Transition Implementation Status Reporting. 12 August 2016

Similar documents
Transition Implementation Status Reporting. 31 March 2016

IANA Stewardship Transition and PTI Overview

Post Transition IANA model Draft

Update on IANA Stewardship Transition

IANA Stewardship Transition & Enhancing ICANN Accountability. Elise Gerich ICANN VP, IANA Dept 28 August 2015

IANA Stewardship Transition What Does It Mean for Us?

IANA Stewardship Transition & Enhancing ICANN Accountability. Andrea Beccalli DNS.PT Events May 12

IANA Stewardship Transition Coordination Group (ICG)!! October 2014! ianacg.org!!!

Asks for clarification of whether a GOP must communicate to a TOP that a generator is in manual mode (no AVR) during start up or shut down.

3. Are you providing input on behalf of another entity (e.g. organization, company, government)?

Cross Community Working Group (CWG) To Develop An IANA Stewardship Proposal. On Naming Related Functions. Discussion Document for ICANN52 Singapore

IANA ccnso Update Kim Davies ICANN 55, 8 March 2016

MISO PJM Joint and Common Market Cross Border Transmission Planning

IANA Stewardship Transition & Enhancing ICANN Accountability

ccnso activity overview (work plan) Monthly overview Version: August 2016

RDAP Implementation. Francisco Arias & Gustavo Lozano 21 October 2015

ISO/IEC JTC 1 Special Working Group on Accessibility (SWG-A)

SME License Order Working Group Update - Webinar #3 Call in number:

Freedom of Information Act 2000 reference number RFI

Root KSK Roll Delay Update

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT

IANA Update ICANN Meetings, Marrakech Kim Davies Internet Assigned Numbers Authority

Undergraduate Admission File

Security and Stability Advisory Committee!! Activities Update! ICANN Los Angeles Meeting! October 2014! #ICANN51

NIR February JPNIC Updates. Hiroki Kawabata Japan Network Information Center (JPNIC) Copyright 2016 Japan Network Information Center

Banner 9 Overview and Transition timeline August Edgar Coronel Paddy Wong

Overview of ITU capacity building activities

software.sci.utah.edu (Select Visitors)

July 13, Via to RE: International Internet Policy Priorities [Docket No ]

ICANN and the IANA. Elsa Saade and Fahd Batayneh MEAC-SIG August 2016

Overview of the Proposal from the Number Resources Community. Izumi Okutani Chair, The CRISP Team

Previous Intranet Initial intranet created in 2002 Created solely by Information Systems Very utilitarian i Created to permit people to access forms r

AGENDA 30 SEPTEMBER 2016 SPECIAL BOARD Meeting 60 minutes Time, etc. Agenda Item Shepherd

Russ Housley 21 June 2015

This report is based on sampled data. Jun 1 Jul 6 Aug 10 Sep 14 Oct 19 Nov 23 Dec 28 Feb 1 Mar 8 Apr 12 May 17 Ju

COURSE LISTING. Courses Listed. with SAP Hybris Marketing Cloud. 24 January 2018 (23:53 GMT) HY760 - SAP Hybris Marketing Cloud

ICT PROFESSIONAL MICROSOFT OFFICE SCHEDULE MIDRAND

Transport Infrastructure Agreement Change management

TOWN MANAGER S WEEKLY REPORT

Action Plan developed by Ordre des Comptables Professionnels Agréés d Haïti (OCPAH) BACKGROUND NOTE ON ACTION PLANS

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

ISPOR Student Network Committee Work Plan Template

The Number Registry System

Town of Georgetown Comprehensive Plan

Privacy and Proxy Service Provider Accreditation. ICANN58 Working Meeting 11 March 2017

BANGLADESH UNIVERSITY OF PROFESSIONALS ACADEMIC CALENDAR FOR MPhil AND PHD PROGRAM 2014 (4 TH BATCH) PART I (COURSE WORK)

REPORT 2015/149 INTERNAL AUDIT DIVISION

New Concept for Article 36 Networking and Management of the List

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC.

