Dell Networking S4810 Open Networking (ON) Getting Started Guide

Similar documents
Dell Networking S4048 Open Networking (ON) Getting Started Guide

S4112-ON Series. Setup Guide

VEP4600. Setup Guide

S5048F-ON. Set-up Guide

Dell Networking S4100-ON Series. Set-Up Guide

Dell Getting Started Guide for the S6100 ON System March 2016

Dell Force10 S55 and S60 Systems. Quick Start Guide. Regulatory Model: S55/S60

Installation Job Aid for VSP 4450GTX-HT- PWR+

Installation Job Aid for VSP 4850GTS

Dell Force10 Z9000 System. Quick Start Guide. Regulatory Model: Z9000

Installation Job Aid for Ethernet Routing Switch 3600 Series

Dell MD1280 Storage Enclosure Getting Started Guide

Dell Networking S5000 Installation Guide 9.7(0.0)

LVN5200A-R2, rev. 1, Hardware Installation Guide

Installation Note for the Cisco ME 3800X and ME 3600X Switch Power Supply and Fan Modules

Installation and Maintenance

Preparing to Install the VG248

Installation Job Aid for Ethernet Routing Switch 5900 Series

HP UPS R/T3000 ERM. Overview. Precautions. Installation Instructions

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

Dell Networking S3100 Series Installation Guide. June 2016

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

Junos WebApp Secure 5.0 Hardware Guide

Lightspeed Advanced Reporting Bottle Rocket Hardware Installation Guide

Switch Installation. Preparing. Safety Warnings CHAPTER

Switch Installation. Preparing for Installation. Safety Warnings

Dell SCv300 and SCv320 Expansion Enclosure Owner's Manual

Quick Start Guide S X. 1. Unpacking the Switch. 2. Identifying Your System. Front View

Installation Job Aid for Avaya Virtual Services Platform 8400

Installation Manual. Mounting Instructions Mechanical Mounting. Luminato. Teleste Corporation

Dell SC7020 Storage Controller Getting Started Guide

Installing the Cisco MDS 9020 Fabric Switch

Dell Networking C9010 Getting Started Guide

Installing the S4810 System. Publication Date: March 2012

Dell Storage Center. Getting Started Guide. SCv2000 and SCv2020 Storage System. Regulatory Model: E09J, E10J Regulatory Type: E09J001, E10J001

Dell SCv3000 and SCv3020 Storage System Owner s Manual

Dual-Feed 80A Auto Low Voltage Disconnect Panel - 80LVD02

Power Supply and Fan Module Installation

Dell SC7020 and SC7020F Storage Systems Owner s Manual

HP UPS R/T3000 G2. Overview. Precautions. Kit contents. Installation Instructions

The power behind competitiveness. Delta Infrasuite Power Management. Power Distribution Unit. User Manual.

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

Quick Start Guide. Dell Force10 E300, E600i, and E1200i Systems

TRC-190 User s Manual

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

E-Series Site Preparation Guide

Table of Contents Quick Install Guide page Introduction Safety Rack System Precautions ESD Precautions...

AI130 AIswitch Series 130 Chassis Installation Guide

Dell EMC Storage MD1280 Enclosure Owner's Manual

Dell SC5020 and SC5020F Storage Systems Getting Started Guide

Dell SCv3000 and SCv3020 Storage System Getting Started Guide

iconverter 2-Module Power Chassis

Dell SC460 Expansion Enclosure Getting Started Guide

VEP4600 Installation Guide. July 2018

Replacing the Power Supply

3-Phase, Dual-Input 6-Slot Power Supply System STARTUP GUIDE

Dell Networking S5000 Getting Started Guide

TRC-190 User s Manual

16Hi HARDWARE INSTALLATION GUIDE

ExtremeSwitching 210 and 220 Series Switches: Hardware Installation Guide

Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options

Power Supply Installation

Arcserve UDP 8100 and UDP 8200

Installation Notes for the Catalyst 3750-X and 3560-X Switch Power Supply Modules

