FairPoint Change Management Process

Similar documents
FairPoint Change Management Process Agenda & Opening Remarks

Verizon West Notification Milestones

Virtual Front Office Training for LSR Preorder and Order November 2008

November 2005 Items by Release Report

July 2005 Items by Release Report

Wholesale Platform Services Overview

Frontier Communications CLEC User Forum (CUF) May 19, 2016

June 2005 Items by Release Report

Prioritization Working Group

Guidelines for LNP Ordering Carrier Relations

Fairpoint Communications. Maine, New Hampshire, and Vermont. Jeopardy Notification. Version 1.1

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

Prioritization Working Group

Switched Access Translations ONLY REQTYP M, ACT C. VFO Product Feature Group D Access Service Request (ASR)

Wholesale Advantage Voice Overview (Legacy Service Territory)

Prioritization Working Group

Industry Notification Accessible Letter

Hot Cut Process. Timeframes for Hot Cut Standard for Basic Cut-Over Window: Amount of time from start to completion of physical cut-over of lines:

Exiant Communications LLC LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES

FARMERS TELECOMMUNICATIONS CORPORATION LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES

Local Interconnection Switched Access - Disconnect Trunks

PWG Change Request History Type 5

PWG Change Request History Type 5

CenturyLink EASE. VFO Overview

COLEMAN COUNTY TELEPHONE COOP, INC. LOCAL NUMBER PORTABILITY (LNP) BUSINESS RULES

PWG Change Request History. Type 5 Session 7 Agenda December 19, 2007

New Business and/or Issues Verizon provided a status on its action items from the New Business discussion at the August CUF meeting.

for the reporting interval ending January 31, 2014 INdigital telecom

AT&T Dedicated Ethernet Ordering Process

PWG Change Request History. Type 5 Session 7 Agenda

PWG Change Request History

7. Access to Signaling Systems and Call Related Databases 7.0 Limitation on Unbundling Obligation (N)

ATIS Network Interconnection Interoperability Forum, (NIIF)

OSS Interface Change Management Meeting September 14, 2004

OSS Interface Change Management Meeting October 14, 2003

PART 19 - Unbundled Network Elements and Number Portability SECTION 6 - Number Portability Original Sheet No. 1

Charter EZPort User Guide

AT&T Dedicated Ethernet Ordering Process

Re: ATIS OBF Simple Port Service Request Preparation Guide WC Docket No

Local Interconnection Switched Access - Establish New E911 Trunks

CFA Roll/Hot Cut Request Job Aid

EXHIBIT D. Section ACCESS TO OPERATIONAL SUPPORT SYSTEMS (OSS) 1.1 Description

October 2005 Items by Release Report

Verizon East Release Overview. June 2010

LSR System Overview. In this document:

Verizon East Release Overview. February 2005 Release Publication 12/9/2004 Version 3 1/4/05

Ethernet Internet Access (EIA) Ordering Process for UNI & EVC

March 2003 OSS Interface Change Management Meeting

FCC FEDERAL COMMUNICATIONS COMMISSION. In the Matter of ) Telephone Number Portability ) CC Docket No ) RM 8535

OSS Interface Change Management Meeting November 12, 2003

10. Unbundled Dark Fiber 10.1 General

History of System Impacting Change Requests. Type 5

Create Standard ASR - REQTYP E

Re: ATIS OBF Simple Port Service Request Preparation Guide WC Docket No

Provider Test Acceptance (PTA) Overview and Enrollment Instructions

Local Interconnection Switched Access Augment of existing Trunks

Local Interconnection Switched Access - Establish New Trunks

Switched Access - FG D - Establish New Trunk Group

Create Standard ASR with Diversity - REQTYP E

8. Common Channel Signaling Network Interconnection (CCS/SS7) 8.1 General

Pennsylvania Carrier-to-Carrier Guidelines Performance Standards and Reports. Verizon Reports

E-PATH Core Pop ENNI Order Processing

History of System Impacting Change Requests. Type 5

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C In the Matter of ) ) Telephone Number Portability ) CC Docket No.

