COOPER POWER SERIES. 600 A U-OP visible break connector system operation instructions. Deadbreak Apparatus Connectors MN650022EN

Similar documents
COOPER POWER SERIES. Input/Output (I/O) module installation instructions. Voltage Regulators MN225067EN

COOPER POWER SERIES. RS-485 digital communications accessory board installation and operation instructions. Voltage Regulators MN225074EN

COOPER POWER SERIES. Visible-Break switch accessory operation instructions. Padmounted switchgear MN285011EN

COOPER POWER SERIES. Fiber-optic/RS-232 communications module installation and operation instructions. Voltage Regulators MN225020EN

COOPER POWER SERIES. Ethernet communications module installation and operation instructions. Voltage Regulators MN225033EN

COOPER POWER SERIES. DC motor operator control installation and operation instructions. Padmounted Switchgear MN285018EN

COOPER POWER SERIES. Form 4C microprocessor-based recloser control standard and automation power supply kit installation and operation instructions

Single Phase Vacuum Capacitor Switch. UltraVacLT 15kV 95kV or 125kV BIL

S Contents. Figure 1. Kyle Form 4C Analog Current Metering Accessory KME

Series NRX drawout circuit breaker and cassette rejection interlocks

GridAdvisor Series II smart sensor installation instructions

INCOM communications adapter module

S Sectionalizers Types TVS15 and TVS27 Time Voltage Sectionalizer Installation and Operation Instructions. Contents

S Reclosers Form 4C Microprocessor-Based Recloser Control KME (120V) and KME (240V) Analog Current Metering Accessory Design II

Digitrip 520MC with Maintenance Mode

S Reclosers. Contents. Form 4C Recloser Control Protocol Conversion Kits KME , -7002, and Installation Instructions

Shutter Assembly Guide Frame Accessory

COOPER POWER SERIES. Type GN3E and GN3VE sectionalizers installation and operation instructions

S Reclosers. Contents. Form 6 Recloser Control Disassembly, Reassembly, and Testing Instructions

Vista SD Portable Remote Control Pendant

Time delay undervoltage module

Power Xpert Meter 350 (PXM350) three-phased DIN-rail multifunction meter

Installation and Operation

Power Xpert Meter 2000 Series

Voltage Detector and Phasing Tester Operating Instructions 83280

Instructions for installation, operation and maintenance of the Arc Quenching Device (AQD)

Model VT120 Fast Timing Preamplifier Operating and Service Manual

Eaton Innovative TechnologyT XT50/100 surge protective device

E-Series Troubleshooting Guide

Multi Unit Enclosed Meter

Manual No: Revision: D. Mag Retrofit Probe. Installation Guide

COOPER POWER Effective August 2015 Supersedes S July 2014

Series Amp Pad Mount Quick Connect Input and Output Power Panels

Series Amp Quick Connect Input and Output Power Panels

LP800 Loop Tester. Installation and Operation Manual

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.

SATA II HDD Canister KISS DA 435 Quick Reference Guide

MN150004EN E-Allocation Software User Guide. Effective July 2017 Supercedes October 2016

Configuration. S&C Scada-Mate Switching System Outdoor Distribution (14.4 kv through 34.5 kv)

3M Duplex Polishing Machine 6851-E with Universal Dual Holder Instructions

Installer Guide. About SecureConnect. Contents. About this guide. Eaton SecureConnect. About the web portal

Instructions for Testing Magnum DS Trip Units Using PACB Test Kit Styles 87C0270G01-G03

Install Motor Controller User Manual

PS/IO Circuit Board Retrofit

Lotus DX. sit-stand workstation. assembly and operation instructions. MODEL # s: LOTUS-DX-BLK LOTUS-DX-WHT

Conext CL-60 Inverter Firmware Upgrade Process

TLS-3XX Series Consoles

Installation NOTICE. S&C IntelliCap Automatic Capacitor Control. Table of Contents. Instruction Sheet

HV-CS kv Edge Mount Triaxial Jack

Omnitron Systems Technology, Inc. 1. iconverter. 19-Module Managed Power Chassis User s Manual

INSTRUCTIONS FOR THE IQ DC POWER SUPPLY INSTRUCTION LEAFLET IL E

Vapor Monitor Interface Module

PIM-Mini Pulsed Current Source Operation Manual

DIGITAL VOLTAGE INDICATOR

Product Description. S&C IntelliNode Interface Module. Table of Contents. Instruction Sheet

3-4 SAS/SATA II HDD Canister Entry version USER S MANUAL XC-34D1-SA10-0-R. Document number: MAN A

Model 8020-STC. Kelvin Standard Triaxial Connector Card. Description / October 2014 *P * 1