G5 PDU Installation Guide

EOS-6000 Series Optical A/B Switch User Manual DC Version

Dell PowerVault MD3060e Storage Enclosure Owner's Manual

Hardware Reference Guide For Thin Clients

QUICK START GUIDE 7000 SERIES DEVICES. 3D7010/7020/7030 (Chassis: CHRY-1U-AC) 3D7115/7125, AMP7150 (Chassis: GERY-1U-4C8S-AC)

QUICKSTART INSTALLATION INSTRUCTIONS

OPTICAL HEADEND PLATFORM OTOHP-CH 3RU CHASSIS OTOHP-PS POWER SUPPLY MODULE OTOHP-BP BLANK PANEL INSTRUCTION MANUAL

Customer Replacement Procedure

Dell PowerVault MD3400/3420/3800i/3820i/3800f/ 3820f Storage Arrays Getting Started Guide

Customer Upgrade Procedure

Installing the Cisco SFS 3504 Server Switch

SCv360 Expansion Enclosure

User s Guide. for Echo Express and Echo Express Pro Thunderbolt Expansion Chassis for PCIe Cards

This simple chassis houses one media-converter module and features an external AC power supply and also a terminal block for DC power input.

Line reactors SINAMICS. SINAMICS G120P Line reactors. Safety information 1. General. Mechanical installation 3. Electrical installation 4

Installation Job Aid for Avaya Virtual Services Platform 7200 Series

HARDWARE INSTALLATION GUIDE. Arcserve UDP 8100 and UDP 8200 Appliance Hardware Installation Guide

PEM Faults and Blower Failures

RMB Peripheral Units Installation Guide

D-Link Switch User Manual. Table of Contents

Prisma MediaCenter 20-Slot, 6-Slot, and 3-Slot Chassis Installation Instructions

Installing a Network Module

User s Manual. ACS550-PD 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual

Dell Vostro 1310/1510/1710/2510 Setup and Features Information

Media Conversion Rack-Mount Chassis AT-MCR12. Installation Guide Rev. A

Installing a Network Module

16-SLOT IN-BAND MANAGEMENT CHASSIS

RZ5/RZ5D/RZ6 Processor. Operator s Manual

INSTRUCTION MANUAL RA 55 RACK ADAPTER RACK ADAPTER FOR MST SERIES POWER MODULES

CVH Slot Media Converter Chassis Quick Installation Guide

TABLE OF CONTENTS 1. OVERVIEW... 1

FVT Slot Media Converter Chassis w/ Redundant Power User Manual

Perle MCR200 Installation Guide

User s Guide. for xmac mini Server 2H Thunderbolt -to-pcie Expansion System and 1U Rack Enclosure for Mac mini With Thunderbolt Port

CPCI System Subrack 1 U

User s Guide. for Echo Express III-R Rackmount Thunderbolt -to-pcie Card Expansion Chassis

Transcription:

Dell Networking S4810 Open Networking (ON) Getting Started Guide Regulatory Model: S4810

Notes, Cautions, and Warnings NOTE: A NOTE indicates important information that helps you make better use of your computer. CAUTION: A CAUTION indicates either potential damage to hardware or loss of data and tells you how to avoid the problem. WARNING: A WARNING indicates a potential for property damage, personal injury, or death. Copyright 2014 Dell Inc. All rights reserved. This product is protected by U.S. and international copyright and intellectual property laws. Dell and the Dell logo are trademarks of Dell Inc. in the United States and/or other jurisdictions. All other marks and names mentioned herein may be trademarks of their respective companies. 2014 04 Rev. CV70R Rev. A00

Contents 1 About this Guide...5 2 Install the Hardware... 7 Install the Chassis... 7 Attaching the Mounting Brackets... 8 Rack Mounting Safety Considerations... 8 Mounting the Chassis in a Rack or Cabinet... 9 Attaching the Ground Cable (Optional)... 9 Important Points to Remember...10 Installing AC Power Supplies... 11 Installing a Fan Module... 11 Installing the SFP+ and QSFP+ Optics...12 Supply Power and Power Up the System... 12 AC Power... 13 Fans... 13 After Installing the S4810 ON... 13 3 Technical Specifications... 15