APNIC Update. 20 May Paul Wilson. Revision:

BEST PRACTICE GUIDE ON THE USE OF THE ELECTRONIC COMMON TECHNICAL DOCUMENT

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

Japan s Measures against Spam

The Insider s Guide To Transfers. John Sweeting - Senior Director, Registration Services Cathy Clements Transfer Services Manager

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017

The Formation of The NELAC Institute

IP addressing policies: what does this mean? Adam Gosling Senior Policy Specialist, APNIC APT PRF for the Pacific: August 2013

Network Working Group Request for Comments: 4147 Category: Informational August Proposed Changes to the Format of the IANA IPv6 Registry

Pennington County Government Justice Center. Schematic Design - October 27, 2015

Intellectual Property Constituency (IPC)

PrairieCat Governing Bodies, Committees and Meetings for FY2019

National Smart Metering Program Testing Framework Work Stream Actions Log

San Francisco Housing Authority (SFHA) Leased Housing Programs October 2015

USGv6: US Government. IPv6 Transition Activities 11/04/2010 DISCOVER THE TRUE VALUE OF TECHNOLOGY

Update on IANA Seoul, Republic of Korea October 2009

DAS LRS Monthly Service Report

Gateway Transportation Collaboration Forum. 21/01/2015 Gateway Transportation Collaboration Forum 1

Annex A to the DVD-R Disc and DVD-RW Disc Patent License Agreement Essential Sony Patents relevant to DVD-RW Disc

ICANN Update RIPE Andrew McLaughlin

Status of IPv4 Deple1on and Transfers. ASO Address Council 25 June 2014

One possible roadmap for IANA evolution

Energy Step Code Implementation Strategy. March 26, 2018

High Confidence Transportation Cyber-Physical Systems: Automotive, Aviation, and Rail

EA-01/01 List of EA Publications

WHOIS Review Team Internationalized Registration Data Expert Working Group. Margie Milam ICANN October 2015

CIMA Asia. Interactive Timetable Live Online

APPENDIX E2 ADMINISTRATIVE DATA RECORD #2

The World Bank KI: Telecommunications and ICT Development Project (P126324)

Wide-Area Reliability Monitoring and Visualization Tools

Overview on the Project achievements

ADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service

Section 1.2: What is a Function? y = 4x

SCI - software.sci.utah.edu (Select Visitors)

WHOIS Accuracy Reporting System (ARS): Phase 2 Cycle 1 Results Webinar 12 January ICANN GDD Operations NORC at the University of Chicago

APNIC Update. German Valdez External Relations Program Director, APNIC ARIN XXX 26-October-2012

Tracking the Internet s BGP Table

MHBE Compliance Program SECOND QUARTER FY 2019 REPORT. TO MHBE BOARD OF TRUSTEES January 22, 2019

ACTIVE MICROSOFT CERTIFICATIONS:

HPE Security Data Security. HPE SecureData. Product Lifecycle Status. End of Support Dates. Date: April 20, 2017 Version:

Stakeholder consultation process and online consultation platform

GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast December 12, 2017

Compliance Enforcement Initiative

Proposed Increase In Rates In Water, Sewer and Reclaimed. June 9, 2009

Draft Response to the Internet Coordination Group Request for Proposals on IANA from the RIR community

AIMMS Function Reference - Date Time Related Identifiers

What's New in CTPAT. Logo and Abbreviation Current Membership Trusted Trader Best Practices Minimum Security Criteria Outreach/Training

Grid Security Policy

1/8. Note by the Chair. Executive Summary. 24 th Senior Officials Meeting of the Environment Management Group. EMGSOM.24(a)_4_Work Plan_2019

More Binary Search Trees AVL Trees. CS300 Data Structures (Fall 2013)

Transcription:

Transition Status Reporting August

Content 1. Overall Timeline 2. Status Update 3. Appendix: Projects Plans 2

Overall Timeline

Track 3 Track 2 Track 1 Planning Timeline Completed Remaining Root Zone Management System (RZMS) updates & parallel testing Root Zone Maintainer Agreement (RZMA) 1 Dec 1 Jan 16 Feb 16 Mar 16 Apr 16 May 16 Jun 16 Jul 16 Aug 16 16 Service Level Expectations (SLEs) for Naming Community Service Level Agreements (SLAs) with the Number Community IETF MoU Supplemental Agreement Public Technical Identifiers (PTI) Incorporation, Governance Documents, Subcontracting agreements Bylaws, Naming and Services agreements Root Zone Evolution Review Committee (RZERC) Customer Standing Committee (CSC) 60% 40% IANA Intellectual Property Rights (IPR) 6% 3% IANA Operational Escalation Processes 80% 20% Bylaws Articles of Incorporation Independent Review Process (IRP) Enhancements Reconsideration Request Enhancements Empowered Community of the post-transition Financial Planning Process % 4% Overall % Complete 90% 4

