Status of the EUR works, EUR organisation

Similar documents
Towards Design Standardization and Safety Harmonisation : European Nuclear Utility Initiatives

WNA CORDEL Group and its Roadmap to greater Standardization of Reactor Designs

Toshiba/Westinghouse Challenges for the Global Market

Raidis Zemdegs WNA/CORDEL

WNA : activities in NPP operation, new build and supply chain. Irina Borysova, 26 July 2011, for TWG LWR and HWR, IAEA

E.ON: a nuclear player in Europe

Network of Excellence and Sustainable Association for Plant Life Assessment and Long Term Operation in Europe

Nuclear Growth at Home and Abroad

CORDEL s Activities Cooperation in Reactor Design and Licensing

I&C Challenges, Architecture and Lessons Learned, Status on EPR projects

Jacques Régaldo, Chairman of WANO

Keynote Speech IAEA Technical Meeting on Fatigue Assessment in Light Water Reactors for Long Term Operation: Good Practices and Lessons Learned

Hitachi-GE Nuclear Energy, Ltd. UK ABWR GENERIC DESIGN ASSESSMENT Resolution Plan for RO-ABWR-0028 Safety System Logic & Control (SSLC) Class 1 HMI

The Fukushima accident Consequences for Japan and France

Role of I&C Conceptual Design in NPP Licensing

13543/17 PhL/at 1 DG G 3 B

Improving the Security of Radioactive Sources in Industrial Radiography in South East Asia

REGULATORY, FINANCIAL AND POLITICAL CHALLENGES TO NEW BUILD: THE EDF EXPERIENCE

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Criticality control in SFP. Radwaste and Decommissioning

EUROPEAN ORGANISATION FOR SECURITY SUPPLY CHAIN SECURITY WHITE PAPER

The contribution of ETSON to improved emergency preparedness in the light of the Fukushima NPS accident

The European Programme for Energy Efficiency in Data Centres: The Code of Conduct

EA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits

Memorandum of Understanding

IAEA MILESTONE, MNPC as NEPIO and EPP 11 IN ECONOMIC TRANSFORMATION PROGRAM (ETP) REPORT STATUS & PROGRESS OF NUCLEAR POWER PRE-PROJECT ACTIVITIES

GDA Step 2 Assessment of Security for Generic Design Assessment of Hitachi GE s UK Advanced Boiling Water Reactor (UK ABWR) OFFICIAL

European Nuclear Security Regulators Association

Standards: Implementation, Certification and Testing Work group Friday, May 8, :00 Pm-1:30 Pm ET.

Achieving CANDU Excellence Through Collaboration

Balancing energy and environmental demands

Digitalization of Nuclear Power Plants at EDF

Suppliers Qualification to Ensure Nuclear & Radiation Safety Requirements in Newcomer Countries

Dialogue on Nonproliferation and Nuclear Security in Southeast Asia. Nuclear Cooperation in Southeast Asia. Stephanie Lieggi Senior Research Associate

ARTICLE 29 DATA PROTECTION WORKING PARTY

Network Code on Operational Security. User s Group System Operations 06/11/2013

Overview of Global Nuclear Safety and Security Network (GNSSN)

IAEA Activities under the Nuclear Safety Action Plan

The future role of DSOs in the context of the Clean Energy for All Europeans package

ENISA S WORK ON ICS AND SMART GRID SECURITY

Balancing energy and environmental demands

EU Code of Conduct on Data Centre Energy Efficiency

UAE s National Integrated Planning for nuclear power infrastructure development

cybersecurity in Europe Rossella Mattioli Secure Infrastructures and Services

Ongoing EPRI Plant Modernization and Configuration Management Initiatives

Engineering and Technical Risk Management Solutions

ABWR Reactor Technology

UAE Nuclear Energy Program Overview

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679)

nuclearsafety.gc.ca Implications of the Fukushima Daiichi Accidents for the New Builds Design Requirements in Canada

EUROPEAN ACCREDITATION LEGAL FRAMEWORK

Supply Chain Services for Nuclear Power Plants: How to build and control the supply chain

