A Guide to the Input Data and Model of the 2018 National Electricity Market Electricity Statement of Opportunities

Similar documents
2018 Summary Report into the cyber security preparedness of the National and WA Wholesale Electricity Markets. AEMO report to market participants

AEMO S RESPONSE TO MARKET AUDITOR S REPORTS FOR AUDIT PERIOD 1 AUGUST 2015 TO 30 JUNE 2016

WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES

GBB (WA) 1.11 (BUILD 345) RELEASE NOTES

GBB (WA) 1.8 (BUILD 316) RELEASE NOTES

VAR DISPATCH WEB INTERFACE USER GUIDE VERSION 0.3

METERING SERVICE PROVIDER REGISTRATION PROCEDURE (PART1)

TRIP OF CLARE SOUTH TOWNSVILLE SOUTH 132 KV TRANSMISSION LINE ON 24 JUNE 2015

GUIDE TO GAS SUPPLY HUB CSV FILE TRANSACTIONS

MMS DATA SUBSCRIPTION SERVICES USER INTERFACE GUIDE

MMS DATA MODEL GUI INSTALLER GUIDE

Guide to Contract Reference Selections 1.00 Final March 2019

METERING SERVICE PROVIDER APPLICATION FORM (PART 2)

Data Interchange Framework and Glossary 1.01 Final September 2018

Power System Operating Incident Report Trip of Calvale No.2 275kV busbar and Calvale-Halys 8810 and 8811 transmission lines on 30 March 2014

GUIDELINES FOR SHARED TRANSMISSION CONNECTIONS IN VICTORIA

ALLOCATION OF EMBEDDED NETWORK CODES

ASX Austraclear. EXIGO Common Gateway GUI version 1-11 (Production and Test Bed) (HTHL File Upload) Installation and User Guide

3.1. Taiwan Solar PV On-Grid and Off-Grid Cumulative Installed Capacity,

Forced and Planned Outage Substitution, RAAIM Pre-Calc

TERMS & CONDITIONS. Complied with GDPR rules and regulation CONDITIONS OF USE PROPRIETARY RIGHTS AND ACCEPTABLE USE OF CONTENT

AdviserCentral. Reverse Fact Find Creation. Release 5

THE NATIONAL GAS MARKET BULLETIN BOARD - PARTICIPANT REGISTRATION KIT

GUIDE TO B2B VALIDATION MODULE SOFTWARE COVERS THE SET-UP AND USE OF THE B2B VALIDATION MODULE SOFTWARE

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7

GBB (WA) REPORT APPLICATION PROGRAMMING INTERFACE (API) VERSION 1.5

Creating Custom Patches through Packing List Utility

WEMS SUBMISSION SPECIFICATION VERSION 5.0

GUIDE TO DATA SUBSCRIPTION PROVIDES INSTRUCTIONS FOR USING THE DATA SUBSCRIPTION WEB INTERFACE IN THE EMMS MARKETS PORTAL. Version: 3.

ReferencePoint TM Corporate Actions Dissemination Guide

Submission to the Senate Legal and Constitutional Affairs Legislation Committee on the Migration Amendment (Offshore Resources Activity) Repeal Bill

Prizetech Privacy Policy

SAP SMS 365 SAP Messaging Proxy 365 Product Description August 2016 Version 1.0

EMMS DATA INTERCHANGE GUIDE

B2B MAPPING TO ASEXML

NEM 12&13 FILE FORMAT CLARIFICATIONS

Your Health. Your Safety. Our Commitment. Violence Assessment Tool. Online User Guide

Assembly of glass fiber optic cables

Description of the Application Process for Small Embedded Generators

C4C30. SAP Cloud Applications Studio COURSE OUTLINE. Course Version: 21 Course Duration: 4 Day(s)

SAP Enable Now. Desktop Components (Cloud Edition)

HA215 SAP HANA Monitoring and Performance Analysis

Specific Terms And Conditions for hi!share International Prepaid Airtime Top- Up Value Added Service ( hi!share International Terms )

B2B PROCEDURE ONE WAY NOTIFICATION PROCESS

CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL

BW305. SAP Business Warehouse Query Design and Analysis COURSE OUTLINE. Course Version: 15 Course Duration: 5 Day(s)

Engaging the new energy consumer

CARBON FOOTPRINT MONITORING THROUGH INNOVATION

Week 2 Unit 3: Creating a JDBC Application. January, 2015

Why Reducing File Size Should Be a Top Priority in Your Organization

User Manual Price List Import

HA150 SQL Basics for SAP HANA

My Locations help guide

Installing Your Microsoft Access Database (Manual Installation Instructions)

HA100 SAP HANA Introduction

BCDC 2E, 2012 (On-line Bidding Document for Stipulated Price Bidding)

Submission to the International Integrated Reporting Council regarding the Consultation Draft of the International Integrated Reporting Framework

HA215 SAP HANA Monitoring and Performance Analysis

Terms and Conditions for External accounts Service

Network Configuration Document Selection for New Substations Framework

CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL

Data Centers: The Case For Energy Risk Management and Energy Reliability

BC404. ABAP Programming in Eclipse COURSE OUTLINE. Course Version: 16 Course Duration: 3 Day(s)