Optical Wave Service (OWS) REQTYP S, ACT = N

VERIZON MARYLAND LLC 1. Performance Assurance Plan. Maryland

FairPoint Communications Wholesale E-DIA Ordering Guide

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast December 12, 2017

December, 2002 OSS Interface Change Management Meeting

June 2, If you have questions, please do not hesitate to contact me at (517) Sincerely,

PWG Change Request History. Type 5 Session 5 Agenda December 11, 2007

Customer Service Record (CSR) Inquiry Process

National Pooling Administration Contract #FCC13C nd Revised Change Order Proposal #3B

E-Path Core Pop ENNI Order Processing

Training Tutorial Using Level 3 Port Out Request Tool Version 2.0 Audience: Carrier User

Switched Access - FG D Trunk Group Augment

Verizon West Notification Milestones

AT&T Switched Ethernet (ASE) Ordering Process

for the report interval ending August 29, 2012 {Q3} (and including prior periods of 2012) INdigital telecom

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017

PWG Change Request History Type 5

Instructions Applying for IAC code (CCNA/ACNA) and EC Code Accessing Frontier s Ordering System

Table of Contents 6.1 INTRODUCTION LOOP WITH NUMBER PORTABILITY ADMINISTRATIVE SECTION 4

LSR System Reject Error Code Matrix

LNP CO Code Transfer Process

Basic Service Request Management. BMC Remedyforce Winter 11

NANP Administration System (NAS) User Registration Guide 2.6v

12. Interim Number Portability (INP) 12.1 General

Platform Remote Call Forward Job Aid

COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION

ASR Dark Fiber Transport Ordering Guide

Metropolitan Telecommunications of New Hampshire, Inc. Business Rates LOCAL SERVICE Monthly Recurring

Verizon West Change Control (Type 4) Items by Release

Resale at Retail Services Manual Section III. Pre-Ordering

White paper. An Overview of Wireless Number Portability

Verizon West Change Control (Type 4) Items by Release

Foreword... Foreword 1

OSS Interface Change Management Meeting April 12, 2005

WHAT PARTICIPANTS SHOULD KNOW

Verizon East Release Overview

Transcription:

FairPoint Change Management Process John Berard, Director Wholesale Services Portland, Maine September 16, 2010

Agenda Opening Remarks WebEx and Conference Call Etiquette Mute Phones when not speaking *6 (*6 again to un-mute) Never put your phone on hold to take another call (avoids music on hold) State your name and company when speaking Ask Questions at the end of the slide not in the middle. Two options (raise hand on WebEx or un-mute and ask your question)

Agenda 3:00PM to 4:30PM Change Management Forum 3:00PM to 3:10PM 3:10PM to 3:50PM 3:50PM to 4:15PM 4:15PM to 4:30PM Wholesale Change Management Forum Introductions Agenda John Berard Type 1 Change Requests (CR) Review August and September 2010 Release Updates Top Type 1 CRs Scheduled for Release Type 2, 3, 4, and 5 Change Request (CR) Review Type 5 New Requests Wrap Up 3

FairPoint Wholesale Change Management Forum Type 1 Change Requests Portland, Maine

Agenda August Regression Feedback 9/30 Planned Deployments 5

Regression Feedback 8/26 Release 15 CLEC impacting incidents deployed in the August maintenance release Feedback received for the item below: Defect 19023 LSR Trans Type Defect Description CLEC Issue Identified IT Comments If a business order is identified as cut through, it is not dispatched, however there are some CKTIDs in which FairPoint is required to install service, tag a circuit, and provide DEMARC back on the work order complete form. A new process needs to be put into place to call for dispatch with these specific CKTIDs. GWI is still seeing business orders come through as CT-Y. Example PON's: P6-03123, P6-03124. Also, PON P6-03131 was issued on 9/1 with a 9/9 due date. FOC stated CT-N. Order provisioned, no demarc info provided. No Dispatch work order created. Called OMC who had to issue a manual work order (ADV271208) We are tracking the incorrect CT:Y value in Incident 21085 which is going to be deployed on 9/30. The order which did not generate a work order and did not return cut through was manually created and was missing the field that is used to trigger the OSP work instructions. This should not impact flow through orders. We will make sure a job aid goes out to ensure the reps know how to key these order types going forward. 5

9/30 Deployment 9/30 Incidents and CRs Planned for Deployment A total of 10 CLEC impacting Items are planned Key items include: 18137 Centrex winback PONs need to have a PLN task added so that the CLEC is notified of the line loss. 20041 Additional logic to derive the BAN for ASRs with BAN = E in order to reduce fallout between ordering/billing systems. 20202 Updated logic to pass fields to the CABS billing vendor to calculate mileage. 20365 CO work instructions are not being generated on AB/D orders causing the APPTS task to complete early. 21085 CT value is incorrect on business loop circuits. 6