Capacity building in the IAEA Action Plan on Nuclear Safety

Hitachi s Recent Efforts to Cope with Growing Global Nuclear Energy Market

Horizon Nuclear Power

Cybersecurity Policy in the EU: Security Directive - Security for the data in the cloud

Rev 2 May Health and Safety Authority. Function and Scope of REACH and CLP Helpdesk

Recent developments CEN and CENELEC

Hitachi-GE Nuclear Energy, Ltd. UK ABWR GENERIC DESIGN ASSESSMENT Resolution Plan for RO-ABWR-0027 Hardwired Back Up System

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

BEREC Public debriefing

Smart Grid Standards and Certification

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013

Safety of Nuclear Installations

GNSSN. Global Nuclear Safety and Security Network

Cyber Security in Europe and CEER s new PEER initiative

In Accountable IoT We Trust

Innovations in collaborative modelling and simulation to deliver the Behavioural Digital Aircraft : A summary of results from the CRESCENDO project

BDT Activities on Spectrum Management István Bozsóki Head of Division BDT/IEE/SBD

UK ABWR Generic Design Assessment Generic PCSR Chapter 4 : Safety Management throughout Plant Lifecycle

Compass4D Working towards deployment of C-ITS. Pierpaolo Tona, Project Manager

International Accreditation Forum, Inc. User Advisory Committee UAC

BWROG - RCIC (AFW) Expanded Operation Performance Band - Overview and Status

opensgra open Smart Grid Reference Architecture Based upon the GridWise Context Setting Framework & NIST Roadmap

EUROPEAN PLATFORMS AND INITIATIVES FOR C-ITS DEPLOYMENT

Local Supply Chain Development

Nuclear Safety and Security in Brief

IAEA Perspective: The Framework for the Security of Radioactive Material and Associated Facilities

CONTINUOUS PROFESSIONAL DEVELOPMENT (CPD) POLICY

Controlled Document Page 1 of 6. Effective Date: 6/19/13. Approved by: CAB/F. Approved on: 6/19/13. Version Supersedes:

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

IAEA Programme on Instrumentation and Control System Design and Engineering for Operating NPPs

ENISA s Position on the NIS Directive

The failings of the Advanced Boiling Water Reactor (ABWR) proposed for Wylfa Nuclear Power Station

ESFRI Strategic Roadmap & RI Long-term sustainability an EC overview

Work to establish standard ENTSOE STAKEHOLDER COMMITTEE 1

Task 57 Solar standards and certification Version 1.1. Guideline for Implementing Certification Schemes for Solar Heating and Cooling Products

Cyber Security in Smart Commercial Buildings 2017 to 2021

The Future of Solid State Lighting in Europe

Policy drivers and regulatory framework to roll out the Smart Grid deployment. Dr. Manuel Sánchez European Commission, DG ENERGY

Measures for implementing quality labelling and certification

PATHWAYS TO INNOVATION IN DISASTER RISK MANAGEMENT. Paolo Venturoni CEO European Organisation For Security 4 th June 2018

Development of a new IEC Standard on Cybersecurity Controls for I&C in Nuclear Power Plants IEC 63096

A comprehensive approach on personal data protection in the European Union

INTERMEDIATE EVALUATION

Smart Finance for Smart Buildings

Training & Certification Guide

RECOGNITION POLICY (RPL)

CEN and CENELEC Position Paper on the draft regulation ''Cybersecurity Act''

End-to-end Safety, Security and Reliability Keys for a successful I4.0 Migration

Implementation of Business Continuity Management System (BCMS) based on ISO 22301:2012 requirements

Transcription:

European Utility Requirements for LWR nuclear power plants EUR seminar 2010, Barcelona, June 1 st 2010 Status of the EUR works, EUR organisation Luc VANHOENACKER, Tractebel Engineering (GDFSUEZ)

EUR today: a mature cooperative organization of European utilities Working together since 1992 Committed to keep the nuclear option open Sharing specification and development works for Gen 3 LWR plants Today involving most of the major European nuclear electricity producers or group of (19) Operating a very large nuclear fleet: more than 130 LWRs + others In competition with each other page 2

page 3 The EUR project initial objectives (1991) A single technology: light water To reduce licensing risks Quite high safety objectives: : common rules valid for a long enough time and in a wide enough area Seek for improved acceptance Safety harmonisation : within Europe and, as far as possible, with USA To increase plant competitiveness allowing the development of standard designs usable throughout a wide area promoting cost-effective design features establishing conditions for a fair competition between the vendors To deal with the open European electricity market Harmonised design requirements

