PV Module Installation Instructions

Similar documents
Installation Guide for America Solar Wholesale Photovoltaic Modules

Worldwide Energy and Manufacturing USA, Co., LIMITED Add: RM 1708 C1, NAN FUNG TOWER, 173 DES VOEUX RD CENTRAL, HK. Installation Manual

IEC Installation Manual and User Manual for. BYD Photovoltaic Module

IEC Installation Guide for Suntech Power Photovoltaic Module

Conergy PH Series Modules. Solar module user manual

SoliTek Standard Photovoltaic module (PV) Documentation and Installation Manual

INSTALLATION MANUAL FOR ILB HELIOS PHOTOVOLTAIC MODULES

Please carefully read the following installation and safety instructions. Non-compliance with these instructions may void the module warranty.

INSTALLATION MANUAL FOR BISOL SOLAR MODULES

Rev1 QP-10-IM21UL/Rev Rev2 QP-10-IM21UL/Rev Rev3 QP-10-IM21UL/Rev Rev4 QP-10-IM21UL/Rev4

Model 2380 Rack-Mount Kit

KANEKA CORPORATION 3-2-4, NAKANOSHIMA, KITA-KU OSAKA , JAPAN

Model 2380 Rack-Mount Kit

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Quick Start Guide. 2MP 4X PTZ IP Camera O2P4X

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.

Model P4017 Single Channel USB Oscilloscope. Quick Start Guide

Sun-Port Power Solar PV Modules Installation and User Manual

INSTRUCTION MANUAL. * Design and Specifications are subject to change without notice. ver. 1.0 PRINTED IN KOREA

PA Series. Available in 6.0MP and 8.0MP

Model 2600B-PM V Protection Module with 1 A Clamp. Description / April 2015 *PPA * 1

Outdoor PTZ. Mounting on the Ceiling Using Pendant Mount. Installation Guide. For Models: I93, I94, I95, I96, KCM /12/03

INSTALLATION MANUAL THE / MODULE. IEC & UL version

Model 2657A-LIM-3 LO Interconnect Module

YINGLI SOLAR PANDA Bifacial MODULES Installation and User Manual

Optional add-on cassette Attachment Instruction manual

Model 8020-STC. Kelvin Standard Triaxial Connector Card. Description / October 2014 *P * 1

Model 8020-KHV. Kelvin Keithley Triaxial Connector Card. Description / October 2014 *P * 1

NEW REVISION: G. Safety and Installation Instructions. for Europe, Asia, Australia, Latin America and Africa

CVU-200-KIT. 200 V Bias Tee Kit. Description. Parts list / October 2014 *P A* 1

Available in 2.0MP, 4.0MP, 6.0MP and 8.0MP, with 2.8mm and 3.6mm lenses.

Available in 2.0MP, 4.0MP and 8.0MP variants

ECO LINE: MODULES CORRECTLY MOUNTED

Installation manual plugs and connectors with screw connection (16/32 A)

B-Box H Installation Guidance

Installation Manual INTELLIGENT SERVER. Model name: BMS-LSV6UL

MODULE INSTALLATION AND USER MANUAL - PERC AND MONO SERIES.

SUN KTL-USH0 Quick Guide. Issue: 01 Part Number: Date: HUAWEI TECHNOLOGIES CO., LTD.

TOP - 1. Instruction Manual. Version 1.0 Produced in Jan. 2004

Mounting on the Ceiling Using Flush Mount (Face Down)

CVU-3K-KIT. 3 kv Bias Tee Kit. Description. Parts list / October 2014 *P * 1

Dome Camera. Hardware Manual Z81, Z /01/08

USER MANUAL. LED IP Ribbon. ~Horizontal~ Keep this manual for future needs! Copyright Reproduction prohibited!

Smart Grid Tie Microinverter User Manual

ITA100 MKII 100mW green DMX laser

FortiCam SD20 Mounting Guide

ILUMEN PID SOLUTION INDOOR OUTDOOR ILUMEN PIDBOX MINI INSTALLATION MANUAL. Ilumen PIDbox mini Version 1.5

Operation Manual. Capacitor Boxes adjustable 80 A / 125 A Track, 2,04 μf to 8 μf. Order Number

Large Police Light 100W ORDERCODE 80361

Full HD IP Vandal Dome Camera

LED SPIDER MOVING HEAD LIGHT

1 Channel Strobe Controller ORDERCODE 40226

SUN2000-(2KTL-5KTL)-L0. Quick Guide. Issue: 01 Part Number: Date: HUAWEI TECHNOLOGIES CO., LTD.

