2 of FG CACM. ** Integration of SEE not later than 2015

3 Mar Recent activities: Gas Sector 2011 2012 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar FG on Capacity Allocation Mechanisms for the European Gas Transmission Network PUBLIC CONSULT. 2 May Opinion on ENTSO-G Statutes, List of Members and Rules of Procedure T.C. 5 Apr 5 May PUBLIC 12 Apr CONSULT. 12 Jun 3 Aug FG on Gas Balancing in Transmission Systems Opinion on ENTSO-G EU-wide Ten-Year Development Plan 16 Sept 18 Oct FG on Interoperability Rules SCOPING FG on Rules regarding Harmonised Transmission Tariff Structures SCOPING

Gas: FG and NC planning 2011 2012 2013 2014 2015 FG/NC on Capacity Allocation Mechanisms FG NC Comitology Guidelines on Congestion Management Procedures FG CG EV COMITOLOGY COMITOLOGY FG/NC on Gas Balancing in Transmission Systems NC NC EV COMITOLOGY FG/NC on Interoperability Rules FG FG/NC on Harmonised Transmission Tariff Structures EV COMITOLOGY FG NC EV COMITOLOGY WS ACER ENTSO-E EP - EC EV = Evaluation on NC

Gas: Early CAM Implementation South Region CAM harmonisation on ES PT interconnection Future extension of the project to the IPs with FR Common TSO allocation platform in 2014 South - South East Region Coordinated short-term capacity services on AT - IT Extension of GATRAC project for the allocation of bundled products to IPs with SK and other countries North-West Region Possible analysis for a future TSOs common platform for capacity allocation and booking services The creation of joint (cross-regional) CAM platforms is one of the priorities for 2012 GRI work

Gas: Security of Supply projects Risk Element Assessment Risk Matrix Approach Stakeholder Workgroup Likelihood v Severity 15 Identified as potential high risk Draft PAP Stakeholder Consultation (incl. other MS) Sources, Scenarios and Consequences Draft PAP, EP Stakeholder Consultation (including other MS) Infrastructure and supply standards Risk Factor Determination Different Approaches and positive solutions using the GRIs to demonstrate compliance with security of Supply legislation in 3 selected Member States. December 2011 Stakeholder Meeting, SSE Region

The Way Forward: Meeting the Challenges.True commitment of key stakeholders (NRAs, TSOs, PXs) both at EU and regional level throughout the implementation phase.continuous support and involvement of all stakeholders: AESAG(/AGSAG?) process, and regional Fora.Engagement of Member States.Regular and transparent reporting on progress and challenges:.quarterly reports (first issue: April 2012 covering Q1 2012).Annual Status Review (first issue: March 2012).Florence/Madrid Fora

Thank you for your attention! Thank you for your attention www.acer.europa.eu