FairPoint Wholesale Change Management Forum Type 2, 3, 4, and 5 Change Requests Portland, Maine

Type 2 Regulatory Federal/State Industry Forum Change Request Summary FCC Order 09-41 LNPA WG & NANC OBF LSOP Committee CR # - FRP01 05142009 1 Day Simple Port Complete simple port Wireline Wireline and intermodal port requests within one business day. Implementation dates: August 2, 2010 for larger Service Providers February 2, 2011 for smaller Service Providers Pending Details FCC 10-85 - WC Docket 07-244 and CC Docket 95-116 Report and Order concluded that 14 fields are necessary to accomplish a simple port, and mandate that service providers use the 14 fields we describe in this Order and only those 14 fields to accomplish a simple port. Fourteen fields: (1) Ported Telephone Number, (2) Account Number, (3) Zip Code, (4) Company Code, (5) New Network Service Provider, (6) Desired Due Date, (7) Purchase Order Number, (8) Version, (9) Number portability Direction Indicator, (10) Customer Carrier Name Abbreviation, (11) Request Type, (12) Activity, (13) Telephone Number (Initiator), and (14) Agency Authority Status. Dates 73 days Draft Business Rules November 19, 2010 66 days Draft Technical Specifications TC s have 15 days from publication of draft documents to provide comments November 26, 2010 45 days Final Business Rules and Technical Specifications and error message documentation - December 19, 2010 Effective Date/Implementation February 2, 2011

Type 3 Industry Guidelines Industry Forum ATIS - OBF UOM ASR Committee Change Request Summary CR # - FRP01 03242010 - ASOG 41 Release Issue Date (Final Posting OBF) March 26, 2010 Flash Cut Weekend Friday, September 17 thru Monday, September 20, 2010 ASOG CTE Customer Ebonding Testing scheduled August 13 - September 10, 2010. Completed Date to Production Effective Date/Implementation September 20, 2010

Change Requests New Portland, Maine

New Change Request No New Change Request

August Ballot Results Type 4 & 5 Portland, Maine

August Ballot Results Final Ranking Final Results 1 thru 5 Ranking per CLEC CR Number Description LOE 3.6 5-7 4-3 3-2 2-0 1-4 Blanks - 0 Pass - 0 4 - AT&TConsumer 3 - BayRing 5 - Broadview 1 - CloseCallAmerica 1 - Comcast 5 - Cornerstone 5 - DSCICorp 4 - GWI 5 - Level3 1 - Matrix 4 - MetTel 5 - OneComm 3 - OTT 5 - Oxford 5 - SoverNet 1 - USA Tel FRP01-01262010 TA This is a request to return the FairPoint tester s extension and name. Configure Remedy/VFO TA to return the FairPoint Tester's extension and name (via an Attribute Value Change Notification) when the tester picks up the ticket. This will provide a more efficient communication channel if the CLEC needs to call in to inquire on the ticket. Low 13

August Ballot Results Final Ranking Final Results 1 thru 5 Ranking per CLEC CR Number Description LOE 3.9 5-6 4-3 3-5 2-0 1-1 Blanks - 0 Pass - 1 5 - AT&TConsumer 3 - BayRing 3 - Broadview Pass - CloseCallAmerica 1 - Comcast 4 - Cornerstone 5 - DSCICorp 3 - GWI 4 - Level3 4 - Matrix 5 - MetTel 5 - OneComm 3 - OTT 3 - Oxford 5 - SoverNet 5 - USA Tel FRP01-03082010 LSR - CSR/CCSR- This is a request to update the Query functionality to allow a query by the following fields WTN, CKR, HNMUL, MONTH, SVCFEAT, TSC, LIVEFIN, SFNTER, TLI, or LST as applicable vs. the current level of by BAN only. High 14