HDCVI Compact Mobile Camera User s Manual

M215 (M215-60) Safety

Enphase S-Series Microinverter and Engage Cable Safety

HDCVI Camera User s Manual

Models 2601B, 2602B, and 2604B System SourceMeter Instruments Quick Start Guide

NIR Moisture Analyzer KB-30

SUN2000P-375 W Smart PV Optimizer. User Manual. Issue 01. Date HUAWEI TECHNOLOGIES CO., LTD.

M250 (M LL) Safety

DC-D2212R / DC-D2212WR

Fog machine PT Users Manual

Octostrip ORDERCODE 42220

HD-CVI Camera User s Manual

INSEBO2IRF 2.1MP 1080P IP Eyeball Camera with IR

SolConeX extra-low voltage flange socket

POCKET MULTIMETER Model No: MM18

Model 7705 Control Module

Speed Dome Installation Manual

Network Camera. Quick Guide DC-D1223WX. Powered by

Sonic Ruptor 400. User Manual

2260B-RMK-Series Rack Mount Kit

HD Mini IR Waterproof Bullet Network Camera. Quick Start Guide. Version 1.0.0

Installation and Maintenance Manual SF140-S / SF145-S / SF150-S / SF155-S / SF160-S / SF165-S / SF170-S

Full HD Speed Dome IP Camera

Smart Grid Tie Microinverter User Manual

ELV12 Series. Instruction Manual

LXEM145 SERIES Lanx Australis single Phase KWh Meter 45Amp. User manual

Model 8010 High Power Device Test Fixture Interconnection Reference Guide

OPERATING MANUAL. Quality control system on the production complies with requirements ISO 9001:2008

The following symbols are used to show dangerous operation or handling. Make sure you understand them before reading the guide.

FS Series PV Modules Reverse Current Overload

Robot Light V2. User Manual

&%=579 OPERATING INSTRUCTIONS

PV Rapid Shutdown device

Document Issue or Modification Record. Edition Date ECN code Modification content Writed or modified. ADD 3.3.1(7) 3.3.1(8) 3.3.

Promopar ORDERCODE 30120

HD40H(X) Performance Series Camera. User Guide

HD Mini IR Waterproof Fixed Network Camera. Quick Start Guide. Version 1.2.0

Document Issue or Modification Record. Edition Date ECN code Modification content Writed or modified

Installation & Operation Instructions

Powergate3+ Decoder. Instruction manual and user s guide

HITACHI. EH-150 series PLC EH-RTD8 Resistance Temperature Detective input module Instruction manual. Safety precautions

HV-CS kv Edge Mount Triaxial Jack

LED W RGBA User Manual

Operating manual. Diagnostic adapter VAS Operating manual Diagnostic adapter VAS Client documentation Revision: 00 Version: 05/2018

MAXIMA+ Series Rotary Level Indicator

SUN KTL-M0 Quick Guide (Europe Edition) Issue: 01 Part Number: Date: HUAWEI TECHNOLOGIES CO., LTD.

HDCVI Dome Camera. User s Manual V1.0.1

Transcription:

Name 1601A Page 1 / 8

Name 1601A Page 2 / 8 1 Introduction Thanks for purchasing PV modules of HT SOLAR ENERGY JOINT STOCK COMPANY This manual refers to PV modules manufactured and sold by HT Turkey. This manual contains the installation and safe handling information of HT s PV module. All instructions shall be carefully read before installation. Please contact marketing department for further information if have any question. The installation staff shall be familiar with the mechanical and electrical requirement of PV system and shall comply with safety precautions listed in this manual and local law regulations when installing the modules. The company does not take the responsibility of the loss, damage, or expense arising which caused by any violation of this manual. This manual shall be properly kept for future reference such as maintenance, re-sale and disposal of the module at the end of its useful life. The company reserves the right of final interpretation of this installation manual. 2 Product Identification 1) Each module has a label on the back containing following information: Product type, weight, size, fuse current, the system max voltage, rated power measured under standard test conditions, rated current, rated voltage, open circuit voltage, short circuit current. 2) Bar code (serial number): each module is registered with a unique serial number. It is permanently fixed inside the module, which can be seen from the front of module. Explanation:Under standard test conditions (1000W / m² irradiance, AM=1.5, 25 C (77 F) ambient temperature), the electrical performance parameters of modules, such as Isc, Voc, and Pmax, will have ± 10% deviation compared to nominal value. 3 Tools & Materials for Installation 1) Screwdriver, Wrench 2) Mounting rack, stainless steel screws, nuts, washers, clamps and other accessories 4 Warnings 1) It requires specialized skills and knowledge for installation of solar photovoltaic systems and performed by qualified licensed professional installation staff. 2) PV modules generate DC electrical energy when exposed to sunlight or other light sources. Active

Name 1601A Page 3 / 8 parts of module such as terminals can result in burns, sparks, and lethal shock. 3) Apply modules to such as ground, roofs etc. outdoor environment. Appropriate rack structure shall be designed by system designer or installation staff. 4) Do not disconnect the cables of modules when modules are on operation. 5) Do not disassemble modules or move nameplate or any adhesion parts of modules. 6) Do not place the modules where it is easy to produce or gather combustible gases. 7) Artificially concentrated sunlight shall not be directed on the module. 8) Any dropping or covering on modules is not allowed. Do not tread, stand or walk on modules. 9) Do not pull or drag the modules by cables or connectors. 10) Keep children away from modules during transportation and installation, 11) Do not touch live terminals with bare hands. Use insulated tools for electrical connections. 12) Do not wear metal rings, bracelet, earrings, nose rings, lip rings or other metal accessories during transportation and installation,. 13) Do not destroy the structure of the module such as drill on the glass surface and frame which will void its warranty. 14) Do not destroy the modules edge seal which will void its warranty. 15) Any shading on the cells by fixture will downgrade the modules performance which will void its warranty. 16) Make sure the connection between the rack and PV module is firmly and without loosen. 5 System design Please use the the equipments, connectors, wires and rack which match with solar power system. In a particular system, be sure to apply the same type of modules. Please refer to the short-circuit current (Isc) and open circuit voltage (Voc) showing on modules label as proper value to install and design when determining settling parameters such as rated voltage, the wire capacity, fuse, the controller capacity and module output power of relevant parts of PV system. It need to take 1.25 times of Isc, Voc when design and installation modules.

Name 1601A Page 4 / 8 Make sure the array of modules should be installed within the Maximum permitted system voltage. And it need taken into the influence of environment temperature. 5.1 Appropriate install environment selection To ensure the system output power reach to maximum value, make sure there is no shading on the modules when choose the installation location at any circumstance. 5.2 Appropriate inverter selection It need take the output power, open-circuit voltage, short-circuit current of PV modules array into consideration when choose inverter type. And the minimum voltage of the module array should be higher than the threshold voltage of inverters to guarantee the inverters proper functioning. Below table 1 is the example of choosing inverters: the internal structure of inverters is showing in the following Figure 1, this inverter can be accessed into two module arrays. Figure 1 Inverter internal structure Table 1 Example of choosing inverters Module performance parameters Reference in choosing Requirements in inverters Notes inverters parameters Module power 260W Array Maximum 260*21= 5460 output output power 5460W W power Open-circuit voltage 37.6V 45.9V is calculated Maximum Maximu 21*45.9= based on T=-40, input voltage m system 963.9V voltage temperature voltage coefficient is -0.34%/K 1000V Short-circuit current 8.97A System MPPT Maxim irradiance current of 10.76A 1200W/m 2 short-circuit array current 15A Maximum quantity in Series connection of array 21 Pcs Starting voltage <Array input voltage The above suggestion about the choice of inverters is just for reference. The specific choice of inverters should contact with professional system design company.

