Validator Update Instructions for Rowe BC1200 $1 - $20

Similar documents
Royal RVV-500 (B) Retrofit Kit

Section. Service & Maintenance. - Core & Hard Disk Drive (HDD) - Amplifier - Monitor - UPS - Dollar Bill Acceptor - Fan Filter G - 1

Ion Memory Upgrade. Visit the AMI Entertainment Web site PM

Instructions to Install Retrofit Kit RVMC 4/5000 Machine (MDB Only)

Service & Maintenance

TDM To MiniMech conversion ProceDure

Kit# KOV ModBox IR REMOTE CONTROL KIT

E1135C PDU and Pod Upgrade Procedure

Coin Acceptors, Inc. Installation Instructions for the 4.3 Touch Screen Display

PoE/FPR Kit for Auto-Sync Time Clock. The Auto-Sync Time Clock is a validated time system with a Web interface and auto discovery.

Megatouch FORCE Monitor Chassis Board Replacement

Installation Instructions

CONSOLE CONNECTOR KIT 9501 INSTALLATION INSTRUCTIONS

Installation Instructions

A m e r i c a n C h a n g e r

Coin Manager CN MDB Installation Guide-Canada. Set Up Screen Features (Continued) GENERAL INFORMATION

Installation Guide. Retrofit Kit for USB Ready Intraoral Systems

Phase Loss Protection Upgrade. Phase Loss Protection Upgrade. In this bulletin:

Greenlite Cashless In-Field Hardware Installation Instructions

Instructions to Install Retrofit Kit 6/7000 Machine

RS3000 SERIES BILL ACCEPTORS

Basketball Shot Clock Set LX2180 Manual

LED Lighting Kit For Elara NanoEdge Fixed Frame. Installation Guide. Attention: Read this guide before assembling your screen.

Please read thoroughly before starting installation and check that kit contents are complete.

Installation Instructions. Rock-Ola Ecast B75B Motherboard Upgrade Kit Kit #

How To Install: C4000 EMV Upgrade Kit

Microprocessor Module Replacement Kit for Multi-Zone Leak Monitors Instruction Manual

INSTALLATION MANUAL KIOSK SX6 SF6

Air Hockey v7.0 Controller PCB Air Hockey 10v Transformer

INSTALLATION INSTRUCTIONS

Diamond Cabinet Slant Top Users Manual Revision 1.0

Smart Multivariable Transmitter (SMV 3000) Electronics Module Replacement Kit Instruction

A m e r i c a n C h a n g e r OPERATIONS MANUAL MODEL AC2207. ARL Listed STD: UL 756

Kit K Instructions. V8700 to Alpha Conversion Instructions

E2460GS Oscilloscope Upgrade Kit

Installation Instructions. Ecast Mojo B75B Motherboard Upgrade Kit Kit #

EASTERN LABS. Instructions Model RM /25/2007. Operation. Junction Box Assembly. Different Types of Switch Installations

SECURITY MODULE UPGRADE

INSTRUCTIONS FOR THE INSTALLATION OF THE INFINITY "L" DISPLAY HOOD (INTO PREVIOUSLY INSTALLED INFINITY "L" SYSTEMS)

TDM-100/150 TO NMD-50 CONVERSION PROCEDURES RL5000

ATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES

ColorMaxLP Label Roll Rewinder

ATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES

V910 Kit. Hardware Installation Guide. P/N Revision: A

Installing and Removing SDRAM and DRAM

Installation Instructions. Ecast View B75B Motherboard Upgrade Kit Kit #

ATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES

Coastal Electronic Technologies, Inc. GM LOCKPICK GMX-320 Installation and Operation Instructions

California Antique Slots, Inc. (805) (FAX)

Seeburg JCU-DEC Kit Convert Your Seeburg DEC Wallbox Into a Jukebox

MCH WIRE HARNESS WITH QUICK DISCONNECT REPLACEMENT Initial Release 1/31/2013

Power Supply Replacement Instructions

ACW-5 Operational Manual

BATTERY-POWERED CHANGER MODEL AC400B

13 MMC for PC Option Modules

Upgrading a 2U CHP to an i7 Quad Core SBC

How To Install: G2500 EMV Upgrade Kit

CAMERA ASSEMBLY. Removal/Replacement of the Camera Box Assembly APR-CA. Install Camera Assembly. Remove Camera Assembly