Status Update

RZMS, RZMA & Names SLEs Status As Of Date: 08//16 Project Description Plan Completion Date RZMS changes to remove RZA role and support parallel testing Names SLEs (SLEs for Naming Community) RZMA (Agreement with Root Zone Maintainer) Remove NTIA's authorization process from RZMS (code changes for and Verisign, and parallel testing). RZMS code changes to accommodate new SLEs, development of aggregation tool and dashboard ing of SLAs, and setting of initial SLAs. Completion of draft RZMA. 09//16 08/1/16 07/06/16 09//16 08/1/16 01/31/16 / 02/29/16 04/1/16 / 04//16 0/1/16 / 0/31/16/ 06//16 Status % Complete 0% 0% 0% Key Dates: s RZMS code changes (RZA) Existing data Parsing conclusions shared s RZMS code changes (SLEs) NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV s RZMS code changes (parallel testing) Start parallel testing VRSGN s RZMS code changes (parallel testing) End parallel testing RZMA ready for public review SLA targets defined SLA dashboard ready Insert SLAs into - PTI contract Remove RZA Role in production RZMS Name SLE performance targets approved by the Names SLEs work group and ratified by CWG. On-track Behind schedule, but recovery still possible Not started Target will be missed * All dates are estimates 6

PTI (Post-transition IANA) Status As Of Date: 08//16 Project Description Plan Completion Date Status % Complete PTI Incorporation, Governance Documents, Subcontracting agreements Incorporation of PTI, development of PTI governance documents, development of Numbers and Protocol Parameters subcontracting agreements. 09//16 08/1/16 0% Naming Function and Services Agreements Development of Naming Function and Services Agreements. 09/16/16 60% Key Dates: NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV AoI 1, CoIP 2 and Bylaws ready for Public Comment -PTI contract ready for public comment Filing for 01c3 PTI Plan defined PTI entity legally formed -PTI Contracts Finalized 1 AoI: Articles of Incorporation / 2 CoIP: Conflicts of Interest Policy Staff and final PTI Articles posted. Staff analysis of comments submitted on governance documents began. IETF informed that it will not comment on the protocol parameter subcontracting agreement. On-track Behind schedule, but recovery still possible Upcoming activities: Publish staff analysis and final PTI governing documents. Naming Function agreement public comment period. Share 1 st draft of services agreement with the community. Not started Target will be missed PTI Structure activities Incorporation activities 01 c3 filing activities -PTI contracts activities * All dates are estimates 7

IPR, RZERC, CSC & Escalation Processes Status As Of Date: 08//16 Project Description Plan Completion Date IANA IPR Transfer of IANA IPR to a independent trust. 9//16 RZERC (Root Zone Evolution Review Committee) CSC (Customer Service Standing Committee) Escalation Processes Formation of committee to advise Board on RZMS architectural and operational changes. Formation of committee to monitor PTI performance. Updating of existing IANA operational complaint and escalation processes. 09//16 / 08/1/16 08/31/16 / 8/1/16 09//16 08/1/16 09//16 / 08/1/16 09/1/16 Status % Complete 6% 0% 0% 80% Key Dates: Draft charter ready RZERC charter drafted & posted for Public Comment NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV CSC Initial outreach RZERC charter RZERC adopted by constituted Board IANA IPR Agreements posted for Public Comments Escalation CSC IANA IPR CSC process constituted Agreements constituteddocumentation executed updated Community discussions to finalize draft IANA IPR agreements for public comment. Staff and final RZERC charter published. Finalized escalation processes documentation. RZERC and CSC members appointed. IANA IPR agreements public comment period. On-track Behind schedule, but recovery still possible Not started Target will be missed * All dates are estimates 8

Enhancing s Accountability Status As Of Date: 08//16 s Bylaws s Articles of Incorporation (AoI) IRP Enhancements RR Enhancements Project Description Plan Completion Date Empowered Community Support Mechanisms Financial Planning Process Updates Updating of Bylaws. 06/09/16 0//16 Updating of Articles of Incorporation 07/31/16 Implement enhancements to Independent Review Process. Implement enhancements to 's reconsideration request process. Implement processes and mechanisms in support of the empowered community. 09//16-08/1/16 09//16 09//16 08//16 09//16 08/1/16 caretaker budget, PTI caretaker budget and PTI budget. 08/1/16 Status % Complete 0% 0% % 0% 0% 0% Key Dates: Bylaws posted for public comments Board adopts Bylaws AoI posted for public comments Board adopts revised AoI NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV Staff and final Articles published. Finalized Request for Reconsideration process documentation. Finalized PTI budget language for inclusion in the PTI bylaws. On-track Behind schedule, but recovery still possible Not started Target will be missed * All dates are estimates 9

RIRs SLAs & IETF MoU Supplemental Agreement Status As Of Date: 08//16 Project Description Plan Completion Date* RIRs SLAs (Service Level Agreement with the Number Community) IETF MoU Supplemental Agreement Key Dates: Completion of draft agreement, including SLAs with RIRs, and operationalization of SLAs. Completion of draft -IETF MoU Supplemental Agreement. IETF MoU Suppl. Doc finalized 06//16 06//16 Status % Complete NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV IETF MoU Suppl. Doc signed 0% * Completion Date dependent on USG s approval of proposals 0% RiRs SLAs Document finalized RiRs SLAs Document signed RIR SLA document signed on 29 June. IETF MoU document signed on 24 June. Upcoming activities: On-track Behind schedule, but recovery still possible Not started Target will be missed * All dates are estimates