PCM-7140 Pulsed Current Source Operation Manual

Installation Instructions

OPERATING AND SERVICE MANUAL. Universal Interface Device 47

Application Guide. M 2174B Moloney Replacement Adapter Panel

Model 2380 Rack-Mount Kit

Primary Injection Test Procedure

Turbo Fiberglass Cone Fan and Grill Fan 36 Direct Drive. Installation & Operator s Instruction Manual

User s Manual. Bluetooth Slim Keyboard. Page

Resolver to Digital Expansion Board

Customer Replacement Procedure

Instructions for Operation of S&C Test Accessory Catalog Number TA-2669

Chore-Tronics Mobile Server

CERTIFIED TEST REPORT

It's Here... Access Elevator Supply now offers Replacement Logic Boards for Siemens Class 72G Elevator Soft Starters. Easy to install and lightweight

PREFACE. Thank you for choosing Zen Space Desks. We hope your desk helps you find your zen when being used. Zen Space Desks Team

Model 8020-KHV. Kelvin Keithley Triaxial Connector Card. Description / October 2014 *P * 1

Agilent Technologies E5385A 100-Pin Probe

OPERATING AND SERVICE MANUAL. Universal Interface Device 47

for the SPV Installation and Operation Manual Instruction Manual IM E Contents

Customer Replacement Procedure

ALPHA Plus and A3 ALPHA Switchboard Meters with the CPS Power Supply

Agilent Technologies E5339A 38-Pin Low-Voltage Probe

5504 Thermocouple Analog Input Module

36'' & 48'' E-Z Shutter Fan Installation & Operator s Instruction Manual

Customer Upgrade Procedure

Model 4001A Modular System Bin Operating and Service Manual

INSTALLATION INSTRUCTIONS. Decorative Display Frame and Optical Filter Kit. 32", 42", and 50"

CubePro. Main PCB Replacement Guide. Prosumer 3D Printer. Original Instructions

Owner s Manual & Safety Instructions

Agilent Technologies E5346A 38-Pin Probe and E5351A 38-Pin Adapter Cable

Wall. No opening (Example: LA-030-W)

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

CONTACTOR DRIVER BOARD. DS200CDBAG1A and DS200CDBAG1B

User Guide. Control Box. RoscoLED TM.

Surge Protective Devices Installation, Operation and Maintenance Manual. LoadTrack LTL

Series 3700 Screw Terminal Assemblies Installation Instructions

CVU-3K-KIT. 3 kv Bias Tee Kit. Description. Parts list / October 2014 *P * 1

MicroTech III Water Source Heat Pump BACnet MS/TP Communication Module

Manual No: Revision: F. Relay Output Modules. Installation Guide

Model 7705 Control Module

Model P4017 Single Channel USB Oscilloscope. Quick Start Guide

Source-Transfer Application Guide

SAVE THESE INSTRUCTIONS

Transcription:

Deadbreak Apparatus Connectors MN650022EN COOPER POWER Effective March 2016 Supersedes S600-14-1 June 2010 SERIES 600 A U-OP visible break connector system operation instructions

DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information, recommendations, descriptions and safety notations in this document are based on Eaton Corporation s ( Eaton ) experience and judgment and may not cover all contingencies. If further information is required, an Eaton sales office should be consulted. Sale of the product shown in this literature is subject to the terms and conditions outlined in appropriate Eaton selling policies or other contractual agreement between Eaton and the purchaser. THERE ARE NO UNDERSTANDINGS, AGREEMENTS, WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY, OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES. ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON. THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental or consequential damage or loss whatsoever, including but not limited to damage or loss of use of equipment, plant or power system, cost of capital, loss of power, additional expenses in the use of existing power facilities, or claims against the purchaser or user by its customers resulting from the use of the information, recommendations and descriptions contained herein. The information contained in this manual is subject to change without notice. ii 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016

Contents SAFETY INFORMATION Safety information...iv PRODUCT INFORMATION Introduction...1 Acceptance and initial inspection...1 Handling and storage...1 Standards...1 Description of operation....1 INSTALLATION PROCEDURE Equipment required...2 Isolating and grounding a cable requiring repair....3 Reconnecting the circuit from the cable to the apparatus bushing...5 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016 iii