Name 1601A Page 5 / 8 5.3 Installation Location Selection 1) In most applications, modules should be installed in a location where they will receive maximum sunlight throughout the year should guarantee no shading 2) It is suggest that the modules should facing south in northern hemisphere, and modules should facing north in southern hemisphere. 3) The tilt angle of the PV module is measured between the surface of the PV module and a horizontal ground surface (as shows in Figure 2). The PV module generates maximum output power when it faces the sun vertical. If you want the specific information of best install tilt angle, please consult the local authoritative solar system construction company. Figure 2 PV module tilt angle 5.4 Appropriate mounting rack selection The load calculation should be charged by system designers and installers to make sure all modules could bear predetermined load conditions. The choosing rack should pass all the inspection and test by third party test institution which possessing static mechanics analysis ability. 6 Modules Installation 6.1 Modules unpacking 1) Do not unpack modules in rainy weather. 2) The modules shall be placed horizontally after unpacking. Do not incline, stack or.lean modules. No inclining No stacking No Leaning 3) Modules should not be piled up together directly without any protection. In order to prevent the frame and glass from scratch, it need to apply specialized plastic or paper angle to separate the modules as showing in following Figure 3. The quantities of one pallet modules should not exceed 20. 6.2 Modules installing Method

Name 1601A Page 6 / 8 It is suggest using the following two installation methods and the materials could be decided by local requirement. 6.2.1 Clamping Method: Load 2400Pa(Using 4 clamps) Load 5400Pa(Using 4 clamps) Notes: L is the length of PV module, L 1640mm. Length of clamp 150mm. Load 2400Pa(Using 4 clamps) Load 5400Pa(Using 4 clamps) Notes: L is the length of PV module, 1640mm L 1956mm. Length of clamp 150mm. 6.2.2 Installed through mounting holes, match with M8 20mm nuts and bolts.

Name 1601A Page 7 / 8 L 1640mm 1640mm L 1956mm Load 2400Pa Load 5400Pa Load 2400Pa Load 5400Pa Using four mounting holes, position S or P is optional Using four mounting holes, position S or P optional Using four mounting holes, position S. 7 Electrical Connections 1) Please read the electrical wiring drawings carefully before connecting. For the IEC standard module, the maximum system voltage is 1000V DC. And the special module, the maximum system voltage is 1500V DC. 2) Connection of modules and junction box: the modules series and junction boxes shall be connected by DC cable. Cross-sectional area and connector capacity of the cable shall meet the maximum system short-circuit current (it is recommended 4mm2 for the cable cross-sectional area of an individual module. The diameter of cable is 4mm 2, and the application temperature range is -40~90. Connector rated current greater than 15A), otherwise the cable and connector would be overheating because of strong circuit. Please note that the maximum temperature of cables is 90, and the maximum temperature of connector is 125. 3) The modules and support could be grounded to Earth by grounding holes, to enhance the insulation effect. Detailed could find in following Figure 3. Grounding screw Stainless steel plain cushion M4 10~15mm M4 10~15mm Washers Bolt Nut

Name 1601A Page 8 / 8 Grounding cable Figure 3 Illustration of grounding 4) Electrical connection should conform with local electrical laws regulations. 5) Modules are equipped with bypass diodes, improper installation may damage diodes, cables or junction box. 6) Please wrap the connectors after taking out the modules without immediate installation to prevent damage caused by wind or rain. Use of lubricant on connectors is prohibited due to it will make the connector failure 7) Do not remove the waterproof rubber rings out of the junction box or connectors. 8) Use of diesel oil for heating is strictly prohibited at installation site. The gas produced by combustion of diesel and other petroleum products may cause the wiring boxes get cracking. 8 Maintenance 8.1 Check all electrical connections to ensure that there is no open circuit and well connected. 1) Check the open circuit voltage of each module: 2) Covered the modules completely by non-transparent material. 3) Disconnect the wire terminals 4) Remove the non-transparent material off the modules; check and measure the terminal open circuit voltage. 5) If the measured voltage is reduced by 1/4, it supposed to be bypass diode damaged. Please test the bypass diode performance. 8.2. It s recommend that adopt the following maintenance to ensure the modules maintain the best performance: 1) If necessary, Please clean the glass surface of modules by soft sponge or wiping cloth with water. A mild without abrasive cleaning agent can be used to remove stubborn dirt. 2) Mechanical and electrical checks are required every six months to ensure the modules connectors clean and reliable connected. 3) It need consult qualified person to check the modules if have any doubt on the modules.