Appendix High-Level Project Plans

RZMS & SLEs for Naming Community % Complete: 0% Status: Complete proposals NTIA issued 1 makes RZMS code changes to remove RZA role makes RZMS code changes to support parallel testing Verisign makes code changes to support parallel testing Parallel testing Remove NTIA s authorization process in Production RZMS determines feasibility of existing data use parses existing data (per feasibility determination) makes RZMS code changes for SLEs collects SLE metrics for SLA setting develops aggregation tool and SLAs dashboard aggregates data and propose SLAs reviews SLE metrics & agree on proposed SLAs with CWG X Name SLE performance targets approved by the Names SLEs work group and submitted to CWG for ratification. CWG to approve Names SLEs. RZMS & parallel testing activities Parsing of existing data activities SLE activities -PTI contract activity

RIRs SLA % Complete: 0% Status: Complete proposals NTIA issued 1 Finalize SLA document with RIRs Board Adoption Execute SLA document IANA contract SLA document becomes effective Signed the RIR SLA document on 29 June. RIRs SLAs activities USG activity 13

IETF MoU Supplemental Agreement ( MoU ) % Complete: 0% Status: Complete proposals NTIA issued 1 Finalize MoU document Board adoption Execute MoU document IANA contract MoU document becomes effective Signed the IETF MoU document on 24 June. MoU activities USG activity 14

Post-Transition IANA (PTI) % Complete: 80% Status: On-track final proposals NTIA issued 1 Define PTI Plan Incorporation Articles of Incorporation drafting, comment period and Board approval File for incorporation PTI Governance Bylaws drafting, comment period, and finalization for Board approval Governance Documents drafting, comment period and finalization -PTI Contract(s) -PTI subcontracting agreements drafting and finalization -PTI Naming Function and Services agreements drafting and finalization Staff and final PTI Articles posted. Staff analysis of comments submitted on governance documents began. IETF informed that it will not comment on the protocol parameter subcontracting agreement. Publish staff analysis and final PTI governing documents. Naming Function agreement public comment period. Share 1 st draft of services agreement with the community. Public Comment Period PTI Structure activities Incorporation activities 01 c3 filing activities -PTI contract activity 1

RZERC (Root Zone Evolution Review Committee) % Complete: 0% Status: Complete proposals NTIA issued 1 RZERC Charter drafting, public comment period, and Board approval requests appointment of representatives to RZERC Appointing organizations appoint representatives Staff and final RZERC charter published. Public Comment Period RZERC charter activities RZERC constitution activities 16

Customer Standing Committee (CSC) % Complete: 0% Status: Complete proposals NTIA issues 1 CSC Formation outreach SO/ACs appoint candidates sends SO/AC selected candidates to gnso/ccnso CSC constituted CSC Charter activity CSC Constitution activities Operationalization activities 17

IANA Operational Escalation Processes % Complete: 80% Status: On-track proposals NTIA issued 1 Define Plan Revise process documentations Define mediation process for Names community s IANA Customer Service Complaint Resolution Process Escalation processes documentation finalized. plan activity Escalation mechanisms activities 18

Bylaws % Complete: 0% Status: Complete proposals NTIA issued 1 Prep proposed amendments to s Bylaws Transmission of final proposals to NTIA Bylaws drafting Board takes action to post Bylaws for comments Public Comment Period Finalize Bylaws Board adopts & notifies NTIA Bylaws activity USG activity 19

Articles of Incorporation (AoI) % Complete: 0% Status: Complete proposals NTIA issued 1 AoI drafting Board takes action to post AoI for comments 40-days Public Comment Period Finalize AoI Board adoption Staff analysis of public comments and final Articles published. AoI activities 20

Request For Reconsideration (RR) Enhancements % Complete: 0% Status: Complete proposals NTIA issued 1 coordinates with Ombudsman on any support needed updates RR process documentation Finalizing Request for Reconsideration process documentation. RR activities 21

Empowered Community Enhancements % Complete: 0% Status: Complete proposals NTIA issued 1 puts in place mechanisms to support the EC processes puts in place secretariat support EC support mechanisms in place. EC processes support activities Secretariat Support activities 22

Post-transition Financial Planning Process % Complete: 0% Status: Complete proposals NTIA issued 1 Define & PTI caretaker budget frameworks Update /PTI financial planning process (FY18) Finalized PTI budget language for inclusion in the PTI bylaws. 23