Tim Hortons EI30 Ethernet Interface Circuit Board

TACC Parts List Description

AMERICAN CHANGER CORP.

imac Intel 27" EMC 2639 Hard Drive

EX2000 Series Vending System. User s Manual. Choose ACDI for all your document vending needs User s Manual

Operational Manual for the ACW-5-D

Procedure to Upgrade from B&W Maintenance Panel to TIB Color Touchscreen Door in a Working Maxum or Maxum II Analyzer Equipped With a SYSCON2

DISCLAIMER PLEASE READ

EX2000 Series Vending System. User s Manual. Choose ACDI for all your document vending needs User s Manual

SPECIAL INSTRUCTIONS FOR CAPACITORS COMPACT GENERATORS

ARC-CDJPLAYER INSTALLATION MANUAL Full plug and play kit, universal fit for use in Chrysler vehicles with RA1, RA2, RA3, or RA4 radios.

Installing a Power over Ethernet injector

Phillips Screwdriver. Some C-128's may need a TORX ("star" point) driver (size T10)f available at Sears, and other hardware and automotive stores.

4.1 Parts and Components... IV Assembly Tips... IV Assembly Precautions... IV Required Tools, Equipment and Materials..

Model 7416LED

Replacement Keyswitch Assembly

ROWE BILL CHANGERS BCxx00 BUCKET POWER ON ERRORS! March 04, 2005 Bruno D Puglia See Bruno s page

PIX 515/515E. PIX 515/515E Product Overview CHAPTER

C40 Console Upgrade Kit Installation PN Kit, C5 to C40 Console Upgrade PN Kit, C5 to C40 Console Upgrade with Contact Heart Rate

ELECTRO-MECH SCOREBOARD CO.

A TCP/IP network CAT 5 cable If the network is faster than 10baseT a switching hub will be needed Static IP address

IBM. Rack Installation Instructions

EMC 10T "CE" Mechanical Upgrade Procedure

DaNI Robot Camera. User Guide V0512

1. Mount the echo and tremolo control switches under the keyboard shelf, in a position convenient for the organist.

Havis Integrated Control System Installation Instructions for Standard* Ford Police Interceptor Utility

USBCNC-SW USB Disk Key reader for CNC Controls Machine Mount instructions for Universal Switcher Version

*E * E E0606

SYSTEM MAINTENANCE MANUAL TACTICAL ENGAGEMENT SIMULATION SYSTEM (TESS) TARGET TRAINING SYSTEM (TTS) OCONUS FIXED LOCATION INSTALLATION

Outdoor PTZ. Mounting on the Ceiling Using Pendant Mount. Installation Guide. For Models: I93, I94, I95, I96, KCM /12/03

INSTALLATION MANUAL. LO SIDE BOX ADD-ON KIT For driver or passenger side configurations TRUCK STORAGE SOLUTIONS FOR THE WAY YOU WORK

SMART Coin System QUICK START AND CONFIGURATION GUIDE

TIVO DVR UPGRADE INSTRUCTIONS (#80-HD)

Upgrading Legacy Iso-Gard Line Isolation Monitors and Remote Indicators

Cutter Option Installation Instructions

Floppy Disk To USB. Converter Installation and. Operation Manual

CAP300-Outdoor. Installation Guide. 300Mbps Wireless N Outdoor Access Point

Installation Instructions

Installation Instructions

User Guide. Intel NUC 8 Business, a Mini PC with Windows 10 NUC8i7HNKQC. Intel NUC 8 Enthusiast, a Mini PC with Windows 10 NUC8i7HVKVA

Ag Leader Technology. DirectCommand Installation Hardi 20-pin Interface Kit (Sprayer Chassis Mount)

Installation Instructions

Transcription:

Validator Update Instructions for Rowe BC1200 $1 - $20 Kit Overview The purpose of the kit is to replace the Rowe BA50 transport and stacker with a 120 volt Mars validator with a compact mask. The kit and these instructions pertain to a Rowe BC1200, this is a front-loading changer with two hoppers. There are 2 variations of the kit, one will process $1-$5 and the second $1-$20. This kit is designed for dollar bill changers that are not used to make change for a coin. If you are accepting coins please, contact us for a coin interface kit. This stock kit will work in changers with board numbers 65069006 and 65069050. The kit will work with all 3 variations of the Rowe BILL CHANGER CONTROL COMPUTER boards; 65069001, 65069006, and 65069050. The E prom in board versions 6509006 and 6509050 will be changed to 2.7. If you are installing the kit with board number 65069001 two additional parts are needed. This is the early style obsolete board. Please call us prior to beginning the conversion so they can be sent to you. The parts kit includes a E prom and a transport by-pass harness. Order part number KITCVR65069001-Eprom costing $10.00. We can be reached at Capital Vending 800 814-7756. The installation information is intended for experienced personnel familiar with the operation of these components. All of the installation procedures must be reviewed and understood prior to installing the kit. The installation instructions are based upon a dollar bill changer that has not been modified from the original factory configuration. If the machine has been altered in any way, restore the machine to the original factory configuration prior to beginning the conversion. The installer must know the proper procedures to replace an E prom. Kit Components The kit contains the following parts: Module in black plastic box; labeled BC1200/1400/3500 Metal validator slide plate with wide opening E prom with label BC3500 V2.7 One package of Velcro Additional Required Items Not Included With Kit Working Mars validator Model AE2411/AE2451, VN2511, or AE2611 The four 11-32 hex nuts used to mount the Mars validator to the validator slide plate are included in the Mars validator shipping box. Dollar bills to test the validator and verify operation of the kit Electrical tape Tools Required 11/32, ¼, and 3/8 long handle nut drivers Pliers Small screwdriver or IC removal tool Optional Tools Required for low coins screw installation Drill 5/16 drill bit Page 1

Installation Instructions 1. Unplug the power cord from the wall and open the door of the changer. 2. Remove the BA50 bill transport by unplugging the harness at the 15-position harness connector. A 12-inch harness will still be connected to the side of the BA50 transport. 3. Remove the bill box(es) from the stacker assembly. 4. Remove the stacker assembly by unscrewing the two ¼ screws at the top of the assembly. It may be necessary to hold the nuts under the assembly with a pair of pliers. [For changers with a dual stacker: remove the two ¼ screws that secure the stacker assembly base to the bill box bracket. The bill box bracket can remain in the changer] Disconnect the harness from the upper rear right hand side. Slide the stacker assembly forward out of the changer. Replace the upper two screws and nuts. The original stacker harness will not be connected to any component. 5. Set the dip switches on the 120v Mars validator per the label on the kit Module. 6. Unplug the 9-position harness at the Coin Acceptor Assembly. If the changer was not originally equipped with a Coin Acceptor Assembly on the front door, it will be necessary to look behind the hopper assembly for the harness. Figure 4 shows a changer with a factory installed Coin Acceptor Assembly. 7. Insert the 9-position harness from the new Module into the open connector. This kit is not designed for use in a changer that accepts coins. If there is a coin acceptor on the front door the 9-position connector will remain open. If you need to accept coins, please contact us for a coin interface kit. 8. Remove the right hopper from the changer for easy access to the power junction box. 9. Unplug the 3-position power harness from the power junction box located on the upper area of the right side of the cabinet. Plug the 3 position male connector from the kit into the now open connector. Plug the machine harness into the 3 position female connector of the wiring harness from the Module. 10. Mount the kit Module to the right hand wall of the changer using Velcro. See figure 5. 11. Mount the validator onto the metal validator slide plate; the four 11-32 keps nuts are supplied with the validator. A twelve-inch factory harness may be connected to the validator when it is removed from the box. Unplug this harness, as it is not used with the kit. 12. Set the dip switches on the validator per the label on the Module. 13. Slide the validator plate assembly down the tracks that originally secured the BA50 transport. Attach the harness from the Module with the long black connector to the validator. Note the position of the two keyed pins when attaching the connector. 14. If the machine was not factory fitted with a Coin Acceptor Assembly this step can be skipped. Remove either of the 2 wires from the coin return switch; red or black. Wrap the terminal in electrical tape. 15. The E prom in the control board needs to be changed. It is assumed you are working with board model 65069006 or 65069050. Remove the BILL CHANGER CONTROL COMPUTER. 16. Remove the cover from the BILL CHANGER CONTROL COMPUTER. 17. Remove the existing Eprom form the socket. Install the E prom supplied in the parts kit. Be sure to observe the orientation of the notch on the chip. 18. Replace the cover and reinstall the BILL CHANGER CONTROL COMPUTER in the changer. 19. At this point the BILL CHANGER CONTROL COMPUTER is reprogrammed. Plug the cord back into the wall outlet. After a 10 second warm up period the walking blue dash will appear on the BILL CHANGER CONTROL COMPUTER and begin scrolling back and forth. The 3 most popularly used programs are described below. The programming assumes 4 quarters will be dispensed for each dollar value inserted. If you are dispensing dollar coins divide the number of coins to be dispensed by 4. The below instructions can be used as a basis for substituting your own values if needed. The values you are programming may seem odd, however the validator now controls the denominations accepted. The MC mode is recommended if you are dispensing the same value coin in both hoppers. The operation Page 2