Introduction to ASX Derivatives Clearing System Open Interface V1.4.4

Accountants. Enterprise. Installation Guide. Administration Centre. Version 3.0

GENERAL PRIVACY POLICY

Transitioning from Migration Workbench to Data Workbench

Terms and Conditions of Website Use

SurvalentONE Distribution Management System

Public vs private cloud for regulated entities

FAQs Data Workbench SAP Hybris Cloud for Customer PUBLIC

Accounts. User Guide December 2016 Version 1.5

MSATS USER INTERFACE GUIDE

Overview. Business value

Organize and Deliver Digital Assets Using Adobe Experience Manager v6.x Student Workbook

HA240 Authorization, Security and Scenarios

HA150. SAP HANA 2.0 SPS02 - SQL and SQLScript for SAP HANA COURSE OUTLINE. Course Version: 14 Course Duration: 3 Day(s)

HA100 SAP HANA Introduction

ECDL / ICDL Spreadsheets Level 1 Syllabus Version 1.0 (UK)

The HIPAA Security & Privacy Rule How Municipalities Can Prepare for Compliance

SAP HANA Operation Expert Summit PLAN - Hardware Landscapes. Addi Brosig, SAP HANA Product Management May 2014

Financial Statements XBRL Utility v Release Notes

Quick Start Guide. BlackBerry Workspaces app for Android. Version 5.0

HA100 SAP HANA Introduction

Odette MMOG.np Converter Tool

Shoper 9 Tally.ERP 9 Data Bridge

Support Policy and Service Level Commitment

CitiManager. Registering for CitiManager, Enrolling in Paper-Free Statements, and Viewing Your Electronic Statement

CLD100. Cloud for SAP COURSE OUTLINE. Course Version: 16 Course Duration: 2 Day(s)

Depository. User Guide June 2016 Version 1.5

NEXT GENERATION Data Centres FOR NEW GENERATION. Technology

MDG100 Master Data Governance

Optimize Data Quality for Input to Critical Projects

NEW TRAFFIC SOURCE Very affordable CHEAP! High quality!

ADM506. Database Administration Oracle II COURSE OUTLINE. Course Version: 15 Course Duration: 2 Day(s)

Company presentation Transition and Transformation

SAP 3D Visual Enterprise 9.0: Identifiers in VDS Files

Open Data Policy City of Irving

Product Introduction: TSM-PC/PA05A

BC414. Programming Database Updates COURSE OUTLINE. Course Version: 15 Course Duration: 2 Day(s)

Transcription:

August 2018 A Guide to the Input Data and Model of the 2018 National Electricity Market Electricity Statement of Opportunities

PURPOSE AEMO has prepared this document to assist stakeholders in interpreting and using the input data produced for the purposes of modelling the National Electricity Market (NEM). DISCLAIMER This document or the information in it may be subsequently updated or amended. This document does not constitute legal or business advice, and should not be relied on as a substitute for obtaining detailed advice about the National Electricity Law, the National Electricity Rules, or any other applicable laws, procedures or policies. AEMO has made every effort to ensure the quality of the information in this document but cannot guarantee its accuracy or completeness. Accordingly, to the maximum extent permitted by law, AEMO and its officers, employees and consultants involved in the preparation of this document: make no representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of the information in this document; and are not liable (whether by reason of negligence or otherwise) for any statements or representations in this document, or any omissions from it, or for any use or reliance on the information in it. VERSION CONTROL Version Release date Changes 1 24/08/2018 2018 Australian Energy Market Operator Limited. The material in this publication may be used in accordance with the copyright permissions on AEMO s website.

1. Configuring the 2018 NEM ESOO Model 4 2. 2018 NEM ESOO Model Naming Convention 7 3. Further details 8 Table 1 Zip files from AEMO s 2018 ESOO webpage 4 Table 2 2018 NEM ESOO Model naming convention 7 Figure 1 Contents of 2018 ESOO Model folder 5 Figure 2 Contents of Load Traces folder 5 AEMO 2018 2018 ESOO Input Data Package and Model 3

This chapter contains the steps needed to set up the 2018 ESOO PLEXOS market model, including configuration of the input data package used in the simulation model. The step by step guide is documented below. 1. Download the zip files from AEMO s 2018 Electricity Statement of Opportunities (ESOO) webpage. The list of zip files is summarised in Table 1. Table 1 Zip files from AEMO s 2018 ESOO webpage No File Description 1 2018 ESOO Model.zip Contains model files, constraint equation workbooks, and associated parameter files. 2 2018 Large Scale Solar Traces.zip Contains half-hourly generation traces for named solar projects. 3 2018 REZ Solar Traces.zip Contains half-hourly generation traces for solar in ISP REZ zones. 4 2018 REZ Wind Traces.zip Contains half-hourly generation traces for wind in ISP REZ zones. 5 2018 Wind Traces.zip Contains half-hourly generation traces for named wind projects. 6 2018 Zonal Solar Traces.zip Contains half-hourly generation traces for solar in NTNDP zones. 7 Constraint Ratings.zip Contains half-hourly line ratings for Victorian transmission lines. 8 OP_Underlying_NES_Trace.zip Contains half-hourly regional demand traces for underlying demand (demand before the impact of rooftop PV). 9 OPSO.zip Contains half-hourly regional demand traces for operational demand (demand after the impact of rooftop PV). 10 PV Traces.zip Contains half-hourly regional generation traces for rooftop PV. 2. Unzip the file 2018 ESOO Model.zip. This will generate the 2018 ESOO Model folder. The contents of the 2018 ESOO Model folder are illustrated in Figure 1. AEMO 2018 2018 ESOO Input Data Package and Model 4