4

About this Guide 1 This document is intended as a Quick Start Guide to get new systems up and running and ready for configuration. For complete installation information, refer to Installing the S4810 Open Network (ON) System. About this Guide 5

6

Install the Hardware 2 Before installing the switch, verify that you meet these guidelines: You have enough clearance to the front of the switch so you can read the light emitting diodes (LEDs). The AC power cord reaches from the power outlet to the Utility-panel connector. The switch is rack-mounted before you power it up. Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent lighting. Ensure the cabling is safely away from other devices that might damage the cables. If needed, allow one rack unit (RU) space between devices to provide room for cabling. Airflow around the switch and through the vents is unrestricted. Temperature around the unit does not exceed 104 F (40 C). If the switch is in a closed or multirack assembly, the temperature might be higher than normal room temperature. Humidity around the switch does not exceed 85 percent. Altitude at the installation site is below 6600 feet. The switch is installed in an environment as free as possible from dust and foreign conductive material (such as metal flakes from construction activities). Cooling mechanisms, such as fans and blowers in the switch, can draw dust and other particles causing contaminant buildup inside the chassis, which can result in system malfunction. Install the Chassis To install the S4810 Open Networking (ON) system, Dell Networking recommends completing the installation procedures in the order presented here. NOTE: Always handle the system and its components with care. Avoid dropping the S4810 ON chassis or its field replaceable units. NOTE: For proper ventilation, position the S4810 ON chassis in an equipment rack (or cabinet) with a minimum of 5 inches (12.7 cm) of clearance around exhaust vents. The acceptable ambient temperature ranges are listed in the Technical Specifications section under Environmental Parameters. CAUTION: Always wear an electrostatic discharge (ESD)-preventive wrist or heel ground strap when handling the S4810 ON and its components. As with all electrical devices of this type, take all necessary safety precautions to prevent injury when installing this system. ESD damage can occur if components are mishandled. Install the Hardware 7

Attaching the Mounting Brackets The S4810 ON is shipped with mounting brackets (rack ears) and the required screws for rack or cabinet installation. The brackets are enclosed in a package with the chassis. 1. Take the brackets and screws out of their packaging. 2. Attach the brackets to the sides of the chassis at the power supply unit (PSU) end, using four screws for each bracket. Attach the bracket so that the ear faces to the PSU and the outside of the chassis. Figure 1. S4810 ON Mounting Brackets 1. Utility side of the chassis 2. Mounting Bracket Rack Mounting Safety Considerations You may either place the switch on the rack shelf or mount the switch directly into a 19" wide, EIA-310- E- compliant rack. Rack loading Overloading or uneven loading of racks may result in shelf or rack failure, which may damage the equipment and cause personal injury. Stabilize the racks in a permanent location before loading begins. Mount the components beginning at the bottom of the rack, then work to the top. Do not exceed your rack load rating. Power considerations Connect only to the power source specified on the unit. When you install multiple electrical components in a rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock hazards. Elevated ambient temperature If you install the equipment in a closed rack assembly, the operating temperature of the rack environment may be greater than the room ambient temperature. Use care not to exceed the 40 C maximum ambient temperature of the switch. Reduced air flow Install the equipment in the rack so that you do not compromise the amount of airflow required for safe operation of the equipment. 8 Install the Hardware

Reverse air flow To ensure cool air intake and to avoid hot air blow out from the I/O panel, ensure you have the necessary clearance. Reliable earthing Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit; for example, the use of the power strips. Do not mount the equipment with the Utility panel facing in the downward position. NOTE: These instructions are a condensed reference. Read the safety instructions in your Safety, Environmental, and Regulatory information booklet before you begin. NOTE: The illustrations in this document are not intended to represent a specific switch. Mounting the Chassis in a Rack or Cabinet 1. Dell Networking recommends that one person hold the S4810 ON chassis in place while a second person attaches the brackets to the posts. 2. Attach the bracket "ears" to the rack or cabinet posts, using two screws for each bracket. Ensure the screws are tightened firmly. Figure 2. Mount the Chassis 1. Screws 2. 4 Post Rack (or Cabinet) 3. Mounting Bracket Attaching the Ground Cable (Optional) The S4810 ON requires one M4x0.7 screw for attaching a ground cable to the chassis. To properly ground the chassis, Dell Networking recommends a 6 AWG one-hole lug, #10 hole size, 63" spacing. The one-hole lug must be a UL-recognized, crimp-type lug. NOTE: The rack installation ears are not a suitable grounding point. Install the Hardware 9