of the MC Mode is described on page 2-12 in the Rowe BC-1200/1400 Bill & Coin Changer Field Service Manual and Parts Catalog; fifth edition. MC MODE - 4 COINS PER DOLLAR VALUE A. Slide the BILL CHANGER CONTROL COMPUTER forward so it is easy to view the blue display and access the programming buttons. B. Slide the mode switch upwards to the programming mode, the display will read TEMP COUNTERS. C. Depending upon the vintage of the BILL CHANGER CONTROL COMPUTER, the FUNCTION button may be labeled as FUNCTION or FUNCTION-ERROR RESET. These instructions refer to the button as FUNCTION. D. Press the FUNCTION button, the display will read PERM COUNTERS. E. Press the FUNCTION button, the display will read PROGRAMMING. If a security code was entered earlier enter the code now. F. Press the FUNCTION button, the display will read MC PAYOUT. It must be set to ON. Use either of the COUNT SWITCHES BUTTONS to set this option to ON. G. Press the FUNCTION button, the display will read HOP VAL; the value of coins for the left hopper will be flashing. Press the VALUE button until the display reads T1. H. Press the HOPPER button; the display will advance to the right hopper. Press the VALUE button until the display reads T1. I. Press the FUNCTION button, the display will read ACCEPT 1; this is set to NO. The NO and YES options are toggled using the COUNT SWITCHES. J. Press the VALUE button, the display will read ACCEPT 2; this is set to NO. K. Press the VALUE button, the display will read ACCEPT 5; this is set to YES. L. Press the VALUE button, the display will read ACCEPT 10; this is set to NO. M. Press the VALUE button, the display will read ACCEPT 20; this is set to NO. N. Press the VALUE button, the display will read ACCEPT 25; this setting must be set to YES. O. Press the VALUE button, the display will read ACCEPT 25A; this setting is set to NO. P. Press the VALUE button, the display will read ACCEPT 50; this is set to YES. Q. Press the FUNCTION button, the display will show 25 PAY MC MC. Use the COUNT SWITCH BUTTONS to set the value to 4. Use the COUNT SWITCHES to change the value. This value determines the number of coins to be dispensed for a $1 bill; twice the amount of coins for a $2 bill. R. Press the VALUE button, the display will show 50 PAY MC MC. Use the COUNT SWITCHES BUTTONS to set the value to 20. Use the COUNT SWITCHES to change the value. This value determines the number of coins to be dispensed for a $5 bill. S. At this point all of the programming changes needed for the kit have been made, slide the function button down to the NORMAL OPERATING MODE. The display will indicate Storing New Data. T. The walking blue dash will begin scrolling. The 2 green arrows on the validator will begin blinking. U. Skip to #16. NON MC MODE - 2 QUARTERS FROM EACH HOPPER FOR A $1 BILL & 10 QUARTERS FROM EACH HOPPER FOR A $5 BILL A. Slide the BILL CHANGER CONTROL COMPUTER forward so it is easy to view the blue display and access the programming buttons. B. Slide the mode switch upwards to the programming mode, the display will read TEMP COUNTERS. C. Depending upon the vintage of the BILL CHANGER CONTROL COMPUTER, the FUNCTION button may be labeled as FUNCTION or FUNCTION-ERROR RESET. These instructions refer to the button as FUNCTION. Page 3