Figure 1 Contents of 2018 ESOO Model folder 3. Open the Load Traces folder. 4. Extract the other nine zip files into the Load Traces folder, as listed in Table 1. 5. The Load Traces folder should then contain the following folders, as shown in Figure 2. Figure 2 Contents of Load Traces folder AEMO 2018 2018 ESOO Input Data Package and Model 5

6. The 2018 ESOO modelling has been performed under three core scenarios and two ISP development sensitivities. These scenarios and sensitivities contain varying outlooks for future supply and demand. The three core BAU scenarios are Neutral, Fast change and Slow change while the two development sensitivities are ISP without Snowy 2.0 and ISP with Snowy 2.0. These sensitivities are modelled using different sets of constraints workbooks and are setup in two separate model files. a. The core BAU scenarios are set up in 2018 ESOO Model.xml. i. To run the core scenarios, copy and rename NTNDP BAU.XML to NTNDP.XML. b. The ISP development sensitivities are set up in 2018 ISP ESOO Model.xml. i. To run the ISP without Snowy 2.0 sensitivity, copy and rename NTNDP ISP.XML to NTNDP.XML. ii. To run the ISP with Snowy 2.0 sensitivity, copy and rename NTNDP ISPS.XML to NTNDP.XML. AEMO 2018 2018 ESOO Input Data Package and Model 6

A set of naming conventions is developed in the 2018 NEM ESOO to shorten the model names in order to comply with the maximum number of characters allowed in naming models in PLEXOS. Table 2 describes the model naming convention used in the 2018 NEM ESOO. The jobsets populated in this model reflect this naming convention. For example, the jobset _tesoo_sn_y1828_p10_r1718_dbau represents the following assumptions: Neutral demand scenario. A model horizon between 2018-19 and 2027-28. The POE10 peak demand forecast The 2017-18 reference year. The ESOO BAU scenario that assumed only existing and committed projects. Table 2 2018 NEM ESOO Model naming convention Descriptor Prefix Options Description Project _t ESOO 2018 NEM ESOO Scenario _s N, S, W N = Neutral economic conditions (Neutral pace of change) S = Strong economic conditions (Fast pace of change) W = Weak (Slow pace of change) Year _y 1828 Financial years starting from 2018-19 to 2027-28 Probability of Exceedance _p 10, 50 10 = 10% POE 50 = 50% POE Reference Year _r 1011 to 1718 Eight reference years on which Demand, Solar and Wind traces are based (2010-11 to 2017-18) Sensitivity _d BAU ISP ISPS BAU = Business as usual ISP development plan without Snowy 2.0 ISP development plan with Snowy 2.0 AEMO 2018 2018 ESOO Input Data Package and Model 7

The model is populated with the settings that were used in the 2018 ESOO modelling which was run using custom results extraction tools on a cloud simulation platform. Desktop applications may require changes to settings to reduce the size of simulations and allow for results to be produced in other forms. Two separate model files are provided. 2018 ESOO Model.xml this contains the BAU scenarios for Neutral, Strong (Fast change) and Weak (Slow change) 2018 ESOO ISP Model.xml this contains the neutral BAU ISP development plan sensitivities for with and without Snowy 2.0 PLEXOS 7.500 R02 x64 Edition was used to create and run the 2018 ESOO scenarios. Each model was run using a Split Execution with the number of splits equal to the number of samples. The ESOO was run with the OpenPLEXOS NEMConstraints assembly applied. This allows the application of transmission constraint equations contained in the constraint workbooks provided. Both the PLEXOS software and the OpenPLEXOS assemblies are available from Energy Exemplar. The models can be run without the OpenPLEXOS assembly but would not incorporate the impact of transmission constraint equations. The constraints workbooks represent the constraints that are relevant for assessing reliability. These constraint sets do not account for all transmission limitations in the NEM. The constraint sets applied are focused on constraints that impact reliability outcomes. The constraints workbooks also include outage constraint sets which are triggered based on outage variables specified in the model. These constraints should be ignored if simulating for another purpose, or when transmission outages are not considered. The constraints workbooks also change depending on the model run (BAU, ISP, ISPS). These are controlled through the NTNDP.xml file. AEMO 2018 2018 ESOO Input Data Package and Model 8