August Ballot Results Final Ranking Final Results 1 thru 5 Ranking per CLEC CR Number Description LOE 3.9 5-6 4-3 3-4 2-0 1-1 Blanks - 1 Pass - 1 1 - AT&TConsumer 4 - BayRing 5 - Broadview 4 - CloseCallAmerica Pass - Comcast 3- Cornerstone 3 - DSCICorp 5 - GWI 3 - Level3 Blank- Matrix 5 - MetTel 5 - OneComm 4 - OTT 5 - Oxford 5 - SoverNet 3 - USA Tel FRP01-02102010 LSR - Adding TNT on LSR Forms LSNP and LS This is a change to build the validation and requirements around the TNT field. FairPoint's purpose of this change is to allow Wholesale Customer to request a Test and Tag on a cut through order. Note: When the Pre-Order responses indicates the address is cut-through and the End Users uses this field as described below the Service Provider will be billed for this service. TNT values are 1 alpha character as follows: A Test B Tag D Test & Tag Med 15

August Ballot Results Final Ranking Final Results 1 thru 5 Ranking per CLEC CR Number Description LOE 3.7 5-7 4-2 3-2 2-3 1-1 Blanks - 0 Pass - 1 2 - AT&TConsumer 1 - BayRing 5 - Broadview 5 - CloseCallAmerica Pass - Comcast 2 - Cornerstone 2 - DSCICorp 4 - GWI 3 - Level3 5 - Matrix 3 - MetTel 5 - OneComm 4 - OTT 5 - Oxford 5 - SoverNet 5 - USA Tel FRP01-04152010 LSR LSR Order Business Rule Change - LSR FORM field REMARKS conditional when the IMPCON Implementation Contact is also required. FairPoint is requesting that when the IMPCOM field is required that the Wholesale Customer send the E-Mail address for a Implementation Contact so issues and or concerns may be sent via email for feedback about the PON. IMPCON - Identifies the customer's representative or office responsible for control of installation and completion. High 16

Change Request Ranked and Balloted Portland, Maine

Type 5 Change Request CLEC Broadview - Karen Bracken Cornerstone Austin AT&T Debbie Knittel Change Request Summary CR# - FRP01 05042009 - VFO GUI Proposed Changes: Add FOC Date (confirmed date) Provisioning Complete date and Billing Complete date Add Cancel view only Add sup field - Complete added per Synchronoss 11.5.2 Add FairPoint Order Number Add the ability to manipulate the fields as they appear on the work list by each login this is not doable without intensive re-work to the VFO GUI out of scope Level of Effort Medium - HIGH This request will require new development of the VFO GUI and would need to be approved by the fellow Synchronoss customers to ensure that there is not a negative impact. Final Ranking - 4.6 Current Status Date to Production Pending initiative FairPoint has yet to complete all requirements Delivery Date not scheduled for 2010

Type 5 Change Request CLEC Broadview Karen Bracken Verizon Business Sherry Lichtenberg Level of Effort Change Request Summary CR# - FRP01-05262009 - Add Drop Down under Pre Order TN Reservation that would allow rep to select RANDOM/GOLD/SEQUENTIAL TNs/specified numbers other than NPA NXX XXXX only by line number This change will impact internal systems. High Final Ranking - 4.5 Current Status Date to Production Draft Notes 1. Pending initiative FairPoint has yet to complete all requirements 2. Synchronoss No development required. 3. FairPoint production tentative 4 th Quarter 2010 N- Random - no changes currently supported G Gold Easy number to remember Line number only 4 numbers the same (1111, 2222, 3333), 2 number pattern (2211, 3322, 4411), 3 and 1 number (3331, 1113, 2224,), or 1 and 3 numbers (1333, 4111, 3222) S Sequential Line numbers that are sequence ( 1001, 1002, 1003)

Type 5 Change Request CLEC AT&T Debbie Knittel/Mary Mullen Level of Effort Change Request Summary CR# - FRP02 05222009 Phase 1 of this CR - We would like excel export functionality added to TA. Completed added per Synchronoss 11.7.0.4 Phase 2 of this CR - add additional fields to Wisor / Synchronoss for Restored time, outage duration, and close out narrative and the trouble found code and disposition code. This should include the numeric value of the trouble found code. Pending. Phase 2 - This request will require development to the VFO GUI High Final Ranking - 4.3 Current Status Phase 2 Pending not currently scheduled Date to Production Phase 1 - Completed added per Synchronoss 11.7.0.4