D. Press the FUNCTION button, the display will read PERM COUNTERS. E. Press the FUNCTION button, the display will read PROGRAMMING. If a security code was entered earlier enter the code now. F. Press the FUNCTION button, the display will read MC PAYOUT. It must be set to OFF. Use either of the COUNT SWITCHES BUTTONS to set this option to OFF. G. Press the FUNCTION button, the display will read HOP VAL; the value of coins for the left hopper will be flashing. Press the VALUE button until the display reads T1. H. Press the HOPPER button; the display will advance to the right hopper. Press the VALUE button until the display reads T1. I. Press the FUNCTION button, the display will read ACCEPT 1; this is set to NO. The NO and YES options are toggled using the COUNT SWITCHES. J. Press the VALUE button, the display will read ACCEPT 2; this is set to NO. K. Press the VALUE button, the display will read ACCEPT 5; this is set to YES. L. Press the VALUE button, the display will read ACCEPT 10; this is set to NO. M. Press the VALUE button, the display will read ACCEPT 20; this is set to NO. N. Press the VALUE button, the display will read ACCEPT 25; this setting must be set to YES. O. Press the VALUE button, the display will read ACCEPT 25A; this setting is set to NO. P. Press the VALUE button, the display will read ACCEPT 50; this is set to YES. Q. Press the FUNCTION button, the display will show 25 PAY ---. Use the COUNT SWITCH BUTTONS to change the value for the left hopper to 2. Press the HOPPER button to advance to the right hopper value. Use the COUNT SWITCHES to set the value at 2. This value determines the number of coins to be dispensed for a $1 bill; twice the amount of coins for a $2 bill. R. Press the VALUE button, the display will show 50 PAY ---. Use the COUNT SWITCHES BUTTONS to change the value for the left hopper to 10. Press the HOPPER button to advance to the right hopper value. Use the COUNT SWITCHES to change set the value to 10. This value determines the number of coins to be dispensed for a $5 bill. S. At this point all of the programming changes needed for the kit have been made, slide the function button down to the NORMAL OPERATING MODE. The display will indicate Storing New Data. T. The walking blue dash will begin scrolling. The 2 green arrows on the validator will begin blinking. U. Skip to #16. NON MC MODE - 3 QUARTERS AND 5 NICKELS FOR A $1 BILL & 19 QUARTERS AND 5 NICKELS FOR A $5 BILL A. Slide the BILL CHANGER CONTROL COMPUTER forward so it is easy to view the blue display and access the programming buttons. B. Slide the mode switch upwards to the programming mode, the display will read TEMP COUNTERS. C. Depending upon the vintage of the BILL CHANGER CONTROL COMPUTER, the FUNCTION button may be labeled as FUNCTION or FUNCTION-ERROR RESET. These instructions refer to the button as FUNCTION. D. Press the FUNCTION button, the display will read PERM COUNTERS. E. Press the FUNCTION button, the display will read PROGRAMMING. If a security code was entered earlier enter the code now. F. Press the FUNCTION button, the display will read MC PAYOUT. It must be set to OFF. Use either of the COUNT SWITCHES BUTTONS to set this option to OFF. G. Press the FUNCTION button, the display will read HOP VAL; the value of coins for the left hopper will be flashing. Press the VALUE button until the display reads T1. H. Press the HOPPER button; the display will advance to the right hopper. Press the VALUE button until the display reads T1. Page 4