EUR: a hub to harmonise European utilities views & requirements and to make Gen 3 a reality in Europe a utility network to share experience in plant specification, design evaluation, licensing l To build common specifications for the European GenIII NPPs a common bridge with external stakeholders the vendors the regulators: safety (WENRA), HV grid, the EUR counterparts outside Europe: EPRI, Asian utilities, the international organisations: IAEA, OECD, EU, WNA the education and training organizations and networks: ENEN, WNU, page 4

page 5 The EUR document: a generic Gen 3 LWR specification A specification written by investors & operators Open Wide experience basis (6 different vendors & 19 operators in Europe) Not a regulatory document Design objectives and functional requirements, Fits all the designs of interest to the European utilities Modular structure, versatile, easy to adapt Neutral Does not favour any specific design Seldom forbids, except where there is a bad operation experience or an unacceptable industrial risk Benchmarked Other industrial specifications (EPRI-URD), regulatory documents, international design guides Real Gen 3 designs A possible base to call for bids

The EUR document: a short list of selected designs Most of the available designs on the European market candidate to evaluation by EUR Assessment of the designs of interest for EUR utilities page 6 Real support to the product by utilities Preliminary checking before starting full scope work In depth understanding of the rationales of the evaluated designs Certificate granted to the vendor to recognize the complete evaluation Benefits for both the potential customers and the vendors

The EUR document volume 1 volume 2 volume 3 volume 4 main policies & objectives page 7 generic nuclear island requirements Applications of EUR to specific projects generic conventional island requirements revision C: 04/2001 revision C: 10/2007

page 8 The EUR document Volume 1 presents the main utility objectives and the summaries the main requirements. Volume 2 is a set of generic nuclear island requirements. The contents cover most of what a Plant Owner has to specify for the assessment, licensing, design, supply, construction, tests and operation of a future LWR power plant. Volume 3 includes evaluations of the selected LWR designs that are felt feasible for the European market. There is a subset of volume 3 per project, produced with contribution of the corresponding vendor. Volume 4 is a set of generic requirements for the power generation plant organised by chapters that deal with the specific systems. revision A: 03/1994 revision B: 11/1995 revision C: 04/2001 BWR 90: 06/1999 EPR rev A: 12/1999 EP1000: 12/1999 ABWR: 12/2001 SWR 1000: 02/2002 AP1000: 06/2006 AES92: 06/2006 EPR rev B: 06/2009 revision A: 11/1996 revision B: 03/2000 revision C: 10/2007

EUR volume 3: analyses of compliance of the selected LWR projects vs. the EUR generic requirements analyses at detail level each of the 4000 requirements (shall, should, may) of the EUR volumes 1 & 2 is analysed by EUR utilities' engineers from information supplied by b y the vendors. standard scale of compliance for all the projects rationales & references cross-checking checking between the different assessments several man years for each project the detailed analyses are not published only the main deviations are highlighted in the published part as a well as the main "compliance with objectives. page 9

EUR volume 3 BWR 90/90+ EPR page 10 7 subsets of volume 3 already published EP 1000 SWR 1000 ABWR AP 1000 VVER AES EPR 92 1400 MWe 1600 MWe 1000 MWe 1000 MWe 1400 MWe 1000 MWe 1000 MWe 1600 MWe evolutionary 4-SG BWR evolutionary 3-SG PWR PWR with BWR passive with passive evolutionary safety 2-SG BWR PWR with 4-SG passive PWR with 4-SG passive evolutionary PWR Westinghouse Areva Atom safety features features General Electric safety features safety features Areva June 1999 Dec 1999 Westinghouse Areva & Ansaldo Dec 2001 Westinghouse AEP & Ansaldo Moscow, July GP, 2009 KI Dec 1999 Feb 2002 May 2007 Dec 2007

European Utility Requirements for future LWR plants Get fresh news at: http://www www.europeanutilityrequirements.orgorg