! SAFETY FOR LIFE Safety for life! SAFETY FOR LIFE Eaton meets or exceeds all applicable industry standards relating to product safety in its Cooper Power series products. We actively promote safe practices in the use and maintenance of our products through our service literature, instructional training programs, and the continuous efforts of all Eaton employees involved in product design, manufacture, marketing, and service. We strongly urge that you always follow all locally approved safety procedures and safety instructions when working around high voltage lines and equipment, and support our Safety For Life mission. Safety information The instructions in this manual are not intended as a substitute for proper training or adequate experience in the safe operation of the equipment described. Only competent technicians who are familiar with this equipment should install, operate, and service it. A competent technician has these qualifications: Is thoroughly familiar with these instructions. Is trained in industry-accepted high and low-voltage safe operating practices and procedures. Is trained and authorized to energize, de-energize, clear, and ground power distribution equipment. Is trained in the care and use of protective equipment such as arc flash clothing, safety glasses, face shield, hard hat, rubber gloves, clampstick, hotstick, etc. Following is important safety information. For safe installation and operation of this equipment, be sure to read and understand all cautions and warnings. Hazard Statement Definitions This manual may contain four types of hazard statements: DANGER Indicates an imminently hazardous situation which, if not avoided, will result in death or serious injury. WARNING Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury. CAUTION Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury. CAUTION Indicates a potentially hazardous situation which, if not avoided, may result in equipment damage only. Safety instructions Following are general caution and warning statements that apply to this equipment. Additional statements, related to specific tasks and procedures, are located throughout the manual. DANGER Hazardous voltage. Contact with hazardous voltage will cause death or severe personal injury. Follow all locally approved safety procedures when working around highand low-voltage lines and equipment. G103.3 WARNING Before installing, operating, maintaining, or testing this equipment, carefully read and understand the contents of this manual. Improper operation, handling or maintenance can result in death, severe personal injury, and equipment damage. G101.0 WARNING This equipment is not intended to protect human life. Follow all locally approved procedures and safety practices when installing or operating this equipment. Failure to comply can result in death, severe personal injury and equipment damage. G102.1 WARNING Power distribution and transmission equipment must be properly selected for the intended application. It must be installed and serviced by competent personnel who have been trained and understand proper safety procedures. These instructions are written for such personnel and are not a substitute for adequate training and experience in safety procedures. Failure to properly select, install or maintain power distribution and transmission equipment can result in death, severe personal injury, and equipment damage. G122.3 iv 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016

CAUTION The 600 A U-OP connector is designed to be operated in accordance with normal safe operating procedures. These instructions are not intended to supersede or replace existing safety and operating procedures. Connectors must be de-energized during operation or maintenance. Visible break and adequate grounding must be provided before cable work proceeds. Handling and storage Be careful during handling and storage of the U-OP connector to minimize the possibility of damage. If the U-OP connector is to be stored for any length of time prior to installation, provide a clean, dry storage area. Standards ISO 9001 Certified Quality Management System U-OP connectors should be installed and serviced only by personnel familiar with good safety practice and the handling of high-voltage electrical equipment. Product information Introduction These instructions are applicable for Eaton's Cooper Power series U-OP connector configurations shown in Figure 1. Other configurations are possible with the U-OP connector. For other configurations, other or additional steps may be needed to operate the U-OP connector. Read this manual first Read and understand the contents of this manual and follow all locally approved procedures and safety practices before installing or operating this equipment. Additional information These instructions cannot cover all details or variations in the equipment, procedures, or process described nor provide directions for meeting every possible contingency during installation, operation, or maintenance. For additional information, contact your Eaton representative. Figure 1. 600 A U-OP connector. Acceptance and initial inspection Each U-OP connector is in good condition when accepted by the carrier for shipment. Upon receipt, inspect the shipping container for signs of damage. Unpack the U-OP connector and inspect it thoroughly for damage incurred during shipment. If damage is discovered, file a claim with the carrier immediately. S1 Figure 2. One-line diagram of a three-phase cable connected to a three-phase switch on either end. S2 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016 1

U CONNECTOR APPARATUS BUSHING PARKING STAND CURRENT PATH THROUGH U-OP CONNECTOR SYSTEM ( ) 2 BUSHING 600 A DEADBREAK JUNCTION T-OP II CONNECTOR Figure 3. The U-OP connector system in a typical pad-mounted switchgear application. Installation procedure Equipment required (3) 200 A Grounding Elbows (3) 600 A Grounded Standoff Bushings with U-OP Studs (3) U-OP/T-OP II Protective Caps (1) O & T Tool (1) Voltage Detector (1) Clampstick Figure 4. Open switch at both ends of cable. 2 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016