CAUTION: Grounding conductors must be made of copper. Do not use aluminum conductors. NOTE: Coat the one-hole lug with an anti-oxidant compound prior to crimping. Bring any unplated mating surfaces to a shiny finish, and coat with an anti-oxidant prior to mating. Plated mating surfaces must be clean and free from contamination. 1. Cut the ground cable to the desired length. The cable length must facilitate the proper operation of fault interrupt circuits. Dell Networking recommends using the shortest cable route allowable. 2. Attach the one-hole lug to the chassis using an M4x0.7 screw with a captive internal tooth lock washer, as shown. Torque the screw to 20 in-lbs. Figure 3. Attach the Ground Cable 3. Attach the other end of the ground cable to a suitable ground point. Important Points to Remember The S4810 ON is designed to support two hot-swappable power supplies with integrated fans that provide cooling for the chassis. The PSU slides into the slot smoothly. Do not force the PSU into a slot as this action may damage the PSU or the S4810 ON chassis. The S4810 ON supports AC power supplies with two air-flow directions (I/O to Utility and Utility to I/O). The S4810 ON does not support mixing PSU types. The fan airflow direction for both the PSUs must be the same. WARNING: Although the switch can run on one PSU, Dell Networking highly recommends using two PSUs for full redundancy and proper cooling. To avoid overheating if the switch needs to run with only one PSU for a time, Dell Networking recommends using PSU1 (on the left) and covering the second PSU slot opening with a blank plate. WARNING: The Utility panel consists of four slots numbered from 1 to 4. Insert PSUs in slots 1 and 4. WARNING: ESD damage can occur if components are mishandled. Always wear an ESDpreventive wrist or heel ground strap when handling the S4810 ON and its components. WARNING: DO NOT mix airflow directions. Both power supplies must use the same airflow direction (I/O to Utility or Utility to I/O). WARNING: To prevent electrical shock, ensure the S4810 ON is grounded properly. If you ground your equipment incorrectly, excessive emissions may result. To ensure the power cables meet your local electrical requirements, use a qualified electrician. 10 Install the Hardware

Installing AC Power Supplies 1. Remove the PSU from the electro-static bag. 2. Use the grab handle to slide the PSU into the switch PSU slot. Figure 4. Install the AC Power Supply Unit 3. Tighten the securing screws on the PSU. 4. Attach the power cables. NOTE: The system is powered-up as soon as you connect the power cord between the system and the power source. 5. Repeat steps 1 through 4 for the second PSU. NOTE: Ensure that the PSU is correctly installed. When you correctly install the PSU, the power connector is on the left side of the PSU. Installing a Fan Module 1. Remove the fan module from the shipping box. 2. Use the grab handle to slide the module into the switch fan slot. 3. Tighten the securing screws on the fan module. CAUTION: DO NOT mix airflow directions. Both fans must use the same airflow direction (I/O to Utility or Utility to I/O). Install the Hardware 11