I. Press the FUNCTION button, the display will read ACCEPT 1; this is set to NO. The NO and YES options are toggled using the COUNT SWITCHES. J. Press the VALUE button, the display will read ACCEPT 2; this is set to NO. K. Press the VALUE button, the display will read ACCEPT 5; this is set to YES. L. Press the VALUE button, the display will read ACCEPT 10; this is set to NO. M. Press the VALUE button, the display will read ACCEPT 20; this is set to NO. N. Press the VALUE button, the display will read ACCEPT 25; this setting must be set to YES. O. Press the VALUE button, the display will read ACCEPT 25A; this setting is set to NO. P. Press the VALUE button, the display will read ACCEPT 50; this is set to YES. Q. Press the FUNCTION button, the display will show 25 PAY ---. Use the COUNT SWITCH BUTTONS to set the value for the left hopper to 3 (quarters). Press the HOPPER button to advance to the right hopper value. Use the COUNT SWITCHES to change the value to 5 (nickels). This value determines the number of coins to be dispensed for a $1 bill; twice the amount of coins for a $2 bill. R. Press the VALUE button, the display will show 50 PAY ---. Use the COUNT SWITCHES BUTTONS to change the value for the left hopper to 19 (quarters). Press the HOPPER button to advance to the right hopper value. Use the COUNT SWITCHES to set the value at 5 (nickels). This value determines the number of coins to be dispensed for a $5 bill. S. At this point all of the programming changes needed for the kit have been made, slide the function button down to the NORMAL OPERATING MODE. The display will indicate Storing New Data. T. The walking blue dash will begin scrolling. The 2 green arrows on the validator will begin blinking. Insert several $1.00 dollar bills and then $5.00 dollar bills to confirm proper operation Installation Instructions for Hopper Low Coins Screws in Rowe Dollar Bill Changers for Kit Modules accepting $10 and $20 These instructions apply to the final step of installing a kit Module to upgrade a Rowe changer for the acceptance of $10 and $20. Upon completion of the installation of the kit module, the changer should be tested. The changer can now make change for $10 and $20 dollar bills. When a $10 bill is inserted the amount of coins programmed for a $5 pay out is dispensed twice. When a $20 bill is inserted the amount of coins programmed for a $5 pay out is dispensed 4 times. Be sure the dip switches on the Mars AE2611 validator is set up to accept $10 and/or $20 bills and test the kit. Upon verification that the kit and changer are working properly a low coins screw is installed. This must be installed to prevent short changing a customer. If the changer is in an attended location and the hoppers never empty, it is not necessary to install the low coins screw. The screw is used to detect ground through the coins in the hopper. When coins are not touching the screw and the metal wall of the hopper the Module will disable the validator until more coins are inserted. The kit Module will automatically reset when additional coins are inserted. MC PAYOUT INFORMATION If the changer is being used in the MC mode, a low coins screw sensor will only need to be installed in the last hopper to be emptied; left hopper on 2 hopper models. The parts kit consists of a single harness. If you are not using the MC Mode, the hopper that will empty Page 5

first should be monitored. The Module is capable of monitoring both hoppers. An additional harness is available at no charge by calling (800) 814-7756. INSTALLATION INSTRUCTIONS 1. Turn off the changer. 2. Remove the hopper(s) from the changer and set it in a work area. If it is filled with coins, remove the coins. 3. Drill an 5/16 hole in the black plastic area at the bottom of the hopper. The hole should be located at the center of the hopper and 7/8 form the very bottom of the plastic. Positioning is important so that a coin does not get wedged between the screw and the hopper body. See Figure 1 below. 4. Insert the screw through the hole. Reach your hand into the hopper and align the nut. Begin tightening the screw while holding the nut. When the nut is almost fully tightened, slip the open spade terminal under the screw head. Finish tightening the screw so the harness is held securely in place. The terminal should be positioned so that it is vertical, 3:00 or 9:00. See figures 1 and 2. 5. Once the hopper has been modified place it back in the changer. 6. Run the harnesses directly down to the bottom of the hopper and then across towards the module. Be sure to position the harness(es) so they do not interfere with the coin delivery or the other hoppers. 7. Disconnect one of the black wires (with pick insulators) terminals at the module. Any of the 3 can be disconnected. 8. Connect the wire from the hoppers to the now open female connector. The wires with the male terminals are now left open. 9. Confirm there are not any open female connectors, as this will disable the validator. 10. Load coins into the hoppers so the screw threads are covered. 11. Turn on the changer. After a 10 second warm up period the validator will accept bills. Figure 1 Figure 2 For technical help please contact us at (800) 814-7756 from 9:00am 4:30pm EST. Page 6

Page 7

Rowe BC 1200 Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Page 8