Isolating and grounding a cable requiring repair 1. De-energize cables A. Open switches at both ends of cable to be isolated. Refer to Figure 4. B. Determine that there is adequate working room around the terminators for parking the grounded standoff bushings. C. Determine that there is adequate working room for handling clampstick around apparatus cabinet. D. Place insulating rubber blanket on the ground directly in front of terminators. E. Inspect and test all operating equipment for serviceability. F. Connect grounding elbows to system ground. G. Connect ground leads of protective caps to system ground. H. Connect ground leads of grounded standoff bushings to system ground. 2. Determine that cables are de-energized A. Remove 200 A protective cap or arrester from T-OP II terminators using clampstick and set aside in a clean, protected area. B. Insert test probe into 200 A interfaces using clampstick. C. Test for voltage by using voltage detector designed for terminators. Remove probe after testing. WARNING High Voltage. Do not proceed until cable is de-energized. Failure to company may result in death, serious personal injury and equipment damage. 3. Provide a visible ground A. Close grounding elbows into T-OP II 200 A interface using a clampstick. Refer to Figure 5. CAUTION High Voltage. Ground all three phases (Steps 2 and 3) before proceeding. Failure to comply may result in serouis personal injury and equipment damage. Figure 6. Mount grounded standoff bushing. Figure 5. Close grounding elbows. 4. Provide a visible break A. Clean and lubricate grounded standoff bushing. B. Mount grounded standoff bushing in the apparatus parking pocket using a clampstick. Do not tighten eyebolt leave grounded standoff bushing loose in parking stand. Refer to Figure 6. C. Grasp U-OP operating handle with clampstick, but do not pull handle completely into clampstick. 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016 3

D. Rotate the clampstick counterclockwise until U-OP operating shaft is completely disengaged from the mating stud. Refer to Figure 7. G. Rotate the clampstick clockwise until the operating shaft is completely seated on the mating stud. H. Verify that the U connector is completely seated by ensuring that the operating shaft is on far enough to cover the indentation in the mating stud. See Figure 10. I. Install U-OP protective cap over the exposed bushing of the 600 A deadbreak junction by rotating clockwise until the cap is completely seated. Refer to Figure 9. Figure 7. Disengage U-OP operating shaft. E. Once U-OP operating shaft is completely unthreaded but is still positioned on the stud, pull clampstick completely onto handle and engage antirotational tabs. F. Reorient the U connector so that the short leg of the U is over the grounded standoff bushing, the long leg of the U is over the apparatus bushing, and the operating shaft slides over the mating stud mounted on the parking stand. Disengage the antirotational tabs from the clampstick. Refer to Figure 8. Figure 9. Install U-OP protective cap on exposed bushing. J. Attach U-OP protective cap s drain wire to system ground. K. Repeat steps A to I for the remaining two phases. INDENTATION IN HOLD- DOWN STUD Figure 8. Reorient the U connector. Figure 10. Checking if the U connector is fully seated. 4 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016

Reconnecting the circuit from the cable to the apparatus bushing A. Remove U-OP protective cap s drain wire from system ground. B. Grasp the operating eye of the U-OP protective cap, but do not pull it into the clampstick. Rotate it counterclockwise until the cap s threads are completely disengaged from the U-OP stud and remove the protective cap. C. Lubricate the exposed bushing, if necessary. D. Grasp the operating handle of the U but do not pull it into the hotstick. Rotate counter-clockwise until the operating shaft is completely disengaged from its mating stud. Refer to Figure 11. E. Reorient the U as shown in Figure 12, with the long leg over the apparatus bushing, the short leg over the exposed deadbreak junction interface, and the operating shaft over the mating stud. F. Rotate the handle clockwise until the operating shaft is completely threaded onto its mating stud. Figure 13. Install protective cap or arrester. Figure 11. Disengage operating shaft from mating stud. G. Verify that the U connector is fully installed by ensuring that the operating shaft is on far enough to cover the indentation in the mating stud. See Figure 10. H. Remove the grounded standoff bushing from the parking stand. I. Remove the grounding elbow from the T-OP II. J. Install a protective cap or elbow arrester on the 200 A interface of the T-OP II. (Refer to Figure 13.) Figure 12. Reorient the U connector. 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016 5

This page intentionally left blank. 6 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016

This page intentionally left blank. 600 A U-OP VISIBLE BREAK CONNECTOR SYSTEM OPERATION INSTRUCTIONS MN650022EN March 2016 7

! SAFETY FOR LIFE Eaton 1000 Eaton Boulevard Cleveland, OH 44122 United States Eaton.com Eaton s Cooper Power Systems Division 2300 Badger Drive Waukesha, WI 53188 United States Eaton.com/cooperpowerseries 2016 Eaton All Rights Reserved Printed in USA Publication No. MN650022EN Rev 00 (Replaces S600141 Rev. 00) Eaton is a registered trademark. All trademarks are property of their respective owners. For Eaton's Cooper Power series product information call 1-877-277-4636 or visit: www.eaton.com/cooperpowerseries.