CAUTION: Check the fans at six-month intervals and replace them as necessary. To accurately determine replacement intervals, regularly monitor the speeds of the cooling fans. Installing the SFP+ and QSFP+ Optics The S4810 ON has 48 small form-factor pluggable plus (SFP+) optical ports and four quad small formfactor pluggable plus (QSFP+) optical ports. For a list of supported optics, refer to the S4810 ON data sheet at www.dell.com or contact your Dell Networking representative. CAUTION: ESD damage can occur if the components are mishandled. Always wear an ESDpreventive wrist or heel ground strap when handling the S4810 ON and its components. WARNING: When working with optical fibers, follow all the warning labels and always wear eye protection. Never look directly into the end of a terminated or unterminated fiber or connector as it may cause eye damage. 1. Position the optic so it is in the correct position. The optic has a key that prevents it from being inserted incorrectly. 2. Insert the optic into the port until it gently snaps into place. NOTE: Both rows of QSFP+ ports require that you install the 40GbE optics with the tabs facing up. NOTE: When you cable the ports, be sure not to interfere with the airflow from the small vent holes above and below the ports. Supply Power and Power Up the System Supply power to the S4810 ON after the chassis is mounted in a rack or cabinet. Dell Networking recommends re-inspecting your system prior to powering up. Verify that: The equipment is properly secured to the rack. The equipment rack is properly mounted and grounded. The ambient temperature around the unit (which may be higher than the room temperature) is within the limits specified for the S4810 ON. There is sufficient airflow around the unit. The input circuits are correctly sized for the loads and that you use sufficient overcurrent protection devices. All protective covers are in place. NOTE: A country/region-specific AC power cable is included in the shipping container for powering up an AC power supply. You must order all other power cables separately. CAUTION: ESD damage can occur if the components are mishandled. Always wear an ESDpreventive wrist or heel ground strap when handling the S4810 ON and its components. When the system powers up, the fans come on at high speed. The fan speed slows as the system boots up. The power status LED blinks until the boot-up sequence is complete. When the boot up is complete, the power status LED is steadily lit. 12 Install the Hardware

AC Power CAUTION: Ensure that the PSU is installed correctly. The AC power connector must be on the left side of the PSU and the status LED at the top of the PSU. Connect the plug to each AC power connector. Make sure that the power cord is secure. As soon as the cable is connected between the S4810 ON and the power source, the switch is poweredup; there is no on/off switch. Fans Both the fan module and the integrated fan-power supply are hot-swappable if a second (redundant) power supply is installed and running. NOTE: To run the system, both slots must have operating fan units. If you do not install a module in each slot (either as part of the PSU or as an independent fan module), the system shuts down in one minute. NOTE: The S4810 ON supports two airflow direction options. You can only use a single direction in a chassis; do not mix fan flow types. Normal is airflow from the I/O panel to the power supply. Reversed is airflow from the power supply to the I/O panel. There are environmental factors that could decrease the amount of time required between fan replacements. Check these environmental factors regularly. Any unusual environmental circumstance at the site that causes an increase in temperature and/or particulate matter in the air might affect performance (for example, new equipment installation). After Installing the S4810 ON After you have securely installed and powered on the S4810-ON, to configure your system, refer to your ONIE-compatible third-party operating system documentation. Install the Hardware 13

14

Technical Specifications 3 NOTE: Operate the system at an ambient temperature not higher than 40 C. CAUTION: Lithium Battery Caution: There is a danger of explosion if the battery is incorrectly replaced. NOTE: Replace the battery only with the same or an equivalent type. Dispose of the batteries according to the manufacturer's instructions. Table 1. S4810 ON Chassis Physical Design Parameter Height Width Depth Chassis weight with factory-installed components Rack clearance required Specifications 1.73 inches (4.4 cm) 17.32 inches (44.0 cm) 18.11 inches (47.6 cm) 14.39 pounds (approx.) (6.54 kg) Front: 5 inches (12.7 cm) Rear: 5 inches (12.7 cm) Table 2. Environmental Parameters Parameter Operating temperature Operating humidity Storage temperature Relative humidity Maximum thermal output Specifications 32 to 104 F (0 to 40 C) 10 85 percent (RH), noncondensing 40 to 158 F ( 40 to 70 C) 10 85 percent, noncondensing 1194 BTH/h Maximum Altitude No performance degradation to 10,000 feet (3,048 meters) Shock Table 3. Power Requirements Meets Bellcore Zone 4 earthquake requirements (MIL-STD-810) Parameter AC Power supply Maximum current draw per system Maximum power consumption Typical power consumption Specifications 100 VAC ~ 240 VAC 50 60 Hz 4.20 A @ 100 VAC 1.70 A @ 240 VAC 350 Watts (AC) 220 Watts (AC) Technical Specifications 15

Parameter Maximum system power input Specifications 350 Watts (AC) 16 Technical Specifications