Type 5 Change Request CLEC Cornerstone Communications Austin Brower Level of Effort High Change Request Summary CR# - FRP01 07172009 - VFO GUI Proposed Changes: VFO GUI - For all pop-up selections, please provide the meaning of each value /within/ the pop up, as well as in a tool tip at the bottom of the form. This is also inclusive for Sup Other Pop-up selector should include the meaning of each value (1 through N). This request will require new development to apply FairPoint Business Rules to each REQTYP/ACT and allow for changes/updates to VFO GUI as new versions of the LSOG are placed into production. Final Ranking 3.4 Current Status Date to Production Pending initiative FairPoint has yet to complete all requirements Pending - Delivery Date

Type 5 Change Request February 2010 CLEC Cornerstone Austin Brower CR Second by Change Request Summary CR # - FRP01 01262010 TA Module This is a request to return the FairPoint tester s extension and name Please configure Remedy/VFO TA to return the FairPoint Tester's extension and name (via an Attribute Value Change Notification) when the tester picks up the ticket. This will provide a more efficient communication channel if the CLEC needs to call in to inquire on the ticket. SegTel Kath Mullholand Level of Effort Final Ranking - 3.6 Status Aug 2010 Ballot TBD Date to Production

Type 4 FairPoint Change Request Company FairPoint Matt Bertsch CR Second by Change Request Summary CR # - FRP01 03082010 CABs CSR CCSR Internal CR 427 Update the Query functionality to allow a query by the following fields WTN, CKR, HNMUL, MONTH, SVCFEAT, TSC, LIVEFIN, SFNTER, TLI, or LST as applicable vs. the current level of by BAN only. Jennifer Mahern One Communications Level of Effort Final Ranking - 3.9 Aug 2010 Ballot Date to Production TBD

Type 4 FairPoint Change Request CLEC FairPoint Gwen Hammond Change Request Summary CR # - FRP01 02102010 LSR Forms LSNP and LS This is change to build the validation and requirements around the TNT field. The purpose of this change is to allow Wholesale Customer to request a Test and Tag on a cut through order. Note: When the Pre-Order responses indicates the address is cut-through and the End Users uses this field as described below the Service Provider will be billed for this service. CR Second by TNT values are 1 alpha character as follows: A Test B Tag D Test & Tag Jeanette Toledo - BCN Level of Effort Final Ranking - 3.9 Status Aug 2010 Ballot TBD Date to Production

CR Adding TNT field to LS and LSNP Draft TNT Test and Tag Requested- Identifies the customer is requesting additional testing and tagging beyond that which is included with the product ordered. Drop Down: (1 alpha) A Test B Tag D Test & Tag This field is applicable to migration Requests only. CHC = Y without TNT field will designate a Hot Cut. CHC = Y with the TNT field will designate a Hot Coordinate Conversion If populated with a D, enter the following in REMARKS field on the LSR form: Test and Tag at demark Call Test Center at NPA-NXX-XXXX If populated with A enter the following in REMARKS field on the LSR form: Test at demark Call Test Center at NPA-NXX- XXXX If populated with B enter the following in REMARKS field on the LSR form: Tag at demark Call Test Center at NPA-NXX- XXXX

Type 4 FairPoint Change Request CLEC FairPoint Gwen Hammond CR Second by Change Request Summary CR # - FRP01 04152010 LSR Order Business Rule Change - LSR FORM field REMARKS conditional when the IMPCON Implementation Contact is also required. FairPoint is requesting that when the IMPCOM field is required that the Wholesale Customer send the E- Mail address for a Implementation Contact so issues and or concerns may be sent via email for feedback about the PON. IMPCON - Identifies the customer's representative or office responsible for control of installation and completion. Required when the CHC field = A, B, or Y. Required when the first position of the REQTYP field = A and the LNA field on the LS Form = N. Required when the first position of the REQTYP field = A and the CI. field on the LS Form = E. Required when the first position of the REQTYP field = "D" and the LNA field on the PS Form = "N" or "T". Required when the first position of the REQTYP field = "F" or "M" and the LNA field on the PS Form = "N". Required when the first position of the REQTYP field = "K" and the LNA field on the RPL Form = "N". Required when the first position of the REQTYP field = "L" and the LNA field on the RFR Form = "N". Required when the first position of the REQTYP field = "N" and the TNA field on the DDPS Form = "N". Required when the first position of the REQTYP field = "P" and the LNA field on the CRS Form = "N". Required when the first position of the REQTYP field = Q and the LNA field on the IS Form = N. Jennifer One Communications Level of Effort Final Ranking - 3.7 Date to Production Aug 2010 Ballot TBD

Change Management Process Questions